Вы находитесь на странице: 1из 92

Project: REFINERA FRANCISCO I.

MADERO ETAP Page: 1


12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Short-Circuit Summary Report

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
3-HV-0305 13.80 2.530 -15.237 15.446 0.337 -0.971 1.028 13.173 2.395 13.389 -13.258 -2.141 13.430
3-HV-0306 13.80 2.262 -13.663 13.849 0.333 -0.959 1.015 11.131 1.871 11.287 -11.233 -1.610 11.348
3-MV-BA01 2.40 1.845 -17.507 17.604 0.000 0.000 0.000 15.162 1.633 15.250 15.162 1.633 15.250
3-MV-BB01 2.40 1.807 -17.214 17.308 0.000 0.000 0.000 14.750 1.567 14.833 14.750 1.567 14.833
04-CCM-01 BA 4.16 1.645 -16.779 16.860 0.399 -0.009 0.399 14.201 1.416 14.271 -14.303 -1.416 14.373
04-CCM-01 BB 4.16 1.788 -18.550 18.636 0.399 -0.008 0.399 16.033 1.609 16.114 -16.133 -1.608 16.213
04-CCM-02 BA 0.48 3.627 -15.508 15.926 0.000 0.000 0.000 13.384 3.124 13.744 13.384 3.124 13.744
04-CCM-02 BB 0.48 3.620 -15.467 15.885 0.000 0.000 0.000 13.382 3.135 13.744 13.382 3.135 13.744
04-CCM-03 BA 0.48 3.764 -16.373 16.800 0.000 0.000 0.000 14.074 3.227 14.439 14.074 3.227 14.439
04-CCM-03 BB 0.48 3.899 -17.544 17.972 0.000 0.000 0.000 15.105 3.357 15.473 15.105 3.357 15.473
04-CCM-04 BA 0.48 3.811 -16.192 16.634 0.000 0.000 0.000 13.934 3.255 14.309 13.934 3.255 14.309
04-CCM-04 BB 0.48 4.035 -17.536 17.994 0.000 0.000 0.000 15.054 3.449 15.444 15.054 3.449 15.444
04-TDB-01 BA 0.22 2.403 -7.066 7.463 2.772 -7.133 7.652 6.115 2.078 6.459 -7.703 1.510 7.850
04-TDB-01 BB 0.22 2.402 -7.063 7.460 2.773 -7.133 7.653 6.115 2.079 6.459 -7.701 1.507 7.847
6-LV-SERV. PROPIOS 0.48 1.456 -2.272 2.699 0.000 0.000 0.000 1.968 1.261 2.337 1.968 1.261 2.337
6-MV-2.4 kV 2.40 1.553 -14.294 14.378 0.000 0.000 0.000 12.380 1.376 12.456 12.380 1.376 12.456
07-CCM-01 BA 4.16 1.714 -16.665 16.753 0.399 -0.009 0.399 14.106 1.473 14.183 -14.208 -1.473 14.285
07-CCM-01 BB 4.16 1.869 -18.417 18.512 0.399 -0.008 0.399 15.918 1.678 16.006 -16.018 -1.677 16.106
07-CCM-02 BA 0.48 3.787 -16.373 16.805 0.000 0.000 0.000 14.107 3.249 14.477 14.107 3.249 14.477
07-CCM-02 BB 0.48 3.907 -16.751 17.200 0.000 0.000 0.000 14.478 3.375 14.866 14.478 3.375 14.866
07-CCM-03 BA 0.48 3.690 -16.077 16.495 0.000 0.000 0.000 13.804 3.164 14.162 13.804 3.164 14.162
07-CCM-03 BB 0.48 3.747 -16.325 16.750 0.000 0.000 0.000 14.061 3.225 14.426 14.061 3.225 14.426
07-CCM-04 BA 0.48 3.718 -15.874 16.303 0.000 0.000 0.000 13.672 3.185 14.038 13.672 3.185 14.038
07-CCM-04 BB 0.48 3.746 -16.515 16.935 0.000 0.000 0.000 14.278 3.239 14.641 14.278 3.239 14.641
07-MV-BA01 2.40 2.393 -16.339 16.513 0.000 0.000 0.000 14.041 2.081 14.194 14.041 2.081 14.194
07-MV-BB01 2.40 2.393 -16.339 16.513 0.000 0.000 0.000 14.041 2.081 14.194 14.041 2.081 14.194
07-TDB-01 BA 0.22 2.004 -5.491 5.845 2.222 -5.507 5.938 4.752 1.733 5.058 -5.980 1.024 6.067
07-TDB-01 BB 0.22 2.015 -5.509 5.866 2.232 -5.521 5.955 4.770 1.744 5.079 -5.999 1.016 6.084
8-MJW-LV-CCM1 0.48 1.227 -4.449 4.615 0.000 0.000 0.000 3.850 1.061 3.994 3.850 1.061 3.994
8-MJW-MV-BABB 2.40 2.716 -12.693 12.980 0.000 0.000 0.000 10.881 2.328 11.128 10.881 2.328 11.128
8-MJW-MV-IEM 4.16 1.034 -5.367 5.466 0.000 0.000 0.000 4.614 0.889 4.699 4.614 0.889 4.699
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 2
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
8-MJW-MV-SQ-D 4.16 1.034 -5.367 5.466 0.000 0.000 0.000 4.614 0.889 4.699 4.614 0.889 4.699
10-BUS-2.4 2.40 1.236 -7.315 7.419 0.000 0.000 0.000 6.329 1.070 6.419 6.329 1.070 6.419
10-CCM-2.4 KV 2.40 1.252 -7.276 7.383 0.000 0.000 0.000 6.296 1.084 6.388 6.296 1.084 6.388
10-CCM-10 0.48 1.991 -9.613 9.817 0.000 0.000 0.000 8.324 1.724 8.500 8.324 1.724 8.500
010-HV-2121A 13.80 2.581 -25.586 25.716 1.542 -0.147 1.549 21.848 2.410 21.981 -22.244 -2.383 22.371
010-HV-2121B 13.80 2.050 -20.323 20.426 1.538 -0.233 1.556 17.279 1.976 17.391 -17.678 -1.929 17.783
10-HV-CCM-13.8 13.80 1.151 -3.893 4.060 0.685 -0.148 0.700 3.361 0.994 3.505 -3.543 -0.970 3.673
010-LV-2151A 0.48 3.198 -21.911 22.143 0.000 0.000 0.000 18.901 2.757 19.102 18.901 2.757 19.102
010-LV-2151B 0.48 3.166 -21.630 21.860 0.000 0.000 0.000 18.696 2.741 18.896 18.696 2.741 18.896
010-LV-2152A 0.48 3.534 -22.946 23.216 0.000 0.000 0.000 19.804 3.043 20.037 19.804 3.043 20.037
010-LV-2152B 0.48 3.439 -21.974 22.242 0.000 0.000 0.000 18.967 2.961 19.196 18.967 2.961 19.196
010-LV-2153A 0.48 3.196 -21.993 22.224 0.000 0.000 0.000 19.004 2.757 19.203 19.004 2.757 19.203
010-LV-2153B 0.48 3.109 -21.431 21.656 0.000 0.000 0.000 18.521 2.688 18.715 18.521 2.688 18.715
010-LV-2154A 0.48 3.360 -21.966 22.222 0.000 0.000 0.000 18.983 2.895 19.203 18.983 2.895 19.203
010-LV-2154B 0.48 3.263 -21.806 22.049 0.000 0.000 0.000 18.817 2.808 19.025 18.817 2.808 19.025
010-LV-2161A 0.22 2.887 -12.900 13.219 3.408 -13.942 14.352 11.165 2.497 11.441 -13.213 5.086 14.158
010-LV-2161B 0.22 2.874 -12.826 13.144 3.414 -13.791 14.207 11.097 2.484 11.372 -13.161 4.975 14.070
010-MV-2131A 4.16 1.452 -20.276 20.328 0.479 -0.011 0.479 17.475 1.282 17.522 -17.596 -1.281 17.642
010-MV-2131B 4.16 1.353 -18.746 18.795 0.479 -0.011 0.479 16.155 1.218 16.201 -16.276 -1.217 16.321
11-CCM-BUS1 2.40 1.157 -12.051 12.106 0.000 0.000 0.000 10.372 0.999 10.420 10.372 0.999 10.420
11-CCM-BUS2 2.40 1.136 -11.879 11.934 0.000 0.000 0.000 10.288 0.997 10.336 10.288 0.997 10.336
11-LV-BA01 0.48 3.938 -21.834 22.186 0.000 0.000 0.000 18.907 3.422 19.214 18.907 3.422 19.214
11-LV-BB01 0.48 4.068 -22.540 22.904 0.000 0.000 0.000 19.324 3.450 19.630 19.324 3.450 19.630
11-LV-CCM1 0.48 8.117 -11.573 14.136 0.000 0.000 0.000 9.918 6.963 12.118 9.918 6.963 12.118
11-LV-CCM2 0.48 7.695 -6.108 9.824 0.000 0.000 0.000 5.235 6.622 8.442 5.235 6.622 8.442
11-LV-CCM3 0.48 7.565 -6.525 9.990 0.000 0.000 0.000 5.648 6.552 8.650 5.648 6.552 8.650
11-LV-CCM4 0.48 7.572 -6.029 9.679 0.000 0.000 0.000 5.219 6.557 8.381 5.219 6.557 8.381
12-BARRAS2.4A 2.40 2.143 -17.805 17.933 0.000 0.000 0.000 15.224 1.849 15.336 15.224 1.849 15.336
12-BARRAS2.4B 2.40 1.975 -16.653 16.769 0.000 0.000 0.000 14.228 1.694 14.329 14.228 1.694 14.329
12-CCM-440 0.48 1.052 -1.462 1.801 1.070 -1.301 1.684 1.266 0.911 1.560 -1.801 -0.331 1.831
13-HV-BA 13.80 2.075 -15.688 15.825 0.330 -0.994 1.047 13.576 2.010 13.724 -13.659 -1.750 13.770
13-HV-BB 13.80 2.426 -17.233 17.403 0.328 -1.004 1.056 13.797 1.957 13.935 -13.902 -1.683 14.003
15-LV-BA01-480 0.48 3.861 -26.980 27.255 4.018 -28.161 28.446 23.297 3.342 23.535 21.225 18.158 27.933
15-LV-BA02-480 0.48 2.604 -12.068 12.346 0.000 0.000 0.000 10.436 2.252 10.676 10.436 2.252 10.676
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 3
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
15-LV-BB01-480 0.48 3.153 -21.881 22.107 3.253 -22.725 22.957 18.886 2.722 19.081 17.219 14.627 22.593
15-LV-BB02-220 0.22 2.433 -5.423 5.944 2.716 -5.798 6.403 4.695 2.105 5.145 -6.229 1.008 6.310
15-MV-BA01 2.40 2.479 -31.306 31.404 0.000 0.000 0.000 26.612 2.194 26.702 26.612 2.194 26.702
15-MV-BB01 2.40 2.652 -31.936 32.046 0.000 0.000 0.000 26.948 2.292 27.045 26.948 2.292 27.045
18 -MV-BA01 2.40 1.019 -10.731 10.780 0.000 0.000 0.000 9.294 0.892 9.337 9.294 0.892 9.337
18-LV-220 0.22 1.828 -6.917 7.154 1.988 -7.313 7.578 5.990 1.584 6.196 -7.077 2.295 7.439
18-LV-480 BA 0.48 2.873 -20.200 20.403 0.000 0.000 0.000 17.493 2.498 17.670 17.493 2.498 17.670
18-LV-480 BB 0.48 3.138 -19.273 19.526 0.000 0.000 0.000 16.655 2.710 16.874 16.655 2.710 16.874
18-LV-TR5-EXT 0.22 1.828 -6.917 7.154 1.988 -7.313 7.578 5.990 1.584 6.196 -7.077 2.295 7.439
18-MV-BB01 2.40 0.907 -8.939 8.985 0.000 0.000 0.000 7.697 0.783 7.737 7.697 0.783 7.737
19-HV-4160 BA1 4.16 0.315 -1.067 1.113 0.000 0.000 0.000 0.923 0.273 0.963 0.923 0.273 0.963
19-HV-4160 BA2 4.16 0.334 -1.684 1.717 0.000 0.000 0.000 1.457 0.289 1.485 1.457 0.289 1.485
19-HV-4160 BA3 4.16 2.007 -11.602 11.774 0.396 -0.014 0.396 9.901 1.708 10.048 -10.002 -1.707 10.147
19-HV-4160 BB 4.16 1.141 -7.710 7.794 0.395 -0.018 0.395 6.665 0.987 6.738 -6.765 -0.986 6.836
19-LV-480 BA 0.48 1.146 -4.361 4.509 0.892 -1.841 2.046 3.774 0.991 3.903 -4.094 -0.417 4.115
19-LV-480 BB 0.48 1.650 -7.339 7.522 0.000 0.000 0.000 6.354 1.428 6.513 6.354 1.428 6.513
020-HV-22A21A 13.80 1.965 -27.279 27.350 1.571 -0.134 1.576 23.289 1.913 23.367 -23.691 -1.889 23.767
020-HV-22A21B 13.80 1.680 -21.291 21.358 1.544 -0.227 1.560 18.097 1.689 18.176 -18.498 -1.644 18.571
020-HV-22B21 13.80 2.496 -25.924 26.044 1.566 -0.141 1.573 22.137 2.335 22.260 -22.539 -2.311 22.657
020-HV-22B21 BB 13.80 2.024 -20.402 20.502 1.539 -0.233 1.556 17.345 1.956 17.455 -17.745 -1.909 17.848
020-LV-22A51A 0.48 3.570 -20.871 21.174 0.000 0.000 0.000 18.007 3.070 18.267 18.007 3.070 18.267
020-LV-22A51B 0.48 3.663 -21.315 21.627 0.000 0.000 0.000 18.364 3.145 18.631 18.364 3.145 18.631
020-LV-22A52 BA 0.48 3.534 -20.745 21.044 0.000 0.000 0.000 17.893 3.039 18.149 17.893 3.039 18.149
020-LV-22A52 BB 0.48 4.073 -23.831 24.177 0.000 0.000 0.000 20.438 3.467 20.730 20.438 3.467 20.730
020-LV-22A53 BA 0.48 4.204 -22.430 22.820 0.000 0.000 0.000 19.409 3.639 19.748 19.409 3.639 19.748
020-LV-22A53 BB 0.48 4.276 -22.588 22.989 0.000 0.000 0.000 19.528 3.697 19.875 19.528 3.697 19.875
020-LV-22B52 BA 0.48 3.537 -21.143 21.437 0.000 0.000 0.000 18.263 3.059 18.518 18.263 3.059 18.518
020-LV-22B52 BB 0.48 3.554 -21.922 22.209 0.000 0.000 0.000 18.858 3.054 19.104 18.858 3.054 19.104
020-LV-22B55A 0.48 3.265 -19.212 19.487 0.000 0.000 0.000 16.626 2.831 16.866 16.626 2.831 16.866
020-LV-22B55B 0.48 3.237 -19.096 19.369 0.000 0.000 0.000 16.529 2.804 16.765 16.529 2.804 16.765
020-MV-22A31A 4.16 1.355 -16.459 16.515 0.479 -0.014 0.479 14.208 1.189 14.258 -14.329 -1.187 14.378
020-MV-22A31B 4.16 1.404 -16.076 16.137 0.479 -0.014 0.479 13.830 1.240 13.886 -13.951 -1.239 14.006
020-MV-22B31A 4.16 1.300 -15.086 15.141 0.479 -0.014 0.479 13.017 1.139 13.067 -13.137 -1.138 13.187
020-MV-22B31B 4.16 1.329 -15.182 15.240 0.479 -0.014 0.479 13.090 1.181 13.144 -13.211 -1.179 13.264
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 4
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
22-TDA-1 13.80 3.535 -6.572 7.462 0.331 -0.887 0.946 5.541 2.914 6.260 5.453 3.161 6.304
22-TDA-2 13.80 4.293 -13.773 14.426 0.332 -0.982 1.037 11.202 3.381 11.701 -11.306 -3.115 11.727
22-TDA-4A 4.16 2.731 -10.604 10.950 0.199 -0.003 0.199 9.050 2.324 9.344 -9.101 -2.324 9.393
22-TDA-4B 4.16 1.826 -13.487 13.610 0.200 -0.003 0.200 11.457 1.557 11.562 -11.507 -1.557 11.612
23-HV-CCM-13.8A 13.80 2.393 -13.314 13.527 0.334 -0.953 1.010 10.858 1.973 11.036 -10.960 -1.713 11.094
23-HV-CCM-13.8B 13.80 3.088 -16.323 16.613 0.336 -0.975 1.031 13.116 2.450 13.343 -13.223 -2.185 13.402
023-LV-2451A 0.48 3.172 -12.167 12.573 0.000 0.000 0.000 10.523 2.743 10.874 10.523 2.743 10.874
023-LV-2451B 0.48 3.152 -12.119 12.522 0.000 0.000 0.000 10.480 2.727 10.829 10.480 2.727 10.829
23-LV-CCM-220A 0.22 1.857 -3.437 3.907 1.898 -3.433 3.923 2.976 1.607 3.383 -3.947 0.107 3.949
23-LV-CCM-480A 0.48 2.829 -16.986 17.220 0.000 0.000 0.000 14.670 2.445 14.872 14.670 2.445 14.872
23-LV-CCM-480B 0.48 3.784 -18.433 18.817 0.000 0.000 0.000 15.928 3.267 16.260 15.928 3.267 16.260
23-MV-CCM-4.16A 4.16 1.227 -11.652 11.716 0.399 -0.013 0.399 9.930 1.063 9.987 -10.032 -1.062 10.088
23-MV-CCM-4.16B 4.16 1.374 -13.536 13.606 0.399 -0.011 0.399 11.534 1.180 11.594 -11.635 -1.180 11.695
25-CCM-1 BUS A 0.48 3.990 -20.481 20.866 0.000 0.000 0.000 17.523 3.407 17.851 17.523 3.407 17.851
25-CCM-1 BUS B 0.48 3.592 -17.895 18.252 0.000 0.000 0.000 15.465 3.103 15.773 15.465 3.103 15.773
25-TDBT-1 BA 0.22 2.933 -5.346 6.097 2.919 -4.580 5.432 4.624 2.534 5.272 -6.049 -0.545 6.074
25-TDBT-1 BB 0.22 2.284 -4.554 5.095 2.336 -4.027 4.655 3.943 1.977 4.411 -5.109 -0.185 5.112
28-LV-28G41 BA 0.48 0.944 -4.544 4.641 0.000 0.000 0.000 3.933 0.817 4.017 3.933 0.817 4.017
28-LV-28G41 BB 0.48 0.813 -3.854 3.939 0.000 0.000 0.000 3.337 0.704 3.410 3.337 0.704 3.410
30-LV-30F42 0.48 1.346 -5.127 5.301 0.000 0.000 0.000 4.440 1.166 4.590 4.440 1.166 4.590
030-LV-1151A 0.48 3.439 -22.316 22.579 0.000 0.000 0.000 19.321 2.981 19.550 19.321 2.981 19.550
030-LV-1151B 0.48 3.438 -22.310 22.574 0.000 0.000 0.000 19.313 2.981 19.542 19.313 2.981 19.542
030-LV-1152A 0.48 3.240 -20.670 20.922 0.000 0.000 0.000 17.895 2.809 18.115 17.895 2.809 18.115
030-LV-1152B 0.48 3.375 -21.405 21.670 0.000 0.000 0.000 18.529 2.926 18.759 18.529 2.926 18.759
030-LV-1153A 0.48 3.143 -20.885 21.120 0.000 0.000 0.000 18.071 2.719 18.274 18.071 2.719 18.274
030-LV-1153B 0.48 3.335 -22.136 22.386 0.000 0.000 0.000 19.087 2.870 19.302 19.087 2.870 19.302
030-LV-1161A 0.22 2.523 -11.965 12.228 2.907 -12.591 12.922 10.359 2.184 10.587 -12.044 4.456 12.842
030-LV-1161B 0.22 2.568 -12.142 12.410 2.943 -12.713 13.049 10.504 2.220 10.736 -12.206 4.457 12.994
030-MV-1131A 4.16 1.726 -22.196 22.263 0.479 -0.010 0.479 19.168 1.528 19.229 -19.289 -1.526 19.349
030-MV-1131B 4.16 1.662 -20.730 20.797 0.479 -0.011 0.479 17.870 1.474 17.930 -17.990 -1.473 18.050
040-HV-2521A 13.80 3.134 -23.725 23.931 1.515 -0.160 1.523 20.271 2.848 20.471 -20.660 -2.819 20.852
040-HV-2521B 13.80 2.460 -19.059 19.217 1.530 -0.242 1.549 16.212 2.293 16.373 -16.610 -2.245 16.761
040-LV-2551 BA 0.48 3.143 -21.002 21.236 0.000 0.000 0.000 18.182 2.725 18.385 18.182 2.725 18.385
040-LV-2551 BB 0.48 3.199 -21.345 21.584 0.000 0.000 0.000 18.475 2.776 18.682 18.475 2.776 18.682
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 5
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
040-LV-2552 BA 0.48 3.196 -20.260 20.510 0.000 0.000 0.000 17.539 2.771 17.757 17.539 2.771 17.757
040-LV-2552 BB 0.48 3.063 -19.542 19.781 3.434 -19.633 19.931 16.913 2.658 17.121 -18.818 7.212 20.153
040-LV-2561 BA 0.22 2.778 -12.391 12.698 3.251 -12.677 13.087 10.730 2.406 10.996 -12.616 4.070 13.257
040-LV-2561 BB 0.22 2.737 -12.266 12.567 3.218 -12.589 12.994 10.620 2.371 10.882 -12.497 4.082 13.147
040-MV-2531A 4.16 1.730 -19.923 19.998 0.479 -0.011 0.479 17.204 1.529 17.272 -17.325 -1.528 17.392
040-MV-2531B 4.16 1.643 -18.405 18.479 0.479 -0.011 0.479 15.867 1.472 15.935 -15.987 -1.471 16.055
050-LV-1351A 0.48 3.457 -20.164 20.458 0.000 0.000 0.000 17.473 3.000 17.728 17.473 3.000 17.728
050-LV-1351B 0.48 3.271 -18.678 18.962 0.000 0.000 0.000 16.167 2.837 16.414 16.167 2.837 16.414
050-LV-1352A 0.48 3.291 -19.179 19.460 0.000 0.000 0.000 16.606 2.853 16.849 16.606 2.853 16.849
050-LV-1352B 0.48 3.223 -18.437 18.717 0.000 0.000 0.000 15.958 2.795 16.201 15.958 2.795 16.201
050-LV-1361A 0.22 2.328 -8.666 8.973 2.553 -7.869 8.273 7.504 2.016 7.770 -8.844 1.571 8.983
050-LV-1361B 0.22 2.339 -8.690 9.000 2.573 -7.908 8.316 7.525 2.026 7.793 -8.879 1.586 9.020
050-MV-1331A 4.16 2.279 -14.029 14.213 0.477 -0.016 0.477 12.131 1.988 12.292 -12.251 -1.986 12.410
050-MV-1331B 4.16 2.116 -13.132 13.302 0.477 -0.017 0.477 11.332 1.852 11.483 -11.452 -1.850 11.601
060-LV-1451A 0.48 3.284 -19.335 19.612 0.000 0.000 0.000 16.741 2.847 16.981 16.741 2.847 16.981
060-LV-1451B 0.48 3.255 -18.986 19.263 0.000 0.000 0.000 16.433 2.823 16.674 16.433 2.823 16.674
060-LV-1452A 0.48 3.364 -19.404 19.693 0.000 0.000 0.000 16.801 2.916 17.052 16.801 2.916 17.052
060-LV-1452B 0.48 3.174 -18.431 18.703 0.000 0.000 0.000 15.953 2.753 16.189 15.953 2.753 16.189
060-LV-1461A 0.22 2.350 -8.699 9.010 2.567 -7.886 8.293 7.533 2.035 7.803 -8.876 1.555 9.011
060-LV-1461B 0.22 2.334 -8.691 8.999 2.570 -7.909 8.316 7.525 2.021 7.792 -8.879 1.591 9.020
060-MV-1431A 4.16 2.043 -14.082 14.229 0.477 -0.016 0.478 12.178 1.784 12.308 -12.298 -1.782 12.426
060-MV-1431B 4.16 1.906 -13.171 13.308 0.477 -0.017 0.478 11.366 1.672 11.489 -11.487 -1.670 11.607
070-HV-1521A 13.80 3.622 -23.810 24.084 1.514 -0.161 1.523 20.337 3.258 20.596 -20.726 -3.229 20.976
070-HV-1521B 13.80 2.867 -19.111 19.325 1.528 -0.239 1.546 16.247 2.634 16.460 -16.645 -2.587 16.845
070-LV-1551A 0.48 3.171 -19.585 19.840 0.000 0.000 0.000 16.957 2.749 17.178 16.957 2.749 17.178
070-LV-1551B 0.48 3.049 -18.565 18.814 0.000 0.000 0.000 16.066 2.643 16.282 16.066 2.643 16.282
070-LV-1552A 0.48 3.071 -18.711 18.962 0.000 0.000 0.000 16.200 2.663 16.418 16.200 2.663 16.418
070-LV-1552B 0.48 3.004 -18.367 18.611 0.000 0.000 0.000 15.897 2.606 16.110 15.897 2.606 16.110
070-LV-1561A 0.22 2.458 -10.981 11.253 2.850 -11.274 11.629 9.509 2.129 9.744 -11.152 3.653 11.735
070-LV-1561B 0.22 2.441 -10.926 11.196 2.836 -11.235 11.587 9.461 2.115 9.694 -11.099 3.659 11.687
070-MV-1531A 4.16 1.491 -15.518 15.590 0.479 -0.014 0.479 13.418 1.311 13.482 -13.538 -1.310 13.602
070-MV-1531B 4.16 1.408 -14.465 14.534 0.478 -0.015 0.479 12.482 1.249 12.544 -12.602 -1.247 12.664
080-HV-1621A 13.80 3.901 -23.035 23.363 1.506 -0.165 1.515 19.676 3.488 19.983 -20.064 -3.458 20.359
080-HV-1621B 13.80 3.031 -18.703 18.947 1.525 -0.242 1.544 15.901 2.765 16.140 -16.299 -2.717 16.523
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 6
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
080-LV-1651A 0.48 2.999 -18.380 18.623 0.000 0.000 0.000 15.912 2.599 16.122 15.912 2.599 16.122
080-LV-1651B 0.48 2.972 -18.241 18.481 0.000 0.000 0.000 15.787 2.578 15.996 15.787 2.578 15.996
080-LV-1652A 0.48 3.032 -18.547 18.793 0.000 0.000 0.000 16.056 2.628 16.270 16.056 2.628 16.270
080-LV-1652B 0.48 3.023 -18.526 18.771 0.000 0.000 0.000 16.034 2.622 16.247 16.034 2.622 16.247
080-LV-1653A 0.48 2.999 -18.380 18.623 0.000 0.000 0.000 15.912 2.599 16.122 15.912 2.599 16.122
080-LV-1653B 0.48 3.047 -12.267 12.640 0.000 0.000 0.000 10.616 2.637 10.939 10.616 2.637 10.939
080-LV 1661A 0.22 2.578 -10.456 10.769 3.163 -11.278 11.713 9.054 2.233 9.325 -11.017 3.872 11.678
080-LV 1661B 0.22 2.468 -9.235 9.559 3.017 -10.290 10.724 7.996 2.137 8.277 -9.894 3.664 10.551
080-MV-1631A 4.16 1.394 -14.565 14.631 0.478 -0.015 0.479 12.583 1.224 12.642 -12.703 -1.222 12.762
080-MV-1631B 4.16 1.351 -13.839 13.905 0.478 -0.016 0.479 11.939 1.198 11.999 -12.060 -1.196 12.119
090-HV-1721A 13.80 3.872 -23.040 23.363 1.502 -0.167 1.511 19.682 3.456 19.983 -20.068 -3.426 20.359
090-HV-1721B 13.80 3.101 -18.519 18.777 1.523 -0.243 1.543 15.747 2.820 15.997 -16.143 -2.772 16.380
090-LV-1751A 0.48 2.714 -17.020 17.235 0.000 0.000 0.000 14.735 2.353 14.922 14.735 2.353 14.922
090-LV-1751B 0.48 2.689 -16.991 17.203 0.000 0.000 0.000 14.667 2.322 14.849 14.667 2.322 14.849
090-LV-1752A 0.48 1.586 -18.041 18.110 0.000 0.000 0.000 15.619 1.376 15.679 15.619 1.376 15.679
090-LV-1752B 0.48 1.423 -17.266 17.325 0.000 0.000 0.000 14.943 1.236 14.994 14.943 1.236 14.994
090-LV-1761A 0.22 3.355 -8.966 9.573 3.685 -9.890 10.554 7.764 2.906 8.290 5.721 8.420 10.180
090-LV-1761B 0.22 2.777 -6.222 6.813 2.873 -5.578 6.274 5.387 2.405 5.900 -6.836 0.108 6.837
090-MV-1731A 4.16 0.864 -8.261 8.306 0.476 -0.027 0.477 7.145 0.753 7.184 -7.265 -0.750 7.303
090-MV-1731B 4.16 0.850 -8.116 8.160 0.476 -0.027 0.477 7.009 0.744 7.048 -7.129 -0.741 7.168
100-HV-1821A 13.80 3.094 -23.917 24.116 1.517 -0.159 1.526 20.433 2.817 20.626 -20.823 -2.788 21.009
100-HV-1821B 13.80 2.418 -19.213 19.364 1.531 -0.241 1.550 16.341 2.260 16.497 -16.739 -2.212 16.885
100-LV-1851A 0.48 4.041 -23.671 24.013 0.000 0.000 0.000 20.492 3.501 20.789 20.492 3.501 20.789
100-LV-1851B 0.48 3.651 -21.240 21.552 0.000 0.000 0.000 18.382 3.166 18.653 18.382 3.166 18.653
100-LV-1852A 0.48 3.881 -22.245 22.581 0.000 0.000 0.000 19.254 3.359 19.545 19.254 3.359 19.545
100-LV-1852B 0.48 3.497 -20.234 20.534 0.000 0.000 0.000 17.505 3.029 17.765 17.505 3.029 17.765
100-LV-1853A 0.48 3.954 -22.623 22.966 0.000 0.000 0.000 19.585 3.425 19.882 19.585 3.425 19.882
100-LV-1853B 0.48 3.640 -21.215 21.525 0.000 0.000 0.000 18.362 3.157 18.631 18.362 3.157 18.631
100-LV-1854A 0.48 3.657 -20.531 20.854 0.000 0.000 0.000 17.773 3.169 18.053 17.773 3.169 18.053
100-LV-1854B 0.48 3.488 -19.862 20.166 0.000 0.000 0.000 17.188 3.025 17.453 17.188 3.025 17.453
100-LV-1861A 0.22 3.238 -11.305 11.759 3.784 -11.758 12.352 9.789 2.804 10.183 -12.000 3.306 12.447
100-LV-1861B 0.22 2.871 -7.325 7.868 3.062 -6.226 6.939 6.343 2.486 6.813 -7.885 0.190 7.887
100-MV-1831A 4.16 1.884 -20.108 20.196 0.479 -0.011 0.479 17.352 1.659 17.431 -17.472 -1.658 17.551
100-MV-1831B 4.16 1.737 -18.895 18.975 0.479 -0.011 0.479 16.273 1.549 16.346 -16.393 -1.548 16.466
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 7
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
110-HV-3221A 13.80 1.935 -16.495 16.608 0.329 -0.997 1.050 13.495 1.686 13.600 -13.594 -1.416 13.667
110-HV-3221B 13.80 1.956 -15.955 16.075 0.332 -0.993 1.047 13.811 1.917 13.944 -13.895 -1.658 13.993
110-HV-3321A 13.80 2.048 -16.130 16.260 0.329 -0.995 1.048 13.211 1.770 13.329 -13.310 -1.501 13.394
110-HV-3321B 13.80 2.153 -15.279 15.430 0.331 -0.988 1.042 13.218 2.070 13.379 -13.302 -1.811 13.425
110-LV-3351A 0.48 3.054 -18.245 18.498 0.000 0.000 0.000 15.763 2.641 15.983 15.763 2.641 15.983
110-LV-3351B 0.48 3.095 -18.908 19.160 0.000 0.000 0.000 16.371 2.689 16.591 16.371 2.689 16.591
110-LV-3352A 0.48 3.139 -18.669 18.931 0.000 0.000 0.000 16.131 2.714 16.358 16.131 2.714 16.358
110-LV-3352B 0.48 3.057 -17.944 18.202 0.000 0.000 0.000 15.536 2.656 15.761 15.536 2.656 15.761
110-LV-3361A 0.22 2.910 -8.372 8.863 3.303 -8.112 8.759 7.247 2.518 7.672 -9.079 1.395 9.186
110-LV-3361B 0.22 2.877 -8.304 8.788 3.279 -8.072 8.713 7.190 2.492 7.610 -9.014 1.412 9.123
110-MV-3331A 4.16 1.007 -10.088 10.138 0.477 -0.022 0.478 8.636 0.874 8.681 -8.758 -0.872 8.801
110-MV-3331B 4.16 1.009 -9.854 9.905 0.005 0.000 0.005 8.527 0.897 8.574 -8.528 -0.897 8.575
120-LV-35A51A 0.48 3.584 -18.236 18.585 0.000 0.000 0.000 15.791 3.111 16.094 15.791 3.111 16.094
120-LV-35A51B 0.48 3.672 -19.064 19.414 0.000 0.000 0.000 16.477 3.174 16.780 16.477 3.174 16.780
120-LV-35A61A 0.22 4.062 -8.749 9.645 4.916 -7.447 8.923 7.576 3.518 8.353 -10.232 -0.422 10.241
120-LV-35A61B 0.22 2.862 -9.378 9.806 3.350 -8.745 9.365 8.118 2.477 8.488 -9.978 1.583 10.103
120-LV-35B51A 0.48 4.056 -17.749 18.207 0.000 0.000 0.000 15.370 3.520 15.768 15.370 3.520 15.768
120-LV-35B51B 0.48 4.184 -19.058 19.512 0.000 0.000 0.000 16.474 3.616 16.866 16.474 3.616 16.866
120-LV-35B52A 0.48 4.252 -17.689 18.193 0.000 0.000 0.000 15.267 3.670 15.702 15.267 3.670 15.702
120-LV-35B52B 0.48 4.074 -16.488 16.984 0.000 0.000 0.000 14.258 3.525 14.687 14.258 3.525 14.687
120-MV-35A41A 2.40 2.750 -15.662 15.902 0.000 0.000 0.000 13.557 2.409 13.769 13.557 2.409 13.769
120-MV-35A41B 2.40 2.693 -15.437 15.670 0.000 0.000 0.000 13.245 2.314 13.446 13.245 2.314 13.446
120-MV-35B41A 2.40 4.363 -10.879 11.722 0.000 0.000 0.000 9.412 3.791 10.147 9.412 3.791 10.147
120-MV-35B41B 2.40 4.244 -10.914 11.710 0.000 0.000 0.000 9.394 3.639 10.074 9.394 3.639 10.074
120-MV-35B42A 2.40 4.346 -10.946 11.777 0.000 0.000 0.000 9.464 3.777 10.190 9.464 3.777 10.190
120-MV-35B42B 2.40 4.302 -10.727 11.558 0.000 0.000 0.000 9.234 3.690 9.943 9.234 3.690 9.943
130-LV-3651A 0.48 3.416 -18.870 19.176 0.000 0.000 0.000 16.336 2.961 16.602 16.336 2.961 16.602
130-LV-3651B 0.48 3.378 -18.696 18.999 0.000 0.000 0.000 16.182 2.929 16.445 16.182 2.929 16.445
130-LV-3652A 0.48 3.505 -19.701 20.010 0.000 0.000 0.000 17.056 3.037 17.324 17.056 3.037 17.324
130-LV-3652B 0.48 3.378 -18.696 18.999 0.000 0.000 0.000 16.182 2.929 16.445 16.182 2.929 16.445
130-LV-3661A 0.22 2.600 -12.856 13.116 2.927 -14.277 14.574 11.132 2.252 11.358 -12.805 5.776 14.048
130-LV-3661B 0.22 2.565 -12.652 12.909 2.897 -14.108 14.402 10.955 2.222 11.178 -12.618 5.753 13.868
130-MV-3631A 4.16 3.518 -16.136 16.515 0.477 -0.014 0.477 13.936 3.058 14.267 -14.056 -3.056 14.384
130-MV-3631B 4.16 3.214 -15.104 15.442 0.477 -0.015 0.477 13.022 2.804 13.321 -13.143 -2.802 13.438
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 8
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
140-LV-3461A 0.22 2.956 -11.416 11.792 3.218 -12.990 13.382 9.886 2.562 10.212 8.133 10.092 12.962
140-LV-3461B 0.22 2.971 -11.526 11.903 3.226 -13.080 13.472 9.977 2.571 10.303 8.222 10.137 13.052
140-LV-3751A2 0.48 4.516 -22.200 22.654 0.000 0.000 0.000 19.223 3.921 19.619 19.223 3.921 19.619
140-MV-3741A 2.40 5.224 -15.403 16.265 0.000 0.000 0.000 13.325 4.552 14.081 13.325 4.552 14.081
140-MV-3741B 2.40 4.941 -14.715 15.522 0.000 0.000 0.000 12.624 4.208 13.307 12.624 4.208 13.307
140-MV-3751B 0.48 4.538 -23.124 23.565 0.000 0.000 0.000 19.981 3.917 20.362 19.981 3.917 20.362
140-TR-3731A 0.48 4.929 -14.285 15.112 0.000 0.000 0.000 12.369 4.273 13.087 12.369 4.273 13.087
150-LV-3851A 0.48 3.639 -12.125 12.659 0.000 0.000 0.000 10.499 3.154 10.963 10.499 3.154 10.963
150-LV-3851B 0.48 3.522 -11.673 12.193 0.000 0.000 0.000 10.095 3.043 10.544 10.095 3.043 10.544
150-LV-3861A 0.22 2.007 -4.436 4.868 2.065 -4.169 4.652 3.841 1.738 4.216 -4.892 0.223 4.897
150-LV-3861B 0.22 1.999 -4.413 4.845 2.058 -4.155 4.637 3.821 1.730 4.195 -4.871 0.228 4.876
150-MV-3841A 2.40 4.989 -13.143 14.058 0.000 0.000 0.000 11.370 4.340 12.170 11.370 4.340 12.170
150-MV-3841B 2.40 4.756 -12.529 13.402 0.000 0.000 0.000 10.767 4.060 11.506 10.767 4.060 11.506
160-HV-41A21 13.80 0.736 -19.133 19.148 1.570 -0.158 1.578 16.485 0.708 16.501 -16.884 -0.684 16.898
160-HV-41A22 (TD-7) 13.80 1.672 -27.967 28.017 1.573 -0.131 1.579 23.872 1.685 23.931 -24.275 -1.662 24.332
160-HV-41A23 13.80 1.425 -21.884 21.931 1.547 -0.223 1.563 18.599 1.491 18.659 -19.001 -1.446 19.056
160-HV-41C21A 13.80 2.652 -26.133 26.268 1.549 -0.143 1.556 22.310 2.479 22.447 -22.707 -2.453 22.840
160-HV-41C21B 13.80 2.090 -20.741 20.846 1.540 -0.230 1.557 17.628 2.019 17.743 -18.028 -1.973 18.136
