ESTRUCTURA DE PRESUPUESTO POR MODALIDAD DE CONTRATA

Costo a precios
Unidad Factor
Descripcin Cant. de mercado
Medida Correccin
(S/.)

DEMOLICIN DE INFRAESTRUCTURA M3 1000.00 10,000.00


MOVIMIENTO DE TIERRAS M3 1500.00 21,000.00
OBRAS GENERALES GLB 1.00 5,000.00
BLOQUE I AULAS M2 224.00 302,400.00
BLOQUE II ADMINISTRACIN M2 120.00 168,000.00
.
RAMPAS M2 20.00 20,000.00
AREAS DEPORTIVAS M2 620.00 297,600.00
MURO PERIMETRICO ML 100.00 72,000.00RO PERIMETRICO (469.50
MURO DE CONTENCION ML 20.00 36,000.00 DE CONTENCION (105.50
OBRAS COMPLEMENTARIAS GLB 1.00 120,000.00
VEREDAS DE CIRCULACION EXTERIOR ML 60.00 9,600.00
TRANSPORTE Y FLETE GLB 1.00 25,000.00
Costo directo Infraestructura 1,086,600.00
Gastos generales (10% CD) 108,660.00
Utilidad (10% CD) 108,660.00
Sub total Infraestructura 1,303,920.00
IGV (18%) 234,705.60
Valor referencial 1,538,625.60 0.847
COSTO DEL EXPEDIENTE TCNICO (5% VR) GLB 1 76,931.28 0.910
COSTO DE LIQUIDACIN (1% VR) GLB 1 15,386.26 0.910
MITIGACIN AMBIENTAL (A TODO COSTO) GLB 1 50,000.00 0.847
CAPACITACIN A TODO COSTO Taller 20.00 40,000.00 0.910
MOBILIARIO (A TODO COSTO) GLB 1 100,000.00 0.847
EQUIPAMIENTO (A TODO COSTO) GLB 1 150,000.00 0.847
AULAS PRE FABRICADAS GLB 1 50,000.00 0.847
GESTION DEL PROYECTO (3% VR) GLB 1 46,158.77 0.847
GASTOS DE SUPERVISIN (5% VR) GLB 1 76,931.28 0.910
Total 2,144,033.18 0.85

Costo a precios
Unidad Factor
Descripcin Cant. de mercado
Medida Correccin
(S/.)
Valor referencial 1,538,625.60 0.847
COSTO DEL EXPEDIENTE TCNICO (5% VR) GLB 1 76,931.28 0.910
COSTO DE LIQUIDACIN (1% VR) GLB 1 15,386.26 0.910
MITIGACIN AMBIENTAL (A TODO COSTO) GLB 1 50,000.00 0.847
CAPACITACIN A TODO COSTO Taller 20 40,000.00 0.910
MOBILIARIO (A TODO COSTO) GLB 1 100,000.00 0.847
EQUIPAMIENTO (A TODO COSTO) GLB 1 150,000.00 0.847
AULAS PRE FABRICADAS GLB 1 50,000.00 0.847
GESTION DEL PROYECTO (3% VR) GLB 1 46,158.77 0.847
GASTOS DE SUPERVISIN (5% VR) GLB 1 76,931.28 0.910
Total 2,144,033.18
DE CONTRATA
Costo a precios
sociales
(S/.)

1,303,215.88
70,007.46
14,001.49
42,350.00
36,400.00
84,700.00
127,050.00
42,350.00
39,096.48
70,007.46
1,829,178.78

Costo a precios
sociales
(S/.)
1,303,215.88
70,007.46
14,001.49
42,350.00
36,400.00
84,700.00
127,050.00
42,350.00
39,096.48
70,007.46
1,829,178.78
ESTRUCTURA DE PRESUPUESTO POR MODALIDAD ADMINISTRACION
DIRECTA
Costo a precios
Unidad Factor
Descripcin Cant. de mercado
Medida Correccin
(S/.)

