CRITICAL EQUIPMENT NDT INSPECTION LIST OF RIG PTX 15

In accordance with API standards, national legislation, other industry standards, and best
practices, it is necessary (for all critical and important equipment in the rig), to have these
tests in order to determine their condition and to avoid possible accidents and / or fatalities
due to equipment failure.

Table 1 shows the critical and important equipment of the rig PTX 15, with its inspection date,
expiration date, required standard, and required comments.

According with the inspection schedule, the inspection certificates are valid.

NDT INSPECTIONS, CERTIFICATES, AND TESTS - CAT. III Y IV HOISTING SYSTEM RIG PTX 15
FECHA DE REFERENCIA
EQUIPO VENCIMIENTO COMENTARIOS
CERTIFICADO A NORMA
Reporte Cat III PLL 036-15
Reporte Cat IV certificado de fbrica de DRILMMEC
30/09/2015 6 MESES CAT III Inspeccin Cat. III corresponde cada 2 aos. De
TORRE 5 AOS CAT IV
API RP 4G
acuerdo al control de Inspeccin que maneja PTX en
15/04/2008
su Matriz de frecuencia de Inspeccin PTX FORM-
PTX-QUA-227-S.
Inspeccin NDT se realiza cada 2 aos de acuerdo al
formato Inspeccin PTX FORM-PTX-QUA-227-S
API RP 4G
PINES Y PASADORES DE LA CAT. III Matriz de Frecuencia de Inspeccin, sin
Semanal 6 MESES CAT III embargo se realiza inspeccin visual en toda la
TORRE estructura del mstil el estado de los pines y
pasadores mediante el documento de inspeccin de
mstil y subestructura.
Reporte Cat III PLL 036-15
Inspeccin cat. III corresponde cada 2 aos. De
TRABAJADERO DE TUBERIA 30/09/2015 6 MESES CAT III API RP 4G acuerdo al control de Inspeccin que maneja PTX en
su Matriz de frecuencia de Inspeccin PTX FORM-
PTX-QUA-227-S.
Reporte Cat III PLL 036-15
Reporte Cat IV certificado de fbrica de DRILMMEC
30/09/2015 6 MESES CAT III Inspeccin Cat. III corresponde cada 2 aos. De
SUBESTRUCTURA 5 AOS CAT IV
API RP 4G
acuerdo al control de Inspeccin que maneja PTX en
15/04/2008
su Matriz de frecuencia de Inspeccin PTX FORM-
PTX-QUA-227-S
Inspeccin NDT se realiza cada 2 aos de acuerdo al
formato Inspeccin PTX FORM-PTX-QUA-227-S
CAT. III Matriz de Frecuencia de Inspeccin, sin
PINES DE LA
Semanal 6 MESES CAT III API RP 8B embargo se realiza inspeccin visual en toda la
SUBESTRUCTURA subestructura el estado de los pines y pasadores
mediante el documento de inspeccin de mstil y
subestructura.

POLEAS WINCHES Y Reporte cat III-SAIS-PTX-0033-311016


28/10/2016 6 MESES CAT III API RP 8B Se adjunta informe de la inspeccin de los winches de
SOPORTES A POLEAS los soportes de las poleas.

30/09/2015 5 AOS CAT IV


API RP 8B: 5.3.3.1;
Reporte Cat. IV NOV - PLL 036-15
GANCHO Y BLOQUE VIAJERO 6 MESES CAT III
API RP 54: 9.7.1 y
Reporte Cat. III - SAIS-PTX-0033-311016
31/10/2016 9.16.1
5 AOS CAT IV
WINCHES 31/10/2016 6 MESES CAT III
API RP 8B Reporte Cat. IV - SAIS-PTX-0033-311016

