1. General
safety information
A

LC3000 2. General
NORM product information
ALARM
3. Installation
TEST
4. Setting up the controller

5. Wiring diagrams

6. Commissioning

7. Maintenance

8. Fault finding

Printed in theAB
IM-P402-36 UKIssue 13 1
Copyright 2004
1. General safety information
Your attention is drawn to the relevant Supplementary Safety Information sheet
supplied with the product as well as to any National or local regulations.
Safe operation of the product depends on it being properly installed, commissioned
and maintained by a qualified person in compliance with the operating instructions.
It is essential to comply with general installation and safety instructions for pipeline
and plant construction, as well as to make proper use of tools and safety equipment.
The product is designed and constructed to withstand the forces encountered
during normal use. Use of the product for any other purpose, or failure to install the
product in accordance with these Installation and Maintenance Instructions, could cause
damage to the product, will invalidate the marking, and may cause injury or fatality
to personnel.

Additional Safety Notes:


Level control and level limiting products in steam boilers
Products / systems must be selected, installed, operated, and tested in accordance with:
- Local or National standards and regulations.

ve
- Guidance Notes, (Health and Safety Executive PM5 in the UK).
- The requirements of Approvals Authorities.
- Boiler Inspection Bodies.
- Boiler manufacturers specifications.
Two independent low water limiting systems must be installed on steam boilers.
hi
Level probes must be installed in separate protection tubes / chambers, with
sufficient clearance between the tips, and earth.
Each probe must be connected to an independent controller. The alarm relays
must isolate the boiler heat supply at low alarm status.
rc
A high water alarm may be part of the water level control, or a separate system. An
independent high water alarm system must be fitted if it is considered a safety requirement.
If the high water alarm is a limiter, the relays must interrupt and lockout the energy
supply at high water status. All boiler water limiters require regular functional testing.
The level probe and controller is only part of the safety system. To complete the
A

system, additional circuitry (wiring, relays, alarm bell / lamp etc.) is required. Circuitry
must be designed and wired to 'fail-safe'.
A suitable water treatment regime must be used to ensure continuous safe and correct
operation of the control and limiter systems. Consult the above authorities and a
competent water treatment company.
Warning
Isolate the mains supply before unplugging the controller since hazardous voltages will
be exposed on the controller base. This product complies with the requirements
of Electromagnetic Compatibility Directive 89 / 336 / EEC by meeting the standards of:
- EN 61326 : 1997 A1 + A2 Emissions Class A equipment Table 4.
- EN 61326 : 1997 A1 + A2 Immunity for Industrial locations Annex A1.
The following conditions should be avoided as they may create interference above
the limits specified in EN 61326 (Immunity) if:
- The product or its wiring is located near a radio transmitter.
- Excessive electrical noise occurs on the mains supply. Power line protectors (ac)
should be installed if mains supply noise is likely. Protectors can combine filtering,
suppression, surge and spike arrestors.
- Cellular telephones and mobile radios may cause interference if used within
approximately 1 metre (39") of the product or its wiring. The actual separation
distance necessary will vary according to the surroundings of the installation and
the power of the transmitter.
If this product is not used in the manner specified by this IMI, then the protection
provided may be impaired.

2 IM-P402-36 AB Issue 13
2. General product information
The Spirax Sarco LC3000 is an advanced level controller with built in cyclic self-testing facilities.
It is designed for use with high or low level, self-monitoring, high integrity level probes to
provide water level alarms in steam and hot water boilers. The LC3000 is a dual voltage unit
(UL / FM version 120 V only) with LED indication of the following conditions:-
Green Normal Level correct
Red Level alarm Boiler water low /high
An automatic cyclic test of the probe, probe cable and controller is carried out every few seconds
by internally simulating a fault in the probe.
A test button is fitted so that a full test of the probe, controller, and associated circuits can be carried out.
Provision is made for the wiring of a remote test button if required.
In most countries, steam boilers operating with limited supervision require two self-monitoring
level probes and controllers to provide two independent low level alarms. A high level alarm is
also advised, and is compulsory in some countries.

