Winding resistance measurement


Turns ratio test AC voltage
and OLTC analysis DC current

RMO-T series TRT series


RMO-TW TRT03
RMO-TD TRT30
RMO-TT TRT33
TWA series TRT4x
TWA25A TRT63
TWA40D

3 | 2016 DV Power All Rights Reserved.


Transformer Tests using DV Power Devices
TYPES OF MEASUREMENTS
Winding resistance measurement (IEC 60076-1) RMO-T, TWA
Analysis of On-Load Tap changers (IEC 60214-1) RMO-T, TWA
Heat run test (IEC 60076-2) RMO-T
Demagnetization process RMO-T, TWA, DEM
Turns ratio measurement of power transformers (IEC 60076-1) TRT
Turns ratio verification of instrument transformers (IEC 60076-1) TRT
Excitation current measurement TRT
Phase angle measurement TRT
Vector group detection TRT
Demagnetization status verification TRT
Magnetic balance test TRT

4 | 2016 DV Power All Rights Reserved.


RMO-T and TWA Family of Devices
Transformer Tests using DV Power Devices
TYPES OF TESTS (RMO-T and TWA family)

Winding resistance measurement RMO-T, TWA


Analysis of On-Load Tap changers RMO-T, TWA
Heat run test RMO-T
Demagnetization process RMO-T, TWA, DEM

6 | 2016 DV Power All Rights Reserved.


Device Series Development Evolution

RMO-TW series
winding resistance measurement The most advanced on the market

TWA40D
RMO-TD series
+ connection of all 8 (or 6) bushings at once
+ tap changer analysis (DVtest)
+ OLTC synchronization measurement
+ OLTC motor current measurement
+ simultaneous three-phase measurement
+ demagnetization process
+ fast measurement

RMO-TT series
+ temperature measurement channels

7 | 2016 DV Power All Rights Reserved.


Winding Resistance Measurement
Why is it important?
Winding and connection damages
OLTC contact malfunctions
Defined by standard

How is it performed?
Injecting DC current, measuring voltage drop,
calculating resistance R = U / I
Should be done for all phases and every tap position
Compared to reference measurement, across phases

8 | 2016 DV Power All Rights Reserved.


Winding Resistance Measurement
How difficult it can be?
Time to inject DC current to a winding (charging)
Stabilization time

9 | 2016 DV Power All Rights Reserved.


Winding Resistance Measurement
Charging time
Volt-seconds needed
100 kV winding at 50 Hz needs 450 Vs
100 kV winding at 60 Hz needs 375 Vs
Thus, 50 Hz winding needs 75 s at 6 V
Or, 8 s at 60 V
Residual flux makes time 0.25 1.7 times longer

All our devices have charging voltage up to 55 V DC!

10 | 2016 DV Power All Rights Reserved.


Winding Resistance Measurement
Stabilization time
Depends on time constant L/R
Eliminate inductance influence
By saturating the core

11 | 2016 DV Power All Rights Reserved.


Winding Resistance Measurement
How to saturate the core

Use high current


Low current may not saturate the core in a reasonable time
High current may heat up the winding

Higher current => better saturation => lower L => shorter time

12 | 2016 DV Power All Rights Reserved.


Winding Resistance Measurement
How to saturate the core

To get saturation 1.2 x Iex = 1.2 x 2-5% In


To avoid heating of the wire <10% In
10% of nominal current
Current cannot be reached? Winding resistance too high Device
power limit reached, lower the current value

Our instruments can generate up to 100 A DC!

13 | 2016 DV Power All Rights Reserved.


Winding Resistance Measurement
Measuring at LV side may take very long time

LV side may have very low resistance


Therefore large time constant L/R
On large units stabilization may take 15-60 minutes
Sometimes even 100 A might not be enough to significantly shorten
the time

Use HV winding as an additional help for faster saturation!

14 | 2016 DV Power All Rights Reserved.


Winding Resistance Measurement
Saturation by one or two windings?

15 | 2016 DV Power All Rights Reserved.


