Вы находитесь на странице: 1из 13

Date of Request Agency Presidential Communications Operations

1 PCOO Office
2 OSHC Occupational Safety and Health Center
3 MGB Mines and Geosciences Bureau
4 SRA Sugar Regulatory Administration
5 PITC Philippine International Trading Corporation
6 PRC Professional Regulation Commission
7 CCC Climate Change Commission
8 DOE Department of Energy
9 17 Feb PCGG Presidential Commission on Good Government
10 RD Registry of Deeds
Metropolitan Waterworks and Sewerage
11 1 March MWSS System
12 23 March SEC Securities and Exchange Commission
13 23 March PICC Philippine International Convention Center
14 23 March DBM Department of Budget and Management
15 24 March FH Fabella Hospital
16 6 April Malacanang
17 6 April UP Manila University of the Philippines Manila
18 24 April TELOF
19 DENR NCR
20 3 May NAPOLCOM National Police Commission
21 8 June PRC Professional
Professional Regulation
Regulation Commission
Commission -- PICC
22 8 June PRC Sampaloc Manila
National Parks Development Committee -
23 8 June NPDC Ermita Manila
24 14 June MGB Mines and Geosciences Bureau
25 15 June UPCC UP Computer Center
26 20 June OCD Office of Civil Waterworks
Metropolitan Defense and Sewerage
27 27 June MWSS System
28 28 June RTVM Radio TV Malacanang
29 29 June TPB Tourism Promotions
Procurement Service Board
Department of Budget
30 29 June PS-DBM Management
Department of Agriculture Regional Field
31 30 June DAR Office No. IV-A (Calabarzon)
32 3 July PNR Philippine National Railways
33 4 July NICA National Intelligence Coordinating Agency
34 4 July MRT Taft Station
35 7 July OWWA Overseas Workers Welfare Administration
37 Jan. 31 2017 LRT 2NPC
Santolan National Power Corp.
38 May 17 2017 Station LRT 2 Santolan Station
39 12 July SSS Social Security System
40 14 July HLURB Housing and Land Use Regulatory Board
41 17 July PCUP Presidential Commission for the Urban Poor
42 19 July OWWA Overseas Workers Welfare Administration
43 21 July PCIC Philippine Crop Insurance Corporation
44 21 July NTC National Telecommunications Commission
45 26 July TELOF Telecommunications Office
46 28 July PCTC Philippine Center on Transnational Crime
47 28 July PITC
48 31 July PLM Pamantasan ng Lungsod ng Manila
49 1 August OCD Office of CivilofDefense
Department Agriculture Regional Field
50 14 August DA A-4 Office No. IV-A (CALABARZON)
51 14 August NCCA National Commission for Culture and the Arts
52 14 August NICA National Intelligence Coordinating Agency
53 16 August EAMC East Avenue Medical Center
Polytechnic University of the Philippines, Sta.
54 16 August PUP Mesa
55 18 August NAP National Archives of the Philippines
56 18 August OSHC Occupational Safety and Health Center
57 August 20 2017 LRT2 Pureza Station
Surveying (Please input time
Purpose/Reason/Issue
Transfer of equipment to 2nd and date of survey) Status
floor Done Pending
Connect to GovNet Done Surveyed:Jan. 31 2017 Installation of 48F/Completed
Re-cabling Surveyed:March 7 2017 For recabling (tentative June)
Re-cabling Surveyed:March 7 2017 For recabling
procurement of ODF and MC
Connection to GovNet Done Surveyed:03/09/2017 before proceeding to
Awaiting instructions from USEC
Connection to GovNet To be survey DFV
Needs clarification from MRT on
Connection to GovNet For Survey MRT7 Project
Waiting for update from BCDA on
Connection to GovNet To be survey availability of conduit
Connection to GovNet
Re-cabling (get 4 cores from LRA To be survey Call PCGG on five poles
Call RD on existing fiber within
and install their ODF and MC To be survey LRA compound
Tie Cable Instalation Completed
Recabling Done (March 13, 2017) June 29 2017
Interface is down Surveyed:Feb. 1 2017 Installation of 48F/Completed:
Ongoing Survey (10:49 AM, Unknown cause of downtime,
Interface is down March 24, 2017) reported to Fastel
Fiber Cut/ Completed:March 25