Minimum conductivity (when used with an LP30 probe) 30 S /cm or 30 ppm

ve
Maximum ambient temperature 55C (131F)
Minimum ambient temperature 0C (32F)
Pollution degree 2
Overvoltage catagory II
Indoor use only
hi
Altitude up to 2 000 m (6 561.5 ft)
Maximum relative humidity 80% for temperatures up to 31C (87.8F)
Humidity
decreasing linearly to 50% relative humidity at 40C (104F).
Protection rating IP40
rc
230 V setting (not available with UL /FM version) 198 V - 264 V
Mains supply voltage
115 V setting (120 V UL /FM version) 99 V - 132 V
Frequency 50 - 60 Hz
20 mm cartridge, 100 mA anti-surge (T). For the UL / FM version, replacement
Fuse type
fuses must be UL recognised to maintain the integrity of the approval.
A

Maximum power consumption 6 VA


Maximum cable length (controller to probe) 50 m (164 ft)
Terminal torque rating 1Nm (9 lbf in)

Clamping screw

LC3000
NORM Green (Normal)
ALARM Red (Alarm)

TEST Test button

Clamping screw
Fig. 1

IM-P402-36 AB Issue 13 3
3. Installation
WARNING:
Isolate the mains supply before unplugging the controller since hazardous voltages
will be exposed on the controller base.
To unplug the controller from its base, undo the two retaining screws and pull the controller
straight forwards. Rocking the controller in the vertical plane will ease removal.
The controller must be installed in a suitable industrial control panel or fireproof enclosure
to provide impact and environmental protection (pollution degree 2). Spirax Sarco can
provide suitable metal or plastic enclosures (for standard controller only).
The controller may be mounted on a 'top hat' DIN rail using the clip provided or the clip can
be removed and the controller base screwed directly to a chassis plate.
Caution: Allow 15 mm spacing between multiple units for air circulation.
The controller is for installation category II (overvoltage category) and must be installed in
accordance with IEC 60364 or equivalent. For the US and Canadian markets the controller
must be wired in accordance with the National and Local Electrical Code (NEC) or Canadian
Electrical Code (CEC). The controller and all connected circuits must have a common
isolation system which meets the relevant requirements of IEC 60947-1 and IEC 60947-3
or equivalent. This must be positioned close to the controller and clearly identified as the

ve
disconnect device. A quick blow 3A external fuse must be fitted in all phases of the controller
and relay supply. The relays must be on the same phase as the controller supply. See notes
on wiring diagram.
Cabling should be installed in accordance with BS 6739 - Instrumentation in Process Control
Systems: Installation design and practice or local equivalent.
hi
Note: Screened high temperature, 4 core, 1 mm2 (18-16 AWG) cable is required for the probe
wiring. For the UL / FM version, NEC class I wiring with a minimum temperature rating of 75C
(167F) must be used. If the cable is to be exposed to a higher temperature, then a suitable
temperature rating will need to be selected. For the standard version a suitable cable is Pirelli
FP200 or Delta Crompton Firetuf OHLS. The same type of cable may be used for the mains
rc
wiring. Connect the screens as shown in the wiring diagrams (Section 5).
If the product is not used in the manner specified in this IMI, then the protection
provided may be impared.

Relay rating table:


Version Relay load type Rating
A

Resistive at 250 Vac 2.5 A


Standard
Inductive at 250 Vac 1A
UL /FM version Pilot duty at 120 Vac only 1A

4 IM-P402-36 AB Issue 13
4. Setting up the controller
The controller is supplied with the mains selection switch set to
230 V for the standard version (UL / FM version 120 V only - The
supply voltage is not selectable).