30/09/2015 5 AOS CAT IV Reporte Cat. III - SAIS-PTX-0033-311016


ANCA DEL CABLE MUERTO 6 MESES CAT III
API RP 8B
Reporte Cat. IV NOV PLL 042-15
31/10/2016
30/09/2015 5 AOS CAT IV Reporte Cat. III - SAIS-PTX-0033-311016
CORONA 6 MESES CAT III
API RP 4G
Reporte Cat. IV NOV - PLL 048-15
31/10/2016
15/01/2014 5 AOS CAT IV Reporte Cat. III - SAIS-PTX-0033-311016
MALACATE - TAMBOR 6 MESES CAT III
API RP 7L
Reporte Cat. IV NOV - IQT-009-14
31/10/3016
Reporte Cat IV certificado de fbrica
5 AOS CAT IV
PIPE WRANGLER 03/07/2014 6 MESES CAT III
API RP 7L Petrex considera Inspeccin NDT cada 1000 das de
acuerdo a las recomendaciones del cliente fabricante.
Reporte cat III-SAIS-PTX-0033-311016
LINK ELEVATORS 31/10/2016 6 MESES API RP 08B
Reporte cat IV PLL 048-15
Fueron inspeccionados por personal de Petrex
API 9A calificado para el servicio y se evidencia cables para
API RP 08B
CABLES DE LOS WINCHES 28/10/2016 API RP 54
cambio por descarte se encuentran en proceso de
IADC compra. . Informe .TMP-PTX-RSM-224-S-R01 Informe
tcnico Insp. elemento de izaje
CABLE DE PERFORACION API RP 08B Cable Nuevo. Instalada en esta locacin el 15/11/16
CABLES DE LLAVES DE API RP 54 Fueron inspeccionados por personal de Petrex
28/10/2016 IADC calificado para el servicio. Se evidencia cables para
POTENCIA. API RP 08B cambio por descarte se encuentran en proceso de
NDT INSPECTIONS, CERTIFICATES, AND TESTS - CAT. III Y IV HOISTING SYSTEM RIG PTX 15
FECHA DE REFERENCIA
EQUIPO VENCIMIENTO COMENTARIOS
CERTIFICADO A NORMA
compra. Informe .TMP-PTX-RSM-224-S-R01 Informe
tcnico Insp. elemento de izaje

BURROS (BASTIDORES) DE 6 MESES CAT III


API RP 4G NO APLICA
5 AOS CAT IV
TUBERIA
Reporte Cat. III y IV - SAIS-PTX-0033-311016
ELEVADORES DE TUBERA 31/10/2016 6 MESES API RP 08B
Reporte Cat. IV NOV PLL 036-15
POSTES DEL V-DOOR 31/10/2016 6 MESES API RP 08B Reporte Cat. III - SAIS-PTX-0033-311016

NDT INSPECTIONS, CERTIFICATES, AND TESTS - CAT. III Y IV ROTARY SYSTEM RIG PTX 15
FECHA DE REFERENCIA
EQUIPO VENCIMIENTO COMENTARIOS
CERTIFICADO A NORMA
17/03/2015 5 AOS CAT IV Reporte Cat IV certificado de fbrica
TOP DRIVE 6 MESES CAT III
API RP 7L
Reporte Cat. III - SAIS-PTX-0033-311016
31/10/2016
5 AOS CAT IV
ROTARIA 31/10/2016 6 MESES CAT III
API RP 7L Reporte Cat. III - SAIS-PTX-0033-311016
5 AOS CAT IV
MASTER BUSHING 31/10/2016 6 MESES CAT III
API RP 7L Reporte Cat. III - SAIS-PTX-0033-311016
5 AOS CAT IV
INSERT BOWL 31/10/2016 6 MESES CAT III
API RP 7L Reporte cat III-SAIS-PTX-0033-311016
Category 1 - V inspection.
Consideration of a DS1 Category
5 is intended for drill string
components that are to be used in
extremely adverse conditions
where the potential cost of Tubera que trabajo en la locacin anterior se
TUBERA DE PERFORACION Y failure is very large. DS1
API RP 7G Section
13.2 / DS.1 Category
encuentra en nuevo mundo inspeccionada por CIA
Category 5 includes the NOV a requerimiento del cliente. Se esperan reportes
TUBULARES EN GENERAL Ultrasonic End Area Inspection
Requirements
de inspeccin.
of Upset and Slip areas of the
Drill pipe, where the
accumulated fatigue at both the
areas together contribute 96%
probability of failure.
CUA MANUAL 31/10/2016 6 MESES API RP 7L Reporte cat III-SAIS-PTX-0033-311016
MANUAL POWER TONGS 31/10/2016 6 MESES API RP 7L Reporte cat III-SAIS-PTX-0033-311016
LLAVE HIDRULICA 31/10/2016 6 MESES API RP 7L Reporte cat III-SAIS-PTX-0033-311016
SAFETY CLAMPS 31/10/2016 6 MESES API RP 7L Reporte cat III-SAIS-PTX-0033-311016
CROSSOVER VARIOS 31/10/2016 6 MESES API RP 08B Reporte cat III-SAIS-PTX-0033-311016

