PROBLEMA N 04
Sub-drain design
The rain intensity for a rainfall of 60 minutes and its return period in 2 years is 54 mm/hr. The filling material can be fine sand, medium san
or gravel (see Morris and Johnson's table, at the end of this test). You want to check if a PVC sub-drain with a diameter of 6" (150 mm) ca
design rain. The sub-drains will be installed on both sides of a two-lane track. Assume that each lane has a total width of 4.20 m. The slop
0.2 %. The filling material must be chosen so that the minimum width results in a logic value. For permeability of each material use the av
the table. With the previous value, calculate the minimum width of the sub-drain and the maximum evacuation distance of the flow rate. A
connectivity between the layer drainage of the line and sub-drains. (3 points)

DATOS:
IS = Intensidad de lluvia = 54.00 mm/hr =
I= Infiltracion = 36.00 mm/hr =
W = Ancho contribuyente = 4.20 m =

DATOS INCREMENTADOS: Factor de Incremento (2.24%) = 1.0224

IS = Intensidad de lluvia = 55.21 mm/hr =


I= Infiltracion = 36.81 mm/hr =
W = Ancho contribuyente = 4.29 m =

En el grafico se traza una linea vertical por la absisa que representa el ancho hasta interceptar la infiltracion Is. Del punto de intercepcion
linea horizontal para hallar B.Kt (p2/dia). Se halla el Kt minimo.
Utilizando la Tabla de Morris y Jhonson probamos valores de K promedios, tambien se puede trabajar para valores medios

Para nuestro caso asumismos valores


material como la arena fina

Es necesario convertir el valor d


aritmtica de cm/s a pie
Kt =
Kt =
B=

Conversin de los datos de la media aritmtica (de cms/s a pie/da), para diversos materiales

Media
Material N de anlisis Valor mnimo Valor mximo aritmtica
(cm/s) (cm/s) (cms/s)
Arena (fina) 159 0.00002 0.0189 0.00288
Arena (media) 255 0.00009 0.0567 0.0142
Arena (gruesa) 158 0.00009 0.661 0.052
Grava 40 0.03 3.12 0.403

USO DEL BACO (Para determinar espaciamiento de subdrenes)

I= 1.45 in/hr
W= 2.0448 2.00 Numero de carriles
B= 97.99 ft
g= 0.002 pendiente de la Tuberia

Diametro Comercial:
I= 1.45

Para material (arena media)

Kt = 40.25 ft/day VALORES A INGRESAR : I= 1.45 in/hr


B= 19.87 ft W= 2.0448
L= 19.87 ft
g= 0.00204

Diametro Comercial:
D=

B=

TUBERIA CORRUGADA

I= 1.45

Para Arena (Gruesa)


No se puede ingresar a la tabla puesto que los valores de B estan d
Kt = 147.40 ft/day
hasta 2000 pies
B= 5.43 ft

Asumiendo Arena (Grava):

Kt = 1142.36 ft/day No se puede ingresar a la tabla puesto que los valores de B estan d
hasta 2000 pies
B= 0.70 ft
CONCLUSIN: D = 4" TUBERIA CORRUGADA
B = @ 35 m
erial can be fine sand, medium sand, coarse sand
n with a diameter of 6" (150 mm) can evacuate the
as a total width of 4.20 m. The slope of the pipe is
eability of each material use the average values of
cuation distance of the flow rate. Assume there is

2.13 pulg/hr
1.42 pulg/hr
13.78 ft

2.17 in/hr
1.45 in/hr
14.09 ft

acion Is. Del punto de intercepcion, se traza una

Usando el baco de B.K Versus W e


Intensidad de Lluvia encontramos el
valor de B.Kt

B.Kt = 800.00 ft2/day

B=
Width of trench
(Longitud de
Trinchera = L)
Width of trench
(Longitud de
Trinchera = L)

para valores medios

a nuestro caso asumismos valores para un


erial como la arena fina

Es necesario convertir el valor de la media


aritmtica de cm/s a pie/da
2.88E-03 cms/s
8.16 ft/day
97.99 ft

Media
aritmtica
(pie/dia)
8.1637795276
40.2519685039
147.4015748032
1142.3622047244

