Ritz Carlton Dubai Renovation

Client / Employer

Mohamed & Obaid Almulla (L.L.C)


P.O. Box 59
Dubai, United Arab Emirates

Tel: 04 2221241
Fax: 04 2218109

Design Consultant

Smallwood Reynolds, Stewart,


Stewart & Associates, Inc.

83 Clemenceau Ave. # 14-03


UE Square
Singapore 23920

Tel: 0065 68354355


Fax: 0065 68354322

Phase II Stages 2 & 3


Engineer
Kitchen Equipment

Rice Perry Ellis & Partners


Bills of Quantities
P.O. Box 13634
Dubai, United Arab Emirates
Tel 04 2822505
Fax 04 2822506

Chartered Quantity Surveyors

D.G. Jones & Partners M.E. Ltd


P.O. Box 1801

Issue Date: March 2013 Dubai, United Arab Emirates


Tel 04 4490933
Fax 04 4490930
RITZ CARLTON DUBAI RENOVATION

BILLS OF QUANTITIES

INDEX

PAGE NOS.

PREAMBLES P/1 - P/35

BILL No. 1 PRELIMINARIES 1/1 - 1/22

BILL No. 2 STAGE 2 2/1 - 2/31

BILL No. 3 STAGE 3 3/1 - 3/13

BILL No. 4 TENDERER'S ADJUSTMENTS FOR BILL NOS 2 TO 3 4/1

GENERAL SUMMARY GS/1


PREAMBLES
RITZ CARLTON DUBAI EXPANSION PHASE II STAGE 2

PREAMBLES

SECTION 1 - GENERAL

1.1 Foreword

1.1.1 The Bills of Quantities has been prepared generally in accordance with the
Principles of Measurement (International) for Works of Construction dated June
1979 issued by the Royal Institution of Chartered Surveyors, London, UK,
amended to suit local practice and conditions.

1.2 Work executed under the Contract

1.2.1 All work indicated on the Contract drawings or described in these documents
are to be executed under the Contract unless specifically excluded in writing by
the Engineer.

1.3 Measurement

1.3.1 Unless otherwise stated, no deductions shall be made from items required to
measure by area for voids of less than 0.50 m.

1.3.2 Unless otherwise described or measured separately, prices for all items shall
include for all necessary straight, raking or circular cutting.

1.3.3 Generally in setting down dimensions in the Bill of Quantities, the sequence is
length - width - height. All measurements have been taken up or down to the
nearest metre (or other units), and where exactly half metre (or other units)
measurements result these have been taken up.

1.3.4 Notwithstanding the provisions stated in the principles of measurement, the rate
shall include for straight, curved, spherical or conical works, unless described
otherwise or measured separately.

1.4 Items to be Fully Inclusive

1.4.1 The following shall be deemed to be included with all items:-

a) Labour and all costs in connection therewith.

b) Materials, goods and all costs in connection therewith (e.g. conveyance,


delivery, unloading, storing, handling, hoisting, lowering taxes and
duties, insurances, levies and the like).

c) Fitting and fixing materials and goods in position.

d) Use of scaffolding, plant, equipment and tools.

DB0450 Ritz Carlton Renovation


Phase II Stage 2 - Bills of Quantities P/1 March 2013
RITZ CARLTON DUBAI EXPANSION PHASE II STAGE 2

PREAMBLES

SECTION 1 GENERAL [contd]

1.4 Items to be Fully Inclusive [cont'd]

e) Waste of materials.

f) Cutting and making good.

g) Establishment charges, overhead charges and profit.

h) Guarantees and warranties wherever necessary as provided in


Specification.

j) Coordination with other contractors.

k) Preparation of drawings, submittals, materials for approval.

1.5 Provisional Sums

1.5.1 Provisional Sums will be dealt with in the manner set forth in the General and
Particular Conditions of Contract.

1.5.2 Items for "attendance" given after Provisional Sums for Nominated Sub-
contractors or Statutory Authorities shall include for the placing and processing
of orders as directed by the Project Manager, the cost of opening up and
maintaining letters of credit required, for the provision by the Contractor to the
sub-contractors of all facilities for the proper execution of their work, including
the free use of scaffolding, messrooms, latrines, power, light and water, storage
space, labour and plant for receiving, off loading, stacking and handling of
materials, obtaining and providing details regarding the construction
programme and for co-ordinating the works with all other contractors and
subcontractors working on site.

1.6 Definitions

1.6.1 m = linear metre


m = square metre
m = cubic metre
No. = number
Kg = kilogram
N = Newton
Item = composite measurement
Rate = price per unit
BS = British Standard
Dhs. = United Arab Emirates Dirham/s
Hr. = Hour

DB0450 Ritz Carlton Renovation


Phase II Stage 2 - Bills of Quantities P/2 March 2013
RITZ CARLTON DUBAI EXPANSION PHASE II STAGE 2

PREAMBLES

SECTION 1 GENERAL [contd]

1.7 Ordering Materials

1.7.1 The Bills of Quantities shall not be used as a basis for ordering materials and
the Contractor is entirely responsible for assessing the quantities of materials to
be ordered and no claim will be entertained in respect of the quantities
contained in the Bills of Quantities being approximate.

1.8 Preliminaries

1.8.1 Monthly payments for Preliminaries shall only be made for those costs which
have been properly incurred and for which the Contractor has inserted prices
against in the Bills of Quantities' Preliminaries section. Payment for all time
related items will only start from the date of the Engineers approval for the
particular items in the Preliminaries bill.

1.8.2 Plant, machinery, transport and other movable items when provided on site and
priced for in the Bills of Quantities' Preliminaries section shall be valued
proportionally with the permanent work as previously described.

1.9 Pricing

1.9.1 The Contractor will be required to provide the Engineer with a full and detailed
Rate Breakdown within 48 hours of being so requested. The breakdown is to
show the actual calculations of the Preliminaries, Labour, Plant and Materials,
cost of the works, the build-up of the measured rates with on-costs and
overheads and any other allowances used to arrive at the Tender Price.

1.10 P.C. Rates

1.10.1 Where P.C. rates for supply of materials are given in an item description, the
contractors priced rate for that item will be adjusted by the net difference
between the P.C. rate and the actual rate paid by the contractor as instructed
by the Project Manager and the Contract Price shall be adjusted accordingly.

1.11 Provisional Quantities

1.11.1 Where quantities are indicated to be Provisional they shall be remeasured in


accordance with these measurement rules. The value of work for the actual
quantities as measured shall be paid to the Contractor at the rates inserted by
him in the bill of quantities and the Contract Price shall be adjusted accordingly.

DB0450 Ritz Carlton Renovation


Phase II Stage 2 - Bills of Quantities P/3 March 2013
RITZ CARLTON DUBAI EXPANSION PHASE II STAGE 2

PREAMBLES

SECTION 2 DEMOLITION AND ALTERATION

2.1 General

2.1.1 Old materials carefully removed, shall be understood to become the property of
the Employer and shall be removed and placed in storage.

2.1.2 Removal of individual fittings, fixtures, doors and windows and louveres or the
like shall be as an item stating the location.

2.1.3 Demolition of existing block work shall be measured as an item stating the
location.

2.1.4 Removal of existing finishes shall be measured as an item stating the location.

2.1.5 Removal of existing equipments shall be measured as an item.

2.1.6 Removal of walls shall include for any finishes to either face

2.1.7 Removal of distribution boards and panel boards, cables and draw wires to
power points and lighting points, wiring accessories, lighting fixtures shall be
measured as an item stating the locations.

2.1.8 Removal of pipework, duct work etc. shall be measured as an item stating the
location.

2.2 Rates for Demolition

2.2.1 Rates for demolition shall be deemed to include for the delivery of all reusable
demolished materials to the Employers stores as directed by the Engineer.

2.2.2 Rates for demolition shall be deemed to include for making good to match the
existing.

2.2.3 Rates for demolitions shall be deemed to include for making joints between old
and new according to the specifications and to Engineers approval.

2.2.4 Rates for demolition and alteration works to include for all necessary supports
to existing structures, applying new finishes where required to match existing
and making good all works disturbed.

2.2.5 Rates for demolition shall be deemed to include protection to all remaining
fittings, finishes, structures during operations.

DB0450 Ritz Carlton Renovation


Phase II Stage 2 - Bills of Quantities P/4 March 2013
RITZ CARLTON DUBAI EXPANSION PHASE II STAGE 2

PREAMBLES

SECTION 3 - CONCRETE WORK

3.1 Generally

3.1.1 No differentiation shall be made for work at different levels.

3.1.2 Laying concrete in bays and daywork joints including necessary formwork shall
be understood to be included.

3.2 In-situ Concrete

3.2.1 In-situ concrete in the following categories shall be measured by area stating
the thickness:-

a) Blinding beds

b) Screeds

c) Concrete toppings

d) Other classifications as may be appropriate

3.3 Reinforcement

3.3.1 Bar reinforcement shall be measured by weight; separately identified for the
concrete elements, bars of differing diameters shall be given in the same item.

3.3.2 Weight of reinforcement shall be the net weight without addition of rolling
margin, supports, spaces, contruction laps etc.

3.3.3 It will be the Contractor's responsibility to produce bar bending schedules in a


format to be approved by the Engineer / Consultant / Project Manager.

3.4 Formwork

3.4.1 Formwork to sides and soffits of beam shall include curved or sloping soffits.

3.4.2 Unless otherwise stated, formwork to decorative features shall be measured by


the length, area or enumerated as appropriate.

3.4.3 No allowance shall be made for overlaps or passings at angles and no


deduction shall be made for:-

a) Intersections of main beams with walls or columns.

b) Intersections of secondary beams with main beams.

DB0450 Ritz Carlton Renovation


Phase II Stage 2 - Bills of Quantities P/5 March 2013
RITZ CARLTON DUBAI EXPANSION PHASE II STAGE 2

PREAMBLES

SECTION 3 - CONCRETE WORK [contd]

3.5 Sundries

3.5.1 Expansion material or the like shall be understood to be included.

3.5.2 Fixing, ties, inserts or the like shall be understood to be included.

3.6 Rates for Concrete Work

3.6.1 Rates for concrete work shall include for work at differing levels and shall
include for hoisting or lowering.

3.6.2 Rates for concrete work shall include for all testing as described.

3.6.3 Rates for concrete shall include for laying in bays; for all formwork to
construction, expansion and daywork joints and for cutting and notching such
formwork to allow passage of reinforcement through the joints and working in
and around rod or mesh reinforcement and filling into formwork; for vibrating
and curing.

3.6.4 Rates for concrete work shall include for all sundry items not associated with
MEP installations such as cutting or forming all holes, chases, sinkings,
mortises and the like; for wood or steel float finishes to all surfaces; for casting
in ties for blockwork; for all necessary grouting in of wood or metal members,
pipes, and making good for all trades.

3.6.5 Rates for plain concrete blinding beds under foundations and the like are to
include for all necessary formwork at edges or extra width of concrete in lieu.

3.6.6 Rates for rod reinforcement shall include all necessary cutting and bending,
adequate chairs, bar grips, cover blocks and spacers to support the
reinforcement to the satisfaction of the Engineer. The intersection of all
reinforcement shall be tied with rust proof wire and rates shall include for this.

3.6.7 Rates for reinforcement shall also include for providing bending schedules in an
approved format.

3.6.8 Rates for fabric reinforcement shall include for all laps, bends, distance blocks
and tying wire as above.

3.6.9 Rates for formwork shall include for all cutting, notching, allowance for overlaps
and passing at angles, battens, strutting, propping, bolting, welding, easing,
striking and removal. Rates shall include for providing a chamfered angle at all
external angles as specified.

DB0450 Ritz Carlton Renovation


Phase II Stage 2 - Bills of Quantities P/6 March 2013
RITZ CARLTON DUBAI EXPANSION PHASE II STAGE 2

PREAMBLES

SECTION 3 - CONCRETE WORK [contd]

3.6 Rates for Concrete Work [contd]

3.6.10 Rates for ribbed metal deck formwork shall include for preparing and submitting
workshop drawings for the Engineers approval.

3.6.11 Rates for precast concrete work shall be deemed to include all bedding,
pointing, special sealings and special pointing between units and structure,
anchor bolts and other fixing devices, designed reinforcement and any other
reinforcement or handling devices needed for handling storage and fixing,
moulds, hoisting and fixing.

3.6.12 Mortises, plugs, grouting for general fixing of joinery metalwork shall be deemed
to be included in the rates and no further reference shall be made to such work.

3.6.13 Rates for concrete work laid in trenches as bed or surround to all pipes and
ducts shall include for all necessary formwork.

3.6.14 Rates for polythene sheeting and similar materials shall include for all laps.

SECTION 4 - MASONRY

4.1 Walls and Piers

4.1.1 Cutting, bonding, tying to concrete or steel, special pointing or wedging up to


soffits and the like, building in ends of concrete wood or metal members shall
be understood to be included.

4.2 Rates for Masonry

4.2.1 Rates for blockwork and masonry shall include for all cutting, pinning, toothing
and bonding, for tying to concrete, for pointing, or wedging up to concrete soffits
and the like; for building in or cutting and pinning in ends of lintels, bearing bars,
timbers, steel sections and the like; for filling cavities of hollow block wall with
mortar or concrete as specified and for vertical movement joints, galvanized
reinforcement, clamps for ancillary works and metal lath at junctions with
concrete to receive render / plaster.

DB0450 Ritz Carlton Renovation


Phase II Stage 2 - Bills of Quantities P/7 March 2013
RITZ CARLTON DUBAI EXPANSION PHASE II STAGE 2

PREAMBLES

SECTION 5 - METALWORK

5.1 Generally

5.1.1 The weight of steelwork shall the net weight, without addition for rolling margin
or welding material and without deduction for holes, splay cuts, notches or the
like.

5.1.2 Welded, rivetted or bolted work shall be so described.

5.1.3 Cutting, drilling, testing, bolting, welding and fabrication, hoisting and fixing in
position shall be understood to be included.

5.1.4 Preparation of workshop and erection drawings shall be understood to be


included.

5.2 Structural Steelwork

5.2.1 Unless otherwise stated, structural steelwork shall be measured by weight,


classified as follows:-

a) Grillages.
b) Beams.
c) Stanchions.
d) Portal frames, stating the number.
e) Support steelwork, which shall include purlins, sheeting rails, braces,
struts, outriggers or the like.
f) Other classifications, as may be appropriate.