NDT INSPECTIONS, CERTIFICATES, AND TESTS - CAT. III Y IV FLUID CIRCULATION SYSTEM RIG PTX 15
FECHA DE REFERENCIA
EQUIPO VENCIMIENTO COMENTARIOS
CERTIFICADO A NORMA
API 16 A
API RP 7L Reporte de NOV PLL 036-15
30/09/2015 5 AOS CAT IV API 7K
BOMBAS DE LODO 6 MESES CAT III API RP 574
Reporte cat III-SAIS-PTX-0033-311016
31/10/2016 API RP 570
ANSI B31.3
31/10/2016 6 MESES CAT III
API RP 574
Reporte de NOV PLL 036-15
LINEAS DE ALTA PRESIN 5 AOS CAT IV
API RP 570
Reporte cat III-SAIS-PTX-0033-311016
30/09/2015 ANSI B31.3
31/10/2016 API RP 574
6 MESES CAT III Reporte de NOV PLL 036-15
STAND PIPE 30/09/2015 5 AOS CAT IV
API RP 570
Reporte cat III-SAIS-PTX-0033-311016
ANSI B31.3

API RP 53
chapter Nuevo instalado el 15/11/16
ROTARY HOSE 31/10/2016 6 MESES CAT III
17.3.2.1 Reporte cat III-SAIS-PTX-0033-311016
API RP 7L
30/09/2015 API RP 574
Reporte de NOV PLL 048-15
VIBRATOR HOSES 6 MESES CAT III API RP 570
Reporte Cat III-SAIS-PTX-0033-311016
31/10/2016 ANSI B31.3
Category 1 - V inspection.
Consideration of a DS1 Category
5 is intended for drill string
components that are to be used in
extremely adverse conditions
where the potential cost of
API RP 7G Section
failure is very large. DS1
CHICKSAN 31/10/2016 Category 5 includes the
13.2 / DS.1 Category Reporte Cat IV-SAIS-PTX-0033-311016
Requirements
Ultrasonic End Area Inspection
of Upset and Slip areas of the
Drill pipe, where the
accumulated fatigue at both the
areas together contribute 96%
probability of failure.
NDT INSPECTIONS, CERTIFICATES, AND TESTS - CAT. III Y IV WELL CONTROL SYSTEM RIG PTX 15
FECHA DE REFERENCIA
EQUIPO VENCIMIENTO COMENTARIOS
CERTIFICADO A NORMA
API 16 A
5 AOS CAT IV
ANNULAR BOP 16/12/2014 1 AO CAT III
API 6 Certificado de Fabrica CAMERON 749-14
API STD 53
API 16 A
5 AOS CAT IV Certificado de Fabrica -NOV PO#926699
RAM DOBLE BOP 16/12/2014 1 AO CAT III
API 6
ASSET#34702 / NOV 449029
API STD 53
5 AOS CAT IV
BOP HANDLING SYSTEM 31/10/2016 6 MESES CAT III
API RP 7L Reporte cat IV-SAIS-PTX-0033-311016
API 16 A
5 AOS CAT IV Certificado de Fabrica PO NUMBER 14-100565 / PLL
CHOKE MANIFOLD 03/10/2014 1 AO CAT III
API 6
036-15
API STD 53
API 16 A
5 AOS CAT IV
KILL LINES 31/10/2016 1 AO CAT III
API 6 Reporte cat III-SAIS-PTX-0033-311016
API STD 53
API 16 A De acuerdo al estndar de petrex solo considerando
6 MESES API 6
ACUMULADOR 23/01/2015 5 AOS HIDROSTTICA API STD 53
CAT-IV segn su formato de Matriz de frecuencia de
API RP 54 Inspeccin. PTX FORM-PTX-QUA-227-S.
API 16 A
Se cuenta con reporte de CAT IV
API 6 No ha considerado aun la inspeccin de Cat III. Se
BOTELLAS DEL ----- 1 AO API STD 53 recomienda realizar inspeccin. De acuerdo al
5 AOS HIDROSTTICA API RP 54 estndar de petrex solo considerando CAT-IV segn
ACUMULADOR 23/01/2015 API 510/572 su formato de Matriz de frecuencia de Inspeccin.
ASME SEC VIII, IX
PTX FORM-PTX-QUA-227-S
31/10/2016 1 AO UL 142
SEPARADOR DE GAS 5 AOS HIDROSTTICA API 12F
Reporte cat III-SAIS-PTX-0033-311016
12/02/2014

