Вы находитесь на странице: 1из 6

PERSONAL PROFILE

RONALD ALLAN A. TALISAY


Address: No. 21 Tulip Street, Lhinette Homes, Saog, Marilao Bulacan, Philippines
Cell No: SMART +639217700430 GLOBE +639776989237
Email: ronald_allan_17@yahoo.com.ph
LinkedIn: https://www.linkedin.com/in/ronald-allan-talisay-81a73951
Male | May 19, 1984 | Filipino | 33 Years Old

JOB APPLIED FOR


Telecom Implementation Engineer / Telecom Engineer / Telecom Site Engineer / Telecommunication Technician

PREFERRED JOB
Site Engineer / Site Supervisor / Commissioning and Integration Engineer

TECHNICAL BACKGROUND
Highly skilled and has working knowledge in Outdoor and Indoor (IBS/DAS) Installation, commissioning and testing of BTS or
RBS (HUAWEI, NOKIA, ERICSSON), PDH Microwave radio (HUAWEI RTN 950, ERICSSON mini-link TN and AVIAT Networks),
VSAT equipment (COMMTECH), Node B (3G) equipment (NOKIA & SIEMENS).Knows how to use test equipment such as BER
tester, ANRITSU Site master, Power Meter.
CAREER OBJECTIVE
To obtain a position within the company that will allow me to utilize my education and experience for the benefit of the company as
well as for my personal growth and professional advancement.

WORK EXPERIENCE

TWINCOM ASIA PACIFIC


IBS /DAS Engineer
6050 Cayetano Avenue, Diversion Road, Brgy. Ususan, Taguig City Philippines
May 15, 2017 to Present

KEY RESPONSIBILITIES:
Responsible for Pre-Site Survey, RF Coverage Survey.
Responsible for Preparing DAS Plan and Design for 2G, 3G and LTE network using Visio, Autocad and IBwave
Design Tool.
Responsible for BOQ Arrangement.
Responsible for Site Quality and Globe Telecom Standards.
Result Performance Review and Analysis.
Responsible in Installation of Huawei In-Building Solutions Indoor and Outdoor
Responsible in Commissioning and Testing Huawei BTS and feeder from jumper to the antenna.
Responsible plumbing Jumpers, combiners, to the feeder for Passive configurations.
Responsible for plumbing jumper to the feeder, FOC from RRU to BTS for active configurations.
Responsible for Sweep testing and prepare documentations for submittal Responsible for Functionality testing
after confirmation of Integration for the broadcast ON AIR
Responsible to get the necessary requirements for the submission of documents.
Troubleshooting of fault before and after integrations.
Testing environmental alarms to make sure all alarm are clear before leaving site.
Responsible to give daily update on the development of site to IS and client.

BUSINESS OR SECTOR TELECOMMUNICATIONS


WUHAN FIBERHOME INTERNATIONAL TECHNOLOGIES PHILIPPINES INC.
IBS/DAS Supervisor
6782 Ayala Ave., Legaspi Village, Makati City
March 8, 2016 to May 8, 2017

KEY RESPONSIBILITIES:
Site Supervisor for IBS and OSP Project
Assists the Fiber Technician and Subcontractor for Installation.
Attend weekly meetings with clients.
Coordinate with the logistic team regarding the site delivery and timing
Coordinating with the team regarding any site defects clearance
Reporting on a daily basis the site status to his Project Manager.
Subcon Coordination.
Perform PAT and FAT.
Monitor and validate Site Folder completion and other project documentations
Ensure that all deliverables to the Customer are met.
Other works as may have deemed required by the Project manager

BUSINESS OR SECTOR TELECOMMUNICATIONS

HUAWEI TECHNOLOGIES PHILIPPINES INC.


Telecom Survey and Design Service Engineer / Site Engineer
52nd Floor, PBCOM Tower, Ayala Avenue corner V.A. Rufino, Salcedo Village, Makati City
March 7, 2016 to March 6, 2017

KEY RESPONSIBILITIES:
Overall Telecom Survey and Design Service Engineer in FBB Program (DWDM, DATACOM, CORE, MSAN and MSAP)
Responsible for Technical Site Survey Report, Survey Design, Site Validation, Site Audit.
Create As-Built Documents using MS VISIO and AutoCAD for TSSR Report,
Supervision for rollout of OPTIX OSN 6800, OSN 8800, OSN 9800, OSN 1500, OSN 3500 and OSN 7500 Installation
BUSINESS OR SECTOR TELECOMMUNICATIONS

PROJECTS INVOLVED

DEP19B Project (Domestic Fibre Optic Network, DWDM)


Roles & Responsibilities:
Responsible for Technical Site Survey Report, Survey Design, Site Validation and Site Audit.
Card Insertion, Fibre Laying, Testing and Acceptance
Supervision for rollout of OPTIX OSN 6800, OSN 8800, OSN 9800 Installation

PIIBL Ph13 Project (Philippine Inter-Island Backhaul Loop, DWDM)


Roles & Responsibilities:
Responsible for Technical Site Survey Report, Survey Design, Site Validation and Site Audit.
Card Insertion, Fibre Laying, Testing and Acceptance
Supervision for rollout of OPTIX OSN 6800, OSN 8800, OSN 9800 Installation

PLDT-SMART Synergy Project and SMART CEN Project (DATACOMM)


Roles & Responsibilities:
Responsible for Technical Site Survey Report, Survey Design, Site Validation and Site Audit of SMART CEN Project.

