Вы находитесь на странице: 1из 55

ANALISIS Y DISEO DE ALBAILERIA ESTRUCTURAL

DATOS DE LA ESTRUCTURA

USO = Departamentos Unifamiliares


SISTEMA ESTRUCTURAL = Albaileria Estructural
ESFUERZO DEL SUELO = 1.80 Kg/cm2
ALTURA DEL EDIFICIO = 10.60 m.
ALTURA DE ENTRE PISO = 2.65 m.
ALTURA DE ALFEIZARES = 0.90 m.
ESPESOR DE MURO = 0.15 m.
ESPESOR DE LOSA = 0.15 m.
LONGITUD DEL EDIFICIO EN X = 12.50 m.
LONGITUD DEL EDIFICIO EN Y = 7.60 m.
PESO ESP. DEL CONCRETO = 2.40 Tn/m3
PESO ESP. DEL MURO = 1.80 Tn/m3
DIMESIONES DEL LADRILLO = 0.10 x 0.25 x 0.15
NUMERO DE NIVELES = 4.00
SOBRE CARGA 25% = 0.20 Tn/m2

DISTRIBUCION ARQUITECTONICA :

DORMITORIOS : = 3.0
LAVANDERIA : = 1.0
SALA - COMEDOR : = 1.0
COCINA : = 1.0
SERVICIOS HIGUENICOS : = 3.0
METRADO DE CARGAS

AREA TOTAL DE TECHO :

Area = ( 13.50 * 8.6 ) - ( 0.7 * 2.35 + 0 * 0 ) = 114.46 m2

Longitud de Muros
Completos : = 1.00 + 2.00 + 0.25 + 2.75 + 1.75 + 1.00 + 1.35 +
3.75 + 1.00 + 0.50 + 0.75 + 2.35 + 2.85 + 2.35 +
2.20 + 2.60 + 2.45 + 1.45 + 1.45 + 1.50 + 1.11 +
3.25 + 1.35 + 1.98 + 4.00 + 2.59 + 2.00 + 4.35 +
3.80 + 3.30
L = 63.03 m.

Alfeizares : = 1.10 + 1.34 + 0.75 + 1.00 + 0.75 + 1.20 + 0.84


0.00 + 0.00 + 0.00 + 0.00 + 0.00 + 0.00

L = 6.98 m.

Peso de Techo : = 4 x 114.46 x 0.15 x 2.40 = 164.82 Tn


Piso Terminado : = 3 x 114.46 x 0.10 = 34.34 Tn
Cielo Raso : = 4 x 114.46 x 0.0345 = 15.79 Tn
Peso de Muros : = 4 x 63.03 x 0.15 x 2.47 x 1.80 = 168.14 Tn
Alfeizares : = 4 x 6.98 x 0.15 x 0.90 x 1.80 = 6.78 Tn
Ducto = 4 x 0.81 x 0.15 x 1.50 x 1.80 = 1.31 Tn
Peso de Vidrios : = 4 x 6.98 x 1.57 x 0.006 x 2.50 = 0.66 Tn
= 4 x 0.81 x 0.97 x 0.006 x 2.50 = 0.05 Tn
Peso de Puertas : = 4 x 0.55 x 0.90 x 2.47 x 0.03 = 0.12 Tn
Sobre Carga : = 4 x 114.46 x 0.20 x 0.25 = 22.89 Tn
Peso Total de la Edificacion = 414.90 Tn
391.96
CALCULO DE LA FUERZA SISMICA

ZUCS
V= P
R
V = Fuerza sismica
Z = Factor de Zona
U = Factor de Uso
C = Coeficiente Sismica
S = Coeficiente de Suelo
R = Reduccion de Ductilidad
P = Peso Total de la Edificacion
Muros en el Eje X

MURO l (cm)

X1 1.00
X2 2.00
X3 0.25
X4 2.75
X5 1.75
X6 1.00
X7 1.35
X8 3.75
X9 1.00
X10 0.50
X11 0.75
X12 2.35
X13 2.00
X14 4.35
X15 3.80
X16 3.30
31.90

MURO l (cm)

Y1 2.85
Y2 2.35
Y3 2.20
Y4 2.60
Y5 2.45
Y6 1.45
Y7 1.45
Y8 1.50
Y9 1.11
Y10 3.25
Y11 1.35
Y12 1.98
Y13 4.00
Y14 2.59
31.13
63.03
Tp
C=2.5 ()
T
2.5 T=
hn
CT
h 9.67
T = = = 0.16
CT 60
2.5TP 2.5 x 0.6
C = = = 9.31 2.5
T 0.16

C = 2.5

w1 = 103.73 Tn
w2 = 103.73 Tn
w3 = 103.73 Tn
w4 = 103.73 Tn
P = 414.90 Tn

0.3 x 1 x 1.2 x 2.5


V = 414.90
3

V = 124.47 Tn

DISTRIBUCION DE LA FUERZA SISMICA EN ALTURA

f*H Pi hi f = 1
Fi =
Pi hi

NIVEL Pi hi Pi hi V Fi Hi=Vi
4 103.73 9.88 1024.80 124.47 49.79 49.79
3 103.73 7.41 768.60 124.47 37.34 87.13
2 103.73 4.94 512.40 124.47 24.89 112.02
1 103.73 2.47 256.20 124.47 12.45 124.47
414.90 2562.01 124.47

49.79 49.79

37.34 87.13

24.89 112.02

12.45 124.47
CALCULO DE LA RIGIDEZ DE MUROS
Las rigideces de los muros se calculan con la formula:
Em * t Ri = Rigides del Muro
Ri =
h h Em = Modulo de Elasticidad
4 ( ) + 3 ( )
l l h = Altura
l = Longitud
Muros en el Eje X

h h
MURO l (cm) h (cm) t (cm) Em (Tn/m2) 4 ( ) 3 ( ) Ri
l l
X1 100 247 15 3.80 60.28 7.41 0.84
X2 200 247 15 3.80 7.53 3.71 5.07
X3 25 247 15 3.80 3857.72 29.64 0.01
X4 275 247 15 3.80 2.90 2.69 10.19
X5 175 247 15 3.80 11.25 4.23 3.68
X6 100 247 15 3.80 60.28 7.41 0.84
X7 135 247 15 3.80 24.50 5.49 1.90
X8 375 247 15 3.80 1.14 1.98 18.27
X9 100 247 15 3.80 60.28 7.41 0.84
X10 50 247 15 3.80 482.22 14.82 0.11
X11 75 247 15 3.80 142.88 9.88 0.37
X12 235 247 15 3.80 4.64 3.15 7.31
X13 200 247 15 3.80 7.53 3.71 5.07
X14 435 247 15 3.80 0.73 1.70 23.40
X15 380 247 15 3.80 1.10 1.95 18.70
X16 330 247 15 3.80 1.68 2.25 14.53
31.90

h h
MURO l (cm) h (cm) t (cm) Em (Tn/m2) 4 ( ) 3 ( ) Ri
l l
Y1 285 247 15 3.80 2.60 2.60 10.95
Y2 235 247 15 3.80 4.64 3.15 7.31
Y3 220 247 15 3.80 5.66 3.37 6.31
Y4 260 247 15 3.80 3.43 2.85 9.08
Y5 245 247 15 3.80 4.10 3.02 8.00
Y6 145 247 15 3.80 19.77 5.11 2.29
Y7 145 247 15 3.80 19.77 5.11 2.29
Y8 150 247 15 3.80 17.86 4.94 2.50
Y9 111 247 15 3.80 44.07 6.68 1.12
Y10 325 247 15 3.80 1.76 2.28 14.12
Y11 135 247 15 3.80 24.50 5.49 1.90
Y12 198 247 15 3.80 7.77 3.74 4.95
Y13 400 247 15 3.80 0.94 1.85 20.40
Y14 259 247 15 3.80 3.47 2.86 9.00
31.13
CALCULO DE LA FUERZA HORIZONTAL QUE TOMA CADA MURO

Ri
Vi = Vn
Ri

Primer Nivel Segundo Nivel

MURO Ri Vn (Tn) Vi (Tn) MURO Ri Vn (Tn) Vi (Tn)

X1 0.84 124.47 0.50 X1 0.84 112.02 0.45


X2 5.07 124.47 2.99 X2 5.07 112.02 2.69
X3 0.01 124.47 0.01 X3 0.01 112.02 0.01
X4 10.19 124.47 6.00 X4 10.19 112.02 5.40
X5 3.68 124.47 2.17 X5 3.68 112.02 1.95
X6 0.84 124.47 0.50 X6 0.84 112.02 0.45
X7 1.90 124.47 1.12 X7 1.90 112.02 1.01
X8 18.27 124.47 10.76 X8 18.27 112.02 9.68
X9 0.84 124.47 0.50 X9 0.84 112.02 0.45
X10 0.11 124.47 0.07 X10 0.11 112.02 0.06
X11 0.37 124.47 0.22 X11 0.37 112.02 0.20
X12 7.31 124.47 4.30 X12 7.31 112.02 3.87
X13 5.07 124.47 2.99 X13 5.07 112.02 2.69
X14 23.40 124.47 13.78 X14 23.40 112.02 12.40
X15 18.70 124.47 11.01 X15 18.70 112.02 9.91
X16 14.53 124.47 8.56 X16 14.53 112.02 7.70
111.16 111.16

MURO Ri Vn (Tn) Vi (Tn) MURO Ri Vn (Tn) Vi (Tn)

Y1 10.95 124.47 6.45 Y1 10.95 112.02 5.80


Y2 7.31 124.47 4.30 Y2 7.31 112.02 3.87
Y3 6.31 124.47 3.72 Y3 6.31 112.02 3.35
Y4 9.08 124.47 5.34 Y4 9.08 112.02 4.81
Y5 8.00 124.47 4.71 Y5 8.00 112.02 4.24
Y6 2.29 124.47 1.35 Y6 2.29 112.02 1.21
Y7 2.29 124.47 1.35 Y7 2.29 112.02 1.21
Y8 2.50 124.47 1.47 Y8 2.50 112.02 1.32
Y9 1.12 124.47 0.66 Y9 1.12 112.02 0.60
Y10 14.12 124.47 8.32 Y10 14.12 112.02 7.48
Y11 1.90 124.47 1.12 Y11 1.90 112.02 1.01
Y12 4.95 124.47 2.92 Y12 4.95 112.02 2.62
Y13 20.40 125.51 12.11 Y13 20.40 112.02 10.81
Y14 9.00 124.47 5.30 Y14 9.00 112.02 4.77
100.24 100.24

Tercer Nivel Cuarto Nivel

MURO Ri Vn (Tn) Vi (Tn) MURO Ri Vn (Tn) Vi (Tn)

X1 0.84 87.13 0.35 X1 0.84 49.79 0.20


X2 5.07 87.13 2.09 X2 5.07 49.79 1.19
X3 0.01 87.13 0.01 X3 0.01 49.79 0.00
X4 10.19 87.13 4.20 X4 10.19 49.79 2.40
X5 3.68 87.13 1.52 X5 3.68 49.79 0.87
X6 0.84 87.13 0.35 X6 0.84 49.79 0.20
X7 1.90 87.13 0.78 X7 1.90 49.79 0.45
X8 18.27 87.13 7.53 X8 18.27 49.79 4.30
X9 0.84 87.13 0.35 X9 0.84 49.79 0.20
X10 0.11 87.13 0.05 X10 0.11 49.79 0.03
X11 0.37 87.13 0.15 X11 0.37 49.79 0.09
X12 7.31 87.13 3.01 X12 7.31 49.79 1.72
X13 5.07 87.13 2.09 X13 5.07 49.79 1.19
X14 23.40 87.13 9.64 X14 23.40 49.79 5.51
X15 18.70 87.13 7.71 X15 18.70 49.79 4.40
X16 14.53 87.13 5.99 X16 14.53 49.79 3.42
111.16 111.16

MURO Ri Vn (Tn) Vi (Tn) MURO Ri Vn (Tn) Vi (Tn)

