0.000 1.122 PML Riser
1.500 1.120
3.000 1.120
4.500 1.120
6.000 1.121
7.500 1.121
9.000 1.109
10.500 1.119
12.000 1.113
13.500 1.114
15.000 1.145
16.500 1.111
18.000 1.134
19.500 1.126
21.000 1.115
22.500 1.106
24.000 1.118
25.500 1.122
27.000 1.134
28.500 1.125
30.000 1.121
31.500 1.111
33.000 1.119
34.500 1.119 Concrete Bandwall
36.000 1.057
37.500 1.128
39.000 1.128
40.500 1.115
42.000 1.12
43.500 1.136
45.000 1.117
46.500 1.116
48.000 1.121
49.500 1.123
51.000 1.133
52.500 1.118
54.000 1.126
55.500 1.121
57.000 1.123
58.500 1.094
60.000 1.106
61.500 1.116
63.000 1.098
64.500 1.096

1
CIPS potential data - 21 May 2015 HMS Corporation Sdn.Bhd
Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From chainage 0.000 (PML Riser) to 417.000 (PML Fencing)
Inside Petronas Methanol Plant

66.000 1.099
67.500 1.110
69.000 1.110
70.500 1.106
72.000 1.107
73.500 1.060
75.000 1.109
76.500 1.062 Pipe bending 90%
78.000 1.109
79.500 1.02
81.000 1.086
82.500 1.027
84.000 1.107
85.500 1.100
87.000 1.052
88.500 1.023
90.000 1.058
91.500 1.071
93.000 1.134
94.500 1.133 Test Point No.1
96.000 1.057
97.500 1.099
99.000 1.105
100.500 1.083
102.000 1.097
103.500 1.055
105.000 1.032
106.500 1.035
108.000 1.078
109.500 1.077
111.000 1.079
112.500 1.079
114.000 1.094
115.500 1.079
117.000 1.078
118.500 1.100
120.000 1.102
121.500 1.098
123.000 1.104
124.500 1.096
126.000 1.042
127.500 1.090
129.000 1.034
130.500 1.059
132.000 1.042
133.500 1.006

2
CIPS potential data - 21 May 2015 HMS Corporation Sdn.Bhd
Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From chainage 0.000 (PML Riser) to 417.000 (PML Fencing)
Inside Petronas Methanol Plant

135.000 1.052
136.500 1.081
138.000 1.031
139.500 1.058
141.000 1.041
142.500 1.060
144.000 1.066
145.500 1.013
147.000 1.089
148.500 1.069
150.000 1.011
151.500 1.022 cable trench 11kv area
153.000 1.040 skip 12 meters inside SESB fencing
154.500 1.000
156.000 1.030
157.500 1.013 drainage
159.000 1.053 end of drainage
160.500 1.071 road crossing No.3 - skip 7 meters
162.000 1.06 end of road crossing
163.500 1.043 drainage
165.000 1.016
166.500 1.076
168.000 1.085
169.500 1.077
171.000 1.089
172.500 1.081
174.000 1.081
175.500 1.083
177.000 1.085
178.500 1.084
180.000 1.082
181.500 1.084
183.000 1.093
184.500 1.086
186.000 1.063
187.500 1.002
189.000 1.012
190.500 1.059 drainage
192.000 1.059 end of drainage
193.500 1.066
195.000 1.065 road crossing No.2 - skip 7 meters
196.500 1.071 end of road crossing
198.000 1.074
199.500 1.121
201.000 1.114
202.500 1.127

3
CIPS potential data - 21 May 2015 HMS Corporation Sdn.Bhd
Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From chainage 0.000 (PML Riser) to 417.000 (PML Fencing)
Inside Petronas Methanol Plant

204.000 1.112
205.500 1.131
207.000 1.127
208.500 1.154
210.000 1.152
211.500 1.148
213.000 1.078
214.500 1.058
216.000 1.142
217.500 1.068
219.000 1.041
220.500 1.145
222.000 1.183
223.500 1.182
225.000 1.176
226.500 1.120
228.000 1.118
229.500 1.117
231.000 1.122
232.500 1.115
234.000 1.118
235.500 1.113
237.000 1.075
238.500 1.122
240.000 1.101
241.500 1.117
243.000 1.115
244.500 1.104
246.000 1.115
247.500 1.113
249.000 1.117
250.500 1.110
252.000 1.124
253.500 1.118
255.000 1.111
256.500 1.116
258.000 1.114
259.500 1.109
261.000 1.122
262.500 1.124
264.000 1.200
265.500 1.181
267.000 1.173
268.500 1.197
270.000 1.210
271.500 1.341

4
CIPS potential data - 21 May 2015 HMS Corporation Sdn.Bhd
Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From chainage 0.000 (PML Riser) to 417.000 (PML Fencing)
Inside Petronas Methanol Plant