Interface Surveyed (March 25, 2017)
Feasibilityisofdown
connecting to 2017
connection to GovNet and also for
GovNet and Free WiFi Access Schedule for Survey Free WiFi access
Cut,Trouble Found No Power June
Possible fiber cut For restoration 17 2017(Power Maintenance)
No Fiber Cut Checked June 17
Possible fiber cut For restoration 2017
Transfer Of ODF From old Bldg.
Transfer of VLAN equipment Surveyed (April 25, 2017) New Completed:April 28 2017
Connection to GovNet To be survey For Survey Schedule
Survey scheduled on May 3 Re-
Possible fiber cut Schedule for Survey schedule of Survey
Possible Connection to GovNet Surveyed Completed:6/11/2017 Surveyed Completed:June 11 2017
Possible Connection to GovNet Surveyed Completed:6/9/2017 Surveyed Completed:June 9 2017
Possible Connection to GovNet Surveyed Completed Surveyed Completed:April 20 2017
Transfer Of ODF Completed:June
Transfer For Transfer of ODF
Transfer of
of cable
cable and equipment 17 2017
to 4th Floor Completed:June 18
to 3rd floor Surveyed June 17 2017 2017
Building, Camp Aguinaldo Installation and Termination of
Compound Surveyed June 28 2017 ODF Completed:July 7 2017
Cable Extension to Regulatory FOC cable Laying Completed:June
Office Surveyed Completed 29 2017
an Existing FOC From RTVM to
For connection Surveyed Completed 07/04/17 PSG(Node).
2017:Waiting schedule for Cable
For connection Done Surveyed Laying
Tentative scheduling:Re-
For connection Schedule for Survey Schedule
Schedule. Schedule for July 28,
For connection Schedule for Survey 2017 (Friday)
Tentative scheduling/for
For Schedule for Survey
For connection
transfer of cable from 5th Schedule:Re-Schedule
floor to 7th floor Surveyed:8/14/2017 Look for Mr. Ryan Terrenal
DICT Cable Found based on the
Possible fiber cut Surveyed:07/04/2017 8:30-9:00 Report.
Coordinate with Mr. Danny Flores
No reported downtime No need for survey (09175805413). Refer to item 42
Installation Of 48F/Completed
For Connection Surveyed:Jan 31 2017 Installed:Feb. 13 2017
For Connection
Network Down/ Possible Fiber Schedule Of Survey:May
Ongoing restoration (July17 2017
13,
Surveyed Completed:May 17 2017
DPWH4-A, LTFRB. Restored July
Cut 2017) 13, 2017
Forwarded/Awaiting instructions
Reconnection Surveyed July 14 2017 from Engr. Torralba
For possible connection Surveyed:July 17 2017 Schedule survey on July 17, 2017
Team deployed for surveying to cut by vehicle error.
Request to fix cabling (July 21) (Tempporary Fixed.July 22 2017)
For possible connection Done Surveyed:07/27/2017
No internet connectivity For checking with Network Team Issue resolved
Problem withby MERALCO's
Network Team.
For checking by Fastel/Checked
Downtime transformer.
07/26/2017 3:34PM Fernandez II and Mr. Warren
Connection to GovNet For surveying Cordero at 7214162
Connection to GovNet be Done Pulling of FOC from Old Please
Contactrefer to item
person: 5
Jonathan
Transfer of cable and equipment Server To New Server Room Siena (5279068, 6432580)
Activation of equipment N/A For
928patching
9859 / 09193757177
Possible Connection to GovNet For surveying (Ms. Julany)
For config/checking of Network
Cannot
Transferaccess IP 5th floor to
FOC from team Informed Jaros/Mark
to 7th Floor Schedule On
7th Floor
Cable Transfer from 2nd Floor Surveyed:8/14/2017 8/19/2017(Saturday)
Floor. Contact person is Jaffe
Mezannine to 1st Floor For surveying/For transferring Serenio (09773942724)
For surveying of closest splicing Pureza Stn. Splicing Point
Possible Connection to GovNet Number
Re-connection to GovNet (agency point Abonales2(524
of OPP-Mabini
3231 / 0917
transferred near BOC) For surveying 946 4662)
Tentative dates of August 24
"Installation" of procured SFP For installation (Thurs) or 25 (Fri)
Target complete restoration
Fiber Cut(Hit by Lightning) today (August 22)
Connected Date
(Y/N) Finished/Connected For activation (Network team) Remarks