Diametro Comercial:
D = 4"
TUBERIA CORRUGADA
B = 29.87 m

RESPUESTA

pulg/hora
2.00 # de carriles

pendiente de la Tuberia

tro Comercial:
3"

6.06 m RESPUESTA

ERIA CORRUGADA

uesto que los valores de B estan desde 20 pies


hasta 2000 pies

uesto que los valores de B estan desde 20 pies


hasta 2000 pies
POSTGRADUATE PROGRAMME
HIGHWAY MASTER

PROBLEMA N 05: EROSIN/CONTROL DE EROSIN

a) Erosion in bridge abutments. The supporting elements of a bridge are abutments with eaves at 45 degrees. In the design condition
the velocity of water is 1.75 m/s. The average shear force is 95 N/m2 at the base of the channel. The intrusion on the left abutment is app
right side is 4 m. The bed is alluvial and consists of rounded particles with diameters: d90 = 85 mm, d84 = 70 mm, d50 = 42 mm, d16 = 22
scour that occurs in the abutments of this bridge. Assume that the abutments of the bridge are aligned with the flow and that the sediment
to check if the bed is mobile, use the graph at the end of this test. (2 points)
Ayuda: para verificar si el lecho es mvil use el grfico correspondiente al final de esta prueba.

DATOS DE ENTRADA
Factor de Incremento (2.24%) =
Tirante (m) Y= 4.8
Velocidad (m/s) V= 1.75
Esf. Cortante en la base (N/m2) b = 95
Intrusin estribo izquierdo (m) Lizq. = 6
Intrusin estribo derecho (m) Lder. = 4
ngulo de inclinacin del estribo() = 90
(estribos alineados con el flujo)

ngulo de inclinacin de aleros() 45


Concentracin de sedimentos: BAJA
Dimetros caract. del lecho (mm): d90 = 80
d84 = 70
d50 = 42
d16 = 22

SOCAVACIN POTENCIAL TOTAL

La expresin que permite calcular la socavacin potencial total viene a ser la suma de los siguientes componentes:

Yt =Yg+Yc+Ys

donde: Yt : Socavacin Potencial Total


Yg : Sicavacin General
Yc : Socavacin por Contraccin
Ys : Socavacin Local

VERIFICACION DE LA CONDICION DEL LECHO

Grfico Dm(mm) Versus c (lb/ft2) y Concentracin de Sedimentos:


En el grfico se traza una lnea vertical por la abscisa que representa el dimetro medio del sedimento hasta interceptar la
concentracin de sedimentos. Del punto de interseccin, se traza una lnea horizontal para hallar B.Kt(ft2). Se halla el Kt mnimo.
En efecto,con: Dm = D50 = 42 mm y

c = 0.7 lb/ft2
(Recordando que: 1lb/pie2 = 47.88 N/m2

c = 33.52 N/m2

Por otro lado, segn dato el Esfuerzo Cortante Actuante es:


b = 97.13 N/m2

c < b

Dado que la condicion del lecho es Movil, indicativo que las partculas se estn moviendo, por tanto se utilizar
las ecuaciones en lecho mvil para el clculo de la socavacin local en estribos.

CLCULO DE LA SOCAVACIN LOCAL (Ys)

MTODO DE FROEHLICH
Este mtodo calcula la socavacin local mediante la siguiente frmula:

Socavacin el lecho mvil /=2.27_ _ (/ )^0.43


^0.61+1
donde: Ys : Socavacin Local
he : Profundidad media del flujo (tirante) en la zona de inundacin obstruida por el estribo aguas ar
L : Long. del estribo y accesos al puente que se opone al paso del agua, m.
Kf : Coeficiente que depende de la forma del estribo. (Tabla 27-Manual de hidrologa, Hidrulica y D
(K1=1.0 - vertical, 0.82-aleros, 0.55 - con proteccin)