273.000 1.295
274.500 1.286
276.000 1.290
277.500 1.164
279.000 1.116
280.500 1.147 road crossing No.1 (skip 7 meters)
282.000 1.143 end of road crossing
283.500 1.143
285.000 1.163
286.500 1.155
288.000 1.128
289.500 1.133
291.000 1.173
292.500 1.175
294.000 1.158
295.500 1.158
297.000 1.141
298.500 1.153
300.000 1.155
301.500 1.185
303.000 1.178
304.500 1.150
306.000 1.140
307.500 1.132
309.000 1.146
310.500 1.144
312.000 1.140
313.500 1.133
315.000 1.141
316.500 1.150
318.000 1.130
319.500 1.150
321.000 1.130
322.500 1.144
324.000 1.143
325.500 1.142
327.000 1.140
328.500 1.147
330.000 1.133
331.500 1.137
333.000 1.145
334.500 1.141
336.000 1.145
337.500 1.141
339.000 1.137
340.500 1.137

5
CIPS potential data - 21 May 2015 HMS Corporation Sdn.Bhd
Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From chainage 0.000 (PML Riser) to 417.000 (PML Fencing)
Inside Petronas Methanol Plant

342.000 1.135
343.500 1.139
345.000 1.135
346.500 1.126
348.000 1.127
349.500 1.130
351.000 1.134
352.500 1.128
354.000 1.133
355.500 1.125
357.000 1.111
358.500 1.130
360.000 1.134
361.500 1.132
363.000 1.129
364.500 1.129
366.000 1.130
367.500 1.128
369.000 1.124
370.500 1.127
372.000 1.124
373.500 1.129
375.000 1.135
376.500 1.131
378.000 1.130
379.500 1.131
381.000 1.129
382.500 1.126
384.000 1.127
385.500 1.132
387.000 1.129
388.500 1.133
390.000 1.131
391.500 1.133
393.000 1.135
394.500 1.141
396.000 1.137
397.500 1.131
399.000 1.127
400.500 1.134
402.000 1.133
403.500 1.143
405.000 1.137
406.500 1.137
408.000 1.141
409.500 1.134

6
CIPS potential data - 21 May 2015 HMS Corporation Sdn.Bhd
Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From chainage 0.000 (PML Riser) to 417.000 (PML Fencing)
Inside Petronas Methanol Plant

411.000 1.123
412.500 1.126
414.000 1.133
415.500 1.129
417.000 1.124 End of survey - PML Fencing

7
CIPS potential data - 21 May 2015 HMS Corporation Sdn.Bhd
Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From chainage 0.000 (PML Riser) to 417.000 (PML Fencing)
Inside Petronas Methanol Plant

Chainage ON Potential (-V) GPS Coordinate


Remark
(meter) w.r.t CuCuSO4 Latitude Longtitude
0.000 1.122 PML Riser
1.500 1.120
3.000 1.120
4.500 1.120
6.000 1.121
7.500 1.121
9.000 1.109
10.500 1.119
12.000 1.113
13.500 1.114
15.000 1.145
16.500 1.111
18.000 1.134
19.500 1.126
21.000 1.115
22.500 1.106
24.000 1.118
25.500 1.122
27.000 1.134
28.500 1.125
30.000 1.121
31.500 1.111
33.000 1.119
34.500 1.119 Concrete Bandwall
36.000 1.057
37.500 1.128
39.000 1.128
40.500 1.115
42.000 1.12
43.500 1.136
45.000 1.117
46.500 1.116
48.000 1.121
49.500 1.123
51.000 1.133
52.500 1.118
54.000 1.126
55.500 1.121
57.000 1.123
58.500 1.094
60.000 1.106
61.500 1.116
63.000 1.098
64.500 1.096

8
CIPS potential data - 21 May 2015 HMS Corporation Sdn.Bhd
Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From chainage 0.000 (PML Riser) to 417.000 (PML Fencing)
Inside Petronas Methanol Plant

66.000 1.099
67.500 1.110
69.000 1.110
70.500 1.106
72.000 1.107
73.500 1.060
75.000 1.109
76.500 1.062 Pipe bending 90%
78.000 1.109
79.500 1.02
81.000 1.086
82.500 1.027
84.000 1.107
85.500 1.100
87.000 1.052
88.500 1.023
90.000 1.058
91.500 1.071
93.000 1.134
94.500 1.133 5.24974966 115.2411041 Test Point No.1
96.000 1.057
97.500 1.099
99.000 1.105
100.500 1.083
102.000 1.097
103.500 1.055
105.000 1.032
106.500 1.035
108.000 1.078
109.500 1.077
111.000 1.079
112.500 1.079
114.000 1.094
115.500 1.079
117.000 1.078
118.500 1.100
120.000 1.102
121.500 1.098
123.000 1.104
124.500 1.096
126.000 1.042
127.500 1.090
129.000 1.034
130.500 1.059
132.000 1.042
133.500 1.006

9
CIPS potential data - 21 May 2015 HMS Corporation Sdn.Bhd
Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From chainage 0.000 (PML Riser) to 417.000 (PML Fencing)
Inside Petronas Methanol Plant