MSAP Phase12C Project (MSAP SDH)


Roles & Responsibilities:
Responsible for Technical Site Survey Report, Survey Design, Site Validation and Site Audit.
Card Insertion, Fibre Laying, Testing and Acceptance
Supervision for rollout of OPTIX OSN 1500, OSN 3500 and OSN7500 Installation
LBP HOLDINGS LIMITED (PAPUA NEW GUINEA)
Technical Service Manager
Lot 52, Section 35 Kunai Street, Hohola NCD, Port Moresby, Papua New Guinea
January 31, 2015 to January 31, 2016

Key Responsibilities:
Satellite Engineer in DIGICEL Papua New Guinea
Technical Service Manager in DIGICEL ERICSSON Project Discovery
Technical Service Manager in TELIKOM PNG HUAWEI NBN FTK Project
BUSINESS OR SECTOR Telecommunications

PROJECTS INVOLVED

DIGICEL OSP Project


OSP Engineer
November 20, 2015 January 31, 2016
Experience in Right of Way (ROW Officer), Permit Processing.
Fiber Optic Aerial Installation, Messenger Wire Installation and Fiber Laying
FTTH Installation according to OSP Standards, Fibre Splicing.
Power Meter Testing (1310nm, 1490nm and 1550nm) and Acceptance.

TPNG NBN TK Project


November 20, 2015 January 31, 2016
Site Supervisor, Telecom Installer, Commissioning and Integration Engineer.

Roles & Responsibilities:


Leads the installation of HUAWEI UMTS850 and LTE1800, BBU3910,
RRU3804, RRU3939, Panel Antenna, TMC11H, and DCDCU Breaker Distribution.
Attended weekly meeting with HUAWEI and TELIKOM PNG
Installation and Commissioning of RTN950 V100R700 Hybrid Microwave.
Microwave Antenna Installation, Panning or Alignment
Commissioning and Integration of BBU3910
Installation of RTN XMC ODU V100.
Installation of EMU Sensors, Water sensors, Smoke Sensor, Door Status Sensor, Humidity and Temperature Sensor.
Installation of PSU, DCDU 200B6, BC1203.
Installation of Batteries, Dry Contact Signal Cables

PROJECT DISCOVERY (Digicel-Ericsson Civil and Telecom Installation)


March 17, 2015- June 16, 2015
Site Supervisor, Telecom Installer, Commissioning and Integration Engineer.

Roles & Responsibilities:


RBS6601 Installation, Ericsson Site Controller, SIU, External Alarms, Solar Panel.
Attended weekly meeting with DIGICEL and ERICSSON.
Leads the team for the building of Ericsson Tower (Civil Works).
Microwave Antenna Panning, Commissioning and Integration OMT.

Airtel Satellite Support Engineer (Project Discovery Digicel Papua New Guinea)
February 1, 2015 March 16, 2015 and June 15, 2015 November 20, 2015

Roles & Responsibilities:


Monitoring, Maintenance of Airtel 9.4m Antenna, HPAs, ASC300 Beacon Receiver,
Antenna Control Unit, PUC and PCMA
Supports the subcontractors in Remote areas (Cross Pol. Isolation)
Subcontractor Freelancer
February 2014 to December 2014
Key Responsibilities:
Performed Site Survey, Site Validation and Site Audit
IBS DAS Installation, Testing and Acceptance
Site Folder completion and other project documentations.
Reporting on a daily basis the site status to Subcontractor Project Supervisor.

COMMTREND CONSTRUCTION CORPORATION


Telecom Engineer
No.23 Sarmiento St. Brgy. Tinajeros, Malabon City, Philippines

Key Responsibilities:
Project Planning, Implementation & Completion of Project on Schedule.
Supervising site installation to meet standard and according to the handbook specifications.
Coordination with Project Manager, O&M manager, switches Team and TI partners.
Coordinating with the Project Manager regarding the site acceptance.
Coordinate with the logistic team regarding the site delivery and timing.
Coordinating with the team regarding any site defects clearance
Reporting on a daily basis the site status to his Project Manager.
Monitors the daily activities of work like site survey, equipment installation, materials delivery implementation
and troubleshooting
Monitor and validate Site Folder completion and other project documentations
Ensure that all deliverables to the Customer are met.
Other works as may have deemed required by the Project manager

PROJECTS INVOLVED

DMPI 3G PH4 Project (July 2012 July 2013):


Site Supervisor, Telecom Installer, Commissioning and Integration Engineer.

