STEEL SCHEDULE

ITEM QTY PART NUMBER DESCRIPTION MASS


1 1 PSD-528-01 LEG ASSEMBLY 01 265,2 kg
3000 3000 2 2 PSD-528-02 LEG ASSEMBLY 02 504,8 kg
3 2 PSD-528-03 LEG MOUNITNG ASSEMBLY 80,7 kg
TOTAL STEEL MASS 850,7 kg
135 135 135 135 135 135

BOLT SCHEDULE - STRENGHT GRADE 4.8


ITEM QTY DESCRIPTION MASS
20 8 M16x40 - HEX BOLT - GALVANIZED 0,8 kg

135 135
320
21 8 M16 - FLAT WASHER - GALVANIZED 0,1 kg
22 8 M16 - HEX NUT - GALVANIZED 0,2 kg
TOTAL FASTENERS MASS 1,2 kg

GENERAL STEEL NOTES:


320 2680 320 2680 320

1. ALL WORK TO BE IN ACCORDANCE WITH SANS 2001-CS 1 & SANS 1921-3, EXCEPT WHERE NOTED
TOP VIEW
OTHERWISE ON THE DRAWING (OR PROJECT SPECIFICATION).
350 2. ALL HOLES 18mm FOR M16 Gr 4.8 BOLTS U.O.N.
3. ALL STEEL GRADE TO BE S355JR.
3000 PHASE CENTRES 3000 PHASE CENTRES
160 4. ALL WELDING CONTINUOUS FILLET, CLEAN AND SEAL WELDED. ALL FINISHED WELDS TO BE
VISUALLY INSPECTED BY A QUALIFIED WELDING SUPERVISOR.
170
30

5. ALL EXCESS WELD SPATTER, SLAG AND SHARP BURRS TO BE REMOVED PRIOR TO GALVANISING.
20 6. ALL FINISHED ITEMS TO BE HARD STAMPED WITH THE INDIVIDUAL PART NUMBER PRIOR TO
GALVANISING. PART NUMBER TO BE CLEARY VISIBLE AFTER GALVANISING
7. ALL FINISHED STEELWORK TO BE HOT DIP GALVANISED TO ISO 1461.
8. ALL GRADE 4.8 BOLTS TO BE TORQUED TO THE FOLLOWING FIGURES UNLESS OTHERWISE
SPECIFIED (M10 - 20Nm, M12 - 34Nm, M16 - 85Nm, M20 - 166Nm)
9. NOTE THAT QTY INDICATED ON EACH ITEM IS FOR ONE STRUCTURE ONLY.

4450
20 21 22
5400 O/A SUPPORT

5360

3 2

150 150
120

200
910

ISOMETRIC VIEW

750
A A
N.T.S.
20

FRONT VIEW
SIDE VIEW
MANUAL OPERATING EARTH SWITCHES SUPPORT (MK 'PSD-528')
A1 SCALE 1 : 20
A3 SCALE 1 : 40

3000 3000

140 140 140 140 140 140

350 2650 350 2650 350

SECTION A-A
SCALE 1 : 20

CONCO PROJECT APPROVAL CONTRACT:


CONSOLIDATED
COPYRIGHT: THIS DRAWING IS THE ADDIS ABABA HV TRANSMISSION NETWORK
DRAWN D. PIETERSE 2016/12/06 POWER PROJECTS UPGRADING PROJECT CONTRACT No. 2 EEP
PROPERTY OF CONSOLIDATED GROUP AFRICA PROJECT NUMBER CO/53.20/67/08
POWER PROJECTS (PTY) LTD. IS D.O. CHECK R. BEKKER LIMITED
PRIVATE AND CONFIDENTIAL AND IS 5th FLOOR, RAFFLES TOWER TEL: ++230 403 55 55
PROJ. ENG. TITLE:
SUPPLIED ON THE EXPRESS 19 CYBERCITY, EBENE
MAURITIUS SHEGOLE 132/230kV SUBSTATION -
UNDERSTANDING THAT IT IS NOT TO B.U.M. / DIR. ARRANGEMENT & DETAILS OF FREE STANDING
BE USED FOR ANY PURPOSE OR PO BOX 34, REDUIT E-Mail: conco@concogrp.com EARTH SWITCH SUPPORT
MAURITIUS Web: www.concogrp.com
COPIED OR COMMUNICATED TO ANY PROFESSIONAL ENGINEER / TECHNOLOGIST APPROVAL

