Академический Документы
Профессиональный Документы
Культура Документы
Presupuesto
Obra 0302004
01.00.00.0 ESTRUCTURAS
01.01.00.0 TRABAJOS PRELIMINARES
01.01.01.0 LIMPIEZA DE TERRENO MANUAL M2 899.53 0.89
01.01.02.0 TRAZO, NIVELES Y REPLANTEO M2 790.77 2.51
01.04.01.0 ZAPATAS
01.04.01.1 MORTERO f'c=175 kg/cm2 M3 14.40 366.16
01.04.01.2 FIERRO CORRUGADO 1/2", Fy=4200 kg/cm2 KG 374.17 6.56
01.04.07.5 RAMPA
01.04.07.6 MORTERO f'c=210 kg/cm2 M3 2.96 432.31
01.04.07.7 FIERRO CORRUGADO 1/2", Fy=4200 kg/cm2 KG 228.32 6.56
01.04.07.8 ENCOFRADO Y DESENCOFRADO M2 8.89 41.29
01.05.00.0 ALBAILERIA
01.05.01.0 MURO DE LADRILLO TUBULAR; aparejo de canto; c:a 1:5; e=1.50 cm. M2 308.75 36.38
01.05.02.0 MURO DE LADRILLO TUBULAR; aparejo de soga; c:a 1:5; e=1.50 cm. M2 230.45 40.45
01.05.03.0 ALAMBRE DE REFUERZO EN MUROS DE ALBAILERIA KG 70.35 6.76
02.00.00.0 ARQUITECTURA
02.01.00.0 COBERTURAS
02.01.01.0 CORREA DE MADERA 2" x 4" M 543.77 15.73
02.01.02.2 COBERTURA CON PLANCHA DE POLIPROPILENO M2 845.28 39.82
02.01.03.0 CUMBRERA CON PLANCHA DE POLIPROPILIENO M 43.38 22.54
02.01.04.0 FRISO DE PLANCHA PLANA DE ETERNIT"; incluye soportes de madera 2" x 2" M 216.35 29.05
02.01.05.0 COBERTURA CON PLANCHA DE ETERNIT EN CULATA M2 8.34 56.93
02.01.06.0 MALLA MOSQUITERO PLASTICA M2 36.06 23.30
02.02.00 CIELORRASO
02.02.01.0 CIELO RASO CON PLANCHA PANEL DE FIBROCEMENTO; incluye entramado de mader
M2 845.28 48.10
02.08.00.0 CERRAJERIA
02.08.01.0 BISAGRA CAPUCHINA ALUMINIZADA 3 1/2" x 3 1/2" UND 57.00 8.56
02.08.02.0 CERRADURA DE 3 GOLPES PARA PUERTA EXTERIOR UND 8.00 81.67
02.08.03.0 CERRADURA PARA PUERTA INTERIOR DEL TIPO EXPOLOCK UND 15.00 29.28
02.09.00.0 PINTURA
02.09.01.0 PINTURA LATEX EN CIELORASO; 2 manos M2 845.28 10.74
02.09.02.0 PINTURA LATEX EN MUROS; 2 manos M2 823.87 10.58
02.09.03.0 PINTURA ANTICORROSIVA Y ESMALTE EN PUERTAS METALICAS; 2 manos c/u M2 35.10 10.80
02.09.04.0 PINTURA BARNIZ EN CARPINTERIA DE MADERA; 2 manos M2 49.65 10.65
02.10.00.0 VARIOS
02.10.01.0 BANCA C:A REVESTIDO CON CERAMICA M2 3.80 415.88
02.10.02.0 MESA C:A REVESTIDO CON CERAMICO M2 18.68 416.98
20/06/2007
SAN JUAN
800.58
1,984.83 2,785.41
1,566.43
2,355.31
7.33
1,941.22
2,522.56
782.21
3,802.00 12,977.06
149.95 149.95
5,272.70
2,454.56 7,727.26
13,536.94
11,121.76
20,985.64 45,644.34
516.29
756.11
938.47
929.03 3,139.90
3,214.88
9,431.51
10,305.98 22,952.37
6,770.30
10,655.15
8,205.56 25,631.01
369.82
1,226.00
365.44
831.99 2,793.25
1,279.64
1,497.78
367.07 3,144.49
11,232.33
9,321.70
475.57 21,029.60
5,020.56
1,118.16
915.20
630.45
950.30
3,478.72
3,335.44
1,247.88
1,661.92
1,704.94
459.90
902.64
1,200.62
781.68
516.88
311.62