5.2.2 Roof trusses shall be enumerated .

5.2.3 Fittings (for example, caps, brackets, sag rods) shall be given as item.

5.2.4 Fittings (for example, bolts, distance pieces, rivets) shall be given as item.

5.2.5 Wedging and grouting under base plates or the like shall be given as item.

5.2.6 Holding down bolts or the like shall be given as item, temporary boxes and
grouting shall be understood to be included.

5.2.7 Protective treatment shall be given as an item.

DB0450 Ritz Carlton Renovation


Phase II Stage 2 - Bills of Quantities P/8 March 2013
RITZ CARLTON DUBAI EXPANSION PHASE II STAGE 2

PREAMBLES

SECTION 5 METALWORK [contd]

5.3 Rates for Structural Steelwork

5.3.1 Rates for structural steelwork are to include for cutting, drilling, testing and
testing apparatus, bolting, welding and fabrication, hoisting and fixing in position
and for all touching up primer as necessary.

5.3.2 Rates shall include for preparing and submitting workshop drawings for the
Engineers approval before fabrication commences.

5.3.3 Rates shall also include for preparing and submitting erection drawings for the
Engineers approval.

5.3.4 Rates for steelwork shall include for all scribing, rebates, grooves, chamfers,
splayed and rounded edges, fair and returned ends, mitres, holes for pipes,
etc., and for all short or isolated lengths.

SECTION 6 - DOORS AND WINDOWS

6.1 Doors

6.1.1 Doors together with their associated frames and linings, including decoration,
ironmongery and glass shall be enumerated.

6.2 Windows

6.2.1 Windows, together with their frames, including ironmongery and glass shall be
enumerated.

6.3 Rates for Doors and Windows

6.3.1 Rates for door frames shall be deemed to include for al sub frames, fixing
devices, bedding and in non hardening mastic if required and stripping off all
protective tape.

6.3.2 Rates for windows shall be deemed to include for all frames, sub frames, fixing
devices, bedding and pointing in non hardening mastic if required and stripping
off all protective tape.

6.3.3 Rates for doors and frames shall be deemed to include for painting and
decoration.

6.3.4 Notwithstanding the clause No. H.6 of principals of measurements for works of
constructions, glazing shall be deemed to be included for in relevant items of
works.

DB0450 Ritz Carlton Renovation


Phase II Stage 2 - Bills of Quantities P/9 March 2013
RITZ CARLTON DUBAI EXPANSION PHASE II STAGE 2

PREAMBLES

SECTION 7 - FINISHES

7.1 Generally

7.1.1 Particulars of material, composition, size, surface finish, bedding, jointing and
grouting shall be given.

7.1.2 Preparing backgrounds, e.g. hacking concrete or raking out joints of blockwork
shall be understood to be included with the items.

7.1.3 All labours are be understood to be included with the item.

7.1.4 Work shall be measured by the area in contact with the base.

7.1.5 Measurement shall be taken on meters, or as square meters or as appropriate


irrespective of curved, spherical and cornical works.

7.2 Beds and Backings

7.2.1 Beds and backings shall be measured together with the required finish.

7.2.2 Preformed backgrounds (for example plaster board, expanded metal lathing)
Shall each be measured together with the appropriate items.

7.3 In-Situ Finishings

7.3.1 Skirtings, kerbs, treads, risers, bands, mouldings, coves, channels or the like
shall be measured by length. Ends, angles, rounded edges and the like shall be
understood to be included.

7.3.2 Metal angle beads, stop beads or the like shall be understood to be included in
the item for plastering and similar finishes.

7.3.3 Division strips shall be measured by length.

7.3.4 Nosing, non-slip inserts and the like shall be measured together with the
required finish in accordance with clause 12.2 hereof.

7.4 Tile, Slab and Block Finishings

7.4.1 Rounded edge tiles and corner tiles shall be understood to be included.

7.4.2 Plastic cover beads and the like shall be understood to be included.

7.5 Suspended Ceilings

7.5.1 Suspended ceiling shall include all necessary access panels with accessories.

DB0450 Ritz Carlton Renovation


Phase II Stage 2 - Bills of Quantities P/10 March 2013
RITZ CARLTON DUBAI EXPANSION PHASE II STAGE 2

PREAMBLES

SECTION 7 FINISHES [contd]

7.6 Decoration

7.6.1 Decoration measured under the separate section as Painting and Decoration.

7.7 Rates for In-situ finishings

7.7.1 Rates for in-situ work shall include for raking out joints of blockwork or bonding
coat or spraying cement slurry on new concrete surfaces to form key, for
working in narrow widths, small and isolated area, rounded arises, fair and
chamfered edges, for making good up to boundaries of other works, for making
good and working around pipes, brackets, etc., and for all other incidental
labours.

7.7.2 Rates shall also include for reinforcing strips at junction of differing materials,
etc.

7.7.3 Rates shall also be deemed to include the use of metal plaster stops and angle
beads.

7.7.4 Rates shall also include for masking before the application of spray finishes,
work executed overhead, temporary rules, supports, screeds and templates.

7.7.5 Rates shall also be deemed to include for the expansion and movement joints
as specified.

7.7.6 Rates shall also include for preparation of structural floor slabs, walls, soffits
etc.

7.8 Rates for Tiles, Slabs and Block finishings

7.8.1 Rates for tile, slab and block finishings shall include for rounded edge tiles and
angles, cutting and fitting up to boundaries and around pipes and brackets, etc.,
and waste; for work in narrow width, small and isolated areas; for perimeter and
intermediate movement joints and all other incidental labours including
cleaning.

7.8.2 Rates shall also be deemed to include for the expansion and movement joints
as specified.

7.8.3 Rates shall also be deemed to include sealant to all sanitary fittings.

7.8.4 Rates shall also include the application of finishes to curved, spherical and
cornical surfaces.

DB0450 Ritz Carlton Renovation


Phase II Stage 2 - Bills of Quantities P/11 March 2013
RITZ CARLTON DUBAI EXPANSION PHASE II STAGE 2

PREAMBLES

SECTION 7 FINISHES [contd]

7.9 Painting Polishing and Similar Work

7.9.1 Painting, polishing and similar work shall be measured by area stating the type,
preparation, number of coats etc.

7.9.2 Painting, polishing and similar work in following categories shall be deemed
included with description under the appropriate section.

a) Non structural metal work.

b) Kitchen cabinets.

c) Wardrobes

d) Counters.

e) Doors and windows.

7.9.3 Painting, polishing and similar work in following categories shall be measured
as a separate item under appropriate section.

a) Structural steel work.

7.9.4 Working in multi colours, sloping surfaces and working at any height shall be
understood to be included.

7.10 Rates for Painting and Decoration

7.10.1 Rates for painting and decorating shall include for multi colours, cutting in,
matching patterns, working to colour codes on services, preparation of
basework, working at any height. The rates shall also include for opening edges
of windows and doors and work on additional surfaces exposed by such
opening edges and for narrow widths.

7.10.2 Rates for sprayed paints shall include for all masking work.

DB0450 Ritz Carlton Renovation


Phase II Stage 2 - Bills of Quantities P/12 March 2013
RITZ CARLTON DUBAI EXPANSION PHASE II STAGE 2

PREAMBLES

SECTION 8 - MECHANICAL WORK

8.1 Generally

Work (unless associated with more than one installation) shall be Classified as
follows and given under an appropriate heading:-

a) Air conditioning installation

b) Hot and Cold water installation

c) Drainage installation

d) Fire fighting installation

8.2 Sundries

8.2.1 Rates for the documents shall include for providing as built drawings and shop
drawings, operating instructions and maintenance manuals within the time
period as specified.

8.2.2 Rate for the incidental works shall deemed to be included for cleaning and
sterilizing.

8.2.3 Rates to include for supports, fixings, anchors, insulating blocks, noise
suppresants

8.2.4 All identification labels, plates, discs, charts, colour coding are deemed to be
included in the rates

8.2.5 Provision of maintenance kits, loose keys and consumables stores are to be
included within the rates

8.3 Pipework and Gutterwork

8.3.1 Fittings to pipes irrespective of the diameter shall be understood to be included.

8.3.2 Pipe supports shall be understood to be included.

8.3.3 Valves or the like shall be enumerated. Sleeves, cover plates or the like shall
be understood to be included.

DB0450 Ritz Carlton Renovation


Phase II Stage 2 - Bills of Quantities P/13 March 2013
RITZ CARLTON DUBAI EXPANSION PHASE II STAGE 2

PREAMBLES

SECTION 8 - MECHANICAL WORK [cont'd]

8.4 Ductwork

8.4.1 Rectangular or square ductwork shall be measured by area, length taken along
the centre line over all fittings extra length for seams, stiffeners, supports,
fixings or the like shall be understood to be included.

8.4.2 Circular flexible ductwork shall be enumerated, stating the diameter.

8.4.3 Fittings including access openings, brackets hangers and other supports to
ductwork shall be understood to be included.

8.5 Equipment

8.5.1 Tanks, fans, pumps, hoods, air-handling units or the like shall be enumerated.

8.5.2 Valves, strainers unions, pressure gauges, thermometers to equipment shall be


understood to be included.

8.5.3 Traps for sanitary fittings shall be understood to be included with the fittings.

8.5.4 Connections to water supply and waste, including necessary waste outlets,
traps flexible connections etc. shall be deemed to be included with the fixing
rate of sanitary fixtures.

8.5.6 Tools and apare parts as reuired are to be included with the fitting

8.6 Automatic Controls

8.6.1 Sensing or activating devices (for example, thermostats, humidstats, motorised


valves), control panels, air compressors and receivers or the like shall be
deemed to be included in the respective items.

8.6.2 Wiring, pneumatic tubing, isolators, starters, relays or the like associated with
automatic controls shall be deemed to be included.

8.7 Connections to Supply Mains

8.7.1 Connections to supply mains shall be measured as an item.

DB0450 Ritz Carlton Renovation


Phase II Stage 2 - Bills of Quantities P/14 March 2013
RITZ CARLTON DUBAI EXPANSION PHASE II STAGE 2

PREAMBLES

SECTION 8 - MECHANICAL WORK [cont'd]

8.8 Insulation including Linings and Protective Coverings

8.8.1 Insulation to rectangular duct work shall be measured by area, calculated as


the length taken along the centre line over all fittings times the net girth of
nominal dimensions. Additional insulation to flanges or the like shall be
understood to be included.

8.8.2 Insulation equipment shall be deemed to be included in the respective item.

8.8.3 Insulation boxes around accessories shall be deemed to be included.

8.8.4 Rates for insulation are to include for cutting and waste, jointing laps and for
working around and over ancillaries, fittings, flanges, and other obstructions.

8.9 Plumbing Works

8.9.1 Rates for Hot and Cold water (Except cold water pipes laid on roof) pipework
shall include for insulating including cuttings and waste, jointing laps and for
working around and over ancillaries, fittings, flange and other obstructions.

8.9.2 Rates for all pipework shall include for assembling and jointing, pipe supports,
pipe sleeves and cover plates and the like.

8.9.3 Rates for pipework shall include for all fittings, brackets, hangers and other
necessary supports.

8.10 Excavating trenches for services (only if measured separately in the Bills
of Quantities)

8.10.1 Excavating trenches for groups of pipes shall be so described.

8.10.2 Disposal, backfilling, compacting and grading bottoms and supporting sides of
excavation, etc. shall be understood to be included.

8.11 Beds, Haunchings and Surroundings (only if measured separately in the


Bills of Quantities)

8.11.1 Beds, haunchings and surroundings shall be understood to be included with the
excavation item.

8.12 Drainage

8.12.1 Drain accessories (for example gullies, traps) shall be enumerated; concrete
surrounds and additional excavation shall be understood to be included.

8.12.2 Fittings to drainage pipes including clean outs shall be understood to be


included with the drainage pipes.

DB0450 Ritz Carlton Renovation


Phase II Stage 2 - Bills of Quantities P/15 March 2013
RITZ CARLTON DUBAI EXPANSION PHASE II STAGE 2

PREAMBLES

SECTION 8 - MECHANICAL WORK [cont'd]

8.13 Rates for Drainage

8.13.1 The rates Clauses for other trades shall also apply to this Section where
relevant.

8.13.2 The rates for drainage pipes shall include for excavating trenches as required
for pipe alone or for the pipe and bed under and shall also include for backfilling
with selected excavated material carefully packed around pipes and clearing
away any surplus.

8.13.3 Rates for manholes, soakaways, septic tanks and the like shall include for
excavation, backfill and removing surplus excavated material from site, for
reinforcing concrete as required and for connections to the drain pipe.

8.14 Manholes, Soakaways, Septic Tanks, etc. (Only if measured separately in


the Bills of Quantities

8.14.1 Manholes, soakaways, septic tanks, etc. shall be enumerated stating the
internal size and the average depth to the nearest 250mm.

8.14.2 Inspection chambers or the like shall be enumerated.

8.14.3 Manhole covers shall be understood to be included with manholes.

8.14.4 Rates for manholes, soakaways, septic tanks and the like shall include for
excavation, backfill and removing surplus excavated material from site, for
reinforcing concrete as required and for connections to the drain pipe.

8.15 Connection

8.15.1 Connections to existing pipes or sewers shall be enumerated.

DB0450 Ritz Carlton Renovation


Phase II Stage 2 - Bills of Quantities P/16 March 2013
RITZ CARLTON DUBAI EXPANSION PHASE II STAGE 2

PREAMBLES

SECTION 9 - ELECTRICAL WORK

9.1 Generally

9.1.1 Work together with its trunking, ducting and cable trays (unless associated with
more than one installation) shall be Classified as follows and given under an
appropriate heading:-

a) Main and Submain Installation.

b) Power Installation.

c) Lighting Installation.

d) Emergency Lighting System.

e) Telephone and Data Installation.

f) Aircraft Obstruction System.

g) Lightning protection and Earthing Installation.

h) Fire alarm system.

j) Building Management System

9.1.2 Installations may be enumerated (for example, Earthing System) which should
then include for all work that is required for a complete installation.

9.1.3 Tape and bus-bar trunking measured separately under appropriate sections.

9.1.4 The references herein to `conduit' shall be understood to include trunking,


ducting or the like.