DEMOLICIN DE INFRAESTRUCTURA M3 1000.00 12,000.00


MOVIMIENTO DE TIERRAS M3 1500.00 25,500.00
OBRAS GENERALES GLB 1.00 6,000.00
BLOQUE I AULAS M2 224.00 347,200.00
BLOQUE II ADMINISTRACIN M2 120.00 192,000.00
.
RAMPAS M2 20.00 20,600.00
AREAS DEPORTIVAS M2 620.00 310,000.00
MURO PERIMETRICO ML 100.00 78,000.00RO PERIMETRICO (469.50 ML)
MURO DE CONTENCION ML 20.00 37,800.00 DE CONTENCION (105.50 ML)
OBRAS COMPLEMENTARIAS GLB 1.00 125,000.00
VEREDAS DE CIRCULACION EXTERIOR ML 60.00 11,400.00
TRANSPORTE Y FLETE GLB 1.00 27,000.00
COSTO DIRECTO 1,192,500.00
GASTOS GENERALES (10% CD) GLB 1 119,250.00
GASTOS DE SUPERVISIN (5% CD) GLB 1 59,625.00 0.910
COSTO DEL EXPEDIENTE TCNICO (5% CD) GLB 1 59,625.00 0.910
COSTO DE LIQUIDACIN (1% CD) GLB 1 11,925.00 0.910
MITIGACIN AMBIENTAL (A TODO COSTO) GLB 1 50,000.00 0.847
CAPACITACIN A TODO COSTO Taller 20.00 40,000.00 0.910
MOBILIARIO (A TODO COSTO) GLB 1 100,000.00 0.847
EQUIPAMIENTO (A TODO COSTO) GLB 1 150,000.00 0.847
AULAS PRE FABRICADAS GLB 1 50,000.00 0.847
GESTION PROYECTO (3%CD) GLB 1 35,775.00
Total 1,832,925.00 #REF!

Costo a precios
Unidad Factor
Descripcin Cant. de mercado
Medida Correccin
(S/.)
MANO DE OBRA CALIFICADA 238,500.00 0.910
MANO DE OBRA NO CALIFICADA 119,250.00 0.600
MATERIALES 715,500.00 0.847
HERRAMIENTAS Y EQUIPOS 119,250.00 0.847
COSTO DIRECTO 1,192,500.00 0.000
GASTOS GENERALES (10% CD) GLB 1 119,250.00 0.910
GASTOS DE SUPERVISIN (5% CD) GLB 1 59,625.00 0.910
COSTO DEL EXPEDIENTE TCNICO (5% CD) GLB 1 59,625.00 0.910
COSTO DE LIQUIDACIN (1% CD) GLB 1 11,925.00 0.910
MITIGACIN AMBIENTAL (A TODO COSTO) GLB 1 50,000.00 0.847
CAPACITACIN A TODO COSTO Taller 20 40,000.00 0.910
MOBILIARIO (A TODO COSTO) GLB 1 100,000.00 0.847
EQUIPAMIENTO (A TODO COSTO) GLB 1 150,000.00 0.847
AULAS PRE FABRICADAS GLB 1 50,000.00 0.847
GESTION PROYECTO (3%CD) GLB 1 35,775.00 0.847
Total 1,868,700.00

* PARA ZONA RURAL EL FC DE LA MONC ES 0.41


DMINISTRACION

Costo a precios
sociales
(S/.)

54,258.75
54,258.75
10,851.75
42,350.00
36,400.00
84,700.00
127,050.00
42,350.00

#REF!

Costo a precios
sociales
(S/.)
217,035.00
71,550.00
606,355.93
101,059.32
996,000.25
108,517.50
54,258.75
54,258.75
10,851.75
42,350.00
36,400.00
84,700.00
127,050.00
42,350.00
30,301.43
1,587,038.43
ESTRUCTURA DE PRESUPUESTO POR MODALIDAD DE CONTRATA
Costo a precios
Unidad
Descripcin Cant. de mercado GG
Medida
(S/.)