Y1 10.95 87.13 4.51 Y1 10.95 49.79 2.58


Y2 7.31 87.13 3.01 Y2 7.31 49.79 1.72
Y3 6.31 87.13 2.60 Y3 6.31 49.79 1.49
Y4 9.08 87.13 3.74 Y4 9.08 49.79 2.14
Y5 8.00 87.13 3.30 Y5 8.00 49.79 1.88
Y6 2.29 87.13 0.94 Y6 2.29 49.79 0.54
Y7 2.29 87.13 0.94 Y7 2.29 49.79 0.54
Y8 2.50 87.13 1.03 Y8 2.50 49.79 0.59
Y9 1.12 87.13 0.46 Y9 1.12 49.79 0.26
Y10 14.12 87.13 5.82 Y10 14.12 49.79 3.33
Y11 1.90 87.13 0.78 Y11 1.90 49.79 0.45
Y12 4.95 87.13 2.04 Y12 4.95 49.79 1.17
Y13 20.40 87.56 8.45 Y13 20.40 49.79 4.80
Y14 9.00 87.13 3.71 Y14 9.00 49.79 2.12
100.24 100.24
Vi (Tn)

0.45
2.69
0.01
5.40
1.95
0.45
1.01
9.68
0.45
0.06
0.20
3.87
2.69
12.40
9.91
7.70

Vi (Tn)

5.80
3.87
3.35
4.81
4.24
1.21
1.21
1.32
0.60
7.48
1.01
2.62
10.81
4.77

Vi (Tn)

0.20
1.19
0.00
2.40
0.87
0.20
0.45
4.30
0.20
0.03
0.09
1.72
1.19
5.51
4.40
3.42

Vi (Tn)

2.58
1.72
1.49
2.14
1.88
0.54
0.54
0.59
0.26
3.33
0.45
1.17
4.80
2.12
CALCULO DEL CENTRO DE RIGIDEZ
Muros en el Eje X

MURO Rxi Yi Rxi * Yi

X1 0.84 7.44 6.27


X2 5.07 7.44 37.73
X3 0.01 7.44 0.11
X4 10.19 7.44 75.82
X5 3.68 7.44 27.39 (Rxi * Yi )
YR =
X6 0.84 5.09 4.29 RXi
X7 1.90 5.09 9.67
X8 18.27 4.84 88.45 289.77
YR =
X9 0.84 3.73 3.14 111.16
X10 0.11 3.73 0.43
YR = 2.61 m
X11 0.37 3.73 1.39
X12 7.31 2.74 20.03
X13 5.07 2.13 10.80
X14 23.40 0.075 1.76
X15 18.70 0.075 1.40
X16 14.53 0.075 1.09
111.16 289.77

Muros en el Eje Y

MURO R Yi Xi Ryi * Xi

Y1 10.95 0.08 0.82


Y2 7.31 3.95 28.87
Y3 6.31 5.80 36.62
Y4 9.08 7.90 71.71
Y5 8.00 12.35 98.82 (Rxi * Yi )
XR =
Y6 2.29 4.10 9.39 R Yi
Y7 2.29 5.95 13.63
Y8 2.50 10.00 25.00 629.70
XR =
Y9 1.12 12.35 13.87 100.24
Y10 14.12 0.08 1.06
XR = 6.28 m
Y11 1.90 4.10 7.79
Y12 4.95 5.31 26.30
Y13 20.40 9.05 184.61
Y14 9.00 12.35 111.20
100.24 629.70
CALCULO DEL CENTRO DE MASAS
Muros en el Eje X

MURO Pi Xi Pi * Xi

X1 0.67 0.5 0.33


X2 1.33 3 4.00
X3 0.17 5.8 0.97
X4 1.83 8.1 14.86
X5 1.17 11.55 13.48 (Pi * Xi )
XG =
X6 0.67 5.30 3.53 Xi
X7 0.90 7.15 6.44
X8 2.50 10.5 26.26 151.04
XG =
X9 0.67 4.53 3.02 21.27
X10 0.33 6.1 2.03
XG = 7.10 m
X11 0.50 7.7 3.85
X12 1.57 11.2 17.55
X13 1.33 5.02 6.70
X14 2.90 2.25 6.53
X15 2.53 7.08 17.94
X16 2.20 10.7 23.55
21.27 151.04

Muros en el Eje Y

MURO Pi Yi Pi * Yi

Y1 1.90 5.90 11.21


Y2 1.57 6.10 9.56
Y3 1.47 6.20 9.10
Y4 1.73 6.00 10.40
Y5 1.63 6.10 9.97 (Pi * Yi )
YG =
Y6 0.97 2.90 2.80 Pi
Y7 0.97 2.90 2.80
Y8 1.00 3.40 3.40 74.74
YG =
Y9 0.74 3.30 2.44 20.76
Y10 2.17 1.60 3.47
YG = 3.60 m
Y11 0.90 0.75 0.68
Y12 1.32 1.00 1.32
Y13 2.67 2.00 5.34
Y14 1.73 1.30 2.25
20.76 74.74
CALCULO DE EXCENTRICIDADES

MT = Vn ( 1.5 * e + eacc ) CONDICION N 01


MT = Vn ( e + eacc ) CONDICION N 02

DONDE :
ex = XG - XR eY = YG - YR
eaccx = 0.05Dx eaccx = 0.05DY

REMPLAZANDO :

ex = 7.10 - 6.28 = 0.82 eY = 3.60 - 2.61 = 0.99

eaccx = 0.05 * 12.50 = 0.625 eaccY = 0.05 * 7.6 = 0.38

EVALUACION EN EL 4to NIVEL

MTX1 = 49.79 ( 1.5 x 0.82 + 0.63 ) = 92.19 Tn-m

MTX2 = 49.79 ( 0.82 - 0.63 ) = 9.60 Tn-m

MTY1 = 49.79 ( 1.5 x 0.99 + 0.38 ) = 93.09 Tn-m

MTY2 = 49.79 ( 0.99 - 0.38 ) = 30.53 Tn-m

EVALUACION EN EL 3er NIVEL

MTX1 = 87.13 ( 1.5 x 0.82 + 0.63 ) = 161.34 Tn-m

MTX2 = 87.13 ( 0.82 - 0.63 ) = 16.80 Tn-m

MTY1 = 87.13 ( 1.5 x 0.99 + 0.38 ) = 162.91 Tn-m

MTY2 = 87.13 ( 0.99 - 0.38 ) = 53.43 Tn-m

EVALUACION EN EL 2do NIVEL

MTX1 = 112.02 ( 1.5 x 0.82 + 0.63 ) = 207.43 Tn-m

MTX2 = 112.02 ( 0.82 - 0.63 ) = 21.60 Tn-m

MTY1 = 112.02 ( 1.5 x 0.99 + 0.38 ) = 209.46 Tn-m


MTY2 = 112.02 ( 0.99 - 0.38 ) = 68.69 Tn-m

EVALUACION EN EL 1er NIVEL

MTX1 = 124.47 ( 1.5 x 0.82 + 0.63 ) = 230.48 Tn-m

MTX2 = 124.47 ( 0.82 - 0.63 ) = 24.00 Tn-m

MTY1 = 124.47 ( 1.5 x 0.99 + 0.38 ) = 232.73 Tn-m

MTY2 = 124.47 ( 0.99 - 0.38 ) = 76.32 Tn-m

CALCULO DE FUERZA CORTANTE TOTAL EN CADA MURO

Vi = VTRASLACION + VTORSION

MT1* RYi ( Xi - XR )
dv1 = VYi =
Rxi ( Yi-YR) + RYi ( Xi-XR)

MT2* RXi ( Yi - YR )
dv2 = VXi =
Rxi ( Yi-YR) + RYi ( Xi-XR)
CALCULO DE FUERZA TOTAL EN CADA MURO PRIMER NIVEL
MTX1 = 230.48
Muro E L Y Vi Rx Rx * Y Y - YR Rx ( Y - YR ) Rx ( Yi- YR ) dV1 dV2 V1 V2 V Total
MTX2 = 24.00 X1 0.15 1.00 7.44 0.50 0.84 6.27 4.83 4.07 19.672 0.3290 0.0343 0.82 0.53 0.8249
X2 0.15 2.00 7.44 2.99 5.07 37.73 4.83 24.51 118.465 1.9816 0.2063 4.97 3.19 4.9675
MTY1 = 232.73 X3 0.15 0.25 7.44 0.01 0.01 0.11 4.83 0.07 0.343 0.0057 0.0006 0.01 0.01 0.0144
X4 0.15 2.75 7.44 6.00 10.19 75.82 4.83 49.26 238.070 3.9822 0.4146 9.98 6.42 9.9828
MTY2 = 76.32 X5 0.15 1.75 7.44 2.17 3.68 27.39 4.83 17.80 86.007 1.4386 0.1498 3.61 2.32 3.6065
X6 0.15 1.00 5.09 0.50 0.84 4.29 2.48 2.09 5.193 0.1691 0.0176 0.66 0.51 0.6649
X7 0.15 1.35 5.09 1.12 1.90 9.67 2.48 4.72 11.721 0.3816 0.0397 1.50 1.16 1.5007
X8 0.15 3.75 4.84 10.76 18.27 88.45 2.23 40.81 91.140 3.2994 0.3435 14.06 11.10 14.0594
X9 0.15 1.00 3.73 0.50 0.84 3.14 1.12 0.95 1.062 0.0765 0.0080 0.57 0.50 0.5723
X10 0.15 0.50 3.73 0.07 0.11 0.43 1.12 0.13 0.145 0.0104 0.0011 0.08 0.07 0.0779
X11 0.15 0.75 3.73 0.22 0.37 1.39 1.12 0.42 0.471 0.0339 0.0035 0.25 0.22 0.2536
X12 0.15 2.35 2.74 4.30 7.31 20.03 0.13 0.97 0.130 0.0787 0.0082 4.38 4.31 4.3826
X13 0.15 2.00 2.13 2.99 5.07 10.80 -0.48 -2.42 1.153 -0.1955 -0.0204 2.79 2.97 2.9656
X14 0.15 4.35 0.08 13.78 23.40 1.76 -2.53 -59.25 150.005 -4.7899 -0.4987 8.99 13.28 13.2798
X15 0.15 3.80 0.08 11.01 18.70 1.40 -2.53 -47.34 119.853 -3.8644 -0.3985 7.14 10.61 10.6105
X16 0.15 3.30 0.08 8.56 14.53 1.09 -2.53 -36.79 93.142 -2.9742 -0.3097 5.58 8.25 8.2458
936.57