9.1.5 Cable trays shall be measured by length stating the width.

9.2 Main Circuits

9.2.1 Cable including terminations to distribution boards and the like shall be
enumerated.

9.2.2 Any kind of conduit shall be understood to be included.

DB0450 Ritz Carlton Renovation


Phase II Stage 2 - Bills of Quantities P/17 March 2013
RITZ CARLTON DUBAI EXPANSION PHASE II STAGE 2

PREAMBLES

SECTION 9 - ELECTRICAL WORK [cont'd]

9.3 Sub-Main Circuits

9.3.1 Cable including terminations to individual sub-main circuits shall be enumerated


and separately identified as may be appropriate.

9.3.2 Any kind of conduit shall be understood to be included.

9.4 Sundries

9.4.1 Rates for the documents shall include for providing as built drawings, shop
drawings, operating instructions and maintenance manuals within the time
period as specified and in the approved format.

9.4.2 Rate for the incidental works shall deemed to be included for cleaning and
sterilizing.

9.5 Rates for Electrical Work

9.5.1 Rates for all conduit shall include for all fittings, draw wires and supports.

9.5.2 Rates for cable trays shall include for all fittings and supports.

SECTION 10 TENDER ADJUSTMENTS

10.1.1 Any tenderers adjustments which are commercial or speculative in nature, or


any other general tender discounts shall be incorporated as Adjustments in
the General Summary.

10.1.2 The Adjustments described in clause 19.1.1 above shall apply to all bills
excluding Provisional Sums, unless clearly indicated otherwise. In the event
that a Contract is awarded on the basis of this tender, the adjustment item,
calculated as a percentage of the total tendered sum excluding Provisional
Sums or the total for the bills indicated, shall be applied to all rates and items as
entered in the Bill of Quantities (including any addenda) and the Contract shall
be signed based on the inclusion of the adjusted rates and sums. During this
Contract, the adjusted rates and items shall be applied during remeasure and in
the valuation of variation orders.

DB0450 Ritz Carlton Renovation


Phase II Stage 2 - Bills of Quantities P/18 March 2013
BILL NO. 1

PRELIMINARIES
RITZ CARLTON DUBAI RENOVATION

BILL No.1 - PRELIMINARIES

ITEM DESCRIPTION TOTAL (Dhs.)

PRELIMINARIES

General Notes on Preliminaries

A These Preliminaries are applicable to the whole of the Works. If the


Tenderer wishes to price any of the items contained herein then each such
item, clause or sub-clause must be individually priced. The Tenderer shall
not enter any lump sums covering more than one or all items, clauses or
sub-clauses. Where any item, clause or sub-clause of the Preliminaries
has not been priced, it will be deemed that the value of such item, clause
or sub-clause is included in the rates for measured items elsewhere in the
Bills of Quantities.

Form of Tender

B The Contractor shall describe and list below and price herein any
obligation contained in the Form of Tender and Appendices for which he
has not allowed elsewhere and wishes to price separately.

Instructions to Tenderers

C The Contractor shall describe and list below and price herein any
obligations contained in the Instructions to Tenderers for which he has not
allowed elsewhere and wishes to price separately.

Form of Agreement

D The Contractor shall describe and list below and price herein any
obligations contained in the Form of Agreement for which he has not
allowed elsewhere and wishes to price separately.

Conditions of Contract

E The Contractor shall describe and list below and price herein any
obligations contained in the Conditions of Contract (Parts I and II) for which
he has not allowed elsewhere and wishes to price separately.

Drawings, Specification, Preambles, Bill of Quantities

F The Contractor shall describe and list below and price herein any
obligations contained on the drawings or within the specification,
preambles or bill of quantities for which he has not allowed elsewhere and
wishes to price separately.

Carried to Collection

DB0450 - Renovation Contract


Phase 2 Stage 2 - Bills of Quantities 1/1 March 2013
RITZ CARLTON DUBAI RENOVATION

BILL No.1 - PRELIMINARIES

ITEM DESCRIPTION TOTAL (Dhs.)

PRELIMINARIES [cont'd]

Pricing Generally

A The Contractor shall satisfy himself as to the meaning of every item in the
Bills of Quantities, and the rates and prices inserted by him will be deemed
to cover all his obligations under the Contract and all matters and things
necessary for the proper construction, and completion of the Works
including, but not by way of limitation, all temporary work required
(including any that may be required by Subcontractors). The prices shall
include for all materials and labour and for the provision and use of all plant
- whether mechanical or non-mechanical - required for the expeditious
carrying out of the Works in their proper sequence - for shifting, altering
and adapting such temporary work and plant as may be required during
the progress of the Works and removing at completion and making good
any surfaces disturbed; and if not included in any prices inserted
against the Conditions of Contract Clauses above; for the guarantees,
insurances and bonds required; for the costs of preparing a tender; for the
work in connection with measurements and the final account; for profit; and
for all other establishment charges and on costs of whatever nature. No
claim for additional payment will be allowed for any error or
misunderstanding by the Contractor in these respects. The selected
Contractor will be required to provide the Engineer with a full and detailed
Tender breakdown upon being awarded the Contract. This Tender
breakdown is to show the actual calculations of the Preliminaries, the
labour, plant and material costs of the Works, the build-up of measured
rates with on-costs and overheads and any other allowances used to arrive
at the Tender Sum.
Items in Bills Not Basis for Ordering Materials

B The Contractor shall not use the items given in the Bill of Quantities as a
basis for ordering materials until he has satisfied himself from the drawings
and the specification that the items given are covered the whole work to be
executed.

Construction Plant and Tools

C The Contractor shall provide and deliver to site all constructional plant and
tools required for the proper execution of the Works. Plant over four years
old from the date of manufacture will not be permitted on Site without a
Certificate of worthiness from a reputable company

D The facilities shall include the provision of protective clothing and safety
equipment.

Carried to Collection

DB0450 - Renovation Contract


Phase 2 Stage 2 - Bills of Quantities 1/2 March 2013
RITZ CARLTON DUBAI RENOVATION

BILL No.1 - PRELIMINARIES

ITEM DESCRIPTION TOTAL (Dhs.)

PRELIMINARIES [cont'd]

Construction Plant and Tools [cont'd]

A All cranes with a lifting capacity of one tonne or over are to be fitted with
an approved safe load indicator.

B The Contractor shall immediately replace at his own cost all items or
equipment that become defective for the required duties.

No Objection Certificate(s)

C The Contractor shall be responsible for obtaining No Objection


Certificate(s) from all relevant services and other authorities for the
diversion of services, excavation and shoring works.

Temporary Works

D The Contractor is responsible for the design, construction, maintenance


and removal of all temporary works. The Contractor shall submit to the
Engineer his proposals for all temporary works for approval.

Existing Services

E The Contractor shall be responsible for the protection of all existing


services within the Site and shall make good any damage to existing
services resulting form his carrying out of the Works to the satisfaction of
the Engineer and relevant authority. The Contractor shall be responsible
for giving notice to the relevant authority where temporary or permanent re-
routing of existing services is found to be necessary and shall provide
attendance upon any contractor employed to carry out such re-routing.

Site Area

F The Contractor's activities shall be confined to the Site area within the
limits of the Site hoarding. Throughout the period of construction of the
Works, the Contractor shall maintain the whole area of his operations in a
clean, tidy and safe condition by arranging his materials in an orderly
manner.

G The Contractor will be held responsible for any nuisance caused by his
own or the Subcontractors workmen to grounds surrounding the site and
adjoining buildings, etc., and must make good all such damage and settle
any claims for compensation at his own expense.

H The Contractor in his activities shall take extreme precautions not to hinder
any ongoing operations of the existing Hotel.

Carried to Collection

DB0450 - Renovation Contract


Phase 2 Stage 2 - Bills of Quantities 1/3 March 2013
RITZ CARLTON DUBAI RENOVATION

BILL No.1 - PRELIMINARIES

ITEM DESCRIPTION TOTAL (Dhs.)

PRELIMINARIES [cont'd]

Temporary Hoardings

A The Contractor shall provide all other temporary fencing, hoardings, fans,
planked footways, guard rails, gantries and the like as may be necessary
for protecting the public or occupants for the proper execution of the Works
and for meeting the requirements of any service or other authority and to
the approval of the Engineer.

B The Contractor shall allow for co-ordination with the existing Hotel
operator.

Labour Camp

C Labour Camp is not permitted within the Site area or within the Contractor's
site compound. Watchmen and security staff only may be accommodated.

Transport of Workpeople

D The Contractor shall make all necessary arrangements for the transport of
his own, and his sub-contractors', employees for the duration of the Works

Safety, health and welfare of workpeople

E The Contractor, and all persons employed by him on Site, shall comply
with all Acts, Orders, Laws and Regulations concerning the safety, health
or welfare of workpeople

Site Administration

F The Contractor shall provide sufficient staff and equipment to perform the
administrative duties required to execute the Contract.

G The whole of the Works shall be carried out under the full-time supervision
of the Contractor.

H The Contractor shall keep the Engineer fully informed of the sequence of
all operations comprised in the Works and he shall not delegate such
responsibility to any Subcontractor or to any other agent except with the
written permission of the Engineer.

Security

J The Contractor shall protect the Site from unauthorized entry and fire and
shall control his labor force to prevent nuisance or trespass onto adjacent
property or within existing hotel

Carried to Collection

DB0450 - Renovation Contract


Phase 2 Stage 2 - Bills of Quantities 1/4 March 2013
RITZ CARLTON DUBAI RENOVATION

BILL No.1 - PRELIMINARIES

ITEM DESCRIPTION TOTAL (Dhs.)

PRELIMINARIES [cont'd]

Labour and Materials

A The Contractor shall provide such labour, materials and transport as the
Engineer's Representative may require to assist him in carrying out tests
and checks on materials and workmanship and setting out and
measurement of the Works.

Tests

B Provide all testing, and assistance as specified in the Contract

C The Contractor shall monitor noise and vibration throughout operations to


ensure that specified limits are complied with.

Submittals

D The Contractor shall allow for submittals in accordance with the


specifications.

Samples

E When so required by the Engineer, samples of goods or materials are to


be provided at the Contractor's expense in accordance with specifications.

Permits

F The Contractor shall obtain and pay for all necessary permits, inspections
and tests for the proper installation of his work, as may be required by the
various administrative authorities having jurisdiction.

Progress

G The contractor shall provide monthly progress reports and progress


photographs as specified

H The Contractor shall provide the Engineer with final construction


photographs in accordance with the specifications.

Shop Drawings and Method Statements

J The Contractor, prior to commencement of the works, shall submit for


approval of the Engineer, the Method Statements, shop drawings and all
other details as required.

Carried to Collection

DB0450 - Renovation Contract


Phase 2 Stage 2 - Bills of Quantities 1/5 March 2013
RITZ CARLTON DUBAI RENOVATION

BILL No.1 - PRELIMINARIES

ITEM DESCRIPTION TOTAL (Dhs.)

PRELIMINARIES [cont'd]

Scaffolding

A The Contractor shall provide, erect, maintain, dismantle and clear away at
completion proper and adequate scaffolding for his own use and for the
use of all the Subcontractors nominated and otherwise. Any holes shall be
made good to match the adjacent surfaces as the scaffolding is
dismantled. The Contractor shall be entirely responsible for all safety
precautions in connection with scaffolding and for its entire sufficiency for

Records

B During the progress of the Works, the Contractor shall keep at his own
cost, records of all details and dimensions of the Works as constructed
and shall at any time submit such of the records to the Engineer as he may
require.

C In addition to those records which are specifically required by the


Specification to be kept (e.g. test cubes of concrete, air temperatures,
etc.,) a Site record shall be kept of the completion dates of the various
works in each trade, with particular reference to work which requires time
for drying out, such as solid backgrounds which receive in-situ screeds and
finishings, including the completion times of the individual layers of such
application. These records shall be provided at a minimum of one monthly
intervals.

D The Contractor shall provide list of items to be removed and salvaged and
deliver to Employers stores prior to start of demolition.

E The Contractor shall provide pre-demolition photographs showing existing


conditions of adjoining construction and site improvements including finish
surfaces.

Protection

F Adequate protection against any form of damage or deterioration shall be


provided for all sections of the Works. This shall include protective tapes,
casings, guard rails and the like, which shall be provided if necessary.

G The Contractor shall take all reasonable and proper steps for the protection
of all places on or about the Works which may be dangerous to his
workmen or any other persons. The Contractor shall provide and maintain
signs, red warning lamps, traffic signals and barricades as necessary in
such places.

Carried to Collection

DB0450 - Renovation Contract


Phase 2 Stage 2 - Bills of Quantities 1/6 March 2013
RITZ CARLTON DUBAI RENOVATION

BILL No.1 - PRELIMINARIES

ITEM DESCRIPTION TOTAL (Dhs.)

PRELIMINARIES [cont'd]

Protection [cont'd]

A The Contractor shall provide temporary cooling and ventilation necessary


to protect existing works in accordance with specification.

B The Contractor shall take all precautions to protect the existing Hotel
during demolition works and during construction by providing and
maintaining fabric screens, temporary hoardings etc. at agreed location to
limit dust and noise.

Cleaning the works

C On completion of the Contract, the Works shall be completely cleared and


swept clean, all debris arising is to be removed from site and all in
accordance with the specification.

Traffic Regulations

D The Contractor shall observe all traffic regulations, including those


regarding the loading or unloading of or waiting by vehicles on the public
highway, and the contract sum is deemed to include for strict compliance
therewith. All access roads are to be maintained clean at all times.

Accidents

E The Contractor shall promptly report to the Engineer any accident


whatsoever and he shall make the necessary arrangements to obtain
medical help and transport to a hospital. A full statement, giving full details
of the accident, including statements of witnesses shall be promptly
submitted to the Engineer.

F If any claim is made by any one against the Contractor or any


Subcontractor, the Contractor shall promptly report the facts in writing to
the Engineer giving full details of the claim.

Local Authority Workmen

G The Contractor shall allow access to workmen employed by the local or


other authorities and providing them with attendance as required.

As-Built Drawings

H The Contractor shall provide "As Built" drawings in accordance with the
Specification.

Carried to Collection

DB0450 - Renovation Contract


Phase 2 Stage 2 - Bills of Quantities 1/7 March 2013
RITZ CARLTON DUBAI RENOVATION

BILL No.1 - PRELIMINARIES

ITEM DESCRIPTION TOTAL (Dhs.)