160-LV-41A51A 0.48 3.798 -20.690 21.036 0.000 0.000 0.000 17.870 3.278 18.168 17.870 3.278 18.168
160-LV-41A51B 0.48 3.631 -18.941 19.286 0.000 0.000 0.000 16.381 3.123 16.676 16.381 3.123 16.676
160-LV-41A52A 0.48 3.506 -18.791 19.116 0.000 0.000 0.000 16.268 3.038 16.550 16.268 3.038 16.550
160-LV-41A52B 0.48 3.568 -19.457 19.782 0.000 0.000 0.000 16.842 3.093 17.124 16.842 3.093 17.124
160-LV-41A61A 0.22 2.701 -13.244 13.517 0.000 0.000 0.000 11.468 2.340 11.705 11.468 2.340 11.705
160-LV-41A61B 0.22 2.719 -13.399 13.672 0.000 0.000 0.000 11.602 2.356 11.839 11.602 2.356 11.839
160-LV-41C51A 0.48 3.014 -20.092 20.317 0.000 0.000 0.000 17.395 2.612 17.590 17.395 2.612 17.590
160-LV-41C51B 0.48 2.912 -19.183 19.403 0.000 0.000 0.000 16.605 2.526 16.796 16.605 2.526 16.796
160-LV-41C61A 0.22 0.911 -0.740 1.174 0.777 -0.465 0.905 0.640 0.789 1.016 -0.969 -0.630 1.156
160-LV-41C61B 0.22 0.908 -0.739 1.170 0.775 -0.465 0.904 0.640 0.786 1.013 -0.968 -0.627 1.153
160-LV-41D51A 0.48 4.332 -16.048 16.623 0.000 0.000 0.000 13.761 3.726 14.256 13.761 3.726 14.256
160-LV-41D51B 0.48 4.309 -16.110 16.676 0.000 0.000 0.000 13.749 3.696 14.237 13.749 3.696 14.237
160-LV-41E51A 0.48 3.447 -19.935 20.231 0.000 0.000 0.000 17.259 2.987 17.515 17.259 2.987 17.515
160-LV-41E51B 0.48 3.342 -19.352 19.639 0.000 0.000 0.000 16.750 2.898 16.999 16.750 2.898 16.999
160-LV-41E61A 0.22 1.354 -2.416 2.769 1.401 -2.456 2.828 2.092 1.173 2.398 -2.818 0.076 2.819
160-LV-41E61B 0.22 1.350 -2.412 2.764 1.398 -2.454 2.824 2.089 1.169 2.394 -2.814 0.079 2.815
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 9
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
160-LV-41F51A 0.48 3.156 -13.913 14.267 0.000 0.000 0.000 12.025 2.729 12.330 12.025 2.729 12.330
160-LV-41F51B 0.48 3.055 -13.023 13.376 0.000 0.000 0.000 11.263 2.645 11.569 11.263 2.645 11.569
160-LV-41F61A 0.22 0.979 -1.068 1.449 0.955 -0.813 1.254 0.925 0.847 1.254 -1.373 -0.533 1.473
160-LV-41F61B 0.22 0.974 -1.066 1.444 0.953 -0.812 1.252 0.923 0.844 1.251 -1.371 -0.530 1.469
160-MV-41C31A 4.16 1.025 -11.671 11.716 0.478 -0.019 0.478 10.090 0.896 10.129 -10.210 -0.894 10.249
160-MV-41C31B 4.16 0.998 -11.496 11.539 0.478 -0.020 0.478 9.930 0.880 9.969 -10.051 -0.878 10.089
160-MV-41D31A 4.16 2.254 -19.218 19.350 0.479 -0.012 0.479 16.584 1.975 16.701 -16.704 -1.973 16.820
160-MV-41D31B 4.16 2.067 -18.113 18.231 0.479 -0.012 0.479 15.599 1.828 15.706 -15.720 -1.827 15.826
160-MV-41E31 BA 4.16 2.918 -16.567 16.822 0.477 -0.014 0.478 14.309 2.541 14.533 -14.429 -2.540 14.651
160-MV-41E31 BB 4.16 2.672 -15.503 15.731 0.477 -0.015 0.477 13.368 2.340 13.571 -13.488 -2.338 13.690
160-MV-41F31A 4.16 1.382 -10.794 10.882 0.476 -0.022 0.477 9.332 1.203 9.409 -9.452 -1.200 9.528
160-MV-41F31B 4.16 1.351 -10.632 10.718 0.476 -0.022 0.477 9.184 1.182 9.260 -9.304 -1.179 9.379
160-MV-4131A 4.16 1.298 -21.452 21.492 0.479 -0.010 0.480 18.526 1.156 18.562 -18.646 -1.155 18.682
160-MV-4131B 4.16 1.242 -20.434 20.472 0.479 -0.011 0.480 17.624 1.127 17.660 -17.744 -1.126 17.780
171-LV-4251A 0.48 2.993 -11.456 11.841 0.000 0.000 0.000 9.911 2.589 10.243 9.911 2.589 10.243
171-LV-4251B 0.48 2.903 -11.210 11.579 0.000 0.000 0.000 9.690 2.507 10.009 9.690 2.507 10.009
171-LV-4261A 0.22 0.835 -1.456 1.678 0.838 -1.405 1.636 1.261 0.723 1.454 -1.681 -0.045 1.681
171-LV-4261B 0.22 0.833 -1.454 1.676 0.837 -1.404 1.635 1.259 0.721 1.451 -1.679 -0.043 1.680
171-MV-4231A 4.16 0.794 -9.022 9.057 0.477 -0.025 0.477 7.758 0.692 7.789 -7.878 -0.689 7.908
171-MV-4231B 4.16 0.761 -7.838 7.875 0.476 -0.028 0.477 6.712 0.657 6.744 -6.833 -0.654 6.865
172-LV-4351A 0.48 2.628 -14.838 15.069 0.000 0.000 0.000 12.849 2.285 13.051 12.849 2.285 13.051
172-LV-4351B 0.48 2.439 -13.546 13.764 0.000 0.000 0.000 11.730 2.121 11.921 11.730 2.121 11.921
180-HV-44C21A 13.80 4.833 -19.179 19.779 1.440 -0.195 1.453 16.405 4.233 16.942 -16.776 -4.196 17.293
180-HV-44C21B 13.80 3.834 -16.088 16.538 1.502 -0.259 1.524 13.693 3.393 14.107 -14.086 -3.343 14.477
180-HV-44G21A 13.80 5.008 -17.852 18.541 1.413 -0.206 1.428 15.278 4.369 15.890 -15.643 -4.330 16.231
180-HV-44G21B 13.80 4.033 -15.097 15.626 1.492 -0.267 1.516 12.858 3.546 13.338 -13.249 -3.495 13.702
180-HV-44I21 (TD-9) 13.80 0.921 -17.854 17.878 1.567 -0.163 1.575 15.446 0.812 15.468 -15.842 -0.788 15.862
180-LV-44A51A 0.48 3.328 -18.490 18.787 0.000 0.000 0.000 16.007 2.884 16.265 16.007 2.884 16.265
180-LV-44A51B 0.48 3.294 -18.334 18.627 0.000 0.000 0.000 15.868 2.856 16.123 15.868 2.856 16.123
180-LV-44A61A 0.22 1.580 -4.862 5.112 1.585 -4.206 4.494 4.210 1.368 4.427 -4.984 0.479 5.007
180-LV-44A61B 0.22 1.577 -4.857 5.107 1.583 -4.203 4.492 4.206 1.366 4.422 -4.979 0.481 5.002
180-LV-44C51A 0.48 3.008 -18.220 18.467 0.000 0.000 0.000 15.773 2.608 15.987 15.773 2.608 15.987
180-LV-44C51B 0.48 3.272 -20.255 20.518 0.000 0.000 0.000 17.430 2.816 17.656 17.430 2.816 17.656
180-LV-44C61A 0.22 1.634 -6.051 6.267 1.758 -6.370 6.608 5.240 1.415 5.427 -6.190 1.948 6.489
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 10
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
180-LV-44C61B 0.22 1.666 -6.144 6.366 1.781 -6.435 6.677 5.316 1.441 5.508 -6.276 1.941 6.569
180-LV-44E51A 0.48 3.150 -11.462 11.887 0.000 0.000 0.000 9.924 2.728 10.292 9.924 2.728 10.292
180-LV-44E51B 0.48 3.214 -11.710 12.143 0.000 0.000 0.000 10.130 2.781 10.505 10.130 2.781 10.505
180-LV-44E61A 0.22 0.872 -1.195 1.479 0.872 -1.014 1.337 1.035 0.755 1.281 -1.460 -0.322 1.495
180-LV-44E61B 0.22 0.910 -1.280 1.570 0.899 -1.055 1.386 1.108 0.788 1.360 -1.540 -0.347 1.579
180-LV-44F51A 0.48 3.606 -13.088 13.576 0.000 0.000 0.000 11.330 3.124 11.753 11.330 3.124 11.753
180-LV-44F51B 0.48 3.606 -13.088 13.576 0.000 0.000 0.000 11.330 3.124 11.753 11.330 3.124 11.753
180-LV-44F61A 0.22 0.914 -1.604 1.846 0.942 -1.633 1.885 1.389 0.792 1.599 -1.875 0.040 1.875
180-LV-44F61B 0.22 0.911 -1.603 1.844 0.940 -1.632 1.883 1.388 0.789 1.597 -1.873 0.042 1.873
180-LV-44G51A 0.48 3.060 -11.636 12.032 0.000 0.000 0.000 10.074 2.651 10.417 10.074 2.651 10.417
180-LV-44G51B 0.48 3.045 -11.588 11.981 0.000 0.000 0.000 10.031 2.638 10.372 10.031 2.638 10.372
180-LV-44G61A 0.22 0.887 -0.734 1.151 0.767 -0.466 0.897 0.635 0.768 0.997 -0.962 -0.609 1.139
180-LV-44G61B 0.22 0.887 -0.734 1.151 0.767 -0.466 0.897 0.635 0.768 0.997 -0.962 -0.609 1.139
180-LV-44H51A 0.48 3.452 -10.442 10.998 0.000 0.000 0.000 9.041 2.990 9.522 9.041 2.990 9.522
180-LV-44H51B 0.48 3.434 -10.404 10.956 0.000 0.000 0.000 9.006 2.975 9.485 9.006 2.975 9.485
180-LV-44H51B2 0.22 1.050 -0.780 1.307 0.866 -0.464 0.983 0.675 0.909 1.132 -1.033 -0.755 1.280
180-LV-44H61A 0.22 1.046 -0.780 1.305 0.865 -0.465 0.982 0.675 0.906 1.130 -1.033 -0.752 1.278
180-LV-44I51A 0.48 4.799 -14.084 14.880 0.000 0.000 0.000 12.197 4.157 12.886 12.197 4.157 12.886
180-LV-44I51B 0.48 4.799 -14.084 14.880 0.000 0.000 0.000 12.197 4.157 12.886 12.197 4.157 12.886
180-LV-44I61 0.22 0.927 -1.610 1.858 0.951 -1.637 1.893 1.394 0.803 1.609 -1.882 0.029 1.882
180-LV-44M51 BA 0.48 3.967 -27.553 27.837 0.000 0.000 0.000 23.785 3.434 24.032 23.785 3.434 24.032
180-LV-44M51 BB 0.48 4.426 -30.552 30.871 0.000 0.000 0.000 26.340 3.825 26.616 26.340 3.825 26.616
180-MV-44A31A 4.16 3.230 -15.252 15.590 0.476 -0.015 0.477 13.175 2.808 13.470 -13.294 -2.806 13.587
180-MV-44A31B 4.16 2.958 -14.353 14.654 0.476 -0.016 0.477 12.378 2.582 12.644 -12.498 -2.579 12.762
180-MV-44C31A 4.16 1.604 -13.863 13.955 0.478 -0.015 0.478 11.978 1.404 12.060 -12.098 -1.403 12.179
180-MV-44C31B 4.16 1.608 -13.545 13.640 0.478 -0.016 0.478 11.677 1.416 11.763 -11.798 -1.414 11.882
180-MV-44E31-A 4.16 1.874 -11.508 11.660 0.476 -0.020 0.477 9.946 1.632 10.079 -10.066 -1.629 10.197
180-MV-44E31-B 4.16 1.857 -11.296 11.447 0.476 -0.020 0.477 9.743 1.621 9.877 -9.864 -1.618 9.996
180-MV-44F31A 4.16 3.963 -14.472 15.005 0.475 -0.016 0.476 12.500 3.438 12.965 -12.620 -3.436 13.080
180-MV-44F31B 4.16 3.601 -13.732 14.196 0.475 -0.016 0.475 11.842 3.132 12.249 -11.962 -3.129 12.365
180-MV-44G31A 4.16 1.684 -13.656 13.760 0.478 -0.015 0.478 11.799 1.473 11.891 -11.919 -1.471 12.010
180-MV-44G31B 4.16 1.655 -13.104 13.208 0.478 -0.016 0.478 11.307 1.457 11.400 -11.427 -1.455 11.519
180-MV-44H31A 4.16 2.600 -7.400 7.844 0.468 -0.031 0.469 6.399 2.252 6.784 -6.518 -2.248 6.894
180-MV-44H31B 4.16 2.516 -7.238 7.663 0.467 -0.031 0.468 6.252 2.181 6.622 -6.371 -2.176 6.732
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 11
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
180B-CCM-CTOSAT 0.48 3.272 -20.255 20.518 0.000 0.000 0.000 17.430 2.816 17.656 17.430 2.816 17.656
181-LV-3951A 0.48 4.216 -18.042 18.528 0.000 0.000 0.000 15.574 3.631 15.992 15.574 3.631 15.992
181-LV-3951B 0.48 3.826 -16.320 16.763 0.000 0.000 0.000 14.077 3.292 14.457 14.077 3.292 14.457
181-LV-3961A 0.22 2.104 -7.489 7.779 2.263 -7.986 8.301 6.482 1.820 6.733 -7.711 2.462 8.094
181-LV-3961B 0.22 2.039 -7.328 7.606 2.212 -7.862 8.167 6.341 1.763 6.582 -7.556 2.483 7.953
181-MV-3941A 2.40 2.987 -14.916 15.212 0.000 0.000 0.000 12.782 2.559 13.036 12.782 2.559 13.036
181-MV-3941B 2.40 2.803 -13.843 14.124 0.000 0.000 0.000 11.854 2.393 12.094 11.854 2.393 12.094
330-CCM-1 BA 0.48 4.152 -16.093 16.620 0.000 0.000 0.000 13.886 3.576 14.339 13.886 3.576 14.339
330-CCM-1 BB 0.48 3.968 -15.439 15.940 0.000 0.000 0.000 13.346 3.427 13.779 13.346 3.427 13.779
330-CCM-2 BA 0.22 1.527 -1.570 2.190 1.412 -1.120 1.802 1.359 1.322 1.896 -1.993 -0.906 2.190
330-CCM-2 BB 0.22 1.519 -1.566 2.182 1.408 -1.119 1.799 1.356 1.315 1.889 -1.990 -0.899 2.183
330-TDA-1 BA 4.16 3.243 -10.768 11.246 0.779 -0.055 0.781 9.159 2.722 9.555 -9.360 -2.717 9.746
330-TDA-1 BB 4.16 2.652 -9.516 9.879 0.777 -0.060 0.780 8.163 2.269 8.472 -8.362 -2.262 8.663
330-TDBT-1 BA 0.48 3.967 -27.553 27.837 0.000 0.000 0.000 23.785 3.434 24.032 23.785 3.434 24.032
330-TDBT-1 BB 0.48 4.426 -30.552 30.871 0.000 0.000 0.000 26.340 3.825 26.616 26.340 3.825 26.616
ALIM-API-1 2.40 3.429 -5.276 6.293 0.000 0.000 0.000 4.554 2.948 5.425 4.554 2.948 5.425
API-LV-CCM-01 0.48 4.894 -5.816 7.601 0.000 0.000 0.000 5.034 4.231 6.576 5.034 4.231 6.576
API-LV-CCM-MJW 0.48 4.966 -6.836 8.449 0.000 0.000 0.000 5.915 4.292 7.308 5.915 4.292 7.308
Barra11 4.16 2.493 -1.888 3.127 0.189 -0.008 0.189 1.636 2.147 2.700 -1.685 -2.146 2.729
Barra12 0.22 5.447 -13.842 14.875 5.149 -15.141 15.993 11.976 4.710 12.869 9.647 13.033 16.214
Barra14 0.22 4.549 -9.862 10.861 4.350 -8.931 9.934 8.535 3.935 9.399 -10.617 0.146 10.618
BK4-CCM-04A 0.48 2.979 -10.371 10.790 0.000 0.000 0.000 8.978 2.580 9.341 8.978 2.580 9.341
BK4-CCM-04B 0.48 3.208 -10.392 10.876 0.000 0.000 0.000 8.996 2.778 9.416 8.996 2.778 9.416
BUS SE-19A CERO CORTES1 4.16 1.303 -9.244 9.335 0.397 -0.017 0.397 7.927 1.118 8.006 -8.028 -1.116 8.105
BUS TABLERO 28G31 4.16 0.486 -2.417 2.466 0.000 0.000 0.000 2.091 0.420 2.133 2.091 0.420 2.133
Bus TAR 2.40 4.584 -9.545 10.588 0.000 0.000 0.000 8.241 3.953 9.140 8.241 3.953 9.140
BUS TBT 0.48 7.507 -26.152 27.208 9.099 -31.555 32.841 22.603 6.474 23.511 -28.461 13.499 31.500
BUS TR-28G21 PRIM 13.80 2.642 -13.715 13.967 0.341 -0.933 0.993 11.165 2.122 11.365 -11.270 -1.870 11.425
BUS TR-28G21 SEC 4.16 0.980 -9.746 9.795 0.398 -0.016 0.398 8.353 0.844 8.396 -8.454 -0.843 8.496
BUS TR-28G41 0.22 1.244 -2.636 2.915 1.443 -2.871 3.214 2.283 1.077 2.524 -3.135 0.496 3.174
Bus2 4.16 1.532 -10.977 11.084 0.398 -0.014 0.398 9.363 1.317 9.455 -9.465 -1.316 9.556
Bus3 13.80 3.752 -15.559 16.005 0.331 -0.993 1.047 12.552 2.949 12.893 -12.657 -2.679 12.937
Bus4 13.80 2.557 -14.033 14.264 0.326 -0.981 1.033 11.573 2.150 11.771 -11.669 -1.885 11.821
Bus5 2.40 1.817 -17.462 17.556 0.000 0.000 0.000 14.998 1.587 15.082 14.998 1.587 15.082
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 12
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus6 0.22 1.571 -5.847 6.055 1.709 -6.218 6.449 5.064 1.361 5.244 -5.999 1.959 6.311
Bus7 2.40 2.224 -16.254 16.405 0.000 0.000 0.000 13.916 1.912 14.047 13.916 1.912 14.047
Bus8 0.48 2.236 -15.625 15.784 0.000 0.000 0.000 13.523 1.946 13.663 13.523 1.946 13.663
Bus9 0.48 2.427 -16.873 17.047 0.000 0.000 0.000 14.606 2.113 14.758 14.606 2.113 14.758
Bus10 2.40 2.213 -16.218 16.368 0.000 0.000 0.000 13.938 1.921 14.070 13.938 1.921 14.070
Bus12 2.40 6.427 -11.034 12.769 0.000 0.000 0.000 9.516 5.518 11.000 9.516 5.518 11.000
Bus15 2.40 6.427 -11.034 12.769 0.000 0.000 0.000 9.516 5.518 11.000 9.516 5.518 11.000
Bus19 2.40 6.389 -11.187 12.883 0.000 0.000 0.000 9.639 5.451 11.073 9.639 5.451 11.073
Bus21 2.40 1.815 -17.542 17.635 0.000 0.000 0.000 15.005 1.567 15.087 15.005 1.567 15.087
Bus22 13.80 2.886 -15.141 15.413 0.326 -0.992 1.044 12.228 2.305 12.443 -12.330 -2.035 12.497
Bus23 2.40 1.077 -9.273 9.336 0.000 0.000 0.000 8.022 0.933 8.077 8.022 0.933 8.077
Bus24 2.40 0.960 -9.340 9.390 0.000 0.000 0.000 8.081 0.831 8.123 8.081 0.831 8.123
Bus25 13.80 0.581 -5.089 5.122 0.756 -0.118 0.765 4.390 0.503 4.419 -4.585 -0.488 4.611
Bus26 2.40 4.800 -27.900 28.310 0.000 0.000 0.000 23.617 4.057 23.963 23.617 4.057 23.963
Bus27 2.40 4.564 -27.478 27.855 0.000 0.000 0.000 23.403 3.922 23.729 23.403 3.922 23.729
Bus32 13.80 2.254 -18.257 18.396 0.331 -1.004 1.057 14.538 1.839 14.654 -14.645 -1.564 14.728
Bus33 4.16 0.730 -7.909 7.943 0.476 -0.028 0.477 6.772 0.630 6.802 -6.894 -0.628 6.922
Bus34 4.16 0.918 -8.821 8.868 0.476 -0.026 0.477 7.586 0.797 7.628 -7.706 -0.794 7.747
Bus35 0.48 2.868 -12.633 12.954 0.000 0.000 0.000 10.928 2.481 11.206 10.928 2.481 11.206
Bus341 0.22 1.868 -3.346 3.832 2.023 -3.557 4.093 2.899 1.622 3.322 -3.995 0.276 4.004
bus342 13.80 3.084 -13.675 14.018 0.330 -0.979 1.033 11.804 2.832 12.139 -11.888 -2.575 12.163
Bus343 0.22 1.026 -1.207 1.585 1.046 -1.214 1.603 1.045 0.889 1.372 -1.579 -0.278 1.603
Bus344 2.40 2.488 -10.482 10.773 0.000 0.000 0.000 9.032 2.137 9.281 9.032 2.137 9.281
Bus346 4.16 3.118 -10.197 10.663 0.772 -0.059 0.775 8.676 2.622 9.064 -8.876 -2.617 9.253
Bus347 4.16 1.659 -19.776 19.846 0.479 -0.011 0.479 17.046 1.458 17.108 -17.166 -1.457 17.228
Bus348 2.40 4.882 -12.374 13.302 0.000 0.000 0.000 10.705 4.245 11.516 10.705 4.245 11.516
Bus350 4.16 1.262 -15.324 15.376 0.479 -0.014 0.479 13.213 1.124 13.261 -13.334 -1.122 13.381
Bus351 0.22 2.735 -14.097 14.360 3.148 -15.838 16.148 12.206 2.370 12.434 -14.057 6.669 15.559
Bus352 0.22 0.907 -1.605 1.843 0.937 -1.633 1.883 1.389 0.785 1.596 -1.874 0.046 1.874
Bus353 2.40 3.588 -4.782 5.978 0.000 0.000 0.000 4.140 3.104 5.174 4.140 3.104 5.174
Bus354 0.22 0.993 -1.736 2.000 0.000 0.000 0.000 1.503 0.860 1.732 1.503 0.860 1.732
Bus355 0.22 2.183 -4.443 4.951 2.297 -4.590 5.133 3.847 1.890 4.286 -5.059 0.485 5.082
Bus356 13.80 2.850 -15.457 15.718 0.326 -0.994 1.046 12.463 2.278 12.670 -12.566 -2.007 12.725
Bus357 0.22 1.555 -2.777 3.183 1.620 -2.844 3.274 2.405 1.346 2.756 -3.251 0.112 3.253
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 13
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus358 0.48 2.604 -9.419 9.772 0.000 0.000 0.000 8.144 2.250 8.449 8.144 2.250 8.449
Bus359 0.48 6.667 -9.862 11.904 0.000 0.000 0.000 8.503 5.713 10.244 8.503 5.713 10.244
Bus360 0.22 0.899 -1.592 1.829 0.932 -1.625 1.873 1.379 0.779 1.584 -1.862 0.051 1.862
Bus361 2.40 5.282 -14.227 15.176 0.000 0.000 0.000 12.307 4.598 13.138 12.307 4.598 13.138
Bus362 13.80 2.661 -25.452 25.591 1.565 -0.143 1.571 21.737 2.467 21.877 -22.139 -2.442 22.273
Bus363 0.22 0.903 -1.596 1.834 0.934 -1.627 1.876 1.382 0.782 1.588 -1.866 0.048 1.866
Bus364 0.48 4.321 -11.025 11.842 0.000 0.000 0.000 9.518 3.717 10.218 9.518 3.717 10.218
Bus365 0.48 5.769 -18.434 19.316 0.000 0.000 0.000 15.964 4.996 16.727 15.964 4.996 16.727
Bus366 0.22 2.777 -13.569 13.850 3.140 -15.201 15.522 11.744 2.402 11.987 -13.559 6.249 14.929
Bus367 13.80 0.748 -19.086 19.101 1.568 -0.158 1.576 16.444 0.718 16.460 -16.843 -0.694 16.857
Bus369 0.48 3.231 -22.790 23.017 0.000 0.000 0.000 19.641 2.772 19.835 19.641 2.772 19.835
Bus372 13.80 1.672 -15.689 15.778 1.808 -17.319 17.413 13.526 1.472 13.606 12.607 11.223 16.879
Bus373 0.48 5.181 -9.733 11.025 0.000 0.000 0.000 8.425 4.485 9.544 8.425 4.485 9.544
Bus374 4.16 1.656 -19.069 19.141 0.479 -0.011 0.479 16.422 1.481 16.489 -16.543 -1.480 16.609
Bus375 0.22 0.930 -1.637 1.883 0.953 -1.655 1.910 1.417 0.806 1.630 -1.906 0.032 1.906
Bus376 0.22 0.939 -1.678 1.923 0.960 -1.683 1.938 1.453 0.813 1.665 -1.943 0.031 1.944
Bus377 13.80 0.374 -1.203 1.260 0.209 -0.643 0.676 1.042 0.324 1.091 -1.114 -0.105 1.119
Bus378 13.80 2.283 -2.107 3.107 0.340 -0.615 0.703 1.820 1.940 2.660 1.730 2.119 2.735
Bus379 0.22 1.786 -3.760 4.162 1.953 -4.019 4.468 3.242 1.532 3.586 -4.345 0.639 4.392
Bus381 0.22 2.592 -10.648 10.959 3.173 -13.318 13.691 9.219 2.244 9.488 7.177 11.138 13.250
Bus383 0.22 1.026 -1.207 1.585 1.046 -1.214 1.603 1.045 0.889 1.372 -1.579 -0.278 1.603
Bus386 0.22 0.908 -1.171 1.482 0.975 -1.207 1.552 1.014 0.786 1.283 -1.539 -0.164 1.548
Bus387 4.16 3.116 -10.200 10.666 0.772 -0.059 0.775 8.679 2.621 9.066 -8.878 -2.615 9.255
Bus388 2.40 4.988 -13.699 14.579 0.000 0.000 0.000 11.763 4.252 12.508 11.763 4.252 12.508
Bus389 0.48 3.032 -21.987 22.195 0.000 0.000 0.000 19.030 2.628 19.211 19.030 2.628 19.211
Bus390 0.22 2.020 -7.519 7.786 2.201 -8.012 8.309 6.511 1.749 6.742 -7.719 2.539 8.126
Bus391 2.40 4.659 -11.825 12.710 0.000 0.000 0.000 10.167 3.980 10.918 10.167 3.980 10.918
Bus392 0.48 3.040 -20.341 20.567 0.000 0.000 0.000 17.605 2.638 17.802 17.605 2.638 17.802
Bus393 0.22 3.585 -8.645 9.359 3.782 -9.884 10.583 7.470 3.092 8.085 5.492 8.882 10.442
Bus394 2.40 1.721 -9.078 9.240 0.000 0.000 0.000 7.860 1.497 8.002 7.860 1.497 8.002
Bus395 0.22 1.124 -1.995 2.290 1.176 -2.055 2.368 1.728 0.973 1.983 -2.344 0.086 2.346
Bus396 2.40 3.272 -4.564 5.616 0.000 0.000 0.000 3.942 2.815 4.844 3.942 2.815 4.844
Bus397 0.22 1.976 -3.603 4.110 2.079 -3.701 4.244 3.120 1.711 3.558 -4.216 0.190 4.220
Bus398 13.80 1.817 -16.677 16.775 0.331 -0.994 1.048 13.638 1.597 13.731 -13.737 -1.328 13.801
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 14
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus399 0.48 4.432 -11.186 12.032 0.000 0.000 0.000 9.676 3.830 10.406 9.676 3.830 10.406
Bus400 0.22 2.748 -13.583 13.858 3.115 -15.208 15.523 11.750 2.375 11.988 -13.560 6.281 14.944
Bus401 13.80 0.744 -19.098 19.112 1.570 -0.158 1.578 16.455 0.715 16.470 -16.853 -0.691 16.867
Bus403 13.80 2.187 -26.744 26.833 1.569 -0.137 1.575 22.834 2.091 22.929 -23.236 -2.067 23.328
Bus404 10.35 0.974 -12.326 12.364 0.000 0.000 0.000 10.626 0.866 10.661 10.626 0.866 10.661
Bus406 0.22 3.448 -9.798 10.387 3.708 -11.575 12.154 8.484 2.986 8.994 6.534 10.036 11.975
Bus407 13.80 3.217 -23.489 23.708 1.516 -0.161 1.524 20.070 2.915 20.280 -20.459 -2.886 20.662
Bus409 2.40 1.338 -7.063 7.189 0.000 0.000 0.000 6.112 1.159 6.220 6.112 1.159 6.220
Bus410 2.40 1.338 -7.063 7.189 0.000 0.000 0.000 6.112 1.159 6.220 6.112 1.159 6.220
Bus411 13.80 0.373 -1.205 1.261 0.209 -0.643 0.676 1.043 0.323 1.092 -1.116 -0.104 1.121
Bus414 0.48 3.267 -12.570 12.987 0.000 0.000 0.000 10.863 2.821 11.224 10.863 2.821 11.224
Bus415 0.22 2.198 -3.870 4.451 2.250 -3.910 4.511 3.351 1.903 3.854 -4.504 0.071 4.505
Bus417 34.50 1.080 -13.335 13.378 0.135 -0.791 0.802 11.261 0.954 11.301 -11.299 -0.745 11.324
Bus418 2.40 2.453 -10.335 10.622 0.000 0.000 0.000 8.948 2.134 9.199 8.948 2.134 9.199
bus419 13.80 3.602 -14.740 15.174 0.329 -0.988 1.041 11.942 2.843 12.275 -12.045 -2.575 12.317
Bus421 2.40 3.920 -15.467 15.957 0.000 0.000 0.000 13.387 3.423 13.818 13.387 3.423 13.818
Bus422 4.16 1.611 -19.893 19.958 0.479 -0.011 0.479 17.146 1.418 17.205 -17.267 -1.416 17.325
Bus423 0.48 3.880 -18.788 19.185 4.030 -20.440 20.834 16.271 3.360 16.614 14.187 14.563 20.331
Bus425 0.48 3.173 -22.620 22.842 0.000 0.000 0.000 19.536 2.743 19.727 19.536 2.743 19.727
Bus426 0.22 1.068 -1.256 1.648 1.089 -1.264 1.669 1.087 0.925 1.427 -1.643 -0.288 1.668
Bus428 0.22 1.130 -2.003 2.300 1.180 -2.061 2.375 1.735 0.979 1.992 -2.352 0.082 2.354
Bus429 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus430 0.48 1.585 -7.109 7.283 0.000 0.000 0.000 6.149 1.371 6.300 6.149 1.371 6.300
Bus431 2.40 1.976 -8.481 8.708 0.000 0.000 0.000 7.343 1.717 7.542 7.343 1.717 7.542
Bus432 0.48 3.022 -17.436 17.696 3.176 -18.343 18.616 15.057 2.609 15.281 13.389 12.347 18.213
Bus433 0.22 0.908 -1.171 1.482 0.975 -1.207 1.552 1.014 0.786 1.283 -1.539 -0.164 1.548
Bus434 0.22 1.976 -3.603 4.110 2.079 -3.701 4.244 3.120 1.711 3.558 -4.216 0.190 4.220
Bus436 13.80 2.280 -18.173 18.316 0.331 -1.003 1.057 14.477 1.858 14.596 -14.583 -1.582 14.669
Bus438 0.48 1.021 -1.752 2.027 1.033 -1.764 2.045 1.517 0.884 1.755 -2.040 0.005 2.040
Bus439 2.40 3.272 -4.564 5.616 0.000 0.000 0.000 3.942 2.815 4.844 3.942 2.815 4.844
Bus440 0.48 4.122 -10.631 11.402 0.000 0.000 0.000 9.186 3.554 9.850 9.186 3.554 9.850
Bus441 0.48 3.801 -20.222 20.576 0.000 0.000 0.000 17.479 3.276 17.784 17.479 3.276 17.784
Bus443 13.80 1.810 -20.969 21.047 1.542 -0.229 1.559 17.824 1.790 17.914 -18.225 -1.744 18.308
Bus445 4.16 4.083 -13.847 14.436 0.475 -0.016 0.475 11.961 3.540 12.474 -12.081 -3.538 12.588
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 15
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus446 0.22 3.368 -9.702 10.270 3.639 -11.482 12.045 8.401 2.916 8.892 6.473 9.931 11.855
Bus447 4.16 1.798 -20.291 20.371 0.479 -0.011 0.479 17.510 1.586 17.581 -17.630 -1.585 17.701
Bus448 2.40 1.495 -6.894 7.054 0.000 0.000 0.000 5.965 1.294 6.104 5.965 1.294 6.104
Bus449 2.40 1.686 -6.661 6.871 0.000 0.000 0.000 5.763 1.459 5.945 5.763 1.459 5.945
Bus450 13.80 0.375 -1.202 1.259 0.210 -0.642 0.675 1.041 0.325 1.090 -1.113 -0.106 1.119
Bus452 0.22 1.189 -2.161 2.466 1.254 -2.234 2.562 1.867 1.024 2.129 -2.539 0.136 2.543
Bus454 34.50 1.028 -13.413 13.453 0.134 -0.791 0.802 11.327 0.911 11.363 -11.365 -0.702 11.387
Bus455 2.40 2.431 -10.362 10.643 0.000 0.000 0.000 8.971 2.115 9.217 8.971 2.115 9.217
Bus456 13.80 2.108 -15.928 16.067 0.329 -0.994 1.047 13.054 1.815 13.179 -13.152 -1.546 13.242
Bus458 0.22 2.045 -3.305 3.887 2.179 -3.566 4.179 2.862 1.770 3.365 1.696 3.707 4.077
Bus460 0.48 4.879 -13.796 14.633 0.000 0.000 0.000 11.941 4.225 12.666 11.941 4.225 12.666
Bus462 0.22 1.068 -1.256 1.648 1.089 -1.264 1.669 1.087 0.925 1.427 -1.643 -0.288 1.668
Bus463 4.16 2.531 -1.934 3.185 0.189 -0.008 0.189 1.676 2.180 2.750 -1.724 -2.179 2.779
Bus465 0.48 4.439 -11.610 12.429 0.000 0.000 0.000 10.036 3.834 10.743 10.036 3.834 10.743
Bus466 0.48 3.629 -13.209 13.699 0.000 0.000 0.000 11.438 3.146 11.863 11.438 3.146 11.863
Bus467 0.22 2.093 -7.913 8.185 2.274 -8.365 8.668 6.849 1.811 7.084 -8.095 2.629 8.511
Bus468 0.48 4.112 -10.612 11.381 0.000 0.000 0.000 9.184 3.559 9.850 9.184 3.559 9.850
Bus469 0.48 3.665 -20.281 20.609 0.000 0.000 0.000 17.505 3.155 17.787 17.505 3.155 17.787
Bus470 13.80 1.904 -27.410 27.476 1.566 -0.134 1.572 23.398 1.871 23.472 -23.800 -1.847 23.871
Bus472 0.22 6.113 -21.302 22.162 6.646 -22.772 23.722 18.440 5.292 19.184 -22.085 6.948 23.152
Bus473 10.35 0.896 -11.299 11.334 0.000 0.000 0.000 9.718 0.816 9.752 9.718 0.816 9.752
Bus474 0.48 3.446 -13.399 13.835 0.000 0.000 0.000 11.601 2.985 11.978 11.601 2.985 11.978
Bus475 0.22 2.463 -12.454 12.695 2.795 -13.861 14.140 10.785 2.133 10.994 -12.398 5.681 13.638
Bus476 0.48 4.748 -15.968 16.659 0.000 0.000 0.000 13.823 4.112 14.422 13.823 4.112 14.422
Bus478 0.22 2.775 -12.999 13.292 2.942 -13.792 14.103 11.256 2.403 11.509 9.691 9.750 13.747
Bus479 0.22 3.023 -6.113 6.820 3.156 -6.279 7.027 5.294 2.618 5.905 -6.944 0.609 6.971
bus481 0.22 1.505 -3.140 3.482 1.590 -3.240 3.609 2.707 1.293 3.000 -3.567 0.392 3.589
Bus481 0.12 1.399 -1.682 2.188 1.571 -1.859 2.434 1.457 1.212 1.895 -2.352 -0.174 2.359
Bus482 0.48 1.420 -6.165 6.326 0.000 0.000 0.000 5.338 1.229 5.478 5.338 1.229 5.478
Bus483 0.44 3.410 -11.212 11.719 3.533 -12.083 12.589 9.767 3.017 10.222 8.005 9.456 12.390
Bus484 13.80 2.202 -15.094 15.254 0.330 -0.987 1.041 13.057 2.108 13.226 -13.140 -1.849 13.270
Bus486 2.40 2.801 -7.722 8.215 0.000 0.000 0.000 6.683 2.434 7.113 6.683 2.434 7.113
Bus488 4.16 1.586 -19.956 20.019 0.479 -0.011 0.479 17.201 1.396 17.257 -17.321 -1.395 17.377
Bus489 0.48 4.808 -13.679 14.499 0.000 0.000 0.000 11.841 4.163 12.551 11.841 4.163 12.551
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 16
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus490 0.22 0.606 -1.526 1.642 0.618 -1.545 1.664 1.321 0.525 1.422 -1.636 0.258 1.656
Bus491 2.40 1.435 -7.710 7.842 0.000 0.000 0.000 6.646 1.234 6.760 6.646 1.234 6.760
Bus492 13.80 3.042 -13.694 14.027 0.340 -0.945 1.005 11.823 2.800 12.150 -11.909 -2.552 12.179
Bus493 13.80 3.791 -6.174 7.245 0.343 -0.761 0.835 5.222 3.129 6.088 5.131 3.340 6.122
Bus495 2.40 2.224 -9.424 9.683 0.000 0.000 0.000 8.106 1.911 8.329 8.106 1.911 8.329
Bus496 0.22 2.563 -6.683 7.157 2.672 -7.456 7.920 5.785 2.218 6.196 4.405 6.431 7.795
Bus497 0.48 3.512 -12.715 13.191 0.000 0.000 0.000 10.995 3.034 11.406 10.995 3.034 11.406
Bus498 0.22 2.714 -7.975 8.424 2.720 -8.376 8.806 6.903 2.348 7.291 5.545 6.761 8.744
Bus499 2.40 3.988 -7.897 8.846 0.000 0.000 0.000 6.799 3.415 7.609 6.799 3.415 7.609
Bus500 0.22 6.111 -21.353 22.211 6.653 -22.884 23.832 18.486 5.290 19.228 -22.140 7.043 23.233
Bus501 13.80 1.565 -21.540 21.597 1.540 -0.226 1.557 18.308 1.600 18.378 -18.708 -1.554 18.772
Bus502 0.48 3.207 -22.742 22.967 0.000 0.000 0.000 19.685 2.781 19.880 19.685 2.781 19.880