Role & Responsibilities:


Implementation of HUAWEI 3G and LTE Swap, Microwave Upgrade, New Node B and eNodeB sites.
Coordinated with the Client DMPI Project Managers and Vendor Huawei Site Engineers for Telecom Implementation.
Commissioning, Integration, Acceptance of Huawei 3G and LTE Swap, Microwave Upgrade and New Node B Sites.
Microwave Link alignment 0.3 to 1.8m, link parameter testing, link of site and main site.
New Site Acceptance for Microwave Installation & Commissioning of 0.3m,0.6m,1.2m,1.8m,2.4m Antenna
Perform BER Test of E1 and Feeder Sweep Test (VSWR & DTF) using Site Master and Bird Test Equipment.
External alarms testing and forwarding.
Installation & Commissioning a new site.
Responsible for all VSWR, RSL & DTF alarm
Coordinating with Warehouse, Vendor team, O&M Engineer, Field managers for Different aspect of project work like Material
delivery, Installation, AT, Billings.
Solving Site Installation problems.
Responsible for bringing new site on air and responsible for pre-acceptance tests of new cell site and acceptance test.

NOKIA BTS Installation Project (February 2013 February 2014):


Site Supervisor, Telecom Installer, Commissioning and Integration Engineer.

Role & Responsibilities:


Project Planning, Implementation & Completion of Project on Schedule.
Supervising site installation to meet NSN SQI standard and according to the handbook specifications.
Coordination with Nokia Project Manager, O&M manager, Switches Team and TI partners.
Coordinating with the Nokia Project Manager regarding the site acceptance.
Coordinate with the logistic team regarding the site delivery and timing
Coordinating with the team regarding any site defects clearance
Reporting on a daily basis the site status to his Project Manager.
Monitors the daily activities of work like site survey, equipment installation, materials delivery implementation
and troubleshooting
Monitor and validate Site Folder completion and other project documentations.
New Site Installation, Commissioning and Integration for Nokia 2G, 3G Flexi BTS
Integration of new sites 2G and 3G (call test, GPRS test and external alarm test)
Measurement of VSWR using site master (Anritsu).
Installation, Commissioning, and Alignment of Microwave antenna (1+0, 1+1) link.
VSWR measurement of RF cables through site master (ANRITSU).
Responsible for Technical Site Survey Report.
PISM and RFI Inspection Report (For Civil Work Inspection, preparing for Telecom Installation).

Globe IBS Project


IBS/ DAS Engineer
(August 2013 February 2014):

KEY RESPONSIBILITIES:
Responsible for Pre-Site Survey, RF Coverage Survey.
Responsible for Preparing DAS Plan and Design for 2G, 3G and LTE network using Visio, Autocad Design Tool.
Responsible for BOQ Arrangement.
Responsible for Site Quality and Globe Telecom Standards.
Result Performance Review and Analysis.
Responsible in Installation of Huawei In-Building Solutions Indoor and Outdoor
Responsible in Commissioning and Testing Huawei BTS and feeder from jumper to the antenna.
Responsible plumbing Jumpers, combiners, to the feeder for Passive configurations.
Responsible for plumbing jumper to the feeder, FOC from RRU to BTS for active configurations.
Responsible for Sweep testing and prepare documentations for submittal Responsible for Functionality testing
after confirmation of Integration for the broadcast ON AIR
Responsible to get the necessary requirements for the submission of documents.
Troubleshooting of fault before and after integrations.
Testing environmental alarms to make sure all alarm are clear before leaving site.
Responsible to give daily update on the development of site to IS and client.

BUSINESS OR SECTOR TELECOMMUNICATIONS


EDUCATION

College
University of the East Caloocan
S.Y. 2006-2011
BS Electronics and Communications Engineering
Samson Road, Caloocan City

Secondary
Meycauayan College
S.Y 1997-2001
Calvario, Meycauayan Bulacan

Primary
Bayugo Elementary School
S.Y. 1991-1997
Bayugo, Meycauayan Bulacan

CHARACTER REFERENCES

Engr. Neil Jeffrey Del Mundo


RAN OPTIMIZATION NMM
E2E Wireless Optimization
Smart Communications Inc.
Mobile Number: +639298231335 / +639493000222
Email: NEDelmundo@smart.com.ph

Engr. Rainier Mapa


Telecom Group Head
Comm Trend Construction Corporation
Mobile Number: +639175760884
Email: rainier.mapa@commtrend.net

Engr. Alan Cris Valencia


OSP Site Supervisor
Wuhan Fiberhome International Technologies Philippines Inc.
6782 Ayala Ave., Legaspi Village, Makati City
Mobile Number: +639168547687
Email: Allan_valencia@yahoo.com

Sworn and declared that all information stated above is true, correct and most updated.

RONALD ALLAN A. TALISAY


Applicant

Вам также может понравиться