PRELIMINARIES [cont'd]

Clearing away Rubbish

A Allow for clearing away rubbish at regular intervals during the progress of
the Works and at completion and for leaving the Site and perimeter tidy at
completion.

Working with Other Contractors

B The Contractor is understood to be aware that he will not have the sole use
of the Site and is understood to have allowed for working with all the other
separately employed Contractors.

Insurances

C The Contractor shall allow for insurances in accordance with the


requirements of the Contract.

Supervision of Other Works

D The Contractor shall provide staff suitably qualified to supervise each


section of the Works or works of other parties to ensure full compliance
with the Specification and the Tender / Contract Documents.

E The Contractor shall submit a Curriculum Vitae for the Engineer's approval
for each member of staff to be employed on the Project for supervision of
the Works and the works of other parties.

Coordination with Direct Contracts with Client

F The Contractor shall price herein any obligation in respect of coordination


with Contractors in direct Contract with Client.

Performance Bond

G The Contractor shall allow for the provision of the performance bond in
accordance with the requirements of the Contract.

Programme

G In accordance with Clause 8.3 of the Conditions of Contract and the


specification the Contractor shall prepare a comprehensive construction
programme setting out the schedule for completion of the Works including
that of all Subcontractors and identifying all critical activities all in
accordance with the specifications.

Carried to Collection

DB0450 - Renovation Contract


Phase 2 Stage 2 - Bills of Quantities 1/8 March 2013
RITZ CARLTON DUBAI RENOVATION

BILL No.1 - PRELIMINARIES

ITEM DESCRIPTION TOTAL (Dhs.)

PRELIMINARIES [cont'd]

Project Meetings

A The Contractor shall price herein any obligation contained in the


specification on project meetings which he has not allowed elsewhere and
wishes to price separately.

Any other Conditions or Items

B The Contractor shall separately list and price below any other Conditions or
Items considered to have a monetary value.

Carried to Collection

DB0450 - Renovation Contract


Phase 2 Stage 2 - Bills of Quantities 1/9 March 2013
RITZ CARLTON DUBAI RENOVATION

BILL No.1 - PRELIMINARIES

ITEM DESCRIPTION TOTAL (Dhs.)

COLLECTION

From Page No. 1 / 1

From Page No. 1 / 2

From Page No. 1 / 3

From Page No. 1 / 4

From Page No. 1 / 5

From Page No. 1 / 6

From Page No. 1 / 7

From Page No. 1 / 8

From Page No. 1 / 9

TOTAL BILL No.1 - PRELIMINARIES


Carried to General Summary

DB0450 - Renovation Contract


Phase 2 Stage 2 - Bills of Quantities 1 / 10 March 2013
BILL NO. 2

KITCHEN AND LAUNDRY EQUIPMENT - STAGE 2


RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

KITCHEN EQUIPMENT

Supply, install and commission including necessary


fitting and fixtures, all complete as specified and as
shown on drawing

COMMISSARY KITCHEN

Bulk Cooking

A Mobile Table, Ref. GRBU-01 2 No

B Fire Suppression System, Ref. GRBU-03 1 No

C Fire Suppression System, Ref. GRBU-04 1 No

D Exhaust Hood, Ref. GRBU-05 1 No

E Tubular Wall Shelf, Ref. GRBU-06 1 Lot

F Gas Smooth Plate Fry Top on Hygiene Open Base


Cupboard, Ref. GRBU-07 1 No

G Gas Grill with Open Base, Ref. GRBU-08 2 No

H Spreader Table, Ref. GRBU-09 1 No

J Deep Fat Fryer, Gas, Ref. GRBU-10 2 No

K Spreader table, Open hygenic base w/ C-board, 500L,


Ref. GRBU-12 1 No

L 4-Open Burner Range on Gas Oven, Ref. GRBU-13 2 No

M Spreader table, Open hygenic base w/ C-board, 400L ,


Ref. GRBU-14 1 No

N 2-Tier Overshelves with Base Lightings,Ceiling


Mounted, Ref. GRBU-15 5 Lot

P Worktop (1-Piece) (covering Item no. GRBU-17 to 23 ),


Ref. GRBU-16 1 Lot

Q Sink Counter with Space for Garbage Bin, Ref. GRBU-


17 1 No

R Mobile Garbage Bin, Ref. GRBU-18 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2/1 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

COMMISSARY KITCHEN (CONT'D)

Bulk Cooking (cont'd)

A 3-Door Counter Chiller, GN 1/1, Ref. GRBU-19 1 No

B 3-Door Counter Chiller, GN 1/1, Ref. GRBU-20 1 No

C Mobile Garbage Bin, Ref. GRBU-22 1 No

D Sink Counter with Space for Garbage Bin, Ref. GRBU-


23 1 No

E Drain Trough with Grating, Ref. GRBU-24 3 Lot

F Tilting Boiling Kettle, Elec., 150Lt, freestanding, Ref.


GRBU-25 1 No

G Exhaust Hood, Ref. GRBU-26 1 No

H Tilting Brat Pan, Elec., 80Lt, freestanding, Ref. GRBU-


27 2 No

J Drain Trough with Grating, Ref. GRBU-28 1 Lot

K Combi-Oven, Electric, Ref. GRBU-29 2 No

L Water Filter (Combi-Oven), Ref. GRBU-30 1 No

M Roll-in Blast Chiller, Ref. GRBU-31 1 No

N GN Roll-in Trolley, Ref. GRBU-32 1 No

P Hand Wash Sink with Soap Dispenser & Bin, Ref.


No
GRBU-33 1

Q Insect Killer, Ceiling Mounted, Ref. GRBU-34 1 No

Dispatch Chiller

R Walk-in Chiller, Ref. GRDE-01 1 No

S Slot Channel, Ref. GRDE-02 1 Lot

T GN Trolley 2/1, Ref. GRDE-03 13 No

U Mobile Plate Stacker, 104 Plates, Ref. GRDE-04 9 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2/2 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

COMMISSARY KITCHEN (CONT'D)

Pork Chiller

A Walk-in Chiller, Ref. GRPC-01 1 No

B Drain Trough with Grating, Ref. GRPC-02 1 Lot

C 4-Tier Cold Store Shelving, 60 ", Ref. GRPC-03 4 No

Pork Preparation

D Insect Killer, Ceiling Mounted, Ref. GRPP-01 1 No

E Drain Trough with Grating, Ref. GRPP-02 1 Lot

F Hand Wash Sink with Soap Dispenser & Bin, Ref.


GRPP-03 1 No

G Mobile Stand for GRPP-04, Ref. GRPC-04 1 No

H Vacuum Packaging Machine, GRPP-05 1 No

J Chopping Block, GRPP-06 1 No

K Knife Sanitizer, GRPP-07 1 No

L 2-Bowl Sink Counter, GRPP-08 1 No

M Counter Table with Drawer & Base Shelf, GRPP-09 1 No

N Open Counter Cabinet, GRPP-10 1 No

P 1-Tier Wall Shelf with Base Lightings, GRPP-11 1 Lot

Q Mobile Food Bin, GRPP-13 2 No

R Worktop (1-Piece) (covering Item no. GRPP-08 to 13),


Ref. GRPP-14 1 Lot

S Mobile Garbage Bin, Ref. GRPP-15 1 No

Garde Manger Holding Chiller 1

T Walk-in Chiller, Ref. GRH1-01 1 No

U Slot Channel, Ref. GRH1-02 1 Lot

V GN Trolley 2/1, Ref. GRH1-03 18 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2/3 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

COMMISSARY KITCHEN (CONT'D)

Garde Manger Holding Chiller 2

A Walk-in Chiller, Ref. GRH2-01 1 No

B Slot Channel, Ref. GRH2-02 1 Lot Lot

C GN Trolley 2/1, Ref. GRH2-03 13 No

Garde Manger

D Worktop (1-Piece) (covering Item no. GRGM-02 to


GRGM-10), Ref GRGM-01 1 Lot

E 3-Door Counter Chiller, GN 1/1, Ref. GRGM-02 1 No

F 3-Door Counter Chiller, GN 1/1, Ref. GRGM-03 1 No

G 2-Door Counter Chiller, GN 1/1, Ref. GRGM-04 1 No

H 2-Tier Overshelves with Base Lightings,Ceiling


Mounted, Ref. GRGM-05 5 Lot

J Counter Cabinet, Ref. GRGM-06 1 No

K 2-Tier Overshelves with Base Lightings,Ceiling


Mounted, Ref. GRGM-07 5 Lot

L Counter Cabinet, Ref. GRGM-08 1 No

M 3-Door Counter Chiller, GN 1/1, Ref. GRGM-09 1 No

N 3-Door Counter Chiller, GN 1/1, Ref. GRGM-10 1 No

P Mobile Garbage Bin, Ref. GRGM-12 1 No

Worktop (1-Piece) (covering Item no. GRGM-14 to


Q GRGM-27), Ref. GRGM-13 1 Lot

R Counter Cabinet, Ref. GRGM-14 1 No

S Sink Counter, Ref. GRGM-15 1 No

T 1-Tier Wall Shelf with Base Lighting, Ref. GRGM-16 1 Lot

U 3-Door Counter Chiller, GN 1/1, Ref. GRGM-17 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2/4 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

COMMISSARY KITCHEN (CONT'D)

Garde Manger (cont'd)

A Portion Scale, Table Mount, Ref. GRGM-18 1 No

B Food Blender, Ref. GRGM-19 2 No

C Mixer, Ref. GRGM-21 1 No

D Meat Slicer, Ref. GRGM-22 1 No

E Counter Cabinet, Ref. GRGM-23 1 No

F 6-Drawer Counter Chiller, GN 1/1, Ref. GRGM-25 1 No

G 1-Tier Wall Shelf with Base Lighting, Ref. GRGM-26 1 Lot

H Counter Sink Table with Base Shelf, Ref. GRGM-27 1 No

J Mobile Garbage Bin, Ref. GRGM-28 1 No

K Hand Wash Sink with Soap Dispenser, Ref. GRGM-29 1 No

L Insect Killer, Ceiling Mounted, Ref. GRGM-30 1 No

M Counter Cabinet with Mid & Base Shelf, Ref. GRGM-31 1 No

N Exhaust Hood, Ref. GRGM-32 1 No

P Induction cooker, base-line, Ref. GRGM-33 2 No

Q Water Filter (Combi-Oven), Ref. GRGM-35 1 No

R Combi-Oven, Electric, Ref. GRGM-36 1 No

S Drain Trough with Grating, Ref. GRGM-37 1 Lot

Vegetable & Fruit Preparation

T Hand Wash Sink with Soap Dispenser, Ref. GRVP-01 1 No

U Insect Killer, Ceiling Mounted, Ref. GRVP-02 1 No

V Vegetable Preparation Machine, Ref. GRVP-03 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2/5 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

COMMISSARY KITCHEN (CONT'D)

Vegetable & Fruit Preparation (cont'd)

A Trolley w/ Perforated Basket for Vegetables, Ref. GRVP-


04 3 No

B Bacterial Control Unit, Ref. GRVP-05 1 No

C Potato Peeler, Free Standing, Ref. GRVP-07 1 No

D Worktop (1-Piece) (covering Item no. GRVP-09 to


GRVP-21), Ref. GRVP-08 1 Lot

E 2 Bowl Sink Counter, Ref. GRVP-09 1 No

F 1-Tier Wall Shelf with Base Lighting, Ref. GRVP-10 1 Lot

G Open Counter Cabinet, Ref. GRVP-12 1 No

H Mobile Bin, Ref. GRVP-13 3 No

J Juice Extractor, Ref. GRVP-14 2 No

K Counter Cabinet, Ref. GRVP-15 1 No

L 1-Tier Wall Shelf with Base Lighting, L-shape, Ref.


GRVP-16 1 Lot

M Open Counter Cabinet, Ref. GRVP-17 1 No

N 1-Tier Wall Shelf with Base Lighting, Ref. GRVP-18 2 Lot

P 3-Door Counter Chiller, GN 1/1, Ref. GRVP-19 1 No

Q Sink Counter, Ref. GRVP-20 1 No

R Knife Sanitizer, Ref. GRVP-21 1 No

S Mobile Garbage Bin, Ref. GRVP-22 1 No

T Vacuum Packaging Machine, Ref. GRVP-24 1 No

U Mobile Stand for GRVP-24, GRVP-25 1 No

V Open Cabinet w/ Space for Garbage Bin, Ref. GRVP-26


1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2/6 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

COMMISSARY KITCHEN (CONT'D)

Vegetable & Fruit Preparation (cont'd)

A Mobile Garbage Bin, Ref. GRVP-27 1 No

2-Tier Overshelves Ceiling Mounted w/ Base Lightings,


B Ref. GRVP-28 1 Lot

C 3-Door Counter Chiller, GN 1/1, Ref. GRVP-29 1 No

D Counter Cabinet, Ref. GRVP-30 1 No

E 2-Tier Overshelves with Base Lightings,Ceiling


Mounted, Ref. GRVP-31 1 Lot

F Portion Scale, Table Mount, Ref. GRVP-32 1 No

G Counter Cabinet, Ref. GRVP-33 1 No

H Worktop (1-Piece) (covering Item no. GRVP-26 to 33),


Ref. GRVP-34 1 Lot

J Drain Trough with Grating, Ref. GRVP-35 1 Lot

Vegetable & Fruit Chiller

K Walk-in Chiller, Ref. GRVC-01 1 No

L Slot Channel, Ref. GRVC-02 1 Lot

M 4-Tier Cold Store Shelving, 48 ", Ref. GRVC-03 5 No

N 4-Tier Cold Store Shelving, 60 ", Ref. GRVC-04 3 No

P GN Trolley 2/1, Ref. GRVC-05 7 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2/7 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

COMMISSARY KITCHEN (CONT'D)

General Store

A Insect Killer, Ceiling Mounted, Ref. GRGS-01 1 No

B Dunnage Rack, 48 ", Ref. GRGS-02 12 No

C Compact Shelvings, Ref. GRGS-03 1 Lot

D 4-Tier Dry Store Shelving, 48 ", Ref. GRGS-04 6 No

E 4-Tier Dry Store Shelving, 60 ", Ref. GRGS-05 8 No

F Hand Wash Sink with Soap Dispenser, Ref. GRGS-06 1 No

Meat Chiller

G Walk-in Chiller, Ref. GRMC-01 1 No

H Slot Channel, Ref. GRMC-02 1 Lot

J GN Trolley 2/1, Ref. GRMC-03 2 No

K 4-Tier Cold Store Shelving, 60 ", Ref. GRMC-04 1 No

L 4-Tier Cold Store Shelving, 48 ", Ref. GRMC-05 2 No

Meat Freezer

M Walk-in Freezer, Ref. GRMF-01 1 No

N 4-Tier Cold Store Shelving, 60 ", Ref. GRMF-02 3 No

P GN Trolley 2/1, Ref. GRMF-03 2 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2/8 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

COMMISSARY KITCHEN (CONT'D)

Meat Preparation

A Insect Killer, Ceiling Mounted, Ref. GRMP-01 1 No

Hand Wash Sink with Soap Dispenser & Bin, Ref.