PERSON WITHOUT THE WRITTEN DRG. No. REV


A 06/12/16 ISSUED FOR APPROVAL D.P R.B NAME SCALE ON A1 SCALE ON A3 SHEET
PERMISSION OF THE PROPRIETORS.
MU02337-528 A
REV DATE DESCRIPTION BY CHKD REFERENCE DRAWING No. REFERENCE DRAWING DESCRIPTION Reg. No. SIGNATURE: DATE: AS NOTED AS NOTED 1 OF 4

2016/12/06 - D. PIETERSE C:\Vault Working Folder\PD\CPP-GA\Current Projects\Ethiopia - MU02337\500 Shegole\MU02337-528\Working Files\MU02337-528.idw


320 350 O/A 20 THK PLT
320 O/A THK PLT
35 280 35
160 160 25 270 25

20 PLT
140 140 20 PLT
135 135 20 PLT

25
35
30 30

450
5 5
C C

100

140
350 O/A 20 THK PLT

135
320 O/A THK PLT
1.4

35 BM
0
20

280

270
2- 18 HOLES

135
140
1.6

35

25
FRONT VIEW SIDE VIEW
1.6 FRONT VIEW SIDE VIEW PART: PSD-528-01-4
APRT: PSD-528-01-1 1 OFF REQ'D
1 OFF REQ'D A1 SCALE 1 : 5
A1 SCALE 1 : 5 A3 SCALE 1 : 10
A3 SCALE 1 : 10
5360 O/A 273x6 THK
273 O.D.
5360 O/A LENGTH: 5360 (273.1x6 CIRCULAR HOLLOW SECTION)

4450

FRONT VIEW
PART: PSD-528-01-3 SIDE VIEW
1 OFF REQ'D
A1 SCALE 1 : 15
A3 SCALE 1 : 30

370 137 140 O/A 60x60x8L 23 15 10 PLT


5400 O/A

40 60 40
R136,5

115
4950

35 BM

150 O/A 10 THK PLT


75

75

60

120
40 BM
1.3 130 377 FRONT VIEW
PART: PSD-528-01-6
PLAN VIEW 2 OFF REQ'D
A1 SCALE 1 : 2
A3 SCALE 1 : 4

30
350 507 O/A PC200x75
70 70 14 HOLE
320 190 160 SIDE VIEW
18 20
5
300 163 38 O/A
50 300 157 10 THK PLT
1.5
40

FRONT VIEW
PART: PSD-528-01-2
120

200

4 OFF REQ'D

40

126,5
R136,5 A1 SCALE 1 : 2
A3 SCALE 1 : 4
40

4- 14 HOLES

120

200
1.1 4- 14 HOLES
B B
750

GENERAL STEEL NOTES:

40
5

1.2 1. ALL WORK TO BE IN ACCORDANCE WITH SANS 2001-CS 1 & SANS 1921-3, EXCEPT WHERE NOTED
FRONT VIEW
PART: PSD-528-01-5 OTHERWISE ON THE DRAWING (OR PROJECT SPECIFICATION).

60
1 OFF REQ'D 2. ALL HOLES 18mm FOR M16 Gr 4.8 BOLTS U.O.N.
A1 SCALE 1 : 5
20 PLT

A3 SCALE 1 : 10 3. ALL STEEL GRADE TO BE S355JR.