Winding Resistance Measurement
Measuring at LV side by saturating core from HV side

Less current required


Need more cables on top of the transformer (if using single-phase
devices)
Need a little more thinking prior to the test (if using single-phase
devices)

On a large GSU transformers this can speed up the


measurement 10 to 20 times!

16 | 2016 DV Power All Rights Reserved.


Tap Changer DVtest Method
Why is it important?
New method (used and approved by MR and ABB)
Detecting problems within tap changer
No need to extract tap changer from the transformer
How is it performed?
Injecting and recording DC current through winding
Changes of current reflect changes of resistance/reactance

17 | 2016 DV Power All Rights Reserved.


Tap Changer DVtest Method
Cooperation with MR tap changers
Maschinenfabrik Reinhausen the one of the
biggest tap changer manufecturer in the world

Link for the brochure

18 | 2016 DV Power All Rights Reserved.


The Result is a Graph

19 | 2016 DV Power All Rights Reserved.


The Result is a Graph

20 | 2016 DV Power All Rights Reserved.


Why bother?

Give me one good reason to test!

I will give you 4

21 | 2016 DV Power All Rights Reserved.


Reason 1

40% of problems in transformers

22 | 2016 DV Power All Rights Reserved.


Reason 2

About one in 20 OLTC failures lead to


transformer main tank failure

- Presentation on OLTC diagnostics, Laurent Allard, ABB Secheron, Euro TechCon


Chester UK 2010

23 | 2016 DV Power All Rights Reserved.


Reason 3

HQ study showed 12% require maintenance


before manufacturers suggested period.

- WECC Substation WG meeting minutes, Vancouver Washington, May 2006

24 | 2016 DV Power All Rights Reserved.


Reason 4

About 33% of OLTC failures are caused by


incorrect maintenance and bad reassembly.

- P.Kang, D. Birthwistle, et al. "Non invasive on line condition monitoring of OLTC",


IEEE proceedings January 2000, Generation, transmission and distribution, Volume 3,
pp.2223-2228

25 | 2016 DV Power All Rights Reserved.


Heat Run Test
Why is it important?
Detecting winding hot spot temperature
Performed by transformer manufacturer

How is it performed?
Measuring winding resistance during transformer cooling
Measuring ambient temperature, top and bottom oil layer
temperature
Extrapolating resistance curve

26 | 2016 DV Power All Rights Reserved.


Demagnetization
Why is it important?
Remanent magnetism can cause various problems:
High amplitude inrush current at start-up of power transformer,
Incorrect operation of protective relays,
Erroneous results during electrical measurements on transformer
(FRA test, excitation current measurement)

27 | 2016 DV Power All Rights Reserved.


Causes of Transformer Magnetization

When disconnecting a transformer from service


Consequence of high fault currents
Test using DC current

28 | 2016 DV Power All Rights Reserved.


Inrush Current

Comparison of maximum inrush current with and without


residual flux

29 | 2016 DV Power All Rights Reserved.


Calculation

It was shown that inrush currents calculated at


the head of the feeder were reduced by about
60% when a power transformer was previously
demagnetized.

- B. Kovan, F. de Leon, D. Czarkowski, Z. Zabar, L. Birnebaum, 2011: "Mitigation of


Inrush Currents in Network Transformers by Reducing the Residual Flux With an
Ultra-Low-Frequency Power Source", IEEE Transactions on Power Delivery, vol. 26
issue 3, 1563-1570.

30 | 2016 DV Power All Rights Reserved.


How?

DV Power has developed a simple and very effective


demagnetization method:
Internally changing the polarity of a controlled DC
current
Current is supplied at decreasing magnitude for each
step
Safely discharges the energy and guarantees the
current magnitude

31 | 2016 DV Power All Rights Reserved.


How?

Every next step, value of current will be 60% of the


previous value
This will continue until 5 mA value is reached

32 | 2016 DV Power All Rights Reserved.


etization process implies reducing the surface of the hysteresis loop
Theory
etization is succesfull if the surface of hysteresis loop is small enough

Alternate direction
Lower the magnitude
Bring flux to 0

36/47

33 | 2016 DV Power All Rights Reserved.