K : Coeficiente que depende del ngulo de ataque del flujo

F : Nmero de Froud F=/


()

Dado que el valor de la intrusin de los estribos, tanto en el estribo derecho e izquierdo son diferentes, por tanto calcularemos la
socavacin para cada uno de ellos:

ESTRIBO IZQUIERDO ESTRIBO DERECHO

Luego: he : 4.91 m he :
Lizq. : 6.13 m Lder. :
Kf : 0.82 Kf :
K : 1.00 K :
F : 0.26 F :
Ys (est. Izq) = 9.03 m

MTODO DE LAURSEN
Este mtodo calcula la socavacin local mediante la siguiente frmula:

Socavacin el lecho mvil /=2.75/((/11.5


+1) ^1.71)
donde: Ys : Socavacin Local
he : Profundidad media del flujo (tirante) en la zona de inundacin obstruida por el estribo aguas ar
L : Long. del estribo y accesos al puente que se opone al paso del agua, m.

Dado que el valor de la intrusin de los estribos, tanto en el estribo derecho e izquierdo son diferentes, por tanto calcularemos la
socavacin para cada uno de ellos:

ESTRIBO IZQUIERDO ESTRIBO DERECHO

Luego: he : 4.91 m he :
Lizq. : 6.13 m Lder. :
Lizq./he: 1.25 Lder./he:
Reemp. datos en la ecuacin y resolviendo por tanteo "Ys":
Para: Ys = 8.30 m ,entonces: Para: Ys =
Ys = Lizq/he = 1.22 m Ys =Lder./he =

Ys (est. Izq) = 8.30 m

MTODO HIRE
Este mtodo calcula la socavacin local mediante la siguiente frmula:

Ys=4_(_/0.55)_
^0.33
donde: Ys : Profundidad de Socavacin Local
he : Profundidad media del flujo (tirante) en la zona de inundacin obstruida por el estribo aguas ar
F: Nmero de Froud
Kf : Factor de correccin por forma del estribo. (Tabla 27-Manual de hidrologa, Hidrulica y Drenaj
(K1=1.0 - vertical, 0.82-aleros, 0.55 - con proteccin)
K : Factor de correccin por ngulo de ataque del flujo

Dado que este mtodo no est en funcin de la intrusin de los estribos; por tanto, la socavacin local ser igual en ambos estribos

Luego: he = 4.91 m
Kf = 0.82 m
K = 1.00
F = 0.26

Ys = 18.77 m

RESUMEN
Se hace un resumen de la socavacin local obtenida por los 3 mtodos:

SOCAVACIN LOCAL EN EL ESTRIBO


MTODO
IZQUIERDO (m)
FROEHLICH 9.0
LAURSEN 8.3
HIRE 18.77

Por lo tanto, segn el mtodo de FROEHLICH la profundidad de socavacin (valores crticos) local es aprox. de:
Estribo Izquierdo = 9.03 m
Estribo Derecho = 8.82

CLCULO DE LA SOCAVACIN GENERAL (Yg) INCLUIDO POR CONTRACCIN (Yc)

MTODO DE LISCHTVAN - LEVEDIEV


La ecuacin que permite el clculo de la socavacin general para auelos no cohesivos, considerando los coeficientes por correccin por
contraccin es la siguiente:

=(( _ ^(5/3))/
(0.68 ^0.28))^(1/
SUELOS NO COHESIVOS: (1+))

, son factores que se introducen a la ecuacin de socavacin general por efecto de contraccin del flujo debido a
presencia de estribos, cuyos valores se muestran en tablas posteriores.
donde:
ds = Profundidad total despus de producirse la socavacin de fondo. Se mide desde el nivel del
agua al pasar la avenida hasta el nivel de fondo erosionado en metros.
do = Profundidad inicial que existe en una determinada vertical de la seccin entre el nivel del
agua al pasar la avenida y nivel de fondo obtenido durante el estiaje en metros.
dm = Dimetro medio, calculado de la granulometra del material de fondo.
B= Coeficiente que toma considera periodo de retorno que presenta gasto de diseo, ver cuadro.
X= Exponente variable ver cuadros. Para suelos no cohesivos su valor depende de (dm) en mm.
= Factor de correccin por contraccin del cauce
= Factor de correccin por forma de transporte de sedimentos.
=/
A su vez, "" se calcula con la siguiente ecuacin: ( _ ^(5/3)
)