To change the mains supply voltage:


- Loosen the two cover clamping screws.
- Unplug the controller from its base.
- Remove the rear cover panel.
- Slide out the printed circuit board assembly.
- Move the voltage selection switch to 115 V.
- Replace the printed circuit board assembly.
- Replace the rear cover panel.
- Plug the controller into the base.

ve
- Tighten the cover screws.
hi
Transformer
Transformer
rc
230
230
A

20 mm fuse
100 mA anti-surge (T)
Slide switch left for
Fig. 2 115 V supply

IM-P402-36 AB Issue 13 5
5. Wiring diagrams
5.1 Screen connection
An earth current loop is created if a wire or screen is connected between two earth points, which
are at different potential (voltage).
Spirax Sarco boiler controls do not have an internal connection to earth. The controller is connected
to earth via the LP30/ LP31. The screen and the earth wire are only connected at one end of the
system, i.e. at: the LP30/ LP31 earth terminal.
Note: The LP30 / LP31 earth terminal is a functional earth rather than a protective earth.
A protective earth provides protection from electric shock under a single fault condition.
This product has double insulation and therefore does not require a protective earth.
A functional earth is used in order for the product to operate. In this application, the earth (tank /
boiler shell) is used as the common of the probe. It also provides a sink/ drain for any electrical
interference.
Ensure that the screen is connected to terminal 12 of the LC3000 and to the earth terminal of the
LP30/ LP31.
The LC3000 (terminal 12) is only earthed via the LP30/ LP31.
CAUTION:

ve
Do not connect terminal 12 of the controller to an earth. To do so may induce an earth
current loop, which may reduce the performance or damage the product.

5.2 Wiring diagram notes


The controller should normally be powered through the boiler panel control fuse, so that
terminal 1 is live whenever the boiler plant is switched on.
An optional test button may be wired in as shown. This is useful if the controller is installed in a
hi
locked enclosure and it is required to simulate a low or high water level condition for test purposes.
All relays are shown in the power off position.
The terminals are suitable for two 1.5 mm2 or 16 AWG cables (maximum).
LP30 and LP31 UL /FM probes only
rc
The LP30 and LP31 UL / FM probes are supplied with four 18 AWG, 12" long colour coded flying
leads. These are to be cut to length and connected to a suitable metal terminal box. A length of
flexible metal conduit is required between the probe and the terminal box to provide environmental
protection and easy electrical connection. The cable socket is provided with a " NPT conduit
adaptor for this purpose. See LP30 and LP31 IMI for further details.
A

6 IM-P402-36 AB Issue 13
LC3000 controller
Fuse 3 A maximum
L 1 Select mains
voltage
N 2 internally
Fuse 3 A maximum
Live supply from 3
burner circuit Normal
4 Relay 1
* Fit link as shown *
N 5
Alarm
Alarm lamp or bell
6
Normal
Relay 2
7

ve
Burner circuit broken at alarm

8
Screen
9
hi
10

11

12
rc

Do not connect
terminal 12 to
any other earth
A

Optional external
test button
Yellow
Black

Black

Red

This terminal is internally connected to


LP30 connector 3 2 1 the probe body and earth.
Ensure resistance from probe body to
pipework /boiler shell is less than 1 W.
Internal link
Internal resistor
Comparator tip

Low alarm tip

Fig. 3 See Page 8, Figures 4, 5 and 6 for other probe wiring details.

IM-P402-36 AB Issue 13 7
Detail showing wiring of the LP31 for high alarm

Screen
9

10

11

12

LC3000

Yellow
Black
Black

Red

ve
1 2 3 LP31connector

Internal link * * Internal resistor


hi Ensure resistance from probe body to
pipework /boiler shell is less than 1 W.
Fig. 4 High alarm tip

Detail showing wiring of UL / FM LP30 and LP31


rc

Screen Screen
9 9

10 10
A

11 11

12 12

LC3000 LC3000
Terminal box Terminal box
Yellow

Yellow
Black

Black

Black

Black
Red

Red

3 2 1
LP30 1 2 3
LP31
connector connector
Internal link
Internal resistor
* *Internal resistor
Internal link
Comparator tip
Low High
alarm tip alarm tip
Ensure resistance from
Ensure resistance from probe body to probe body to pipework /
pipework /boiler shell is less than 1 W. boiler shell is less than 1 W.
Fig. 5 Fig. 6

8 IM-P402-36 AB Issue 13
6. Commissioning
With the water level normal the green LED should be on and the boiler panel should indicate
normal water level. The green LED will briefly extinguish every few seconds showing that the
automatic cyclic test is being carried out.

