Вы находитесь на странице: 1из 2

Jr.

Jose Olaya N 271 - Tarapoto


Cel. 965860525 RPM. #965860525
Email: mcproing_eirl@yahoo.es

DISEO DE MEZCLA DE CONCRETO. BASADO EN METODOS


RECOMENDADOS POR EL A.C.I.

PROYECTO : PLANTA DE INCUBACION - RAMPAS DE ACCESO


LOCALIZACIN: DISTRITO DE PUCACA, PROVINCIA DE PICOTA - DEPARTAMENTO DE SAN MARTN
SOLICITADO : DON POLLO LORETO SAC

fc =210 kg/cm2

CARACTERISTICAS FISICAS DE LOS AGREGADOS


ARENA GRAVA
PESO ESPECIFICO [gr/cc] 2.58 2.65
ABSORCION [%] 0.87 0.58
PESO UNIT. SUELTO [Kg/m3] 1609.00 1491.00
PESO UNIT.COMPACT. [Kg/m3] 1733.00 1611.00
TAM. MAX. [pulg] 1"
TAM. MAX. NOMINAL [pulg] 3/4"
MOD. FINEZA 2.30
CONT. HUMEDAD [%] 0.00 0.00
PORCENT DE AGREG. [%] 0.42 0.58

CEMENTO PACASMAYO TIPO I


PESO ESPECIFICO [gr/cc] 3.11

VALORES DE DISEO POR m3 [PASTA]


CEMENTO [Kg.] 340.0
AGUA [Lt.] 180.0
AIRE [%] 2.00
ADITV: PLASTIMENT HE98 [Lt.] 1.70

RELACION A/C 0.53

VOLUMEN DE LA PASTA
CEMENTO 0.109 m3

AGUA 0.180 m3

AIRE 0.020 m3
ADITV: PLASTIMENT HE98 0.002 Lt
0.311 m3

VOLUMEN DE AGREGADOS 0.689 m3

ARENA 0.289 m3

PIEDRA 0.400 m3

PESOS SECOS DE AGREGADOS


ARENA 745.6 Kg/m3

PIEDRA 1,059.9 Kg/m3


1805.50

HUMEDAD SUPERFICIAL DE AGREGADOS


HUMEDAD - ABSORCION
ARENA -0.87
PIEDRA -0.58
Jr. Jose Olaya N 271 - Tarapoto
Cel. 965860525 RPM. #965860525
Email: mcproing_eirl@yahoo.es

DISEO DE MEZCLA DE CONCRETO. BASADO EN METODOS


RECOMENDADOS POR EL A.C.I.

PROYECTO : PLANTA DE INCUBACION - RAMPAS DE ACCESO

APORTE DE HUMEDADES DE LOS AGREGADOS


ARENA -6.50 Lt.
PIEDRA -6.10 Lt.
-12.60 Lt.

AGUA EFECTIVA
192.60 Lt.

DISEO EFECTIVO DE OBRA [CORREGIDO]


CEMENTO 340.0 Kg/m3

AGUA 192.6 Lt/m3

ARENA 746.0 Kg/m3

PIEDRA 1060.0 Kg/m3

ADITV: PLASTIMENT HE98 1.700 Lt/m3

TANDA DE LABORATORIO [FACTOR] : 0.00494


CEMENTO 1.680 Kg
AGUA 0.950 Lt.
ARENA 3.690 Kg
PIEDRA 5.240 Kg
ADITV: PLASTIMENT HE98 0.008 Lt.

PROPORCION EN PESO
CEMENTO ARENA PIEDRA AGUA
340/340 746/340 1060/340 192.6*42.5/340
1.00 2.19 3.12 24.10 Lt./bolsa

PESO UNITARIO DE AGREGADOS


ARENA 1609.0 Kg/m3

PIEDRA 1491.0 Kg/m3

PESOS POR PIE CUBICO DE MATERIALES


CEMENTO 42.5 Kg/p3

AGUA 24.1 Lt/p3

ARENA 46.0 Kg/p3

PIEDRA 42.6 Kg/p3

PESOS POR TANDA DE UN SACO


CEMENTO 42.5 Kg/saco
AGUA 24.1 Lt/saco
ARENA 93.1 Kg/saco
PIEDRA 132.6 Kg/saco

PIES CUBICOS POR SACO [DOSIFICACION EN VOLUMEN]


CEMENTO 42.50 pie3/saco
AGUA 24.10 Lt/saco
ARENA 2.0 pie3/saco

PIEDRA 3.1 pie3/saco

PROPORCION EN VOLUMEN
CEMENTO ARENA PIEDRA AGUA
1.0 2.0 3.1 24.1 Lt/saco
PROPORCION EN VOLUMEN (baldes 18L.)
CEMENTO ARENA PIEDRA AGUA
1.0 2.9 4.4 24.1 Lt/saco