Muro E L X Vi Ry Ry * X X - XR Ry ( X - XR ) RY ( X - XR ) dV1 dV2 V1 V2 V Total


Y1 0.15 2.85 0.08 6.45 10.95 0.822 -6.21 -67.99 421.9908 -5.5499 -1.8201 0.90 4.63 4.6292
Y2 0.15 2.35 3.95 4.30 7.31 28.874 -2.33 -17.05 39.7496 -1.3915 -0.4563 2.91 3.85 3.8476
Y3 0.15 2.20 5.80 3.72 6.31 36.615 -0.48 -3.04 1.4662 -0.2484 -0.0814 3.47 3.64 3.6356
Y4 0.15 2.60 7.90 5.34 9.08 71.710 1.62 14.69 23.7655 1.1990 0.3932 6.54 5.74 6.5435
Y5 0.15 2.45 12.35 4.71 8.00 98.824 6.07 48.56 294.6446 3.9638 1.2999 8.68 6.01 8.6752
Y6 0.15 1.45 4.10 1.35 2.29 9.392 -2.18 -5.00 10.9060 -0.4080 -0.1338 0.94 1.21 1.2150
Y7 0.15 1.45 5.95 1.35 2.29 13.630 -0.33 -0.76 0.2524 -0.0621 -0.0204 1.29 1.33 1.3284
Y8 0.15 1.50 10.00 1.47 2.50 25.000 3.72 9.30 34.5605 0.7588 0.2488 2.23 1.72 2.2308
Y9 0.15 1.11 12.35 0.66 1.12 13.871 6.07 6.82 41.3565 0.5564 0.1825 1.22 0.84 1.2177
Y10 0.15 3.25 0.08 8.32 14.12 1.059 -6.21 -87.66 544.1105 -7.1560 -2.3468 1.16 5.97 5.9688
Y11 0.15 1.35 4.10 1.12 1.90 7.793 -2.18 -4.15 9.0492 -0.3386 -0.1110 0.78 1.01 1.0081
Y12 0.15 1.98 5.31 2.92 4.95 26.302 -0.97 -4.81 4.6790 -0.3930 -0.1289 2.52 2.79 2.7875
Y13 0.15 4.00 9.05 12.11 20.40 184.606 2.77 56.46 156.2979 4.6093 1.5116 16.72 13.62 16.7201
Y14 0.15 2.59 12.35 5.30 9.00 111.202 6.07 54.64 331.5483 4.4602 1.4627 9.76 6.76 9.7618
1914.38
CALCULO DE FUERZA TOTAL EN CADA MURO SEGUNDO NIVEL
MTX1 = 207.43
Muro E L Y Vi Rx Rx * Y Y - YR Rx ( Y - YR ) Rx ( Yi- YR ) dV1 dV2 V1 V2 V Total
MTX2 = 21.60 X1 0.15 1.00 7.44 0.45 0.84 6.27 4.83 4.07 19.672 0.2961 0.0308 0.74 0.48 0.74
X2 0.15 2.00 7.44 2.69 5.07 37.73 4.83 24.51 118.465 1.7834 0.1857 4.47 2.87 4.47
MTY1 = 209.46 X3 0.15 0.25 7.44 0.01 0.01 0.11 4.83 0.07 0.343 0.0052 0.0005 0.01 0.01 0.01
X4 0.15 2.75 7.44 5.40 10.19 75.82 4.83 49.26 238.070 3.5840 0.3732 8.98 5.77 8.98
MTY2 = 68.69 X5 0.15 1.75 7.44 1.95 3.68 27.39 4.83 17.80 86.007 1.2948 0.1348 3.25 2.09 3.25
X6 0.15 1.00 5.09 0.45 0.84 4.29 2.48 2.09 5.193 0.1521 0.0158 0.60 0.46 0.60
X7 0.15 1.35 5.09 1.01 1.90 9.67 2.48 4.72 11.721 0.3434 0.0358 1.35 1.04 1.35
X8 0.15 3.75 4.84 9.68 18.27 88.45 2.23 40.81 91.140 2.9694 0.3092 12.65 9.99 12.65
X9 0.15 1.00 3.73 0.45 0.84 3.14 1.12 0.95 1.062 0.0688 0.0072 0.52 0.45 0.52
X10 0.15 0.50 3.73 0.06 0.11 0.43 1.12 0.13 0.145 0.0094 0.0010 0.07 0.06 0.07
X11 0.15 0.75 3.73 0.20 0.37 1.39 1.12 0.42 0.471 0.0305 0.0032 0.23 0.20 0.23
X12 0.15 2.35 2.74 3.87 7.31 20.03 0.13 0.97 0.130 0.0708 0.0074 3.94 3.88 3.94
X13 0.15 2.00 2.13 2.69 5.07 10.80 -0.48 -2.42 1.153 -0.1759 -0.0183 2.51 2.67 2.67
X14 0.15 4.35 0.08 12.40 23.40 1.76 -2.53 -59.25 150.005 -4.3109 -0.4489 8.09 11.95 11.95
X15 0.15 3.80 0.08 9.91 18.70 1.40 -2.53 -47.34 119.853 -3.4444 -0.3586 6.46 9.55 9.55
X16 0.15 3.30 0.08 7.70 14.53 1.09 -2.53 -36.79 93.142 -2.6767 -0.2787 5.02 7.42 7.42
936.57

Muro E L X Vi Ry Ry * X X - XR Ry ( X - XR ) Ry (X - XR ) dV1 dV2 V1 V2 V Total


Y1 0.15 2.85 0.08 5.80 10.95 0.822 -6.21 -67.99 421.991 -4.9949 -1.6381 0.81 4.17 4.17
Y2 0.15 2.35 3.95 3.87 7.31 28.874 -2.33 -17.05 39.750 -1.2523 -0.4107 2.62 3.46 3.46
Y3 0.15 2.20 5.80 3.35 6.31 36.615 -0.48 -3.04 1.466 -0.2235 -0.0733 3.12 3.27 3.27
Y4 0.15 2.60 7.90 4.81 9.08 71.710 1.62 14.69 23.765 1.0791 0.3539 5.89 5.16 5.89
Y5 0.15 2.45 12.35 4.24 8.00 98.824 6.07 48.56 294.645 3.5674 1.1699 7.81 5.41 7.81
Y6 0.15 1.45 4.10 1.21 2.29 9.392 -2.18 -5.00 10.906 -0.3672 -0.1204 0.85 1.09 1.09
Y7 0.15 1.45 5.95 1.21 2.29 13.630 -0.33 -0.76 0.252 -0.0559 -0.0183 1.16 1.20 1.20
Y8 0.15 1.50 10.00 1.32 2.50 25.000 3.72 9.30 34.560 0.6829 0.2240 2.01 1.55 2.01
Y9 0.15 1.11 12.35 0.60 1.12 13.871 6.07 6.82 41.357 0.5007 0.1642 1.10 0.76 1.10
Y10 0.15 3.25 0.08 7.48 14.12 1.059 -6.21 -87.66 544.110 -6.4404 -2.1121 1.04 5.37 5.37
Y11 0.15 1.35 4.10 1.01 1.90 7.793 -2.18 -4.15 9.049 -0.3047 -0.0999 0.70 0.91 0.91
Y12 0.15 1.98 5.31 2.62 4.95 26.302 -0.97 -4.81 4.679 -0.3537 -0.1160 2.27 2.51 2.51
Y13 0.15 4.00 9.05 10.81 20.40 184.606 2.77 56.46 156.298 4.1484 1.3604 14.96 12.17 14.96
Y14 0.15 2.59 12.35 4.77 9.00 111.202 6.07 54.64 331.548 4.0142 1.3164 8.79 6.09 8.79
1914.38
CALCULO DE FUERZA TOTAL EN CADA MURO TERCER NIVEL
MTX1 = 161.34
Muro E L Y Vi Rx Rx * Y Y - YR Rx ( Y - YR ) Rx ( Yi- YR ) dV1 dV2 V1 V2 V Total
MTX2 = 16.80 X1 0.15 1.00 7.44 0.35 0.84 6.27 4.83 4.07 19.672 0.2556 0.0266 0.60 0.37 0.60
X2 0.15 2.00 7.44 2.09 5.07 37.73 4.83 24.51 118.465 1.5390 0.1602 3.63 2.25 3.63
MTY1 = 162.91 X3 0.15 0.25 7.44 0.01 0.01 0.11 4.83 0.07 0.343 0.0044 0.0005 0.01 0.01 0.01
X4 0.15 2.75 7.44 4.20 10.19 75.82 4.83 49.26 238.070 3.0927 0.3220 7.29 4.52 7.29
MTY2 = 53.43 X5 0.15 1.75 7.44 1.52 3.68 27.39 4.83 17.80 86.007 1.1173 0.1163 2.63 1.63 2.63
X6 0.15 1.00 5.09 0.35 0.84 4.29 2.48 2.09 5.193 0.1313 0.0137 0.48 0.36 0.48
X7 0.15 1.35 5.09 0.78 1.90 9.67 2.48 4.72 11.721 0.2964 0.0309 1.08 0.81 1.08
X8 0.15 3.75 4.84 7.53 18.27 88.45 2.23 40.81 91.140 2.5624 0.2668 10.09 7.80 10.09
X9 0.15 1.00 3.73 0.35 0.84 3.14 1.12 0.95 1.062 0.0594 0.0062 0.41 0.35 0.41
X10 0.15 0.50 3.73 0.05 0.11 0.43 1.12 0.13 0.145 0.0081 0.0008 0.06 0.05 0.06
X11 0.15 0.75 3.73 0.15 0.37 1.39 3.73 1.39 5.191 0.0874 0.0091 0.24 0.16 0.24
X12 0.15 2.35 2.74 3.01 7.31 20.03 2.74 20.03 54.879 1.2576 1.2576 4.27 4.27 4.27
X13 0.15 2.00 2.13 2.09 5.07 10.80 2.13 10.80 23.008 0.6782 0.6782 2.77 2.77 2.77
X14 0.15 4.35 0.08 9.64 23.40 1.76 0.08 1.76 0.132 0.1102 0.1102 9.76 9.76 9.76
X15 0.15 3.80 0.08 7.71 18.70 1.40 0.08 1.40 0.105 0.0880 0.0092 7.79 7.72 7.79
X16 0.15 3.30 0.08 5.99 14.53 1.09 0.08 1.09 0.082 0.0684 0.0071 6.06 6.00 6.06
655.21

Muro E L X Vi Ry Ry * X X - XR Ry ( X - XR ) Ry( X - XR ) dV1 dV2 V1 V2 V Total


Y1 0.15 2.85 0.08 4.51 10.95 0.822 -6.21 -67.99 421.991 -4.3103 -1.4135 0.20 3.10 3.10
Y2 0.15 2.35 3.95 3.01 7.31 28.874 -2.33 -17.05 39.750 -1.0807 -0.3544 1.93 2.66 2.66
Y3 0.15 2.20 5.80 2.60 6.31 36.615 -0.48 -3.04 1.466 -0.1929 -0.0633 2.41 2.54 2.54
Y4 0.15 2.60 7.90 3.74 9.08 71.710 1.62 14.69 23.765 0.9312 0.3054 4.67 4.05 4.67
Y5 0.15 2.45 12.35 3.30 8.00 98.824 6.07 48.56 294.645 3.0785 1.0096 6.38 4.31 6.38
Y6 0.15 1.45 4.10 0.94 2.29 9.392 -2.18 -5.00 10.906 -0.3169 -0.1039 0.63 0.84 0.84
Y7 0.15 1.45 5.95 0.94 2.29 13.630 -0.33 -0.76 0.252 -0.0482 -0.0158 0.90 0.93 0.93
Y8 0.15 1.50 10.00 1.03 2.50 25.000 3.72 9.30 34.560 0.5893 0.1933 1.62 1.22 1.62
Y9 0.15 1.11 12.35 0.46 1.12 13.871 6.07 6.82 41.357 0.4321 0.1417 0.90 0.60 0.90
Y10 0.15 3.25 0.08 5.82 14.12 1.059 -6.21 -87.66 544.110 -5.5577 -1.8226 0.26 4.00 4.00
Y11 0.15 1.35 4.10 0.78 1.90 7.793 -2.18 -4.15 9.049 -0.2629 -0.0862 0.52 0.70 0.70
Y12 0.15 1.98 5.31 2.04 4.95 26.302 -0.97 -4.81 4.679 -0.3052 -0.1001 1.74 1.94 1.94
Y13 0.15 4.00 9.05 8.45 20.40 184.606 2.77 56.46 156.298 3.5798 1.1740 12.03 9.62 12.03
Y14 0.15 2.59 12.35 3.71 9.00 111.202 6.07 54.64 331.548 3.4640 1.1360 7.18 4.85 7.18
1914.38
CALCULO DE FUERZA TOTAL EN CADA MURO CUARTO NIVEL
MTX1 = 92.19
Muro E L Y Vi Rx Rx * Y Y - YR Rx ( Y - YR ) Rx ( Yi- YR ) dV1 dV2 V1 V2 V Total
MTX2 = 9.60 X1 0.15 1.00 7.44 0.20 0.84 6.27 4.83 4.07 19.672 0.1460 0.0152 0.34 0.21 0.34
X2 0.15 2.00 7.44 1.19 5.07 37.73 4.83 24.51 118.465 0.8794 0.0916 2.07 1.29 2.07
MTY1 = 93.09 X3 0.15 0.25 7.44 0.00 0.01 0.11 4.83 0.07 0.343 0.0025 0.0003 0.01 0.00 0.01
X4 0.15 2.75 7.44 2.40 10.19 75.82 4.83 49.26 238.070 1.7673 0.1840 4.17 2.58 4.17
MTY2 = 30.53 X5 0.15 1.75 7.44 0.87 3.68 27.39 4.83 17.80 86.007 0.6385 0.0665 1.51 0.93 1.51
X6 0.15 1.00 5.09 0.20 0.84 4.29 2.48 2.09 5.193 0.0750 0.0078 0.27 0.21 0.27
X7 0.15 1.35 5.09 0.45 1.90 9.67 2.48 4.72 11.721 0.1693 0.0176 0.62 0.47 0.62
X8 0.15 3.75 4.84 4.30 18.27 88.45 2.23 40.81 91.140 1.4643 0.1525 5.77 4.46 5.77
X9 0.15 1.00 3.73 0.20 0.84 3.14 1.12 0.95 1.062 0.0339 0.0035 0.23 0.20 0.23
X10 0.15 0.50 3.73 0.03 0.11 0.43 1.12 0.13 0.145 0.0046 0.0005 0.03 0.03 0.03
X11 0.15 0.75 3.73 0.09 0.37 1.39 3.73 1.39 5.191 0.0499 0.0052 0.14 0.09 0.14
X12 0.15 2.35 2.74 1.72 7.31 20.03 2.74 20.03 54.879 0.7186 0.7186 2.44 2.44 2.44
X13 0.15 2.00 2.13 1.19 5.07 10.80 2.13 10.80 23.008 0.3876 0.3876 1.58 1.58 1.58
X14 0.15 4.35 0.08 5.51 23.40 1.76 0.08 1.76 0.132 4.1104 0.0630 9.62 5.57 9.62
X15 0.15 3.80 0.08 4.40 18.70 1.40 0.08 1.40 0.105 0.0503 0.0052 4.45 4.41 4.45
X16 0.15 3.30 0.08 3.42 14.53 1.09 0.08 1.09 0.082 0.0391 0.0041 3.46 3.43 3.46
655.21

