1. Company policy is to provide sufficient volume to close, open and close again
all rams and annulars using the information below, calculate required volume.
2. According to API RP 53, what is the maximum allowable closing time for a 20"
annular?
30 seconds
60 seconds
2 minutes
45 seconds
4. Indicate the activities that may be carried out with the BOP stack shown below.
74
5. Indicate the activities that may be carried out with the BOP stack shown below.
a Pipe rams
b Blind rams
a Annular
d HCR valves
e Pipe rams and HCR valves.
7. Which two pressure readings would decrease if you operated the pipe rams?
a Manifold pressure
b Annular pressure
c Accumulator pressure
d Precharge pressure
8. Which of the two tools below would you use if you wanted to test the BOP stack
and the wellhead / upper casing seals.
9. Identify which type of valve should be used for the operations listed.
75
10. Identify the situations in which a BOP pressure test is required per API RP-53.
11. Identify from the sketch below, which valves should be opened to circulate the
well through the remote adjustable choke and the mud gas separator. The well
is closed in on the annular.
FLOWLINE
NON-RETURN
VALVE
REMOTE CHOKE
TO MUD TANKS
MUD
PUMP
TO MGS
CEMENT
PUMP KILL TO VENTLINE
MANUAL
CHOKE
Valves
76
In each of the following problems ( 12 through 15 ) below write the letter from the list
below that best describes the reason for the pressure gauge readings.
12.
Problem
13.
Problem
14.
Problem
15.
Problem
77
16. What is the primary function of weep holes (drain hole, vent hole) on a ram
type BOP? (Choose one answer).
17. You only have one inside BOP with an NC50 (4-1/2" IF) lower connection on
your rig but the drill string consists of 5" HWDP, and 8" collars. Which one of
the following crossovers would you have on the drill floor in case of a kick while
tripping?
Type 1 Type 2
a. Requires the use of a key to close
b. Must not run In the hole in the closed position
c. Has to be pumped open to read "shut-in drillpipe pressure"
d. Will not allow for wireline to be run inside the drill string
e. Has potential to leak through the open/close key
f. Easier to stab if strong flow is encountered up the drillstring
78
19. Mark the following with "+" if it is an advantage or "-" if it is a disadvantage of
using a float valve in the drill string.
20. The following statements relate to the driller's remote control BOP control panel
located on the rig floor. Decide if the statements are true or false.
a. If you operate a function without operating the master control valve that
function will not work.
FALSE
b. The master control valve on an air operated panel allows air pressure to
go to each function in preparation for you operating the function.
FALSE
c. The master control valve must be held depressed while BOP functions
are operated.
FALSE
d. The master control valve must be depressed for five seconds then
released before operating a BOP function.
TRUE
21. A BOP operating unit has 8 accumulator bottles, each with a capacity of 10
gallons.
What is the total usable fluid volume when the minimum BOP Operating
pressure is 1200 psi ?
gallons
79
B.O.P. Remote Panel
22. On a 3000 psi accumulator system what are the normal operating pressures
seen on the following gauges?
Gauge #1 psi
Gauge #2 psi
Gauge #3 psi
Gauge #4 psi
23. On which 2 gauges on the remote panel would you expect to see reduction in
pressure when the annular preventer is being closed?
Gauge #1
Gauge #2
Gauge #3
Gauge #4
80
24. If gauge #1 reads 0, which of the following statements is true?
25. Mark an "X" in the box where the problem relates to the cause:
26. Which one of the following Problems above (a, b, c, or d) has not stopped the
BOP from closing? Circle your answer.
1
2
3
4
81
27. Which of the following statements is true concerning Ram Packing Element?
82
29. Indicate the numbers in the following boxes which correspond with the items in
the picture below:
a. Closing Chamber.
b. Opening Chamber.
c. Wear Plate.
83