135.000 1.052
136.500 1.081
138.000 1.031
139.500 1.058
141.000 1.041
142.500 1.060
144.000 1.066
145.500 1.013
147.000 1.089
148.500 1.069
150.000 1.011
151.500 1.022 cable trench 11kv area
153.000 1.040 skip 12 meters inside SESB fencing
154.500 1.000
156.000 1.030
157.500 1.013 drainage
159.000 1.053 end of drainage
160.500 1.071 road crossing No.3 - skip 7 meters
162.000 1.06 end of road crossing
163.500 1.043 drainage
165.000 1.016
166.500 1.076
168.000 1.085
169.500 1.077
171.000 1.089
172.500 1.081
174.000 1.081
175.500 1.083
177.000 1.085
178.500 1.084
180.000 1.082
181.500 1.084
183.000 1.093
184.500 1.086
186.000 1.063
187.500 1.002
189.000 1.012
190.500 1.059 drainage
192.000 1.059 end of drainage
193.500 1.066
195.000 1.065 road crossing No.2 - skip 7 meters
196.500 1.071 end of road crossing
198.000 1.074
199.500 1.121
201.000 1.114
202.500 1.127

10
CIPS potential data - 21 May 2015 HMS Corporation Sdn.Bhd
Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From chainage 0.000 (PML Riser) to 417.000 (PML Fencing)
Inside Petronas Methanol Plant

204.000 1.112
205.500 1.131
207.000 1.127
208.500 1.154
210.000 1.152
211.500 1.148
213.000 1.078
214.500 1.058
216.000 1.142
217.500 1.068
219.000 1.041
220.500 1.145
222.000 1.183
223.500 1.182
225.000 1.176
226.500 1.120
228.000 1.118
229.500 1.117
231.000 1.122
232.500 1.115
234.000 1.118
235.500 1.113
237.000 1.075
238.500 1.122
240.000 1.101
241.500 1.117
243.000 1.115
244.500 1.104
246.000 1.115
247.500 1.113
249.000 1.117
250.500 1.110
252.000 1.124
253.500 1.118
255.000 1.111
256.500 1.116
258.000 1.114
259.500 1.109
261.000 1.122
262.500 1.124
264.000 1.200
265.500 1.181
267.000 1.173
268.500 1.197
270.000 1.210
271.500 1.341

11
CIPS potential data - 21 May 2015 HMS Corporation Sdn.Bhd
Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From chainage 0.000 (PML Riser) to 417.000 (PML Fencing)
Inside Petronas Methanol Plant

273.000 1.295
274.500 1.286
276.000 1.290
277.500 1.164
279.000 1.116
280.500 1.147 road crossing No.1 (skip 7 meters)
282.000 1.143 end of road crossing
283.500 1.143
285.000 1.163
286.500 1.155
288.000 1.128
289.500 1.133
291.000 1.173
292.500 1.175
294.000 1.158
295.500 1.158
297.000 1.141
298.500 1.153
300.000 1.155
301.500 1.185
303.000 1.178
304.500 1.150
306.000 1.140
307.500 1.132
309.000 1.146
310.500 1.144
312.000 1.140
313.500 1.133
315.000 1.141
316.500 1.150
318.000 1.130
319.500 1.150
321.000 1.130
322.500 1.144
324.000 1.143
325.500 1.142
327.000 1.140
328.500 1.147
330.000 1.133
331.500 1.137
333.000 1.145
334.500 1.141
336.000 1.145
337.500 1.141
339.000 1.137
340.500 1.137

12
CIPS potential data - 21 May 2015 HMS Corporation Sdn.Bhd
Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From chainage 0.000 (PML Riser) to 417.000 (PML Fencing)
Inside Petronas Methanol Plant

342.000 1.135
343.500 1.139
345.000 1.135
346.500 1.126
348.000 1.127
349.500 1.130
351.000 1.134
352.500 1.128
354.000 1.133
355.500 1.125
357.000 1.111
358.500 1.130
360.000 1.134
361.500 1.132
363.000 1.129
364.500 1.129
366.000 1.130
367.500 1.128
369.000 1.124
370.500 1.127
372.000 1.124
373.500 1.129
375.000 1.135
376.500 1.131
378.000 1.130
379.500 1.131
381.000 1.129
382.500 1.126
384.000 1.127
385.500 1.132
387.000 1.129
388.500 1.133
390.000 1.131
391.500 1.133
393.000 1.135
394.500 1.141
396.000 1.137
397.500 1.131
399.000 1.127
400.500 1.134
402.000 1.133
403.500 1.143
405.000 1.137
406.500 1.137
408.000 1.141
409.500 1.134

13
CIPS potential data - 21 May 2015 HMS Corporation Sdn.Bhd
Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From chainage 0.000 (PML Riser) to 417.000 (PML Fencing)
Inside Petronas Methanol Plant