Bus503 0.22 2.444 -12.383 12.622 2.780 -13.802 14.079 10.722 2.118 10.929 -12.331 5.679 13.576
Bus504 0.48 4.547 -15.572 16.223 0.000 0.000 0.000 13.478 3.939 14.041 13.478 3.939 14.041
Bus505 0.22 1.154 -2.014 2.321 1.229 -2.129 2.458 1.741 0.994 2.005 -2.406 0.137 2.410
Bus506 13.80 0.376 -1.201 1.259 0.210 -0.642 0.675 1.040 0.326 1.090 -1.113 -0.107 1.118
Bus507 0.22 2.181 -9.193 9.448 2.177 -9.484 9.730 7.957 1.888 8.178 6.873 6.790 9.661
Bus508 0.22 3.088 -6.414 7.119 3.290 -6.669 7.436 5.553 2.674 6.163 -7.313 0.799 7.356
Bus509 2.40 2.316 -0.708 2.422 0.000 0.000 0.000 0.612 2.005 2.097 0.612 2.005 2.097
Bus510 0.22 2.327 -6.083 6.513 2.418 -6.764 7.184 5.264 2.014 5.637 4.019 5.823 7.076
Bus511 4.16 4.992 -16.728 17.456 0.476 -0.013 0.476 14.423 4.313 15.054 -14.543 -4.312 15.168
Bus512 0.22 3.178 -11.843 12.261 0.000 0.000 0.000 10.254 2.752 10.617 10.254 2.752 10.617
Bus513 0.22 1.068 -1.256 1.649 1.089 -1.265 1.669 1.088 0.925 1.428 -1.644 -0.288 1.669
Bus514 2.40 1.236 -7.315 7.419 0.000 0.000 0.000 6.329 1.070 6.419 6.329 1.070 6.419
Bus516 0.48 4.550 -7.375 8.666 0.000 0.000 0.000 6.386 3.941 7.504 6.386 3.941 7.504
Bus518 13.80 1.425 -21.886 21.932 1.547 -0.223 1.563 18.600 1.493 18.660 -19.001 -1.448 19.056
Bus519 4.16 1.278 -16.616 16.665 0.479 -0.013 0.479 14.344 1.123 14.388 -14.464 -1.121 14.508
Bus520 0.48 3.070 -22.034 22.247 0.000 0.000 0.000 19.076 2.662 19.261 19.076 2.662 19.261
Bus521 4.16 3.717 -13.183 13.697 0.475 -0.017 0.475 11.370 3.230 11.820 -11.490 -3.228 11.934
Bus522 0.22 2.513 -12.546 12.795 2.837 -13.936 14.222 10.864 2.177 11.080 -12.491 5.662 13.714
Bus523 0.22 3.131 -12.875 13.250 3.461 -14.676 15.079 11.149 2.712 11.474 9.220 11.244 14.541
Bus524 0.28 0.160 -0.185 0.244 0.162 -0.186 0.246 0.160 0.138 0.211 -0.242 -0.045 0.246
Bus526 2.40 4.229 -10.764 11.565 0.000 0.000 0.000 9.264 3.632 9.951 9.264 3.632 9.951
Bus565 0.48 2.345 -13.312 13.517 0.000 0.000 0.000 11.503 2.026 11.680 11.503 2.026 11.680
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 17
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus566 0.48 5.297 -18.310 19.061 0.000 0.000 0.000 15.847 4.584 16.497 15.847 4.584 16.497
Bus567 13.80 1.554 -21.567 21.622 1.540 -0.226 1.557 18.331 1.591 18.399 -18.730 -1.545 18.794
Bus568 0.22 2.519 -12.597 12.847 2.859 -14.063 14.351 10.908 2.182 11.124 -12.559 5.778 13.824
Bus569 4.16 2.067 -18.113 18.231 0.479 -0.012 0.479 15.599 1.828 15.706 -15.720 -1.827 15.826
Bus570 0.46 2.482 -14.216 14.431 2.857 -17.256 17.491 11.854 2.019 12.025 10.156 14.202 17.460
Bus571 13.80 2.087 -16.251 16.384 0.329 -1.014 1.066 14.065 2.040 14.212 -14.148 -1.775 14.259
Bus572 0.22 1.069 -1.261 1.653 1.090 -1.268 1.672 1.092 0.926 1.431 -1.648 -0.288 1.673
Bus573 0.22 2.213 -3.787 4.386 2.678 -4.572 5.299 3.279 1.916 3.798 -4.976 0.970 5.070
Bus575 2.40 3.298 -14.831 15.193 0.000 0.000 0.000 12.726 2.831 13.037 12.726 2.831 13.037
Bus576 2.40 3.682 -12.493 13.025 0.000 0.000 0.000 10.814 3.207 11.280 10.814 3.207 11.280
Bus577 0.22 1.734 -3.355 3.777 1.898 -3.525 4.003 2.906 1.502 3.271 -3.950 0.352 3.965
Bus578 13.80 3.042 -16.098 16.383 0.328 -0.997 1.049 12.956 2.416 13.179 -13.060 -2.144 13.235
Bus579 0.22 2.297 -4.842 5.360 2.520 -5.171 5.752 4.193 1.989 4.640 -5.588 0.785 5.643
Bus580 0.22 1.007 -1.749 2.018 1.028 -1.770 2.047 1.514 0.872 1.747 -2.040 0.024 2.040
Bus581 0.48 5.365 -18.399 19.165 0.000 0.000 0.000 15.913 4.637 16.575 15.913 4.637 16.575
Bus582 4.16 3.331 -14.678 15.052 0.476 -0.016 0.476 12.680 2.894 13.006 -12.800 -2.892 13.122
Bus583 0.46 2.321 -13.302 13.503 2.728 -16.379 16.604 11.138 1.906 11.300 9.476 13.617 16.589
Bus584 34.50 1.038 -13.418 13.459 0.134 -0.791 0.803 11.323 0.927 11.361 -11.361 -0.718 11.384
Bus585 2.40 4.858 -8.118 9.461 0.000 0.000 0.000 7.000 4.176 8.151 7.000 4.176 8.151
Bus586 0.22 1.007 -1.180 1.551 1.044 -1.209 1.597 1.022 0.872 1.343 -1.563 -0.253 1.583
Bus588 0.22 2.319 -6.077 6.504 2.412 -6.759 7.177 5.259 2.007 5.629 4.016 5.814 7.067
Bus589 4.16 3.053 -13.846 14.178 0.476 -0.016 0.476 11.942 2.661 12.235 -12.062 -2.659 12.352
Bus590 0.22 1.513 -2.666 3.066 1.562 -2.717 3.134 2.309 1.310 2.654 -3.117 0.075 3.117
Bus591 13.80 2.602 -14.763 14.990 0.330 -0.987 1.041 12.759 2.443 12.990 -12.842 -2.184 13.027
Bus592 2.40 3.920 -15.467 15.957 0.000 0.000 0.000 13.387 3.423 13.818 13.387 3.423 13.818
Bus593 4.16 4.982 -16.738 17.464 0.476 -0.013 0.476 14.432 4.305 15.060 -14.552 -4.304 15.175
Bus594 2.40 5.465 -26.981 27.529 0.000 0.000 0.000 22.984 4.677 23.454 22.984 4.677 23.454
Bus595 0.48 3.165 -20.498 20.740 0.000 0.000 0.000 17.745 2.743 17.956 17.745 2.743 17.956
Bus596 115.00 0.010 -0.059 0.060 0.007 -0.040 0.041 0.050 0.009 0.051 -0.053 0.007 0.054
Bus598 13.80 2.147 -16.411 16.551 0.328 -1.012 1.064 13.428 1.850 13.554 -13.526 -1.575 13.617
Bus599 0.48 2.350 -7.680 8.031 2.300 -8.255 8.570 6.645 2.033 6.949 5.541 6.496 8.539
Bus600 0.48 7.070 -24.492 25.492 0.000 0.000 0.000 21.137 6.091 21.997 21.137 6.091 21.997
Bus602 2.40 1.338 -7.065 7.190 0.000 0.000 0.000 6.113 1.158 6.222 6.113 1.158 6.222
Bus603 0.48 2.349 -13.327 13.532 0.000 0.000 0.000 11.523 2.033 11.701 11.523 2.033 11.701
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 18
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus604 0.48 3.132 -20.304 20.544 0.000 0.000 0.000 17.573 2.718 17.782 17.573 2.718 17.782
Bus605 115.00 0.010 -0.059 0.060 0.007 -0.040 0.041 0.050 0.009 0.051 -0.053 0.007 0.054
Bus606 13.80 1.851 -14.786 14.901 0.325 -1.007 1.059 11.985 1.566 12.087 -12.086 -1.291 12.155
Bus607 0.22 2.694 -8.525 8.941 2.712 -8.811 9.219 7.379 2.332 7.739 6.016 6.895 9.151
Bus608 0.48 1.991 -9.613 9.817 0.000 0.000 0.000 8.324 1.724 8.500 8.324 1.724 8.500
Bus609 4.16 0.220 -1.379 1.396 0.373 -0.075 0.380 1.167 0.184 1.182 -1.268 -0.179 1.281
Bus610 13.80 0.816 -18.094 18.112 1.567 -0.162 1.576 15.654 0.720 15.671 -16.050 -0.696 16.065
Bus611 0.22 0.700 -1.197 1.387 0.727 -1.238 1.435 1.037 0.606 1.201 -1.414 0.035 1.415
Bus612 13.80 3.042 -13.694 14.027 0.340 -0.945 1.005 11.823 2.800 12.150 -11.909 -2.552 12.179
Bus613 0.22 2.199 -7.399 7.719 2.343 -7.940 8.279 6.405 1.904 6.682 5.152 6.191 8.054
Bus614 0.22 1.462 -2.609 2.991 1.539 -2.701 3.109 2.259 1.266 2.590 -3.072 0.134 3.075
Bus615 2.40 2.716 -12.693 12.980 0.000 0.000 0.000 10.881 2.328 11.128 10.881 2.328 11.128
Bus617 34.50 1.074 -13.363 13.406 0.134 -0.791 0.802 11.277 0.956 11.317 -11.315 -0.746 11.340
Bus618 0.22 2.546 -5.388 5.959 2.518 -4.427 5.093 4.665 2.204 5.159 -5.868 -0.343 5.878
Bus619 4.16 4.946 -16.781 17.494 0.476 -0.013 0.476 14.468 4.274 15.086 -14.588 -4.272 15.201
Bus620 0.22 1.503 -2.627 3.027 1.555 -2.689 3.106 2.274 1.302 2.621 -3.080 0.076 3.081
Bus621 0.48 3.633 -11.123 11.701 0.000 0.000 0.000 9.627 3.144 10.127 9.627 3.144 10.127
Bus622 0.22 2.020 -3.613 4.139 2.109 -3.707 4.265 3.128 1.748 3.584 -4.233 0.155 4.235
Bus623 4.16 4.936 -16.792 17.503 0.476 -0.013 0.476 14.479 4.265 15.094 -14.599 -4.264 15.209
Bus624 34.50 1.074 -13.363 13.406 0.134 -0.791 0.803 11.277 0.956 11.317 -11.315 -0.746 11.339
Bus627 0.48 1.425 -2.916 3.246 1.481 -2.968 3.317 2.525 1.234 2.811 -3.295 0.277 3.307
Bus629 4.16 2.666 -18.158 18.353 0.478 -0.013 0.478 15.650 2.321 15.821 -15.770 -2.319 15.940
Bus630 13.80 3.190 -14.384 14.733 0.333 -0.985 1.040 12.417 2.946 12.761 -12.501 -2.687 12.786
Bus632 13.80 3.095 -14.610 14.934 0.333 -0.987 1.041 12.615 2.870 12.937 -12.699 -2.611 12.964
Bus635 4.16 0.935 -5.482 5.561 0.000 0.000 0.000 4.712 0.805 4.780 4.712 0.805 4.780
Bus637 13.80 1.559 -17.202 17.272 0.332 -1.001 1.055 14.913 1.612 15.000 -14.997 -1.351 15.057
Bus638 0.48 2.847 -8.120 8.604 0.000 0.000 0.000 7.023 2.461 7.441 7.023 2.461 7.441
Bus639 4.16 1.545 -20.054 20.113 0.479 -0.011 0.479 17.285 1.362 17.338 -17.405 -1.360 17.458
Bus640 13.80 1.767 -19.247 19.328 0.331 -1.011 1.064 15.241 1.498 15.314 -15.348 -1.219 15.396
Bus641 2.40 4.808 -12.103 13.023 0.000 0.000 0.000 10.404 4.119 11.190 10.404 4.119 11.190
Bus642 0.48 2.847 -8.120 8.604 0.000 0.000 0.000 7.023 2.461 7.441 7.023 2.461 7.441
Bus644 4.16 1.433 -18.556 18.611 0.479 -0.012 0.479 15.992 1.286 16.043 -16.113 -1.284 16.164
Bus647 0.48 2.847 -8.120 8.604 0.000 0.000 0.000 7.023 2.461 7.441 7.023 2.461 7.441
Bus648 0.22 1.198 -2.074 2.395 1.285 -2.209 2.556 1.796 1.038 2.074 -2.489 0.144 2.493
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 19
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus650 0.22 1.433 -2.927 3.259 1.543 -3.094 3.457 2.534 1.241 2.822 -3.370 0.400 3.393
Bus651 13.80 0.352 -5.680 5.691 0.776 -0.103 0.783 4.898 0.308 4.908 -5.097 -0.295 5.105
Bus653 13.80 1.387 -15.589 15.650 0.331 -0.982 1.036 12.651 1.204 12.708 -12.753 -0.936 12.787
Bus655 2.40 0.721 -3.115 3.197 1.013 -3.524 3.666 2.697 0.624 2.768 -3.432 1.386 3.701
Bus657 13.80 1.549 -17.539 17.608 0.336 -0.989 1.044 14.361 1.378 14.427 -14.461 -1.111 14.504
Bus658 2.40 4.813 -12.534 13.427 0.000 0.000 0.000 10.848 4.186 11.628 10.848 4.186 11.628
Bus660 2.40 1.883 -8.189 8.403 0.000 0.000 0.000 7.085 1.629 7.270 7.085 1.629 7.270
Bus661 13.80 0.926 -17.843 17.867 1.567 -0.163 1.575 15.436 0.816 15.458 -15.832 -0.792 15.852
Bus662 13.80 1.982 -18.805 18.909 0.334 -0.993 1.048 15.035 1.588 15.118 -15.141 -1.317 15.199
Bus665 13.80 1.501 -17.351 17.415 0.337 -0.990 1.046 15.011 1.554 15.091 -15.096 -1.295 15.152
Bus667 0.22 2.398 -4.125 4.771 2.430 -4.155 4.813 3.572 2.077 4.132 -4.803 0.016 4.803
Bus668 4.16 4.279 -15.910 16.475 0.476 -0.013 0.476 13.709 3.715 14.203 -13.829 -3.713 14.319
Bus671 0.48 4.561 -23.905 24.336 5.013 -27.907 28.354 20.693 3.949 21.067 17.947 20.719 27.411
Bus673 2.40 2.019 -7.959 8.211 0.000 0.000 0.000 6.887 1.747 7.105 6.887 1.747 7.105
Bus676 2.40 0.643 -3.288 3.351 0.789 -4.083 4.159 2.847 0.557 2.901 2.338 3.251 4.004
Bus677 0.22 2.398 -4.125 4.771 2.430 -4.155 4.813 3.572 2.077 4.132 -4.803 0.016 4.803
Bus679 0.22 2.396 -4.124 4.769 2.428 -4.154 4.811 3.570 2.074 4.129 -4.802 0.018 4.802
Bus680 4.16 4.460 -15.713 16.334 0.476 -0.013 0.476 13.541 3.869 14.083 -13.661 -3.867 14.198
Bus685 4.16 4.708 -9.320 10.442 0.390 -0.015 0.391 8.050 4.084 9.027 -8.149 -4.082 9.114
Bus688 0.22 1.064 -1.253 1.644 1.087 -1.263 1.666 1.085 0.921 1.424 -1.640 -0.285 1.665
Bus690 4.16 1.502 -18.388 18.450 0.479 -0.012 0.479 15.848 1.344 15.904 -15.968 -1.343 16.025
Bus693 4.16 1.537 -18.299 18.364 0.479 -0.012 0.479 15.771 1.374 15.831 -15.892 -1.372 15.951
Bus695 0.48 3.415 -15.745 16.111 0.000 0.000 0.000 13.628 2.959 13.945 13.628 2.959 13.945
Bus696 0.22 1.801 -3.307 3.765 1.948 -3.488 3.995 2.865 1.561 3.263 -3.922 0.282 3.932
Bus697 0.48 5.006 -21.339 21.918 6.656 -21.359 22.372 18.473 4.333 18.974 -22.655 6.238 23.498
Bus698 4.16 1.570 -18.218 18.285 0.479 -0.012 0.479 15.701 1.402 15.763 -15.821 -1.400 15.883
Bus699 2.40 1.785 -9.368 9.537 0.000 0.000 0.000 8.111 1.558 8.259 8.111 1.558 8.259
Bus700 2.40 0.634 -3.305 3.366 0.759 -4.143 4.212 2.862 0.549 2.914 2.393 3.323 4.095
Bus701 0.22 1.363 -2.756 3.075 1.441 -2.867 3.209 2.386 1.181 2.663 -3.150 0.313 3.166
Bus705 0.22 1.093 -1.270 1.676 1.107 -1.274 1.687 1.100 0.947 1.451 -1.660 -0.308 1.688
Bus706 0.22 1.428 -2.517 2.894 1.465 -2.546 2.937 2.180 1.237 2.506 -2.931 0.051 2.932
Bus708 0.48 3.048 -23.020 23.221 0.000 0.000 0.000 19.861 2.628 20.034 19.861 2.628 20.034
Bus709 0.48 3.919 -15.854 16.331 0.000 0.000 0.000 13.723 3.394 14.137 13.723 3.394 14.137
Bus710 0.22 2.645 -4.661 5.359 2.715 -4.719 5.444 4.036 2.290 4.641 -5.430 0.099 5.431
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 20
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus711 0.22 1.175 -2.115 2.420 1.225 -2.161 2.485 1.832 1.018 2.096 -2.471 0.087 2.473
Bus712 0.48 3.007 -22.815 23.013 0.000 0.000 0.000 19.722 2.604 19.894 19.722 2.604 19.894
Bus713 13.80 0.348 -5.691 5.701 0.777 -0.103 0.784 4.908 0.304 4.917 -5.106 -0.292 5.115
Bus715 2.40 2.429 -14.560 14.761 0.000 0.000 0.000 12.514 2.097 12.689 12.514 2.097 12.689
Bus717 2.40 2.163 -13.237 13.412 0.000 0.000 0.000 11.365 1.862 11.516 11.365 1.862 11.516
Bus718 0.22 2.645 -4.661 5.359 2.715 -4.719 5.444 4.036 2.290 4.641 -5.430 0.099 5.431
Bus719 13.80 0.110 -0.346 0.363 0.000 0.000 0.000 0.299 0.095 0.314 0.299 0.095 0.314
Bus723 0.48 3.279 -23.759 23.984 0.000 0.000 0.000 20.508 2.822 20.702 20.508 2.822 20.702
Bus725 0.22 2.088 -4.011 4.522 2.369 -4.551 5.131 3.472 1.808 3.915 -4.843 0.823 4.913
Bus726 0.48 3.260 -23.314 23.541 0.000 0.000 0.000 20.126 2.808 20.321 20.126 2.808 20.321
Bus727 0.22 2.082 -3.725 4.267 2.155 -3.785 4.355 3.225 1.803 3.695 -4.341 0.120 4.343
Bus728 2.40 5.530 -6.654 8.652 0.000 0.000 0.000 5.753 4.750 7.461 5.753 4.750 7.461
Bus730 2.40 5.539 -6.622 8.633 0.000 0.000 0.000 5.721 4.759 7.442 5.721 4.759 7.442
Bus731 0.22 2.633 -4.640 5.335 2.702 -4.698 5.419 4.018 2.280 4.620 -5.406 0.098 5.406
Bus733 0.22 2.523 -4.437 5.104 2.586 -4.490 5.182 3.843 2.185 4.420 -5.169 0.087 5.170
Bus734 2.40 5.926 -9.394 11.107 0.000 0.000 0.000 8.106 5.089 9.571 8.106 5.089 9.571
Bus735 0.22 2.645 -4.661 5.359 2.715 -4.719 5.444 4.036 2.290 4.641 -5.430 0.099 5.431
Bus738 0.48 3.100 -22.682 22.893 0.000 0.000 0.000 19.600 2.674 19.781 19.600 2.674 19.781
Bus739 2.40 5.947 -9.347 11.079 0.000 0.000 0.000 8.062 5.109 9.544 8.062 5.109 9.544
Bus740 0.48 2.998 -22.237 22.438 0.000 0.000 0.000 19.217 2.592 19.392 19.217 2.592 19.392
Bus741 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus742 34.50 0.046 -0.269 0.273 0.000 0.000 0.000 0.233 0.040 0.237 0.233 0.040 0.237
Bus743 0.48 3.008 -9.371 9.842 0.000 0.000 0.000 8.113 2.604 8.521 8.113 2.604 8.521
Bus744 0.48 3.202 -9.974 10.475 0.000 0.000 0.000 8.636 2.776 9.071 8.636 2.776 9.071
Bus745 13.80 1.386 -15.586 15.648 0.332 -0.981 1.035 12.653 1.200 12.710 -12.755 -0.933 12.789
Bus748 2.40 1.701 -9.116 9.273 0.000 0.000 0.000 7.837 1.463 7.973 7.837 1.463 7.973
Bus749 2.40 1.760 -9.451 9.614 0.000 0.000 0.000 8.130 1.514 8.269 8.130 1.514 8.269
Bus750 0.22 1.026 -1.207 1.585 1.046 -1.214 1.603 1.045 0.889 1.372 -1.579 -0.278 1.603
Bus751 13.80 3.525 -6.511 7.404 0.331 -0.885 0.945 5.491 2.907 6.213 5.404 3.154 6.257
Bus752 4.16 0.479 -2.345 2.394 0.473 -2.409 2.455 2.024 0.414 2.066 1.792 1.661 2.444
Bus754 0.22 1.801 -3.307 3.765 1.948 -3.488 3.995 2.865 1.561 3.263 -3.922 0.282 3.932
Bus755 4.16 1.619 -15.876 15.958 0.478 -0.014 0.479 13.706 1.414 13.778 -13.826 -1.413 13.898
Bus756 0.22 1.068 -1.256 1.648 1.089 -1.264 1.669 1.087 0.925 1.427 -1.643 -0.288 1.668
Bus757 4.16 1.649 -15.521 15.608 0.478 -0.015 0.479 13.354 1.448 13.432 -13.475 -1.446 13.552
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 21
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus758 4.16 2.023 -3.872 4.369 1.975 -4.233 4.671 3.337 1.737 3.762 2.385 4.088 4.732
Bus759 0.22 3.406 -4.455 5.608 4.120 -4.888 6.393 3.858 2.950 4.857 -6.418 -0.274 6.424
Bus760 2.40 3.208 -8.756 9.325 0.000 0.000 0.000 7.574 2.774 8.066 7.574 2.774 8.066
Bus761 2.40 4.227 -10.773 11.572 0.000 0.000 0.000 9.272 3.630 9.957 9.272 3.630 9.957
Bus762 0.48 0.987 -4.474 4.581 1.003 -4.603 4.711 3.869 0.852 3.961 3.358 3.230 4.659
Bus764 13.80 4.341 -13.549 14.228 0.332 -0.980 1.035 11.033 3.420 11.551 -11.136 -3.155 11.575
Bus767 0.22 2.943 -10.898 11.289 3.234 -12.603 13.011 9.432 2.547 9.770 7.651 10.024 12.611
Bus769 0.22 1.068 -1.256 1.648 1.089 -1.264 1.669 1.087 0.925 1.427 -1.643 -0.288 1.668
Bus770 0.48 1.158 -2.223 2.507 1.184 -2.273 2.563 1.925 1.003 2.170 -2.531 0.161 2.536
Bus774 0.48 1.949 -7.531 7.779 0.000 0.000 0.000 6.522 1.690 6.737 6.522 1.690 6.737
Bus775 0.48 3.233 -22.890 23.117 0.000 0.000 0.000 19.783 2.785 19.978 19.783 2.785 19.978
Bus776 0.22 0.941 -1.664 1.912 0.985 -1.716 1.979 1.441 0.815 1.656 -1.957 0.071 1.958
Bus777 0.48 3.151 -22.608 22.827 0.000 0.000 0.000 19.511 2.712 19.698 19.511 2.712 19.698
Bus778 13.80 0.110 -0.344 0.361 0.000 0.000 0.000 0.298 0.095 0.312 0.298 0.095 0.312
Bus779 0.22 0.948 -1.672 1.922 0.990 -1.722 1.986 1.448 0.821 1.664 -1.965 0.067 1.966
Bus780 4.16 1.998 -4.104 4.565 1.962 -5.002 5.373 3.536 1.715 3.930 2.692 4.885 5.578
Bus781 13.80 0.110 -0.345 0.362 0.000 0.000 0.000 0.299 0.095 0.313 0.299 0.095 0.313
Bus782 0.22 0.678 -0.819 1.063 0.702 -0.831 1.088 0.710 0.587 0.921 -1.074 -0.165 1.087
Bus784 13.80 0.110 -0.345 0.362 0.000 0.000 0.000 0.299 0.095 0.314 0.299 0.095 0.314
Bus785 2.40 2.556 -9.215 9.563 0.000 0.000 0.000 7.928 2.195 8.226 7.928 2.195 8.226
Bus787 13.80 0.373 -1.206 1.263 0.209 -0.644 0.677 1.045 0.323 1.093 -1.117 -0.103 1.122
Bus788 13.80 2.357 -26.263 26.369 1.567 -0.140 1.573 22.428 2.223 22.538 -22.830 -2.198 22.935
Bus790 13.80 1.986 -18.778 18.883 0.334 -0.992 1.047 15.021 1.589 15.105 -15.127 -1.319 15.185
Bus793 13.80 1.543 -17.547 17.615 0.336 -0.987 1.043 14.372 1.371 14.438 -14.473 -1.105 14.515
Bus794 0.22 1.794 -3.117 3.597 1.825 -3.143 3.635 2.700 1.553 3.115 -3.629 0.031 3.629
Bus795 13.80 1.496 -17.358 17.422 0.337 -0.989 1.045 15.015 1.548 15.095 -15.100 -1.291 15.155
Bus797 2.40 2.316 -0.708 2.422 0.000 0.000 0.000 0.612 2.005 2.097 0.612 2.005 2.097
Bus798 4.16 2.401 -15.015 15.205 0.477 -0.015 0.477 12.963 2.085 13.130 -13.083 -2.084 13.248
Bus799 4.16 1.619 -15.875 15.958 0.478 -0.014 0.479 13.705 1.415 13.777 -13.825 -1.413 13.897
Bus800 2.40 4.778 -6.266 7.880 0.000 0.000 0.000 5.411 4.111 6.796 5.411 4.111 6.796
Bus801 0.48 1.525 -7.267 7.426 0.000 0.000 0.000 6.286 1.319 6.423 6.286 1.319 6.423
Bus802 4.16 1.617 -15.888 15.970 0.478 -0.014 0.479 13.716 1.413 13.789 -13.837 -1.411 13.908
Bus804 4.16 3.679 -13.847 14.328 0.475 -0.016 0.475 11.918 3.179 12.334 -12.038 -3.177 12.450
Bus806 4.16 1.914 -14.826 14.949 0.478 -0.015 0.478 12.756 1.673 12.865 -12.876 -1.671 12.984
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 22
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus807 4.16 3.417 -13.169 13.605 0.475 -0.016 0.475 11.354 2.967 11.735 -11.474 -2.965 11.850
Bus809 13.80 1.978 -18.892 18.996 0.329 -1.017 1.069 15.004 1.641 15.093 -15.110 -1.361 15.171
Bus810 13.80 1.978 -18.892 18.996 0.331 -1.010 1.062 15.004 1.641 15.093 -15.111 -1.363 15.172
Bus811 4.16 3.682 -13.844 14.326 0.475 -0.016 0.475 11.915 3.182 12.333 -12.035 -3.180 12.448
Bus812 4.16 3.723 -13.801 14.294 0.475 -0.016 0.475 11.879 3.216 12.306 -11.999 -3.215 12.422
Bus814 4.16 1.644 -15.537 15.624 0.478 -0.015 0.479 13.367 1.443 13.445 -13.488 -1.442 13.565
Bus815 4.16 1.649 -15.530 15.618 0.478 -0.015 0.479 13.363 1.448 13.441 -13.483 -1.446 13.561
Bus816 0.48 3.657 -25.233 25.496 0.000 0.000 0.000 21.656 3.108 21.878 21.656 3.108 21.878
Bus817 0.48 3.096 -22.241 22.456 0.000 0.000 0.000 19.189 2.660 19.372 19.189 2.660 19.372
Bus818 0.48 3.764 -23.885 24.180 0.000 0.000 0.000 20.669 3.258 20.924 20.669 3.258 20.924
Bus819 0.48 3.840 -24.026 24.331 0.000 0.000 0.000 20.772 3.321 21.036 20.772 3.321 21.036
Bus820 13.80 2.678 -25.417 25.558 1.565 -0.143 1.571 21.707 2.481 21.848 -22.108 -2.456 22.244
Bus821 13.80 2.133 -20.095 20.207 1.537 -0.235 1.554 17.086 2.040 17.207 -17.485 -1.993 17.598
Bus822 4.16 1.518 -14.593 14.672 0.478 -0.015 0.478 12.593 1.326 12.663 -12.713 -1.325 12.782
Bus823 4.16 1.548 -14.687 14.769 0.478 -0.015 0.478 12.664 1.367 12.738 -12.785 -1.365 12.857
Bus824 4.16 3.316 -13.271 13.679 0.475 -0.016 0.475 11.442 2.879 11.799 -11.562 -2.877 11.914
Bus826 4.16 1.522 -14.583 14.662 0.478 -0.015 0.478 12.584 1.330 12.654 -12.704 -1.328 12.773
Bus827 4.16 1.514 -14.602 14.681 0.478 -0.015 0.478 12.600 1.323 12.669 -12.720 -1.322 12.789
Bus828 4.16 1.637 -14.529 14.621 0.478 -0.015 0.478 12.538 1.428 12.619 -12.658 -1.426 12.738
Bus829 4.16 1.632 -14.540 14.631 0.478 -0.015 0.478 12.547 1.424 12.627 -12.667 -1.422 12.747
Bus830 2.40 1.845 -17.507 17.604 0.000 0.000 0.000 15.162 1.633 15.250 15.162 1.633 15.250
Bus831 4.16 1.663 -14.632 14.726 0.478 -0.015 0.478 12.616 1.465 12.701 -12.737 -1.463 12.820
Bus832 4.16 1.669 -14.618 14.713 0.478 -0.015 0.478 12.604 1.470 12.689 -12.724 -1.469 12.809
Bus833 4.16 1.548 -14.687 14.768 0.478 -0.015 0.478 12.664 1.367 12.737 -12.784 -1.365 12.857
Bus834 4.16 1.553 -14.674 14.756 0.478 -0.015 0.478 12.653 1.371 12.727 -12.773 -1.369 12.847
Bus835 0.48 3.137 -23.352 23.562 0.000 0.000 0.000 20.098 2.692 20.278 20.098 2.692 20.278
Bus836 0.48 3.112 -22.593 22.806 0.000 0.000 0.000 19.518 2.693 19.703 19.518 2.693 19.703
Bus837 0.48 2.799 -20.572 20.761 0.000 0.000 0.000 17.805 2.426 17.970 17.805 2.426 17.970
Bus838 0.48 2.851 -20.828 21.023 0.000 0.000 0.000 18.025 2.475 18.194 18.025 2.475 18.194
Bus839 0.48 3.452 -14.814 15.211 0.000 0.000 0.000 12.761 2.967 13.101 12.761 2.967 13.101
Bus840 0.48 3.550 -15.243 15.651 0.000 0.000 0.000 13.163 3.062 13.515 13.163 3.062 13.515
Bus841 0.48 2.828 -20.723 20.915 0.000 0.000 0.000 17.933 2.455 18.100 17.933 2.455 18.100
Bus842 0.48 2.805 -20.588 20.778 0.000 0.000 0.000 17.819 2.431 17.984 17.819 2.431 17.984
Bus844 4.16 2.256 -19.222 19.354 0.479 -0.011 0.479 16.589 1.976 16.706 -16.709 -1.975 16.825
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 23
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus845 4.16 2.249 -19.241 19.372 0.479 -0.011 0.479 16.605 1.970 16.721 -16.725 -1.969 16.841
Bus846 4.16 2.250 -19.238 19.369 0.479 -0.011 0.479 16.602 1.971 16.719 -16.722 -1.970 16.838
Bus847 4.16 5.229 -16.480 17.289 0.476 -0.013 0.476 14.222 4.528 14.925 -14.342 -4.526 15.039
Bus849 4.16 5.225 -16.486 17.294 0.476 -0.013 0.476 14.227 4.524 14.929 -14.347 -4.522 15.043
Bus850 4.16 5.228 -16.481 17.290 0.476 -0.013 0.476 14.223 4.527 14.926 -14.343 -4.525 15.040
Bus853 4.16 2.246 -19.249 19.380 0.479 -0.011 0.479 16.612 1.968 16.728 -16.732 -1.966 16.847
Bus854 4.16 2.066 -18.120 18.238 0.479 -0.012 0.479 15.607 1.828 15.714 -15.728 -1.826 15.833
Bus855 4.16 2.071 -18.108 18.226 0.479 -0.012 0.479 15.596 1.832 15.704 -15.717 -1.830 15.823
Bus856 4.16 2.066 -18.120 18.238 0.479 -0.012 0.479 15.607 1.828 15.714 -15.728 -1.826 15.833
Bus857 4.16 2.069 -18.111 18.229 0.479 -0.012 0.479 15.599 1.830 15.706 -15.720 -1.829 15.826
Bus859 4.16 4.763 -15.707 16.413 0.475 -0.013 0.476 13.527 4.129 14.143 -13.647 -4.128 14.257
Bus861 4.16 3.980 -14.723 15.251 0.475 -0.015 0.476 12.685 3.454 13.147 -12.806 -3.452 13.263
Bus863 0.48 3.603 -25.195 25.451 0.000 0.000 0.000 21.811 3.123 22.033 21.811 3.123 22.033
Bus864 0.48 3.205 -22.794 23.018 0.000 0.000 0.000 19.726 2.781 19.921 19.726 2.781 19.921
Bus865 0.48 3.432 -23.807 24.053 0.000 0.000 0.000 20.606 2.972 20.819 20.606 2.972 20.819
Bus866 0.48 3.048 -21.799 22.011 0.000 0.000 0.000 18.859 2.642 19.043 18.859 2.642 19.043
Bus867 0.48 3.507 -24.177 24.430 0.000 0.000 0.000 20.929 3.039 21.148 20.929 3.039 21.148
Bus868 0.48 3.194 -22.769 22.992 0.000 0.000 0.000 19.706 2.772 19.900 19.706 2.772 19.900
Bus869 0.48 3.203 -22.119 22.350 0.000 0.000 0.000 19.147 2.776 19.348 19.147 2.776 19.348
Bus870 0.48 3.038 -21.429 21.644 0.000 0.000 0.000 18.544 2.637 18.731 18.544 2.637 18.731
Bus872 4.16 5.134 -15.863 16.673 0.475 -0.013 0.475 13.691 4.445 14.394 -13.811 -4.443 14.508
Bus873 4.16 2.554 -18.399 18.575 0.478 -0.012 0.478 15.877 2.231 16.033 -15.997 -2.229 16.152
Bus874 13.80 1.687 -27.938 27.989 1.573 -0.131 1.579 23.846 1.699 23.906 -24.249 -1.676 24.307
Bus875 4.16 2.339 -17.388 17.545 0.478 -0.013 0.478 14.975 2.058 15.116 -15.096 -2.056 15.235
Bus877 4.16 4.690 -15.155 15.864 0.475 -0.014 0.475 13.053 4.064 13.671 -13.173 -4.062 13.785
Bus878 0.48 3.218 -23.084 23.308 0.000 0.000 0.000 19.862 2.761 20.053 19.862 2.761 20.053
Bus879 0.48 3.201 -23.037 23.258 0.000 0.000 0.000 19.760 2.737 19.949 19.760 2.737 19.949
Bus880 13.80 0.943 -17.807 17.832 1.566 -0.163 1.575 15.405 0.831 15.428 -15.801 -0.807 15.822
Bus881 13.80 0.751 -19.075 19.089 1.570 -0.158 1.578 16.435 0.720 16.451 -16.834 -0.696 16.848
Bus882 13.80 1.706 -27.783 27.835 1.573 -0.131 1.578 23.717 1.709 23.778 -24.120 -1.686 24.179
Bus883 13.80 1.438 -21.794 21.842 1.548 -0.223 1.564 18.524 1.499 18.585 -18.926 -1.454 18.982
Bus884 13.80 3.055 -12.570 12.936 0.329 -0.972 1.027 10.288 2.481 10.583 -10.389 -2.217 10.622
Bus885 2.40 2.143 -17.805 17.933 0.000 0.000 0.000 15.224 1.849 15.336 15.224 1.849 15.336
Bus886 2.40 4.450 -13.414 14.133 0.000 0.000 0.000 11.509 3.802 12.121 11.509 3.802 12.121
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 24
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus887 0.48 4.037 -20.355 20.751 0.000 0.000 0.000 17.567 3.477 17.908 17.567 3.477 17.908
Bus888 0.48 3.640 -18.677 19.028 0.000 0.000 0.000 16.107 3.131 16.409 16.107 3.131 16.409
Bus889 2.40 4.127 -12.487 13.151 0.000 0.000 0.000 10.707 3.519 11.270 10.707 3.519 11.270
Bus900 2.40 5.185 -8.950 10.344 0.000 0.000 0.000 7.707 4.432 8.890 7.707 4.432 8.890
Bus991 2.40 5.273 -8.759 10.224 0.000 0.000 0.000 7.542 4.508 8.787 7.542 4.508 8.787
Bus992 2.40 6.640 -8.410 10.715 0.000 0.000 0.000 7.259 5.687 9.221 7.259 5.687 9.221
Bus993 2.40 5.613 -9.318 10.878 0.000 0.000 0.000 8.026 4.806 9.355 8.026 4.806 9.355
Bus995 13.80 4.064 -14.656 15.209 0.332 -0.988 1.042 11.869 3.196 12.292 -11.974 -2.928 12.327
Bus996 2.40 4.275 -14.454 15.073 0.000 0.000 0.000 12.374 3.638 12.898 12.374 3.638 12.898
Bus997 13.80 2.715 -14.527 14.779 0.330 -0.985 1.039 12.551 2.535 12.805 -12.635 -2.276 12.838
Bus998 13.80 2.715 -14.527 14.779 0.330 -0.985 1.039 12.551 2.535 12.805 -12.635 -2.276 12.838
Bus999 13.80 3.166 -15.820 16.134 0.328 -0.995 1.048 12.750 2.508 12.995 -12.854 -2.238 13.047
Bus1000 13.80 3.166 -15.820 16.134 0.328 -0.995 1.048 12.750 2.508 12.995 -12.854 -2.238 13.047