Yes

Yes March 13, 2017 Issue with Switch


Proposed Plan Submitted 8/1/2017

Yes 5:00 PM, March 24, 2017


Yes 5:00 PM, March 24, 2017
Yes 8:45 PM, March 23, 2017

Yes Done

No fiber cut
Proposed plans submitted
Proposed plans submitted
Proposed plans submitted
Yes June 17, 2017 Ok
Yes
Yes Requires cable and ODF
Yes

Yes

Yes Restored July 13, 2017


Proposed Plan Submitted 7/20/2017
Hang Cable Fixed
Yes 7/22/2017
Proposed Plan Submitted 8/01/2017
Yes
Network up and running
Yes by 4:05 PM, July 26, 2017

Location FOC
Yes 08/05/2017 Distance:1.2km
No LC-LC Connector in ODF
Proposed Plan Submitted 08/18/2017

Proposed Plan Submitted 08/18/2017


mitted 8/1/2017

mitted 7/20/2017
mitted 8/01/2017

mitted 08/18/2017

mitted 08/18/2017
NGA/LGU/GOCC
Philippine Veterans Industrial Acronym
Industrial AddressMisamis
Complex, Tagoloan,
1 Development Corporarion Authority Oriental, Philippines
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Region/Cluster Status
Butuan Draft response letter
Contact Person
Mr. Francisco Abejuela III / Mr. Edilberto Mugot
NGA/LGU/GOCC AddressRd, Diliman, Quezon
Agham
1 Occupational Safety and Trading
Philippine International Health Center OSHC City,Tordesillas,
116 Metro Manila Makati,
2 Corporation PITC Kalakhang Maynila
3 Professional Regulation Commission PRC PICC
4 Professional Regulation Commission PRC Sampaloc
5 Climate Change Commission CCC
6 Department of Energy on Good
Presidential Commission DOE 82 Epifanio de los Santos Ave,
7 Government PCGG Mandaluyong,
1003 Lope de Vega1550 St,
Metro
Santa
8 Fabella Hospital FH Manila
Cruz,
Rizal Manila, 1003Ave,
Park, Kalaw Metro Manila
Ermita,
9 National Parks Development Committee NPDC Manila, Metro Manila
10 Radio TV Malacanang RTVM Roxas Boulevard, Malate,
11 Tourism Promotions
Procurement Service Board
Department of TPB Manila,
PS-DBM1004 Metro Manila
Compound, RR Road,
Budget Management
12 Department of Agriculture Regional Field PS-DBM Paco, Manila, Metro Manil
13 Office No. IV-A (Calabarzon) DAR
14 Philippine National Railways PNR Marikina-Infanta Hwy, Pasig,
15 LRT2 Depot Commission for the Urban
Presidential 1610Project
Santolan Station Ave, Metro Manila
7, Quezon City,
16 Poor PCUP Metro Manila
Quezon City, Diliman, Quezon
17 Philippine Crop Insurance Corporation PCIC City, Flr,
2nd MetroPNPManila
Computer Service
18 Philippine
Department Center on Transnation
of Agriculture Crime
Regional Field PCTC Bldg.,
VisayasCamp Crame
Avenue, 1111Quezon
Diliman,
19 Office No. IV-A (Calabarzon) DA-A4 City
20
Status Contact Person
Needs SFP and Public IP. Mr. Denver Calayan (0917 516 1979)
For surveying Ms. Anna Riserva (818 9801 loc. 393)
Surveyed. Ms. Maridel Banasig (0998 845 2635)
Surveyed. Ms. Maridel Banasig (0998 845 2635)
Surveyed. Needs clarification
Ongoing negotiations from
with ETPI forMRT7
fiber Mr. Rjay Mercado (0939 927 4918)
swapping Mr. Danilo Javier (0917 559 4566, 840 2131)
Issue with poles needs to be resolved. No contact person yet.
For surveying No contact person yet.
Surveyed. No contact person yet.
Surveyed. Arrange meeting with PSG Mr. Rich Eugenio(09196603137)
Surveyed. Issue with poles Mr.Emmanuel Zarate(09369121160)
For surveying No contact person yet.
For surveying Ms. Julany Castillo (928 9859, 0919 375 7177)
For surveying No contact person yet
For surveying Engr. Vernie Sudario (0917 607 4067)
Surveyed. Mr. Edgardo Labaco
Surveyed:07/26/2017 Mr. Allan Retamar (441and
1323)
Psupt.Efren Fernandez Warren Cordero(721-
For Surveying 4162)
Ms. Julany Castillo (928 9859, 0919 375 7177) /
For surveying Mr. Lorenz Navarro