Why demagnetization

Before AC tests to avoid bad results due to remnant


magnetism
Before putting a transformer back in service to avoid high
inrush currents
Requires some additional time for tests, but improves
safety

34 | 2016 DV Power All Rights Reserved.


Winding Ohmmeters
RMO-TW series
RMO10TW
RMO20TW
RMO30TW
RMO50TW

35 | 2016 DV Power All Rights Reserved.


Winding Ohmmeters
RMO-TW series

RMO100TD RMO10TW RMO20TW RMO30TW RMO50TW

Max. current 10 A DC 20 A DC 30 A DC 50 A DC

Max. charging voltage 55 V DC 55 V DC 55 V DC 55 V DC

Typical accuracy 0,1% 0,1% 0,1% 0,1%

Resolution 0,1 0,1 0,1 0,1

36 | 2016 DV Power All Rights Reserved.


Tap Changer Analyzers &
Winding Ohmmeters

RMO-TD series
RMO25TD
RMO40TD
RMO60TD

37 | 2016 DV Power All Rights Reserved.


Tap Changer Analyzers &
Winding Ohmmeter

RMO-TD series
O00TD RMO60TT RMO40TD
RMO25TD RMO60TD
Max. current 25 A DC 40 A DC 60 A DC

Max. charging voltage 55 V DC 55 V DC 55 V DC

Typical accuracy 0,1% 0,1% 0,1%

Resolution 0,1 0,1 0,1

Built-in TC control Optional Optional Included

38 | 2016 DV Power All Rights Reserved.


Tap Changer Analyzers &
Winding Ohmmeters

RMO-TT series
RMO40TT
RMO60TT
RMO100TT

39 | 2016 DV Power All Rights Reserved.


Tap Changer Analyzers &
Winding Ohmmeter

RMO-TT series
RMO60TT RMO60TT
RMO40TT RMO100TT
Max. current 40 A DC 60 A DC 100 A DC

Max. charging voltage 55 V DC 55 V DC 55 V DC

Typical accuracy 0,1% 0,1% 0,1%

Resolution 0,1 0,1 0,1

Temperature channels 3 3 6

Built-in TC control Included Included Included

40 | 2016 DV Power All Rights Reserved.


Tap Changer & Winding Analyzer
TWA40D

Three-phase instrument
One-time connection of all 6-8 bushingss
All 6 resistances measured in one test
Max. 25 A per phase in step by step test
Max. 40 A, 13 A per phase in OLTC
synchronization test

41 | 2016 DV Power All Rights Reserved.


Tap Changer & Winding Analyzer
TWA series
TWA25A TRT03C
TWA40D
Max. current 25 A DC 40 A DC

Max. charging voltage 55 V DC 55 V DC

Typical accuracy 0,1% 0,1%

Resolution 0,1 0,1

Motor current mes. No Yes

Quick YN test No Yes

TPC Analysis Verification (4 ms) DVtest (0.1 ms)

42 | 2016 DV Power All Rights Reserved.


Summarized TWA40D Features

Three tests in one device


One time connection system
Unique transformer saturation method
Quick YN test (TWA40D)
Synchronization test (TWA40D)
Tap changer motor current measurement (TWA40D)
Three-phase demagnetization
Combined transformer testing with TWA and TRT
3 years warranty

43 | 2016 DV Power All Rights Reserved.


Three-Phase Transformer
Demagnetizer DEM60C

Basic technical data:


Demagnetization current :
5 mA - 60 A DC
Weight: 13,5 kg
Demagnetization graph
recording

A, B, C, N connectors
One- time cable setup

44 | 2016 DV Power All Rights Reserved.


TRT series

45 | 2016 DV Power All Rights Reserved.


Transformer Tests using DV Power Devices

TYPES OF TESTS (TRT):


Power transformers turns ratio measurement
Excitation current measurement
Phase angle measurement
Vector group detection
Instrument transformers turns ratio verification
Instrument transformers polarity check
Demagnetization status verification

46 | 2016 DV Power All Rights Reserved.