B GRMP-02 1 No

C Mobile Garbage Bin, Ref. GRMP-03 1 No

D Bacterial Control Unit, Ref. GRMP-04 1 No

E Mobile Stand for GRMP-06, Ref. GRMP-05 1 No

F Vacuum Packaging Machine, Ref. GRMP-06 1 No

G Chopping Block Table, Ref. GRMP-07 1 No

H Meat Saw, Ref. GRMP-08 1 No

J Drain Trough with Grating, Ref. GRMP-09 1 Lot

K Worktop (1-Piece) (covering Item no. GRMP-12 to


GRMP-26), Ref. GRMP-11 1 Lot

L Mobile Bin, Ref. GRMP-13 1 No

Meat Preparation

M Meat Mincer, Ref. GRMP-15 1 No

N 1-Tier Wall Shelf with Base Lighting, L-shape, Ref.


GRMP-16 1 Lot

P Open Counter Cabinet, Ref. GRMP-17 1 No

Q Bowl Cutter, Ref. GRMP-18 1 No

R Counter Cabinet, Ref. GRMP-19 1 No

S 1-Tier Wall Shelf with Base Lighting, L-shape, Ref.


GRMP-20 1 Lot

T Counter Cabinet, Ref. GRMP-21 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2/9 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

COMMISSARY KITCHEN (CONT'D)

Meat Preparation (cont'd)

A Meat Slicer, Ref. GRMP-22 1 No

B 2 Bowl Sink Counter, Ref. GRMP-25 1 No

C Knife Sanitizer, Ref. GRMP-26 1 No

Seafood Preparation

D Hand Wash Sink with Soap Dispenser & Bin, Ref.


GRSP-01 1 No

E Insect Killer, Ceiling Mounted, Ref. GRSP-02 1 No

F Knife Sanitizer, Ref. GRSP-03 1 No

G Drain Trough with Grating, Ref. GRSP-04 1 Lot

H 2-Bowl Fish Sink Counter with Pre-Rinse Spray, Ref.


GRSP-05 1 No

J Counter Cabinet, Ref. GRSP-06 1 No

K 2-Tier Wall Shelf with Base Lighting, Ref. GRSP-07 1 Lot

L Worktop (1-Piece) (covering Item no. GRSP-05 to 08),


Ref. GRSP-09 1 Lot

M Counter Cabinet with Lockable Drawers, Ref. GRSP-10 1 No

N Sink Counter, Ref. GRSP-11 1 No

P 2-Tier Wall Shelf with Base Lighting, Ref. GRSP-12 1 Lot

Q Portion Scale, Table Mount, Ref. GRSP-13 1 No

R Counter Cabinet, Ref. GRSP-15 1 No

S Bacterial Control Unit, Ref. GRSP-16 1 No

T Worktop (1-Piece) (covering Item no. GRSP-11 to 16),


Ref. GRSP-17 1 Lot

U Mobile Garbage Bin, Ref. GRSP-18 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 10 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

COMMISSARY KITCHEN (CONT'D)

Seafood Chiller

A Walk-in Chiller, Ref. GRSE-01 1 No

B Slot Channel, Ref. GRSE-02 1 Lot

C GN Trolley 2/1, Ref. GRSE-03 2 No

D 4-Tier Cold Store Shelving, 60 ", Ref. GRSE-05 1 No

Seafood Freezer

E Walk-in Freezer, Ref. GRSF-01 1 No

F GN Trolley 2/1, Ref. GRSF-02 2 No

G 4-Tier Cold Store Shelving, 48 ", Ref. GRSF-03 3 No

General Freezer

H Walk-in Freezer, Ref. GRGF-01 1 No

J Slot Channel, Ref. GRGF-02 1 Lot

K 4-Tier Cold Store Shelving, 48 ", Ref. GRGF-03 4 No

L 4-Tier Cold Store Shelving, 60 ", Ref. GRGF-04 3 No

M GN Trolley 2/1, Ref. GRGF-05 2 No

General Chiller

N Walk-in Chiller, Ref. GRGC-01 1 No

P Drain Trough with Grating, Ref. GRGC-02 1 Lot

Q GN Trolley 2/1, Ref. GRGC-03 2 No

R 4-Tier Cold Store Shelving, 48 ", Ref. GRGC-04 1 No

S 4-Tier Cold Store Shelving, 60 ", Ref. GRGC-05 5 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 11 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

COMMISSARY KITCHEN (CONT'D)

Holding Chiller

A Walk-in Chiller, Ref. GRHC-01 1 No

B Slot Channel, Ref. GRHC-02 1 Lot

C Dunnage Rack, 60 ", Ref. GRHC-03 2 No

D 4-Tier Cold Store Shelving, 60 ", Ref. GRHC-04 2 No

E 4-Tier Cold Store Shelving, 48 ", Ref. GRHC-05 3 No

Vegetable Wash

Hand Wash Sink with Soap Dispenser & Bin, Ref.


F GRVW-01 1 No

G Insect Killer, Ceiling Mounted, Ref. GRVW-02 1 No

H Drain Trough with Grating, Ref. GRVW-03 1 Lot

Worktop (1-Piece) (covering Item no. GRVW-05 to


J GRVW-10), Ref. GRVW-04 1 Lot

K Mobile Garbage Bin, Ref. GRVW-05 1 No

L 1-Tier Wall Shelf with Base Lighting, Ref. GRVW-06 1 Lot

M Counter Drawer Cabinet w/ Space for Garbage Bin,


Ref. GRVW-07 1 No

N Portion Scale, Table Mount, Ref. GRVW-08 1 No

P 2 Bowl Sink Counter, GRVW-09 1 No

Q 1-Tier Wall Shelf with Base Lighting, Ref. GRVW-10 1 Lot

R Drain Trough with Grating, Ref. GRVW-13 1 Lot

S Vegetable Drying Machine, Ref. GRVW-14 1 No

T Vegetable Washer, Ref. GRVW-15 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 12 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

COMMISSARY KITCHEN (CONT'D)

De-boxing

A Insect Killer, Ceiling Mounted, Ref. GRDB-01 1 No

B Hand Wash Sink with Soap Dispenser & Bin, Ref.


GRDB-02 1 No

C Wall Cabinet with Sliding Doors, Ref. GRDB-03 1 Lot

D Counter Cabinet w/ Lockable Drawer, Ref. GRDB-04 1 No

E Mobile Garbage Bin, Ref. GRDB-05 1 No

F Queen Mary Trolley, Ref. GRDB-06 2 No

Receiving Area

G 50' Hose Reel, 3/8 ID with Front Trigger Gun ", Ref.
GRRA-01 1 No

H Tap Bib, Ref. GRRA-02 1 No

J Mobile Garbage Bin, Ref. GRRA-03 1 No

K Sink Counter, Ref. GRRA-04 1 No

L Platform Scale, with digital indicator, 300kgx0.1kg, Ref.


GRRA-05 1 No

M Counter Cabinet, Ref. GRRA-06 1 No

N Worktop (1-Piece) (covering Item no. GRRA-04 and


GRRA-06), Ref. GRRA-7 1 Lot

Trolley Wash

P Hand Wash Sink with Soap Dispenser & Bin, Ref.


GRTW-01 1 No

Q Insect Killer, Ceiling Mounted, Ref. GRTW-02 1 No

R Soiled Flat Form Trolley, Ref. GRTW-03 4 No

S Wall Mounted Pressure System, Ref. GRTW-04 2 No

T Drain Trough with Grating, Ref. GRTW-05 1 Lot

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 13 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

COMMISSARY KITCHEN (CONT'D)

Dry Trash

A Insect Killer, Ceiling Mounted, Ref. GRDT-01 1 No

B Drain Trough with Grating, Ref. GRDT-02 1 Lot

C Hand Wash Sink with Soap Dispenser & Bin, Ref. 1


GRDT-03 No

D 2 Bowl Sink Counter, Ref. GRDT-04 1 No

E 1-Tier Wall Shelf, Ref. GRDT-05 1 Lot

F 1-Tier Wall Shelf, Ref. GRDT-06 1 Lot

G 2 Bowl Sink Counter, Ref. GRDT-07 1 No

H Worktop (1-Piece) (covering Item no. GRDT-04 to 07), 1


Ref. GRDT-08 No

J Can Washer, Ref. GRDT-11 1 No

K Drain Trough with Grating, Ref. GRDT-12 1 Lot

L Pallet Rack, Ref. GRDT-13 4 No

M Mobile Garbage Bin, Ref. GRDT-14 2 No

N Sorting Table with Scrap Block & Space for Bin, Ref.
GRDT-15 1 No

Garbage Chiller

P Walk-in Chiller, Ref. GRWC-01 1 No

Q Insect Killer, Ceiling Mounted, Ref. GRWC-02 2 No

R Drain Trough with Grating, Ref. GRWC-03 2 Lots

S Pallet Rack, Ref. GRWC-04 18 No

Dirty Linen

T Dirty Linen Trolley, Ref. GRDL-01 19 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 14 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

COMMISSARY KITCHEN (CONT'D)

Detergent Room

A Dunnage Rack, 60 ", Ref. GRDR-01 2 No

B 4-Tier Shelving, 60 ", Ref. GRDR-02 1 No

C 4-Tier Shelving, 48 ", Ref. GRDR-03 2 No

ALL DAY DINING

Indian

D Marble Worktop (1-Piece) (covering Item no. GRIN-02


to 07), Ref. GRIN-01 1 Lot

E 6-Drawer Counter Chiller, GN 1/1 (D-660), Ref. GRIN-


02 1 No

F Wall Cabinet, Ref. GRIN-03 1 Lot

G Counter Cabinet, Ref. GRIN-04 1 No

H Sink Counter, Ref. GRIN-06 1 No

J Bin Compartment, Ref. GRIN-07 1 No

K 4-Open Burner Range on Gas Oven, Ref. GRIN-08 1 No

L Gas Solid Top on Base, Ref. GRIN-09 1 No

M Exhaust Hood, Ref. GRIN-10 1 No

N Counter Cabinet, Ref. GRIN-12 1 No

P Hot Plate, Ref. GRIN-13 1 No

Q Hot Plate, Ref. GRIN-14 1 No

R Counter Cabinet, Ref. GRIN-15 1 No

S Exhaust Hood, Ref. GRIN-16 1 No

T Tandoor Oven, Ref. GRIN-17 1 No

U Food Pan, Full Size, Ref. GRIN-18 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 15 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ALL DAY DINING (CONT'D)

Indian (cont'd)

A Glass Enclosure, Ref. GRIN-19 1 No

B Tandoor Oven, Ref. GRIN-20 1 No

C Counter Cabinet, Ref. GRIN-21 1 No

D Mobile Table with Mid & Base Shelf, Ref. GRIN-22 1 No

Arabic / Mediterranean

Marble Worktop (1-Piece) (covering Item no. GRAM-02


E to 27), Ref. GRAM-01 1Lot Lot

F Hot Plate, Ref. GRAM-02 1 No

G Counter Cabinet, Ref. GRAM-03 1 No

H Hot Carving Shelves, Ref. GRAM-04 1 No

J Counter Cabinet, Ref. GRAM-05 1 No

K Hot Plate, Ref. GRAM-06 1 No

L Counter Cabinet, Ref. GRAM-07 1 No

M Glass Enclosure, Ref. GRAM-08 1 No

N Barbecue Grill, Ref. GRAM-09 1 No

P Exhaust Hood, Ref. GRAM-10 1 No

Q Drop-in Sarjj Cooker, Ref. GRAM-11 1 No

R Counter Cabinet, Ref. GRAM-12 1 No

S Hot Plate, Ref. GRAM-14 1 No

T Counter Cabinet, Ref. GRAM-15 1 No

U Hot Plate, Ref. GRAM-16 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 16 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ALL DAY DINING (CONT'D)

Arabic / Mediterranean (cont'd)

A 2-Drawer Counter Chiller, GN 1/1, Ref. GRAM-17 1 No

B Thermowell, Ref. GRAM-18 1 No

C Rotating Shawarma, Ref. GRAM-20 1 No

D Counter Cabinet, Ref. GRAM-21 1 No

E Bin Compartment, Ref. GRAM-23 1 No

F Sink Counter, Ref. GRAM-24 1 No

G Mini Combi-Oven, Electric, Ref. GRAM-25 1 No

H Water Filter (Combi-Oven), Ref. GRAM-26 1 No

J Counter Cabinet, Ref. GRAM-27 1 No

K Mobile Table, Ref. GRAM-29 1 No

L Exhaust Hood, Ref. GRAM-30 1 No

M Deep Fat Fryer, Gas, Ref. GRAM-31 1 No

N Tubular Wall Shelf, Ref. GRAM-32 1 Lot Lot

P Spreader table, Open hygenic base w/ C-board, 400L,


Ref. GRAM-33 1 No

Q 4-Open Burner Range on Gas Oven, Ref. GRAM-34 1 No

R Rotisserie, Ref. GRAM-35 1 No

S Bin Compartment, Ref. GRAM-37 1 No

T Hand Wash Sink, Drawer Type, Ref. GRAM-38 1 No

U Marble Worktop (1-Piece) (covering Item no. GRAM-37


to 38), Ref. GRAM-39 1Lot Lot

V Fire Suppression System, Ref. GRAM-40 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 17 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ALL DAY DINING (CONT'D)

Arabic / Mediterranean (cont'd)