Bus1001 13.80 2.757 -12.430 12.732 0.325 -0.963 1.016 10.307 2.300 10.561 -10.403 -2.041 10.601
Bus1002 4.16 1.238 -11.269 11.337 0.792 -0.053 0.794 9.650 1.072 9.709 -9.851 -1.066 9.909
Bus1003 4.16 2.162 -12.395 12.582 0.789 -0.050 0.790 10.505 1.818 10.661 -10.708 -1.814 10.860
Bus1004 0.48 3.344 -22.215 22.465 0.000 0.000 0.000 19.018 2.849 19.230 19.018 2.849 19.230
Bus1005 0.48 2.934 -19.652 19.870 0.000 0.000 0.000 16.980 2.536 17.168 16.980 2.536 17.168
Bus1006 4.16 1.812 -10.711 10.864 0.787 -0.055 0.789 9.176 1.557 9.307 -9.377 -1.552 9.505
Bus1009 4.16 2.322 -10.084 10.347 0.782 -0.058 0.784 8.644 1.988 8.870 -8.844 -1.982 9.064
Bus1010 4.16 2.159 -9.710 9.948 0.779 -0.061 0.782 8.326 1.851 8.529 -8.525 -1.845 8.722
Bus1011 0.48 3.468 -18.913 19.228 0.000 0.000 0.000 16.322 2.999 16.595 16.322 2.999 16.595
Bus1012 0.22 0.308 -0.352 0.467 0.309 -0.352 0.469 0.305 0.266 0.405 -0.460 -0.090 0.469
Bus1013 0.22 1.177 -2.081 2.390 1.214 -2.114 2.438 1.801 1.019 2.070 -2.428 0.056 2.429
Bus1014 0.22 1.177 -2.081 2.390 1.214 -2.114 2.438 1.801 1.019 2.070 -2.428 0.056 2.429
Bus1015 0.48 3.278 -17.828 18.127 0.000 0.000 0.000 15.383 2.825 15.640 15.383 2.825 15.640
Bus1016 4.16 2.600 -11.101 11.402 0.781 -0.056 0.783 9.428 2.186 9.678 -9.629 -2.181 9.873
Bus1017 4.16 2.161 -9.707 9.945 0.779 -0.061 0.782 8.322 1.853 8.526 -8.522 -1.846 8.720
Bus1018 0.48 3.374 -18.488 18.793 0.000 0.000 0.000 15.912 2.899 16.174 15.912 2.899 16.174
Bus1019 0.48 3.789 -20.915 21.255 0.000 0.000 0.000 17.943 3.232 18.232 17.943 3.232 18.232
Bus1020 4.16 2.572 -11.140 11.433 0.781 -0.056 0.783 9.460 2.163 9.704 -9.661 -2.158 9.899
Bus1021 4.16 3.481 -8.204 8.912 0.765 -0.063 0.767 7.046 2.977 7.649 -7.243 -2.969 7.828
Bus1022 0.48 3.973 -17.415 17.863 1.313 -2.372 2.712 15.025 3.417 15.409 -15.397 -2.785 15.647
Bus1023 0.48 4.277 -19.027 19.501 1.272 -2.281 2.612 16.343 3.654 16.747 -16.702 -3.049 16.978
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 25
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus1024 4.16 4.166 -9.130 10.036 0.767 -0.059 0.769 7.794 3.506 8.546 -7.992 -3.501 8.725
Bus1025 4.16 2.860 -11.499 11.849 0.783 -0.053 0.785 9.767 2.398 10.057 -9.969 -2.394 10.252
Bus1026 4.16 2.903 -11.454 11.816 0.783 -0.053 0.784 9.721 2.441 10.023 -9.923 -2.437 10.218
Bus1027 4.16 2.898 -11.459 11.820 0.783 -0.053 0.784 9.729 2.434 10.029 -9.931 -2.430 10.224
Bus1028 4.16 1.430 -13.104 13.182 0.793 -0.048 0.794 11.093 1.209 11.159 -11.297 -1.206 11.361
Bus1029 13.80 3.051 -13.783 14.117 0.323 -0.981 1.033 11.208 2.434 11.469 -11.309 -2.168 11.515
Bus1030 4.16 1.057 -9.519 9.577 0.398 -0.014 0.398 8.226 0.916 8.277 -8.327 -0.914 8.377
Bus1031 0.48 3.865 -29.241 29.495 0.000 0.000 0.000 25.306 3.347 25.527 25.306 3.347 25.527
Bus1032 0.48 4.856 -33.676 34.024 0.000 0.000 0.000 29.017 4.188 29.318 29.017 4.188 29.318
Bus1033 4.16 2.041 -14.830 14.970 0.399 -0.010 0.399 12.579 1.738 12.699 -12.681 -1.738 12.800
Bus1036 13.80 3.209 -16.061 16.378 0.336 -0.973 1.030 12.922 2.541 13.170 -13.028 -2.277 13.225
Bus1037 4.16 1.318 -13.630 13.694 0.399 -0.011 0.399 11.612 1.134 11.667 -11.714 -1.133 11.769
Bus1038 0.22 1.938 -3.589 4.079 2.051 -3.691 4.222 3.107 1.678 3.531 -4.196 0.221 4.202
Bus1039 0.48 2.544 -18.087 18.265 0.000 0.000 0.000 15.618 2.200 15.772 15.618 2.200 15.772
Bus1040 0.22 1.976 -3.603 4.110 2.079 -3.701 4.244 3.120 1.711 3.558 -4.216 0.190 4.220
Bus1041 0.48 2.801 -20.106 20.300 0.000 0.000 0.000 17.370 2.420 17.537 17.370 2.420 17.537
Bus1042 4.16 1.774 -12.658 12.782 0.398 -0.012 0.398 10.796 1.515 10.902 -10.898 -1.515 11.002
Bus1044 4.16 5.080 -5.887 7.776 0.384 -0.018 0.385 5.083 4.340 6.684 -5.181 -4.338 6.757
Bus1045 4.16 1.532 -13.236 13.324 0.399 -0.012 0.399 11.282 1.312 11.358 -11.384 -1.311 11.459
Bus1049 4.16 1.175 -11.739 11.798 0.399 -0.012 0.399 10.004 1.019 10.056 -10.105 -1.018 10.157
Bus1050 13.80 2.439 -13.223 13.446 0.334 -0.952 1.009 10.789 2.007 10.974 -10.891 -1.748 11.030
Bus1051 13.80 2.876 -13.043 13.356 0.329 -0.977 1.031 10.648 2.343 10.903 -10.749 -2.078 10.948
Bus1052 2.40 1.955 -17.283 17.394 0.000 0.000 0.000 14.763 1.690 14.859 14.763 1.690 14.859
Bus1053 0.22 1.334 -2.384 2.732 1.397 -2.454 2.824 2.064 1.155 2.365 -2.798 0.109 2.800
Bus1054 2.40 6.003 -16.260 17.333 0.000 0.000 0.000 13.937 5.109 14.844 13.937 5.109 14.844
Bus1055 0.48 3.536 -13.084 13.553 0.000 0.000 0.000 11.312 3.055 11.717 11.312 3.055 11.717
Bus1056 0.48 3.624 -13.697 14.168 0.000 0.000 0.000 11.842 3.131 12.249 11.842 3.131 12.249
Bus1057 2.40 5.967 -16.308 17.365 0.000 0.000 0.000 13.978 5.078 14.872 13.978 5.078 14.872
Bus1059 2.40 2.824 -18.560 18.774 0.000 0.000 0.000 15.880 2.413 16.062 15.880 2.413 16.062
Bus1060 2.40 3.306 -18.198 18.496 0.000 0.000 0.000 15.572 2.821 15.826 15.572 2.821 15.826
Bus1061 2.40 2.121 -19.960 20.072 0.000 0.000 0.000 17.059 1.822 17.156 17.059 1.822 17.156
Bus1062 2.40 1.975 -16.653 16.769 0.000 0.000 0.000 14.228 1.694 14.329 14.228 1.694 14.329
Bus1063 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus1064 4.16 3.949 -12.871 13.463 0.474 -0.016 0.474 11.126 3.427 11.642 -11.246 -3.425 11.756
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 26
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus1065 4.16 1.716 -14.981 15.079 0.478 -0.015 0.478 12.954 1.504 13.041 -13.074 -1.502 13.160
Bus1066 0.48 2.842 -20.712 20.906 0.000 0.000 0.000 17.932 2.465 18.101 17.932 2.465 18.101
Bus1067 0.48 3.248 -12.631 13.042 0.000 0.000 0.000 10.950 2.823 11.309 10.950 2.823 11.309
Bus1068 2.40 4.582 -10.673 11.615 0.000 0.000 0.000 9.236 3.981 10.058 9.236 3.981 10.058
Bus1069 0.48 3.088 -20.580 20.810 0.000 0.000 0.000 17.812 2.680 18.012 17.812 2.680 18.012
Bus1070 0.48 3.274 -22.084 22.325 0.000 0.000 0.000 19.134 2.843 19.344 19.134 2.843 19.344
Bus1071 4.16 2.942 -18.208 18.444 0.478 -0.013 0.478 15.703 2.576 15.912 -15.823 -2.574 16.031
Bus1073 4.16 2.430 -18.458 18.618 0.478 -0.013 0.478 15.920 2.137 16.063 -16.041 -2.135 16.182
Bus1074 2.40 4.317 -8.511 9.543 0.000 0.000 0.000 7.334 3.710 8.219 7.334 3.710 8.219
Bus1075 4.16 0.960 -10.195 10.240 0.477 -0.021 0.478 8.727 0.835 8.767 -8.848 -0.833 8.887
Bus1076 13.80 3.050 -18.617 18.865 1.524 -0.242 1.543 15.829 2.779 16.071 -16.226 -2.732 16.455
Bus1077 4.16 1.286 -13.985 14.044 0.478 -0.016 0.479 12.065 1.143 12.119 -12.185 -1.141 12.239
Bus1078 0.48 2.771 -20.343 20.531 0.000 0.000 0.000 17.611 2.403 17.774 17.611 2.403 17.774
Bus1079 4.16 1.594 -14.090 14.180 0.478 -0.016 0.478 12.173 1.395 12.253 -12.293 -1.393 12.372
Bus1080 4.16 0.963 -9.959 10.005 0.005 0.000 0.005 8.618 0.857 8.661 -8.620 -0.857 8.662
Bus1081 0.48 3.302 -13.887 14.274 0.000 0.000 0.000 12.012 2.857 12.347 12.012 2.857 12.347
Bus1082 4.16 1.698 -14.043 14.145 0.478 -0.016 0.478 12.132 1.485 12.223 -12.252 -1.483 12.342
Bus1083 13.80 3.919 -22.948 23.280 1.505 -0.166 1.514 19.603 3.502 19.913 -19.990 -3.472 20.289
Bus1084 4.16 1.323 -14.723 14.782 0.479 -0.015 0.479 12.719 1.163 12.773 -12.840 -1.162 12.892
Bus1088 4.16 3.315 -12.677 13.103 0.475 -0.017 0.475 10.951 2.876 11.323 -11.071 -2.873 11.438
Bus1089 4.16 1.529 -13.411 13.498 0.478 -0.017 0.478 11.571 1.350 11.649 -11.691 -1.347 11.768
Bus1091 4.16 3.132 -12.097 12.496 0.475 -0.018 0.475 10.434 2.723 10.783 -10.554 -2.721 10.899
Bus1094 4.16 1.054 -9.746 9.803 0.005 0.000 0.005 8.434 0.935 8.485 -8.435 -0.935 8.487
Bus1096 0.48 2.721 -20.159 20.342 0.000 0.000 0.000 17.455 2.367 17.614 17.455 2.367 17.614
Bus1098 4.16 1.530 -13.409 13.496 0.478 -0.017 0.478 11.569 1.350 11.647 -11.689 -1.348 11.767
Bus1099 0.48 2.673 -19.518 19.700 0.000 0.000 0.000 16.861 2.313 17.019 16.861 2.313 17.019
Bus1100 0.48 2.748 -20.173 20.359 0.000 0.000 0.000 17.458 2.386 17.620 17.458 2.386 17.620
Bus1101 4.16 1.056 -9.973 10.029 0.477 -0.022 0.478 8.539 0.916 8.588 -8.660 -0.914 8.709
Bus1102 4.16 1.593 -14.091 14.181 0.478 -0.016 0.478 12.174 1.395 12.254 -12.294 -1.393 12.373
Bus1103 0.48 2.805 -20.509 20.700 0.000 0.000 0.000 17.754 2.432 17.920 17.754 2.432 17.920
Bus1104 4.16 1.594 -14.090 14.180 0.478 -0.016 0.478 12.173 1.395 12.253 -12.293 -1.393 12.372
Bus1105 0.48 2.771 -20.343 20.531 0.000 0.000 0.000 17.611 2.403 17.774 17.611 2.403 17.774
Bus1107 4.16 1.530 -13.410 13.497 0.478 -0.017 0.478 11.569 1.350 11.648 -11.689 -1.348 11.767
Bus1108 4.16 1.625 -13.367 13.465 0.478 -0.017 0.478 11.532 1.431 11.620 -11.652 -1.429 11.739
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 27
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus1109 0.48 2.764 -19.932 20.122 0.000 0.000 0.000 17.219 2.391 17.384 17.219 2.391 17.384
Bus1110 4.16 1.101 -9.863 9.924 0.477 -0.022 0.477 8.446 0.954 8.499 -8.567 -0.952 8.620
Bus1111 0.48 2.685 -19.200 19.387 0.000 0.000 0.000 16.624 2.335 16.787 16.624 2.335 16.787
Bus1112 4.16 1.101 -9.617 9.680 0.005 0.000 0.005 8.322 0.975 8.379 -8.323 -0.975 8.380
Bus1114 4.16 1.943 -9.000 9.207 0.005 0.000 0.005 7.783 1.702 7.967 -7.784 -1.702 7.968
Bus1115 0.48 2.799 -20.456 20.647 0.000 0.000 0.000 17.704 2.430 17.870 17.704 2.430 17.870
Bus1117 4.16 1.987 -9.197 9.409 0.474 -0.023 0.474 7.879 1.704 8.061 -8.000 -1.702 8.179
Bus1118 4.16 1.987 -9.197 9.409 0.474 -0.023 0.474 7.879 1.704 8.061 -8.000 -1.702 8.179
Bus1119 0.48 2.771 -20.213 20.402 0.000 0.000 0.000 17.491 2.403 17.655 17.491 2.403 17.655
Bus1121 0.48 3.279 -13.821 14.205 0.000 0.000 0.000 11.953 2.838 12.285 11.953 2.838 12.285
Bus1122 0.48 4.377 -12.172 12.935 0.000 0.000 0.000 10.525 3.783 11.185 10.525 3.783 11.185
Bus1123 0.48 4.223 -11.863 12.592 0.000 0.000 0.000 10.271 3.660 10.903 10.271 3.660 10.903
Bus1124 4.16 0.819 -8.187 8.228 0.476 -0.027 0.477 7.071 0.718 7.107 -7.191 -0.714 7.226
Bus1125 13.80 3.131 -18.380 18.645 1.522 -0.244 1.542 15.629 2.842 15.885 -16.026 -2.794 16.268
Bus1127 13.80 4.221 -22.004 22.405 1.497 -0.172 1.507 18.803 3.737 19.170 -19.188 -3.706 19.542
Bus1128 13.80 3.961 -22.612 22.956 1.500 -0.169 1.510 19.320 3.526 19.639 -19.706 -3.495 20.013
Bus1129 4.16 0.832 -8.333 8.375 0.476 -0.026 0.477 7.208 0.726 7.244 -7.328 -0.723 7.363
Bus1130 2.40 5.682 -10.307 11.770 0.000 0.000 0.000 8.881 4.880 10.134 8.881 4.880 10.134
Bus1131 2.40 1.483 -16.348 16.415 0.000 0.000 0.000 14.039 1.294 14.099 14.039 1.294 14.099
Bus1132 13.80 2.103 -16.589 16.722 0.332 -0.992 1.046 13.567 1.818 13.688 -13.666 -1.549 13.754
Bus1133 13.80 1.811 -14.933 15.043 0.329 -0.987 1.040 12.098 1.537 12.196 -12.200 -1.267 12.266
Bus1134 2.40 1.388 -14.639 14.704 0.000 0.000 0.000 12.558 1.205 12.615 12.558 1.205 12.615
Bus1135 2.40 5.013 -9.692 10.911 0.000 0.000 0.000 8.345 4.297 9.386 8.345 4.297 9.386
Bus1136 4.16 0.927 -8.107 8.160 0.476 -0.027 0.476 7.012 0.807 7.058 -7.132 -0.804 7.177
Bus1139 4.16 0.926 -8.111 8.163 0.476 -0.027 0.476 7.015 0.806 7.062 -7.135 -0.803 7.180
Bus1141 4.16 1.498 -7.539 7.687 0.472 -0.029 0.473 6.511 1.302 6.640 -6.631 -1.298 6.757
Bus1142 13.80 2.101 -16.594 16.726 0.332 -0.992 1.046 13.570 1.816 13.691 -13.670 -1.547 13.757
Bus1143 4.16 0.910 -7.968 8.020 0.476 -0.028 0.476 6.882 0.796 6.928 -7.002 -0.793 7.047
Bus1144 4.16 0.910 -7.968 8.019 0.476 -0.028 0.476 6.881 0.796 6.927 -7.001 -0.792 7.046
Bus1145 4.16 1.388 -7.378 7.508 0.472 -0.030 0.473 6.382 1.205 6.494 -6.501 -1.201 6.611
Bus1146 13.80 1.810 -14.938 15.047 0.329 -0.987 1.040 12.102 1.536 12.199 -12.203 -1.267 12.269
Bus1147 0.48 2.522 -18.584 18.754 0.000 0.000 0.000 16.089 2.187 16.237 16.089 2.187 16.237
Bus1148 0.48 2.498 -18.541 18.708 0.000 0.000 0.000 16.008 2.157 16.152 16.008 2.157 16.152
Bus1149 0.48 0.970 -18.766 18.791 0.000 0.000 0.000 16.240 0.846 16.262 16.240 0.846 16.262
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 28
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus1150 0.48 1.130 -19.538 19.570 0.000 0.000 0.000 16.915 0.982 16.943 16.915 0.982 16.943
Bus1153 2.40 6.031 -9.175 10.979 0.000 0.000 0.000 7.913 5.181 9.459 7.913 5.181 9.459
Bus1157 13.80 2.202 -20.421 20.540 1.538 -0.232 1.555 17.358 2.105 17.485 -17.758 -2.059 17.877
Bus1158 4.16 0.977 -11.541 11.583 0.478 -0.020 0.478 9.970 0.862 10.007 -10.090 -0.860 10.126
Bus1159 0.48 2.689 -20.928 21.101 0.000 0.000 0.000 18.115 2.334 18.265 18.115 2.334 18.265
Bus1160 4.16 1.029 -11.203 11.250 0.478 -0.020 0.478 9.677 0.906 9.720 -9.798 -0.904 9.839
Bus1170 4.16 2.113 -9.536 9.767 0.473 -0.024 0.474 8.237 1.836 8.440 -8.357 -1.833 8.556
Bus1171 4.16 2.113 -9.536 9.767 0.473 -0.024 0.474 8.237 1.836 8.440 -8.357 -1.833 8.556
Bus1172 13.80 2.830 -25.622 25.777 1.548 -0.146 1.554 21.875 2.620 22.032 -22.273 -2.594 22.423
Bus1173 4.16 1.002 -11.719 11.762 0.478 -0.019 0.478 10.131 0.877 10.169 -10.252 -0.875 10.289
Bus1174 4.16 2.165 -9.649 9.889 0.473 -0.024 0.474 8.343 1.877 8.551 -8.462 -1.874 8.667
Bus1177 4.16 1.046 -11.470 11.518 0.478 -0.020 0.478 9.917 0.914 9.959 -10.037 -0.912 10.078
Bus1178 0.48 2.793 -21.831 22.009 0.000 0.000 0.000 18.900 2.422 19.054 18.900 2.422 19.054
Bus1179 0.48 3.094 -13.699 14.044 0.000 0.000 0.000 11.848 2.679 12.147 11.848 2.679 12.147
Bus1180 4.16 1.385 -10.375 10.467 0.476 -0.023 0.477 8.963 1.211 9.044 -9.083 -1.208 9.163
Bus1181 4.16 2.172 -8.924 9.185 0.472 -0.026 0.473 7.710 1.885 7.938 -7.830 -1.882 8.053
Bus1182 4.16 2.558 -9.510 9.848 0.472 -0.024 0.473 8.222 2.217 8.515 -8.341 -2.214 8.630
Bus1183 4.16 1.415 -10.534 10.629 0.476 -0.022 0.477 9.107 1.232 9.190 -9.227 -1.229 9.308
Bus1184 0.48 3.197 -14.581 14.928 0.000 0.000 0.000 12.603 2.765 12.903 12.603 2.765 12.903
Bus1185 13.80 4.848 -18.863 19.476 1.438 -0.197 1.452 16.137 4.242 16.685 -16.508 -4.205 17.035
Bus1186 4.16 1.544 -14.014 14.098 0.478 -0.015 0.479 12.108 1.353 12.183 -12.228 -1.351 12.302
Bus1187 13.80 3.850 -15.869 16.329 1.500 -0.261 1.523 13.509 3.403 13.931 -13.901 -3.353 14.300
Bus1188 4.16 1.553 -13.684 13.772 0.478 -0.015 0.479 11.797 1.369 11.876 -11.917 -1.367 11.996
Bus1194 4.16 1.639 -13.064 13.166 0.478 -0.017 0.478 11.288 1.433 11.379 -11.409 -1.431 11.498
Bus1195 0.48 2.793 -20.136 20.329 0.000 0.000 0.000 17.431 2.422 17.599 17.431 2.422 17.599
Bus1196 0.48 3.064 -22.121 22.333 0.000 0.000 0.000 19.047 2.637 19.229 19.047 2.637 19.229
Bus1197 13.80 1.403 -15.613 15.676 0.328 -0.995 1.047 12.604 1.241 12.665 -12.706 -0.968 12.743
Bus1198 13.80 1.605 -17.416 17.490 0.331 -0.999 1.053 14.196 1.450 14.269 -14.295 -1.178 14.344
Bus1199 13.80 4.037 -14.899 15.436 1.490 -0.269 1.514 12.692 3.547 13.178 -13.082 -3.495 13.541
Bus1200 4.16 1.603 -13.241 13.337 0.478 -0.016 0.478 11.424 1.414 11.511 -11.545 -1.412 11.631
Bus1201 4.16 1.637 -12.805 12.909 0.478 -0.017 0.478 11.041 1.437 11.134 -11.161 -1.435 11.253
Bus1202 0.48 3.179 -13.273 13.648 0.000 0.000 0.000 11.489 2.755 11.815 11.489 2.755 11.815
Bus1203 4.16 1.880 -12.661 12.800 0.477 -0.017 0.478 10.924 1.649 11.048 -11.045 -1.647 11.167
Bus1206 13.80 5.006 -17.574 18.273 1.412 -0.208 1.427 15.042 4.365 15.663 -15.407 -4.326 16.003
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 29
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus1207 4.16 1.628 -13.804 13.899 0.478 -0.015 0.479 11.927 1.425 12.011 -12.047 -1.423 12.131
Bus1211 4.16 1.931 -13.177 13.318 0.478 -0.016 0.478 11.385 1.684 11.509 -11.505 -1.682 11.628
Bus1212 0.48 3.197 -13.336 13.714 0.000 0.000 0.000 11.546 2.769 11.874 11.546 2.769 11.874
Bus1217 0.48 3.300 -12.121 12.562 0.000 0.000 0.000 10.492 2.859 10.874 10.492 2.859 10.874
Bus1218 4.16 2.527 -7.069 7.508 0.467 -0.032 0.468 6.107 2.190 6.487 -6.225 -2.185 6.598
Bus1221 4.16 2.611 -7.224 7.681 0.467 -0.031 0.468 6.246 2.261 6.643 -6.365 -2.256 6.753
Bus1222 0.48 3.319 -12.173 12.617 0.000 0.000 0.000 10.539 2.875 10.924 10.539 2.875 10.924
Bus1225 13.80 2.653 -25.384 25.522 1.541 -0.148 1.548 21.677 2.467 21.817 -22.073 -2.440 22.207
Bus1226 13.80 2.078 -20.242 20.349 1.538 -0.234 1.555 17.211 1.998 17.326 -17.610 -1.951 17.718
Bus1227 2.40 4.258 -6.475 7.749 0.000 0.000 0.000 5.592 3.670 6.689 5.592 3.670 6.689
Bus1228 4.16 2.872 -9.105 9.547 0.774 -0.062 0.776 7.814 2.457 8.191 -8.012 -2.450 8.378
Bus1229 0.48 3.512 -17.214 17.569 0.000 0.000 0.000 14.877 3.034 15.184 14.877 3.034 15.184
Bus1230 2.40 6.763 -13.426 15.033 0.000 0.000 0.000 11.536 5.784 12.905 11.536 5.784 12.905
Bus1231 0.48 5.217 -21.739 22.356 0.000 0.000 0.000 18.776 4.507 19.309 18.776 4.507 19.309
Bus1232 2.40 6.891 -13.500 15.157 0.000 0.000 0.000 11.577 5.854 12.973 11.577 5.854 12.973
Bus1233 0.48 5.262 -21.820 22.445 0.000 0.000 0.000 18.829 4.535 19.367 18.829 4.535 19.367
Bus1234 0.48 3.685 -17.955 18.329 0.000 0.000 0.000 15.487 3.173 15.809 15.487 3.173 15.809
Bus1235 4.16 3.501 -10.229 10.811 0.775 -0.057 0.777 8.711 2.941 9.194 -8.911 -2.936 9.382
Bus1236 4.16 3.758 -9.530 10.244 0.771 -0.059 0.773 8.129 3.161 8.722 -8.328 -3.155 8.906
Bus1237 4.16 3.100 -8.573 9.116 0.769 -0.064 0.772 7.361 2.652 7.824 -7.559 -2.644 8.008
Bus1238 0.48 3.167 -12.980 13.361 0.000 0.000 0.000 11.229 2.740 11.559 11.229 2.740 11.559
Bus1239 0.48 3.102 -12.740 13.113 0.000 0.000 0.000 11.030 2.687 11.353 11.030 2.687 11.353
Bus1240 4.16 2.031 -11.166 11.349 0.476 -0.020 0.476 9.650 1.767 9.811 -9.770 -1.764 9.928
Bus1241 4.16 2.007 -10.967 11.150 0.476 -0.021 0.476 9.461 1.749 9.621 -9.581 -1.746 9.739
Bus1242 13.80 2.136 -15.331 15.479 0.331 -0.988 1.042 13.262 2.055 13.420 -13.346 -1.796 13.466
Bus1243 4.16 1.722 -18.655 18.735 0.399 -0.008 0.400 16.126 1.553 16.200 -16.226 -1.551 16.300
Bus1244 4.16 3.161 -15.403 15.724 0.397 -0.009 0.397 13.059 2.672 13.329 -13.160 -2.672 13.429
Bus1245 0.48 3.100 -17.225 17.502 0.000 0.000 0.000 14.864 2.670 15.102 14.864 2.670 15.102
Bus1246 0.48 3.093 -17.194 17.470 0.000 0.000 0.000 14.878 2.680 15.117 14.878 2.680 15.117
Bus1247 4.16 3.617 -16.864 17.248 0.397 -0.009 0.398 14.567 3.177 14.909 -14.667 -3.176 15.007
Bus1249 4.16 5.050 -14.638 15.484 0.395 -0.010 0.395 12.638 4.400 13.382 -12.738 -4.399 13.476
Bus1250 4.16 5.081 -14.598 15.457 0.395 -0.010 0.395 12.603 4.427 13.358 -12.703 -4.425 13.452
Bus1254 4.16 1.580 -16.882 16.956 0.399 -0.009 0.399 14.286 1.363 14.351 -14.389 -1.363 14.453
Bus1255 13.80 1.915 -13.973 14.103 0.326 -0.982 1.034 11.367 1.608 11.480 -11.467 -1.340 11.545
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 30
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus1256 4.16 2.619 -15.848 16.062 0.398 -0.009 0.399 13.428 2.221 13.610 -13.530 -2.222 13.711
Bus1257 4.16 2.968 -17.413 17.664 0.399 -0.008 0.399 15.044 2.620 15.271 -15.145 -2.619 15.369
Bus1258 0.22 2.266 -8.320 8.623 2.425 -9.425 9.732 7.200 1.959 7.461 5.905 7.402 9.468
Bus1259 0.22 2.265 -8.315 8.618 2.427 -9.425 9.733 7.199 1.961 7.462 5.904 7.399 9.466
Bus1260 4.16 3.386 -15.591 15.954 0.397 -0.009 0.397 13.214 2.859 13.520 -13.316 -2.859 13.619
Bus1261 0.48 3.231 -18.139 18.424 0.000 0.000 0.000 15.596 2.767 15.839 15.596 2.767 15.839
Bus1262 4.16 3.586 -16.898 17.274 0.397 -0.009 0.398 14.594 3.151 14.930 -14.694 -3.150 15.028
Bus1263 0.48 3.360 -19.332 19.622 0.000 0.000 0.000 16.655 2.891 16.904 16.655 2.891 16.904
Bus1264 4.16 3.589 -16.898 17.275 0.397 -0.009 0.398 14.593 3.154 14.931 -14.694 -3.153 15.028
Bus1265 0.48 3.486 -19.344 19.656 0.000 0.000 0.000 16.624 2.975 16.888 16.624 2.975 16.888
Bus1266 4.16 3.152 -15.416 15.735 0.397 -0.009 0.397 13.069 2.664 13.337 -13.170 -2.664 13.437
Bus1267 0.48 3.280 -17.920 18.218 0.000 0.000 0.000 15.424 2.798 15.676 15.424 2.798 15.676
Bus1268 4.16 3.193 -15.302 15.632 0.397 -0.009 0.397 12.974 2.698 13.252 -13.076 -2.699 13.352
Bus1269 0.48 3.197 -17.575 17.863 0.000 0.000 0.000 15.138 2.736 15.384 15.138 2.736 15.384
Bus1270 0.20 1.802 -5.695 5.973 1.923 -6.222 6.512 4.930 1.560 5.171 3.900 4.990 6.334
Bus1271 0.20 1.791 -5.673 5.949 1.913 -6.202 6.490 4.909 1.548 5.147 3.882 4.975 6.310
Bus1272 4.16 3.640 -16.758 17.149 0.397 -0.009 0.397 14.474 3.196 14.823 -14.574 -3.195 14.920
Bus1273 0.48 3.220 -18.248 18.530 0.000 0.000 0.000 15.779 2.785 16.023 15.779 2.785 16.023
Bus1274 4.16 3.425 -15.475 15.849 0.397 -0.009 0.397 13.117 2.892 13.432 -13.219 -2.892 13.532
Bus1275 0.48 3.169 -17.803 18.083 0.000 0.000 0.000 15.293 2.714 15.532 15.293 2.714 15.532
Bus1276 4.16 3.644 -16.754 17.146 0.397 -0.009 0.397 14.470 3.200 14.820 -14.570 -3.199 14.917
Bus1277 0.48 3.220 -18.061 18.345 0.000 0.000 0.000 15.565 2.770 15.809 15.565 2.770 15.809
Bus1278 4.16 3.644 -16.757 17.148 0.397 -0.009 0.397 14.473 3.199 14.822 -14.573 -3.198 14.920
Bus1279 0.48 3.356 -18.575 18.875 0.000 0.000 0.000 16.058 2.899 16.317 16.058 2.899 16.317
Bus1280 4.16 3.189 -15.306 15.634 0.397 -0.009 0.397 12.977 2.695 13.254 -13.079 -2.695 13.354
Bus1281 0.48 3.249 -18.138 18.427 0.000 0.000 0.000 15.628 2.786 15.875 15.628 2.786 15.875
Bus1287 4.16 5.139 -14.520 15.403 0.395 -0.010 0.395 12.537 4.477 13.312 -12.636 -4.475 13.405
Bus1296 4.16 3.876 -16.992 17.429 0.397 -0.008 0.397 14.675 3.401 15.064 -14.775 -3.400 15.161
Bus1302 4.16 4.414 -10.502 11.392 0.393 -0.014 0.393 9.070 3.834 9.847 -9.169 -3.832 9.938
Bus1303 0.48 2.222 -9.900 10.146 0.000 0.000 0.000 8.534 1.915 8.746 8.534 1.915 8.746
Bus1304 4.16 3.967 -10.102 10.853 0.393 -0.015 0.393 8.638 3.360 9.268 -8.738 -3.359 9.361
Bus1305 0.48 2.171 -9.582 9.825 0.000 0.000 0.000 8.287 1.877 8.497 8.287 1.877 8.497
Bus1307 4.16 4.228 -9.129 10.061 0.390 -0.016 0.391 7.821 3.585 8.604 -7.921 -3.584 8.694
Bus1308 4.16 4.474 -7.831 9.019 0.464 -0.026 0.465 6.768 3.865 7.794 -6.886 -3.861 7.894
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 31
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus1309 4.16 3.493 -8.612 9.294 0.468 -0.026 0.469 7.436 3.023 8.027 -7.555 -3.019 8.136
Bus1310 4.16 1.421 -20.347 20.397 0.479 -0.011 0.480 17.537 1.256 17.582 -17.658 -1.254 17.702
Bus1311 4.16 1.324 -18.814 18.860 0.479 -0.011 0.479 16.214 1.193 16.258 -16.335 -1.192 16.378
BusESCUELA BJ 0.22 3.156 -4.843 5.780 3.292 -4.234 5.363 4.194 2.733 5.006 -5.858 -0.884 5.924
BusTAR 0.22 1.809 -5.616 5.900 1.926 -6.136 6.431 4.869 1.573 5.117 3.849 4.942 6.264
CASAVISITAS-CCM-480 0.22 2.599 -4.577 5.264 2.667 -4.633 5.346 3.964 2.251 4.558 -5.332 0.095 5.333
CASETAPALMAS-CCM-480 0.22 2.633 -4.640 5.335 2.702 -4.698 5.419 4.018 2.280 4.620 -5.406 0.098 5.406
CASETAPALMAS-CCM-480A 0.22 2.225 -3.895 4.486 2.274 -3.936 4.546 3.373 1.927 3.885 -4.536 0.061 4.536
CCM-1/3 SE-1 0.48 3.967 -27.553 27.837 0.000 0.000 0.000 23.785 3.434 24.032 23.785 3.434 24.032
CCM-01 480 V 0.48 1.151 -3.928 4.093 1.291 -3.723 3.941 3.396 0.994 3.539 -4.103 0.771 4.175
CCM-1 B-1 0.48 2.637 -10.077 10.416 0.000 0.000 0.000 8.716 2.280 9.010 8.716 2.280 9.010
CCM-1 SE-1 0.48 3.967 -27.553 27.837 0.000 0.000 0.000 23.785 3.434 24.032 23.785 3.434 24.032
CCM-01 SE-1 2.40 1.676 -14.212 14.311 0.000 0.000 0.000 12.195 1.449 12.281 12.195 1.449 12.281
CCM-1 SE-20 2.40 1.815 -17.542 17.635 0.000 0.000 0.000 15.005 1.567 15.087 15.005 1.567 15.087
CCM-2 A/A SE-1 0.48 4.426 -30.552 30.871 0.000 0.000 0.000 26.340 3.825 26.616 26.340 3.825 26.616
CCM-2 B-1 0.48 2.636 -10.036 10.376 0.000 0.000 0.000 8.682 2.281 8.977 8.682 2.281 8.977
CCM-2 SE-1 0.48 4.426 -30.552 30.871 0.000 0.000 0.000 26.340 3.825 26.616 26.340 3.825 26.616
CCM-02 SE-1 2.40 1.796 -15.823 15.925 0.000 0.000 0.000 13.593 1.559 13.682 13.593 1.559 13.682
CCM-2 SE-20 2.40 1.817 -17.462 17.556 0.000 0.000 0.000 14.998 1.587 15.082 14.998 1.587 15.082
CCM-3 SE-1 0.48 4.426 -30.552 30.871 0.000 0.000 0.000 26.340 3.825 26.616 26.340 3.825 26.616
CCM-4 SE-1 0.48 3.967 -27.553 27.837 0.000 0.000 0.000 23.785 3.434 24.032 23.785 3.434 24.032
CCM-5 SE-1 0.48 3.967 -27.553 27.837 0.000 0.000 0.000 23.785 3.434 24.032 23.785 3.434 24.032
CCM-6 SE-1 0.48 4.426 -30.552 30.871 0.000 0.000 0.000 26.340 3.825 26.616 26.340 3.825 26.616
CCM-190-1A 0.48 2.225 -8.704 8.984 0.000 0.000 0.000 7.529 1.924 7.770 7.529 1.924 7.770
CCM-190-1B 0.48 2.271 -9.051 9.332 0.000 0.000 0.000 7.798 1.957 8.040 7.798 1.957 8.040
CCM-480 SE-MFA 0.48 2.650 -13.254 13.516 0.000 0.000 0.000 11.466 2.294 11.693 11.466 2.294 11.693
CCM-4160 4.16 0.329 -1.658 1.690 0.375 -0.065 0.381 1.391 0.270 1.417 -1.493 -0.266 1.516
CCM-5207A-2 0.48 2.445 -13.622 13.840 3.248 -15.534 15.870 11.398 2.012 11.574 -14.131 7.686 16.086
CCM-5207B-1 0.46 2.527 -12.547 12.799 3.631 -10.361 10.978 10.399 2.077 10.605 -12.742 2.471 12.979
CCM-5207C-1 0.46 2.836 -9.312 9.734 3.365 -8.146 8.814 7.863 2.345 8.206 -9.871 1.323 9.959
CCM-5207C-2 0.46 2.615 -9.273 9.635 3.249 -8.146 8.770 7.825 2.172 8.121 -9.804 1.509 9.920
CCM-5207D-1 0.46 2.583 -10.079 10.404 3.363 -9.106 9.707 8.465 2.144 8.733 -10.632 2.106 10.839
CCM-5207E-1 0.46 2.800 -8.700 9.139 3.221 -7.397 8.068 7.360 2.321 7.717 -9.206 0.925 9.252
CCM-5420-2 0.48 2.583 -14.753 14.977 3.406 -16.462 16.810 12.280 2.103 12.459 -15.161 7.968 17.128
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 32
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
CCM-5420-3 0.46 2.892 -5.300 6.038 2.724 -3.469 4.411 4.535 2.439 5.149 -5.766 -1.195 5.888
CCM-BT-480 BA 0.48 2.221 -9.753 10.002 0.000 0.000 0.000 8.438 1.922 8.654 8.438 1.922 8.654
CCM-BT-480 BB 0.48 2.181 -9.885 10.122 0.000 0.000 0.000 8.552 1.888 8.758 8.552 1.888 8.758
CCM-BT-CB-1A 0.48 3.845 -11.238 11.877 0.000 0.000 0.000 9.731 3.333 10.286 9.731 3.333 10.286
CCM-BT-CB-1B 0.48 3.830 -11.215 11.851 0.000 0.000 0.000 9.699 3.311 10.248 9.699 3.311 10.248
CCM-CB-2 0.48 4.426 -30.552 30.871 0.000 0.000 0.000 26.340 3.825 26.616 26.340 3.825 26.616
CCM-CB3-1 0.48 2.464 -1.534 2.903 0.000 0.000 0.000 1.328 2.134 2.514 1.328 2.134 2.514
CCM-CB3-2 0.22 2.498 -2.565 3.580 2.872 -3.296 4.372 2.221 2.163 3.101 0.577 4.417 4.455