411.000 1.123
412.500 1.126
414.000 1.133
415.500 1.129
417.000 1.124 End of survey - PML Fencing

14
CIPS potential data - 21 May 2015 HMS Corporation Sdn.Bhd
Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From chainage 0.000 (PML Riser) to 417.000 (PML Fencing)
Inside Petronas Methanol Plant

side SESB fencing

3 - skip 7 meters

2 - skip 7 meters

15
CIPS potential data - 21 May 2015 HMS Corporation Sdn.Bhd
Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From chainage 0.000 (PML Riser) to 417.000 (PML Fencing)
Inside Petronas Methanol Plant

1 (skip 7 meters)

16
CIPS potential data - 21 May 2015 HMS Corporation Sdn.Bhd
Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From chainage 0.000 (PML Riser) to 417.000 (PML Fencing)
Inside Petronas Methanol Plant

ML Fencing

17
CIPS potential data - 21 May 2015 HMS Corporation Sdn.Bhd
Chainage ON Potential (-V) Remark
0.000 1.122 0.85 GRT
1.500 1.12 0.85
3.000 1.12 0.85
4.500 1.12 0.85 CLOSE I

pipe to soil potentals w.r.t. CuCuSO4


6.000 1.121 0.85
7.500 1.121 0.85
9.000 1.109 0.85
10.500 1.119 0.85 1.5
12.000 1.113 0.85
13.500 1.114 0.85 1.4
15.000 1.145 0.85
16.500 1.111 0.85
1.3
18.000 1.134 0.85
19.500 1.126 0.85
21.000 1.115 0.85 1.2
22.500 1.106 0.85
24.000 1.118 0.85 1.1
25.500 1.122 0.85
27.000 1.134 0.85
1
28.500 1.125 0.85
30.000 1.121 0.85
31.500 1.111 0.85 0.9
33.000 1.119 0.85
Insulating Flanges inside GRT

34.500 1.119 0.85 Concrete Bandwall 0.8


36.000 1.057 0.85
37.500 1.128 0.85

Pipe Bend 90 degree


0.7
39.000 1.128 0.85

CP Test point No.1


40.500 1.115 0.85
42.000 1.12 0.85 0.6
43.500 1.136 0.85
45.000 1.117 0.85 0.5
46.500 1.116 0.85
48.000 1.121 0.85 0.4
49.500 1.123 0.85
51.000 1.133 0.85
0.3
52.500 1.118 0.85
Concrete Bandwall