Donde:
Be = Ancho efectivo en la seccin descontando todos los obstc
ym = Tirante medio de la seccin.
= Coeficiente que toma en cuenta el efecto de contraccin pr
o estribos. Si no hay obstculos, =1.

OBSERVACIN:
El problema planteado carece de datos para llevar a cabo el clculo del presente socavacin general
incluido la contraccin.Asi, por ejemplo:
"" f(Qd, Ym, Be, ) de los cuales no se conoce Qd, ni el Be
""f(Luz libre=Be, Velocidad media=V) de los cuales no se conoce Be

" "f(peso especfico de la muetra de sedimento= m), cuyo valor se desconoce en el problema. " "

CONCLUSIN
Dada la situacin, la socavacin mxima calculada corresponde nicamente a la socavacin local; no obstante, se reitera
Socavacin Potencial Total es la sumatoria de : Socavacin General+Socavacin por Contraccin+Socavacin Local; los c
deberan de calcularse necesariamente en proyectos de Consultora.

ESTRIBO IZQUIERDO Ys (est. Izq) =


ESTRIBO DERECHO Ys (est. Der.) =

Estos resultados de socavacin calculada es para un caudal, cuyo tiempo de retorno es de 500 aos segn lo estipulado
por el Manual de Hidrologa, Hidrulica y Drenaje-MTC.

POSTGRADUATE PROGRAMME
HIGHWAY MASTER

b) To calculate the safety factor of a rockfill with an equivalent diameter of 350 mm, whose specific gravity is 2.65. This ma
extracted from quarry and will be supported by on a slope of 1.75 H: 1 V. The shear force at the base is 66 N/m2 and in the
50 N/m2. Assume that the angle that the flow lines make with the horizontal, , is zero. (1 point)

DATOS
Factor de Incremento (2.24%) = 1.0224
Dimetro enrocado (mm) Dm= 350
Gravedad Especfica Ss= 2.65
Talud: Vertical V= 1
Horizontal H= 1.75
Esf. Cortante en la base (N/m2) b 66
Esf. Cortante en el Talud (N/m2) t 50
ng. /lineas de corriente y la horiz.() = 0

1
P horizontal


P
1

1
P horizontal


P
1

Vista Normal Al talud

CLCULO DEL FACTOR DE SEGURIDAD (S.F.)

* FACTOR DE SEGURIDAD (S.F.) EN EL TALUD


El Factor de Seguridad en el Talud se calcula con la siguiente expresin:

SF=()/
el cual debe ser aproxi.
(_1
+)
En donde:
= ^(1) (/
((64&2/(_
))+))

_=(21_0)/
((1)) Si 0 en los mrgenes es conocido, entonces Ds=Dm

_1=_
y ((1+(+))/2)

Luego:
= 29.59
no = 0.066

Segn el ABACO: estimamos el valor de "" con: : 29.59


no : 0.066
y Ss : 2.71
= 43.0

Luego reemplazando datos, hallamos: ,n1, SF


= 3.57
n1 = 0.04

SF = 1.54 >

S.F. = 1.54

* FACTOR DE SEGURIDAD (S.F.) EN EL PIE DEL TALUD


El Factor de Seguridad en el en el Pie del Talud se calcula con la siguiente expresin:

SF=()/(_1
+)
SF=()/(_1
+)
En donde:
= ^(1)
(/2)

_=(21_0)/
((1)) Si 0 en los mrgenes es conocido, entonces Ds=Dm

_1=_
y ((1+)/2)

Luego:
= 29.59
no = 0.087

Segn el ABACO: estimamos el valor de "" con: : 29.59


no : 0.087
y Ss : 2.71
= 43.0

Luego reemplazando datos, hallamos: ,n1, SF


= 0.08
n1 = 0.04

SF = 1.52 >

S.F. = 1.52

CONCLUSIN
Los factores de seguridad calculados son:
EL EL TALUD: S.F.