CCM-DAF 0.48 4.552 -30.574 30.910 0.000 0.000 0.000 26.460 3.945 26.752 26.460 3.945 26.752
CCM-E BUS B 0.46 2.810 -5.772 6.419 2.766 -3.921 4.798 4.929 2.365 5.467 -6.219 -0.924 6.287
CCM-LV-BT-5414 0.22 4.077 -10.993 11.725 5.019 -10.216 11.383 9.519 3.530 10.153 -12.391 1.137 12.443
CCM-MZ-BA-1 0.48 4.552 -30.574 30.910 0.000 0.000 0.000 26.460 3.945 26.752 26.460 3.945 26.752
CCM-MZ-BB-1 0.48 4.408 -29.723 30.048 0.000 0.000 0.000 25.716 3.831 26.000 25.716 3.831 26.000
CCM-MZ-BC-1 0.48 4.552 -30.574 30.910 0.000 0.000 0.000 26.460 3.945 26.752 26.460 3.945 26.752
CCM-S.AUX-TG-4 BA 0.48 3.967 -27.553 27.837 0.000 0.000 0.000 23.785 3.434 24.032 23.785 3.434 24.032
CCM-S.AUX-TG-4 BB 0.48 4.426 -30.552 30.871 0.000 0.000 0.000 26.340 3.825 26.616 26.340 3.825 26.616
CCM-SA-01/SA-02 BA 0.48 4.552 -30.574 30.910 0.000 0.000 0.000 26.460 3.945 26.752 26.460 3.945 26.752
CCM-SA3 0.48 4.408 -29.723 30.048 0.000 0.000 0.000 25.716 3.831 26.000 25.716 3.831 26.000
CCM-SA-04 BB 0.48 4.408 -29.723 30.048 0.000 0.000 0.000 25.716 3.831 26.000 25.716 3.831 26.000
CCM-TD-102 BA 0.48 2.346 -16.189 16.358 0.000 0.000 0.000 13.998 2.031 14.145 13.998 2.031 14.145
CCM-TD-102 BB 0.48 2.472 -17.394 17.568 0.000 0.000 0.000 15.036 2.139 15.188 15.036 2.139 15.188
CCM-TDB-1A 0.48 5.372 -19.963 20.673 0.000 0.000 0.000 17.246 4.640 17.859 17.246 4.640 17.859
CCM-TDB-1B 0.48 5.414 -20.030 20.748 0.000 0.000 0.000 17.289 4.667 17.908 17.289 4.667 17.908
CCM-URV 0.48 4.302 -10.119 10.995 4.354 -10.085 10.984 8.797 3.787 9.578 6.653 8.753 10.995
CF-07 0.48 4.807 -22.755 23.257 6.011 -24.836 25.553 19.698 4.161 20.133 -23.525 9.485 25.366
DER SE-MFA 2.40 3.779 -11.982 12.564 0.000 0.000 0.000 10.317 3.257 10.819 10.317 3.257 10.819
DERIVADOR 1 SE-7 13.80 3.552 -10.272 10.869 0.344 -0.865 0.931 8.587 2.939 9.076 -8.686 -2.708 9.099
DERIVADOR SE-9 13.80 0.750 -4.885 4.943 0.717 -0.131 0.729 4.215 0.649 4.265 -4.402 -0.629 4.446
DERIVADOR SE-17 13.80 0.574 -5.108 5.140 0.757 -0.118 0.766 4.407 0.498 4.435 -4.602 -0.482 4.627
DERIVADOR SE-MZ METRO 2.40 3.752 -8.957 9.711 0.000 0.000 0.000 7.724 3.233 8.373 7.724 3.233 8.373
ENLACE SE-8 13.80 3.685 -8.163 8.956 0.331 -0.916 0.974 6.827 3.012 7.462 6.740 3.267 7.490
ENTRADA 19MV-4160 BA 4.16 1.967 -11.976 12.137 0.397 -0.012 0.397 10.216 1.674 10.352 -10.317 -1.673 10.452
ENTRADA 19MV-4160 BB 4.16 1.100 -7.858 7.935 0.396 -0.017 0.397 6.793 0.953 6.860 -6.893 -0.951 6.958
EXT. MP-TD-1 13.80 1.483 -15.306 15.378 0.328 -0.992 1.045 12.384 1.292 12.452 -12.486 -1.020 12.528
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 33
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
EXT. MP-TD-2 13.80 1.700 -17.041 17.126 0.331 -0.996 1.050 13.921 1.511 14.003 -14.021 -1.241 14.075
EXT. MP-TD-3 13.80 1.643 -16.879 16.959 0.333 -0.998 1.052 14.623 1.671 14.719 -14.707 -1.411 14.774
FUERZA SECC73 13.80 0.552 -4.980 5.010 0.726 -0.127 0.737 4.297 0.478 4.323 -4.484 -0.460 4.508
28-HV-28G22
FUERZA SECC78 13.80 2.594 -14.002 14.240 0.342 -0.935 0.995 11.384 2.085 11.573 -11.489 -1.832 11.634
28-HV-28G21
HR 13.80 0.376 -1.201 1.259 0.210 -0.642 0.675 1.040 0.326 1.090 -1.113 -0.107 1.118
HR-CCM 0.48 3.886 -18.587 18.989 4.142 -19.882 20.309 16.096 3.366 16.445 13.880 14.052 19.751
HR-HV-CFE 13.80 0.373 -1.205 1.261 0.209 -0.643 0.676 1.043 0.323 1.092 -1.116 -0.104 1.121
HR-HV-CFE/RFM 13.80 0.373 -1.205 1.261 0.209 -0.643 0.676 1.043 0.323 1.092 -1.116 -0.104 1.121
HR-HV-REF 13.80 2.283 -2.107 3.107 0.340 -0.615 0.703 1.820 1.940 2.660 1.730 2.119 2.735
HR-I-LINE C 0.48 3.886 -18.587 18.989 4.142 -19.882 20.309 16.096 3.366 16.445 13.880 14.052 19.751
HR-TBT BA 0.22 5.838 -26.228 26.870 6.314 -29.991 30.648 22.714 5.056 23.270 19.308 22.555 29.691
HV-20 BA 13.80 2.852 -15.333 15.596 0.326 -0.993 1.045 12.372 2.279 12.580 -12.475 -2.009 12.636
HV-20 BB 13.80 2.526 -14.196 14.419 0.326 -0.982 1.035 11.701 2.126 11.892 -11.797 -1.861 11.943
I-21.1 13.80 3.657 -15.818 16.235 0.331 -0.995 1.049 12.744 2.876 13.064 -12.849 -2.606 13.110
I-21.2 13.80 2.798 -13.228 13.520 0.329 -0.979 1.032 10.790 2.283 11.029 -10.891 -2.017 11.077
INT ENLACE 15-LV-BA02-480 0.48 2.598 -12.051 12.328 0.000 0.000 0.000 10.416 2.244 10.655 10.416 2.244 10.655
LP-01 0.22 1.477 -2.940 3.290 1.523 -2.997 3.362 2.546 1.279 2.849 -3.332 0.249 3.342
LV-22A61 BA 0.22 6.326 -20.626 21.575 7.404 -20.472 21.770 17.857 5.476 18.677 -22.102 4.634 22.583
LV-22A61 BB 0.22 6.326 -20.626 21.575 7.404 -20.472 21.770 17.857 5.476 18.677 -22.102 4.634 22.583
LV-22B51 BA 0.48 3.599 -21.171 21.475 0.000 0.000 0.000 18.281 3.110 18.544 18.281 3.110 18.544
LV-22B51 BB 0.48 3.460 -20.530 20.819 0.000 0.000 0.000 17.770 2.998 18.021 17.770 2.998 18.021
LV-22B53 BA 0.48 3.282 -19.355 19.631 0.000 0.000 0.000 16.751 2.846 16.991 16.751 2.846 16.991
LV-22B53 BB 0.48 3.229 -19.100 19.372 0.000 0.000 0.000 16.532 2.798 16.767 16.532 2.798 16.767
LV-22B54 BA 0.48 3.661 -13.927 14.400 0.000 0.000 0.000 12.023 3.158 12.431 12.023 3.158 12.431
LV-22B54 BB 0.48 3.566 -13.488 13.952 0.000 0.000 0.000 11.612 3.066 12.010 11.612 3.066 12.010
LV-22B61 BA 0.22 3.513 -10.479 11.052 0.000 0.000 0.000 9.073 3.042 9.570 9.073 3.042 9.570
LV-22B61 BB 0.22 3.556 -10.548 11.131 0.000 0.000 0.000 9.133 3.080 9.638 9.133 3.080 9.638
LV-41L51 0.48 2.682 -5.153 5.809 0.000 0.000 0.000 4.459 2.319 5.026 4.459 2.319 5.026
LV-MCC-01A 0.48 5.772 -22.311 23.046 0.000 0.000 0.000 19.313 4.996 19.948 19.313 4.996 19.948
LV-MCC-01B 0.48 7.070 -24.492 25.492 0.000 0.000 0.000 21.137 6.091 21.997 21.137 6.091 21.997
LV-MCC-02 0.22 1.745 -6.018 6.266 1.812 -6.251 6.509 5.210 1.510 5.425 -6.154 1.743 6.396
LVM-0001B BB 0.48 4.141 -15.873 16.404 1.314 -2.385 2.723 13.694 3.562 14.150 -14.069 -2.920 14.369
LVMCC-0001A BA 0.48 4.435 -17.518 18.070 1.274 -2.297 2.627 15.043 3.791 15.513 -15.405 -3.177 15.729
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 34
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
LVMCC-002 BA 0.22 1.015 -1.195 1.568 0.000 0.000 0.000 1.034 0.879 1.357 1.034 0.879 1.357
LVMCC-002 BB 0.22 1.014 -1.197 1.569 0.000 0.000 0.000 1.037 0.878 1.358 1.037 0.878 1.358
MC LV-CCM-1-480 0.48 4.966 -7.872 9.308 0.000 0.000 0.000 6.812 4.294 8.052 6.812 4.294 8.052
MC LV-CCM-2-220 0.22 1.907 -3.185 3.712 2.025 -3.394 3.952 2.758 1.651 3.214 1.678 3.468 3.853
MC-CCM-03 0.48 3.218 -3.261 4.582 0.000 0.000 0.000 2.841 2.796 3.986 2.841 2.796 3.986
MC-LV-CCM-02 0.48 3.190 -9.386 9.914 0.000 0.000 0.000 8.158 2.782 8.619 8.158 2.782 8.619
MC-MV-CCM-2400 2.40 4.813 -12.534 13.427 0.000 0.000 0.000 10.848 4.186 11.628 10.848 4.186 11.628
MC2 TD 220V BA 0.22 2.107 -4.273 4.764 2.166 -3.826 4.397 3.699 1.823 4.124 -4.788 -0.102 4.790
MC2 TD 220V BB 0.22 2.098 -4.267 4.755 2.160 -3.824 4.392 3.694 1.816 4.116 -4.782 -0.095 4.783
MC2-LV-CCM1A 0.48 3.763 -17.352 17.755 0.000 0.000 0.000 14.974 3.253 15.324 14.974 3.253 15.324
MC2-LV-CCM1B 0.48 3.763 -17.352 17.755 0.000 0.000 0.000 14.974 3.253 15.324 14.974 3.253 15.324
MC2-LV-CCM2A 0.48 4.081 -19.321 19.747 0.000 0.000 0.000 16.568 3.484 16.931 16.568 3.484 16.931
MC2-LV-CCM2B 0.48 3.665 -16.946 17.338 0.000 0.000 0.000 14.580 3.150 14.916 14.580 3.150 14.916
MC2-MV-BA01 4.16 2.072 -11.797 11.977 0.787 -0.054 0.789 10.005 1.745 10.156 -10.207 -1.740 10.355
MC2-MV-BB01 4.16 1.769 -10.210 10.362 0.786 -0.059 0.788 8.750 1.520 8.881 -8.951 -1.514 9.078
MFA-LV-CCM1 0.48 2.650 -13.254 13.516 0.000 0.000 0.000 11.466 2.294 11.693 11.466 2.294 11.693
MFA-LV-CCM2 0.48 2.650 -13.254 13.516 0.000 0.000 0.000 11.466 2.294 11.693 11.466 2.294 11.693
MFA-LV-CCM3 0.48 2.650 -13.254 13.516 0.000 0.000 0.000 11.466 2.294 11.693 11.466 2.294 11.693
MFA-LV-CCM4 0.48 2.650 -13.254 13.516 0.000 0.000 0.000 11.466 2.294 11.693 11.466 2.294 11.693
MFA-MV-1 2.40 3.779 -11.982 12.564 0.000 0.000 0.000 10.317 3.257 10.819 10.317 3.257 10.819
MFA-MV-1A 2.40 3.789 -11.911 12.499 0.000 0.000 0.000 10.256 3.265 10.763 10.256 3.265 10.763
MFA-MV-2 2.40 3.798 -11.840 12.434 0.000 0.000 0.000 10.195 3.273 10.708 10.195 3.273 10.708
MFA-MV-2A 2.40 3.807 -11.770 12.370 0.000 0.000 0.000 10.136 3.281 10.653 10.136 3.281 10.653
MFA-MV-3 2.40 3.816 -11.701 12.307 0.000 0.000 0.000 10.076 3.289 10.599 10.076 3.289 10.599
MJA-CCM-480-1 0.48 3.126 -10.900 11.340 0.000 0.000 0.000 9.452 2.717 9.834 9.452 2.717 9.834
MJA-CCM-480-2 0.48 4.030 -7.058 8.128 0.000 0.000 0.000 6.116 3.497 7.045 6.116 3.497 7.045
MJA-LV-1 0.48 1.685 -6.236 6.459 0.000 0.000 0.000 5.400 1.460 5.594 5.400 1.460 5.594
MJA-MV-1 2.40 3.476 -10.316 10.886 0.000 0.000 0.000 8.927 3.027 9.426 8.927 3.027 9.426
MJA-MV-2 2.40 3.556 -10.131 10.737 0.000 0.000 0.000 8.766 3.095 9.296 8.766 3.095 9.296
MJN-131-IT-4 2.40 1.160 -10.239 10.305 0.000 0.000 0.000 8.856 1.005 8.913 8.856 1.005 8.913
MJN-133-IT-1 0.48 2.438 -9.935 10.230 0.000 0.000 0.000 8.602 2.111 8.857 8.602 2.111 8.857
MJN-CCM-PN 0.48 2.438 -9.935 10.230 0.000 0.000 0.000 8.602 2.111 8.857 8.602 2.111 8.857
MLA 0.48 3.967 -27.553 27.837 0.000 0.000 0.000 23.785 3.434 24.032 23.785 3.434 24.032
MP LV-CCM-1-480 0.48 5.395 -16.524 17.383 0.000 0.000 0.000 14.281 4.661 15.023 14.281 4.661 15.023
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 35
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
MP LV-CCM-2-480 0.48 5.429 -16.568 17.435 0.000 0.000 0.000 14.310 4.682 15.057 14.310 4.682 15.057
MP-TD-1 13.80 1.396 -15.639 15.701 0.327 -0.998 1.050 12.635 1.231 12.695 -12.737 -0.958 12.773
MP-TD-2 13.80 1.590 -17.474 17.546 0.330 -1.003 1.056 14.255 1.434 14.327 -14.354 -1.162 14.401
MP-TD-3 13.80 1.538 -17.289 17.357 0.332 -1.004 1.058 14.983 1.592 15.068 -15.066 -1.331 15.125
MP-TD-4 13.80 1.760 -19.283 19.363 0.330 -1.014 1.067 15.290 1.485 15.362 -15.396 -1.206 15.444
MSW-MCC-01A 0.48 3.693 -11.007 11.610 0.000 0.000 0.000 9.532 3.202 10.056 9.532 3.202 10.056
MSW-MCC-01B 0.48 3.633 -11.123 11.701 0.000 0.000 0.000 9.627 3.144 10.127 9.627 3.144 10.127
MSW-MCC-02 0.22 0.638 -0.713 0.957 0.659 -0.739 0.990 0.618 0.553 0.829 0.277 0.936 0.976
MV-1A-1 2.40 3.920 -12.530 13.129 0.000 0.000 0.000 10.784 3.379 11.301 10.784 3.379 11.301
MV-1A-2 2.40 3.704 -13.789 14.278 0.000 0.000 0.000 11.861 3.196 12.284 11.861 3.196 12.284
MV-MZ- BB 2.4 kV 13.80 4.280 -17.632 18.144 1.463 -0.263 1.487 14.983 3.792 15.455 -15.365 -3.738 15.813
MV-MZ-BA 2.4 kV 13.80 5.914 -21.249 22.057 1.493 -0.181 1.504 18.145 5.168 18.866 -18.530 -5.134 19.228
MV-SWGR-01A 13.80 0.536 -5.215 5.242 0.759 -0.115 0.767 4.499 0.465 4.523 -4.694 -0.450 4.715
MV-SWGR-01B 13.80 2.812 -15.566 15.818 0.326 -0.995 1.047 12.545 2.249 12.745 -12.648 -1.978 12.802
MV-SWGR/MCC-01A 4.16 0.857 -9.762 9.799 0.399 -0.013 0.399 8.436 0.744 8.469 -8.536 -0.743 8.569
MV-SWGR/MCC-01B 4.16 1.562 -15.463 15.542 0.399 -0.009 0.399 13.105 1.341 13.174 -13.207 -1.341 13.275
MZ-LV-CCM1 0.48 1.377 -5.777 5.939 0.000 0.000 0.000 5.000 1.192 5.140 5.000 1.192 5.140
MZ-LV-CCM2 0.48 1.390 -5.722 5.888 0.000 0.000 0.000 4.952 1.203 5.097 4.952 1.203 5.097
BK4-CCM-05A 0.22 1.772 -6.127 6.378 1.949 -6.734 7.011 5.306 1.534 5.523 -6.388 2.204 6.758
BK4-CCM-05B 0.22 1.808 -6.131 6.392 1.978 -6.737 7.022 5.309 1.566 5.535 4.217 5.305 6.777
BK4-TM4.16-02 4.16 3.677 -9.089 9.805 0.469 -0.026 0.470 7.852 3.178 8.471 -7.971 -3.174 8.580
BK4-TM4.16-03 4.16 3.444 -8.800 9.450 0.469 -0.026 0.469 7.598 2.981 8.161 -7.716 -2.977 8.271
BOOSTER-CCM-01 0.48 1.952 -6.265 6.562 0.000 0.000 0.000 5.425 1.691 5.682 5.425 1.691 5.682
BT-5298 BA 0.48 2.583 -14.753 14.977 3.406 -16.462 16.810 12.280 2.103 12.459 -15.161 7.968 17.128
BT-5298 BB 0.48 2.445 -13.622 13.840 3.248 -15.534 15.870 11.398 2.012 11.574 -14.131 7.686 16.086
BT-6028-02 0.22 7.920 -24.829 26.062 9.031 -28.210 29.621 21.502 6.859 22.570 -26.754 9.470 28.380
BUS PRIM TRA4 13.80 3.402 -8.371 9.036 0.339 -0.873 0.937 7.001 2.767 7.528 -7.101 -2.532 7.539
BUS 2.2KV C.A.F. 2.40 4.082 -11.618 12.314 0.000 0.000 0.000 9.993 3.505 10.590 9.993 3.505 10.590
BUS A TR2 13.80 0.755 -4.206 4.273 0.705 -0.146 0.720 3.631 0.653 3.689 -3.815 -0.630 3.867
BUS ALUMBRADO2 0.22 1.134 -2.132 2.415 1.221 -2.221 2.535 1.847 0.982 2.092 -2.506 0.176 2.512
BUS CERO-CORTES-TRA1 13.80 3.278 -8.579 9.183 0.336 -0.877 0.939 7.165 2.664 7.644 -7.264 -2.428 7.659
BUS ENLACE SE-7 Y 13 2.40 3.594 -9.739 10.381 0.000 0.000 0.000 8.427 3.126 8.988 8.427 3.126 8.988
BUS G1 0.48 8.927 -19.422 21.376 9.918 -21.349 23.541 16.784 7.700 18.466 -22.427 4.193 22.815
BUS G2 0.48 8.032 -22.075 23.491 9.278 -23.470 25.237 19.076 6.924 20.294 -24.552 5.617 25.186
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 36
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
BUS JARDIN TR-1A 0.22 3.157 -6.380 7.118 3.268 -6.497 7.273 5.525 2.733 6.164 -7.219 0.576 7.241
BUS JARDIN TR-17 0.22 6.925 -24.685 25.638 7.364 -26.988 27.975 21.372 5.995 22.197 17.448 20.886 27.215
BUS MB-A 4.16 0.492 -2.385 2.436 0.000 0.000 0.000 2.063 0.425 2.107 2.063 0.425 2.107
BUS MB-B 4.16 1.564 -8.678 8.818 0.392 -0.021 0.393 7.448 1.339 7.567 -7.547 -1.336 7.665
BUS MB2 4.16 0.342 -1.668 1.703 0.000 0.000 0.000 1.443 0.296 1.473 1.443 0.296 1.473
BUS MB3 4.16 3.757 -9.718 10.419 0.390 -0.015 0.390 8.322 3.186 8.911 -8.421 -3.185 9.004
BUS P-501B 2.40 5.519 -12.509 13.672 0.000 0.000 0.000 10.819 4.797 11.835 10.819 4.797 11.835
BUS P-608A 2.40 5.265 -11.998 13.102 0.000 0.000 0.000 10.317 4.494 11.254 10.317 4.494 11.254
BUS PPAL BUS A 4.16 1.073 -9.543 9.604 0.398 -0.017 0.398 8.182 0.922 8.233 -8.282 -0.921 8.333
BUS PRI 080-TRF-16531A 0.48 3.137 -14.187 14.529 0.000 0.000 0.000 12.282 2.718 12.579 12.282 2.718 12.579
BUS PRI 080-TRF-16531B 0.48 2.835 -10.203 10.589 0.000 0.000 0.000 8.831 2.454 9.165 8.831 2.454 9.165
Bus SE17 2.40 0.797 -3.099 3.200 1.075 -3.602 3.759 2.683 0.690 2.770 -3.451 1.449 3.743
BUS SE-19 BUNKER 0.22 0.815 -1.544 1.746 0.000 0.000 0.000 1.337 0.706 1.512 1.337 0.706 1.512
BUS SE-19A CERO CORTES 4.16 1.073 -9.543 9.604 0.398 -0.017 0.398 8.182 0.922 8.233 -8.282 -0.921 8.333
Bus36 0.48 2.779 -12.332 12.642 0.000 0.000 0.000 10.658 2.400 10.925 10.658 2.400 10.925
Bus37 4.16 0.853 -7.684 7.732 0.475 -0.029 0.476 6.582 0.734 6.623 -6.703 -0.731 6.743
Bus39 4.16 1.253 -8.577 8.668 0.474 -0.027 0.475 7.378 1.081 7.457 -7.498 -1.078 7.575
Bus40 4.16 0.766 -9.086 9.118 0.477 -0.025 0.478 7.813 0.667 7.841 -7.933 -0.665 7.961
Bus41 13.80 1.790 -16.754 16.850 0.331 -0.994 1.048 13.699 1.577 13.789 -13.798 -1.308 13.860
Bus42 13.80 4.066 -6.284 7.484 0.346 -0.764 0.839 5.404 3.550 6.465 5.316 3.753 6.507
Bus43 13.80 3.782 -6.152 7.221 0.343 -0.761 0.834 5.204 3.121 6.068 5.113 3.332 6.103
bus45 13.80 1.156 -3.875 4.044 0.684 -0.148 0.700 3.346 0.998 3.492 -3.527 -0.973 3.659
Bus48 2.40 2.753 -7.856 8.325 0.000 0.000 0.000 6.767 2.363 7.168 6.767 2.363 7.168
Bus49 13.80 2.024 -1.771 2.689 0.337 -0.584 0.674 1.532 1.725 2.307 1.442 1.897 2.383
Bus53 2.40 1.178 -7.444 7.537 0.000 0.000 0.000 6.441 1.020 6.521 6.441 1.020 6.521
Bus58 13.80 0.770 -4.859 4.919 0.717 -0.131 0.729 4.192 0.666 4.245 -4.378 -0.646 4.426
Bus66 2.40 3.670 -7.670 8.503 0.000 0.000 0.000 6.636 3.174 7.356 6.636 3.174 7.356
Bus67 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus68 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus69 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus70 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus71 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus72 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus73 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 37
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus74 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus75 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus76 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus77 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus78 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus79 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus80 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus81 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus82 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus83 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus84 0.22 2.645 -4.661 5.359 2.715 -4.719 5.444 4.036 2.290 4.641 -5.430 0.099 5.431
Bus85 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus86 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus87 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus88 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus89 13.80 3.615 -7.143 8.006 0.331 -0.898 0.958 6.005 2.970 6.700 5.918 3.220 6.738
Bus90 13.80 3.613 -7.129 7.993 0.331 -0.898 0.957 5.994 2.969 6.689 5.907 3.219 6.727
Bus91 4.16 0.473 -2.357 2.404 0.466 -2.426 2.470 2.034 0.408 2.075 1.807 1.667 2.458
Bus92 13.80 3.623 -7.088 7.960 0.332 -0.897 0.957 5.961 2.977 6.663 5.873 3.227 6.702
Bus95 2.40 2.110 -9.146 9.387 0.000 0.000 0.000 7.870 1.813 8.076 7.870 1.813 8.076
Bus96 2.40 1.597 -10.313 10.436 0.000 0.000 0.000 8.865 1.376 8.972 8.865 1.376 8.972
Bus97 13.80 3.679 -7.991 8.797 0.331 -0.914 0.972 6.689 3.009 7.335 6.602 3.263 7.365
Bus98 2.40 1.539 -9.729 9.850 0.000 0.000 0.000 8.361 1.325 8.465 8.361 1.325 8.465
Bus99 13.80 3.683 -8.074 8.874 0.331 -0.915 0.973 6.756 3.011 7.397 6.669 3.266 7.426
Bus101 4.16 0.828 -5.596 5.657 0.000 0.000 0.000 4.809 0.714 4.862 4.809 0.714 4.862
Bus102 13.80 3.682 -9.004 9.728 0.331 -0.929 0.986 7.498 2.998 8.075 7.412 3.257 8.095
Bus104 2.40 2.181 -13.642 13.815 0.000 0.000 0.000 11.687 1.874 11.836 11.687 1.874 11.836
Bus105 13.80 3.686 -8.900 9.633 0.331 -0.928 0.985 7.415 3.003 8.000 7.329 3.261 8.021
Bus106 13.80 3.686 -8.902 9.635 0.331 -0.928 0.985 7.417 3.003 8.002 7.330 3.260 8.023
Bus115 0.48 1.085 -5.079 5.193 0.000 0.000 0.000 4.395 0.939 4.494 4.395 0.939 4.494
BUS 115KV 115.00 0.010 -0.059 0.060 0.007 -0.040 0.041 0.050 0.009 0.051 -0.053 0.007 0.054
Bus116 0.48 3.971 -10.469 11.197 0.000 0.000 0.000 9.052 3.431 9.680 9.052 3.431 9.680
Bus117 13.80 2.598 -25.663 25.794 1.566 -0.141 1.572 21.915 2.423 22.049 -22.317 -2.398 22.445
Bus118 13.80 3.213 -24.579 24.788 1.561 -0.146 1.568 20.991 2.924 21.194 -21.392 -2.899 21.588
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 38
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus119 13.80 1.994 -20.466 20.563 1.539 -0.233 1.556 17.400 1.929 17.507 -17.800 -1.883 17.899
Bus120 13.80 2.395 -19.779 19.923 1.533 -0.236 1.552 16.817 2.249 16.966 -17.215 -2.202 17.356
Bus122 4.16 1.578 -20.904 20.964 0.479 -0.010 0.479 18.019 1.403 18.074 -18.140 -1.401 18.194
Bus123 4.16 1.632 -22.390 22.449 0.479 -0.010 0.480 19.336 1.447 19.390 -19.457 -1.446 19.510
Bus124 4.16 2.208 -21.131 21.246 0.479 -0.011 0.479 18.250 1.939 18.352 -18.370 -1.938 18.472
Bus125 4.16 2.208 -21.132 21.247 0.479 -0.011 0.479 18.250 1.939 18.353 -18.371 -1.938 18.473
Bus127 4.16 2.203 -21.147 21.261 0.479 -0.011 0.479 18.263 1.935 18.365 -18.384 -1.933 18.485
Bus129 4.16 2.075 -19.816 19.924 0.479 -0.011 0.479 17.083 1.825 17.180 -17.204 -1.823 17.300
Bus130 4.16 2.076 -19.812 19.921 0.479 -0.011 0.479 17.079 1.826 17.176 -17.200 -1.825 17.296
Bus131 4.16 2.078 -19.807 19.916 0.479 -0.011 0.479 17.076 1.828 17.173 -17.196 -1.826 17.293
Bus134 13.80 3.570 -10.148 10.758 0.344 -0.863 0.929 8.488 2.955 8.987 -8.587 -2.723 9.008
Bus135 4.16 4.753 -17.038 17.689 0.476 -0.013 0.476 14.686 4.108 15.249 -14.806 -4.106 15.365
Bus136 4.16 5.534 -17.525 18.378 0.476 -0.012 0.476 15.135 4.796 15.877 -15.255 -4.795 15.991
Bus137 2.40 3.033 -14.768 15.076 0.000 0.000 0.000 12.698 2.624 12.967 12.698 2.624 12.967
Bus138 4.16 5.533 -17.528 18.380 0.476 -0.012 0.476 15.137 4.795 15.878 -15.257 -4.793 15.992
Bus139 4.16 5.521 -17.544 18.392 0.476 -0.012 0.476 15.151 4.785 15.889 -15.271 -4.784 16.003
BUS 140-ALUMBRADO TR-1 0.22 1.622 -3.276 3.656 1.684 -3.345 3.745 2.837 1.405 3.166 -3.712 0.304 3.724
BUS 140-ALUMBRADO TR-2 0.22 1.628 -3.285 3.666 1.687 -3.351 3.752 2.845 1.409 3.175 -3.720 0.301 3.733
BUS 140-TR1 SEC 2.40 2.313 -22.924 23.041 0.000 0.000 0.000 19.855 2.072 19.963 19.855 2.072 19.963
BUS 140-TR3 SEC 2.40 2.182 -21.609 21.719 0.000 0.000 0.000 18.424 1.879 18.520 18.424 1.879 18.520
BUS 140-TR-3731B 0.48 5.047 -14.674 15.518 0.000 0.000 0.000 12.691 4.360 13.419 12.691 4.360 13.419
Bus141 4.16 5.408 -17.700 18.508 0.476 -0.012 0.476 15.286 4.687 15.988 -15.406 -4.686 16.103
Bus142 4.16 5.302 -17.844 18.616 0.476 -0.012 0.476 15.411 4.596 16.082 -15.531 -4.595 16.196
Bus143 4.16 3.953 -18.838 19.248 0.477 -0.012 0.477 16.270 3.436 16.629 -16.390 -3.434 16.746
Bus146 4.16 4.936 -16.799 17.509 0.476 -0.013 0.476 14.485 4.272 15.102 -14.605 -4.271 15.216
Bus147 4.16 5.028 -16.676 17.418 0.476 -0.013 0.476 14.379 4.352 15.023 -14.499 -4.350 15.137
Bus148 4.16 5.036 -16.665 17.409 0.476 -0.013 0.476 14.369 4.359 15.016 -14.489 -4.358 15.130
Bus150 4.16 5.058 -16.635 17.387 0.476 -0.013 0.476 14.343 4.378 14.996 -14.463 -4.376 15.111
Bus151 0.48 3.295 -23.411 23.642 0.000 0.000 0.000 20.265 2.858 20.466 20.265 2.858 20.466
Bus152 0.48 3.294 -23.452 23.683 0.000 0.000 0.000 20.305 2.856 20.505 20.305 2.856 20.505
Bus153 0.48 3.217 -23.029 23.253 0.000 0.000 0.000 19.861 2.768 20.053 19.861 2.768 20.053
Bus154 0.48 3.023 -21.802 22.011 0.000 0.000 0.000 18.864 2.616 19.045 18.864 2.616 19.045
Bus155 13.80 6.117 -20.908 21.784 1.490 -0.182 1.501 17.855 5.336 18.635 -18.239 -5.302 18.994
Bus156 13.80 4.434 -17.410 17.966 1.460 -0.263 1.484 14.794 3.917 15.304 -15.176 -3.863 15.660
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 39
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus157 0.48 3.060 -22.437 22.645 0.000 0.000 0.000 19.419 2.657 19.600 19.419 2.657 19.600
Bus158 4.16 1.960 -17.669 17.778 0.479 -0.012 0.479 15.233 1.740 15.332 -15.353 -1.739 15.452
Bus159 4.16 1.645 -20.107 20.175 0.479 -0.011 0.479 17.363 1.456 17.424 -17.483 -1.455 17.544
Bus160 13.80 3.195 -23.511 23.727 1.514 -0.161 1.522 20.090 2.896 20.298 -20.479 -2.867 20.678
Bus161 4.16 1.562 -18.581 18.646 0.479 -0.011 0.479 16.018 1.404 16.079 -16.138 -1.402 16.199
Bus162 13.80 2.502 -18.918 19.083 1.529 -0.243 1.548 16.093 2.324 16.260 -16.491 -2.276 16.648
Bus163 2.40 3.805 -11.756 12.356 0.000 0.000 0.000 10.123 3.279 10.641 10.123 3.279 10.641
Bus164 4.16 2.105 -19.059 19.175 0.479 -0.012 0.479 16.458 1.849 16.562 -16.579 -1.848 16.681
Bus165 0.48 3.002 -22.120 22.323 0.000 0.000 0.000 19.150 2.603 19.326 19.150 2.603 19.326
Bus166 4.16 2.107 -19.056 19.172 0.479 -0.012 0.479 16.456 1.851 16.559 -16.576 -1.849 16.679
Bus167 0.48 3.010 -21.797 22.004 0.000 0.000 0.000 18.870 2.610 19.049 18.870 2.610 19.049
Bus169 4.16 5.348 -15.790 16.671 0.475 -0.013 0.475 13.634 4.633 14.400 -13.754 -4.632 14.513
Bus170 4.16 1.965 -17.657 17.766 0.479 -0.012 0.479 15.222 1.744 15.322 -15.343 -1.743 15.441
Bus171 0.48 2.880 -21.052 21.248 3.051 -22.053 22.263 18.219 2.500 18.390 -19.836 9.095 21.822
Bus172 4.16 5.519 -15.568 16.517 0.475 -0.013 0.475 13.443 4.781 14.267 -13.562 -4.779 14.380
Bus176 2.40 2.194 -1.722 2.789 0.000 0.000 0.000 1.492 1.895 2.412 1.492 1.895 2.412
Bus177 13.80 3.082 -13.593 13.938 0.340 -0.945 1.004 11.734 2.833 12.071 -11.821 -2.585 12.100
Bus179 4.16 2.926 -14.859 15.145 0.477 -0.015 0.477 12.814 2.556 13.067 -12.935 -2.554 13.184
Bus180 0.48 3.162 -21.354 21.586 0.000 0.000 0.000 18.481 2.744 18.684 18.481 2.744 18.684
Bus181 4.16 3.260 -13.773 14.153 0.476 -0.017 0.476 11.879 2.838 12.213 -11.999 -2.836 12.330
Bus184 0.48 1.432 -2.851 3.191 0.000 0.000 0.000 2.469 1.241 2.763 2.469 1.241 2.763
Bus185 2.40 2.228 -13.325 13.510 0.000 0.000 0.000 11.538 1.957 11.702 11.538 1.957 11.702
Bus186 4.16 3.200 -15.834 16.154 0.477 -0.015 0.477 13.677 2.783 13.957 -13.797 -2.781 14.074
Bus187 0.48 3.266 -21.969 22.211 0.000 0.000 0.000 19.019 2.832 19.229 19.019 2.832 19.229
Bus188 4.16 5.129 -13.239 14.197 0.473 -0.016 0.473 11.436 4.440 12.268 -11.555 -4.438 12.378
Bus189 0.48 1.506 -6.469 6.642 0.000 0.000 0.000 5.602 1.305 5.752 5.602 1.305 5.752
Bus190 2.40 3.555 -10.133 10.739 0.000 0.000 0.000 8.768 3.094 9.298 8.768 3.094 9.298
Bus193 0.48 3.249 -20.966 21.216 0.000 0.000 0.000 18.150 2.817 18.367 18.150 2.817 18.367
Bus194 4.16 3.623 -15.492 15.910 0.476 -0.015 0.476 13.381 3.147 13.746 -13.501 -3.145 13.862
Bus195 4.16 3.312 -14.540 14.913 0.476 -0.015 0.476 12.538 2.886 12.866 -12.658 -2.884 12.983
Bus196 0.48 3.213 -20.752 20.999 0.000 0.000 0.000 17.960 2.788 18.175 17.960 2.788 18.175
Bus197 4.16 3.312 -14.540 14.913 0.476 -0.015 0.476 12.538 2.886 12.866 -12.658 -2.884 12.983
Bus198 4.16 3.621 -15.499 15.917 0.476 -0.015 0.476 13.387 3.145 13.751 -13.507 -3.143 13.868
Bus199 2.40 1.807 -17.214 17.308 0.000 0.000 0.000 14.750 1.567 14.833 14.750 1.567 14.833
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 40
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus200 13.80 2.309 -13.574 13.769 0.333 -0.958 1.015 11.063 1.907 11.226 -11.165 -1.646 11.285
Bus201 0.48 3.339 -21.790 22.045 0.000 0.000 0.000 18.864 2.895 19.085 18.864 2.895 19.085
Bus202 0.48 3.213 -20.752 20.999 0.000 0.000 0.000 17.960 2.788 18.175 17.960 2.788 18.175
Bus203 0.22 2.645 -4.661 5.359 2.715 -4.719 5.444 4.036 2.290 4.641 -5.430 0.099 5.431
Bus204 0.22 2.645 -4.661 5.359 2.715 -4.719 5.444 4.036 2.290 4.641 -5.430 0.099 5.431
Bus205 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus207 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus208 0.22 2.331 -4.088 4.706 2.385 -4.132 4.771 3.540 2.019 4.075 -4.761 0.070 4.761
Bus209 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
Bus210 0.22 2.645 -4.661 5.359 2.715 -4.719 5.444 4.036 2.290 4.641 -5.430 0.099 5.431