54.000 1.126 0.85


55.500 1.121 0.85 0.2
57.000 1.123 0.85
58.500 1.094 0.85 0.1
60.000 1.106 0.85
61.500 1.116 0.85
0
63.000 1.098 0.85 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
00 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0
64.500 1.096 0.85 0. 7 . 15 . 22 . 3 0 . 37 . 45 . 5 2 . 6 0 . 67 . 75 . 8 2 . 9 0 . 97 . 0 5 . 1 2 . 2 0 .
1 1 1 1
Co
0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
00 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0
0. 7 . 15 . 22 . 3 0 . 37 . 45 . 5 2 . 6 0 . 67 . 75 . 8 2 . 9 0 . 97 . 0 5 . 1 2 . 2 0 .
1 1 1 1
66.000 1.099 0.85
67.500 1.11 0.85
69.000 1.11 0.85
70.500 1.106 0.85
72.000 1.107 0.85
73.500 1.06 0.85
75.000 1.109 0.85
76.500 1.062 0.85 Pipe bending 90%
78.000 1.109 0.85
79.500 1.02 0.85
81.000 1.086 0.85
82.500 1.027 0.85
84.000 1.107 0.85
85.500 1.1 0.85
87.000 1.052 0.85
88.500 1.023 0.85
90.000 1.058 0.85
91.500 1.071 0.85
93.000 1.134 0.85
94.500 1.133 0.85 Test Point No.1
96.000 1.057 0.85
97.500 1.099 0.85
99.000 1.105 0.85
100.500 1.083 0.85
102.000 1.097 0.85
103.500 1.055 0.85
105.000 1.032 0.85
106.500 1.035 0.85
108.000 1.078 0.85
109.500 1.077 0.85
111.000 1.079 0.85
112.500 1.079 0.85
114.000 1.094 0.85
115.500 1.079 0.85
117.000 1.078 0.85
118.500 1.1 0.85
120.000 1.102 0.85
121.500 1.098 0.85
123.000 1.104 0.85
124.500 1.096 0.85
126.000 1.042 0.85
127.500 1.09 0.85
129.000 1.034 0.85
130.500 1.059 0.85
132.000 1.042 0.85
133.500 1.006 0.85
135.000 1.052 0.85
136.500 1.081 0.85
138.000 1.031 0.85
139.500 1.058 0.85
141.000 1.041 0.85
142.500 1.06 0.85
144.000 1.066 0.85
145.500 1.013 0.85
147.000 1.089 0.85
148.500 1.069 0.85
150.000 1.011 0.85
151.500 1.022 0.85 cable tranch 11kv
153.000 1.04 0.85 skip 12 mtr fencing
154.500 1 0.85
156.000 1.03 0.85
157.500 1.013 0.85 drainage
159.000 1.053 0.85 drainage end
160.500 1.071 0.85 rc 3
162.000 1.06 0.85 rc end
163.500 1.043 0.85 drainage
165.000 1.016 0.85
166.500 1.076 0.85
168.000 1.085 0.85
169.500 1.077 0.85
171.000 1.089 0.85
172.500 1.081 0.85
174.000 1.081 0.85
175.500 1.083 0.85
177.000 1.085 0.85
178.500 1.084 0.85
180.000 1.082 0.85
181.500 1.084 0.85
183.000 1.093 0.85
184.500 1.086 0.85
186.000 1.063 0.85
187.500 1.002 0.85
189.000 1.012 0.85
190.500 1.059 0.85 drainage
192.000 1.059 0.85 drainage end
193.500 1.066 0.85
195.000 1.065 0.85 rc 2
196.500 1.071 0.85 rc ending
198.000 1.074 0.85
199.500 1.121 0.85
201.000 1.114 0.85
202.500 1.127 0.85
204.000 1.112 0.85
205.500 1.131 0.85
207.000 1.127 0.85
208.500 1.154 0.85
210.000 1.152 0.85
211.500 1.148 0.85
213.000 1.078 0.85
214.500 1.058 0.85
216.000 1.142 0.85
217.500 1.068 0.85
219.000 1.041 0.85
220.500 1.145 0.85
222.000 1.183 0.85
223.500 1.182 0.85
225.000 1.176 0.85
226.500 1.12 0.85
228.000 1.118 0.85
229.500 1.117 0.85
231.000 1.122 0.85
232.500 1.115 0.85
234.000 1.118 0.85
235.500 1.113 0.85
237.000 1.075 0.85
238.500 1.122 0.85
240.000 1.101 0.85
241.500 1.117 0.85
243.000 1.115 0.85
244.500 1.104 0.85
246.000 1.115 0.85
247.500 1.113 0.85
249.000 1.117 0.85
250.500 1.11 0.85
252.000 1.124 0.85
253.500 1.118 0.85
255.000 1.111 0.85
256.500 1.116 0.85
258.000 1.114 0.85
259.500 1.109 0.85
261.000 1.122 0.85
262.500 1.124 0.85
264.000 1.2 0.85
265.500 1.181 0.85
267.000 1.173 0.85
268.500 1.197 0.85
270.000 1.21 0.85
271.500 1.341 0.85
273.000 1.295 0.85
274.500 1.286 0.85
276.000 1.29 0.85
277.500 1.164 0.85
279.000 1.116 0.85
280.500 1.147 0.85 rc 1
282.000 1.143 0.85 rc ending
283.500 1.143 0.85
285.000 1.163 0.85
286.500 1.155 0.85
288.000 1.128 0.85
289.500 1.133 0.85
291.000 1.173 0.85
292.500 1.175 0.85
294.000 1.158 0.85
295.500 1.158 0.85
297.000 1.141 0.85
298.500 1.153 0.85
300.000 1.155 0.85
301.500 1.185 0.85
303.000 1.178 0.85
304.500 1.15 0.85
306.000 1.14 0.85
307.500 1.132 0.85
309.000 1.146 0.85
310.500 1.144 0.85
312.000 1.14 0.85
313.500 1.133 0.85
315.000 1.141 0.85
316.500 1.15 0.85
318.000 1.13 0.85
319.500 1.15 0.85
321.000 1.13 0.85
322.500 1.144 0.85
324.000 1.143 0.85
325.500 1.142 0.85
327.000 1.14 0.85
328.500 1.147 0.85
330.000 1.133 0.85
331.500 1.137 0.85
333.000 1.145 0.85
334.500 1.141 0.85
336.000 1.145 0.85
337.500 1.141 0.85
339.000 1.137 0.85
340.500 1.137 0.85
342.000 1.135 0.85
343.500 1.139 0.85
345.000 1.135 0.85
346.500 1.126 0.85
348.000 1.127 0.85
349.500 1.13 0.85
351.000 1.134 0.85
352.500 1.128 0.85
354.000 1.133 0.85
355.500 1.125 0.85
357.000 1.111 0.85
358.500 1.13 0.85
360.000 1.134 0.85
361.500 1.132 0.85
363.000 1.129 0.85
364.500 1.129 0.85
366.000 1.13 0.85
367.500 1.128 0.85
369.000 1.124 0.85
370.500 1.127 0.85
372.000 1.124 0.85
373.500 1.129 0.85
375.000 1.135 0.85
376.500 1.131 0.85
378.000 1.13 0.85
379.500 1.131 0.85
381.000 1.129 0.85
382.500 1.126 0.85
384.000 1.127 0.85
385.500 1.132 0.85
387.000 1.129 0.85
388.500 1.133 0.85
390.000 1.131 0.85
391.500 1.133 0.85
393.000 1.135 0.85
394.500 1.141 0.85
396.000 1.137 0.85
397.500 1.131 0.85
399.000 1.127 0.85
400.500 1.134 0.85
402.000 1.133 0.85
403.500 1.143 0.85
405.000 1.137 0.85
406.500 1.137 0.85
408.000 1.141 0.85
409.500 1.134 0.85
411.000 1.123 0.85
412.500 1.126 0.85
414.000 1.133 0.85
415.500 1.129 0.85
417.000 1.124 0.85 Fencing
CLOSE INTERVAL POTENTIAL SURVEY RESULT FOR 10" NATURAL GAS UNDERGROUND PIP
FROM CHAINAGE 0.000 (GRT) to 417.000 (PML FENCING)
INSIDE PETRONAS METHANOL PLANT