Development Evolution
TRT03 series
Single phase voltage
TRT4x series
+ 125 V max. voltage
TRT30 series
(Together with CVT40 it can
+ true three phase voltage
output 5 kV AC for testing CVTs)

TRT33 series
+ test voltage 1 V Most advanced
(instrument transformers testing) TRT63 series
+ 250 V test voltage

47 | 2016 DV Power All Rights Reserved.


Turns Ratio Measurement
Why is it important?
Detecting winding defects

How is it performed?
Voltage ratio between primary and
secondary windings is measured for
each transformer leg, applying voltage
at HV side and measuring on LV side
Phase by phase with single-phase
voltage
All phases at once with true three-
phase

48 | 2016 DV Power All Rights Reserved.


Single-phase vs. true three-phase voltage

What the international standards say?

IEC doesnt stipulate which of these to use


ANSI stipulates single-phase voltage, but allows true three-
phase where single-phase is not applicable (In the case of
three-phase transformers, when each phase is independent
and accessible, single-phase power should be used;
although, when convenient, three-phase power may be
used., ANSI C57.12.90-1999)

49 | 2016 DV Power All Rights Reserved.


Single-phase vs. true three-phase voltage

What is the right choice?

The best is to have both options


Exactly what we offer both options in the same unit
No additional modules, no additional cables needed
User can perform single-phase only, true three-phase only,
or both tests

50 | 2016 DV Power All Rights Reserved.


Excitation Current Measurement
Why is it important?
Detecting short-circuited turns
Core lamination shorts
Core de-laminations
Verification of demagnetization process

How is it performed?
Excitation current is transformer primary no load current, or
magnetizing current (with open secondary) tested at reduced
voltage
Results are compared to values obtained under same test voltage
values
Results should follow specific pattern based on transformer
construction type

51 | 2016 DV Power All Rights Reserved.


Phase Angle Measurement
Why is it important?
Can indicate problems in windings and/or magnetic core
Measuring displacement of transformers with specific vector groups
(phase shifting, rectifier, arc furnace and traction transformers)
Verifying polarity of instrument transformers

How is it performed?
Comparing sine waves of AC voltage(s) on HV side and AC voltage(s)
induced on LV side

52 | 2016 DV Power All Rights Reserved.


Vector Group Detection
Why is it important?
Verification of transformer vector group
During/after manufacturing
During/after reparation
Looking for incorrect connections

How is it performed?
Using proprietary algorithm & software solution loaded in TRT
Completely automatic

53 | 2016 DV Power All Rights Reserved.


Demagnetization Status Verification
Why is it important?
Confirmation that transformer has been successfully
demagnetized

How is it performed?
By comparing excitation currents before and after
demagnetization

54 | 2016 DV Power All Rights Reserved.


Combined Measurement System

TRT

TWA

55 | 2016 DV Power All Rights Reserved.


One measuring system TRT & TWA
Interchangeable test leads only one cable set
needed
One time connection saves time
7 tests at once:
Turns ratio in all tap positions
Excitation current
Phase angle
Magnetic balance test
Winding resistances in all tap positions
On load tap changer dynamic resistance
Demagnetization

56 | 2016 DV Power All Rights Reserved.


True three-phase transformer
turns ratio testers
TRT63 series
Additional 250 V test voltage
Important for comparing
excitation currents obtained with
mains voltage
Improved ratio accuracy, up to
0,03%
Higher ratio range, up to 50 000

57 | 2016 DV Power All Rights Reserved.


Summarized TRT63 Features

High test voltage 250 V Better accuracy

True three-phase test Testing transformer with non-standard vector group


(phase-shifting, rectifier, furnace...)
Test plan Preparation the test in office

Automated test mode Automatic measurement and tap position changing

Combined operation with TWA Saving the time and money

3 years warranty

58 | 2016 DV Power All Rights Reserved.


Questions?

59 | 2016 DV Power All Rights Reserved.


Thank you for your attention!

60 | 2016 DV Power All Rights Reserved.

Вам также может понравиться