Muro E L X Vi Ry Ry * X X - XR Ry ( X - XR ) Ry( X - XR ) dV1 dV2 V1 V2 V Total


Y1 0.15 2.85 0.08 2.58 10.95 0.82 -6.21 -67.99 421.991 -2.4631 -0.8077 0.12 1.77 0.12
Y2 0.15 2.35 3.95 1.72 7.31 28.87 -2.33 -17.05 39.750 -0.6175 -0.2025 1.10 1.52 1.52
Y3 0.15 2.20 5.80 1.49 6.31 36.62 -0.48 -3.04 1.466 -0.1102 -0.0361 1.38 1.45 1.45
Y4 0.15 2.60 7.90 2.14 9.08 71.71 1.62 14.69 23.765 0.5321 0.1745 2.67 2.31 2.67
Y5 0.15 2.45 12.35 1.88 8.00 98.82 6.07 48.56 294.645 1.7591 0.5769 3.64 2.46 3.64
Y6 0.15 1.45 4.10 0.54 2.29 9.39 -2.18 -5.00 10.906 -0.1811 -0.0594 0.36 0.48 0.48
Y7 0.15 1.45 5.95 0.54 2.29 13.63 -0.33 -0.76 0.252 -0.0275 -0.0090 0.51 0.53 0.53
Y8 0.15 1.50 10.00 0.59 2.50 25.00 3.72 9.30 34.560 0.3368 0.1104 0.93 0.70 0.93
Y9 0.15 1.11 12.35 0.26 1.12 13.87 6.07 6.82 41.357 0.2469 0.0810 0.51 0.35 0.51
Y10 0.15 3.25 0.08 3.33 14.12 1.06 -6.21 -87.66 544.110 -3.1758 -1.0415 0.15 2.28 0.15
Y11 0.15 1.35 4.10 0.45 1.90 7.79 -2.18 -4.15 9.049 -0.1503 -0.0493 0.30 0.40 0.40
Y12 0.15 1.98 5.31 1.17 4.95 26.30 -0.97 -4.81 4.679 -0.1744 -0.0572 0.99 1.11 1.11
Y13 0.15 4.00 9.05 4.80 20.40 184.61 2.77 56.46 156.298 2.0456 0.6708 6.85 5.47 6.85
Y14 0.15 2.59 12.35 2.12 9.00 111.20 6.07 54.64 331.548 1.9794 0.6491 4.10 2.77 4.10
1914.38
DISEO DE MUROS
Primer piso
Muros en el Eje X

MURO L(m) Pm Area Pt Piso Pd Pl PD PL

X1 1.00 2.67 1.63 2.42 0.65 6.22 0.36 6.22 0.36


X2 2.00 5.34 8.80 13.04 3.52 6.54 0.36 13.08 0.73
X3 0.25 0.67 2.49 3.69 1.00 6.54 0.36 1.64 0.09
X4 2.75 7.34 5.28 7.82 2.11 6.54 0.36 17.99 1.00
X5 1.75 4.67 11.77 17.44 4.71 6.54 0.36 11.45 0.64
X6 1.00 2.67 3.27 4.85 1.31 6.54 0.36 6.54 0.36
X7 1.35 3.60 3.99 5.91 1.60 6.54 0.36 8.83 0.49
X8 3.75 10.00 7.67 11.37 3.07 6.54 0.36 24.53 1.36
X9 1.00 2.67 0.81 1.20 0.32 6.54 0.36 6.54 0.36
X10 0.50 1.33 3.37 4.99 1.35 6.54 0.36 3.27 0.18
X11 0.75 2.00 4.37 6.48 1.75 6.54 0.36 4.91 0.27
X12 2.35 6.27 1.00 1.48 0.40 6.54 0.36 15.37 0.85
X13 2.00 5.34 1.87 2.77 0.75 6.54 0.36 13.08 0.73
X14 4.35 11.60 5.30 7.85 2.12 6.54 0.36 28.45 1.58
X15 3.80 10.14 4.00 5.93 1.60 6.54 0.36 24.85 1.38
X16 3.30 8.80 3.25 4.82 1.30 6.54 0.36 21.58 1.20

Muros en el Eje Y

MURO L(m) Pm Area Pt Piso Pd Pl PD PL

Y1 2.85 7.60 1.58 2.28 0.63 6.54 0.38 18.64 1.08


Y2 2.35 6.27 0.20 0.28 0.08 6.54 0.38 15.37 0.89
Y3 2.20 5.87 3.27 4.71 1.31 6.54 0.38 14.39 0.84
Y4 2.60 6.94 22.21 31.98 8.88 6.54 0.38 17.00 0.99
Y5 2.45 6.54 3.76 5.41 1.50 6.54 0.38 16.02 0.93
Y6 1.45 3.87 3.90 5.62 1.56 6.54 0.38 9.48 0.55
Y7 1.45 3.87 0.65 0.94 0.26 6.54 0.38 9.48 0.55
Y8 1.50 4.00 3.77 5.43 1.51 6.54 0.38 9.81 0.57
Y9 1.11 2.96 3.78 5.44 1.51 6.54 0.38 7.26 0.42
Y10 3.25 8.67 0.97 1.40 0.39 6.54 0.38 21.26 1.24
Y11 1.35 3.60 2.36 3.40 0.94 6.54 0.38 8.83 0.51
Y12 1.98 5.28 3.11 4.48 1.24 6.54 0.38 12.95 0.75
Y13 4.00 10.67 2.61 3.76 1.04 6.54 0.38 26.16 1.52
Y14 2.59 6.91 2.91 4.19 1.16 6.54 0.38 16.94 0.98
DISEO DE MUROS
Segundo piso
Muros en el Eje X

MURO L(m) Pm Area Pt Piso Pd Pl PD PL

X1 1.00 2.00 1.63 1.81 0.49 4.84 0.28 4.84 0.28


X2 2.00 4.00 8.80 9.78 2.64 4.84 0.28 9.68 0.55 6
X3 0.25 0.50 2.49 2.77 0.75 4.84 0.28 1.21 0.07
X4 2.75 5.50 5.28 5.87 1.58 4.84 0.28 13.31 0.76
X5 1.75 3.50 11.77 13.08 3.53 4.84 0.28 8.47 0.48
X6 1.00 2.00 3.27 3.63 0.98 4.84 0.28 4.84 0.28
X7 1.35 2.70 3.99 4.43 1.20 4.84 0.28 6.53 0.37
X8 3.75 7.50 7.67 8.53 2.30 4.84 0.28 18.15 1.04
X9 1.00 2.00 0.81 0.90 0.24 4.84 0.28 4.84 0.28
X10 0.50 1.00 3.37 3.75 1.01 4.84 0.28 2.42 0.14
X11 0.75 1.50 4.37 4.86 1.31 4.84 0.28 3.63 0.21
X12 2.35 4.70 1.00 1.11 0.30 4.84 0.28 11.37 0.65
X13 2.00 4.00 1.87 2.08 0.56 4.84 0.28 9.68 0.55
X14 4.35 8.70 5.30 5.89 1.59 4.84 0.28 21.05 1.20
X15 3.80 7.60 4.00 4.45 1.20 4.84 0.28 18.39 1.05
X16 3.30 6.60 3.25 3.61 0.98 4.84 0.28 15.97 0.91

Muros en el Eje Y

MURO L(m) Pm Area Pt Piso Pd Pl PD PL

Y1 2.85 5.70 1.58 1.76 0.47 4.84 0.28 13.79 0.79


Y2 2.35 4.70 0.20 0.22 0.06 4.84 0.28 11.37 0.65
Y3 2.20 4.40 3.27 3.63 0.98 4.84 0.28 10.65 0.61
Y4 2.60 5.20 22.21 24.69 6.66 4.84 0.28 12.58 0.72
Y5 2.45 4.90 3.76 4.18 1.13 4.84 0.28 11.86 0.68
Y6 1.45 2.90 3.90 4.33 1.17 4.84 0.28 7.02 0.40
Y7 1.45 2.90 0.65 0.72 0.20 4.84 0.28 7.02 0.40
Y8 1.50 3.00 3.77 4.19 1.13 4.84 0.28 7.26 0.42
Y9 1.11 2.22 3.78 4.20 1.13 4.84 0.28 5.37 0.31
Y10 3.25 6.50 0.97 1.08 0.29 4.84 0.28 15.73 0.90
Y11 1.35 2.70 2.36 2.62 0.71 4.84 0.28 6.53 0.37
Y12 1.98 3.96 3.11 3.46 0.93 4.84 0.28 9.58 0.55
Y13 4.00 8.00 2.61 2.90 0.78 4.84 0.28 19.36 1.11
Y14 2.59 5.18 2.91 3.23 0.87 4.84 0.28 12.54 0.72

DISEO DE MUROS
Tercer piso
Muros en el Eje X

MURO L(m) Pm Area Pt Piso Pd Pl PD PL

X1 1.00 1.33 1.63 1.21 0.33 3.22 0.18 3.22 0.18


X2 2.00 2.67 8.80 6.52 1.76 3.22 0.18 6.44 0.37
X3 0.25 0.33 2.49 1.85 0.50 3.22 0.18 0.81 0.05
X4 2.75 3.67 5.28 3.91 1.06 3.22 0.18 8.86 0.51
X5 1.75 2.33 11.77 8.72 2.35 3.22 0.18 5.64 0.32
X6 1.00 1.33 3.27 2.42 0.65 3.22 0.18 3.22 0.18
X7 1.35 1.80 3.99 2.96 0.80 3.22 0.18 4.35 0.25
X8 3.75 5.00 7.67 5.68 1.53 3.22 0.18 12.08 0.69
X9 1.00 1.33 0.81 0.60 0.16 3.22 0.18 3.22 0.18
X10 0.50 0.67 3.37 2.50 0.67 3.22 0.18 1.61 0.09
X11 0.75 1.00 4.37 3.24 0.87 3.22 0.18 2.42 0.14
X12 2.35 3.13 1.00 0.74 0.20 3.22 0.18 7.57 0.43
X13 2.00 2.67 1.87 1.39 0.37 3.22 0.18 6.44 0.37
X14 4.35 5.80 5.30 3.93 1.06 3.22 0.18 14.01 0.80
X15 3.80 5.07 4.00 2.96 0.80 3.22 0.18 12.24 0.70
X16 3.30 4.40 3.25 2.41 0.65 3.22 0.18 10.63 0.61

Muros en el Eje Y

MURO L(m) Pm Area Pt Piso Pd Pl PD PL

Y1 2.85 3.80 1.58 1.17 0.32 3.22 0.18 9.18 0.53


Y2 2.35 3.13 0.20 0.14 0.04 3.22 0.18 7.57 0.43
Y3 2.20 2.93 3.27 2.42 0.65 3.22 0.18 7.08 0.41
Y4 2.60 3.47 22.21 16.46 4.44 3.22 0.18 8.37 0.48
Y5 2.45 3.27 3.76 2.79 0.75 3.22 0.18 7.89 0.45
Y6 1.45 1.93 3.90 2.89 0.78 3.22 0.18 4.67 0.27
Y7 1.45 1.93 0.65 0.48 0.13 3.22 0.18 4.67 0.27
Y8 1.50 2.00 3.77 2.79 0.75 3.22 0.18 4.83 0.28
Y9 1.11 1.48 3.78 2.80 0.76 3.22 0.18 3.57 0.20
Y10 3.25 4.33 0.97 0.72 0.19 3.22 0.18 10.47 0.60
Y11 1.35 1.80 2.36 1.75 0.47 3.22 0.18 4.35 0.25
Y12 1.98 2.64 3.11 2.30 0.62 3.22 0.18 6.38 0.37
Y13 4.00 5.34 2.61 1.88 0.52 3.22 0.18 12.88 0.74
Y14 2.59 3.45 2.91 2.10 0.58 3.22 0.18 8.34 0.48