FRONT VIEW ISOMETRIC VIEW
PART: PSD-528-01 SIDE VIEW 4. ALL WELDING CONTINUOUS FILLET, CLEAN AND SEAL WELDED. ALL FINISHED WELDS TO BE
N.T.S.
1 OFF REQ'D VISUALLY INSPECTED BY A QUALIFIED WELDING SUPERVISOR.
SCALE 1 : 15
5. ALL EXCESS WELD SPATTER, SLAG AND SHARP BURRS TO BE REMOVED PRIOR TO GALVANISING.
PLAN VIEW
6. ALL FINISHED ITEMS TO BE HARD STAMPED WITH THE INDIVIDUAL PART NUMBER PRIOR TO
350 320
GALVANISING. PART NUMBER TO BE CLEARY VISIBLE AFTER GALVANISING
35 280 35 25 270 25 7. ALL FINISHED STEELWORK TO BE HOT DIP GALVANISED TO ISO 1461.
8. ALL GRADE 4.8 BOLTS TO BE TORQUED TO THE FOLLOWING FIGURES UNLESS OTHERWISE
140 140 135 135 SPECIFIED (M10 - 20Nm, M12 - 34Nm, M16 - 85Nm, M20 - 166Nm)
9. NOTE THAT QTY INDICATED ON EACH ITEM IS FOR ONE STRUCTURE ONLY.
200
25

STEEL SCHEDULE
35

ITEM QTY PART NUMBER DESCRIPTION MASS


135 135
140

4- 22 HOLES 1 1 PSD-528 LEG ASSEMBLY 01 265,2 kg


320

270
350

280

1.1 1 PSD-528-01-1 350 mm x 20 mm THK x 350 mm LG PLT 14,0 kg


140

1.2 4 PSD-528-01-2 38 mm x 10 mm THK x 150 mm LG PLT 1,3 kg


35

1.3 1 PSD-528-01-3 273.1 mm x 6 mm THK 2710 mm LG CIRCULAR HOLLOW 221,6 kg


25

1.4 1 PSD-528-01-4 320 mm x 20 mm THK x 320 mm LG PLT 14,6 kg


SECTION B-B 4- 24 HOLES SECTION C-C 100
SCALE 1 : 15 SCALE 1 : 15 1.5 1 PSD-528-01-5 PC200 mm x 75 mm x 507 mm LG 11,9 kg
1.6 2 PSD-528-01-6 60 mm x 60 mm x 8 mm THK x 140 mm LG ANGLE 1,8 kg
CONCO PROJECT APPROVAL CONTRACT:
CONSOLIDATED
COPYRIGHT: THIS DRAWING IS THE ADDIS ABABA HV TRANSMISSION NETWORK
DRAWN D. PIETERSE 2016/12/06 POWER PROJECTS UPGRADING PROJECT CONTRACT No. 2 EEP
PROPERTY OF CONSOLIDATED GROUP AFRICA PROJECT NUMBER CO/53.20/67/08
POWER PROJECTS (PTY) LTD. IS D.O. CHECK R. BEKKER LIMITED
PRIVATE AND CONFIDENTIAL AND IS 5th FLOOR, RAFFLES TOWER TEL: ++230 403 55 55
PROJ. ENG. TITLE:
SUPPLIED ON THE EXPRESS 19 CYBERCITY, EBENE
MAURITIUS SHEGOLE 132/230kV SUBSTATION -
UNDERSTANDING THAT IT IS NOT TO B.U.M. / DIR. ARRANGEMENT & DETAILS OF FREE STANDING
BE USED FOR ANY PURPOSE OR PO BOX 34, REDUIT E-Mail: conco@concogrp.com EARTH SWITCH SUPPORT
MAURITIUS Web: www.concogrp.com
COPIED OR COMMUNICATED TO ANY PROFESSIONAL ENGINEER / TECHNOLOGIST APPROVAL

PERSON WITHOUT THE WRITTEN DRG. No. REV


A 06/12/16 ISSUED FOR APPROVAL D.P R.B NAME SCALE ON A1 SCALE ON A3 SHEET
PERMISSION OF THE PROPRIETORS.
MU02337-528 A
REV DATE DESCRIPTION BY CHKD REFERENCE DRAWING No. REFERENCE DRAWING DESCRIPTION Reg. No. SIGNATURE: DATE: AS NOTED AS NOTED 2 OF 4

