PrecastConcreteBoxCulverts

GuidetoSitePractice
StandardPrecast
Guidetositepractice
The proven strength and performance TAKINGDELIVERY Where box culverts are delivered on end,
characteristics of precast concrete box establishasafemethodofturning.
1. The contractor is normally responsible for
culverts, together with their excellent service Provide any equipment necessary for the
offloadingboxculvertsandshould:
life,makethemidealforawidevarietyofcivil operation.
engineeringandconstructionapplications. Agreewiththesupplierwellinadvancethe
place and approximate time of
delivery. 5. The box culverts may be offloaded into a
Boxculvertsectionscanbe manufacturedin a
storage area or they may be placed in line
variety of shapes and sizes, offering Provide a hard access which can be used alongsidethetrenchinwhichtheyaretobe
exceptionalversatilityintheusestowhichthey safelybystandarddeliveryvehicles.
can be applied. In addition to the more laid.Ineithersituation:
Provide a suitable crane of adequate Beforeoffloading,checktheboxculvertsfor
common use for diverting water courses, box capacity.
culverts have been used in an array of any damage which may have occurred in
applications including balancing tanks, transit and report any defects promptly to
2. Lifting methods differ between box culvert
pedestrian subways, access shafts, service thesupplier.
manufacturers. Holes for eyebolts,
tunnels,seaoutfalls,road crossingsand many threaded lifting sockets or projecting loops
Lowerthemcarefullyontoafirmlevelbase
other situations where the whole life costing are co m monl y us e d but other awayfromtheedgeofthetrench.
consideration requires strength, durability and methods may be employed. The Movethembyliftingandneverbydragging.
economytobeofparamountimportance. contractorshould: Incoldweather,protectopenliftingsockets
Aascertaindetailsoftheliftingmethodused fromfreezingandbursting.
Unlike other materials, such as steel, precast bythesupplier.
concreteboxculvertsdonotrequireadditional JOINTINGMATERIAL
treatments to prolong their useful life or
Provideallhandlingequipmentnecessaryto
operatetheliftingmethodonsite. 1. The box culvert manufacturer may supply
improve performance, theirs surfaces do not jointing material. If required, but not
rustandthesmoothinternalfinishofconcrete Ensurethatanynonstandardattachmentto
the lifting point is supplied and that full supplied by the box culvert manufacturer,
ensures optimum flow of water through the the jointing material should be ordered in
boxculvert. instructionsaregivenforitsuse.
goodtime.
3. Where other methods, such as lifting forks, Establish the type of jointing material and
Precast concrete box culverts fulfil the current whetheranyprimerisnecessary.
design life requirements for buried structures. beams or slings are to be used the
The ability to provide many years of service contractorshould: Measurethequantityrequiredandallowfor
Consult the box culvert supplier to ensure wastage.
with the minimum of maintenance makes
precast concrete box culverts the most thattheproposedmethodisacceptable. Where seasonal grades are available,
costeffectivemeansofdivertingwatercourse, Protect the box culvert and particularly the specifythegraderequired.
especially with the ever present risk of joiningsurfacesfromdamagewhilelifting.
corrosiveelementsinthewaterorsoil. Ensurecompletesafetyofoperatives. 2. Thejointingmaterialsuppliershouldprovide
detailedrecommendationsfortheuseofthe
Whilst the methods and procedures for the products.
4. Generally, box culverts are transported as
installationofprecastconcreteboxculvertsare laid, but for safety or economy, the box Check the quantity ad type of material on
familiar to contractors, careful attention to culverts may be transported on end. The receipt.
detail will lead to safer working, a smoother contractorshould: Noteanyspecialrequirementsforstorage.
flow of operations and a higher standard of Check with the supplier how the box Ensure full application instructions are
finishedculvert. culvertswillbedelivered. followedbyoperatives.

This guide provides a reliable checklist for 3. Damagetotheprofileofpreformedjointing