DISEO DE MUROS
Cuarto piso
Muros en el Eje X

MURO L(m) Pm Area Pt Piso Pd Pl PD PL

X1 1.00 0.67 1.63 0.60 0.16 1.61 0.09 1.61 0.09


X2 2.00 1.33 8.80 3.26 0.88 1.61 0.09 3.22 0.18
X3 0.25 0.17 2.49 0.92 0.25 1.61 0.09 0.40 0.02
X4 2.75 1.83 5.28 1.96 0.53 1.61 0.09 4.43 0.25
X5 1.75 1.17 11.77 4.36 1.18 1.61 0.09 2.82 0.16
X6 1.00 0.67 3.27 1.21 0.33 1.61 0.09 1.61 0.09
X7 1.35 0.90 3.99 1.48 0.40 1.61 0.09 2.17 0.12
X8 3.75 2.50 7.67 2.84 0.77 1.61 0.09 6.04 0.35
X9 1.00 0.67 0.81 0.30 0.08 1.61 0.09 1.61 0.09
X10 0.50 0.33 3.37 1.25 0.34 1.61 0.09 0.81 0.05
X11 0.75 0.50 4.37 1.62 0.44 1.61 0.09 1.21 0.07
X12 2.35 1.57 1.00 0.37 0.10 1.61 0.09 3.78 0.22
X13 2.00 1.33 1.87 0.69 0.19 1.61 0.09 3.22 0.18
X14 4.35 2.90 5.30 1.96 0.53 1.61 0.09 7.00 0.40
X15 3.80 2.53 4.00 1.48 0.40 1.61 0.09 6.12 0.35
X16 3.30 2.20 3.25 1.20 0.33 1.61 0.09 5.31 0.30

Muros en el Eje Y

MURO L(m) Pm Area Pt Piso Pd Pl PD PL

Y1 2.85 1.90 1.58 0.59 0.16 1.61 0.09 4.59 0.26


Y2 2.35 1.57 0.20 0.07 0.02 1.61 0.09 3.78 0.22
Y3 2.20 1.47 3.27 1.21 0.33 1.61 0.09 3.54 0.20
Y4 2.60 1.73 22.21 8.23 2.22 1.61 0.09 4.19 0.24
Y5 2.45 1.63 3.76 1.39 0.38 1.61 0.09 3.94 0.23
Y6 1.45 0.97 3.90 1.44 0.39 1.61 0.09 2.33 0.13
Y7 1.45 0.97 0.65 0.24 0.07 1.61 0.09 2.33 0.13
Y8 1.50 1.00 3.77 1.40 0.38 1.61 0.09 2.42 0.14
Y9 1.11 0.74 3.78 1.40 0.38 1.61 0.09 1.79 0.10
Y10 3.25 2.17 0.97 0.36 0.10 1.61 0.09 5.23 0.30
Y11 1.35 0.90 2.36 0.87 0.24 1.61 0.09 2.17 0.12
Y12 1.98 1.32 3.11 1.15 0.31 1.61 0.09 3.19 0.18
Y13 4.00 2.67 2.61 0.97 0.26 1.61 0.09 6.44 0.37
Y14 2.59 1.73 2.91 1.08 0.29 1.61 0.09 4.17 0.24
DISEO POR FLEXION (DISEO A LA ROTURA)
Muros en el Eje X PRIMER PISO
MURO L(cm) t(cm) Vi(Kg) PD (Kg) PL (Kg) fd Vact Vadm (c/Cal) Vadm(s/Cal) PU (Kg) fm f Mi
X1 100 15 824.87 6218.66 1554.66 4.146 0.55 2.55 1.95 11659.98 7.773 0.695 66736.50
X2 200 15 4967.51 13080.00 3270.00 4.360 1.66 2.58 1.98 24525.00 8.175 0.687 401898.81
X3 25 15 14.36 1635.00 408.75 4.360 0.04 2.58 1.98 3065.63 8.175 0.687 1162.02
X4 275 15 9982.80 17985.00 4496.25 4.360 2.42 2.58 1.98 33721.88 8.175 0.687 807663.24
X5 175 15 3606.48 11445.00 2861.25 4.360 1.37 2.58 1.98 21459.38 8.175 0.687 291783.68
X6 100 15 664.88 6540.00 1635.00 4.360 0.44 2.58 1.98 12262.50 8.175 0.687 53792.61
X7 135 15 1500.73 8829.00 2207.25 4.360 0.74 2.58 1.98 16554.38 8.175 0.687 121417.23
X8 375 15 14059.43 24525.00 6131.25 4.360 2.50 2.58 1.98 45984.38 8.175 0.687 1137485.24
X9 100 15 572.29 6540.00 1635.00 4.360 0.38 2.58 1.98 12262.50 8.175 0.687 46301.67
X10 50 15 77.94 3270.00 817.50 4.360 0.10 2.58 1.98 6131.25 8.175 0.687 6305.42
X11 75 15 253.58 4905.00 1226.25 4.360 0.23 2.58 1.98 9196.88 8.175 0.687 20516.14
X12 235 15 4382.62 15369.00 3842.25 4.360 1.24 2.58 1.98 28816.88 8.175 0.687 354578.12
X13 200 15 2965.60 13080.00 3270.00 4.360 0.99 2.58 1.98 24525.00 8.175 0.687 239933.21
X14 435 15 13279.81 28449.00 7112.25 4.360 2.04 2.58 1.98 53341.88 8.175 0.687 1074409.95
X15 380 15 10610.51 24852.00 6213.00 4.360 1.86 2.58 1.98 46597.50 8.175 0.687 858448.88
X16 330 15 8245.79 21582.00 5395.50 4.360 1.67 2.58 1.98 40466.25 8.175 0.687 667129.64
18.23 41.32 31.72
Muros en el Eje Y
MURO L(cm) t(cm) Vi(Kg) PD (Kg) PL (Kg) fd Vact Vm (c/Cal) Vm(s/Cal) PU (Kg) fm f Mi
Y1 285 15 4629.19 18639.00 4659.75 4.360 1.08 2.58 1.98 34948.13 8.175 0.687 374526.95
Y2 235 15 3847.58 15369.00 3842.25 4.360 1.09 2.58 1.98 28816.88 8.175 0.687 311290.54
Y3 220 15 3635.55 14388.00 3597.00 4.360 1.10 2.58 1.98 26977.50 8.175 0.687 294136.15
Y4 260 15 6543.50 17004.00 4251.00 4.360 1.68 2.58 1.98 31882.50 8.175 0.687 529405.25
Y5 245 15 8675.24 16023.00 4005.75 4.360 2.36 2.58 1.98 30043.13 8.175 0.687 701874.95
Y6 145 15 1214.99 9483.00 2370.75 4.360 0.56 2.58 1.98 17780.63 8.175 0.687 98299.04
Y7 145 15 1328.44 9483.00 2370.75 4.360 0.61 2.58 1.98 17780.63 8.175 0.687 107478.05
Y8 150 15 2230.78 9810.00 2452.50 4.360 0.99 2.58 1.98 18393.75 8.175 0.687 180482.07
Y9 111 15 1217.66 7259.40 1814.85 4.360 0.73 2.58 1.98 13611.38 8.175 0.687 98515.64
Y10 325 15 5968.83 21255.00 5313.75 4.360 1.22 2.58 1.98 39853.13 8.175 0.687 482911.08
Y11 135 15 1008.12 8829.00 2207.25 4.360 0.50 2.58 1.98 16554.38 8.175 0.687 81562.53
Y12 198 15 2787.52 12949.20 3237.30 4.360 0.94 2.58 1.98 24279.75 8.175 0.687 225525.70
Y13 400 15 16720.07 26160.00 6540.00 4.360 2.79 2.58 1.98 49050.00 8.175 0.687 1352745.43
Y14 259 15 9761.80 16938.60 4234.65 4.360 2.51 2.58 1.98 31759.88 8.175 0.687 789783.58
14.89 28.43 21.83

DISEO POR FLEXION (DISEO A LA ROTURA)

Muros en el Eje X SEGUNDO PISO


MURO L(cm) t(cm) Vi(Kg) PD (Kg) PL (Kg) fd Vact Vadm (c/Cal) Vadm(s/Cal) PU (Kg) fm f Mi
X1 100 15 742.38 4840.00 1210.00 3.227 0.49 2.38 1.78 9075.00 6.050 0.729 60062.85
X2 200 15 4470.76 9680.00 2420.00 3.227 1.49 2.38 1.78 18150.00 6.050 0.729 361708.93
X3 25 15 12.93 1210.00 302.50 3.227 0.03 2.38 1.78 2268.75 6.050 0.729 1045.82
X4 275 15 8984.52 13310.00 3327.50 3.227 2.18 2.38 1.78 24956.25 6.050 0.729 726896.92
X5 175 15 3245.83 8470.00 2117.50 3.227 1.24 2.38 1.78 15881.25 6.050 0.729 262605.31
X6 100 15 598.39 4840.00 1210.00 3.227 0.40 2.38 1.78 9075.00 6.050 0.729 48413.35
X7 135 15 1350.66 6534.00 1633.50 3.227 0.67 2.38 1.78 12251.25 6.050 0.729 109275.50
X8 375 15 12653.49 18150.00 4537.50 3.227 2.25 2.38 1.78 34031.25 6.050 0.729 1023736.72
X9 100 15 515.06 4840.00 1210.00 3.227 0.34 2.38 1.78 9075.00 6.050 0.729 41671.50
X10 50 15 70.14 2420.00 605.00 3.227 0.09 2.38 1.78 4537.50 6.050 0.729 5674.88
X11 75 15 228.22 3630.00 907.50 3.227 0.20 2.38 1.78 6806.25 6.050 0.729 18464.53
X12 235 15 3944.36 11374.00 2843.50 3.227 1.12 2.38 1.78 21326.25 6.050 0.729 319120.31
X13 200 15 2669.04 9680.00 2420.00 3.227 0.89 2.38 1.78 18150.00 6.050 0.729 215939.89
X14 435 15 11951.83 21054.00 5263.50 3.227 1.83 2.38 1.78 39476.25 6.050 0.729 966968.96
X15 380 15 9549.46 18392.00 4598.00 3.227 1.68 2.38 1.78 34485.00 6.050 0.729 772603.99
X16 330 15 7421.21 15972.00 3993.00 3.227 1.50 2.38 1.78 29947.50 6.050 0.729 600416.67
16.40 38.09 28.49
Muros en el Eje Y
MURO L(cm) t(cm) Vi(Kg) PD (Kg) PL (Kg) fd Vact Vm (c/Cal) Vm(s/Cal) PU (Kg) fm f Mi
Y1 285 15 4166.27 13794.00 3448.50 3.227 0.97 2.38 1.78 25863.75 6.050 0.729 337074.25
Y2 235 15 3462.82 11374.00 2843.50 3.227 0.98 2.38 1.78 21326.25 6.050 0.729 280161.49
Y3 220 15 3272.00 10648.00 2662.00 3.227 0.99 2.38 1.78 19965.00 6.050 0.729 264722.53
Y4 260 15 5889.15 12584.00 3146.00 3.227 1.51 2.38 1.78 23595.00 6.050 0.729 476464.72
Y5 245 15 7807.72 11858.00 2964.50 3.227 2.12 2.38 1.78 22233.75 6.050 0.729 631687.45
Y6 145 15 1093.49 7018.00 1754.50 3.227 0.50 2.38 1.78 13158.75 6.050 0.729 88469.13
Y7 145 15 1195.60 7018.00 1754.50 3.227 0.55 2.38 1.78 13158.75 6.050 0.729 96730.24
Y8 150 15 2007.70 7260.00 1815.00 3.227 0.89 2.38 1.78 13612.50 6.050 0.729 162433.86
Y9 111 15 1095.90 5372.40 1343.10 3.227 0.66 2.38 1.78 10073.25 6.050 0.729 88664.08
Y10 325 15 5371.95 15730.00 3932.50 3.227 1.10 2.38 1.78 29493.75 6.050 0.729 434619.97
Y11 135 15 907.31 6534.00 1633.50 3.227 0.45 2.38 1.78 12251.25 6.050 0.729 73406.28
Y12 198 15 2508.77 9583.20 2395.80 3.227 0.84 2.38 1.78 17968.50 6.050 0.729 202973.13
Y13 400 15 14957.74 19360.00 4840.00 3.227 2.49 2.38 1.78 36300.00 6.050 0.729 1210163.77
Y14 259 15 8785.62 12535.60 3133.90 3.227 2.26 2.38 1.78 23504.25 6.050 0.729 710805.23
16.34 11.92 11.92
DISEO POR FLEXION (DISEO A LA ROTURA)

