BACKGROUND INFORMATION
COMPANY DETAILS: No. 70, Jalan SC2, Pusat Perindustrian Sungai Chua 43000 Kajang,
Selangor Darul Ehsan, Malaysia.
Tel: 603 - 8733 9163 / 8737 0168 / 8736 5168
Fax: 603 - 8737 3163 / 8734 6641
CLIENT: Tenaga Nasional Berhad
OVERVIEW OF PROJECT/ACTIVITY: On Site Maintenance and Service Battery Charger No.1 and No.2
Bil Detail Description Of Activities Hazard & Potential Risk Method Of Control PIC Remarks
Simulate both Chargers on Unclear boundary Use a proper PPE Competent Equipment will be
Manual Float condition. of working. Use isolated person at site use:
Switch OFF or Isolate Battery Risk of Electrical equipment and Digital Multi-Meter
Bank No.1 Isolator. shock. tools AC/DC Clamp
Switch OFF DCDB DC Incomer Meter
Breaker No.1.
Recalibration the DC Charger Unclear boundary Use a proper PPE Competent Equipment will be
No.1 output voltage, such as V. of working. Use isolated person at site use:
Float and V. Boost. Risk of Electrical equipment and Digital Multi-Meter
All alarms indicator on the LED shock. tools AC/DC Clamp
front panel. Meter
Bil Detail Description Of Activities Hazard & Potential Risk Method Of Control PIC Remarks
Simulate both Chargers on Unclear boundary Use a proper PPE Competent Equipment will be
Manual Float condition. of working. Use isolated person at site use:
Switch OFF or Isolate Battery Risk of Electrical equipment and Digital Multi-Meter
Bank No.2 Isolator. shock tools AC/DC Clamp
Switch OFF DCDB DC Incomer Meter
Breaker No.2.
Replace and relocate the new Unclear boundary Use a proper PPE Competent Equipment will be
PCB Card or parts. of working. Use isolated person at site use:
Reconnect all existing cables or Risk of Electrical equipment and Digital Multi-Meter
additional new cables to new PCB shock. tools AC/DC Clamp
Cards. Ergonomic Meter
Charger Control
Card
Or Multi- Alarm
Card
Bil Detail Description Of Activities Hazard & Potential Risk Method Of Control PIC Remarks
7. Normalize the DC Charger No.1 and
Charger No.2 to DCDB.
Ensure DCDB both Incomer Risk of Electrical Use a proper PPE Competent Equipment will be
supply are same polarity. Shock Use isolated person at site use:
Switch ON both DCDB Incomer equipment and Digital Multi-Meter
breakers. tools AC/DC Clamp
Meter
8. House keeping
Site access 1) All unwanted Competent
blocked materials must be person at site
removed from time
to time
2) Ensure emergency
is clear from
materials and
debris
(Signature)