anyone engaged in the installation of box materialswillimpairefficiency.
culverts. It is published by the Box Culvert Storecartonsflatandprotectfromextremes
Association to encourage good practice in the oftemperature.
useofprecastboxculverts. Stacktoalimitedheighttoavoidcrushing.
Preventcontaminationfromsolvents.
PREPARINGTHETRENCH
1. Keeping to the specified line and gradient,
the trench should be excavated to a width
BoxCulverts
equal to the box culvert width plus about If any adjustment to level is necessary,
600mmformostconditions. remove the box culvert and adjust the
Keep the width to a minimum to avoid surfacelevelofthebedding.
unnecessary excavation, bedding material Donotuselocalpackingtoadjustthelevel.
andbackfill.
Follow the normal requirements for safety MAKINGTHEJOINT
whenworkingintrenches. When a preformed strip is used, joints are
closed by pulling against the box culverts
2. Fullloadbearingcapacityofaninstalledbox previouslylaid.
culvertlineisachievedwithuniformsupport Anchorcablesfirmlyateachend.
atthebase.
Take on the crane the weight of the box
Carefullytrimthe formationtotherequired culvert being jointed to reduce frictional
depth and gradient making allowance for resistanceatthebaseoftheboxculverts.
thethicknessofthebedding.
Allow for a load of approximately one
Excavate local hard or soft areas of the tonnes per metre of strip to compress the
trench bottom which may cause uneven strip.
settlementandreplacewithwellcompacted
backfillselectedtogiveuniformsupport.
Apply heat, as recommended, to soften
APPLYINGTHEJOINTINGMATERIAL bitumenbased strip when the weather is
Maintain a dry formation so far as possible verycold.
by diverting water courses, pumping water Joints may be left open in certain cases but a
fromthetrenchorothermeans.
Close the joint with cable pullers to the
preformed strip compressed within the joint is specifiednominalgap.
In clay soils, leave a protective layer of commonlyused.Thestripshouldbeappliedto
material in the trench bottom until just
On completion, make good any holes used
the box culvert just before it is laid in the
forliftingandlaying.
beforethebeddingislaid. trench.
Wherenecessary,cleanandprimetheinner To provide an internal seal or to improve
BEDDING
and sloping faces both spigot and socket hydraulic flow, joints in box culverts of
1. Bedding is intended to level out any andallowtodry. sufficient size for access may be pointed
remainingirregularitiesinthetrenchbottom Place the strip in the internal corner of the internally. This can take the form of an
and ensure uniform support under the full socketorwhereotherwisedirected. elastometricor bitumenbasedsealantor even
widthandlengthoftheboxculvert. asandcementmortar.
Cutmitredendsandjointhestripatcorners
Lay wellcompacted selected granular anddonotbendthestrip.
materialoverthefullwidthofthetrenchto BACKFILLING
Check all the joints in the strip to ensure
a minimum depth of 200mm having first
thatthestripiscontinuous. Backfilling should commence as soon as
removedanyprotectivelayer.
Always follow the recommendations of the possibleaftertheboxculvertshavebeenlaid.
Blindthesurfacewithfinematerialtoassist
levelling.
manufacturerofthejointingmaterial. Fillthetrenchtothelevelofthetopofthe
boxculvertworkingevenlyoneachside.
LAYINGTHECULVERTS
2. Having achieved a flat, well prepared base, U s e s e l e c t e d b a c k f i l l m a t e r i a l
itshouldnotbeallowedtodeteriorate. A box culvert line is usually laid from the wellcompacted in layers not exceeding
downstream end with sockets facing 200mm
Lay the bedding only a minimum distance
upstreamtoreceivethenextboxculverttobe Donotuseheavyvibratoryequipment.
aheadofthelayingofboxculverts.
laid. Continue filling over the box culvert and
Keep off the prepared base so far as
Inspect the box culvert before laying to compactinlayers.
practicable.
ensure that the jointing surfaces are clean Do not run heavy rollers or construction
and that no damage has occurred in plant over the box culvert without
3. As an alternative to granular bedding, a
handlingandstorageonsite.
concrete blinding layer is sometimes protection.
preferred to protect the formation or to Lower the box culvert carefully on to the
prepared base aligning the spigot with the Care must be taken since site traffic and
allowfasterlayingofboxculverts.
socketoftheunitalreadylaid. construction equipment over shallow fill
Lay a thin flat apron of unreinforced depths can impose loadings greater than
leanmix concrete about 75mm thick on a Preventloosesurfacebeddingmaterialfrom
entering the joint space during positioning those for which the finished box culvert
trench bottom which has been well has been designed. In such cases
preparedtoauniformfirmness. of the unit by placing a hardboard strip
beneath the base joint or by any other protectivemeasureswillberequired.
means.
Comprising the United Kingdoms leading manufacturers of precast concrete box
culverts,theBoxCulvertAssociationisactivelyinvolvedinresearchanddevelopment
programmes aimed at extending the application of box culverts and advancing
installationtechniquestospeedconstructionandmaximiseefficiency.

TheAssociationproducesanumberofpublicationstoassistincorrectspecificationand
installationofprecastconcreteboxculverts.Theseinclude:
GuidetoSitePractice
ProvenStrengthandPerformance
GoodSitePracticeDVDavailableonourwebsite

MEMBERSOFTHE
BOXCULVERTASSOCIATION

HANSONBUILDINGPRODUCTS
BirchwoodWay,CotesParkIndustrialEstate
Somercotes,Derby,DE554NH
Tel:01773602432Fax:01773603134
Email:uksales@hanson.com
Web:www.hanson.com

MILTONPRECAST
MiltonRegis,Sittingbourne
Kent,ME102QF
Tel:01795425191Fax:01795420360
Email:sales@miltonprecast.com
Web:www.miltonprecast.com

TARMACPRECASTCONCRETELTD
Tallington,Stamford
Lincs,PE94RL
Tel:01778381000Fax:01778348041
Email:civils@tarmac.co.uk
Web:www.tarmacprecast.co.uk

BOXCULVERTASSOCIATION
4thFloor,60CharlesStreet,Leicester,LE11FB
Telephone01162536161 Fax:01162514568

Email: boxca@britishprecast.org
Web: www.boxculvert.org.uk

AProductAssociationoftheBritish
PrecastConcreteFederation
Although the Box Culvert Association makes every
endeavourtoensure thatanyadvice,recommendation
orinformationitmaygiveisaccurate,noliabilityofany
kind (including liability for negligence) is accepted in
thisrespectbytheassociation,itsservantsoragents.