Muros en el Eje X TERCER PISO


MURO L(cm) t(cm) Vi(Kg) PD (Kg) PL (Kg) fd Vact Vadm (c/Cal) Vadm(s/Cal) PU (Kg) fm f Mi
X1 100 15 602.63 3220.00 805.00 2.147 0.40 2.19 1.59 6037.50 4.025 0.770 48755.99
X2 200 15 3629.14 6440.00 1610.00 2.147 1.21 2.19 1.59 12075.00 4.025 0.770 293617.03
X3 25 15 10.49 805.00 201.25 2.147 0.03 2.19 1.59 1509.38 4.025 0.770 848.94
X4 275 15 7293.18 8855.00 2213.75 2.147 1.77 2.19 1.59 16603.13 4.025 0.770 590058.18
X5 175 15 2634.80 5635.00 1408.75 2.147 1.00 2.19 1.59 10565.63 4.025 0.770 213169.72
X6 100 15 478.37 3220.00 805.00 2.147 0.32 2.19 1.59 6037.50 4.025 0.770 38703.16
X7 135 15 1079.76 4347.00 1086.75 2.147 0.53 2.19 1.59 8150.63 4.025 0.770 87358.29
X8 375 15 10094.49 12075.00 3018.75 2.147 1.79 2.19 1.59 22640.63 4.025 0.770 816699.42
X9 100 15 406.47 3220.00 805.00 2.147 0.27 2.19 1.59 6037.50 4.025 0.770 32885.35
X10 50 15 55.35 1610.00 402.50 2.147 0.07 2.19 1.59 3018.75 4.025 0.770 4478.37
X11 75 15 241.18 2415.00 603.75 2.147 0.21 2.19 1.59 4528.13 4.025 0.770 19512.57
X12 235 15 4270.29 7567.00 1891.75 2.147 1.21 2.19 1.59 14188.13 4.025 0.770 345490.09
X13 200 15 2768.39 6440.00 1610.00 2.147 0.92 2.19 1.59 12075.00 4.025 0.770 223978.35
X14 435 15 9755.19 14007.00 3501.75 2.147 1.50 2.19 1.59 26263.13 4.025 0.770 789248.34
X15 380 15 7794.35 12236.00 3059.00 2.147 1.37 2.19 1.59 22942.50 4.025 0.770 630605.99
X16 330 15 6057.25 10626.00 2656.50 2.147 1.22 2.19 1.59 19923.75 4.025 0.770 490065.23
13.84 34.98 25.38
Muros en el Eje Y
MURO L(cm) t(cm) Vi(Kg) PD (Kg) PL (Kg) fd Vact Vm (c/Cal) Vm(s/Cal) PU (Kg) fm f Mi
Y1 285 15 3100.93 9177.00 2294.25 2.147 0.73 2.19 1.59 17206.88 4.025 0.770 250882.44
Y2 235 15 2658.33 7567.00 1891.75 2.147 0.75 2.19 1.59 14188.13 4.025 0.770 215073.63
Y3 220 15 2538.64 7084.00 1771.00 2.147 0.77 2.19 1.59 13282.50 4.025 0.770 205390.24
Y4 260 15 4672.35 8372.00 2093.00 2.147 1.20 2.19 1.59 15697.50 4.025 0.770 378018.66
Y5 245 15 6376.48 7889.00 1972.25 2.147 1.74 2.19 1.59 14791.88 4.025 0.770 515892.32
Y6 145 15 840.23 4669.00 1167.25 2.147 0.39 2.19 1.59 8754.38 4.025 0.770 67979.56
Y7 145 15 928.35 4669.00 1167.25 2.147 0.43 2.19 1.59 8754.38 4.025 0.770 75108.41
Y8 150 15 1619.70 4830.00 1207.50 2.147 0.72 2.19 1.59 9056.25 4.025 0.770 131042.82
Y9 111 15 895.01 3574.20 893.55 2.147 0.54 2.19 1.59 6701.63 4.025 0.770 72410.99
Y10 325 15 3998.31 10465.00 2616.25 2.147 0.82 2.19 1.59 19621.88 4.025 0.770 323485.17
Y11 135 15 697.17 4347.00 1086.75 2.147 0.34 2.19 1.59 8150.63 4.025 0.770 56405.28
Y12 198 15 1941.39 6375.60 1593.90 2.147 0.65 2.19 1.59 11954.25 4.025 0.770 157068.80
Y13 400 15 12028.68 12880.00 3220.00 2.147 2.00 2.19 1.59 24150.00 4.025 0.770 973186.16
Y14 259 15 7175.12 8339.80 2084.95 2.147 1.85 2.19 1.59 15637.13 4.025 0.770 580506.95
10.67 24.05 17.45
DISEO POR FLEXION (DISEO A LA ROTURA)

Muros en el Eje X CUARTO PISO


MURO L(cm) t(cm) Vi(Kg) PD (Kg) PL (Kg) fd Vact Vadm (c/Cal) Vadm(s/Cal) PU (Kg) fm f Mi
X1 100 15 344.36 1610.00 402.50 1.073 0.23 1.99 1.39 3018.75 2.013 0.810 27860.57
X2 200 15 2073.79 3220.00 805.00 1.073 0.69 1.99 1.39 6037.50 2.013 0.810 167781.16
X3 25 15 6.00 402.50 100.63 1.073 0.02 1.99 1.39 754.69 2.013 0.810 485.11
X4 275 15 4167.53 4427.50 1106.88 1.073 1.01 1.99 1.39 8301.56 2.013 0.810 337176.10
X5 175 15 1505.60 2817.50 704.38 1.073 0.57 1.99 1.39 5282.81 2.013 0.810 121811.27
X6 100 15 273.36 1610.00 402.50 1.073 0.18 1.99 1.39 3018.75 2.013 0.810 22116.09
X7 135 15 617.00 2173.50 543.38 1.073 0.30 1.99 1.39 4075.31 2.013 0.810 49919.02
X8 375 15 5768.28 6037.50 1509.38 1.073 1.03 1.99 1.39 11320.31 2.013 0.810 466685.38
X9 100 15 232.27 1610.00 402.50 1.073 0.15 1.99 1.39 3018.75 2.013 0.810 18791.63
X10 50 15 31.63 805.00 201.25 1.073 0.04 1.99 1.39 1509.38 2.013 0.810 2559.07
X11 75 15 137.82 1207.50 301.88 1.073 0.12 1.99 1.39 2264.06 2.013 0.810 11150.04
X12 235 15 2440.17 3783.50 945.88 1.073 0.69 1.99 1.39 7094.06 2.013 0.810 197422.91
X13 200 15 1581.94 3220.00 805.00 1.073 0.53 1.99 1.39 6037.50 2.013 0.810 127987.63
X14 435 15 9621.82 7003.50 1750.88 1.073 1.47 1.99 1.39 13131.56 2.013 0.810 778457.78
X15 380 15 4453.92 6118.00 1529.50 1.073 0.78 1.99 1.39 11471.25 2.013 0.810 360346.28
X16 330 15 3461.29 5313.00 1328.25 1.073 0.70 1.99 1.39 9961.88 2.013 0.810 280037.27
8.53 31.89 22.29
Muros en el Eje Y
MURO L(cm) t(cm) Vi(Kg) PD (Kg) PL (Kg) fd Vact Vm (c/Cal) Vm(s/Cal) PU (Kg) fm f Mi
Y1 285 15 116.65 4588.50 1147.13 1.073 0.03 1.99 1.39 8603.44 2.013 0.810 9437.55
Y2 235 15 1519.05 3783.50 945.88 1.073 0.43 1.99 1.39 7094.06 2.013 0.810 122899.22
Y3 220 15 1450.65 3542.00 885.50 1.073 0.44 1.99 1.39 6641.25 2.013 0.810 117365.85
Y4 260 15 2669.91 4186.00 1046.50 1.073 0.68 1.99 1.39 7848.75 2.013 0.810 216010.66
Y5 245 15 3643.70 3944.50 986.13 1.073 0.99 1.99 1.39 7395.94 2.013 0.810 294795.61
Y6 145 15 480.13 2334.50 583.63 1.073 0.22 1.99 1.39 4377.19 2.013 0.810 38845.46
Y7 145 15 530.48 2334.50 583.63 1.073 0.24 1.99 1.39 4377.19 2.013 0.810 42919.09
Y8 150 15 925.54 2415.00 603.75 1.073 0.41 1.99 1.39 4528.13 2.013 0.810 74881.61
Y9 111 15 511.43 1787.10 446.78 1.073 0.31 1.99 1.39 3350.81 2.013 0.810 41377.71
Y10 325 15 150.41 5232.50 1308.13 1.073 0.03 1.99 1.39 9810.94 2.013 0.810 12168.67
Y11 135 15 398.39 2173.50 543.38 1.073 0.20 1.99 1.39 4075.31 2.013 0.810 32231.59
Y12 198 15 1109.36 3187.80 796.95 1.073 0.37 1.99 1.39 5977.13 2.013 0.810 89753.60
Y13 400 15 6849.77 6440.00 1610.00 1.073 1.14 1.99 1.39 12075.00 2.013 0.810 554183.69
Y14 259 15 4100.07 4169.90 1042.48 1.073 1.06 1.99 1.39 7818.56 2.013 0.810 331718.26
5.66 21.93 15.33
DISEO DE ACERO VERTICAL
PRIMER PISO
MURO Mi d AST a 3/8 ESPACIAMIENTO S cm
X1 66736.50 80.00 3.94 1.67 5.55 14.42
X2 401898.81 160.00 11.89 4.79 16.74 9.56
X3 1162.02 20.00 0.27 0.11 0.38 53.07
X4 807663.24 220.00 17.38 7.00 24.48 8.99
X5 291783.68 140.00 9.86 3.97 13.89 10.08
X6 53792.61 80.00 3.17 1.28 4.46 17.94
X7 121417.23 108.00 5.30 2.14 7.47 14.46
X8 1137485.24 300.00 17.92 7.22 25.24 11.89
X9 46301.67 80.00 2.72 1.10 3.83 20.89
X10 6305.42 40.00 0.73 0.30 1.03 38.78
X11 20516.14 60.00 1.60 0.65 2.25 26.61
X12 354578.12 188.00 8.90 3.58 12.53 15.01
X13 239933.21 160.00 7.07 2.85 9.95 16.07
X14 1074409.95 348.00 14.54 5.86 20.48 16.99
X15 858448.88 304.00 13.31 5.36 18.74 16.22
X16 667129.64 264.00 11.91 4.80 16.78 15.73

MURO Mi d AST a 3/8 ESPACIAMIENTO S


Y1 374526.95 228.00 7.72 3.11 10.87 84.19
Y2 311290.54 188.00 7.80 3.14 10.98 68.70
Y3 294136.15 176.00 7.88 3.17 11.10 63.67
Y4 529405.25 208.00 12.03 4.85 16.94 49.30
Y5 701874.95 196.00 16.96 6.84 23.89 32.93
Y6 98299.04 116.00 3.98 1.60 5.61 83.02
Y7 107478.05 116.00 4.36 1.76 6.14 75.84
Y8 180482.07 120.00 7.11 2.86 10.01 48.12
Y9 98515.64 88.80 5.24 2.11 7.38 48.28
Y10 482911.08 260.00 8.73 3.52 12.29 84.92
Y11 81562.53 108.00 3.55 1.43 5.00 86.78
Y12 225525.70 158.40 6.71 2.70 9.45 67.30
Y13 1352745.43 320.00 19.98 8.05 28.15 45.64
Y14 789783.58 207.20 18.06 7.28 25.43 32.70
DISEO DE ACERO VERTICAL
SEGUNDO PISO

MURO Mi d AST a 3/4 ESPACIAMIENTO S cm


X1 60062.85 80.00 3.55 1.93 5.00 64.26
X2 361708.93 160.00 10.71 5.83 15.09 42.57
X3 1045.82 20.00 0.24 0.13 0.34 235.29
X4 726896.92 220.00 15.66 8.53 22.06 40.04
X5 262605.31 140.00 8.88 4.84 12.51 44.91
X6 48413.35 80.00 2.85 1.55 4.02 79.87
X7 109275.50 108.00 4.78 2.60 6.73 64.37
X8 1023736.72 300.00 16.15 8.79 22.74 52.95
X9 41671.50 80.00 2.45 1.34 3.46 92.93
X10 5674.88 40.00 0.66 0.36 0.93 172.19
X11 18464.53 60.00 1.45 0.79 2.04 118.32
X12 319120.31 188.00 8.02 4.37 11.30 66.81
X13 215939.89 160.00 6.37 3.47 8.98 71.55
X14 966968.96 348.00 13.11 7.14 18.47 75.63
X15 772603.99 304.00 12.00 6.53 16.90 72.20
X16 600416.67 264.00 10.74 5.85 15.13 70.05