To carry out a manual test:-


1. With the water level normal, press and hold the test button until the green (normal)
LED extinguishes and the red (alarm) LED lights (approximately 5 - 6 seconds).
The boiler panel should signal alarm.

2. Release the test button.


After a short delay, the green LED will light and the red LED will extinguish, showing that the
internal checking circuits have been verified. The boiler panel will return to normal.
If there is an external lockout circuit in the boiler panel this will need to be reset.

3. If the optional external test button has been connected, press and hold it until the same

ve
test sequence occurs. (approximately 5 - 6 seconds).

4. Lower the boiler water level to below the low alarm level (low alarm), or raise the water
level to above the high alarm level (high alarm).
The green LED will extinguish and the red LED will light. The boiler panel will go to alarm.

5. Alter the water level to normal.


hi
The controller relays will re-energise and allow the burner to fire (after resetting any lockout).
rc

7. Maintenance
No special servicing or maintenance of the controller is necessary. Clean and inspect the LP30/
LP31 annually. Boiler water level controls and alarms require regular testing and inspection. For
A

specific testing instructions for the Spirax Sarco systems please see separate literature.

LP30
Clean and inspect the LP30 assembly annually, particularly the threaded contact surfaces
between the tip extension and the probe central electrode. More regular cleaning is advised
where the quality of boiler water might cause a build-up of insulative scale or oxide on the probe.

Spare parts
Spare fuses Stock number 4033380 Set of 3

IM-P402-36 AB Issue 13 9
8. Fault finding
Most faults which come to light during commissioning are caused by incorrect wiring, installation
or setting up. If there are problems the following points should be checked:-
Diagnosis table
Probable diagnosis Probable diagnosis
Symptom
LP30 LP31
Probe cable to low Probe cable to high alarm
alarm tip open circuit. tip (terminals 1 or 2)
shorted to earth.
Comparator tip Probe cable to probe
Red LED on continuously shorted to earth. terminal 3 open circuit.
Earth open circuit. Earth open circuit.
Probe wires crossed. Probe wires crossed.
Low alarm tip shorted
to comparator tip.

ve
Probe cable to low alarm Probe cable to high alarm
tip shorted to earth. tip open circuit (Probe
Red and green LEDs terminals 1 or 2).
both on continuously
Probe wires crossed. Probe wires crossed.
Comparator tip open circuit.
Green LED flashes quickly on
hi Controller self-checking circuitry has simulated a fault at the
start-up, then red LED lights moment it was switched on, but is working normally.
for about 12 seconds. Green No fault is present.
LED then flashes at normal
speed (every 4 seconds).
rc
Check:
Mains on LED not lit:
- No live supply.
- Neutral not connected.
A

- Controller internal fuse blown.


Controller internal fuse blown:
- Check the mains supply voltage is lower than 264 V, and that the ambient temperature inside
the control panel is less than 55C (131F). If either of these limits has been exceeded, it is
possible that the controller internal thermal fuse has blown, and that the controller will
need to be replaced.
- Ensure that the probe supply voltage is approximately 2 - 2.5 Vac between terminals 10
and 12 of the controller, or terminals 1 and earth of the probe.

10 IM-P402-36 AB Issue 13
ve
hi
rc
A

IM-P402-36 AB Issue 13 11
ve
hi
rc
A

12 IM-P402-36 AB Issue 13

Вам также может понравиться