EN LA BASE: S.F.

Segn el Manual de Hidrologa, Hidrulica y Drenaje, del MTC (pg. 166) el Factor de Seguridad (SF) debe ser
aproximadamente 1.5. En efecto, los valores obtenidos son mayores que dicho parmetro, por tanto, la seguridad de la es
es ACEPTABLE.
POSTGRADUATE PROGRAMME
HIGHWAY MASTER

c) We want to protect a channel excavated in ground with mattresses of gabions. The shape of the channel is trapezoidal.
of 4 m, the slope inclination is 1.75 H: 1 V, the slope of the channel is 2 o/oo and the design flow rate is 24 m3/s. To verify
channel, consider that mattresses will be used 300 mm thick, filled with stones of 100 to 150 mm equivalent diameter. The
underneath the mats has an equivalent diameter d50 of 0.2 mm. Check if the mats will provide sufficient protection and if n
geotextile. (2 points)

DATOS
Factor de Incremento (2.24%) =
Base del canal (m): B= 4
Pendiente: S= 0.002
Caudal (m3/s): Q= 24
Talud: Z= 1.75
Mat. de fondo, arena, (mm): d50= 0.2
Espesor colchoneta (mm): e= 300
Dim. Piedras relleno (mm) d= 100--150
Asumir, en mm: dm= 125
d90= 170

CLCULOS RELATIVOS A LA SECCIN

1/ 6
n d90 / 26 = 0.0287 (coef. de Manning en funcin del mat. de relleno de los gav
Qn
( 1/ 2
)3 A5 / P2 = 3789.962 (Expresin en funcin del rea y permetro mojado)
S

Luego, para: Y = 1.88 m


F(y) = 3881.763

A=(B+YZ)Y = 14.01 m2
=+2(1+^2 ) = 11.80 m
V=Q/A = 1.75 m/s

CLCULOS HIDRAULICOS
Para el caso del presente problema, solo se requiere calcular el N de Froud:

/
= 0.30
(/) ^
0.5
VERIFICACION DE LA VELOCIDAD

* EN EL FONDO (Ir al Nomograma Velocidad Crtica Versus Espesor del Colchn y N de Froud)

Para un espesor de colchn: 0.303 m y N Froud :


Vc = 4.90 m/s

Asi tambin, la velocidad media calculada es:


V = 1.75 m/s

Por tanto: Vc > V

* EN LA INTERFACE
Velocidad en la interface colchn filtro

Vb=1/( /2) = 0.36 m/s


^(2/3) ^(1/2)

Para el suelo arenoso la Velocidad Crtica vale:

=16.1 = 0.23 m/s


_( 50
^(1/2) )
Haciendo la comparacin ambas velocidades, debe resultar:
Vb2.4Ve ;caso contratrio incluir geotextil
En efecto: 0.36 < 0.55

Por tanto: Vb < Ve

CONCLUSION
Las velocidades crticas obtenidades son:
EN EL FONDO Vc

EN LA INTERFASE Ve

Estas velocidades estn por encima de las velocidadeds desarrolladas; por tanto:
* Las colchonetas proporcionan proteccin suficiente
* No es necesario incluir un geotextil

POSTGRADUATE PROGRAMME
HIGHWAY MASTER

d) A channel with a base of 4 m and a slope inclination of 2 H: 1 V carries water with low sediment concentration with a slo
channel has been covered with geo-cells which have been filled with vegetable soil where Bermuda grass has been sown a
a size of approximately 250 mm. If the geo-cell protection height is 3 m, what is the flow rate that reaches this height? Whe
this height, also calculates the flow speed. Help: use graph at the end of the test. (2 points)

Datos:
Factor de Incremento (2.24%) = 1.0224
bw= 4 = 4.09
S= 0.005 = 0.01
Z= 2 = 2.04
Y= 3 = 3.07

Para calcular el caudal es necesario calcular A ,P y R. remplazando datos se tiene.

