Академический Документы
Профессиональный Документы
Культура Документы
BASEMENT
1. Pattern Making
2. Industrial Engineering
3. CAD
4. Cutting Department
5. Relaxation
6. Fabric Store
GROUND FLOOR
1. Dry Finishing
2. Sewing Floor
FIRST FLOOR
1. Admin Area
2. Washing Area
3. Wet Finishing
4. Warehouse
5. Ironing and Packing
TERRACE
1. Canteen
2. Boiler Room
PROCESS FLOW CHART
Inspection
Relaxation
Spreading
Cutting
Panel Checking
Bundling
Sewing
Dry Finishing
Wet Finishing
Washing
Drying
Final Inspection
Ironing
Packing
Warehouse
Dispatch
WORKFORCE IN DIFFERENT DEPARTMENT
Administrative
Department No. of Employees
Executive 2
Accounts and Finance 2
Human Resource 3
Logistics 2
PPC 2
IE 3
CAD 2
Maintenance 2
TOTAL 18
Store Department
Store Manager 1
Checker 2
Workers/ Helpers 4
TOTAL 7
Cutting Department
Production Manager
Pattern Master
Cutting Master
Workers/ Helpers
TOTAL
Sewing Department
Production Manager
Supervisor
Quality Checker
Workers/ Helpers
TOTAL
Finishing Department
Executives 3
Supervisor (Washing) 1
Supervisor (Drying) 1
Supervisor (Ironing) 1
Supervisor (Packing) 1
Supervisor (Warehouse) 1
Worker/ Supervisor
CALCULATION FOR PLANT LAYOUT
Plant Size:
o Length: 150 ft
o Breadth: 80 ft
FSI: 1:1.25
Ground Coverage: 60%
Front Margin: 15 ft
Side Margin: 8 ft
Total Space: 150*80 = 12000
FSI: 1.25* 12000= 15000
Ground Coverage = 7680 ft^2
Available Floor Space: 60* 120 = 7200 ft^2
WASHROOM
Three washrooms each for men and women and one washroom in admin area
DRINKING WATER COOLERS
Enough to provide 4.5 L per person per day
FIRE EXTINGUISHERS
One on each pillar
FIRE EXITS
One on each floor. It is one way and is used only in case of a fire or fire drill
LIFT
One material Lifts per floor of 64 sq ft area
STAIRCASE
One Staircase per floor of 72 sq ft area
ASSUMPTIONS
Layout: Product Specific
Product: Denim Jeans
Available Time: 480 min
No. of days working: 6 days
No. of machines: 140
SAM of the denim: 24 mins
No. of Sewing Lines: 3
Output Per day at 60% efficiency: 2000 pcs
No. of days working in a month: 25
Output per month: 50000
FABRIC STORE:
Order Quantity: 40000 mts
Fabric Required: 40000* 1.3= 52000 mts
Maximum store Capacity: 54000 mts
10% inspection, 5200 m will be inspected i.e., 65 rolls
480 mins will be required to check 5200 m
Diameter of roll: 0.5 ft
Fabric Roll: 80 m
One Inspection machine in the fabric store for inspection
Average consumption per garment: 1.6 m
Per day fabric consumption: 3500m
Inventory: 20 days
Mtr/day: 2000* 1.3= 2600
=2600 * (5%)
=2730 approx
For stock of 20 days= 20*2730
= 54600 mts
Length= Rolls required = 683 rolls (80 mts/ roll)
Width= 700 rolls
Racks: 6ft / 6ft , 17 rolls can be accommodated
So, total 42 racks are required
Area= 55 length * 54 ft= 2970 sq ft
Occupied area= 36* 42 = 1512 sq ft
CUTTING ROOM:
Available Time: 480 mins
Utilization: 75%
Efficiency: 60%
Average Consumption: 1.6mts
Marker Length: 10.4 mts
Layer Height: 5 inch
No. sizes in a marker: 8 way marker
No. of layer: 65
Total garment in a lay: 520
Bundle size: 20
No. of lays required per day: 5
Spreading table length: 12mts
No. of spreading table required: 2
No. of spreader allotted: 1
No. of spreading team: 4
No. of required cutter: 5
No. of cutter allotted: 3
Total area required: 900 sq ft
SEWING ROOM:
SAM of the denim: 24 mins
No. of workstations: 138
No. of sewing line: 3
Total m/c: 160
Total area required: 5700 sq ft
WASHING ROOM:
140 kg Washing Machine = 3
Tumble drier
Drier
M/c area= 36 sq ft
Operational are: 120 sq ft
Total area required: 1560 sq ft
FINISHING ROOM:
Finishing SAM: 5 mins
Machines Requies:
Thread Trimmer
Press Fold
Checking Tables
Sand Blasting
PP spray
Hydro- Extractor
Chevron
Laser Technique machine
Total required Area: 3074 sq ft
CANTEEN:
No. of Employees: 350
Canteen is with the cooking part
So canteen area is 4200 sq ft
All employees can accommodate together