A B C D E F G
Notes:
225 2556 1501500 225 2400 244 3356 225 2100 225 4200 225
2.where applicable the contractor is to
225
225 2556 525 750 375 394 1500 506 2444491800 1106 700
225 750 650 900
225 1500 1800 225
check on site size of components to
manufactured before production.
225 W3
1 1 3.Contractor is responsible for the correct
1500 setting out of the buildings, all external and
1500
Kit.
1275
1275
internal walls with particular reference to
225 225 Ver. W5 boundaries , building lines e.t.c.
450
2 D1 Store 2 4. Contractors to verify all levels , heights and
10
2550
11
12
13
14
1500
1500
9 dimensions on site and to check the same
against the drawings before commercement of
15
8
1425
W4 W1 225 225
W4
16
7
Construction.
3 17
6 3
3600
DISCLAIMER
18
5
19
4 D1
The elements shown on this drawing have been
2250
2100
20
3
2250
Kitchen Terrance approved by the client , and he accepts
1875
5700
2700
21
2
1
Laundry responsibility for materials , content and
4650
W1 2100 Bedroom statement
4 4
1500
1500
1500
W4 Arch beam above W1
Project:
450 4200 450
Arch beam D1
225 225 250
800 600
5100
Lounge Walk Toi./ W3
Proposed Residential
1425
4500
In D2 Bath
2400
3000
1800
6 W2
Dining 6 Amano-Anara Isiala Mbano L.G.A
600 500
Lobby Walk D2
A Toi./ A
In Bath W3 Imo State .
926
6000
600
600
4200
225 225 Closet 450
225
7 551
7
150 D4
19785
225 D1 D1
Arch beam above
1500
Client:
1500
W1 1
W1
3600
2
21
8
3
Guest 8
4199
Ante-
20
Room Room
Exercutive
5
D4 18
2600
6000
6
17
2238
Lounge 7
8
16
15
D3
9 9
14
237 225
9
13
12
11
10
D2
W6
consultants:
10 W1
10
1500
1576
W1
250
Toi. W3
225 225
11 11 SAFEKonxtrukt Nig.
W2
1425
5986
12 1050
Porch 12
No. 145 Wetheral Road Owerri.
4185
Opposite St. Mulumba Catholic Church,
IMO STATE
08062984731
13 13
4
designed
3
1200 1800 1200 225 6225 1500 239 1500 2250 225 Henry Ugochukwu
2
361 450
sheet no.
1
225 4200 225 6000 225 2100 225 4200 225
drawn Henry Ugochukwu
17625
checked Ifeanyi Obani
A B C D E F G Approved
A1 scale Nil
A1