Trung tm nghin cu, pht trin, sn xut phn mm VNG 1 07/10/2017
WEEKLY STATUS REPORT NO.01

To : Gary McKinnon

From : C&S Department

Subject : Vinagame weekly report

Period Ending : 27th October to 3rd November 2017

Prepared by : Nguyen The Hung Structure Principal

1.0 - STRUCTURE ACTIVITIES COMPLETED THIS WEEK W40


No. ACTIVITY NOTES
1.2 STEEL STRUCTURAL DESIGN SCHEDULE
Steel structure checking
1.2.1 Specification check 27-28/10/2017
Update standard content
Steel staircase
1.2.2 30-31/10/2017
(change form concrete to steel)
Canopy detail.
1.2.3 31/10/2017
Mezzanine detail.
1.2.4 Quality Assurance and Quality Control 2/11/2017
1.3 REINFORCEMENT CONCRETE STRUCTURAL DESIGN SCHEDULE
1.3.1 General Note 28/10/2017
Post-tension slabs for B01 and B02
1.3.2 27-30/10/2017
Check column drawing
Check Pile cap and cote drawing
1.3.3 Mass piling update 30-31/10/2017
Plot drawing
1.3.4 Mass Pile D300 30-31/10/2018
1.4 CIVIL DESIGN SCHEDULE
1.4.1 Calculation appendix 27/10/2017
1.4.2 Quality Assurance and Quality Control 28/10/2017
1.4.3 Specification 30-31/10/2017
1.4.4 Check Road Documents 30-31/10/2017
1.4.5 Plot drawing 31/10/2017
1.5 DOCUMENT ISSUANCE
1.5.1 Tender Document Issuance 1/11/2017
Mass Pile D300 Issuance for Underground Tanks, Fence, Tree pot,
1.5.2 Swimming Pool, Parking Gate 1-2, Main Gate. 1/11/2017
Refer to EAN-07
1.6 SITE ESTABLSIHMENT
Solution for rising refusal piles
1.6.1 1/11//2017
Refer to EAN-08 response to RFI .05 from AIC site team
1.7 COORDINATE
1.7.1 Meeting 30/10/2017

Weekly Status Report No.06


Trung tm nghin cu, pht trin, sn xut phn mm VNG 2 07/10/2017
2.0 - STRUCTURE ACTIVITIES IN PROCESS

No. ACTIVITY NOTES


2.1 STEEL STRUCTURAL DESIGN SCHEDULE
Waiting for walking
2.1.1 Steel Roof way decision between
CPE and Arch
REINFORCEMENT CONCRETE STRUCTURAL DESIGN
2.2
SCHEDULE

Waiting for solution


2.2.1 Raising Floor
decision from VNG

Waiting for Architect


2.2.2 Alternation Toilet Ceiling
Drawing

2.3 SUMMARY OF REINFORCEMENT


Beam Slab
Column, Pile cap

Weekly Status Report No.06


Trung tm nghin cu, pht trin, sn xut phn mm VNG 3 07/10/2017
4.0 DESIGN DOCUMENT IN/OUT:

Received the response


Issued Delay
No. Description Doc. No From To Status
Date days Responded Responded
date By

C EAN

I EAN-OUT

Solution for rising refusal S-00-EAN- AIC-Struc AIC- PM


1. 01/11/2017 01/10/2017 Han Doan CLOSED
piles D500 at buiding 02 0008 Dept Dept

S-00-EAN- AIC-Struc AIC- PM


2. Mass piling D300 Issuance 01/11/2017 01/10/2017 Han Doan CLOSED
0008 Dept Dept

Prepared by Checked by Approved by

Han Nguyen Hung Nguyen Gary McKinnon


Structural Structure Principal Structure Project Manager

Weekly Status Report No.06


Trung tm nghin cu, pht trin, sn xut phn mm VNG 4 07/10/2017
Hung Nguyen
Principal Structure

Weekly Status Report No.06


Trung tm nghin cu, pht trin, sn xut phn mm VNG 5 07/10/2017
Weekly Status Report No.06
COF Fibre Optic Production Plant 8 07/10/2017