Bus211 0.22 2.645 -4.661 5.359 2.715 -4.719 5.444 4.036 2.290 4.641 -5.430 0.099 5.431
Bus213 13.80 3.689 -8.800 9.542 0.331 -0.926 0.984 7.335 3.007 7.928 7.249 3.264 7.950
Bus214 13.80 2.588 -15.127 15.347 0.337 -0.970 1.027 13.076 2.442 13.302 -13.161 -2.188 13.342
Bus215 0.48 3.511 -12.684 13.161 0.000 0.000 0.000 10.984 3.044 11.398 10.984 3.044 11.398
Bus216 0.48 3.496 -12.654 13.128 0.000 0.000 0.000 10.942 3.022 11.351 10.942 3.022 11.351
Bus217 13.80 2.938 -18.823 19.051 1.526 -0.241 1.545 16.005 2.688 16.229 -16.403 -2.640 16.614
Bus218 4.16 1.343 -14.610 14.672 0.479 -0.015 0.479 12.607 1.194 12.663 -12.727 -1.192 12.783
Bus219 0.22 1.463 -2.610 2.992 1.540 -2.701 3.109 2.260 1.267 2.591 -3.072 0.133 3.075
Bus220 13.80 3.728 -23.369 23.664 1.513 -0.163 1.522 19.963 3.341 20.241 -20.352 -3.311 20.620
Bus221 4.16 1.421 -15.672 15.737 0.479 -0.014 0.479 13.551 1.252 13.609 -13.671 -1.250 13.728
Bus223 0.48 3.361 -13.479 13.891 0.000 0.000 0.000 11.673 2.915 12.032 11.673 2.915 12.032
Bus224 0.48 3.264 -13.589 13.976 0.000 0.000 0.000 11.756 2.825 12.091 11.756 2.825 12.091
Bus225 0.48 2.822 -20.523 20.716 0.000 0.000 0.000 17.760 2.448 17.928 17.760 2.448 17.928
Bus226 4.16 1.603 -13.998 14.089 0.478 -0.016 0.478 12.079 1.415 12.161 -12.199 -1.413 12.281
Bus227 4.16 3.603 -12.146 12.669 0.474 -0.017 0.474 10.478 3.127 10.935 -10.598 -3.125 11.049
Bus228 4.16 3.605 -12.143 12.667 0.474 -0.017 0.474 10.476 3.130 10.933 -10.596 -3.128 11.048
Bus230 0.48 2.778 -20.326 20.515 0.000 0.000 0.000 17.592 2.412 17.757 17.592 2.412 17.757
Bus231 0.48 2.861 -10.243 10.635 0.000 0.000 0.000 8.899 2.497 9.242 8.899 2.497 9.242
Bus232 4.16 1.604 -13.996 14.088 0.478 -0.016 0.478 12.078 1.415 12.160 -12.198 -1.413 12.280
Bus234 2.40 5.024 -11.068 12.155 0.000 0.000 0.000 9.579 4.365 10.527 9.579 4.365 10.527
Bus235 0.48 2.943 -21.576 21.776 0.000 0.000 0.000 18.680 2.552 18.854 18.680 2.552 18.854
Bus236 4.16 1.713 -14.988 15.086 0.478 -0.015 0.478 12.960 1.502 13.046 -13.080 -1.500 13.166
Bus237 4.16 2.230 -12.726 12.920 0.476 -0.017 0.477 10.982 1.949 11.154 -11.102 -1.946 11.272
Bus238 4.16 3.982 -12.831 13.434 0.474 -0.016 0.474 11.091 3.456 11.617 -11.211 -3.454 11.731
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 41
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus239 2.40 3.822 -15.244 15.716 0.000 0.000 0.000 13.076 3.276 13.481 13.076 3.276 13.481
Bus240 4.16 2.405 -13.575 13.786 0.477 -0.017 0.477 11.738 2.095 11.923 -11.857 -2.093 12.041
Bus241 4.16 2.230 -12.724 12.918 0.476 -0.017 0.477 10.981 1.949 11.152 -11.101 -1.947 11.270
Bus242 0.48 3.106 -21.119 21.346 0.000 0.000 0.000 18.285 2.694 18.482 18.285 2.694 18.482
Bus243 4.16 2.406 -13.568 13.780 0.477 -0.017 0.477 11.732 2.097 11.917 -11.851 -2.095 12.035
Bus244 0.48 3.289 -19.493 19.769 0.000 0.000 0.000 16.880 2.856 17.120 16.880 2.856 17.120
Bus245 0.48 3.383 -20.297 20.577 0.000 0.000 0.000 17.540 2.925 17.782 17.540 2.925 17.782
Bus246 0.22 2.591 -12.532 12.797 2.916 -14.003 14.304 10.846 2.242 11.075 -12.519 5.702 13.756
Bus247 0.22 2.562 -12.349 12.612 2.895 -13.857 14.156 10.694 2.220 10.922 -12.355 5.673 13.595
Bus248 2.40 3.395 -14.418 14.813 0.000 0.000 0.000 12.478 2.964 12.825 12.478 2.964 12.825
Bus249 2.40 3.310 -14.255 14.634 0.000 0.000 0.000 12.240 2.839 12.565 12.240 2.839 12.565
Bus251 2.40 3.865 -13.039 13.599 0.000 0.000 0.000 11.282 3.366 11.773 11.282 3.366 11.773
Bus252 2.40 3.902 -12.970 13.544 0.000 0.000 0.000 11.222 3.398 11.725 11.222 3.398 11.725
Bus253 2.40 3.934 -12.908 13.494 0.000 0.000 0.000 11.169 3.425 11.682 11.169 3.425 11.682
Bus256 0.48 3.062 -20.883 21.106 0.000 0.000 0.000 18.074 2.658 18.268 18.074 2.658 18.268
Bus258 4.16 2.033 -12.770 12.931 0.477 -0.018 0.477 11.021 1.779 11.163 -11.141 -1.777 11.282
Bus262 0.48 2.981 -20.335 20.552 0.000 0.000 0.000 17.600 2.588 17.789 17.600 2.588 17.789
Bus263 4.16 2.034 -12.766 12.927 0.477 -0.018 0.477 11.017 1.780 11.160 -11.138 -1.778 11.279
Bus264 0.48 3.089 -21.272 21.495 0.000 0.000 0.000 18.418 2.679 18.611 18.418 2.679 18.611
Bus265 4.16 2.186 -13.625 13.799 0.477 -0.017 0.477 11.783 1.906 11.936 -11.903 -1.904 12.054
Bus267 4.16 3.966 -11.668 12.324 0.473 -0.018 0.473 10.092 3.438 10.662 -10.211 -3.436 10.774
Bus268 2.40 3.881 -12.711 13.290 0.000 0.000 0.000 10.925 3.327 11.420 10.925 3.327 11.420
Bus269 2.40 3.879 -12.715 13.293 0.000 0.000 0.000 10.928 3.325 11.423 10.928 3.325 11.423
Bus270 4.16 2.410 -12.784 13.009 0.476 -0.018 0.476 11.056 2.098 11.253 -11.176 -2.095 11.370
Bus272 0.48 3.192 -21.300 21.538 0.000 0.000 0.000 18.442 2.768 18.648 18.442 2.768 18.648
Bus273 2.40 3.866 -12.739 13.313 0.000 0.000 0.000 10.949 3.314 11.440 10.949 3.314 11.440
Bus275 2.40 3.866 -12.739 13.313 0.000 0.000 0.000 10.950 3.314 11.440 10.950 3.314 11.440
Bus277 2.40 3.822 -12.824 13.382 0.000 0.000 0.000 11.023 3.276 11.499 11.023 3.276 11.499
Bus278 2.40 4.360 -10.767 11.616 0.000 0.000 0.000 9.315 3.788 10.056 9.315 3.788 10.056
Bus279 0.48 3.989 -18.217 18.649 0.000 0.000 0.000 15.775 3.461 16.150 15.775 3.461 16.150
Bus280 0.48 4.120 -19.513 19.943 0.000 0.000 0.000 16.866 3.560 17.238 16.866 3.560 17.238
Bus281 2.40 4.242 -10.807 11.610 0.000 0.000 0.000 9.302 3.638 9.988 9.302 3.638 9.988
Bus282 4.16 1.201 -20.685 20.720 0.479 -0.011 0.480 17.839 1.094 17.872 -17.960 -1.092 17.993
Bus283 2.40 4.296 -10.507 11.352 0.000 0.000 0.000 9.046 3.685 9.767 9.046 3.685 9.767
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 42
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus284 0.48 3.930 -17.611 18.044 0.000 0.000 0.000 15.226 3.400 15.601 15.226 3.400 15.601
Bus285 0.48 3.019 -21.588 21.798 0.000 0.000 0.000 18.671 2.595 18.850 18.671 2.595 18.850
Bus286 4.16 1.684 -19.544 19.617 0.479 -0.012 0.479 16.856 1.502 16.923 -16.977 -1.501 17.043
Bus287 0.48 2.958 -22.099 22.296 0.000 0.000 0.000 19.128 2.567 19.299 19.128 2.567 19.299
Bus288 0.48 4.110 -18.803 19.247 0.000 0.000 0.000 16.232 3.549 16.615 16.232 3.549 16.615
Bus289 4.16 1.681 -19.549 19.621 0.479 -0.012 0.479 16.860 1.500 16.927 -16.981 -1.498 17.047
Bus290 2.40 4.340 -10.726 11.571 0.000 0.000 0.000 9.274 3.770 10.011 9.274 3.770 10.011
Bus291 0.48 2.890 -21.469 21.662 0.000 0.000 0.000 18.586 2.506 18.754 18.586 2.506 18.754
Bus292 4.16 1.783 -20.470 20.547 0.479 -0.011 0.479 17.678 1.571 17.748 -17.798 -1.570 17.867
Bus293 4.16 1.221 -21.598 21.632 0.480 -0.010 0.480 18.651 1.090 18.683 -18.772 -1.089 18.803
Bus294 4.16 2.603 -19.266 19.441 0.478 -0.012 0.478 16.639 2.273 16.794 -16.759 -2.271 16.913
Bus295 13.80 2.002 -16.282 16.404 0.329 -0.996 1.049 13.329 1.736 13.442 -13.428 -1.467 13.507
Bus296 4.16 1.776 -20.489 20.566 0.479 -0.011 0.479 17.694 1.565 17.763 -17.814 -1.564 17.883
Bus297 0.48 3.188 -23.337 23.554 0.000 0.000 0.000 20.163 2.751 20.349 20.163 2.751 20.349
Bus298 13.80 2.018 -15.755 15.883 0.331 -0.991 1.045 13.635 1.965 13.776 -13.719 -1.706 13.824
Bus300 4.16 3.161 -18.990 19.251 0.478 -0.012 0.478 16.400 2.753 16.629 -16.520 -2.752 16.747
Bus303 4.16 5.201 -17.626 18.378 0.476 -0.012 0.476 15.220 4.508 15.874 -15.340 -4.507 15.988
Bus304 2.40 4.290 -8.499 9.520 0.000 0.000 0.000 7.351 3.726 8.242 7.351 3.726 8.242
Bus306 4.16 4.878 -16.927 17.616 0.476 -0.013 0.476 14.595 4.236 15.197 -14.715 -4.234 15.312
Bus308 4.16 4.838 -16.972 17.648 0.476 -0.013 0.476 14.633 4.201 15.225 -14.753 -4.199 15.339
Bus309 2.40 4.229 -10.764 11.565 0.000 0.000 0.000 9.264 3.632 9.951 9.264 3.632 9.951
Bus310 2.40 2.488 -10.482 10.773 0.000 0.000 0.000 9.032 2.137 9.281 9.032 2.137 9.281
Bus311 4.16 3.104 -10.215 10.676 0.773 -0.059 0.775 8.690 2.611 9.074 -8.890 -2.606 9.264
Bus312 0.22 1.544 -2.767 3.168 1.613 -2.838 3.264 2.396 1.336 2.743 -3.240 0.119 3.242
Bus313 0.22 0.900 -1.594 1.831 0.932 -1.626 1.874 1.380 0.780 1.585 -1.864 0.050 1.864
Bus314 0.22 2.045 -4.073 4.558 2.206 -4.340 4.869 3.530 1.776 3.951 -4.719 0.545 4.750
Bus315 2.40 5.120 -10.834 11.983 0.000 0.000 0.000 9.372 4.446 10.373 9.372 4.446 10.373
Bus316 0.48 6.038 -16.578 17.643 0.000 0.000 0.000 14.319 5.206 15.236 14.319 5.206 15.236
Bus317 4.16 1.224 -15.244 15.293 0.479 -0.014 0.479 13.154 1.074 13.197 -13.274 -1.073 13.317
Bus318 0.22 2.779 -14.264 14.532 3.186 -15.979 16.293 12.351 2.407 12.584 -14.215 6.677 15.705
Bus319 0.22 0.912 -1.611 1.851 0.940 -1.637 1.888 1.395 0.789 1.603 -1.880 0.043 1.880
Bus320 13.80 0.542 -5.204 5.232 0.758 -0.116 0.767 4.489 0.470 4.514 -4.684 -0.455 4.706
Bus321 0.22 0.996 -1.741 2.006 0.000 0.000 0.000 1.507 0.862 1.736 1.507 0.862 1.736
Bus322 2.40 3.973 -7.665 8.633 0.000 0.000 0.000 6.601 3.403 7.427 6.601 3.403 7.427
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 43
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus323 0.22 2.015 -7.507 7.773 2.198 -8.003 8.299 6.501 1.745 6.731 -7.708 2.540 8.116
Bus324 13.80 3.810 -23.331 23.641 1.512 -0.163 1.521 19.930 3.410 20.220 -20.319 -3.381 20.599
Bus325 0.48 5.946 -9.319 11.054 0.000 0.000 0.000 8.063 5.139 9.562 8.063 5.139 9.562
Bus326 2.40 1.713 -9.098 9.258 0.000 0.000 0.000 7.878 1.490 8.017 7.878 1.490 8.017
Bus327 0.22 1.938 -3.589 4.079 2.051 -3.691 4.222 3.107 1.678 3.531 -4.196 0.221 4.202
Bus328 0.48 3.132 -22.366 22.584 0.000 0.000 0.000 19.301 2.691 19.487 19.301 2.691 19.487
Bus329 0.22 0.900 -1.593 1.829 0.932 -1.625 1.873 1.379 0.779 1.584 -1.862 0.050 1.863
Bus332 10.35 1.104 -12.050 12.101 1.137 -13.534 13.582 10.389 0.977 10.434 9.873 8.763 13.201
Bus333 0.48 5.449 -9.892 11.294 0.000 0.000 0.000 8.565 4.718 9.779 8.565 4.718 9.779
Bus334 13.80 2.501 -18.934 19.098 1.529 -0.243 1.548 16.106 2.323 16.272 -16.503 -2.275 16.660
Bus335 0.22 0.935 -1.640 1.888 0.957 -1.658 1.914 1.421 0.810 1.635 -1.910 0.028 1.910
Bus336 0.22 0.900 -1.590 1.827 0.932 -1.624 1.872 1.377 0.779 1.582 -1.860 0.050 1.861
Bus337 2.40 1.338 -7.063 7.189 0.000 0.000 0.000 6.112 1.159 6.220 6.112 1.159 6.220
Bus338 0.22 1.876 -4.069 4.481 2.027 -4.250 4.709 3.508 1.609 3.859 -4.635 0.629 4.678
Bus339 2.40 4.275 -14.454 15.073 0.000 0.000 0.000 12.374 3.638 12.898 12.374 3.638 12.898
Bus340 0.22 2.655 -12.286 12.570 3.229 -14.985 15.329 10.639 2.300 10.884 8.580 11.903 14.673
Bus528 0.22 3.217 -11.925 12.351 0.000 0.000 0.000 10.325 2.786 10.695 10.325 2.786 10.695
Bus529 0.22 1.072 -1.258 1.653 1.092 -1.266 1.672 1.090 0.928 1.432 -1.646 -0.291 1.672
Bus533 0.48 4.398 -7.218 8.452 0.000 0.000 0.000 6.247 3.802 7.313 6.247 3.802 7.313
Bus535 4.16 1.335 -16.217 16.272 0.479 -0.014 0.479 13.952 1.182 14.002 -14.073 -1.180 14.122
Bus536 0.22 2.511 -12.868 13.111 2.837 -14.199 14.479 11.141 2.174 11.352 -12.771 5.747 14.004
Bus537 0.48 3.584 -14.506 14.942 0.000 0.000 0.000 12.557 3.105 12.936 12.557 3.105 12.936
Bus538 0.22 2.529 -12.598 12.850 2.868 -14.063 14.353 10.908 2.191 11.126 -12.562 5.770 13.824
Bus539 0.22 3.003 -12.389 12.748 3.343 -14.198 14.586 10.727 2.601 11.038 8.850 10.917 14.053
Bus540 4.16 0.310 -1.690 1.718 0.376 -0.065 0.381 1.416 0.255 1.439 -1.518 -0.251 1.539
Bus541 0.22 8.975 -28.111 29.509 10.420 -32.534 34.162 24.345 7.773 25.556 -30.554 11.531 32.657
Bus542 34.50 1.073 -13.364 13.407 0.134 -0.791 0.802 11.278 0.955 11.318 -11.316 -0.746 11.340
Bus543 0.22 2.906 -10.781 11.166 3.207 -12.503 12.908 9.336 2.518 9.670 7.563 9.955 12.502
Bus544 0.22 3.656 -7.716 8.538 3.944 -8.090 9.000 6.680 3.165 7.392 -8.820 1.086 8.887
Bus545 4.16 4.998 -16.720 17.451 0.476 -0.013 0.476 14.418 4.317 15.051 -14.538 -4.315 15.165
Bus546 2.40 3.995 -14.627 15.163 0.000 0.000 0.000 12.659 3.485 13.130 12.659 3.485 13.130
Bus547 0.13 0.426 -0.389 0.576 0.432 -0.390 0.582 0.337 0.369 0.499 -0.556 -0.173 0.582
Bus548 0.48 5.859 -9.125 10.845 0.000 0.000 0.000 7.889 5.060 9.372 7.889 5.060 9.372
Bus549 0.22 2.340 -5.978 6.420 2.479 -6.784 7.223 5.177 2.027 5.560 3.876 5.940 7.093
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 44
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
Bus550 2.40 5.709 -27.416 28.004 0.000 0.000 0.000 23.216 4.810 23.709 23.216 4.810 23.709
Bus551 0.22 2.558 -13.074 13.322 2.873 -14.355 14.640 11.309 2.212 11.523 -12.957 5.764 14.181
Bus552 13.80 1.891 -27.442 27.507 1.566 -0.134 1.572 23.426 1.859 23.499 -23.827 -1.835 23.898
Bus553 0.22 2.541 -12.601 12.855 2.860 -13.982 14.271 10.912 2.201 11.132 -12.546 5.652 13.761
Bus554 4.16 2.254 -19.218 19.350 0.479 -0.012 0.479 16.584 1.975 16.701 -16.704 -1.973 16.820
Bus556 4.16 0.316 -1.679 1.709 0.375 -0.065 0.381 1.408 0.260 1.432 -1.509 -0.256 1.531
Bus557 34.50 1.032 -13.428 13.468 0.134 -0.791 0.803 11.330 0.923 11.367 -11.368 -0.713 11.390
Bus558 0.22 1.105 -1.305 1.710 1.115 -1.298 1.711 1.131 0.957 1.481 -1.693 -0.312 1.721
Bus560 2.40 2.396 -8.718 9.041 0.000 0.000 0.000 7.503 2.058 7.780 7.503 2.058 7.780
Bus561 0.22 4.025 -12.512 13.144 4.292 -13.318 13.992 10.836 3.486 11.383 -13.134 3.632 13.627
Bus563 0.48 5.861 -9.129 10.848 0.000 0.000 0.000 7.892 5.062 9.376 7.892 5.062 9.376
Bus564 0.22 2.325 -5.932 6.372 2.467 -6.743 7.180 5.136 2.012 5.516 3.838 5.914 7.050
MZ-MV-01 2.40 3.752 -8.957 9.711 0.000 0.000 0.000 7.724 3.233 8.373 7.724 3.233 8.373
OLEODUCTO-CCM-2400V 2.40 0.680 -3.211 3.282 0.901 -3.820 3.925 2.780 0.589 2.842 -3.420 1.765 3.849
PARTE SUP SUPTCIA FUERZA 2.40 4.229 -10.764 11.565 0.000 0.000 0.000 9.264 3.632 9.951 9.264 3.632 9.951
PATOS-HV-CCM13.8A 13.80 4.077 -6.307 7.510 0.346 -0.764 0.839 5.423 3.560 6.487 5.335 3.764 6.529
PATOS-HV-CCM13.8B 13.80 3.791 -6.174 7.245 0.343 -0.761 0.835 5.222 3.129 6.088 5.131 3.340 6.122
PATOS-MV-CCM2.4A 2.40 1.855 -9.173 9.359 0.000 0.000 0.000 7.942 1.618 8.105 7.942 1.618 8.105
PATOS-MV-CCM2.4B1 2.40 1.828 -9.263 9.442 0.000 0.000 0.000 7.969 1.572 8.122 7.969 1.572 8.122
PRIM 19-MV-TR3 4.16 2.154 -6.851 7.182 0.389 -0.019 0.389 5.924 1.862 6.210 -6.022 -1.860 6.303
PRIM 19-MV-TR4 4.16 0.334 -1.045 1.098 0.000 0.000 0.000 0.904 0.289 0.949 0.904 0.289 0.949
PRIM CERO-CORTES-TRA2 0.48 8.927 -19.422 21.376 9.918 -21.349 23.541 16.784 7.700 18.466 -22.427 4.193 22.815
PRIM CERO-CORTES-TRA3 0.48 8.032 -22.075 23.491 9.278 -23.470 25.237 19.076 6.924 20.294 -24.552 5.617 25.186
PRIMARIO 19-TR1 13.80 2.845 -9.174 9.605 0.329 -0.887 0.946 7.634 2.312 7.977 -7.732 -2.072 8.005
PRIMARIO SE-19 TR-2 13.80 0.755 -4.206 4.273 0.705 -0.146 0.720 3.631 0.653 3.689 -3.815 -0.630 3.867
S. AUX. TD-480 V 0.48 3.008 -9.371 9.842 0.000 0.000 0.000 8.113 2.604 8.521 8.113 2.604 8.521
S.E-16-MV-TDA-2 13.80 3.679 -7.989 8.796 0.331 -0.914 0.972 6.688 3.009 7.334 6.601 3.264 7.363
S.E 25 TAB 13.8 BA 13.80 3.036 -13.930 14.257 0.324 -0.982 1.034 11.320 2.422 11.576 -11.421 -2.155 11.623
S.E 25 TAB 13.8 BB 13.80 2.743 -12.556 12.853 0.325 -0.964 1.018 10.408 2.290 10.657 -10.504 -2.030 10.698
S.E 25 TDA-1 BB 4.16 1.268 -11.218 11.289 0.791 -0.053 0.793 9.606 1.097 9.668 -9.807 -1.091 9.868
S.E 25 TDA-1 BB2 4.16 1.459 -13.053 13.135 0.793 -0.048 0.794 11.050 1.234 11.119 -11.254 -1.230 11.321
S.E-CH-LV-CCM-480 0.48 1.164 -2.117 2.416 1.201 -2.093 2.413 1.833 1.007 2.091 -2.452 0.027 2.452
S.E-U100 CCM-A-1 4160 BA 4.16 3.978 -9.699 10.483 0.771 -0.057 0.773 8.268 3.344 8.919 -8.468 -3.339 9.102
S.E-U100 CCM-A-2 4160 BB 4.16 3.301 -8.654 9.262 0.769 -0.062 0.771 7.429 2.823 7.947 -7.627 -2.816 8.130
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 45
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
S.E.CH-MV-CCMBA 4.16 2.014 -3.917 4.405 1.963 -4.298 4.725 3.376 1.729 3.793 2.435 4.126 4.791
SE GIS 115 kV BA 115.00 2.105 -16.197 16.333 1.940 -12.739 12.886 14.026 1.824 14.144 -14.901 3.423 15.289
SE GIS 115 kV BB 115.00 2.163 -16.780 16.919 1.976 -14.325 14.461 14.509 1.876 14.630 -15.417 4.390 16.029
SE-1 TD-1 2.40 1.522 -14.482 14.562 0.000 0.000 0.000 12.424 1.319 12.494 12.424 1.319 12.494
SE-1 TD-2 2.40 1.603 -16.153 16.233 0.000 0.000 0.000 13.874 1.396 13.944 13.874 1.396 13.944
SE-2-MV- BA 2.40 1.520 -16.851 16.920 0.000 0.000 0.000 14.449 1.330 14.511 14.449 1.330 14.511
SE-2-MV- BB 2.40 1.524 -16.716 16.785 0.000 0.000 0.000 14.479 1.362 14.543 14.479 1.362 14.543
SE-10 INT DE 2400V 2.40 1.252 -7.276 7.383 0.000 0.000 0.000 6.296 1.084 6.388 6.296 1.084 6.388
SE 13 2400 2.40 1.369 -15.097 15.159 0.000 0.000 0.000 13.076 1.219 13.133 13.076 1.219 13.133
SE-14-CCM-MV-TD-2 4.16 0.476 -2.352 2.400 0.469 -2.419 2.464 2.030 0.411 2.072 1.801 1.665 2.453
SE-19 BUS TR-ALUMBRADO 0.22 0.293 -0.345 0.453 0.299 -0.348 0.459 0.299 0.254 0.392 -0.452 -0.078 0.459
SE-19A 28-MV-28G31 BA 4.16 1.170 -9.313 9.386 0.397 -0.017 0.397 7.986 1.004 8.049 -8.087 -1.003 8.149
SE-19A 28-MV-28G31 BB 4.16 0.489 -2.407 2.456 0.000 0.000 0.000 2.082 0.422 2.124 2.082 0.422 2.124
SE-19A BUS TAB 480 0.48 7.507 -26.152 27.208 9.099 -31.555 32.841 22.603 6.474 23.511 -28.461 13.499 31.500
SE-21 CCM 480V BA 0.48 3.588 -11.929 12.457 0.000 0.000 0.000 10.316 3.100 10.772 10.316 3.100 10.772
SE-21 CCM 480V BB 0.48 3.500 -11.309 11.838 0.000 0.000 0.000 9.779 3.024 10.236 9.779 3.024 10.236
SE-171-HV-4221A 13.80 1.715 -16.968 17.054 0.332 -0.995 1.049 13.864 1.522 13.948 -13.964 -1.253 14.020
SE-171-HV-4221B 13.80 2.169 -18.526 18.653 0.331 -1.005 1.058 14.736 1.778 14.842 -14.842 -1.502 14.918
SE-ANIDES TABLERO 2.40 1.599 -9.646 9.777 0.000 0.000 0.000 8.343 1.384 8.457 8.343 1.384 8.457
SE-CAF BUS ALUM. 220 0.22 3.814 -16.196 16.639 3.874 -16.948 17.385 14.014 3.300 14.397 12.051 12.203 17.150
SE-CAF CCM-LV-480-2 0.48 5.869 -24.076 24.781 0.000 0.000 0.000 20.809 5.081 21.420 20.809 5.081 21.420
SE-CAF CCM-LV-BUS 440 0.48 5.869 -24.076 24.781 0.000 0.000 0.000 20.809 5.081 21.420 20.809 5.081 21.420
SE-CAF CCM-LV-VENT DB-25 0.48 5.869 -24.076 24.781 0.000 0.000 0.000 20.809 5.081 21.420 20.809 5.081 21.420
SE-CAF COMP. Y VENT. 0.48 5.869 -24.076 24.781 0.000 0.000 0.000 20.809 5.081 21.420 20.809 5.081 21.420
SE-CAF LV-DB-50 0.22 3.814 -16.196 16.639 3.874 -16.948 17.385 14.014 3.300 14.397 12.051 12.203 17.150
SE-CAF UBICADO DIB.-220-1 0.22 1.002 -1.163 1.535 1.015 -1.168 1.548 1.007 0.868 1.329 -1.522 -0.281 1.547
SE-CAF UBICADO DIB.-220-2 0.22 1.002 -1.163 1.535 1.015 -1.168 1.548 1.007 0.868 1.329 -1.522 -0.281 1.547
SE-CAF UBICADO DIBUJO 0.48 5.869 -24.076 24.781 0.000 0.000 0.000 20.809 5.081 21.420 20.809 5.081 21.420
SE-ED PER LV-CCM-480-1 0.48 2.905 -5.537 6.253 3.151 -4.772 5.718 4.792 2.514 5.411 -6.413 -0.459 6.429
SE-ED PER LV-CCM-480-2 0.48 2.905 -5.537 6.253 3.151 -4.772 5.718 4.792 2.514 5.411 -6.413 -0.459 6.429
SE-ED PER UBICADO DIB 0.22 2.213 -3.787 4.386 2.678 -4.572 5.299 3.279 1.916 3.798 -4.976 0.970 5.070
SE-LAB. CCM-BA_220V 0.22 2.635 -6.856 7.346 2.859 -5.990 6.637 5.936 2.281 6.359 -7.407 0.350 7.415
SE-LAB. CCM-BA-480 0.48 2.112 -6.213 6.562 0.000 0.000 0.000 5.380 1.831 5.683 5.380 1.831 5.683
SE-LAB. CCM-BB-220V 0.22 2.635 -6.856 7.346 2.859 -5.990 6.637 5.936 2.281 6.359 -7.407 0.350 7.415
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 46
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
SE-LAB. CCM-BB-480 0.48 2.112 -6.213 6.562 0.000 0.000 0.000 5.380 1.831 5.683 5.380 1.831 5.683
SE-U100 LP-1 220 0.22 0.924 -0.862 1.264 0.000 0.000 0.000 0.747 0.800 1.095 0.747 0.800 1.095
SE-U100 LPE-2 0.22 0.924 -0.864 1.265 0.000 0.000 0.000 0.749 0.800 1.096 0.749 0.800 1.096
SEC CERO-CORTES-TRA1 0.48 4.955 -30.265 30.668 6.947 -34.245 34.942 26.114 4.273 26.461 -31.226 15.506 34.865
SEC-2 CERO-CORTES-TRA1 0.48 8.927 -19.422 21.376 9.918 -21.349 23.541 16.784 7.700 18.466 -22.427 4.193 22.815
SEC-3 CERO-CORTES-TRA1 0.48 8.032 -22.075 23.491 9.278 -23.470 25.237 19.076 6.924 20.294 -24.552 5.617 25.186
SECCIONAD-124 13.80 1.668 -15.148 15.240 0.329 -0.989 1.042 12.262 1.430 12.345 -12.364 -1.160 12.418
SECCIONAD-0244 13.80 1.927 -16.856 16.966 0.332 -0.993 1.047 13.775 1.684 13.878 -13.875 -1.415 13.947
SECCIONAD-0246 13.80 1.934 -16.846 16.957 0.332 -0.993 1.047 13.767 1.690 13.870 -13.866 -1.421 13.939
SECCIONAD-0248 13.80 1.673 -15.138 15.231 0.329 -0.989 1.042 12.255 1.434 12.339 -12.357 -1.164 12.411
SECUNDARIO 19-TR1 4.16 1.916 -12.376 12.523 0.398 -0.011 0.399 10.550 1.631 10.675 -10.652 -1.631 10.776
SECUNDARIO 19-TR2 4.16 1.065 -8.046 8.116 0.398 -0.016 0.398 6.955 0.923 7.016 -7.055 -0.921 7.115
SGM-5176 BA 4.16 0.299 -1.711 1.737 0.379 -0.063 0.384 1.434 0.245 1.455 -1.537 -0.242 1.556
SGM-5176 BB 4.16 0.299 -1.711 1.737 0.379 -0.063 0.384 1.434 0.245 1.455 -1.537 -0.242 1.556
T.C LV-CCM-220 0.22 2.222 -1.246 2.547 2.771 -1.862 3.338 1.079 1.924 2.206 -0.674 3.533 3.597
T.C LV-CCM-480 0.48 1.521 -0.404 1.574 0.000 0.000 0.000 0.350 1.317 1.363 0.350 1.317 1.363
TA-A TD-102 0.22 1.356 -2.457 2.807 1.414 -2.505 2.877 2.128 1.174 2.430 -2.866 0.103 2.868
TAB SE-7 1/2 0.22 3.076 -2.923 4.244 2.326 -1.780 2.929 2.532 2.663 3.674 -3.452 -2.037 4.008
TAB-E-EDIFICIO 0.22 4.549 -9.862 10.861 4.350 -8.931 9.934 8.535 3.935 9.399 -10.617 0.146 10.618
TAB. EMERG. SITE 0.22 4.549 -9.862 10.861 4.350 -8.931 9.934 8.535 3.935 9.399 -10.617 0.146 10.618
TAB.LAB B1 2.40 4.335 -9.095 10.075 0.000 0.000 0.000 7.834 3.724 8.675 7.834 3.724 8.675
TAB.LAB B2 2.40 4.307 -9.077 10.047 0.000 0.000 0.000 7.852 3.741 8.698 7.852 3.741 8.698
TABLERO 04-CB-01 13.80 2.112 -15.418 15.562 0.331 -0.989 1.043 13.338 2.037 13.493 -13.422 -1.778 13.539
TABLERO 04-CB-02 13.80 1.894 -14.048 14.175 0.326 -0.982 1.035 11.425 1.592 11.535 -11.525 -1.324 11.601
TAR-CCM-1 0.48 4.302 -10.119 10.995 4.354 -10.085 10.984 8.797 3.787 9.578 6.653 8.753 10.995
TAR-CCM-2 0.48 4.280 -10.201 11.062 4.344 -10.164 11.053 8.902 3.774 9.669 -11.007 1.236 11.076
TAR-CCM-220V 0.22 3.044 -8.972 9.475 3.386 -10.304 10.846 7.784 2.654 8.224 5.907 8.668 10.489
TBS-1 34.50 1.021 -13.445 13.483 0.134 -0.792 0.803 11.344 0.913 11.381 -11.383 -0.703 11.404
TBT-01 0.48 4.860 -34.995 35.331 6.792 -40.694 41.257 30.203 4.195 30.493 -35.309 20.236 40.696
TBT-01 CC 0.48 4.807 -22.755 23.257 6.011 -24.836 25.553 19.698 4.161 20.133 -23.525 9.485 25.366
TCC-TAB-DIS-INT 0.48 2.847 -8.120 8.604 0.000 0.000 0.000 7.023 2.461 7.441 7.023 2.461 7.441
TD-1 0.22 1.907 -3.621 4.093 2.081 -3.817 4.347 3.136 1.651 3.544 -4.279 0.365 4.294
TD-1 BA SE-1 0.48 3.967 -27.553 27.837 0.000 0.000 0.000 23.785 3.434 24.032 23.785 3.434 24.032
TD-1 BB SE-1 0.48 4.426 -30.552 30.871 0.000 0.000 0.000 26.340 3.825 26.616 26.340 3.825 26.616
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 47
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
TD-2 0.22 1.891 -3.586 4.054 2.061 -3.776 4.302 3.105 1.637 3.510 -4.236 0.356 4.250
TD-5 13.80 0.400 -5.565 5.579 0.767 -0.107 0.774 4.800 0.349 4.813 -4.996 -0.335 5.007
TD-6 13.80 0.404 -5.552 5.566 0.766 -0.107 0.773 4.788 0.352 4.801 -4.984 -0.339 4.996
TD-34.5 kV-SP 34.50 1.028 -13.416 13.455 0.134 -0.791 0.802 11.328 0.911 11.365 -11.366 -0.702 11.388
TD-BT-220 BA SE-7A 0.22 2.622 -6.185 6.718 3.052 -6.806 7.459 5.355 2.270 5.816 -7.169 1.509 7.326
TD-BT-220 BB SE-7A 0.22 2.622 -6.185 6.718 3.052 -6.806 7.459 5.355 2.270 5.816 -7.169 1.509 7.326
TD-BT-CB-1A 0.22 1.463 -2.610 2.992 1.540 -2.701 3.109 2.260 1.267 2.591 -3.072 0.133 3.075
TD-BT-CB-1B 0.22 1.462 -2.609 2.991 1.539 -2.701 3.109 2.259 1.266 2.590 -3.072 0.134 3.075
TD-MT-CB-1A 2.40 4.397 -11.817 12.609 0.000 0.000 0.000 10.226 3.824 10.917 10.226 3.824 10.917
TD-MT-CB-1B 2.40 4.307 -11.694 12.462 0.000 0.000 0.000 10.055 3.693 10.711 10.055 3.693 10.711
TD-MT-CB-CCM 2.40 3.682 -12.493 13.025 0.000 0.000 0.000 10.814 3.207 11.280 10.814 3.207 11.280
TD-SP BA 0.48 2.856 -7.993 8.488 0.000 0.000 0.000 6.920 2.472 7.349 6.920 2.472 7.349
TD-SP BB 0.48 3.028 -8.427 8.954 0.000 0.000 0.000 7.297 2.624 7.754 7.297 2.624 7.754
TDA-1 BUS A 2.40 1.636 -9.508 9.648 0.000 0.000 0.000 8.172 1.408 8.292 8.172 1.408 8.292
TDA-1 BUS B 2.40 1.693 -10.093 10.234 0.000 0.000 0.000 8.678 1.457 8.800 8.678 1.457 8.800
TDA-1 SE 17 2.40 0.960 -9.340 9.390 0.000 0.000 0.000 8.081 0.831 8.123 8.081 0.831 8.123
TDA-21 BA 2.40 2.121 -19.960 20.072 0.000 0.000 0.000 17.059 1.822 17.156 17.059 1.822 17.156
TDA-21 BB 2.40 2.121 -19.960 20.072 0.000 0.000 0.000 17.059 1.822 17.156 17.059 1.822 17.156
TDA-190-01A 4.16 3.553 -10.972 11.533 0.395 -0.014 0.395 9.367 3.008 9.838 -9.468 -3.007 9.934
TDA-190-01B 4.16 4.006 -11.478 12.157 0.395 -0.014 0.395 9.915 3.486 10.509 -10.014 -3.484 10.603
TDB-190-1A 0.22 1.635 -5.830 6.055 1.836 -6.491 6.745 5.047 1.415 5.242 -6.095 2.248 6.497
TDB-190-1B 0.22 1.644 -5.898 6.123 1.842 -6.541 6.796 5.100 1.421 5.295 -6.154 2.261 6.556
TDB-SP-SE-7 0.48 1.502 -2.980 3.337 0.000 0.000 0.000 2.580 1.300 2.889 2.580 1.300 2.889
TE-MT-CB-1 2.40 4.713 -10.894 11.870 0.000 0.000 0.000 9.428 4.095 10.279 9.428 4.095 10.279
TEM-CCM-1-480 0.48 4.836 -11.827 12.778 0.000 0.000 0.000 10.228 4.179 11.049 10.228 4.179 11.049
TEM-CCM-2-480 0.48 4.857 -11.848 12.805 0.000 0.000 0.000 10.242 4.193 11.067 10.242 4.193 11.067
TEM-CCM-3-220 0.22 1.835 -7.011 7.247 1.909 -7.689 7.922 6.068 1.588 6.272 5.080 5.847 7.746
TG-01 BA 0.22 1.784 -8.808 8.987 1.903 -9.256 9.449 7.624 1.544 7.779 -8.645 3.336 9.267
TG-01 BB 0.22 1.963 -9.685 9.882 2.093 -10.172 10.385 8.382 1.699 8.553 -9.505 3.663 10.186
TGD-1 SE BUNKER 0.48 2.637 -10.077 10.416 0.000 0.000 0.000 8.716 2.280 9.010 8.716 2.280 9.010
TGD-2 SE BUNKER 0.48 2.636 -10.036 10.376 0.000 0.000 0.000 8.682 2.281 8.977 8.682 2.281 8.977
TM-4.16-01 4.16 1.661 -7.110 7.301 0.470 -0.033 0.471 6.122 1.430 6.287 -6.242 -1.426 6.402
U30-HV-1121A 13.80 2.421 -26.150 26.262 1.567 -0.139 1.574 22.328 2.281 22.444 -22.730 -2.257 22.842
U30-HV-1121B 13.80 1.880 -20.771 20.856 1.541 -0.231 1.558 17.658 1.842 17.754 -18.058 -1.795 18.147
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 48
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.