DEMOLICIN DE INFRAESTRUCTURA M3 1000.00 10,000.00 1,000.00


MOVIMIENTO DE TIERRAS M3 1500.00 21,000.00 2,100.00
OBRAS GENERALES GLB 1.00 5,000.00 500.00
BLOQUE I AULAS M2 224.00 302,400.00 30,240.00
BLOQUE II ADMINISTRACIN M2 120.00 168,000.00 16,800.00
. 0.00
RAMPAS M2 20.00 20,000.00 2,000.00
AREAS DEPORTIVAS M2 620.00 297,600.00 29,760.00
MURO PERIMETRICO ML 100.00 72,000.00 7,200.00
MURO DE CONTENCION ML 20.00 36,000.00 3,600.00
OBRAS COMPLEMENTARIAS GLB 1.00 120,000.00 12,000.00
VEREDAS DE CIRCULACION EXTERIOR ML 60.00 9,600.00 960.00
TRANSPORTE Y FLETE GLB 1.00 25,000.00 2,500.00
Costo directo Infraestructura 1,086,600.00 108,660.00
Gastos generales (10% CD) 108,660.00
Utilidad (10% CD) 108,660.00
Sub total Infraestructura 1,303,920.00
IGV (18%) 234,705.60
Valor referencial 1,538,625.60
COSTO DEL EXPEDIENTE TCNICO (5% VR) GLB 1 76,931.28
COSTO DE LIQUIDACIN (1% VR) GLB 1 15,386.26
MITIGACIN AMBIENTAL (A TODO COSTO) GLB 1 50,000.00
CAPACITACIN A TODO COSTO Taller 20.00 40,000.00
MOBILIARIO (A TODO COSTO) GLB 1 100,000.00
EQUIPAMIENTO (A TODO COSTO) GLB 1 150,000.00
AULAS PRE FABRICADAS GLB 1 50,000.00
GESTION DEL PROYECTO (2% VR) GLB 1 30,772.51
GASTOS DE SUPERVISIN (5% VR) GLB 1 76,931.28
Total 2,128,646.93
E CONTRATA
VALOR
UTILIDAD ST IGV REFERENCIA 1 TRIM 2 TRIM 3 TRIM
L

1,000.00 12,000.00 2160.00 14,160.00


2,100.00 25,200.00 4536.00 29,736.00
500.00 6,000.00 1080.00 7,080.00
30,240.00 362,880.00 65318.40 428,198.40
16,800.00 201,600.00 36288.00 237,888.00
0.00 0.00 0.00 0.00
2,000.00 24,000.00 4320.00 28,320.00
29,760.00 357,120.00 64281.60 421,401.60
7,200.00 86,400.00 15552.00 101,952.00
3,600.00 43,200.00 7776.00 50,976.00
12,000.00 144,000.00 25920.00 169,920.00
960.00 11,520.00 2073.60 13,593.60
2,500.00 30,000.00 5400.00 35,400.00
108,660.00 1,303,920.00 234,705.60 1,538,625.60

76,931.28
15,386.26
50,000.00
40,000.00
100,000.00
150,000.00
50,000.00
30,772.51
76,931.28
2,128,646.93
4 TRIM
RUCTURA DE PRESUPUESTO POR MODALIDAD DE CONTRATA
VALOR
Unidad
Descripcin
Medida
Cant. REFERENCIA 1 TRIM
L

DEMOLICIN DE INFRAESTRUCTURA M3 1000.00 14,160.00


MOVIMIENTO DE TIERRAS M3 1500.00 29,736.00
OBRAS GENERALES GLB 1.00 7,080.00
BLOQUE I AULAS M2 224.00 428,198.40
BLOQUE II ADMINISTRACIN M2 120.00 237,888.00
. 0.00
RAMPAS M2 20.00 28,320.00
AREAS DEPORTIVAS M2 620.00 421,401.60
MURO PERIMETRICO ML 100.00 101,952.00
MURO DE CONTENCION ML 20.00 50,976.00
OBRAS COMPLEMENTARIAS GLB 1.00 169,920.00
VEREDAS DE CIRCULACION EXTERIOR ML 60.00 13,593.60
TRANSPORTE Y FLETE GLB 1.00 35,400.00
Costo directo Infraestructura 1,538,625.60
COSTO DEL EXPEDIENTE TCNICO (5% VR) GLB 1 76,931.28
COSTO DE LIQUIDACIN (1% VR) GLB 1 15,386.26
MITIGACIN AMBIENTAL (A TODO COSTO) GLB 1 50,000.00
CAPACITACIN A TODO COSTO Taller 20.00 40,000.00
MOBILIARIO (A TODO COSTO) GLB 1 100,000.00
EQUIPAMIENTO (A TODO COSTO) GLB 1 150,000.00
AULAS PRE FABRICADAS GLB 1 50,000.00
GESTION DEL PROYECTO (2% VR) GLB 1 30,772.51
GASTOS DE SUPERVISIN (5% VR) GLB 1 76,931.28
Total 2,128,646.93
2 TRIM 3 TRIM 4 TRIM