1,510.04
630.40
471.21 174,823.20
8,553.50
33,659.05
977.79
6,284.97
474.80
840.20 50,790.31
40,657.97 40,657.97
7,925.17
14,022.27
5,256.58
1,297.90 28,501.92
9,937.64
1,533.19
20,207.36
16,649.72
825.91
510.74
934.37 50,598.93
35,225.08
3,931.69
613.76 39,770.53
2,133.97
510.00
460.00
480.00
510.00
370.00
380.00
1,500.00
860.00
1,000.00
460.00
69.31
13,874.00
4,622.88
790.65
2,070.96
2,518.47
427.68
2,801.76
7,293.30 43,132.98
1,030.10
4,452.60
1,754.70
2,681.25
782.74
494.89
494.89 11,691.17
487.92
653.36
439.20 1,580.48
9,078.31
8,716.54
379.08
528.77 18,702.70
1,580.34
7,789.19 294,796.52
116.16
116.16
98.49 330.81
4,305.35
3,665.92
263.64 8,565.72
3,261.14
2,983.00
1,050.09
890.43
893.91
5,025.24
530.60
669.06
530.60
106.12
207.68
2,112.84
1,936.77
1,936.77 22,134.25
500,319.69
500,319.69
====================
500,319.69
====================
S10 Pgina :
J & M Service Fecha :
Presupuesto
Obra 0302004 CONSTRUCCION ECOPARQUE AMAZONAS LORETO (PERU)
COSTO DIRECTO
================================================
TOTAL
================================================
20/06/2007
SAN JUAN
ado
0.8
0.80 27.42 1,124.38 1,405.48 3,635.75 0.8
0.80 27.42 685.60 857.00
0.80 26.46 79.39 99.24
0.80 26.46 26.46 33.08
0.80 27.66 82.97 103.71
0.80 12.64 341.28 426.60
0.80 12.64 63.20 79.00
0.80 15.17 136.51 170.64
0.80 8.40 168.00 210.00
0.80 8.40 33.60 42.00
0.80 1.52 12.16 15.20
0.80 1.52 54.72 68.40
0.80 1.52 50.16 62.70
0.80 1.52 50.16 62.70 22,134.25
2,908.60 3,635.75
500,319.69
====================
500,319.69
====================
2908.6
S10 Pgina : 1
J & M Service Fecha :
Partida 01.05.01.0 MURO DE LADRILLO TUBULAR; aparejo de canto; c:a 1:5; e=1.50 cm.
Rendimiento 10.00 M2/DIA Costo unitario directo por : M2 36.38
Partida 01.05.02.0 MURO DE LADRILLO TUBULAR; aparejo de soga; c:a 1:5; e=1.50 cm.
Rendimiento 8.00 M2/DIA Costo unitario directo por : M2 40.45
Partida 02.01.04.0 FRISO DE PLANCHA PLANA DE ETERNIT"; incluye soportes de madera 2" x 2"
Rendimiento 80.00 M/DIA Costo unitario directo por : M 29.05
Partida 02.02.01.0 CIELO RASO CON PLANCHA PANEL DE FIBROCEMENTO; incluye entramado de ma
Rendimiento 20.00 M2/DIA Costo unitario directo por : M2 48.10
Partida 02.03.02.0 TARRAJEO DE MUROS INTERIORES Y EXTERIORES; mezcla c:a 1:5; e=1.5 cm
Rendimiento 12.00 M2/DIA Costo unitario directo por : M2 17.02
Partida 02.04.02.0 PISO CEMENTO PULIDO COLOREADO; e=1"; mortero c:a 1:2
Rendimiento 10.00 M2/DIA Costo unitario directo por : M2 27.62
Partida 02.04.04.0 VEREDA; e=4"; mortero fc=140 kg/cm2; incluye ejecucin de uas y acabado final
Rendimiento 60.00 M2/DIA Costo unitario directo por : M2 50.28