URA LV-CCM-220 0.22 2.779 -6.052 6.660 2.893 -5.405 6.131 5.239 2.405 5.765 -6.706 0.020 6.706
URA-COMB INT 2.40 3.274 -4.768 5.784 0.000 0.000 0.000 4.117 2.817 4.988 4.117 2.817 4.988
VINE SE-14 13.80 3.682 -8.076 8.876 0.331 -0.915 0.973 6.757 3.011 7.398 6.670 3.265 7.427
XXI-MV-CCM1A 2.40 5.544 -16.790 17.682 0.000 0.000 0.000 14.392 4.741 15.153 14.392 4.741 15.153
XXI-MV-CCM1B 2.40 5.683 -16.941 17.869 0.000 0.000 0.000 14.474 4.818 15.254 14.474 4.818 15.254

All fault currents are symmetrical momentary (1/2 Cycle network) values in rms kA

* LLG fault current is the larger of the two faulted line currents
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 49
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Short-Circuit Summary Report

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
3-HV-0305 13.800 0.08449 0.50886 0.51583 0.09987 0.50524 0.51502 7.43187 20.96220 22.24065
3-HV-0306 13.800 0.09395 0.56758 0.57531 0.10869 0.63815 0.64734 7.52044 21.03443 22.33840
3-MV-BA01 2.400 0.00825 0.07828 0.07871 0.00861 0.07820 0.07867
3-MV-BB01 2.400 0.00836 0.07962 0.08006 0.00874 0.08128 0.08175
04-CCM-01 BA 4.160 0.01390 0.14178 0.14246 0.01503 0.14828 0.14904 18.00767 0.10133 18.00795
04-CCM-01 BB 4.160 0.01237 0.12829 0.12888 0.01341 0.12859 0.12929 18.00767 0.10133 18.00795
04-CCM-02 BA 0.480 0.00396 0.01694 0.01740 0.00398 0.01707 0.01752
04-CCM-02 BB 0.480 0.00398 0.01699 0.01745 0.00399 0.01702 0.01748
04-CCM-03 BA 0.480 0.00370 0.01608 0.01650 0.00373 0.01633 0.01675
04-CCM-03 BB 0.480 0.00334 0.01505 0.01542 0.00338 0.01523 0.01560
04-CCM-04 BA 0.480 0.00382 0.01622 0.01666 0.00381 0.01645 0.01688
04-CCM-04 BB 0.480 0.00345 0.01501 0.01540 0.00349 0.01529 0.01568
04-TDB-01 BA 0.220 0.00548 0.01611 0.01702 0.00548 0.01614 0.01704 0.00708 0.01416 0.01583
04-TDB-01 BB 0.220 0.00548 0.01612 0.01703 0.00548 0.01613 0.01703 0.00708 0.01416 0.01583
6-LV-SERV. PROPIOS 0.480 0.05540 0.08647 0.10269 0.05541 0.08646 0.10270
6-MV-2.4 kV 2.400 0.01041 0.09581 0.09637 0.01087 0.09569 0.09631
07-CCM-01 BA 4.160 0.01467 0.14261 0.14336 0.01580 0.14912 0.14995 18.00893 0.10353 18.00923
07-CCM-01 BB 4.160 0.01310 0.12908 0.12974 0.01415 0.12939 0.13016 18.00893 0.10353 18.00923
07-CCM-02 BA 0.480 0.00372 0.01607 0.01649 0.00373 0.01624 0.01667
07-CCM-02 BB 0.480 0.00366 0.01569 0.01611 0.00367 0.01575 0.01618
07-CCM-03 BA 0.480 0.00376 0.01638 0.01680 0.00381 0.01666 0.01709
07-CCM-03 BB 0.480 0.00370 0.01613 0.01655 0.00374 0.01631 0.01673
07-CCM-04 BA 0.480 0.00388 0.01655 0.01700 0.00388 0.01675 0.01719
07-CCM-04 BB 0.480 0.00362 0.01596 0.01636 0.00363 0.01601 0.01642
07-MV-BA01 2.400 0.01216 0.08302 0.08391 0.01263 0.08423 0.08517
07-MV-BB01 2.400 0.01216 0.08302 0.08391 0.01263 0.08423 0.08517
07-TDB-01 BA 0.220 0.00745 0.02041 0.02173 0.00745 0.02045 0.02177 0.00911 0.01864 0.02075
07-TDB-01 BB 0.220 0.00744 0.02034 0.02165 0.00744 0.02035 0.02167 0.00911 0.01864 0.02075
8-MJW-LV-CCM1 0.480 0.01596 0.05789 0.06005 0.01598 0.05797 0.06014
8-MJW-MV-BABB 2.400 0.02234 0.10439 0.10675 0.02278 0.10652 0.10893
8-MJW-MV-IEM 4.160 0.08310 0.43148 0.43941 0.08442 0.43789 0.44595
8-MJW-MV-SQ-D 4.160 0.08310 0.43148 0.43941 0.08442 0.43789 0.44595
10-BUS-2.4 2.400 0.03111 0.18417 0.18678 0.03120 0.18450 0.18712
10-CCM-2.4 KV 2.400 0.03183 0.18495 0.18767 0.03192 0.18528 0.18801
10-CCM-10 0.480 0.00573 0.02764 0.02823 0.00573 0.02765 0.02824
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 50
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
010-HV-2121A 13.800 0.03110 0.30826 0.30983 0.03773 0.31578 0.31802 15.29737 0.83908 15.32036
010-HV-2121B 13.800 0.03914 0.38810 0.39007 0.05100 0.40027 0.40351 15.10043 1.51356 15.17610
10-HV-CCM-13.8 13.800 0.55654 1.88206 1.96263 0.55950 1.89337 1.97431 32.24414 3.42763 32.42581
010-LV-2151A 0.480 0.00181 0.01238 0.01252 0.00182 0.01248 0.01261
010-LV-2151B 0.480 0.00184 0.01254 0.01268 0.00185 0.01259 0.01272
010-LV-2152A 0.480 0.00182 0.01180 0.01194 0.00182 0.01188 0.01202
010-LV-2152B 0.480 0.00193 0.01231 0.01246 0.00193 0.01240 0.01254
010-LV-2153A 0.480 0.00179 0.01234 0.01247 0.00180 0.01240 0.01253
010-LV-2153B 0.480 0.00184 0.01266 0.01280 0.00185 0.01272 0.01285
010-LV-2154A 0.480 0.00189 0.01233 0.01247 0.00188 0.01238 0.01253
010-LV-2154B 0.480 0.00186 0.01243 0.01257 0.00186 0.01252 0.01266
010-LV-2161A 0.220 0.00210 0.00938 0.00961 0.00210 0.00939 0.00962 0.00211 0.00702 0.00733
010-LV-2161B 0.220 0.00211 0.00943 0.00966 0.00211 0.00945 0.00968 0.00222 0.00716 0.00749
010-MV-2131A 4.160 0.00844 0.11785 0.11815 0.00893 0.11893 0.11926 15.00608 0.10499 15.00645
010-MV-2131B 4.160 0.00920 0.12746 0.12779 0.01011 0.12859 0.12898 15.00601 0.10361 15.00637
11-CCM-BUS1 2.400 0.01094 0.11393 0.11445 0.01114 0.11533 0.11587
11-CCM-BUS2 2.400 0.01105 0.11559 0.11611 0.01134 0.11552 0.11608
11-LV-BA01 0.480 0.00222 0.01229 0.01249 0.00223 0.01229 0.01249
11-LV-BB01 0.480 0.00215 0.01191 0.01210 0.00215 0.01216 0.01235
11-LV-CCM1 0.480 0.01126 0.01605 0.01960 0.01150 0.01637 0.02001
11-LV-CCM2 0.480 0.02209 0.01754 0.02821 0.02251 0.01773 0.02865
11-LV-CCM3 0.480 0.02101 0.01812 0.02774 0.02102 0.01812 0.02775
11-LV-CCM4 0.480 0.02240 0.01783 0.02863 0.02241 0.01783 0.02864
12-BARRAS2.4A 2.400 0.00923 0.07671 0.07727 0.00963 0.07864 0.07923
12-BARRAS2.4B 2.400 0.00973 0.08205 0.08263 0.01007 0.08426 0.08486
12-CCM-440 0.480 0.08983 0.12488 0.15384 0.08984 0.12497 0.15392 0.13393 0.13127 0.18754
13-HV-BA 13.800 0.06602 0.49913 0.50348 0.08127 0.49559 0.50221 7.03501 20.67058 21.83493
13-HV-BB 13.800 0.06381 0.45336 0.45783 0.07529 0.52711 0.53246 6.88935 20.53879 21.66345
15-LV-BA01-480 0.480 0.00144 0.01007 0.01017 0.00146 0.01012 0.01023 0.00123 0.00875 0.00883
15-LV-BA02-480 0.480 0.00473 0.02194 0.02245 0.00475 0.02201 0.02251
15-LV-BB01-480 0.480 0.00179 0.01241 0.01254 0.00180 0.01249 0.01262 0.00154 0.01095 0.01106
15-LV-BB02-220 0.220 0.00875 0.01950 0.02137 0.00875 0.01952 0.02139 0.00775 0.01488 0.01678
15-MV-BA01 2.400 0.00348 0.04398 0.04412 0.00390 0.04559 0.04576
15-MV-BB01 2.400 0.00358 0.04309 0.04324 0.00394 0.04533 0.04550
18 -MV-BA01 2.400 0.01215 0.12796 0.12854 0.01240 0.12791 0.12851
18-LV-220 0.220 0.00454 0.01716 0.01775 0.00454 0.01716 0.01775 0.00411 0.01419 0.01478
18-LV-480 BA 0.480 0.00191 0.01345 0.01358 0.00193 0.01344 0.01358
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 51
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
18-LV-480 BB 0.480 0.00228 0.01401 0.01419 0.00229 0.01407 0.01425
18-LV-TR5-EXT 0.220 0.00454 0.01716 0.01775 0.00454 0.01716 0.01775 0.00411 0.01419 0.01478
18-MV-BB01 2.400 0.01558 0.15343 0.15422 0.01583 0.15517 0.15598
19-HV-4160 BA1 4.160 0.61139 2.06999 2.15839 0.61208 2.07497 2.16337
19-HV-4160 BA2 4.160 0.27256 1.37229 1.39910 0.27248 1.37485 1.40160
19-HV-4160 BA3 4.160 0.03477 0.20100 0.20399 0.03560 0.20700 0.21004 18.11592 0.21780 18.11723
19-HV-4160 BB 4.160 0.04510 0.30485 0.30817 0.04537 0.30588 0.30922 18.11592 0.20862 18.11712
19-LV-480 BA 0.480 0.01562 0.05945 0.06147 0.01563 0.05951 0.06153 0.14601 0.24676 0.28672
19-LV-480 BB 0.480 0.00808 0.03595 0.03684 0.00808 0.03596 0.03686
020-HV-22A21A 13.800 0.02093 0.29056 0.29131 0.02742 0.29803 0.29929 15.05904 0.70363 15.07547
020-HV-22A21B 13.800 0.02935 0.37189 0.37305 0.04122 0.38408 0.38628 15.08472 1.47215 15.15638
020-HV-22B21 13.800 0.02931 0.30452 0.30592 0.03572 0.31201 0.31405 15.07394 0.74289 15.09223
020-HV-22B21 BB 13.800 0.03836 0.38671 0.38861 0.05021 0.39890 0.40204 15.09962 1.51141 15.17507
020-LV-22A51A 0.480 0.00221 0.01290 0.01309 0.00221 0.01300 0.01319
020-LV-22A51B 0.480 0.00217 0.01263 0.01281 0.00218 0.01276 0.01295
020-LV-22A52 BA 0.480 0.00221 0.01298 0.01317 0.00222 0.01309 0.01328
020-LV-22A52 BB 0.480 0.00193 0.01130 0.01146 0.00194 0.01153 0.01169
020-LV-22A53 BA 0.480 0.00224 0.01194 0.01214 0.00224 0.01195 0.01216
020-LV-22A53 BB 0.480 0.00224 0.01184 0.01205 0.00225 0.01188 0.01210
020-LV-22B52 BA 0.480 0.00213 0.01275 0.01293 0.00215 0.01281 0.01299
020-LV-22B52 BB 0.480 0.00200 0.01232 0.01248 0.00202 0.01248 0.01265
020-LV-22B55A 0.480 0.00238 0.01402 0.01422 0.00240 0.01404 0.01424
020-LV-22B55B 0.480 0.00239 0.01411 0.01431 0.00240 0.01412 0.01432
020-MV-22A31A 4.160 0.01193 0.14494 0.14543 0.01239 0.14581 0.14634 15.01119 0.13767 15.01182
020-MV-22A31B 4.160 0.01295 0.14827 0.14883 0.01381 0.15012 0.15076 15.01119 0.13767 15.01182
020-MV-22B31A 4.160 0.01361 0.15804 0.15862 0.01415 0.15912 0.15974 15.01119 0.13767 15.01182
020-MV-22B31B 4.160 0.01375 0.15699 0.15759 0.01470 0.15823 0.15891 15.01119 0.13767 15.01182
22-TDA-1 13.800 0.50584 0.94027 1.06770 0.52023 1.01070 1.13672 7.81243 21.70711 23.07017
22-TDA-2 13.800 0.16434 0.52726 0.55228 0.17640 0.60184 0.62715 7.04401 20.71305 21.87804
22-TDA-4A 4.160 0.05471 0.21241 0.21934 0.05602 0.21881 0.22586 36.00817 0.12641 36.00839
22-TDA-4B 4.160 0.02368 0.17487 0.17647 0.02478 0.18165 0.18333 36.00817 0.12641 36.00839
23-HV-CCM-13.8A 13.800 0.10422 0.57970 0.58899 0.11928 0.65061 0.66145 7.59735 21.10645 22.43216
23-HV-CCM-13.8B 13.800 0.08915 0.47124 0.47960 0.10077 0.54540 0.55463 7.36312 20.90243 22.16139
023-LV-2451A 0.480 0.00556 0.02133 0.02204 0.00557 0.02138 0.02210
023-LV-2451B 0.480 0.00557 0.02142 0.02213 0.00559 0.02148 0.02220
23-LV-CCM-220A 0.220 0.01545 0.02861 0.03251 0.01546 0.02862 0.03253 0.01610 0.02778 0.03211
23-LV-CCM-480A 0.480 0.00264 0.01587 0.01609 0.00266 0.01596 0.01618
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 52
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
23-LV-CCM-480B 0.480 0.00296 0.01443 0.01473 0.00297 0.01449 0.01479
23-MV-CCM-4.16A 4.160 0.02147 0.20387 0.20499 0.02284 0.21031 0.21155 18.01242 0.15292 18.01307
23-MV-CCM-4.16B 4.160 0.01783 0.17562 0.17652 0.01870 0.18133 0.18229 18.01242 0.15292 18.01307
25-CCM-1 BUS A 0.480 0.00254 0.01304 0.01328 0.00259 0.01336 0.01361
25-CCM-1 BUS B 0.480 0.00299 0.01489 0.01518 0.00300 0.01495 0.01525
25-TDBT-1 BA 0.220 0.01002 0.01826 0.02083 0.01003 0.01833 0.02090 0.01765 0.02257 0.02865
25-TDBT-1 BB 0.220 0.01118 0.02229 0.02493 0.01118 0.02230 0.02494 0.01871 0.02622 0.03221
28-LV-28G41 BA 0.480 0.01215 0.05847 0.05972 0.01215 0.05853 0.05978
28-LV-28G41 BB 0.480 0.01452 0.06885 0.07036 0.01452 0.06888 0.07040
30-LV-30F42 0.480 0.01328 0.05057 0.05228 0.01328 0.05057 0.05229
030-LV-1151A 0.480 0.00187 0.01213 0.01227 0.00187 0.01214 0.01228
030-LV-1151B 0.480 0.00187 0.01213 0.01228 0.00188 0.01214 0.01229
030-LV-1152A 0.480 0.00205 0.01309 0.01325 0.00206 0.01309 0.01325
030-LV-1152B 0.480 0.00199 0.01263 0.01279 0.00200 0.01264 0.01280
030-LV-1153A 0.480 0.00195 0.01298 0.01312 0.00196 0.01300 0.01315
030-LV-1153B 0.480 0.00184 0.01224 0.01238 0.00185 0.01235 0.01249
030-LV-1161A 0.220 0.00214 0.01016 0.01039 0.00214 0.01017 0.01039 0.00235 0.00840 0.00872
030-LV-1161B 0.220 0.00212 0.01001 0.01023 0.00212 0.01004 0.01026 0.00235 0.00840 0.00872
030-MV-1131A 4.160 0.00837 0.10756 0.10788 0.00882 0.10809 0.10845 15.00760 0.09983 15.00793
030-MV-1131B 4.160 0.00923 0.11512 0.11549 0.00984 0.11611 0.11652 15.00760 0.09983 15.00793
040-HV-2521A 13.800 0.04360 0.33006 0.33293 0.05019 0.33752 0.34123 15.51341 0.97989 15.54433
040-HV-2521B 13.800 0.05308 0.41119 0.41460 0.06493 0.42333 0.42828 15.12282 1.57254 15.20436
040-LV-2551 BA 0.480 0.00193 0.01291 0.01305 0.00194 0.01291 0.01306
040-LV-2551 BB 0.480 0.00190 0.01270 0.01284 0.00191 0.01271 0.01285
040-LV-2552 BA 0.480 0.00211 0.01335 0.01351 0.00211 0.01335 0.01352
040-LV-2552 BB 0.480 0.00217 0.01384 0.01401 0.00218 0.01385 0.01403 0.00283 0.01339 0.01369
040-LV-2561 BA 0.220 0.00219 0.00976 0.01000 0.00219 0.00976 0.01000 0.00286 0.00868 0.00914
040-LV-2561 BB 0.220 0.00220 0.00986 0.01011 0.00220 0.00987 0.01011 0.00286 0.00868 0.00914
040-MV-2531A 4.160 0.01039 0.11965 0.12010 0.01093 0.12026 0.12076 15.00771 0.10156 15.00806
040-MV-2531B 4.160 0.01156 0.12946 0.12998 0.01256 0.13049 0.13109 15.00760 0.09983 15.00793
050-LV-1351A 0.480 0.00229 0.01335 0.01355 0.00229 0.01333 0.01353
050-LV-1351B 0.480 0.00252 0.01440 0.01461 0.00253 0.01441 0.01463
050-LV-1352A 0.480 0.00241 0.01404 0.01424 0.00242 0.01404 0.01425
050-LV-1352B 0.480 0.00255 0.01459 0.01481 0.00256 0.01460 0.01482
050-LV-1361A 0.220 0.00367 0.01367 0.01416 0.00367 0.01367 0.01416 0.00687 0.01647 0.01785
050-LV-1361B 0.220 0.00367 0.01363 0.01411 0.00367 0.01363 0.01412 0.00684 0.01631 0.01769
050-MV-1331A 4.160 0.02710 0.16679 0.16898 0.02763 0.16717 0.16944 15.03169 0.17333 15.03269
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 53
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
050-MV-1331B 4.160 0.02872 0.17826 0.18056 0.02971 0.17928 0.18173 15.03169 0.17333 15.03269
060-LV-1451A 0.480 0.00237 0.01393 0.01413 0.00237 0.01394 0.01414
060-LV-1451B 0.480 0.00243 0.01418 0.01439 0.00244 0.01419 0.01440
060-LV-1452A 0.480 0.00240 0.01387 0.01407 0.00241 0.01387 0.01408
060-LV-1452B 0.480 0.00251 0.01460 0.01482 0.00253 0.01462 0.01483
060-LV-1461A 0.220 0.00368 0.01361 0.01410 0.00368 0.01361 0.01410 0.00687 0.01647 0.01785
060-LV-1461B 0.220 0.00366 0.01363 0.01412 0.00366 0.01363 0.01412 0.00684 0.01631 0.01769
060-MV-1431A 4.160 0.02424 0.16704 0.16879 0.02475 0.16738 0.16920 15.02712 0.17453 15.02813
060-MV-1431B 4.160 0.02585 0.17861 0.18047 0.02684 0.17963 0.18163 15.02712 0.17453 15.02813
070-HV-1521A 13.800 0.04976 0.32706 0.33082 0.05623 0.33453 0.33923 15.50112 0.99718 15.53316
070-HV-1521B 13.800 0.06117 0.40773 0.41229 0.07303 0.41988 0.42619 15.13564 1.56298 15.21613
070-LV-1551A 0.480 0.00223 0.01379 0.01397 0.00224 0.01379 0.01397
070-LV-1551B 0.480 0.00239 0.01454 0.01473 0.00240 0.01455 0.01475
070-LV-1552A 0.480 0.00237 0.01442 0.01462 0.00237 0.01443 0.01462
070-LV-1552B 0.480 0.00240 0.01469 0.01489 0.00242 0.01471 0.01491
070-LV-1561A 0.220 0.00247 0.01102 0.01129 0.00247 0.01102 0.01129 0.00310 0.00974 0.01022
070-LV-1561B 0.220 0.00247 0.01107 0.01135 0.00248 0.01108 0.01135 0.00310 0.00974 0.01022
070-MV-1531A 4.160 0.01473 0.15335 0.15406 0.01528 0.15374 0.15450 15.01119 0.13767 15.01182
070-MV-1531B 4.160 0.01601 0.16448 0.16526 0.01701 0.16550 0.16637 15.01119 0.13767 15.01182
080-HV-1621A 13.800 0.05694 0.33625 0.34103 0.06359 0.34374 0.34957 15.56552 1.04276 15.60041
080-HV-1621B 13.800 0.06728 0.41511 0.42052 0.07918 0.42728 0.43455 15.14432 1.57968 15.22648
080-LV-1651A 0.480 0.00240 0.01469 0.01488 0.00240 0.01470 0.01489
080-LV-1651B 0.480 0.00241 0.01480 0.01500 0.00243 0.01482 0.01501
080-LV-1652A 0.480 0.00238 0.01455 0.01475 0.00239 0.01456 0.01476
080-LV-1652B 0.480 0.00238 0.01457 0.01476 0.00239 0.01459 0.01478
080-LV-1653A 0.480 0.00240 0.01469 0.01488 0.00240 0.01470 0.01489
080-LV-1653B 0.480 0.00528 0.02128 0.02192 0.00529 0.02131 0.02195
080-LV 1661A 0.220 0.00282 0.01145 0.01179 0.00282 0.01145 0.01180 0.00314 0.00842 0.00898
080-LV 1661B 0.220 0.00343 0.01284 0.01329 0.00343 0.01284 0.01329 0.00314 0.00842 0.00898
080-MV-1631A 4.160 0.01564 0.16341 0.16416 0.01623 0.16410 0.16490 15.01233 0.15378 15.01311
080-MV-1631B 4.160 0.01678 0.17191 0.17273 0.01784 0.17305 0.17396 15.01233 0.15378 15.01311
090-HV-1721A 13.800 0.05652 0.33631 0.34103 0.06292 0.34385 0.34956 15.60157 1.06827 15.63810
090-HV-1721B 13.800 0.07008 0.41849 0.42431 0.08197 0.43067 0.43840 15.14918 1.58902 15.23229
090-LV-1751A 0.480 0.00253 0.01588 0.01608 0.00254 0.01589 0.01609
090-LV-1751B 0.480 0.00252 0.01591 0.01611 0.00254 0.01602 0.01622
090-LV-1752A 0.480 0.00134 0.01524 0.01530 0.00135 0.01525 0.01531
090-LV-1752B 0.480 0.00131 0.01594 0.01600 0.00133 0.01596 0.01602
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 54
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
090-LV-1761A 0.220 0.00465 0.01243 0.01327 0.00465 0.01243 0.01327 0.00330 0.00898 0.00957
090-LV-1761B 0.220 0.00760 0.01702 0.01864 0.00760 0.01703 0.01865 0.01261 0.01994 0.02359
090-MV-1731A 4.160 0.03007 0.28761 0.28917 0.03062 0.28824 0.28986 15.02608 0.27289 15.02856
090-MV-1731B 4.160 0.03065 0.29274 0.29434 0.03165 0.29416 0.29586 15.02568 0.26829 15.02807
100-HV-1821A 13.800 0.04239 0.32765 0.33038 0.04898 0.33513 0.33869 15.49188 0.96586 15.52196
100-HV-1821B 13.800 0.05137 0.40823 0.41145 0.06322 0.42042 0.42514 15.12059 1.56666 15.20153
100-LV-1851A 0.480 0.00194 0.01138 0.01154 0.00195 0.01138 0.01155
100-LV-1851B 0.480 0.00218 0.01267 0.01286 0.00219 0.01269 0.01287
100-LV-1852A 0.480 0.00211 0.01209 0.01227 0.00211 0.01210 0.01229
100-LV-1852B 0.480 0.00230 0.01330 0.01350 0.00231 0.01333 0.01352
100-LV-1853A 0.480 0.00208 0.01189 0.01207 0.00208 0.01190 0.01208
100-LV-1853B 0.480 0.00218 0.01269 0.01287 0.00219 0.01270 0.01289
100-LV-1854A 0.480 0.00233 0.01308 0.01329 0.00234 0.01309 0.01330
100-LV-1854B 0.480 0.00238 0.01354 0.01374 0.00239 0.01355 0.01376
100-LV-1861A 0.220 0.00297 0.01038 0.01080 0.00298 0.01039 0.01080 0.00350 0.00860 0.00928
100-LV-1861B 0.220 0.00589 0.01503 0.01614 0.00589 0.01503 0.01615 0.01245 0.01922 0.02290
100-MV-1831A 4.160 0.01109 0.11840 0.11892 0.01162 0.11917 0.11973 15.00771 0.10156 15.00806
100-MV-1831B 4.160 0.01159 0.12605 0.12658 0.01254 0.12730 0.12792 15.00760 0.09983 15.00793
110-HV-3221A 13.800 0.05589 0.47647 0.47974 0.06994 0.53040 0.53500 7.01168 20.60913 21.76924
110-HV-3221B 13.800 0.06032 0.49197 0.49565 0.07576 0.48834 0.49418 7.10026 20.68135 21.86623
110-HV-3321A 13.800 0.06173 0.48610 0.49000 0.07578 0.54003 0.54532 7.02113 20.63402 21.79585
110-HV-3321B 13.800 0.07206 0.51132 0.51637 0.08750 0.50770 0.51519 7.11915 20.73114 21.91945
110-LV-3351A 0.480 0.00247 0.01478 0.01498 0.00249 0.01484 0.01505
110-LV-3351B 0.480 0.00234 0.01427 0.01446 0.00235 0.01428 0.01447
110-LV-3352A 0.480 0.00243 0.01444 0.01464 0.00244 0.01450 0.01471
110-LV-3352B 0.480 0.00256 0.01501 0.01523 0.00257 0.01501 0.01523
110-LV-3361A 0.220 0.00470 0.01354 0.01433 0.00471 0.01355 0.01434 0.00699 0.01321 0.01494
110-LV-3361B 0.220 0.00473 0.01366 0.01445 0.00474 0.01366 0.01446 0.00699 0.01321 0.01494
110-MV-3331A 4.160 0.02353 0.23573 0.23690 0.02475 0.24106 0.24233 15.01919 0.20631 15.02061
110-MV-3331B 4.160 0.02470 0.24121 0.24247 0.02604 0.24131 0.24271 1441.08500 0.20631 1441.08500
120-LV-35A51A 0.480 0.00288 0.01463 0.01491 0.00289 0.01463 0.01491
120-LV-35A51B 0.480 0.00270 0.01402 0.01427 0.00271 0.01407 0.01433
120-LV-35A61A 0.220 0.00555 0.01194 0.01317 0.00555 0.01194 0.01317 0.01243 0.01175 0.01711
120-LV-35A61B 0.220 0.00378 0.01239 0.01295 0.00378 0.01240 0.01297 0.00699 0.01321 0.01494
120-LV-35B51A 0.480 0.00339 0.01484 0.01522 0.00340 0.01484 0.01522
120-LV-35B51B 0.480 0.00305 0.01387 0.01420 0.00306 0.01393 0.01426
120-LV-35B52A 0.480 0.00356 0.01481 0.01523 0.00359 0.01491 0.01534
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 55
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
120-LV-35B52B 0.480 0.00391 0.01584 0.01632 0.00393 0.01589 0.01636
120-MV-35A41A 2.400 0.01507 0.08583 0.08714 0.01543 0.08579 0.08716
120-MV-35A41B 2.400 0.01520 0.08711 0.08843 0.01553 0.08872 0.09007
120-MV-35B41A 2.400 0.04400 0.10972 0.11821 0.04436 0.10968 0.11831
120-MV-35B41B 2.400 0.04288 0.11028 0.11833 0.04318 0.11187 0.11991
120-MV-35B42A 2.400 0.04342 0.10935 0.11765 0.04387 0.10940 0.11787
120-MV-35B42B 2.400 0.04462 0.11128 0.11989 0.04494 0.11286 0.12148
130-LV-3651A 0.480 0.00257 0.01422 0.01445 0.00258 0.01423 0.01446
130-LV-3651B 0.480 0.00259 0.01435 0.01459 0.00261 0.01437 0.01460
130-LV-3652A 0.480 0.00243 0.01364 0.01385 0.00243 0.01364 0.01386
130-LV-3652B 0.480 0.00259 0.01435 0.01459 0.00261 0.01437 0.01460
130-LV-3661A 0.220 0.00192 0.00949 0.00968 0.00192 0.00949 0.00969 0.00141 0.00663 0.00678
130-LV-3661B 0.220 0.00195 0.00964 0.00984 0.00196 0.00965 0.00984 0.00141 0.00663 0.00678
130-MV-3631A 4.160 0.03098 0.14209 0.14543 0.03151 0.14271 0.14614 15.04081 0.15916 15.04166
130-MV-3631B 4.160 0.03237 0.15213 0.15554 0.03337 0.15316 0.15675 15.04070 0.15743 15.04153
140-LV-3461A 0.220 0.00270 0.01043 0.01077 0.00270 0.01043 0.01077 0.00144 0.00679 0.00694
140-LV-3461B 0.220 0.00266 0.01033 0.01067 0.00267 0.01034 0.01068 0.00144 0.00679 0.00694
140-LV-3751A2 0.480 0.00244 0.01199 0.01223 0.00245 0.01199 0.01223
140-MV-3741A 2.400 0.02736 0.08068 0.08519 0.02774 0.08061 0.08525
140-MV-3741B 2.400 0.02842 0.08462 0.08927 0.02862 0.08647 0.09109
140-MV-3751B 0.480 0.00226 0.01154 0.01176 0.00227 0.01159 0.01181
140-TR-3731A 0.480 0.00598 0.01734 0.01834 0.00600 0.01733 0.01834
150-LV-3851A 0.480 0.00629 0.02097 0.02189 0.00631 0.02097 0.02189
150-LV-3851B 0.480 0.00657 0.02176 0.02273 0.00657 0.02183 0.02280
150-LV-3861A 0.220 0.01075 0.02377 0.02609 0.01076 0.02377 0.02609 0.01484 0.02586 0.02982
150-LV-3861B 0.220 0.01082 0.02388 0.02622 0.01082 0.02390 0.02623 0.01484 0.02586 0.02982
150-MV-3841A 2.400 0.03498 0.09215 0.09857 0.03535 0.09209 0.09864
150-MV-3841B 2.400 0.03670 0.09666 0.10339 0.03689 0.09850 0.10519
160-HV-41A21 13.800 0.01599 0.41580 0.41611 0.01989 0.41977 0.42024 15.03841 0.67838 15.05371
160-HV-41A22 (TD-7) 13.800 0.01697 0.28387 0.28438 0.02362 0.29136 0.29231 15.04902 0.67722 15.06425
160-HV-41A23 13.800 0.02360 0.36253 0.36330 0.03551 0.37470 0.37638 15.07470 1.44575 15.14387
160-HV-41C21A 13.800 0.03063 0.30177 0.30332 0.03726 0.30925 0.31149 15.22926 0.80478 15.25051
160-HV-41C21B 13.800 0.03832 0.38028 0.38220 0.05019 0.39244 0.39563 15.09900 1.49249 15.17258
160-LV-41A51A 0.480 0.00238 0.01296 0.01317 0.00239 0.01303 0.01325
160-LV-41A51B 0.480 0.00271 0.01411 0.01437 0.00269 0.01416 0.01441
160-LV-41A52A 0.480 0.00266 0.01425 0.01450 0.00266 0.01426 0.01451
160-LV-41A52B 0.480 0.00253 0.01378 0.01401 0.00254 0.01379 0.01402
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 56
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
160-LV-41A61A 0.220 0.00188 0.00921 0.00940 0.00188 0.00921 0.00940
160-LV-41A61B 0.220 0.00185 0.00910 0.00929 0.00185 0.00911 0.00929
160-LV-41C51A 0.480 0.00202 0.01349 0.01364 0.00203 0.01350 0.01365
160-LV-41C51B 0.480 0.00214 0.01412 0.01428 0.00215 0.01413 0.01430
160-LV-41C61A 0.220 0.08404 0.06819 0.10822 0.08404 0.06819 0.10822 0.19305 0.07975 0.20887
160-LV-41C61B 0.220 0.08419 0.06850 0.10854 0.08419 0.06850 0.10854 0.19305 0.07975 0.20887
160-LV-41D51A 0.480 0.00434 0.01610 0.01667 0.00446 0.01640 0.01700
160-LV-41D51B 0.480 0.00429 0.01605 0.01662 0.00446 0.01650 0.01710
160-LV-41E51A 0.480 0.00233 0.01350 0.01370 0.00234 0.01351 0.01371
160-LV-41E51B 0.480 0.00240 0.01391 0.01411 0.00241 0.01392 0.01413
160-LV-41E61A 0.220 0.02242 0.04001 0.04586 0.02243 0.04001 0.04587 0.02191 0.03703 0.04302
160-LV-41E61B 0.220 0.02244 0.04010 0.04595 0.02244 0.04010 0.04595 0.02191 0.03703 0.04302
160-LV-41F51A 0.480 0.00430 0.01894 0.01943 0.00432 0.01902 0.01950
160-LV-41F51B 0.480 0.00473 0.02017 0.02072 0.00475 0.02022 0.02077
160-LV-41F61A 0.220 0.05924 0.06465 0.08768 0.05924 0.06466 0.08770 0.11296 0.06765 0.13166
160-LV-41F61B 0.220 0.05934 0.06492 0.08795 0.05934 0.06493 0.08796 0.11296 0.06765 0.13166
160-MV-41C31A 4.160 0.01793 0.20422 0.20500 0.01841 0.20486 0.20569 15.01757 0.20257 15.01894
160-MV-41C31B 4.160 0.01799 0.20736 0.20814 0.01885 0.20829 0.20914 15.01757 0.20257 15.01894
160-MV-41D31A 4.160 0.01446 0.12328 0.12413 0.01499 0.12406 0.12496 15.01344 0.11481 15.01387
160-MV-41D31B 4.160 0.01493 0.13090 0.13174 0.01589 0.13217 0.13312 15.01332 0.11308 15.01375
160-MV-41E31 BA 4.160 0.02477 0.14061 0.14278 0.02529 0.14122 0.14347 15.03255 0.15904 15.03339