NDT INSPECTIONS, CERTIFICATES, AND TESTS - CAT. III Y IV POWER SYSTEM RIG PTX 15
FECHA DE REFERENCIA
EQUIPO VENCIMIENTO COMENTARIOS
CERTIFICADO A NORMA
Categora III fue realizada por Cia SAIS (medicin de
31/10/2016 1 AO
API RP 54
TANQUES DE AIRE 120 PSI 5 AOS HIDROSTTICA
API 510/572 espesor de pared) ultrasonido.
26/03/2014 ASME SEC VIII, IX Reporte cat III-SAIS-PTX-0033-311016

NDT INSPECTIONS, CERTIFICATES, AND TESTS - CAT. III Y IV SAFETY SYSTEM RIG PTX 15
FECHA DE REFERENCIA
EQUIPO VENCIMIENTO COMENTARIOS
CERTIFICADO A NORMA
Se realiz calibracin por instrumentista del equipo.
SISTEMA DE
10/11/2016 1 AO API RP 54 Petrex tambin cuenta con personal externo para la
INSTRUMENTACION realizacin de calibracin de los instrumentos crticos.
VLVULAS DE ALIVIO DE LAS Se realiz calibracin por instrumentista del equipo.
BOMBAS DE LODO POP OFF 10/11/2016 1 AO API RP 54 Petrex tambin cuenta con personal externo para la
realizacin de calibracin de los instrumentos crticos.
VALVE RELIEF VALVE
API RP 54 Section Se realiz calibracin por instrumentista del equipo.
VLVULAS DE ALIVIO DE LOS 16.9.3 & API RP 576
10/11/2016 1 AO
Section 6.1
Petrex tambin cuenta con personal externo para la
TANQUES DE AIRE API 510 realizacin de calibracin de los instrumentos crticos.

CERTIFICADOS NDT E INSPECCIONES Y PRUEBAS CAT. III Y IV SISTEMA DE ALMACENAMIENTO RIG H&P 900
FECHA DE REFERENCIA
EQUIPO VENCIMIENTO COMENTARIOS
CERTIFICADO A NORMA
Categora III fue realizada por Cia SAIS (medicin de
31/10/2016 1 AO UL 142
TANQUES DE COMBUSTIBLE 5 AOS HIDROSTTICA API 12F
espesor de pared) ultrasonido.
24/03/2014 Reporte cat III-SAIS-PTX-0033-311016
Categora III fue realizada por Cia SAIS (medicin de
31/10/2016 1 AO UL 142
TANQUES DE LODO 5 AOS HIDROSTTICA API 12F
espesor de pared) ultrasonido.
24/03/2014 Reporte cat III-SAIS-PTX-0033-311016

CERTIFICADOS NDT E INSPECCIONES Y PRUEBAS CAT. III Y IV UTILITARIOS Y PERIFERICOS RIG H&P 900
FECHA DE REFERENCIA A
EQUIPO VENCIMIENTO COMENTARIOS
CERTIFICADO NORMA
Semanalmente se efecta inspecciones Equipos
SISTEMAS DE PROTECCIN ANSI Z 359.11 / OSHA
Proteccin Contra Cada. A la fecha se
DE CAIDAS encuentran operativos en la Plataforma Mashira
6X
US & Canada: Class 1, Div 1,
09/06/2016 09/06/2017 Grups A, B, C & D
DETECTOR DE GASES 30/03/2016 30/03/2017 Europa: ATEX II 2G EeX ia IIC
A la fecha se encuentra vigente y operativo
T4 -20C to +50C.
Se envi con una PDS a Lima para su
EQUIPOS AUTOCONTENIDOS 09/07/2015 09/07/2016 NFPA 1981