Вы находитесь на странице: 1из 6
peus03s it seojoeig Aisnpur S800. sous singe san Honsoeeveg ‘s (pe) = boa wowpeau Um] 3003 NOD 3NO-A1NO BAvi SHOHONY| overt 1 ¥0 wowoNy ‘simeae cpg > SL 1n6s9 30 BYTE] ROPERS OTT (16 "a0 vossenp coves Tete 3003 OREO sg 2 wana wear ‘SUBJECT: VESSEL No 38-T-201 BY: Chandra Date: 03/06/08 ‘Anchor Rod design Chk By: Date: Define Units kinft = kip-ft A) Concrete Pedestal Size Diameter (BCD) - D Pile = 18in Dia Auger -CIP ‘Anchor Bolt dia =d Bolt Sleeve Dia = ds Bolt Sleeve Length = Ls Flour Dwg: 6"x24" sleeve Face to Face Pedestal = (FF) EEL= D+ sin FEL ~ 25988 FE2= D+ 8d FE2 =27.146-ft (ASTM 307 Type C Anchor Rod) FF3= D+ ds+6in F3 = 26313-f1 FE := max(FF1,FF2,FF3) B) Determine Max Tension on Anchor Rod 2.3/4 _in Anchor Rod - ASTM A 307 Grade C - Galvanized/ with Sleeve (6x24)" Moment of Intertia of Anchor Bolts No of Anchor Bolts = 256% 108-8 Allowable loads Ey: sks) Eus= 60ksi Fy = 10.2-ksi FL = 19.8-ksi Area of Bolt = At 5.o4in? Use Ft) 15k aE Conservative Ftallow := FtAt Flallow = 89.094-kip Fvallow := 0.17-Fu-AL Evallow = 60.584-kip Sheet 1 of 5 5 OFF ‘SUBJECT: VESSEL No 38-T-201 BY: Chandra Date: 03/06/08] ‘Anchor Rod design Chk By: Date: Erection Case Errection wt - Vertical load- Per Per = 10s4kip Errection wt Errection Moment - Me Me = 2448kipft Use Seismic Base Moment Momentam=xm an 2 tena Fimaxt = £2 , Mem Etmaxt = 143.79-kip_ (Compression) ‘Etmint 915-kip (Tension) Fos = 183kip Seismic shear Eymax = 5.719-kip IR=0.969. Operating wt - Vertical oad - Pop Pop:= 219¢kip Operating wt Operating Moment Mo Mo = 26967kipit Use Seismic moment Fimax=201.73-kip (Compression) IR = 0.842 Sheet2 of 5 & of SUBJECT: VESSEL No 38-T-201 BY: Chanara_Date: 00608 ‘Anchor Rod design Date:__| ) Anchor Rod Design: Embedment lenath Reference PIP STE05121 /2003 ACI 318 /05 Appendix D ‘Wind Loads and Anchor Bolt Design for Petro Chemical Facilities - ASCE Task Committee ‘on wind induced forces & task committee on Anchor bolt Design Design Griteria: Min Embedment length do = Anchor roddia ~ds= Sleeve dia_-—_Ls = Sleeve length do=d d=275:in da on Ls=24in a) Lt=12 do = 12d 1-330 b)Lais+6do La Lg + 6-do 12 = 405.in Min Edge distance a) 4do b) 4do*0.5(ds-do) Min Bott spacing a) 8do Check Transfer of Tension Force - From Anchor Rod to Pedestal Rebar Max Tension Tmax ( use load factor of 1.5) ‘Tmax:= (1.5) --min(Etmin4 , Etmin2) Tmax = 116.872-kip Rebar yield = fy fy 60ksi ‘Area of rebar required to sufficient to transfer the tension = Ast (0.9-A) Select #9: do9-= 1.128in Apo = (? 2) co 09 = 1 in” #8: dp8 = 10in soo (22) 87 ADS = 0.786.in® 4 Cor roger (2} 22" sain Sheet 3 of 5 SUBJECT: VESSEL No 38-T-201 BY: Chandra Date: 03/06/08 Anchor Rod design ‘Chk By: __ Date: _ Select smaller dia bars with emaller developement lengths for vertical reinforcemet in the pedestal. USE #7 bars USE'4 #7 bars to transfer'the tension in the Anchor into the pedestal Note 1) The # 7 bars must be developed within the pedestal - See cad sketch - OK From Cad sketch Use 4.25 ft Pedestal With # 7 Rebar for vertical reinforcement Min Embedment length of Anchor = Let 3.8aft Le=4608.in 2) Check Anchor rod embedment length Per ACI318- Appendix D _ -See Spread Sheet - OK Use Min required embedment length from cad sketch ( Let) and check for compliance with AppendixD OK 3) Total Length odf Anchor Rod ‘Anchor Rod Total Length = L L = Projection(p) + Embedment(Lm) + bottom plate( im) Projection = p = Grout(1")+Skirt ht (Hs)+ (2x nuts)+1" Grout thk = Gr ‘Skirt ht Hs Nut thk = nt at=@ (Gr + He + 2-4 + Lin) p=2775:in Sheet 4 of 5 Gof SUBJECT: VESSEL No 38-T-201 BY: Chandra Date: 03/06/08) ‘Anchor Rod design Chk By: Date: Bottom length Lb= nut+1" Lb ‘Anchor rod Total length - Lb Lbolt:= p+ Le+Lb Lbolt = 77.58-in, p= 28in Agen 4610 ‘Ape 40in Apel 0+ Le+ Lb Lbolt = 78.in ic & im USE 6-6 ’8" ANCHOR ROD. Sheet of 5 4 #4

Вам также может понравиться