MURO Mi d AST a 3/4 ESPACIAMIENTO S cm


Y1 337074.25 228.00 6.96 3.79 9.81 93.32
Y2 280161.49 188.00 7.03 3.83 9.91 76.19
Y3 264722.53 176.00 7.10 3.87 10.00 70.62
Y4 476464.72 208.00 10.84 5.90 15.26 54.70
Y5 631687.45 196.00 15.28 8.32 21.52 36.56
Y6 88469.13 116.00 3.59 1.96 5.06 92.02
Y7 96730.24 116.00 3.93 2.14 5.54 84.09
Y8 162433.86 120.00 6.41 3.49 9.02 53.39
Y9 88664.08 88.80 4.72 2.57 6.65 53.57
Y10 434619.97 260.00 7.87 4.29 11.09 94.13
Y11 73406.28 108.00 3.20 1.74 4.51 96.18
Y12 202973.13 158.40 6.05 3.29 8.52 74.64
Y13 1210163.77 320.00 17.90 9.75 25.21 50.95
Y14 710805.23 207.20 16.27 8.86 22.91 36.30

DISEO DE ACERO VERTICAL


TERCER PISO

MURO Mi d AST a 3/4 ESPACIAMIENTO S cm


X1 48755.99 80.00 2.88 2.36 4.06 79.05
X2 293617.03 160.00 8.70 7.12 12.26 52.40
X3 848.94 20.00 0.20 0.16 0.28 288.41
X4 590058.18 220.00 12.72 10.41 17.92 49.28
X5 213169.72 140.00 7.22 5.91 10.17 55.27
X6 38703.16 80.00 2.29 1.87 3.22 99.75
X7 87358.29 108.00 3.83 3.13 5.39 80.42
X8 816699.42 300.00 12.90 10.55 18.16 66.30
X9 32885.35 80.00 1.94 1.59 2.73 117.56
X10 4478.37 40.00 0.52 0.43 0.74 217.49
X11 19512.57 60.00 1.54 1.26 2.16 111.39
X12 345490.09 188.00 8.71 7.13 12.27 61.52
X13 223978.35 160.00 6.63 5.43 9.34 68.78
X14 789248.34 348.00 10.72 8.77 15.10 92.50
X15 630605.99 304.00 9.81 8.03 13.82 88.32
X16 490065.23 264.00 8.78 7.19 12.37 85.69

MURO Mi d AST a 3/4 ESPACIAMIENTO S cm


Y1 250882.44 228.00 5.19 4.25 7.31 125.24
Y2 215073.63 188.00 5.41 4.42 7.61 99.12
Y3 205390.24 176.00 5.52 4.52 7.77 90.91
Y4 378018.66 208.00 8.61 7.04 12.12 68.87
Y5 515892.32 196.00 12.49 10.22 17.59 44.72
Y6 67979.56 116.00 2.76 2.26 3.89 119.58
Y7 75108.41 116.00 3.06 2.50 4.31 108.14
Y8 131042.82 120.00 5.17 4.23 7.29 66.11
Y9 72410.99 88.80 3.86 3.16 5.44 65.51
Y10 323485.17 260.00 5.87 4.80 8.26 126.32
Y11 56405.28 108.00 2.46 2.02 3.47 124.98
Y12 157068.80 158.40 4.69 3.84 6.60 96.33
Y13 973186.16 320.00 14.41 11.79 20.30 63.29
Y14 580506.95 207.20 13.29 10.88 18.73 44.42

DISEO DE ACERO VERTICAL


CUARTO PISO

MURO Mi d AST a 3/4 ESPACIAMIENTO S cm


X1 27860.57 80.00 1.65 2.70 2.32 138.23
X2 167781.16 160.00 4.98 8.14 7.01 91.65
X3 485.11 20.00 0.11 0.19 0.16 503.28
X4 337176.10 220.00 7.27 11.91 10.24 86.20
X5 121811.27 140.00 4.13 6.76 5.81 96.67
X6 22116.09 80.00 1.31 2.14 1.84 174.39
X7 49919.02 108.00 2.19 3.58 3.08 140.62
X8 466685.38 300.00 7.37 12.07 10.39 115.95
X9 18791.63 80.00 1.11 1.82 1.56 205.49
X10 2559.07 40.00 0.30 0.49 0.42 379.80
X11 11150.04 60.00 0.88 1.44 1.24 194.72
X12 197422.91 188.00 4.98 8.15 7.01 107.60
X13 127987.63 160.00 3.79 6.21 5.34 120.28
X14 778457.78 348.00 10.61 17.37 14.95 93.45
X15 360346.28 304.00 5.61 9.18 7.90 154.43
X16 280037.27 264.00 5.02 8.22 7.07 149.83

MURO Mi d AST a 3/4 ESPACIAMIENTO S cm


Y1 9437.55 228.00 0.17 0.28 0.24 3788.86
Y2 122899.22 188.00 3.09 5.06 4.35 173.30
Y3 117365.85 176.00 3.16 5.17 4.44 158.95
Y4 216010.66 208.00 4.92 8.06 6.93 120.44
Y5 294795.61 196.00 7.14 11.69 10.06 78.23
Y6 38845.46 116.00 1.58 2.59 2.23 209.03
Y7 42919.09 116.00 1.75 2.86 2.46 189.04
Y8 74881.61 120.00 2.96 4.84 4.17 115.62
Y9 41377.71 88.80 2.21 3.62 3.11 114.57
Y10 12168.67 260.00 0.19 0.32 0.27 3826.09
Y11 32231.59 108.00 1.41 2.31 1.98 218.45
Y12 89753.60 158.40 2.68 4.39 3.78 168.42
Y13 554183.69 320.00 8.21 13.44 11.56 111.07
Y14 331718.26 207.20 7.60 12.44 10.70 77.70
DISEO POR CORTE - ACERO HORIZONTAL (DISEO A LA ROTURA)
Muros en el Eje X

MURO L (cm) Vi (Kg) Vu (Kg) H/L d(cm) AH(cm2) N Ac N Acero AHmin(cm2)

X1 100 824.870 2062.17 11.00 80 0.614 1.97 2 3/8" @ 0.41 1.40


X2 200 4967.509 12418.77 5.50 160 1.848 1.97 2 3/8" @ 0.81 1.40
X3 25 14.363 35.91 44.00 20 0.043 1.97 2 3/8" @ 0.10 1.40
X4 275 9982.798 24956.99 4.00 220 2.701 3.80 4 3/8" @ 0.58 1.40
X5 175 3606.475 9016.19 6.29 140 1.533 2.16 1 3/8" @ 1.40 1.40
X6 100 664.882 1662.20 11.00 80 0.495 0.70 1 3/8" @ 1.15 1.40
X7 135 1500.729 3751.82 8.15 108 0.827 1.16 1 3/8" @ 0.93 1.40
X8 375 14059.430 35148.58 2.93 300 2.790 3.93 4 3/8" @ 0.76 1.40
X9 100 572.293 1430.73 11.00 80 0.426 1.97 2 3/8" @ 0.41 1.40
X10 50 77.936 194.84 22.00 40 0.116 0.16 0 3/8" @ 2.45 1.40
X11 75 253.582 633.95 14.67 60 0.252 0.35 0 3/8" @ 1.69 1.40
X12 235 4382.621 10956.55 4.68 188 1.388 1.95 2 3/8" @ 0.96 1.40
X13 200 2965.598 7414.00 5.50 160 1.103 1.55 2 3/8" @ 1.03 1.40
X14 435 13279.813 33199.53 2.53 348 2.271 3.20 3 3/8" @ 1.09 1.40
X15 380 10610.513 26526.28 2.89 304 2.078 2.93 3 3/8" @ 1.04 1.40
X16 330 8245.788 20614.47 3.33 264 1.859 2.62 3 3/8" @ 1.01 1.40

Muros en el Eje Y

MURO L (cm) Vi (Kg) Vu (Kg) H/L d(cm) AH(cm2) N Ac N Acero AHmin(cm2)

Y1 285 4629.190 11572.98 3.86 228 1.336 1.97 2 3/8" @ 1.16 1.40
Y2 235 3847.582 9618.95 4.68 188 1.346 1.97 2 3/8" @ 0.95 1.40
Y3 220 3635.552 9088.88 5.00 176 1.359 1.97 2 3/8" @ 0.89 1.40
Y4 260 6543.501 16358.75 4.23 208 2.070 2.92 3 3/8" @ 0.71 1.40
Y5 245 8675.244 21688.11 4.49 196 2.912 4.10 4 3/8" @ 0.48 1.40
Y6 145 1214.986 3037.46 7.59 116 0.689 1.97 2 3/8" @ 0.59 1.40
Y7 145 1328.439 3321.10 7.59 116 0.753 1.97 2 3/8" @ 0.59 1.40
Y8 150 2230.776 5576.94 7.33 120 1.223 1.72 2 3/8" @ 0.70 1.40
Y9 111 1217.663 3044.16 9.91 89 0.902 1.27 1 3/8" @ 0.70 1.40
Y10 325 5968.829 14922.07 3.38 260 1.510 1.97 2 3/8" @ 1.32 1.40
Y11 135 1008.121 2520.30 8.15 108 0.614 1.97 2 3/8" @ 0.55 1.40
Y12 198 2787.520 6968.80 5.56 158 1.158 1.97 2 3/8" @ 0.80 1.40
Y13 400 16720.068 41800.17 2.75 320 3.438 1.97 2 3/8" @ 1.62 1.40
Y14 259 9761.803 24404.51 4.25 207 3.100 4.37 4 3/8" @ 0.47 1.40
MOMENTO MAXIMO DE FLEXION

Muros en el Eje X

MURO Vi(Kg) PU (Kg) Mi (Kg/cm2)


X1 824.87 11659.98 3144.18
X2 4967.51 24525.00 18934.80
X3 14.36 3065.63 54.75
X4 9982.80 33721.88 38051.71
X5 3606.48 21459.38 13746.90
X6 664.88 12262.50 2534.35
X7 1500.73 16554.38 5720.37
X8 14059.43 45984.38 53590.73
X9 572.29 12262.50 2181.43
X10 77.94 6131.25 297.07
X11 253.58 9196.88 966.58
X12 4382.62 28816.88 16705.36
X13 2965.60 24525.00 11304.06
X14 13279.81 53341.88 50619.04
X15 10610.51 46597.50 40444.39
X16 8245.79 40466.25 31430.71

Muros en el Eje Y

MURO Vi(Kg) PU (Kg) Mi (Kg/cm2)


Y1 4629.19 34948.13 17645.22
Y2 3847.58 28816.88 14665.94
Y3 3635.55 26977.50 13857.74
Y4 6543.50 31882.50 24942.05
Y5 8675.24 30043.13 33067.67
Y6 1214.99 17780.63 4631.20
Y7 1328.44 17780.63 5063.65
Y8 2230.78 18393.75 8503.11
Y9 1217.66 13611.38 4641.40
Y10 5968.83 39853.13 22751.55
Y11 1008.12 16554.38 3842.68
Y12 2787.52 24279.75 10625.27
Y13 16720.07 49050.00 63732.36
Y14 9761.80 31759.88 37209.34
CALCULO DE ALFEIZARES

Los alfeizares deben separarse de los muros, por lo tanto deben disearse como elementos en voladizo
sometidos a una carga horizontal sismica (ws) que actua perpendicularmente a su plano

Ws = U x C1 x P

C1 = 1 , Para elementos que al fallar puedan precipitarse fuera de la edificacion