Skip CIPS pipeline inside SESB fencing - 12 meters


Pipe Bend 90 degree

CP Test point No.1

pipeline parallel with cable route 11KV

Road Crossing (skip 6 meters)

Road Crossing (skip 6 meters)


Road Crossing (skip 6 mters)
Drainage

Drainage

0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 00 5 0 0 0 0 0 5 0 0 0 00 5 0 0 0 0 0 5 0 0 0 00 5 0 0 0 0 0 5 0 0 0 00 5 0 0 0 0 0 5 00 0 0 0 5 0 0 0
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6 0 67 75 8 2 9 0 97 1 0 5 1 1 2 12 0 12 7 1 3 5 1 4 2 15 0 1 5 7 1 6 5 17 2 18 0 1 8 7 1 9 5 2 0 2 2 1 0 2 1 7 22 5 23 2 2 4 0 2 4 7 25 5 26 2 2 7 0 27 7 28 5 29 2 3 0 0 30 7 31 5 3 2 2 3 3 0 33 7 34 5

Distance (meter)
Ro

Dra
pi

Ro
S

Ro
0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 00 5 0 0 0 0 0 5 0 0 0 00 5 0 0 0 0 0 5 0 0 0 00 5 0 0 0 0 0 5 0 0 0 00 5 0 0 0 0 0 5 00 0 0 0 5 0 0 0
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6 0 67 75 8 2 9 0 97 1 0 5 1 1 2 12 0 12 7 1 3 5 1 4 2 15 0 1 5 7 1 6 5 17 2 18 0 1 8 7 1 9 5 2 0 2 2 1 0 2 1 7 22 5 23 2 2 4 0 2 4 7 25 5 26 2 2 7 0 27 7 28 5 29 2 3 0 0 30 7 31 5 3 2 2 3 3 0 33 7 34 5

Distance (meter)

ON POTENTIAL (-V) ON POTENTIAL MINIMUM CP CRITERIA -0.85V


GAS UNDERGROUND PIPELINE
ML FENCING)
NT
Road Crossing (skip 6 meters)

Fencing inside PML

0 0 0 0 0 5 0 0 0 00 5 0 0 0 0 0 5 00 0 0 0 5 0 0 0 0 0 5 00 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0
5. 2 . 0. 7. 5 . 2. 0. 7. 5 . 2. 0. 7. 5 . 2. 0. 7. 5 . 2.
28 29 3 0 30 31 3 2 3 3 33 34 3 5 3 6 36 37 3 8 3 9 39 40 4 1
Ro

Fe
0 0 0 0 0 5 0 0 0 00 5 0 0 0 0 0 5 00 0 0 0 5 0 0 0 0 0 5 00 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0 0 0 0 5 0 0
5. 2 . 0. 7. 5 . 2. 0. 7. 5 . 2. 0. 7. 5 . 2. 0. 7. 5 . 2.
28 29 3 0 30 31 3 2 3 3 33 34 3 5 3 6 36 37 3 8 3 9 39 40 4 1

M CP CRITERIA -0.85V
Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From 0.000 (Antara Steel Fencing) to 246.00 (Antara Steel Riser)
Inside Antara Steel Plant

Chainage ON Potential (-V) Remark


(meter) w.r.t CuCuSO4
0.000 1.104 Antara Steel fencing
1.500 1.087 pipe bend 90 degree
3.000 1.104
4.500 1.106
6.000 1.104
7.500 1.107
9.000 1.116
10.500 1.112
12.000 1.120
13.500 1.117
15.000 1.100
16.500 1.118
18.000 1.111
19.500 1.112
21.000 1.131
22.500 1.112
24.000 1.109
25.500 1.119
27.000 1.112
28.500 1.111
30.000 1.109
31.500 1.115
33.000 1.107
34.500 1.107
36.000 1.106
37.500 1.113
39.000 1.104
40.500 1.097
42.000 1.108
43.500 1.103
45.000 1.102
46.500 1.114
48.000 1.108
49.500 1.140
51.000 1.038
52.500 1.123 CP test points No.3
54.000 1.137
55.500 1.122
57.000 1.117
58.500 1.126
60.000 1.127
61.500 1.123
63.000 1.108
64.500 1.101
66.000 1.109