A Fire Suppression System, Ref. GRAM-41 1 No

B Fire Suppression System, Ref. GRAM-42 1 No

C Fire Suppression System, Ref. GRAM-43 1 No

D Fire Suppression System, Ref. GRAM-44 1 No

Western

Marble Worktop (1-Piece) (covering Item no. GRWE-02


E to 14), Ref. GRWE-01 1 Lot

F Hand Wash Sink, Drawer Type, Ref. GRWE-02 1 No

G Hot Plate, Ref. GRWE-04 1 No

H Counter Cabinet, Ref. GRWE-05 1 No

J Hot Plate, Ref. GRWE-06 1 No

K Counter Cabinet, Ref. GRWE-07 1 No

L Drop-in Double Induction Cooker, Ref. GRWE-08 2 No

2-Drawer Counter Chiller, GN 1/1 (D-660), Ref. GRWE-


M 09 1 No

N Thermowell, Ref. GRWE-10 1 No

P Bin Compartment, Ref. GRWE-13 1 No

Q Sink Counter, Ref. GRWE-14 1 No

R Exhaust Hood, Ref. GRWE-15 1 No

S Tubular Wall Shelf, Ref. GRWE-16 1 Lot

T Spreader table, Open hygenic base w/ C-board, 400L,


Ref. GRWE-17 1 No

U Deep Fat Fryer, Gas, Ref. GRWE-18 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 18 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ALL DAY DINING (CONT'D)

Western (cont'd)

A Gas Pasta Cooker 40 ltrs C-Board, Ref. GRWE-19 1 No

B 4-Open Burner Range on Gas Oven, Ref. GRWE-20 1 No

C Gas Grill, Ref. GRWE-21 1 No

D Gas Smooth Plate Fry Top, Ref. GRWE-22 1 No

E Spreader table, Open hygenic base w/ C-board, 400L,


Ref. GRWE-23 1 No

F Water Filter (Combi-Oven), Ref. GRWE-26 1 No

G Combi-Oven, Electric, Ref. GRWE-27 1 No

Cold Buffet

H Marble Worktop (1-Piece) (covering Item no. GRCB-02


to 05), Ref. GRCB-01 1 Lot

J Counter Cabinet for Remote Comp., for Item no. GRCB-


03, Ref. GRCB-02 1 No

K Drop-in Frost Top, Ref. GRCB-03 1 No

L 2-Glass Door Counter Refrigerator, Ref. GRCB-04 1 No

M Counter Cabinet for Remote Comp., for Item no. GRCB-


04, Ref. GRCB-05 1 No

N Marble Worktop (1-Piece) (covering Item no. GRCB-07


to 10), Ref. GRCB-06 1 Lot

P Counter Cabinet for Remote Comp., for Item no. GRCB-


08, Ref. GRCB-07 1 No

Q Drop-in Frost Top, Ref. GRCB-08 1 No

R 2-Glass Door Counter Refrigerator, Ref. GRCB-09 1 No

S Counter Cabinet for Remote Comp., for Item no. GRCB-


09, Ref. GRCB-10 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 19 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ALL DAY DINING (CONT'D)

Cold Buffet (cont'd)

A Counter Cabinet for Remote Comp., for Item no. GRCB-


12, Ref. GRCB-11 1 No

B Drop-in Frost Top, Ref. GRCB-12 1 No

C 2-Glass Door Counter Refrigerator, Ref. GRCB-13 1 No

D Counter Cabinet for Remote Comp., for Item no. GRCB-


13, Ref. GRCB-14 1 No

E Marble Worktop (1-Piece) (covering Item no. GRCB-11


to 14), Ref. GRCB-15 1 Lot

F Counter Cabinet for Remote Comp., for Item no. GRCB-


17, Ref. GRCB-16 1 No

G Drop-in Frost Top, Ref. GRCB-17 1 No

H 2-Glass Door Counter Refrigerator, Ref. GRCB-18 1 No

J Counter Cabinet for Remote Comp., for Item no. GRCB-


18, Ref. GRCB-19 1 No

K Marble Worktop (1-Piece) (covering Item no. GRCB-16


to 19), Ref. GRCB-20 1 Lot

L Marble Worktop (1-Piece) (covering Item no. GRCB-22


to 25), Ref. GRCB-21 1 Lot

M Counter Cabinet for Remote Comp., for Item no. GRCB-


23, Ref. GRCB-22 1 No

N Drop-in Frost Top, Ref. GRCB-23 1 No

P 2-Glass Door Counter Refrigerator, Ref. GRCB-24 1 No

Q Counter Cabinet for Remote Comp., for Item no. GRCB-


24, Ref. GRCB-25 1 No

R Marble Worktop (1-Piece) (covering Item no. GRCB-27


to 30), Ref. GRCB-26 1 Lot

S Counter Cabinet for Remote Comp., for Item no. GRCB-


28, Ref. GRCB-27 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 20 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ALL DAY DINING (CONT'D)

Cold Buffet (cont'd)

A Drop-in Frost Top, Ref. GRCB-28 1 No

B 2-Glass Door Counter Refrigerator, Ref. GRCB-29 1 No

C Counter Cabinet for Remote Comp., for Item no. GRCB-


29, Ref. GRCB-30 1 No

D Counter Cabinet for Remote Comp., for Item no. GRCB-


32, Ref. GRCB-31 1 No

E Drop-in Frost Top, Ref. GRCB-32 1 No

F 2-Glass Door Counter Refrigerator, Ref. GRCB-33 1 No

G Counter Cabinet for Remote Comp., for Item no. GRCB-


33, Ref. GRCB-34 1 No

H Marble Worktop (1-Piece) (covering Item no. GRCB-31


to 34), Ref. GRCB-35 1 Lot

J Counter Cabinet for Remote Comp., for Item no. GRCB-


37, Ref. GRCB-36 1 No

K Drop-in Frost Top, Ref. GRCB-37 1 No

L 2-Glass Door Counter Refrigerator, Ref. GRCB-38 1 No

M Counter Cabinet for Remote Comp., for Item no. GRCB-


38, Ref. GRCB-39 1 No

N Marble Worktop (1-Piece) (covering Item no. GRCB-36


to 39), Ref. GRCB-40 1 Lot

Dishwash Area

P Insect Killer, Ceiling Mounted, Ref. GRDW-01 1 No

Q Mobile Garbage Bin, Ref. GRDW-02 2 No

R Sorting Shelf, Ceiling Mounted, Ref. GRDW-03 1 Lot

S Soiled Dish Table with 2 Scrap Rings, Double Bowl


Sink, Pre-Rinse Spray and Deck Mounted Faucet, Ref.
GRDW-04 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 21 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ALL DAY DINING (CONT'D)

Dishwash Area (cont'd)

A Drain Trough with Grating, Ref. GRDW-05 1 Lot

B Water Filter (for Dishwash Machine), Ref. GRDW-06 1 No

C S.S. Vent Duct (from below ceiling to machine only),


Ref. GRDW-07 1 No

D Dishwashing Machine, Ref. GRDW-08 1 No

E Clean Dish Table, Ref. GRDW-09 1 No

F Dish Dolly, Ref. GRDW-10 1 No

G Rack Shelf, Wall Mounted, Ref. GRDW-11 1 No

Steward Store

H Dish Dolly, Ref. GRSS-01 3 No

J 4-Tier Clean Dish Shelving, 60 ", Ref. GRSS-02 2 No

K Hot Cooking

L Worktop (1-Piece) (covering Item no. GRHC-02 to 15),


Ref. GRHC-01 1 Lot

M Sink Counter w/ Space for Garbage Bin, Ref. GRHC-02


1 No

N Mobile Garbage Bin, Ref. GRHC-03 1 No

P Heated Lamp, Ref. GRHC-04 1 Set

Q Counter Cabinet, Ref. GRHC-05 2 No

R Heated Cabinet, Ref. GRHC-06 1 No

S Heated Lamp, Ref. GRHC-07 1 Set

T 2-Tier Overshelves,Ceiling Mounted, Ref. GRHC-08 1 Lot

U Open Cabinet, Ref. GRHC-09 1 No

V 3-Door Counter Chiller, GN 1/1, Ref. GRHC-10 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 22 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ALL DAY DINING (CONT'D)

Hot Cooking (cont'd)

A 2-Tier Wall Shelving with Base Lighting, Ref. GRHC-12 2 Lot

B 2-Door Counter Chiller, GN 1/1, Ref. GRHC-13 1 No

C Sink Counter, Ref. GRHC-14 1 No

D Counter Cabinet, Ref. GRHC-15 1 No

E Water Filter (Combi-Oven), Ref. GRHC-16 1 No

F Combi-Oven, Electric, Ref. GRHC-17 1 No

G Spreader table, Open hygenic base w/ C-board, 400L,


Ref. GRHC-18 1 No

H Gas Grill, Ref. GRHC-19 1 No

J Gas Smooth Plate Fry Top, Ref. GHRC-20 1 No

K Spreader table, Open hygenic base w/ C-board, 700L,


Ref. GRHC-21 1 No

L Salamander, Electric, Ref. GRHC-22 1 No

M Microwave Oven, Ref. GRHC-23 1 No

N Wall Cladding, Ref. GRHC-26 1 No

P Exhaust Hood, Ref. GRHC-27 1 No

Q 4-Open Burner Range on Gas Oven, Ref. GRHC-28 2 No

R Spreader table, Open hygenic base w/ C-board, 400L,


Ref. GRHC-29 1 No

S Deep Fat Fryer, Gas, Ref. GRHC-30 2 No

T Spreader table, Open hygenic base w/ C-board, 400L,


Ref. GRHC-31 1 No

U Tubular Wall Shelf, Ref. GRHC-32 1 Lot

V Tubular Wall Shelf, Ref. GRHC-33 1 Lot

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 23 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ALL DAY DINING (CONT'D)

Hot Cooking (cont'd)

A Sink Counter w/ Space for Garbage Bin, Ref. GRHC-35


1 No

B Mobile Garbage Bin, Ref. GRHC-36 1 No

C Heated Cabinet w/ 1 Heated Well, Ref. GRHC-38 1 No

D Heated Cabinet, Ref. GRHC-39 1 No

E 2-Tier Overshelves w/ Base Lighting, Ceiling Mounted,


Ref. GRHC-40 1 Lot

F Open Cabinet, Ref. GRHC-41 1 No

G Heated Lamp, Ref. GRHC-42 1 Set

H Open Cabinet, Ref. GRHC-43 1 No

J Heated Lamp, Ref. GRHC-44 1 Set

K Worktop (1-Piece) (covering Item no. GRHC-35 to


GRCH-44), Ref. GRHC-45 1 Lot

L Fire Suppression System, Ref. GRHC-46 1 No

M Fire Suppression System, Ref. GRHC-47 1 No

Beverage Area

N Insect Killer, Ceiling Mounted, Ref. GRBA-01 1 No

P Worktop (1-Piece) (covering Item no. GRBA-03 to


GRBA-06), Ref. GRBA-02 1 Lot

Q 2-Tier Overshelves with Base Lightings,Ceiling


Mounted, Ref. GRBA-03 1 Lot

R Open Cabinet, Ref. GRBA-04 2 No

S Sink Counter with Space for Garbage Bin, Ref. GRBA-


05 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 24 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ALL DAY DINING (CONT'D)

Beverage Area (cont'd)

A Mobile Garbage Bin, Ref. GRBA-06 1 No

B 4 Door Upright Chiller, Ref. GRBA-07 1 No

C 4 Door Upright Chiller, Ref. GRBA-08 1 No

General Chiller

D Walk-in Chiller, Ref. GRGC-01 1 No

E Slot Channel, Ref. GRGC-02 1 Lot

F 4-Tier Cold Store Shelving, 48 ", Ref. GRGC-03 2 No

G 4-Tier Cold Store Shelving, 60 ", Ref. GRGC-04 1 No

H GN Trolley 2/1, Ref. GRGC-05 2 No

Seafood / Meat Chiller

J Walk-in Chiller, Ref. GSMC-01 1 No

K Slot Channel, Ref. GSMC-02 1 Lot

L GN Trolley 2/1, Ref. GSMC-03 2 No

M 4-Tier Cold Store Shelving, 60 ", Ref. GSMC-04 1 No

Seafood / Meat Freezer

N Walk-in Freezer, GSMF-01 1 No

P 4-Tier Cold Store Shelving, 48 ", Ref. GSMF-02 1 No

Q 4-Tier Cold Store Shelving, 60 ", Ref. GSMF-03 1 No

R GN Trolley 2/1, Ref. GSMF-04 1 No

Cold Kitchen

S Hand Wash Sink with Soap Dispenser, Ref. GRCK-01 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 25 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ALL DAY DINING (CONT'D)

Cold Kitchen (cont'd)

A Worktop (1-Piece) (covering Item no. GRCK-03 to 19),


Ref. GRCK-02 1 Lot

B Mini Combi-Oven, Electric, Ref. GRCK-03 1 No

C 6-Drawer Counter Chiller, GN 1/1, Ref. GRCK-04 1 No

D Induction cooker, base-line, Ref. GRCK-05 1 No

E Microwave, Ref. GRCK-06 1 No

F Open Counter with space for Mobile Flour Bin & Water
Filter, Ref. GRCK-07 1 No

G Water Filter (Combi-Oven), Ref. GRCK-08 1 No

H Mobile Ingredient bin, Ref. GRCK-09 2 No

J 1-Tier Wall Shelf with Base Lighting, Ref. GRCK-10 1 Lot

K Mixer, 20qt planetary, Ref. GRCK-13 1 No

L Counter Cabinet, Ref. GRCK-14 1 No

M Mobile Garbage Bin, Ref. GRCK-15 1 No

N Open Cabinet, Ref. GRCK-16 1 No

P Sink Counter with Space for Garbage Bin, Ref. GRCK-


17 1 No

Q 2-Door Counter Chiller, GN 1/1 with Food Pan 1/6size x


4deep-8nos, Ref. GRCK-18 1 No

R 2-Tier Overshelves with Base Lightings,Ceiling


Mounted, Ref. GRCK-19 1 Lot

S Pick-Up Ledge, Ref. GRCK-20 2 No

Dry Storage

T 4-Tier Dry Store Shelving, 48 " 4 No

U 4-Tier Dry Store Shelving, 60 " 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 26 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ALL DAY DINING (CONT'D)

Pots & Pans

A Drain Trough with Grating, Ref. GRPP-01 1 Lot

B 2-Tier Utensils Hanger, Ref. GRPP-02 1 Lot

C Three Bowl Pots and Pans Wash Sink, Ref. GRPP-03 1 No

D Sink Sanitizer, Ref. GRPP-04 1 No

E 2-Tier Utensils Hanger, Ref. GRPP-05 1 Lot

F Drain Trough with Grating, Ref. GRPP-06 1 Lot

G 4-Tier Clean Dish Shelving, 48 ", Ref. GRPP-07 2 No

Room Service

H Insect Killer, Ceiling Mounted , Ref. GRSS-01 1 No

J Mobile Garbage Bin, Ref. GRSS-02 1 No

K Worktop (1-Piece) (covering item nos. GRRS-04 to


GRSS-14), Ref. GRSS-03 1 Lot

L 1-Tier Wall Shelf with Base Lighting, Ref. GRSS-04 1 Lot

M Sink Counter, Ref. GRSS-05 1 No

N 3-Door Counter Chiller, GN 1/1, Ref. GRSS-06 1 No

P Instantaneous Water Boiler, 100ltr/hr, Ref. GRSS-07 1 No

Q Coffee Machine, Ref. GRSS-09 1 No

R Coffee Machine, Ref. GRSS-10 1 No

S Water Filter (for Coffee machine & Water Boiler), Ref.