Sabemos que :

Para calcular el caudal es necesario calcular A ,P y R. remplazando datos se tiene.

A= 3.38 m2 P= 18.05 m

Con estos datos no seria duciciente puesto que no tenemos el "n" de kuter (mal llamado n de maning), por lo que usaremo
abaco del examen para hallarlo teniendo en cuenta que las paredes son de geomallas con 250 mm

Usaremos la Linea C puesto que se trata de un Pasto bermuda dicho pasto tiene una clasificacion de retardo moderada

La velocidad maxima para flujo en geoceldas es 6 m/s (Ref Dr Julio Kuroiwa)

Asumimos= 5.00 m/s Con ello ingresamos al abaco que nos pide VxR

VxR= 0.94 m2/s

con lo que se Obtiene en Coeficiente :


n= 0.035

Finalmente remplazando en la formula se tiene el caudal que seria:

Q= 2.26 m3/s La velocidad que alcanza a esta altura seria:

V= 0.67 m/s
PROGRAMME
MASTER

ith eaves at 45 degrees. In the design condition the depth is 4.80 m and
hannel. The intrusion on the left abutment is approximately 6 m and on the
= 85 mm, d84 = 70 mm, d50 = 42 mm, d16 = 22 mm. Calculate the maxim
e are aligned with the flow and that the sediment concentration is low. Help:

1.0224
4.91
1.79
97.13
6.13
4.09
92.02

46.01

81.79
71.57
42.94
22.49

s siguientes componentes:

del sedimento hasta interceptar la


ra hallar B.Kt(ft2). Se halla el Kt mnimo.
Concentracin de Sedimentos: BAJA

LECHO MVIL

s se estn moviendo, por tanto se utilizar

(/ )^0.43

de inundacin obstruida por el estribo aguas arriba del puente, m.


pone al paso del agua, m.
o. (Tabla 27-Manual de hidrologa, Hidrulica y Drenaje-MTC)

_= (/90)
^0.13

son diferentes, por tanto calcularemos la

ESTRIBO DERECHO

4.91 m
4.09 m
0.82
1.00
0.26
Ys (est. Der.) = 8.82 m

/11.5

de inundacin obstruida por el estribo aguas arriba del puente, m.


pone al paso del agua, m.

son diferentes, por tanto calcularemos la

ESTRIBO DERECHO

4.91 m
4.09 m
0.83

6.80 m
0.81 m

Ys (est. Der.) = 6.80 m

de inundacin obstruida por el estribo aguas arriba del puente, m.

bla 27-Manual de hidrologa, Hidrulica y Drenaje-MTC)

cavacin local ser igual en ambos estribos


IN LOCAL EN EL ESTRIBO
DERECHO
8.82
6.80
18.77

alores crticos) local es aprox. de:

onsiderando los coeficientes por correccin por

5/3))/
28))^(1/ pg. 108-Manual de Hidrologa,
Hidrulica y Drenaje-MTC

eral por efecto de contraccin del flujo debido a la

avacin de fondo. Se mide desde el nivel del


o erosionado en metros.
nada vertical de la seccin entre el nivel del
ido durante el estiaje en metros.
del material de fondo.
orno que presenta gasto de diseo, ver cuadro.
o cohesivos su valor depende de (dm) en mm.

e sedimentos.
=/
( _ ^(5/3)
)

ivo en la seccin descontando todos los obstculos en metros.


dio de la seccin.
que toma en cuenta el efecto de contraccin producido por las pilas
Si no hay obstculos, =1.

lculo del presente socavacin general

(Tabla N 13, pg. 107-Manual de Hidrologa,


Hidrulica y Drenaje-MTC)

o valor se desconoce en el problema. " " se calcula con:


=-0.54+1.5143 m, si m>1.0T/m3 (Lecho mvil)
=1.0, si m=1.0T/m3 (Agua clara)

a socavacin local; no obstante, se reitera que la


n por Contraccin+Socavacin Local; los cuales

9.03 m
8.82 m

torno es de 500 aos segn lo estipulado

PROGRAMME
MASTER

mm, whose specific gravity is 2.65. This material has been


hear force at the base is 66 N/m2 and in the slope is approximately
s zero. (1 point)

357.84
2.71 (con el fin de usar el baco)
1.02
1.79
67.48
51.12
0.00

FS
horizontal
Sentido
de
1 rotacin
FS
horizontal
Sentido
de
1 rotacin

lud
WS Cos FD cos

WS Sen cos
SECCIN 1 -1

el cual debe ser aproxi. 1.50

os mrgenes es conocido, entonces Ds=Dm

(ngulo de inclinacin del talud)


(Nmero de Estabilidad)

Fuente: Hidrologa y Drenaje de Vas 2007.


Dr. Julio Kuroiwa Zavallos

(ngulo de reposo del material)

1.50 OK
el cual debe ser 1.50

mrgenes es conocido, entonces Ds=Dm

(ngulo de inclinacin del talud)


(Nmero de Estabilidad)

Fuente: Hidrologa y Drenaje de Vas 2007.


Dr. Julio Kuroiwa Zavallos

(ngulo de reposo del material)

1.50 OK

= 1.54

= 1.52

ctor de Seguridad (SF) debe ser


parmetro, por tanto, la seguridad de la estructura
PROGRAMME
MASTER

s. The shape of the channel is trapezoidal. The channel has a base


d the design flow rate is 24 m3/s. To verify the design of the
of 100 to 150 mm equivalent diameter. The floor of the sand
ats will provide sufficient protection and if necessary include a

1.0224
4.09
0.00
24.54
1.79
0.20
306.72
100--150
127.80
173.81

anning en funcin del mat. de relleno de los gaviones)

en funcin del rea y permetro mojado)

(Tirante)
3789.962 m

(rea)
(Permetro mojado)
(Velocidad Media)

(N de Froud)

esor del Colchn y N de Froud)

0.30 , tenemos:
(Velocidad Crtica)

(Velocidad Media)

Vc>VCORRECTO

para suelos arenosos, nf: 0.02

(Velocidad Crtica)
CORRECTO

= 4.90 m3/s

= 0.23 m/s

netas proporcionan proteccin suficiente


esario incluir un geotextil

PROGRAMME
MASTER

with low sediment concentration with a slope of 5 o/oo. The


soil where Bermuda grass has been sown and whose stems reach
the flow rate that reaches this height? When the channel reaches
t. (2 points)
R= 0.19 m

llamado n de maning), por lo que usaremos el


mallas con 250 mm

una clasificacion de retardo moderada

gresamos al abaco que nos pide VxR

sta altura seria:


POSTGRADUATE
PROGRAMME
HIGHWAY MASTER

B.K. Versus W e Intensidad

UTILIZADO EN LA PREGUNTA N 3

ABACO DISTANCIA DE EVACUACIN DEL CANAL

UTILIZADO EN LA PREGUNTA N 3
Dm(mm) Versus c(lb/ft2) y Concentracin de Sedimentos

UTILIZADO EN LA PREGUNTA N 5A: Para verificar la condicin de lec


UTILIZADO EN LA PREGUNTA N 5D

UTILIZADO EN LA PREGUNTA N 5 B
ad, h
0.8

Nmero de estabilidad, h 0.6

0.4

f= 30 35
0.2
25
0.0924
0.07
0
0 5 10 15 20
Angulo de Inclinacin , ,deg.
sidad

EGUNTA N 3

IN DEL CANAL

N 3
la condicin de lecho
N 5D

GUNTA N 5 B
S.F= 1.5

Ss =
2.71

f=
35 40
45

25 30 35
,deg. 29.59

Вам также может понравиться