Landfill

Safe and efficient


waste disposal and
high quality habitats.
Landfill

Economic and legislative


drivers are diverting
waste from landfill, but it
remains an important part
of UK waste strategy.
European legislation requires a major domestic power needs for a city
reduction in the amount of waste the size of Edinburgh.
going to landfill. This is supported
This process is a viable alternative
by landfill tax rising by 8 per tonne
to burning fossil fuels. It reduces
per year, until it reaches 80 in 2014.
greenhouse gases and preserves
Sometimes, however, landfill is the best
natural resources. So, even worthless
or only economic and environmentally
rubbish has its value in the end.
responsible option for disposing of
waste that cant be reused, recycled Engineered landfills comprise a
or recovered. series of fully lined cells that are
systematically filled then capped.
Todays landfill sites are far more
sophisticated than people might Cells are completely isolated from
expect and are highly engineered surrounding land before tipping
and controlled operations. starts and active controls prevent litter,
One side effect of a maturing landfill dust, pests and noise. Full cells are
is the release of methane gas. capped to ensure that the waste in
Left unchecked, this would create each cell is safely contained while
environmental damage, however the it breaks down naturally. An HDPE
controlled cell design of a Viridor liner is used in conjunction with a
landfill channels this gas through a compacted clay liner to make sure
network of pipes. The gas is pushed the cell is safely contained.
through engines that generate Once a cell is capped it is covered
electricity that is fed directly into with at least a metre of clean topsoil
the National Grid. to enable site restoration.
There are 22 Viridor landfill sites and Site management takes place
11 closed sites producing energy in this throughout the operational and
way, generating 100 megawatts aftercare phases to the highest
of electricity, enough to provide the professional standards.
Landfill

Economic and legislative A typical Viridor landfill cell

drivers are diverting


waste from landfill, but it
remains an important part Leachate liquid
Forms at the bottom of a cell as a
Engineered cap
A cap consists of at least one

of UK waste strategy. product of waste decomposition.


It can be pumped back through the
waste mass to aid breakdown, before
metre of impermeable clay
and clean top soil to enable
site restoration.
being discharged for treatment.

European legislation requires a major domestic power needs for a city Gas/leachate
abstraction point
reduction in the amount of waste the size of Edinburgh.
going to landfill. This is supported
This process is a viable alternative
by landfill tax rising by 8 per tonne Monitoring
to burning fossil fuels. It reduces
per year, until it reaches 80 in 2014. Gas/groundwater
greenhouse gases and preserves
Sometimes, however, landfill is the best monitoring point.
natural resources. So, even worthless
or only economic and environmentally
rubbish has its value in the end.
responsible option for disposing of
waste that cant be reused, recycled Engineered landfills comprise a Waste material Gas collection pipes Waste material
or recovered. series of fully lined cells that are
systematically filled then capped.
Todays landfill sites are far more
sophisticated than people might Cells are completely isolated from
expect and are highly engineered surrounding land before tipping
and controlled operations. Compacted
starts and active controls prevent litter,
clay side liner
One side effect of a maturing landfill dust, pests and noise. Full cells are
is the release of methane gas. capped to ensure that the waste in
Left unchecked, this would create each cell is safely contained while
environmental damage, however the it breaks down naturally. An HDPE
Renewable power generation Compacted HDPE and clay liners HDPE liner
controlled cell design of a Viridor liner is used in conjunction with a
Harvested landfill gas is converted clay base liner These liners are put in protection
landfill channels this gas through a compacted clay liner to make sure
into renewable power. This yields over place before tipping
network of pipes. The gas is pushed the cell is safely contained. 100MW of electricity which is sold to starts and ensure that
through engines that generate the National Grid. the cell remains intact.
Once a cell is capped it is covered
electricity that is fed directly into with at least a metre of clean topsoil
the National Grid. to enable site restoration.
There are 22 Viridor landfill sites and Site management takes place
11 closed sites producing energy in this throughout the operational and
way, generating 100 megawatts aftercare phases to the highest
of electricity, enough to provide the professional standards.
01 02 03

01 Landfill: We operate 22 landfills


and 33 power plants across the UK.

02 Power: We generate over 100MW


of electricity from landfill gas.

03 Restored: We are aiming to


achieve Biodiversity Benchmark Status
at all our closed landfills.

04 Wildlife: Our sites are havens for


rare plants, birds and other species.

04
Design: 375.co.uk
Landfill

We continue our efforts to


encourage native and rare species
to make a new home on the land
we look after.

Viridor
Head Office
Viridor House Regional Offices
Youngman Place South East: 01732 229 200 When you have finished with
this leaflet please recycle it.
Priory Bridge Road South West: 01823 728 800
Taunton TA1 1AP North: 0161 872 0976
Tel: 0845 094 5910 Scotland: 0141 781 9151
viridor.co.uk enquiries@viridor.co.uk