7" LINER CEMENTING JOB

WELLNAME : Q.KAL-C4 CAP OF CASING 9 5/8 0.07321 ** VOL. OF CALIPER "6 ARM" ( cft ) = 610
RIG NAME: EDC-40 CAP OF CASING 7" 0.03714 ** Spacer vol. 100 bbl WT,ppg = 11.5
DATE : 19/4/2011 CAP OF DRILL PIP(G) 0.0173
MUD WT.= 10.7 CAP OF DRILL PIP(s) 0.01707
SHOE JOINT= 82.38 VOL(CASING&HOLE) 0.02259
OVER LAP = 227.41 VOL(CASING&CASING) 0.02561
OVER LINER= 200 VOL(CASING&DRILL PIP) 0.04892
CALCULATIONS CEMENT VOLUME:-
O.H.V= 1.2 610 * 0.1781 = 130.4 BBL
SH.TRACK= 82.38 * 0.03714 = 3.1 BBL
OVER LAP= 227.41 * 0.02561 = 5.8 BBL
C.A.LINER= 200 * 0.07321 = 14.6 BBL H.O.Spacer
TOTAL= 153.9 = 864.1 cft 7429.1
CEMENT WT. = 16 PPG H.O.Cmt
NO OF SK= 864.1 / 1.512 = 571.5 SKS 9473.3
MIXING WATER= 571.5 * 5.132 = 69.8 BBL 9772.59
SLILCA S-8 571.5 * 0.35 = 18802.0 LB
FP-L9 571.5 * 0.04 = 22.9 GL 227.41
BJ-2000 571.5 * 0.2 = 114.3 GL 10000
FL-45LS 571.5 * 0.25 = 142.9 GL
CD-31LS 571.5 * 0.5 = 285.7 GL
R-8L 571.5 * 0.1 = 57.1 Ibs
DIS LINER
DISPLACEMENT= 4640.03

1-Casing= 4640.03 * 0.03714 = 172.3 BBL H&C


2-D.p=G 3678.89 * 0.0173 = 63.6 BBL 4495
2-D.p=S 6176.08 * 0.01707 = 105.4 BBL
TOTAL = 341.4012 BBL
PRESSURE TO LAND PLUG=
1-HEIGHT O.C.CAP = 14.642 / 0.04892 = 299.3 FT
2-HEIGHT.O.SPACER 100 / 0.04892 = 2044.2 FT
OUT SIDE PRESSURE:-
1-OH&OVERLAP= 4174.0 PSI
2-CAP CEMENT= PSI 14412.62
3-SPACER= 1222.4 PSI
4-MUD= 4133.6 PSI
IN SIDE PRESSURE:-
1-CEMENT(SH.J)= 68.5 PSI 82.38
2-MUD= 8019.2 PSI
DIFFERENTIAL PRESSURE= 1442.3 PSI
14495