GRSS-13 1 No

T Counter Cabinet, Ref. GRSS-14 1 No

U 1-Tier Wall Shelf with Base Lighting, Ref. GRSS-15 1 Lot

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 27 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ALL DAY DINING (CONT'D)

Room Service (cont'd)

A Beer Keg, Ref. GRSS-16 2 No

B Counter Cabinet w/ Space for Carbonator & Beer Keg,


Ref. GRSS-17 1 No

C Beer Tap with Cooling Unit, Ref. GRSS-18 1 No

D Cocktail Counter with Bar Sink, Speed Rail, Bar Blender


/ Mixer Compartment & Ice Bin, Ref. GRSS-19 1 No

E Drink Mixer, Ref. GRSS-21 1 No

F Bar Blender, Ref. GRSS-22 2 No

G Carbonator, Ref. GRSS-23 1 No

H Worktop (1-Piece) (covering item nos. GRRS-16 to 23),


Ref. GRSS-24 1 Lot

J 2-Door Upright Chiller, Ref. GRSS-25 1 No

K Drain Trough with Grating, Ref. GRSS-27 1 Lot

L Water Filter (for Ice Cube Machine), Ref. GRSS-28 1 No

M Ice Cube Machine with Ice Bin, Ref. GRSS-29 1 No

N RS Cart Hot Box Support Shelf, Ref. GRSS-30 12 No

P Hot Box, Ref. GRSS-31 72 No

Q Room Service Cart, Ref. GRSS-32 48 No

R Linen Trolley, Ref. GRSS-34 1 No

S Hand Wash Sink with Soap Dispenser & Bin, Ref.


GRSS-35 1 No

T Mobile Table, Ref. GRSS-36 1 No

U Insect Killer, Ceiling Mounted, Ref. GRSS-37 2 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 28 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

LAUNDRY & DRY CLEANING EQUIPMENTS

Laundry Room

A Portable Platform Weighing Scale (EXISTING) 1 No

B Sink 1 No

C Marking Machine 1 No

D Spotting Board (EXISTING) 1 No

E Drycleaning Machine 1 No

F Washer Extractor 9KG 2 No

G Washer Extractor 35 KG (EXISTING) 1 No

H Washer Extractor43 KG (EXISTING) 1 No

J Washer Extractor 80 KG 1 No

K Washer Extractor 55 KG 1 No

L Dryer 18 kg 2 No

M Dryer 52.16 KG (EXISTING) 2 No

N Dryer 55 KG 2 No

P Towel Folder 1 No

Q Mushroom Press (EXISTING) 1 No

R Drycleaning Legger Press 1 No

S Tension Pants Topper 1 No

T Puff Ironer 1 No

U Tension Form Finisher 1 No

V Dri Vacuum 1 No

W Drycleaning Utility Press (EXISTING) 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 29 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

LAUNDRY & DRY CLEANING EQUIPMENTS


(CONT'D)

Laundry Room (cont'd)

A Vertical Dry Set Vacuum Unit (EXISTING) 1 No

B 4Lay Bossom & Body Press (EXISTING) 1 No

C Mushroom Press (EXISTING) 1 No

D Collar Cuff & Yoke Press (EXISTING) 1 No

E Lundry Utility Press 1 No

F Single Roll Polybagger (EXISTING) 1 No

G Air Compressor (EXISTING) 2 No

H Air Dryer (EXISTING) 1 No

J Air Tank (EXISTING) 1 No

K Pigeon Hole, Guest Works 1 Lot

L Assembling Table 1 No

M Z-Trolley 1 Lot

N Trolleys 1 Lot

P Uniform Conveyors 2 No

Q Pigeon Hole, Uniform Works 1 Lot

R Sewing Machine (EXISTING) 1 No

S 4-Tier Shelvings 1 Lot

T Storqage Compartment 1 Lot

U Long Form Steam Air Finisher (EXISTING) 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 30 March 2013
RITZ CARLTON RENOVATION

BILL NO. 2 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

COLLECTION

From Page No. 2 / 1


From Page No. 2 / 2
From Page No. 2 / 3
From Page No. 2 / 4
From Page No. 2 / 5
From Page No. 2 / 6
From Page No. 2 / 7
From Page No. 2 / 8
From Page No. 2 / 9
From Page No. 2 / 10
From Page No. 2 / 11
From Page No. 2 / 12
From Page No. 2 / 13
From Page No. 2 / 14
From Page No. 2 / 15
From Page No. 2 / 16
From Page No. 2 / 17
From Page No. 2 / 18
From Page No. 2 / 19
From Page No. 2 / 20
From Page No. 2 / 21
From Page No. 2 / 22
From Page No. 2 / 23
From Page No. 2 / 24
From Page No. 2 / 25
From Page No. 2 / 26
From Page No. 2 / 27
From Page No. 2 / 28
From Page No. 2 / 29
From Page No. 2 / 30

TOTAL - BILL NO. 1 - KITCHEN & LAUNDRY EQUIPMENT STAGE 2


Carried to General Summary

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 2 / 31 March 2013
BILL NO. 3

KITCHEN AND LAUNDRY EQUIPMENT - STAGE 3


RITZ CARLTON RENOVATION

BILL NO. 3 - KITCHEN & LAUNDRY EQUIPMENT STAGE 3

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

KITCHEN EQUIPMENT

Supply, install and commission including necessary


fitting and fixtures, all complete as specified and as
shown on drawing

ITALIAN KITCHEN AND STAFF CANTEEN

Show Kitchen

A Worktop (1-Piece) (covering Item no. GISK-03 to 05),


Ref. GISK-01 1 Lot

B Thermowell, Ref. GISK-02 1 No

C Counter Cabinet, Ref. GISK-03 1 No

D 2-Door Counter Chiller, GN 2/1, Ref. GISK-04 1 No

E Bin Compartment, Ref. GISK-05 1 No

F Wall Feature, Ref. GISK-06 1 Lot

G S.S.Hatch shelf, Ref. GISK-07 1 No

H Gas Fired Oven, Ref. GISK-08 1 No

J Instantaneous Water Boiler, Ref. GISK-09 1 No

K Water Filter (for Coffee Machine and Water Boiler), Ref.


GISK-10 1 No

L Counter Cabinet, Ref. GISK-11 1 No

M Coffee Machine, Ref. GISK-13 1 No

N Sink Counter, Ref. GISK-14 1 No

P Counter Cabinet, Ref. GISK-15 1 Lot

Q Wine Cellar, Ref. GISK-16 1 Lot

R Hand Wash Sink, Drawer Type, Ref. GISK-17 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 3/1 March 2013
RITZ CARLTON RENOVATION

BILL NO. 3 - KITCHEN & LAUNDRY EQUIPMENT STAGE 3

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ITALIAN KITCHEN AND STAFF CANTEEN (CONT'D)

Hot Kitchen

A Insect Killer, Ceiling Mounted, Ref. GIHK-01 1 No

B Pass-Thru Window with Hatch Shelf, Ref. GIHK-02 1 No

C Worktop L-Shaped (1-Piece) (covering Item no. GIHK-


04 to GIHK-12), Ref. GIHK-03 1 Lot

D 4-Drawer Counter Chiller, GN 2/1, Ref. GIHK-04 1 No

E Sink Counter, Ref. GIHK-05 1 No

F Bin Compartment, Ref. GIHK-06 1 No

G 2-Tier Wall Shelves with Base Lightings, Ref. GIHK-07 1 No

H Heated Cabinet, Ref. GIHK-09 1 No

J Retractable Heated Lamp, Ref. GIHK-10 3 No

K Heated Cabinet w/ 1 Heated Well, Ref. GIHK-11 1 No

L Counter Cabinet, Ref. GIHK-12 1 No

M Pass-Thru Window with Hatch Shelf, Ref. GIHK-14 1 No

N Worktop L-Shaped (1-Piece) (covering Item no. GIHK-


17 to GHIK-27), Ref. GIHK-16 1 Lot

P Sink Counter, Ref. GIHK-17 1 No

Q Bin Compartment, Ref. GIHK-18 1 No

R 2-Tier Wall Shelves with Base Lightings, Ref. GIHK-19 3 Lot

S 3-Door Chiller Counter, GN 2/1, Ref. GIHK-20 1 No

T Counter Cabinet, Ref. GIHK-21 1 No

U 2-Tier Wall Shelves with Base Lightings (L-Shaped),


Ref. GIHK-22 1 Lot

V 6-Drawer Chiller Counter, GN 2/1, Ref. GIHK-25 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 3/2 March 2013
RITZ CARLTON RENOVATION

BILL NO. 3 - KITCHEN & LAUNDRY EQUIPMENT STAGE 3

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ITALIAN KITCHEN AND STAFF CANTEEN (CONT'D)

Hot Kitchen (cont'd)

A 2-Tier Wall Shelves with Base Lightings, Ref. GIHK-26 2 No

B Thermowell, Ref. GIHK-27 1 No

C Hand Wash Sink with Soap Dispenser & Bin, Ref. GIHK-
28 1 No

D Worktop (1-Piece) (covering Item no. GIHK-30 to 45 ),


Ref. GIHK-29 1 Lot

E Gas Lava Stone Chargrill Argentina 2, Ref. GIHK-30 1 No

F Gas Griddle Plate Size 1, Ref. GIHK-31 1 No

G Work Cabinet for Central Inst. Of Gas & Water 400mm,


No
Ref. GIHK-32 1

H Gas Range with 6 Burner, Ref. GIHK-33 1 No

J Gas Oven, Ref. GIHK-34 1 No

K Work Cabinet 810mm, Ref. GIHK-35 1 No

L Electric Pasta Cooker, Ref. GIHK-36 1 No

M Salamander Stand, Ref. GIHK-39 1 No

N Salamander, Electric, Ref. GIHK-40 1 No

P Exhaust Hood, Ref. GIHK-41 1 No

Q 3-Door Chiller Counter, 1725, Ref. GIHK-42 1 No

R Board with Removable Grid, Ref. GIHK-43 1 Lot

S Work Cabinet for Central Inst. Of Elec.535mm, Ref.


No
GIHK-44 1

T Electric Deep Fat Fryer London 2, Ref. GIHK-45 2 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 3/3 March 2013
RITZ CARLTON RENOVATION

BILL NO. 3 - KITCHEN & LAUNDRY EQUIPMENT STAGE 3

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ITALIAN KITCHEN AND STAFF CANTEEN (CONT'D)

Dishwash

A Mobile Garbage Bin, Ref. GIDW-01 1 No

B Sorting Shelf, Ceiling Mounted, Ref. GIDW-02 1 Lot

Soiled Dish Table with 2 Scrap Rings, Double Bowl


Sink, Pre-Rinse Spray and Deck Mounted Faucet, Ref.
C GIDW-03 1 No

D Drain Trough with Grating, Ref. GIDW-04 1 Lot

E Water Filter (for Dishwashing Machine), Ref. GIDW-05 1 No

F Dishwashing Machine, Ref. GIDW-06 1 No

G Condensate Hood, Ref. GIDW-07 1 No

H Clean Dish Table, Ref. GIDW-08 1 No

J Rack Shelf, Wall Mounted, Ref. GIDW-09 1 Lot

K 4-Tier Clean Dish Shelving, 48 ", Ref. GIDW-10 1 No

Potwash Area

L Ice Cube Machine with Ice Bin, Ref. GIPW-01 1 No

M 4-Tier Shelving, 60 ", Ref. GIPW-02 1 No

N Drain Trough with Grating, Ref. GIPW-03 1 Lot

P Three Bowl Pots and Pans Wash Sink, Ref. GIPW-04 1 No

Q 2-Tier Utensils Hanger, Ref. GIPW-05 1 No

R Sink Sanitizer, Ref. GIPW-06 1 No

S 2-Tier Utensils Hanger, Ref. GIPW-07 1 No

T Mobile Garbage Bin, Ref. GIPW-08 1 No

U Water Filter (for Ice Machine), Ref. GIPW-09 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 3/4 March 2013
RITZ CARLTON RENOVATION

BILL NO. 3 - KITCHEN & LAUNDRY EQUIPMENT STAGE 3

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ITALIAN KITCHEN AND STAFF CANTEEN (CONT'D)

Chiller

Drain Trough with Grating, Ref. GIWC-01 1 Lot

Walk-in Chiller, Ref. GIWC-02 1 No

GN Trolley, 2/1, Ref. GIWC-03 2 No

4-Tier Cold Store Shelving, 60 ", Ref. GIWC-04 2 No

4-Tier Cold Store Shelving, 48 ", Ref. GIWC-05 1 No

Store Area

Hand Wash Sink with Soap Dispenser & Bin, Ref. GISR-
01 1 No

Insect Killer, Ceiling Mounted, Ref. GISR-02 1 No

Upright Cabinet, Ref. GISR-03 1 No

Bakery / Pastry Freezer

Walk-in Freezer, Ref. GRBF-01 1 No

GN Trolley 2/1, Ref. GRBF-02 2 No

4-Tier Cold Store Shelving, 60 ", Ref. GRBF-03 2 No

Pastry Chiller

Walk-in Chiller, Ref. GRPA-01 1 No

Drain Trough with Grating, Ref. GRPA-02 1 Lot

4-Tier Cold Store Shelving, 48 ", Ref. GRPA-03 2 No

4-Tier Cold Store Shelving, 60 ", Ref. GRPA-04 2 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 3/5 March 2013
RITZ CARLTON RENOVATION

BILL NO. 3 - KITCHEN & LAUNDRY EQUIPMENT STAGE 3

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ITALIAN KITCHEN AND STAFF CANTEEN (CONT'D)

Bakery Chiller

Walk-in Chiller, Ref. GRBA-01 1 No

Drain Trough with Grating, Ref. GRBA-02 1 Lot

GN Trolley 2/1, Ref. GRBA-03 1 No

4-Tier Cold Store Shelving, 60 ", Ref. GRBA-04 2 No

4-Tier Cold Store Shelving, 48 ", Ref. GRBA-05 1 No

Bakery / Pastry Area

Insect Killer, Ceiling Mounted, Ref. GRBK-01 1 No

Hand Wash Sink with Soap Dispenser & Bin, Ref.


