Вы находитесь на странице: 1из 25

Unlocking Projects in

USD 50 Oil
The perspective of a
rig maintenance
company

OJME, Dubai
9th October 2017
Mark Hannigan | CEO Allrig
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

Agenda

Speaker Profile

Company Profile

Shale vs Offshore

Sustainable Savings

Q&A

2
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

Speaker profile

Meet Mark Hannigan


CEO Allrig
Nationality: British
Based in: Houston, TX, USA
Age: 44 Years

Education
Bachelor Mechanical Engineering, University
of West Scotland
Master of Business Administration, University
of Strathclyde
Member of the Institution of Mechanical Engineers

Previous roles
S&N Pump, Houston, TX: President
Clydeunion Pumps, Glasgow, UK: Managing
Director
Weir Pumps, Glasgow UK: Supply Chain Director

3
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

Who Are Allrig?

Leading independent MODU


service company
One stop shop for turnkey project
& fleet solutions
Global footprint & broad
equipment scopes
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

Offshore Finally Gets There

Offshore has lost out on investment in recent years to shale


Lower breakeven (B/E) economics of shale have proven attractive
Offshore has aggressively reduced cost to restore viability at <$50 bbl
Shale B/E now rising due to capacity constraints

5
Sources 1) Transocean investor presentation Sept 2017 2) Morgan Stanley research, April 2017 3) Rystad Energy April 2017
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

The Problem Offshore Project B/E & Cost Redn

Global offshore B/E pricing now < $50 bbl 2014 2016

Average offshore project cost reduction of 35%

However > 50% of these savings unstainable

Deflation means

Layoffs & pay cuts


Price reductions
Less people doing more
Taking jobs at negative cash flow

These savings will rebound as market recovers reviving offshore viability problem

So, another step change in efficiency savings is required thats sustainable

But how???

6
Source: IH Markit comparisons of 34 deepwater projects between Q3 2014 & Q3 2016
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

The Solution

A winning formula for a


sustainable industry
Collaboration
Innovation
Localisation

7
Digitisation
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

8
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

Collaboration

Working with partners to reduce


overall cost of solution and improve
added value
Dont try to do it all-in-house
Focus on core competence
Play to your strengths
1+1=3

9
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

Collaboration Case Study


Objective
Overseas derrick OEM seeks to establish localised in region derrick repair capability in Middle East to service
installed base, reduce market response time and meet localisation requirements of regional NOCs & rig
owners

Traditional Solution Cost Time Risk


Complete due dilligence & find local attorney/rep $30k 3 months high
Establish local trading entity in-region $50k 6 months low
Secure prequalification as local vendor $50k 1 year med
Invest in local in-region repair facility $10m 18 months med
Send expat manager to oversee set up $500k 1 year med
Recruit localised service tech workforce $300k 3 months high

Collaborative Solution
Launch immediate capability through smart, established, strategically aligned partnerships where each
member plays to their strengths to offer client a single competitive solution

Design authority Service capability Repair capability


Engineering Local workforce Approved facility
Accreditations Fast mobilisation Established QA/QC
Result
Regional rig fleet receive OEM approved service & repair support with rapid response, from in region technical
10 at local market rates
experts
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

11
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

Innovation

Innovation means creative new


solutions to achieve the objective
and can take many forms
Product
Process
Technical
Commercial

12
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

Innovation Case Study

Scope
Install protective cover over exposed gears within jacking system to
retain oil bath and prevent mechanical damage, while permitting
access for inspection & maintenance

Conventional Solution
Fit mild steel coated cover with gasket and multiple bolts around
perimeter. Cover includes spyglass peep hole for visual inspection
of contact point only

Innovative Solution
Design plexiglass replacement cover which meets all corrosion, UV
and mechanical integrity requirements

Result
Entire circumference of both mating gears can be visually
inspected on an ongoing basis and early signs of damage can be
identified before component failure

Geartrain can be inspected while jacking system remains online


No need to remove steel cover, drain oil bath and lose ability to
jack up or down for relocation or weather emergency.

13
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

14
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

Localisation

Putting capability as close to the rig


as possible

Reduce response time


Avoid Ex-pat cost premiums
Build regional infrastructure
Stimulate local innovation
Tailor for regional nuansces
15
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

Localisation Case Study

Scope
Complete rebuild and overhaul of two PCM 120 AS cranes acquired
by client from competitor for future installation on client rigs

Conventional Solution
Dissassemble cranes and ship containerised crane to overseas
centre of excellence (C of E) for tear down, inspect, repair, install
replacement parts, reassemby & testing before shipping back to
region

Localised Solution
Replicate C of E in region by investing in premises, equipment and
accreditations. Relocate overseas SME to region and transfer
workforce knowledge by recruiting and training local team. Complete
entire turnkey overhaul process in region

Result
Client receives world-class crane overhaul at local facility, using
local cost base, whilst avoiding time consuming shipments.
Progress can be tracked by client by visiting local facility.

Supply chain capability in region is enhanced via knowledge


transfer and investment in local capability and infrastructure

16
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

17
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

Digitisation

Harness power of digital technology


to dramatically improve efficiency
Digital Transformation Maturity Model

Transforming
Customer Customer Top Line Customer
Experience Understanding Growth Touch Points

Transforming
Process Workforce Performance
Operational
Digitisation Enablement Management
Processes

Transforming Digitally Modified New Digital Digital


Business Business Business Globalisation
Models

18 Source: MIT Sloan Management Review April 2017


OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

Digitisation Case Study

Digital Solution
Local technician wears smart glass and is guided
Scope through inspection process by SME who remains
Conduct periodic jacking at home but attends rig virually, while client
system inspection observes process from HQ office in real time
Result
Conventional Solution Client receives support of most experienced Allrig
Fly US based SME to rig to SME with no travel cost or time delay, paying local
complete scope, fly home again tech day rate and is able to observe inspection
then submit client report process in real time with digital record
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

take aways

20
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

Key Messages & Take Aways

Great progress made but we must do


more to ensure offshore remains viable
Next wave of savings must be truly
sustainable
There are huge opportunities to realise
these if we all
Collaborate
Innovate
Localise
Digitise
21
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

questions?

22
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

23
OJME 2017 | Be smart, play your part | Building a sustainable industry together Company Confidential

Join the
conversation
at:
allyours@allriggroup.com

24

Вам также может понравиться