CIPS Potential data - 21 May 2015 29 HMS Corporation Sdn.Bhd


Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From 0.000 (Antara Steel Fencing) to 246.00 (Antara Steel Riser)
Inside Antara Steel Plant

67.500 1.136
69.000 1.125
70.500 1.132
72.000 1.108
73.500 1.112
75.000 1.088
76.500 1.106
78.000 1.112
79.500 1.123
81.000 1.014
82.500 1.128
84.000 1.091
85.500 1.144
87.000 1.157
88.500 1.151
90.000 1.148
91.500 1.150
93.000 1.152
94.500 1.033
96.000 1.134
97.500 1.163
99.000 1.127
100.500 1.163
102.000 1.160 Car porch
103.500 1.167
105.000 1.176
106.500 1.179
108.000 1.183
109.500 1.175
111.000 1.185
112.500 1.182
114.000 1.176
115.500 1.172
117.000 1.176
118.500 1.174
120.000 1.167
121.500 1.174
123.000 1.170
124.500 1.171
126.000 1.166
127.500 1.170
129.000 1.172
130.500 1.174
132.000 1.175
133.500 1.173
135.000 1.169
136.500 1.014

CIPS Potential data - 21 May 2015 30 HMS Corporation Sdn.Bhd


Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From 0.000 (Antara Steel Fencing) to 246.00 (Antara Steel Riser)
Inside Antara Steel Plant

138.000 1.115
139.500 1.169
141.000 1.159 Car porch
142.500 1.164
144.000 1.167
145.500 1.163
147.000 1.160
148.500 1.158
150.000 1.149 CP test points No.4
151.500 1.143
153.000 1.157
154.500 1.169
156.000 1.170
157.500 1.153
159.000 1.152
160.500 1.153
162.000 1.151
163.500 1.087
165.000 1.140
166.500 1.152
168.000 1.140
169.500 1.139
171.000 1.136
172.500 1.136
174.000 1.129
175.500 1.134
177.000 1.127
178.500 1.123
180.000 1.129
181.500 1.117
183.000 1.085
184.500 1.116
186.000 1.120 pipe bend 90 degree
187.500 1.128
189.000 1.138
190.500 1.127
192.000 1.132
193.500 1.148
195.000 1.108
196.500 1.094 skip - road crossing (7.5 meters)
198.000 1.093 drainage
199.500 1.110
201.000 1.123
202.500 1.136
204.000 1.139
205.500 1.146
207.000 1.153

CIPS Potential data - 21 May 2015 31 HMS Corporation Sdn.Bhd


Close Interval Potential Survey (CIPS) at 10" Natural Gas Underground Pipeline
From 0.000 (Antara Steel Fencing) to 246.00 (Antara Steel Riser)
Inside Antara Steel Plant

208.500 1.146
210.000 1.162
211.500 1.168
213.000 1.156
214.500 1.102
216.000 1.171
217.500 1.171
219.000 1.171
220.500 1.172
222.000 1.163
223.500 1.153
225.000 1.164
226.500 1.158
228.000 1.150
229.500 1.140
231.000 1.170
232.500 1.172
234.000 1.169
235.500 1.164
237.000 1.169
238.500 1.139
240.000 1.136
241.500 1.130
243.000 1.121
244.500 1.121
246.000 1.122 End of survey - Antara Steel riser

CIPS Potential data - 21 May 2015 32 HMS Corporation Sdn.Bhd


0.000 1.104 0.85 fening

pipe to soil potentals (-V) w.r.t. CuCuSO4


1.500 1.087 0.85 pb 90
3.000 1.104 0.85
4.500 1.106 0.85 CLOSE INTERV
6.000 1.104 0.85 FROM CHAINAG
7.500 1.107 0.85
9.000 1.116 0.85 1.3
10.500 1.112 0.85
12.000 1.12 0.85 1.2
13.500 1.117 0.85
15.000 1.1 0.85 2.4 1.1
16.500 1.118 0.85
18.000 1.111 0.85
1
19.500 1.112 0.85
21.000 1.131 0.85
0.9
22.500 1.112 0.85
24.000 1.109 0.85
0.8
25.500 1.119 0.85
27.000 1.112 0.85
0.7
28.500 1.111 0.85
30.000 1.109 0.85
0.6
31.500 1.115 0.85
33.000 1.107 0.85
0.5
34.500 1.107 0.85
36.000 1.106 0.85
0.4
37.500 1.113 0.85
bendFencing