GRBK-02 1 No

Mobile Table with Shelvings, Ref. GRBK-03 1 No

Fire Suppression System, Ref. GRBK-04 1 No

Sink Counter with Space for Bin, Ref. GRBK-05 1 No

Mechanical Water Doser, Wall Mount, Ref. GRBK-06 1 No

1-Tier Wall Shelf with Base Lightings, Ref. GRBK-07 2 Lot

Mobile Garbage Bin, Ref. GRBK-08 1 No

Food Mixer, Ref. GRBK-09 1 No

Portion Scale, Table Mount, Ref. GRBK-10 1 No

Counter Cabinet with Lockable Drawers, Ref. GRBK-11 1 No

Microwave Oven, Ref. GRBK-13 1 No

Worktop (1-Piece) (covering Item no. GRBK-05 to 13 ),


Ref. GRBK-14 1 Lot

Baking Trolley, Ref. GRBK-15 6 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 3/6 March 2013
RITZ CARLTON RENOVATION

BILL NO. 3 - KITCHEN & LAUNDRY EQUIPMENT STAGE 3

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ITALIAN KITCHEN AND STAFF CANTEEN (CONT'D)

Bakery / Pastry Area (cont'd)

Hand Wash Sink with Soap Dispenser & Bin, Ref.


No
GRBK-16 1

4-open Burners with gas.Oven ,1-side rear C-board,


No
Ref. GRBK-17 1

Exhaust Hood, Ref. GRBK-18 1 No

4-Deck Baking Oven with Proofer, Ref. GRBK-19 1 No

Rotary Oven, Ref. GRBK-20 1 No

Water Filter (Combi-Oven), Ref. GRBK-21 1 No

Combi-Oven, Electric, Ref. GRBK-22 1 No

Exhaust Hood, Ref. GRBK-23 1 No

Mobile Table with Shelvings, Ref. GRBK-24 1 No

Worktop (1-Piece) (covering Item no. GRBK-26 to 30 ),


Ref. GRBK-25 1 Lot

Sink Counter, Ref. GRBK-28 1 No

Portion Scale, Table Mount, Ref. GRBK-29 1 No

Mixer, 20qt planetary, Ref. GRBK-30 1 No

1-Tier Wall Shelf with Base Lighting, Ref. GRBK-31 1 Lot

Mechanical Water Doser, Wall Mount, Ref. GRBK-32 1 No

Dough Divider Moulder, Ref. GRBK-33 1 No

Planetary mixer, 60qt floor mount, elec, Ref. GRBK-34 1 No

Dough sheeter, tabletop model, elec, Ref. GRBK-35 1 No

Mobile Table for GRBK-35, Ref. GRBK-36 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 3/7 March 2013
RITZ CARLTON RENOVATION

BILL NO. 3 - KITCHEN & LAUNDRY EQUIPMENT STAGE 3

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ITALIAN KITCHEN AND STAFF CANTEEN (CONT'D)

Bakery / Pastry Area (cont'd)

Marble Worktop (1-Piece) (covering Item no. GRBK-38


to GRBK-46 ), Ref. GRBK-37 1 Lot

Open Counter with space for Mobile Flour Bin, Ref.


GRBK-38 1 No

Mobile Ingredient bin, Ref. GRBK-39 3 No

3-Door Counter Chiller, GN 1/1, Ref. GRBK-41 1 No

Sink Counter, Ref. GRBK-42 1 No

Sink Counter, Ref. GRBK-43 1 No

3-Door Counter Chiller, GN 1/1, Ref. GRBK-44 1 No

Mobile Ingredient bin, Ref. GRBK-45 3 No

Open Counter with space for Mobile Flour Bin, Ref.


GRBK-46 1 No

2-Tier Overshelves with Base Lightings,Ceiling


Mounted, Ref. GRBK-47 4 Lot

Potwash

Drain Trough with Grating, Ref. GRPO-01 1 Lot

4-Tier Clean Dish Shelving, 48 ", Ref. GRPO-02 4 No

4-Tier Clean Dish Shelving, 60 ", Ref. GRPO-03 1 No

Drain Trough with Grating, Ref. GRPO-05 1 Lot

Sink Sanitizer, Ref. GRPO-06 1 No

Three Bowl Pots and Pans Wash Sink, Ref. GRPO-07 1 No

2-Tier Utensils Hanger, Ref. GRPO-08 1 Lot

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 3/8 March 2013
RITZ CARLTON RENOVATION

BILL NO. 3 - KITCHEN & LAUNDRY EQUIPMENT STAGE 3

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ITALIAN KITCHEN AND STAFF CANTEEN (CONT'D)

Dry Store

4-Tier Dry Store Shelving, 48 ", Ref. GRDY-01 5 No

4-Tier Dry Store Shelving, 60 ", Ref. GRDY-02 1 No

Beverage Chiller

Walk-in Chiller, Ref. GRBC-01 1 No

Slot Channel, Ref. GRBC-02 1 Lot

4-Tier Cold Store Shelving, 48 ", Ref. GRBC-03 2 No

4-Tier Cold Store Shelving, 60 ", Ref. GRBC-04 7 No

Beverage Store

Security Truck, Ref. GRBS-01 3 No

4-Tier Dry Store Shelving, 48 ", Ref. GRBS-02 3 No

4-Tier Dry Store Shelving, 60 ", Ref. GRBS-03 9 No

Dunnage Rack, 48 ", Ref. GRBS-04 12 No

Florist

Insect Killer, Ceiling Mounted, Ref. GRFL-01 1 No

Mobile Table, Ref. GRFL-02 1 No

4-Tier Shelving, 48 ", Ref. GRFL-03 2 No

Worktop (1-Piece) (covering Item no. GRFL-06 to


GRFL-11), Ref. GRFL-05 1 Lot

Counter Cabinet with Lockable Drawers, Ref. GRFL-06 1 No

1-Tier Wall Shelf with Base Lighting, Ref. GRFL-07 1 Lot

1-Tier Wall Shelf with Base Lighting, L-shape, Ref.


GRFL-08 1 Lot

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 3/9 March 2013
RITZ CARLTON RENOVATION

BILL NO. 3 - KITCHEN & LAUNDRY EQUIPMENT STAGE 3

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ITALIAN KITCHEN AND STAFF CANTEEN (CONT'D)

Florist (cont'd)

2-Bowl Sink Counter, Ref. GRFL-09 1 No

1-Tier Wall Shelf with Base Lighting, Ref. GRFL-10 1 Lot

Mobile Garbage Bin, Ref. GRFL-11 1 No

Flower Chiller

Walk-in Chiller, Ref. GRFC-01 1 No

Drain Trough with Grating, Ref. GRFC-02 1 Lot

4-Tier Cold Store Shelving, 60 ", Ref. GRFC-03 1 No

4-Tier Cold Store Shelving, 48 ", Ref. GRFC-04 5 No

Staff Canteen

Insect Killer, Ceiling Mounted, Ref. GRSC-01 1 No

Cutlery and Tray Stand, Ref. GRSC-02 2 No

Worktop (1-Piece) (covering Item no. GRSC-04 to


GRSC-10), Ref. GRSC-03 1 Lot

Bain Marie Counter, 1/1 GN (2 Pans), Ref. GRSC-04 1 No

Soup Warmer Counter with Swing doors, Ref. GRSC-


06 1 No

Tray Slide, Ref. GRSC-07 1 Lot

Bain Marie Counter, 1/1 GN (6 Pans), Ref. GRSC-08 1 No

Sneeze Guard with Lightings, Ref. GRSC-09 1 Lot

Ice well Counter with Swing doors, Ref. GRSC-10 1 No

Mobile Refrigerated Cabinet, Ref. GRSC-12 1 No

Water Filter (for Boiler and Coffee Machine), Ref.


GRSC-13 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 3 / 10 March 2013
RITZ CARLTON RENOVATION

BILL NO. 3 - KITCHEN & LAUNDRY EQUIPMENT STAGE 3

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ITALIAN KITCHEN AND STAFF CANTEEN (CONT'D)

Staff Canteen (cont'd)

Coffee Machine, Ref. GRSC-14 1 No

Instantaneous Water Boiler, Ref. GRSC-15 1 No

Softdrink Dispenser, Ref. GRSC-16 1 No

Counter Cabinet with Swing Door, Ref. GRSC-17 1 No

Water Filter (for Softdrink & Ice/Water Dispenser), Ref.


GRSC-18 1 No

Hand Wash Sink with Soap Dispenser & Bin, Ref.


GRSC-19 1 No

Upright Chiller, Ref. GRSC-20 1 No

Counter Sink Table with Base Shelf, Ref. GRSC-21 1 No

Mobile Garbage Bin, Ref. GRSC-24 1 No

Deep Fat Fryer, Gas, Ref. GRSC-25 1 No

Spreader table, Open hygenic base w/ C-board, 400L,


Ref. GRSC-26 1 No

Tubular Wall Shelf, Ref. GRSC-27 1 Lot

4-Open Burner Range on Gas Oven, Ref. GRSC-28 1 No

Gas Grill, Ref. GRSC-29 1 No

Spreader table, Open hygenic base w/ C-board, 400L,


Ref. GRSC-30 1 No

Equipment Stand for Item GRSC-32, Ref. GRSC-31 1 No

Combi-Oven, Electric, Ref. GRSC-32 1 No

Water Filter (Combi-Oven), Ref. GRSC-33 1 No

Exhaust Hood, Ref. GRSC-34 1 No

Carried to Collection

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 3 / 11 March 2013
RITZ CARLTON RENOVATION

BILL NO. 3 - KITCHEN & LAUNDRY EQUIPMENT STAGE 3

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

ITALIAN KITCHEN AND STAFF CANTEEN (CONT'D)

Staff Canteen (cont'd)

Counter Cabinet with Swing Door, Ref. GRSC-35 1 No

2-Tier Wall Shelf with Base Lighting, Ref. GRSC-36 1 Lot

Dishwash

Insect Killer, Ceiling Mounted, Ref. GRDW-01 1 No

4-Tier Clean Dish Shelving, 48 ", Ref. GRDW-02 2 No

Dish Dolly, Ref. GRDW-03 1 No

Clean Dish Table, Ref. GRDW-04 1 No

Condensate Hood, Ref. GRDW-05 1 No

Dishwashing Machine, Ref. GRDW-06 1 No

Water Filter (for Dishwash Machine), Ref. GRDW-07 1 No

Soiled Dish Table with 2 Scrap Ring, Single Bowl Sink


and Pre Rinse Jet Spray Valve & Faucet, Ref. GRDW-
08 1 No

Pass Thru Shelf, Ref. GRDW-09 1 No

Sorting Shelf, Ref. GRDW-10 1 No

Mobile Garbage Bin, Ref. GRDW-12 2 No

Drain Trough with Grating, Ref. GRDW-13 1 Lot

Insect Killer, Ceiling Mounted, Ref. GRDW-15 1 No

Carried to Colleciton

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 3 / 12 March 2013
RITZ CARLTON RENOVATION

BILL NO. 3 - KITCHEN & LAUNDRY EQUIPMENT STAGE 3

ITEM DESCRIPTION QTY UNIT RATE TOTAL (Dhs.)

COLLECTION

From Page No. 2 / 1


From Page No. 2 / 2
From Page No. 2 / 3
From Page No. 2 / 4
From Page No. 2 / 5
From Page No. 2 / 6
From Page No. 2 / 7
From Page No. 2 / 8
From Page No. 2 / 9
From Page No. 2 / 10
From Page No. 2 / 11
From Page No. 2 / 12

TOTAL - BILL NO. 3 - KITCHEN & LAUNDRY EQUIPMENT STAGE 3


Carried to General Summary

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 3 / 13 March 2013
BILL NO. 4

TENDERER'S ADJUSTMENTS FOR BILL 2 TO 3


RITZ CARLTON RENOVATION

BILL No. 4 - TENDERER'S ADJUSTMENTS FOR BILL NOS. 2 TO 3

BQ ITEM TOTAL (Dhs.)


DESCRIPTION QTY UNIT RATE
/ NEW
OMISSION ADDITION

TENDERER'S ADJUSTMENTS
FOR BILL NOS. 2 TO 3

Note:
Tenderer shall include in this
Bill, any adjustments
necessary for Bill Nos. 2 to Bill
No. 3

NETT OMISSION/ ADDITION -


TENDERER'S ADJUSTMENTS
FOR BILLS 2 TO 3
Carried to General Summary

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities 4/1 March 2013
GENERAL SUMMARY
RITZ CARLTON RENOVATION

GENERAL SUMMARY

ITEM DESCRIPTION TOTAL (Dhs.)

BILL No. 1 PRELIMINARIES From Page No. 1 / 22

BILL No. 2 STAGE 2 From Page No. 2 / 31

BILL No. 3 STAGE 3 From Page No. 3 / 13

BILL No. 4 TENDERER'S ADJUSTMENTS FOR BILL NOS From Page No. 4 / 1
2 TO 3

SUB-TOTAL 1

ADJUSTMENT ITEMS (IF ANY)

SUB-TOTAL 2

Note:
The tenderer shall insert below, the addition for overheads and

Overheads ...%
Profit ...%
Total Overheads and Profit ...%

TOTAL CARRIED TO FORM OF TENDER DHS.

DB0450 - Kitchen Equipment


Phase 2 Stage 2 - Bills of Quantities GS / 1 March 2013