2016/12/06 - D. PIETERSE C:\Vault Working Folder\PD\CPP-GA\Current Projects\Ethiopia - MU02337\500 Shegole\MU02337-528\Working Files\MU02337-528.idw


350 O/A 20 THK PLT 320 O/A 20 THK PLT

20 PLT
35 280 35 25 270 25

140 140 20 PLT 135 135 20 PLT


5

450
30 30

35 BM
5
F F

25
35
2- 18 HOLES 200

140
350 O/A 20 THK PLT

320 O/A 20 THK PLT

135
280

270

135
140
100
2.4

35

25
4- 24 HOLES 4- 22 HOLES
2.5 FRONT VIEW SIDE VIEW
FRONT VIEW PART: PSD-528-02-4
PART: PSD-528-02-1 SIDE VIEW 1 OFF REQ'D
1 OFF REQ'D A1 SCALE 1 : 5
A1 SCALE 1 : 5 A3 SCALE 1 : 10
A3 SCALE 1 : 10
5360 O/A 273x6 CIRCULAR HOLLOW SECTION

5360 O/A 273x6 THK


5400 O/A ASSEMBLY HEIGHT

273

273
4950

FRONT VIEW
PART: PSD-528-02-3 SIDE VIEW
1 OFF REQ'D
A1 SCALE 1 : 15
A3 SCALE 1 : 30

140 O/A 60x60x8L

40 60 40

23 15 10 PLT

35 BM
60

150 O/A 10 THK PLT


120
FRONT VIEW

135
PART: PSD-528-02-5
2 OFF REQ'D
A1 SCALE 1 : 2
A3 SCALE 1 : 4

E E 70 70

30
5 GENERAL STEEL NOTES:

15
1. ALL WORK TO BE IN ACCORDANCE WITH SANS 2001-CS 1 & SANS 1921-3, EXCEPT WHERE NOTED
2.3
SIDE VIEW OTHERWISE ON THE DRAWING (OR PROJECT SPECIFICATION).
18 20
20 PLT

2. ALL HOLES 18mm FOR M16 Gr 4.8 BOLTS U.O.N.


38 O/A
FRONT VIEW SIDE VIEW 3. ALL STEEL GRADE TO BE S355JR.
10 THK PLT
PART: PSD-528-02 4. ALL WELDING CONTINUOUS FILLET, CLEAN AND SEAL WELDED. ALL FINISHED WELDS TO BE
2 OFF REQ'D

126,5
VISUALLY INSPECTED BY A QUALIFIED WELDING SUPERVISOR.
A1 SCALE 1 : 15
A3 SCALE 1 : 30 R136,5 FRONT VIEW
5. ALL EXCESS WELD SPATTER, SLAG AND SHARP BURRS TO BE REMOVED PRIOR TO GALVANISING.
350 320 PART: PSD-528-02-2
2.1 4 OFF REQ'D 6. ALL FINISHED ITEMS TO BE HARD STAMPED WITH THE INDIVIDUAL PART NUMBER PRIOR TO
A1 SCALE 1 : 2
A3 SCALE 1 : 4
GALVANISING. PART NUMBER TO BE CLEARY VISIBLE AFTER GALVANISING
35 280 35 25 270 25
7. ALL FINISHED STEELWORK TO BE HOT DIP GALVANISED TO ISO 1461.
2.2 8. ALL GRADE 4.8 BOLTS TO BE TORQUED TO THE FOLLOWING FIGURES UNLESS OTHERWISE
140 140 135 135
SPECIFIED (M10 - 20Nm, M12 - 34Nm, M16 - 85Nm, M20 - 166Nm)
ISOMETRIC VIEW
N.T.S. 9. NOTE THAT QTY INDICATED ON EACH ITEM IS FOR ONE STRUCTURE ONLY.
25
35