39.000 1.104 0.85

CP Test point No.3


0.3
40.500 1.097 0.85
90

42.000 1.108 0.85


PipeSteel

0.2
43.500 1.103 0.85
degree

45.000 1.102 0.85


Antara

0.1
46.500 1.114 0.85
48.000 1.108 0.85
49.500 1.14 0.85 0

51.000 1.038 0.85


52.500 1.123 0.85 Test post 3
54.000 1.137 0.85 tp 3 to tp 4
55.500 1.122 0.85
ON P
57.000 1.117 0.85
58.500 1.126 0.85
60.000 1.127 0.85
61.500 1.123 0.85
63.000 1.108 0.85
64.500 1.101 0.85
66.000 1.109 0.85
67.500 1.136 0.85
69.000 1.125 0.85
70.500 1.132 0.85
72.000 1.108 0.85
73.500 1.112 0.85
75.000 1.088 0.85
76.500 1.106 0.85
78.000 1.112 0.85
79.500 1.123 0.85
81.000 1.014 0.85
82.500 1.128 0.85
84.000 1.091 0.85
85.500 1.144 0.85
87.000 1.157 0.85
88.500 1.151 0.85
90.000 1.148 0.85
91.500 1.15 0.85
93.000 1.152 0.85
94.500 1.033 0.85
96.000 1.134 0.85
97.500 1.163 0.85
99.000 1.127 0.85
100.500 1.163 0.85
102.000 1.16 0.85 pqrch car
103.500 1.167 0.85
105.000 1.176 0.85
106.500 1.179 0.85
108.000 1.183 0.85
109.500 1.175 0.85
111.000 1.185 0.85
112.500 1.182 0.85
114.000 1.176 0.85
115.500 1.172 0.85
117.000 1.176 0.85
118.500 1.174 0.85
120.000 1.167 0.85
121.500 1.174 0.85
123.000 1.17 0.85
124.500 1.171 0.85
126.000 1.166 0.85
127.500 1.17 0.85
129.000 1.172 0.85
130.500 1.174 0.85
132.000 1.175 0.85
133.500 1.173 0.85
135.000 1.169 0.85
136.500 1.014 0.85
138.000 1.115 0.85
139.500 1.169 0.85
141.000 1.159 0.85 porch car end
142.500 1.164 0.85
144.000 1.167 0.85
145.500 1.163 0.85
147.000 1.16 0.85
148.500 1.158 0.85
150.000 1.149 0.85 tp 4
151.500 1.143 0.85
153.000 1.157 0.85
154.500 1.169 0.85
156.000 1.17 0.85
157.500 1.153 0.85
159.000 1.152 0.85
160.500 1.153 0.85
162.000 1.151 0.85
163.500 1.087 0.85
165.000 1.14 0.85
166.500 1.152 0.85
168.000 1.14 0.85
169.500 1.139 0.85
171.000 1.136 0.85
172.500 1.136 0.85
174.000 1.129 0.85
175.500 1.134 0.85
177.000 1.127 0.85
178.500 1.123 0.85
180.000 1.129 0.85
181.500 1.117 0.85
183.000 1.085 0.85
184.500 1.116 0.85
186.000 1.12 0.85 pipe bend 90
187.500 1.128 0.85
189.000 1.138 0.85
190.500 1.127 0.85
192.000 1.132 0.85
193.500 1.148 0.85
195.000 1.108 0.85
196.500 1.094 0.85 road cx 7 5 meter
198.000 1.093 0.85 drain
199.500 1.11 0.85
201.000 1.123 0.85
202.500 1.136 0.85
204.000 1.139 0.85
205.500 1.146 0.85
207.000 1.153 0.85
208.500 1.146 0.85
210.000 1.162 0.85
211.500 1.168 0.85
213.000 1.156 0.85
214.500 1.102 0.85
216.000 1.171 0.85
217.500 1.171 0.85
219.000 1.171 0.85
220.500 1.172 0.85
222.000 1.163 0.85
223.500 1.153 0.85
225.000 1.164 0.85
226.500 1.158 0.85
228.000 1.15 0.85
229.500 1.14 0.85
231.000 1.17 0.85
232.500 1.172 0.85
234.000 1.169 0.85
235.500 1.164 0.85
237.000 1.169 0.85
238.500 1.139 0.85
240.000 1.136 0.85
241.500 1.13 0.85
243.000 1.121 0.85
244.500 1.121 0.85
246.000 1.122 0.85 riser antara steel
CLOSE INTERVAL POTENTIAL SURVEY (CIPS) AT 10" NATURAL GAS UNDERGROUND PIPELINE
FROM CHAINAGE 0.000 (ANTARA STEEL FENCING) TO 246.000 (INSULATING FLANGES & RIZER)
INSIDE ANTARA STEEL PLANT

Road crossing - skip 7.5


CP Test point No.3

CP Test point No.4

Pipe bend 90
Car Porch

Car Porch

Drainage
degree

meters

Distance (meter)

ON POTENTIAL (-V) MINIMUM CP ON POTENTIAL CRITERIA (-0.85V)


-0.85V)
Pipe bend 90
degree
Road crossing - skip 7.5
meters
Drainage
ERGROUND PIPELINE
NG FLANGES & RIZER)

Insulating flanges & riser

Вам также может понравиться