wear‘SUBJECT: VESSEL No 38-T-201 BY: Chandra Date: 03/06/08
‘Anchor Rod design Chk By: Date:
Define Units kinft = kip-ft
A) Concrete Pedestal Size
Diameter (BCD) - D Pile = 18in Dia Auger -CIP
‘Anchor Bolt dia =d
Bolt Sleeve Dia = ds
Bolt Sleeve Length = Ls
Flour Dwg: 6"x24" sleeve
Face to Face Pedestal = (FF)
EEL= D+ sin FEL ~ 25988
FE2= D+ 8d FE2 =27.146-ft (ASTM 307 Type C Anchor Rod)
FF3= D+ ds+6in F3 = 26313-f1
FE := max(FF1,FF2,FF3)
B) Determine Max Tension on Anchor Rod
2.3/4 _in Anchor Rod - ASTM A 307 Grade C - Galvanized/ with Sleeve (6x24)"
Moment of Intertia of Anchor Bolts
No of Anchor Bolts = 256% 108-8
Allowable loads
Ey: sks) Eus= 60ksi Fy = 10.2-ksi
FL = 19.8-ksi
Area of Bolt = At 5.o4in? Use Ft) 15k aE
Conservative
Ftallow := FtAt Flallow = 89.094-kip
Fvallow := 0.17-Fu-AL Evallow = 60.584-kip
Sheet 1 of 5
5 OFF‘SUBJECT: VESSEL No 38-T-201 BY: Chandra Date: 03/06/08]
‘Anchor Rod design Chk By: Date:
Erection Case
Errection wt - Vertical load- Per Per = 10s4kip Errection wt
Errection Moment - Me Me = 2448kipft Use Seismic Base Moment
Momentam=xm an 2 tena
Fimaxt = £2 , Mem Etmaxt = 143.79-kip_ (Compression)
‘Etmint 915-kip (Tension)
Fos = 183kip Seismic shear
Eymax = 5.719-kip
IR=0.969.
Operating wt - Vertical oad - Pop Pop:= 219¢kip Operating wt
Operating Moment Mo Mo = 26967kipit Use Seismic moment
Fimax=201.73-kip (Compression)
IR = 0.842
Sheet2 of 5 & ofSUBJECT: VESSEL No 38-T-201 BY: Chanara_Date: 00608
‘Anchor Rod design Date:__|
) Anchor Rod Design: Embedment lenath
Reference PIP STE05121 /2003
ACI 318 /05 Appendix D
‘Wind Loads and Anchor Bolt Design for Petro Chemical Facilities - ASCE Task Committee
‘on wind induced forces & task committee on Anchor bolt Design
Design Griteria:
Min Embedment length do = Anchor roddia ~ds= Sleeve dia_-—_Ls = Sleeve length
do=d d=275:in da on Ls=24in
a) Lt=12 do = 12d 1-330
b)Lais+6do La Lg + 6-do 12 = 405.in
Min Edge distance
a) 4do
b) 4do*0.5(ds-do)
Min Bott spacing
a) 8do
Check Transfer of Tension Force - From Anchor Rod to Pedestal Rebar
Max Tension Tmax ( use load factor of 1.5) ‘Tmax:= (1.5) --min(Etmin4 , Etmin2)
Tmax = 116.872-kip
Rebar yield = fy fy 60ksi
‘Area of rebar required to sufficient to transfer the tension = Ast
(0.9-A)
Select
#9: do9-= 1.128in Apo = (? 2) co 09 = 1 in”
#8: dp8 = 10in soo (22) 87 ADS = 0.786.in®
4
Cor roger (2} 22" sain
Sheet 3 of 5SUBJECT: VESSEL No 38-T-201 BY: Chandra Date: 03/06/08
Anchor Rod design ‘Chk By: __ Date: _
Select smaller dia bars with emaller developement lengths for vertical
reinforcemet in the pedestal. USE #7 bars
USE'4 #7 bars to transfer'the tension in the Anchor into the pedestal
Note
1) The # 7 bars must be developed within the pedestal - See cad sketch - OK
From Cad sketch Use 4.25 ft Pedestal With # 7 Rebar for vertical reinforcement
Min Embedment length of Anchor = Let
3.8aft
Le=4608.in
2) Check Anchor rod embedment length Per ACI318- Appendix D _ -See Spread Sheet - OK
Use Min required embedment length from cad sketch ( Let) and check for compliance with
AppendixD OK
3) Total Length odf Anchor Rod
‘Anchor Rod Total Length = L L = Projection(p) + Embedment(Lm) + bottom plate( im)
Projection = p = Grout(1")+Skirt ht (Hs)+ (2x nuts)+1"
Grout thk = Gr
‘Skirt ht Hs
Nut thk = nt at=@
(Gr + He + 2-4 + Lin)
p=2775:in
Sheet 4 of 5
GofSUBJECT: VESSEL No 38-T-201 BY: Chandra Date: 03/06/08)
‘Anchor Rod design Chk By: Date:
Bottom length Lb= nut+1" Lb
‘Anchor rod Total length - Lb
Lbolt:= p+ Le+Lb Lbolt = 77.58-in,
p= 28in
Agen 4610
‘Ape 40in
Apel 0+ Le+ Lb
Lbolt = 78.in
ic
&
im
USE 6-6
’8" ANCHOR ROD.