60
135 135
140

320

270

STEEL SCHEDULE
0
350

280

20

ITEM QTY PART NUMBER DESCRIPTION MASS


140

100
2 2 PSD-528-02 LEG ASSEMBLY 02 504,8 kg
25

2.1 1 PSD-528-02-1 350 mm x 20 mm THK x 350 mm LG PLT 14,0 kg


35

4- 22 HOLES PLAN VIEW 2.2 4 PSD-528-02-2 38 mm x 10 mm THK x 150 mm LG PLT 1,3 kg


4- 24 HOLES
SECTION E-E SECTION F-F 2.3 1 PSD-528-02-3 273,1 mm x 8 mm THK 2710 mm LG CIRCULAR HOLLOW 221,6 kg
A1 SCALE 1 : 15 A1 SCALE 1 : 15 2.4 1 PSD-528-02-4 320 mm x 20 mm THK x 320 mm LG PLT 14,6 kg
A3 SCALE 1 : 30 A3 SCALE 1 : 30
2.5 1 PSD-528-02-5 60 mm x 60 mm x 8 mm THK x 140 mm LG ANGLE 0,9 kg
CONCO PROJECT APPROVAL CONTRACT:
CONSOLIDATED
COPYRIGHT: THIS DRAWING IS THE ADDIS ABABA HV TRANSMISSION NETWORK
DRAWN D. PIETERSE 2016/12/06 POWER PROJECTS UPGRADING PROJECT CONTRACT No. 2 EEP
PROPERTY OF CONSOLIDATED GROUP AFRICA PROJECT NUMBER CO/53.20/67/08
POWER PROJECTS (PTY) LTD. IS D.O. CHECK R. BEKKER LIMITED
PRIVATE AND CONFIDENTIAL AND IS 5th FLOOR, RAFFLES TOWER TEL: ++230 403 55 55
PROJ. ENG. TITLE:
SUPPLIED ON THE EXPRESS 19 CYBERCITY, EBENE
MAURITIUS SHEGOLE 132/230kV SUBSTATION -
UNDERSTANDING THAT IT IS NOT TO B.U.M. / DIR. ARRANGEMENT & DETAILS OF FREE STANDING
BE USED FOR ANY PURPOSE OR PO BOX 34, REDUIT E-Mail: conco@concogrp.com EARTH SWITCH SUPPORT
MAURITIUS Web: www.concogrp.com
COPIED OR COMMUNICATED TO ANY PROFESSIONAL ENGINEER / TECHNOLOGIST APPROVAL

PERSON WITHOUT THE WRITTEN DRG. No. REV


A 06/12/16 ISSUED FOR APPROVAL D.P R.B NAME SCALE ON A1 SCALE ON A3 SHEET
PERMISSION OF THE PROPRIETORS.
MU02337-528 A
REV DATE DESCRIPTION BY CHKD REFERENCE DRAWING No. REFERENCE DRAWING DESCRIPTION Reg. No. SIGNATURE: DATE: AS NOTED AS NOTED 3 OF 4

2016/12/06 - D. PIETERSE C:\Vault Working Folder\PD\CPP-GA\Current Projects\Ethiopia - MU02337\500 Shegole\MU02337-528\Working Files\MU02337-528.idw


2627 O/A ASSEMBLY 60

10 PLT 2607 O/A PC140x60 10 PLT 55 5

30

2- 18 HOLES

5
40
130

140

130

140
60
40

5
5
FRONT VIEW SIDE VIEW
PART: PSD-528-03
2 OFF REQ'D
A1 SCALE 1 : 5
A3 SCALE 1 : 10

55 O/A 10 THK PLT

25 30 10 PLT

35
130 O/A 10 THK PLT

60
35

FRONT VIEW SIDE VIEW


PART: PSD-528-03-2
2 OFF REQ'D
A1 SCALE 1 : 2
A3 SCALE 1 : 4

GENERAL STEEL NOTES:

1. ALL WORK TO BE IN ACCORDANCE WITH SANS 2001-CS 1 & SANS 1921-3, EXCEPT WHERE NOTED
OTHERWISE ON THE DRAWING (OR PROJECT SPECIFICATION).
2. ALL HOLES 18mm FOR M16 Gr 4.8 BOLTS U.O.N.
3. ALL STEEL GRADE TO BE S355JR.
4. ALL WELDING CONTINUOUS FILLET, CLEAN AND SEAL WELDED. ALL FINISHED WELDS TO BE
VISUALLY INSPECTED BY A QUALIFIED WELDING SUPERVISOR.
5. ALL EXCESS WELD SPATTER, SLAG AND SHARP BURRS TO BE REMOVED PRIOR TO GALVANISING.
6. ALL FINISHED ITEMS TO BE HARD STAMPED WITH THE INDIVIDUAL PART NUMBER PRIOR TO
GALVANISING. PART NUMBER TO BE CLEARY VISIBLE AFTER GALVANISING
7. ALL FINISHED STEELWORK TO BE HOT DIP GALVANISED TO ISO 1461.
8. ALL GRADE 4.8 BOLTS TO BE TORQUED TO THE FOLLOWING FIGURES UNLESS OTHERWISE
SPECIFIED (M10 - 20Nm, M12 - 34Nm, M16 - 85Nm, M20 - 166Nm)
9. NOTE THAT QTY INDICATED ON EACH ITEM IS FOR ONE STRUCTURE ONLY.

STEEL SCHEDULE
ITEM QTY PART NUMBER DESCRIPTION MASS
3 2 PSD-528-03 LEG MOUNTING ASSEMBLY 80,6 kg
3.1 1 PSD-528-03-1 PC140 mm x 60 mm x 2607 mm LG 39,3 kg
3.2 2 PSD-528-03-2 55 mm x 10 mm THK x 130 mm LG 1,0 kg
CONCO PROJECT APPROVAL CONTRACT:
CONSOLIDATED
COPYRIGHT: THIS DRAWING IS THE ADDIS ABABA HV TRANSMISSION NETWORK
DRAWN D. PIETERSE 2016/12/06 POWER PROJECTS UPGRADING PROJECT CONTRACT No. 2 EEP
PROPERTY OF CONSOLIDATED GROUP AFRICA PROJECT NUMBER CO/53.20/67/08
POWER PROJECTS (PTY) LTD. IS D.O. CHECK R. BEKKER LIMITED
PRIVATE AND CONFIDENTIAL AND IS 5th FLOOR, RAFFLES TOWER TEL: ++230 403 55 55
PROJ. ENG. TITLE:
SUPPLIED ON THE EXPRESS 19 CYBERCITY, EBENE
MAURITIUS SHEGOLE 132/230kV SUBSTATION -
UNDERSTANDING THAT IT IS NOT TO B.U.M. / DIR. ARRANGEMENT & DETAILS OF FREE STANDING
BE USED FOR ANY PURPOSE OR PO BOX 34, REDUIT E-Mail: conco@concogrp.com EARTH SWITCH SUPPORT
MAURITIUS Web: www.concogrp.com
COPIED OR COMMUNICATED TO ANY PROFESSIONAL ENGINEER / TECHNOLOGIST APPROVAL

PERSON WITHOUT THE WRITTEN DRG. No. REV


A 06/12/16 ISSUED FOR APPROVAL D.P R.B NAME SCALE ON A1 SCALE ON A3 SHEET
PERMISSION OF THE PROPRIETORS.
MU02337-528 A
REV DATE DESCRIPTION BY CHKD REFERENCE DRAWING No. REFERENCE DRAWING DESCRIPTION Reg. No. SIGNATURE: DATE: AS NOTED AS NOTED 4 OF 4

2016/12/06 - D. PIETERSE C:\Vault Working Folder\PD\CPP-GA\Current Projects\Ethiopia - MU02337\500 Shegole\MU02337-528\Working Files\MU02337-528.idw