P = Peso del alfeizar
U = 1 , Factor uso para categoria C

P = 0.15 x 1800 = 270 Kg/m2

Reemplazando

Ws = 1 x 1 x 270 = 270 Kg/m2

El momento seria

1
M = Ws h
2
1
M = 270 ( 1 ) = 135 Kg-m/m
2

Aplicamos el momento ultimo para calcular el acero vertical

KM donde f = 0.85
Mu =
f

2 Mu
As =
fy d
CALCULO DEL ACERO EN ALFEIZARES

MURO L (m) P (Kg) Ws (Kg/m2) M (Kg-m/m) Mu(Kg-m/m) As (cm2) N As N DE ACERO

V- 1Y 1.34 361.80 361.80 180.90 266.03 1.69 2.4 2 3/8" @ 42.03 cm


V- 2Y 0.84 226.80 226.80 113.40 166.76 1.06 1.5 1 3/8" @ 67.06 cm
V- 3Y 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0 3/8" @ ### cm
V- 4Y 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0 3/8" @ ### cm
V- 5Y 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0 3/8" @ ### cm
V- 6Y 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0 3/8" @ ### cm
V- 7Y 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0 3/8" @ ### cm
V- 8Y 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0 3/8" @ ### cm
V- 1X 1.10 297.00 297.00 148.50 218.38 1.39 2.0 2 3/8" @ 51.21 cm
V- 2X 0.75 202.50 202.50 101.25 148.90 0.95 1.3 1 3/8" @ 75.10 cm
V- 3X 1.20 324.00 324.00 162.00 238.24 1.51 2.1 2 3/8" @ 46.94 cm
V- 4X 1.00 270.00 270.00 135.00 198.53 1.26 1.8 2 3/8" @ 56.33 cm
V- 5X 0.75 202.50 202.50 101.25 148.90 0.95 1.3 1 3/8" @ 75.10 cm

VERIFICAMOS DE LA TRACCION DE LA ALBAILERIA

6xP
f't =
t

MURO t (cm) M (Kg-m/m) f't (Kg/cm2)

V- 1Y 15 180.90 4.82
V- 2Y 15 113.40 3.02
V- 3Y 15 0.00 0.00
V- 4Y 15 0.00 0.00
V- 5Y 15 0.00 0.00
V- 6Y 15 0.00 0.00
V- 7Y 15 0.00 0.00
V- 8Y 15 0.00 0.00
V- 1X 15 148.50 3.96
V- 2X 15 101.25 2.70
V- 3X 15 162.00 4.32
V- 4X 15 135.00 3.60
V- 5X 15 101.25 2.70

f't (Kg/cm2) < 8.0 (Kg/cm2) Entonces OK


DISEO DEL DIAFRAGMA HORIZONTAL

Analizamos el pao mas grande : la sala comedor

Usamos una losa armada en dos sentidos ya que es el mejor diafragma horizontal
Asuminos la losa apoyada en cuatro lados con dos lados continuos y dos libremente apoyados

Calculamos el espesor :

Perimetro 2 ( 3.8 + 5.35) asuminos e = 0.12 m.


e = = = 0.11 m.
160 160

METRADO:
Peso propio : 0.12 x 2.4 + 0.1 = 0.388 Kg/m2

Sobrecarga : = 0.200 Kg/m2

Wu = 1.4 WD + 1.7 WL

Wu = 1.40 x 0.39 + 1.70 x 0.20 = 0.883 Tn/m2

Para hallar el momento usamos el metodo de Lineas de Falla de K.W. JOHANSEN

Wu (ar) ab
Mu =
ar br
8 ( 1 + + )
br ar

2a
ar =
i1 + 1 + i3 + 1

2b
ar =
i2 + 1 + i4 + 1
Consideramos :
i3 = i1 = i4 = 0
i2 = 0.5

2a 2 x 3.8
ar = = = 3.80
i1 + 1 + i3 + 1 1+ 1

2b 2 x 5.35
br = = = 5.08
i2 + 1 + i4 + 1 1.22 + 1

0.883 x 3.8 x 5.08


Mu = = 0.69131 Tn-m/m
3.8 5.08
8 ( 1 + + )
5.08 3.8

Hallamos el acero por la formula a la rotura :

d = 12 - 3 = 9 cm
fc = 210 Kg/cm2
fy = 4200 Kg/cm2

Mu d 12
As (+) = a = = = 2.4
a 5 5
fy ( d - )
2

0.69 x 100000
As (+) = = 1.69 cm2
2.4
0.9 x 4200 ( 12 - )
2

As fy 1.69 x 4200
a = = = 2.66 cm
0.85 fc d 0.85 x 210 x 15

As (+) = 1.71 cm2

a = 2.69
cm2 1.4

As (+) = 1.72 cm2 As (+) = 1.72 2 1/2" @ 0.74 m

a = 2.69 a = 2.69
Mu(-) = 0.50 x 0.69 = 0.35 Tn-m/m

Mu(-) d 12
As (-) = a = = = 2.4
a 5 5
fy ( d - )
2

0.35 x 100000
As (-) = = 0.85 cm2
2.4
0.9 x 4200 ( 12 - )
2

As fy 0.85 x 4200
a = = = 1.33 cm
0.85 fc d 0.85 x 210 x 15

As (-) = 0.81 cm2 cm2 1 3/8" @ 0.88 m

a = 1.27

VERIFICAMOS EL ACERO MINIMO EN LAS LOSAS

Asmin = 0.0018 x t x b
Asmin = 0.0018 x 12 x 100

Asmin = 2.16 cm2/m 3 3/8" @ 0.33 m

Verificando : 1/2" @ 0.75 m ===> 1.717 cm2


3/8" @ 0.90 m ===> 0.807 cm2
2.523 cm2

===> 2.52 cm2 > 2.16 cm2 .. OK

VERIFICAMOS CORTE EN LA LOSA

Vu ===> Se presenta a una distancia d de las caras

d = 12 cm
a1 = 3.8
b1 = 5.35

Vu = 1.09 x a1 x b1 = 1.09 x 3.8 x 5.35 = 22160

Vc = 0.85 x 0.53 f'c x p x d

Vc = 0.85 x 0.53 210 x ( 2( 3.8 + 5.35 )) ( 15 )

Vc = 1268.13
CALCULO DE LA DEFLEXION DE LA LOSA

consideramos conservadoramente la losa apoyada en dos lados y usaremos

E = 1000 f'c
E = 1000 x 210 = 210000

Si L < 3m ===> WL
M(+) =
12

Si L > 3m ===> WL
M(+) =
10
En ambos casos
WL
M(-) =
24

WL 0.388 x 5.35
MD(+) = = = 1.11
10 10

WL 0.200 x 5.35
ML(+) = = = 0.57
10 10

WL 0.46 x 5.35
MD(-) = = = 0.55
24 24

WL 0.2 x 5.35
ML(-) = = = 0.24
24 24

Segn K. W. JOHANSEN :

ML
=
8EI

Carga Viva : 0.57 x 5.35 x 100000 x 10000


L = = 0.6773
8x 210000 1 x 100 x 12
( )
12

Incremento por Carga Viva o Carga Muerta

MD+L = ML + K M D K = 2 Factor de deformacion diferidas


, considerando el acero en compresion :

= 0.57 + 2 x 1.11 = 2.79


D+L

2.79 x 10 x 5.35 x 10
D+L = = 3.305
8 x 210000 1 x 100 x 12
( )
12

L 535
MD+L = = = 2.23 cm > D+L ===> Ok
240 240
DISEO DEL SOLADO DE CIMENTACION

Consideraciones :

a) Se debe obtener la capacidad de carga del terreno a 1m y @ 30 cm de profundidad.


b) Cuando la capacidad del terreno en la capa superficial es muy baja, se elimina todo el terreno y se
rellena con material compactado hasta alcanzar el nivel del fondo de la losa
c) con el espesor de la losa se escoge por lo menos 25 cm con la finalidad de poder colocar con facilidad
la armadura y para obtener una buena rigidez.

Verificamos el pao mas grande : la sala-comedor

La carga vertical aplicada seria :

PDtotal 391.96
WD = = = 3.42 Tn/m2
Atotal 114.46

PDtotal 391.96
WL = = = 3.42 Tn/m2
Atotal 114.46

Wu = 1.4 WD + 1.7 WL

Wu = 1.40 x 3.42 + 1.70 x 3.42

Wu = 10.616 Tn/m2

falta dibujo
El valor qu2 es equi alente a 3, 4 veces el valor de qu1 igualando la reaccion total a la carga vertical
y asumiendo la reaccion total a la carga vertical y considerar qu2
qu2= 8.5 tn/m2
el acero positivo a colocarse en la losa esta en la capa superior y lo hallamos con el valor de qu1
mientras que el acero negativo esta en la capa inferior y se halla con el valor de qu2
Wu total=wu*area=3.8*(5.35*10.616) = 216 tn

falta palabras
CALCULO DE LA REACION ULTIMA

Ru = 1 x qu1 + 2 x qu2

Ru = 4.7 x 4.54 x qu1 + ( 2x 0.5 x 3.8 + 2x 0.5 x 4.54 ) x 8.5


Ru = 21.338 qu1 + 70.89

Wu = Ru ( Principio de equilibrio )

215.82 = 21.338 qu1 + 70.89

qu1 = 6.7922617

qu2 8.5 Rehacer


= = 1.251
qu1 6.7922616928

Asuminos : qu2 = 16 Tn/m2

===> 246 = 21.338 qu1 + 133.44

qu1 = 5.2750960727

qu2 5.2750960727
= = 5.275 > 3 ===> OK
qu1 1
CALCULO DE As SUPERIOR

Lo hallamos por el metodo de las lineas de falla de K.W. JOHANSEN, con una carga igual a qu1 y
considerando valores de i1 = i2 = 0.5 , i30 = i4 = 0

Consideramos :
i3 = i1 = i4 = 0
i2 = 0.5

2a 2 x 3.8
ar = = = 7.60
i1 + 1 + i3 + 1 1+ 1

2b 2 x 5.35
br = = = 9.69
i2 + 1 + i4 + 1 1.22 + 1

qu1 (ar) ab
Mu =
ar br
8 ( 1 + + )
br ar

5.28 x 7.6 x 9.69


Mu = = 15.87 Tn-m/m
7.6 9.69
8 ( 1 + + )
9.69 7.6

Mu ,
As (+) =
a
fy ( d - )
2

h = 0.25
d = d = 0.175
r = 0.075

15.87 x 100000
As (+) = = 26.66 cm2/m
3.5
0.9 x 4200 ( 17.5 - )
2
26.66 x 4200
a = = 6.27 4.2
0.85 x 210 x 100

2do Tanteo

As (+) = 5.41 cm2/m 4 1/2" @ 0.23 m

5.41 x 4200
a = = 1.27
0.85 x 210 x 100
CALCULO DE As INFERIOR

Se halla conservadoramente considerando un alosa con un voladizo a 50cm

Mu = w l^2 = 8.5*(0.5)^2 = 1.0625 tn*m


2 2

Mu d 17.5
As (+) = a = = = 2.2
a 5 5
fy ( d - )
2

1.06 x 100000
As (+) = = 1.71 cm2
2.2
0.9 x 4200 ( 17.50 - )
2

As fy 1.71 x 4200
a = = = 2.30 cm
0.85 fc d 0.85 x 210 x 17.5

As (+) = 1.71941 cm2

a = 2.31181
cm2 2.4

As (+) = 1.71979 cm2 As (+) = 1.7198 2 3/8" @ 0.41 m

a = 2.31233 a = 2.3124

verificando el acero minimo

Asmin = 0.0018 * b * t AST = 5.41 + 1.72 = 7.13

Asmin = 4.5 cm2 > Ast 4.5 > 7.13 cm2

cuando el rea de acero minimo es mayor que el area de acero total calculado, colocamos el area de acero minimo

El acero superior debe ser el doble del cero inferior con la finalidad d evitar la apaicion dee fisuras durante el
proceso de fragua del concreto
0.71 / 3 = 0.24 cm
3/8" @
As (superior) = 3 cm2

1.27 / 3 = 0.42 cm
1/2" @

0.71 / 1.5 = 0.47 cm


3/8" @

As (inferior) = 1.5 cm2


1.27 / 1.5 = 0.84 cm
1/2" @

verificacion de la cortante

verificmos el esfurzo cortante asumiendo una reaccion de la sub razante como una carga constante
a una distanci d de as caras

calculando d : t-r = 19 - 7.5 = 12

A1 = A - 2d = 410 - 2* 17.5 = 375 cm = 3.75 m

B1 = B - 2d = 565 - 2* 17.5 = 530 cm = 5.30 m

Vu = wu * A1 * B1

Vu = 5.153 * 3.75 * 5.30 = 102.42 tn

Vc = 0.85*0.53*raiz(210)(2*(3.75+5.30))*12

Vc = 708.9804633 tn

Vc > Vu

Вам также может понравиться