160-MV-41E31 BB 4.160 0.02593 0.15046 0.15268 0.02691 0.15148 0.15385 15.03243 0.15731 15.03326
160-MV-41F31A 4.160 0.02802 0.21892 0.22071 0.02850 0.21958 0.22142 15.03593 0.24505 15.03792
160-MV-41F31B 4.160 0.02825 0.22231 0.22410 0.02910 0.22325 0.22514 15.03593 0.24505 15.03792
160-MV-4131A 4.160 0.00675 0.11155 0.11175 0.00721 0.11213 0.11236 15.00659 0.10480 15.00696
160-MV-4131B 4.160 0.00712 0.11710 0.11732 0.00792 0.11798 0.11824 15.00644 0.10741 15.00683
171-LV-4251A 0.480 0.00592 0.02264 0.02340 0.00593 0.02269 0.02345
171-LV-4251B 0.480 0.00600 0.02317 0.02393 0.00601 0.02326 0.02402
171-LV-4261A 0.220 0.03765 0.06564 0.07567 0.03765 0.06565 0.07568 0.04402 0.06869 0.08159
171-LV-4261B 0.220 0.03767 0.06575 0.07578 0.03767 0.06577 0.07580 0.04402 0.06869 0.08159
171-MV-4231A 4.160 0.02326 0.26418 0.26520 0.02417 0.26783 0.26892 15.02608 0.27289 15.02856
171-MV-4231B 4.160 0.02949 0.30355 0.30498 0.03058 0.31033 0.31183 15.02568 0.26829 15.02807
172-LV-4351A 0.480 0.00321 0.01811 0.01839 0.00323 0.01810 0.01839
172-LV-4351B 0.480 0.00357 0.01982 0.02013 0.00360 0.01981 0.02013
180-HV-44C21A 13.800 0.09843 0.39061 0.40282 0.10508 0.39810 0.41174 16.09667 1.41866 16.15907
180-HV-44C21B 13.800 0.11168 0.46863 0.48175 0.12360 0.48087 0.49651 15.21599 1.71755 15.31262
180-HV-44G21A 13.800 0.11607 0.41374 0.42971 0.12272 0.42123 0.43874 16.32310 1.57891 16.39928
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 57
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
180-HV-44G21B 13.800 0.13158 0.49260 0.50987 0.14349 0.50477 0.52477 15.24643 1.77611 15.34954
180-HV-44I21 (TD-9) 13.800 0.02296 0.44506 0.44566 0.02386 0.44590 0.44653 15.04708 0.67709 15.06231
180-LV-44A51A 0.480 0.00261 0.01452 0.01475 0.00262 0.01453 0.01476
180-LV-44A51B 0.480 0.00263 0.01464 0.01488 0.00264 0.01466 0.01489
180-LV-44A61A 0.220 0.00768 0.02363 0.02485 0.00768 0.02363 0.02485 0.01453 0.03208 0.03522
180-LV-44A61B 0.220 0.00768 0.02366 0.02487 0.00768 0.02366 0.02488 0.01453 0.03208 0.03522
180-LV-44C51A 0.480 0.00244 0.01481 0.01501 0.00245 0.01482 0.01502
180-LV-44C51B 0.480 0.00215 0.01333 0.01351 0.00218 0.01350 0.01368
180-LV-44C61A 0.220 0.00528 0.01957 0.02027 0.00528 0.01957 0.02027 0.00477 0.01646 0.01713
180-LV-44C61B 0.220 0.00522 0.01926 0.01995 0.00523 0.01929 0.01999 0.00477 0.01646 0.01713
180-LV-44E51A 0.480 0.00618 0.02248 0.02331 0.00619 0.02249 0.02332
180-LV-44E51B 0.480 0.00604 0.02201 0.02282 0.00606 0.02206 0.02287
180-LV-44E61A 0.220 0.05063 0.06936 0.08588 0.05063 0.06937 0.08588 0.08454 0.07733 0.11457
180-LV-44E61B 0.220 0.04688 0.06591 0.08088 0.04688 0.06592 0.08089 0.08454 0.07733 0.11457
180-LV-44F51A 0.480 0.00542 0.01968 0.02041 0.00543 0.01969 0.02043
180-LV-44F51B 0.480 0.00542 0.01968 0.02041 0.00543 0.01969 0.02043
180-LV-44F61A 0.220 0.03407 0.05976 0.06879 0.03407 0.05977 0.06880 0.03286 0.05554 0.06453
180-LV-44F61B 0.220 0.03406 0.05989 0.06890 0.03406 0.05989 0.06890 0.03286 0.05554 0.06453
180-LV-44G51A 0.480 0.00586 0.02228 0.02303 0.00587 0.02228 0.02304
180-LV-44G51B 0.480 0.00588 0.02237 0.02313 0.00589 0.02239 0.02315
180-LV-44G61A 0.220 0.08501 0.07030 0.11032 0.08501 0.07031 0.11032 0.19305 0.07975 0.20887
180-LV-44G61B 0.220 0.08502 0.07032 0.11033 0.08502 0.07033 0.11034 0.19305 0.07975 0.20887
180-LV-44H51A 0.480 0.00791 0.02392 0.02520 0.00792 0.02393 0.02521
180-LV-44H51B 0.480 0.00793 0.02402 0.02529 0.00794 0.02403 0.02531
180-LV-44H51B2 0.220 0.07799 0.05793 0.09715 0.07799 0.05793 0.09715 0.18566 0.06726 0.19746
180-LV-44H61A 0.220 0.07807 0.05817 0.09736 0.07807 0.05817 0.09736 0.18566 0.06726 0.19746
180-LV-44I51A 0.480 0.00601 0.01763 0.01862 0.00601 0.01763 0.01863
180-LV-44I51B 0.480 0.00601 0.01763 0.01862 0.00601 0.01763 0.01863
180-LV-44I61 0.220 0.03413 0.05924 0.06837 0.03413 0.05924 0.06837 0.03286 0.05554 0.06453
180-LV-44M51 BA 0.480 0.00142 0.00985 0.00996 0.00144 0.00991 0.01002
180-LV-44M51 BB 0.480 0.00129 0.00888 0.00898 0.00130 0.00896 0.00906
180-MV-44A31A 4.160 0.03192 0.15071 0.15406 0.03246 0.15133 0.15477 15.04194 0.18078 15.04303
180-MV-44A31B 4.160 0.03308 0.16052 0.16390 0.03409 0.16155 0.16511 15.04183 0.17905 15.04289
180-MV-44C31A 4.160 0.01978 0.17096 0.17210 0.02039 0.17164 0.17285 15.01119 0.13767 15.01182
180-MV-44C31B 4.160 0.02076 0.17486 0.17608 0.02181 0.17623 0.17758 15.01119 0.13767 15.01182
180-MV-44E31-A 4.160 0.03311 0.20331 0.20599 0.03371 0.20399 0.20676 15.03239 0.21996 15.03400
180-MV-44E31-B 4.160 0.03404 0.20703 0.20981 0.03508 0.20842 0.21135 15.03239 0.21996 15.03400
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 58
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
180-MV-44F31A 4.160 0.04228 0.15438 0.16007 0.04282 0.15500 0.16080 15.05843 0.18980 15.05962
180-MV-44F31B 4.160 0.04292 0.16365 0.16919 0.04391 0.16468 0.17043 15.05832 0.18808 15.05949
180-MV-44G31A 4.160 0.02137 0.17324 0.17455 0.02197 0.17392 0.17530 15.01119 0.13767 15.01182
180-MV-44G31B 4.160 0.02278 0.18041 0.18184 0.02386 0.18151 0.18307 15.01119 0.13767 15.01182
180-MV-44H31A 4.160 0.10150 0.28888 0.30619 0.10211 0.28956 0.30704 15.13859 0.43255 15.14477
180-MV-44H31B 4.160 0.10291 0.29605 0.31342 0.10399 0.29715 0.31482 15.13859 0.43255 15.14477
180B-CCM-CTOSAT 0.480 0.00215 0.01333 0.01351 0.00218 0.01350 0.01368
181-LV-3951A 0.480 0.00340 0.01456 0.01496 0.00341 0.01467 0.01506
181-LV-3951B 0.480 0.00377 0.01610 0.01653 0.00379 0.01623 0.01667
181-LV-3961A 0.220 0.00442 0.01572 0.01633 0.00442 0.01574 0.01635 0.00368 0.01271 0.01323
181-LV-3961B 0.220 0.00448 0.01609 0.01670 0.00448 0.01612 0.01673 0.00368 0.01271 0.01323
181-MV-3941A 2.400 0.01789 0.08932 0.09109 0.01825 0.09121 0.09302
181-MV-3941B 2.400 0.01947 0.09616 0.09811 0.01980 0.09837 0.10034
330-CCM-1 BA 0.480 0.00417 0.01615 0.01667 0.00418 0.01627 0.01680
330-CCM-1 BB 0.480 0.00433 0.01684 0.01739 0.00434 0.01690 0.01745
330-CCM-2 BA 0.220 0.04045 0.04157 0.05800 0.04044 0.04162 0.05803 0.08476 0.04818 0.09750
330-CCM-2 BB 0.220 0.04053 0.04180 0.05822 0.04053 0.04181 0.05823 0.08476 0.04818 0.09750
330-TDA-1 BA 4.160 0.06159 0.20450 0.21357 0.06244 0.21284 0.22181 9.08180 0.23693 9.08489
330-TDA-1 BB 4.160 0.06526 0.23420 0.24312 0.06625 0.23888 0.24790 9.08203 0.24015 9.08520
330-TDBT-1 BA 0.480 0.00142 0.00985 0.00996 0.00144 0.00991 0.01002
330-TDBT-1 BB 0.480 0.00129 0.00888 0.00898 0.00130 0.00896 0.00906
ALIM-API-1 2.400 0.11998 0.18464 0.22020 0.12042 0.18677 0.22223
API-LV-CCM-01 0.480 0.02348 0.02790 0.03646 0.02349 0.02798 0.03654
API-LV-CCM-MJW 0.480 0.01928 0.02654 0.03280 0.01929 0.02662 0.03288
Barra11 4.160 0.61217 0.46375 0.76799 0.61348 0.47015 0.77291 36.89454 0.76478 36.90246
Barra12 0.220 0.00313 0.00795 0.00854 0.00313 0.00796 0.00856 0.00141 0.00665 0.00680
Barra14 0.220 0.00490 0.01062 0.01169 0.00490 0.01064 0.01171 0.00700 0.01323 0.01496
BK4-CCM-04A 0.480 0.00709 0.02468 0.02568 0.00710 0.02470 0.02570
BK4-CCM-04B 0.480 0.00752 0.02435 0.02548 0.00752 0.02436 0.02550
BK4-CCM-05A 0.220 0.00553 0.01913 0.01992 0.00553 0.01913 0.01992 0.00404 0.01395 0.01452
BK4-CCM-05B 0.220 0.00562 0.01906 0.01987 0.00562 0.01906 0.01988 0.00404 0.01395 0.01452
BK4-TM4.16-02 4.160 0.09187 0.22708 0.24496 0.09237 0.22815 0.24614 15.13874 0.38243 15.14357
BK4-TM4.16-03 4.160 0.09264 0.23668 0.25417 0.09354 0.23781 0.25555 15.13867 0.38105 15.14346
BOOSTER-CCM-01 0.480 0.01256 0.04032 0.04223 0.01257 0.04033 0.04224
BT-5298 BA 0.480 0.00319 0.01823 0.01850 0.00331 0.01975 0.02002 0.00352 0.01046 0.01103
BT-5298 BB 0.480 0.00354 0.01971 0.02002 0.00367 0.02113 0.02145 0.00351 0.01044 0.01101
BT-6028-02 0.220 0.00148 0.00464 0.00487 0.00148 0.00464 0.00487 0.00096 0.00297 0.00312
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 59
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
BUS PRIM TRA4 13.800 0.33198 0.81682 0.88171 0.34182 0.88799 0.95151 8.55213 22.08850 23.68630
BUS 2.2KV C.A.F. 2.400 0.03730 0.10616 0.11253 0.03771 0.10769 0.11410
BUS A TR2 13.800 0.32955 1.83523 1.86458 0.33253 1.84656 1.87626 31.82710 3.04122 31.97207
BUS ALUMBRADO2 0.220 0.02470 0.04643 0.05259 0.02470 0.04643 0.05259 0.02300 0.03888 0.04517
BUS CERO-CORTES-TRA1 13.800 0.30964 0.81045 0.86759 0.31954 0.88163 0.93775 8.47969 22.07275 23.64554
BUS ENLACE SE-7 Y 13 2.400 0.04621 0.12523 0.13348 0.04667 0.12512 0.13354
BUS G1 0.480 0.00541 0.01178 0.01296 0.00542 0.01185 0.01303 0.00404 0.00840 0.00932
BUS G2 0.480 0.00403 0.01109 0.01180 0.00404 0.01115 0.01185 0.00404 0.00840 0.00932
BUS JARDIN TR-1A 0.220 0.00791 0.01599 0.01784 0.00791 0.01600 0.01785 0.00772 0.01482 0.01671
BUS JARDIN TR-17 0.220 0.00134 0.00477 0.00495 0.00134 0.00477 0.00496 0.00091 0.00360 0.00371
BUS MB-A 4.160 0.19904 0.96585 0.98614 0.19897 0.96831 0.98854
BUS MB-B 4.160 0.04832 0.26806 0.27238 0.04896 0.27301 0.27737 18.20911 0.44126 18.21446
BUS MB2 4.160 0.28350 1.38191 1.41069 0.28335 1.38445 1.41315
BUS MB3 4.160 0.08313 0.21501 0.23052 0.08377 0.22097 0.23632 18.28978 0.25284 18.29153
BUS P-501B 2.400 0.04091 0.09272 0.10135 0.04129 0.09267 0.10145
BUS P-608A 2.400 0.04250 0.09684 0.10576 0.04268 0.09867 0.10751
BUS PPAL BUS A 4.160 0.02793 0.24853 0.25009 0.02867 0.25355 0.25517 18.03477 0.24977 18.03650
BUS PRI 080-TRF-16531A 0.480 0.00412 0.01862 0.01907 0.00413 0.01863 0.01908
BUS PRI 080-TRF-16531B 0.480 0.00701 0.02522 0.02617 0.00701 0.02524 0.02620
Bus SE17 2.400 0.10792 0.41940 0.43306 0.10794 0.41958 0.43324 0.10041 0.22065 0.24242
BUS SE-19 BUNKER 0.220 0.03395 0.06432 0.07274 0.03396 0.06434 0.07275
BUS SE-19A CERO CORTES 4.160 0.02793 0.24853 0.25009 0.02867 0.25355 0.25517 18.03477 0.24977 18.03650
Bus528 0.220 0.00268 0.00993 0.01028 0.00268 0.00993 0.01029
Bus529 0.220 0.04982 0.05849 0.07683 0.04982 0.05850 0.07684 0.04918 0.05558 0.07421
Bus533 0.480 0.01706 0.02800 0.03279 0.01707 0.02807 0.03285
Bus535 4.160 0.01211 0.14711 0.14760 0.01296 0.14894 0.14950 15.00939 0.13350 15.00999
Bus536 0.220 0.00186 0.00951 0.00969 0.00186 0.00951 0.00969 0.00144 0.00679 0.00694
Bus537 0.480 0.00445 0.01801 0.01855 0.00446 0.01802 0.01856
Bus538 0.220 0.00195 0.00969 0.00988 0.00195 0.00969 0.00989 0.00141 0.00663 0.00678
Bus539 0.220 0.00235 0.00968 0.00996 0.00235 0.00969 0.00997 0.00129 0.00606 0.00620
Bus540 4.160 0.25241 1.37473 1.39771 0.25966 1.47014 1.49290 18.10834 0.39230 18.11259
Bus541 0.220 0.00131 0.00410 0.00430 0.00131 0.00410 0.00430 0.00078 0.00242 0.00255
Bus542 34.500 0.11895 1.48094 1.48571 0.13830 1.55645 1.56259 12.17714 70.38012 71.42580
Bus543 0.220 0.00296 0.01098 0.01138 0.00296 0.01098 0.01138 0.00141 0.00663 0.00678
Bus544 0.220 0.00637 0.01344 0.01488 0.00637 0.01345 0.01488 0.00581 0.01116 0.01258
Bus545 4.160 0.03942 0.13187 0.13763 0.03986 0.13292 0.13877 15.05602 0.14096 15.05668
Bus546 2.400 0.02408 0.08815 0.09138 0.02443 0.08807 0.09140
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 60
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus547 0.127 0.09395 0.08574 0.12719 0.09395 0.08575 0.12720 0.09283 0.08169 0.12366
Bus548 0.480 0.01381 0.02150 0.02555 0.01384 0.02161 0.02566
Bus549 0.220 0.00721 0.01842 0.01978 0.00721 0.01842 0.01979 0.00368 0.01271 0.01323
Bus550 2.400 0.01009 0.04844 0.04948 0.01045 0.05068 0.05175
Bus551 0.220 0.00183 0.00936 0.00953 0.00183 0.00938 0.00956 0.00144 0.00679 0.00694
Bus552 13.800 0.01991 0.28896 0.28965 0.02655 0.29645 0.29764 15.10112 0.71118 15.11786
Bus553 0.220 0.00195 0.00969 0.00988 0.00195 0.00969 0.00988 0.00144 0.00679 0.00694
Bus554 4.160 0.01446 0.12328 0.12413 0.01499 0.12406 0.12496 15.01344 0.11481 15.01387
Bus556 4.160 0.25992 1.38136 1.40560 0.26685 1.47621 1.50014 18.10834 0.39230 18.11259
Bus557 34.500 0.11338 1.47464 1.47899 0.13293 1.55036 1.55605 12.17142 70.37837 71.42310
Bus558 0.220 0.04798 0.05668 0.07426 0.04798 0.05669 0.07427 0.04918 0.05558 0.07421
Bus560 2.400 0.04062 0.14778 0.15326 0.04099 0.14971 0.15522
Bus561 0.220 0.00296 0.00920 0.00966 0.00296 0.00920 0.00966 0.00243 0.00752 0.00791
Bus563 0.480 0.01380 0.02150 0.02555 0.01384 0.02160 0.02565
Bus564 0.220 0.00727 0.01856 0.01993 0.00728 0.01857 0.01995 0.00368 0.01271 0.01323
BUS SE-19A CERO CORTES1 4.160 0.03591 0.25477 0.25729 0.03662 0.25978 0.26235 18.06356 0.26737 18.06554
BUS TABLERO 28G31 4.160 0.19198 0.95500 0.97410 0.19196 0.95751 0.97656
Bus TAR 2.400 0.05665 0.11797 0.13086 0.05692 0.11879 0.13173
BUS TBT 0.480 0.00281 0.00979 0.01019 0.00281 0.00984 0.01023 0.00139 0.00470 0.00490
BUS TR-28G21 PRIM 13.800 0.10789 0.56014 0.57043 0.11885 0.63272 0.64378 8.03714 21.40750 22.86650
BUS TR-28G21 SEC 4.160 0.02452 0.24396 0.24519 0.02529 0.24903 0.25031 18.01927 0.23387 18.02079
BUS TR-28G41 0.220 0.01860 0.03940 0.04357 0.01860 0.03942 0.04359 0.01605 0.02712 0.03151
Bus2 4.160 0.02995 0.21462 0.21669 0.03132 0.22106 0.22327 18.02590 0.18022 18.02680
Bus3 13.800 0.11671 0.48394 0.49781 0.12810 0.55801 0.57252 6.97468 20.61051 21.75866
Bus4 13.800 0.10013 0.54953 0.55858 0.11400 0.60317 0.61385 7.08332 20.79789 21.97102
Bus5 2.400 0.00817 0.07850 0.07893 0.00858 0.07974 0.08020
Bus6 0.220 0.00544 0.02026 0.02098 0.00545 0.02026 0.02098 0.00477 0.01646 0.01713
Bus7 2.400 0.01145 0.08368 0.08446 0.01180 0.08559 0.08640
Bus8 0.480 0.00249 0.01738 0.01756 0.00252 0.01739 0.01758
Bus9 0.480 0.00231 0.01609 0.01626 0.00234 0.01610 0.01627
Bus10 2.400 0.01144 0.08388 0.08465 0.01185 0.08511 0.08593
Bus12 2.400 0.05462 0.09377 0.10852 0.05482 0.09498 0.10966
Bus15 2.400 0.05462 0.09377 0.10852 0.05482 0.09498 0.10966
Bus19 2.400 0.05334 0.09340 0.10755 0.05336 0.09526 0.10918
Bus21 2.400 0.00809 0.07815 0.07857 0.00844 0.08007 0.08051
Bus22 13.800 0.09679 0.50778 0.51692 0.10867 0.58208 0.59213 6.93766 20.66610 21.79952
Bus23 2.400 0.01712 0.14743 0.14843 0.01720 0.14773 0.14873
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 61
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus24 2.400 0.01508 0.14680 0.14757 0.01516 0.14710 0.14788
Bus25 13.800 0.17632 1.54562 1.55565 0.17926 1.55691 1.56719 30.49394 1.73149 30.54306
Bus26 2.400 0.00830 0.04824 0.04894 0.00866 0.05047 0.05121
Bus27 2.400 0.00815 0.04907 0.04975 0.00857 0.05068 0.05140
Bus32 13.800 0.05308 0.42985 0.43311 0.06512 0.50442 0.50860 6.96577 20.53949 21.68853
Bus33 4.160 0.02779 0.30110 0.30238 0.02888 0.30788 0.30923 15.02298 0.26204 15.02526
Bus34 4.160 0.02804 0.26938 0.27083 0.02894 0.27303 0.27456 15.03367 0.28610 15.03639
Bus35 0.480 0.00474 0.02086 0.02139 0.00475 0.02091 0.02144
Bus36 0.480 0.00482 0.02139 0.02192 0.00483 0.02148 0.02201
Bus37 4.160 0.03426 0.30875 0.31065 0.03535 0.31553 0.31750 15.03327 0.28150 15.03590
Bus39 4.160 0.04005 0.27417 0.27708 0.04084 0.27779 0.28078 15.06608 0.30794 15.06923
Bus40 4.160 0.02212 0.26247 0.26340 0.02303 0.26613 0.26713 15.02338 0.26664 15.02575
Bus41 13.800 0.05023 0.47018 0.47285 0.06423 0.52404 0.52796 7.09574 20.64418 21.82960
Bus42 13.800 0.57829 0.89377 1.06454 0.59365 0.89023 1.07001 10.59519 24.17146 26.39162
Bus43 13.800 0.57776 0.93994 1.10332 0.59181 1.01029 1.17087 10.59519 24.17146 26.39162
bus45 13.800 0.56304 1.88808 1.97024 0.56600 1.89938 1.98192 32.25448 3.44293 32.43772
Bus48 2.400 0.05504 0.15709 0.16645 0.05535 0.15900 0.16836
Bus49 13.800 2.22953 1.95098 2.96262 2.24358 2.02133 3.01984 13.22148 26.73946 29.82962
Bus53 2.400 0.02873 0.18159 0.18385 0.02883 0.18192 0.18419
Bus58 13.800 0.25351 1.59969 1.61965 0.25648 1.61101 1.63129 31.76170 2.70918 31.87704
Bus66 2.400 0.07034 0.14700 0.16296 0.07043 0.14734 0.16331
Bus67 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus68 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus69 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus70 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus71 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus72 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus73 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus74 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus75 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus76 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus77 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus78 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus79 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus80 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus81 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus82 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 62
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus83 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus84 0.220 0.01170 0.02061 0.02370 0.01170 0.02062 0.02370 0.01150 0.01944 0.02259
Bus85 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus86 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus87 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus88 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus89 13.800 0.44934 0.88797 0.99519 0.46372 0.95840 1.06469 7.72261 21.57426 22.91479
Bus90 13.800 0.45064 0.88918 0.99685 0.46503 0.95960 1.06634 7.72468 21.57733 22.91837
Bus91 4.160 0.19661 0.97969 0.99922 0.19792 0.98609 1.00576 0.15522 0.89870 0.91201
Bus92 13.800 0.45555 0.89126 1.00093 0.46993 0.96168 1.07036 7.73247 21.58260 22.92596
Bus95 2.400 0.03318 0.14384 0.14762 0.03354 0.14575 0.14956
Bus96 2.400 0.02032 0.13121 0.13277 0.02071 0.13314 0.13474
Bus97 13.800 0.37872 0.82271 0.90569 0.39309 0.89312 0.97580 7.61064 21.40866 22.72120
Bus98 2.400 0.02198 0.13894 0.14067 0.02241 0.14107 0.14284
Bus99 13.800 0.37259 0.81683 0.89780 0.38699 0.88727 0.96799 7.60029 21.39336 22.70331
Bus101 4.160 0.06214 0.41998 0.42455 0.06346 0.42639 0.43108
Bus102 13.800 0.30999 0.75811 0.81904 0.32451 0.82863 0.88991 7.49825 21.24245 22.52700
Bus104 2.400 0.01583 0.09904 0.10030 0.01627 0.10117 0.10247
Bus105 13.800 0.31650 0.76413 0.82709 0.33102 0.83465 0.89790 7.50860 21.25776 22.54487
Bus106 13.800 0.31633 0.76406 0.82695 0.33083 0.83457 0.89775 7.50860 21.25776 22.54487
Bus115 0.480 0.01114 0.05219 0.05336 0.01116 0.05227 0.05345
BUS 115KV 115.000 189.29480 1086.15900 1102.53100 194.14910 1147.52600 1163.83400 518.72680 2593.63400 2644.99800
Bus116 0.480 0.00878 0.02314 0.02475 0.00880 0.02323 0.02484
Bus117 13.800 0.03112 0.30732 0.30889 0.03766 0.31479 0.31703 15.07399 0.74301 15.09229
Bus118 13.800 0.04166 0.31871 0.32142 0.04817 0.32620 0.32973 15.09136 0.77260 15.11113
Bus119 13.800 0.03757 0.38564 0.38747 0.04929 0.39781 0.40085 15.09967 1.51154 15.17514
Bus120 13.800 0.04806 0.39701 0.39990 0.05975 0.40919 0.41353 15.11705 1.54113 15.19540
Bus122 4.160 0.00862 0.11424 0.11457 0.00924 0.11523 0.11560 15.00625 0.09671 15.00656
Bus123 4.160 0.00778 0.10670 0.10699 0.00823 0.10724 0.10756 15.00625 0.09671 15.00656
Bus124 4.160 0.01175 0.11243 0.11305 0.01220 0.11297 0.11363 15.01300 0.11233 15.01342
Bus125 4.160 0.01175 0.11243 0.11304 0.01220 0.11297 0.11362 15.01300 0.11233 15.01342
Bus127 4.160 0.01170 0.11236 0.11297 0.01216 0.11289 0.11355 15.01300 0.11233 15.01342
Bus129 4.160 0.01255 0.11989 0.12055 0.01317 0.12088 0.12159 15.01300 0.11233 15.01342
Bus130 4.160 0.01257 0.11991 0.12057 0.01318 0.12091 0.12163 15.01300 0.11233 15.01342
Bus131 4.160 0.01258 0.11994 0.12060 0.01320 0.12093 0.12165 15.01300 0.11233 15.01342
Bus134 13.800 0.24577 0.69865 0.74061 0.25903 0.75151 0.79490 9.01418 22.43895 24.18185
Bus135 4.160 0.03649 0.13079 0.13578 0.03700 0.13193 0.13702 15.05760 0.14365 15.05829
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 63
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus136 4.160 0.03935 0.12462 0.13068 0.03980 0.12516 0.13133 15.05760 0.14365 15.05829
Bus137 2.400 0.01849 0.09003 0.09191 0.01896 0.09123 0.09318
Bus138 4.160 0.03933 0.12461 0.13067 0.03978 0.12515 0.13132 15.05760 0.14365 15.05829
Bus139 4.160 0.03920 0.12456 0.13058 0.03965 0.12510 0.13123 15.05760 0.14365 15.05829
BUS 140-ALUMBRADO TR-1 0.220 0.01542 0.03114 0.03474 0.01542 0.03114 0.03474 0.01491 0.02862 0.03227
BUS 140-ALUMBRADO TR-2 0.220 0.01538 0.03104 0.03464 0.01538 0.03105 0.03465 0.01491 0.02862 0.03227
BUS 140-TR1 SEC 2.400 0.00604 0.05984 0.06014 0.00644 0.05974 0.06008
BUS 140-TR3 SEC 2.400 0.00641 0.06348 0.06380 0.00674 0.06544 0.06579
BUS 140-TR-3731B 0.480 0.00581 0.01689 0.01786 0.00581 0.01694 0.01791
Bus141 4.160 0.03792 0.12411 0.12977 0.03836 0.12465 0.13042 15.05760 0.14365 15.05829
Bus142 4.160 0.03675 0.12368 0.12902 0.03718 0.12422 0.12966 15.05760 0.14365 15.05829
Bus143 4.160 0.02563 0.12212 0.12478 0.02607 0.12265 0.12539 15.03865 0.14060 15.03930
Bus146 4.160 0.03867 0.13161 0.13717 0.03926 0.13260 0.13829 15.05760 0.14365 15.05829
Bus147 4.160 0.03981 0.13202 0.13789 0.04041 0.13301 0.13902 15.05760 0.14365 15.05829
Bus148 4.160 0.03991 0.13206 0.13796 0.04052 0.13305 0.13908 15.05760 0.14365 15.05829
Bus150 4.160 0.04019 0.13216 0.13814 0.04080 0.13315 0.13926 15.05760 0.14365 15.05829
Bus151 0.480 0.00163 0.01161 0.01172 0.00164 0.01162 0.01173
Bus152 0.480 0.00163 0.01159 0.01170 0.00163 0.01159 0.01171
Bus153 0.480 0.00165 0.01180 0.01192 0.00166 0.01190 0.01202
Bus154 0.480 0.00173 0.01247 0.01259 0.00173 0.01249 0.01261
Bus155 13.800 0.10270 0.35102 0.36574 0.10935 0.35852 0.37482 15.59819 1.21750 15.64563
Bus156 13.800 0.10944 0.42976 0.44348 0.12135 0.44193 0.45828 15.62387 1.98602 15.74959
Bus157 0.480 0.00165 0.01213 0.01224 0.00167 0.01214 0.01225
Bus158 4.160 0.01490 0.13428 0.13510 0.01590 0.13530 0.13623 15.01300 0.11233 15.01342
Bus159 4.160 0.00971 0.11865 0.11905 0.01025 0.11927 0.11971 15.00636 0.09844 15.00669
Bus160 13.800 0.04521 0.33274 0.33579 0.05179 0.34019 0.34411 15.51611 0.98700 15.54747
Bus161 4.160 0.01079 0.12835 0.12881 0.01179 0.12938 0.12992 15.00625 0.09671 15.00656
Bus162 13.800 0.05473 0.41391 0.41752 0.06658 0.42606 0.43123 15.12552 1.57965 15.20778
Bus163 2.400 0.03454 0.10669 0.11214 0.03497 0.10787 0.11340
Bus164 4.160 0.01375 0.12450 0.12526 0.01429 0.12511 0.12592 15.01311 0.11406 15.01354
Bus165 0.480 0.00167 0.01230 0.01241 0.00168 0.01231 0.01242
Bus166 4.160 0.01377 0.12452 0.12527 0.01431 0.12513 0.12594 15.01311 0.11406 15.01354
Bus167 0.480 0.00172 0.01248 0.01259 0.00173 0.01248 0.01260
Bus169 4.160 0.04622 0.13646 0.14407 0.04674 0.13707 0.14482 15.07013 0.14652 15.07084
Bus170 4.160 0.01495 0.13436 0.13519 0.01596 0.13539 0.13632 15.01300 0.11233 15.01342
Bus171 0.480 0.00177 0.01292 0.01304 0.00178 0.01294 0.01306 0.00157 0.01113 0.01124
Bus172 4.160 0.04858 0.13705 0.14541 0.04912 0.13767 0.14617 15.07013 0.14652 15.07084
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 64
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus176 2.400 0.39076 0.30674 0.49678 0.39120 0.30887 0.49844
Bus177 13.800 0.12641 0.55749 0.57164 0.14186 0.55378 0.57166 7.78611 21.29676 22.67544
Bus179 4.160 0.03064 0.15560 0.15859 0.03162 0.15662 0.15978 15.04003 0.17052 15.04099
Bus180 0.480 0.00188 0.01270 0.01284 0.00189 0.01271 0.01285
Bus181 4.160 0.03909 0.16513 0.16970 0.04006 0.16615 0.17091 15.05521 0.19694 15.05650
Bus184 0.480 0.03899 0.07761 0.08685 0.03901 0.07761 0.08686
Bus185 2.400 0.01692 0.10116 0.10256 0.01738 0.10104 0.10253
Bus186 4.160 0.02945 0.14573 0.14868 0.02998 0.14634 0.14938 15.04014 0.17225 15.04112
Bus187 0.480 0.00184 0.01234 0.01248 0.00184 0.01235 0.01249
Bus188 4.160 0.06111 0.15775 0.16917 0.06163 0.15836 0.16993 15.09496 0.20399 15.09634
Bus189 0.480 0.00946 0.04064 0.04173 0.00948 0.04063 0.04173
Bus190 2.400 0.04271 0.12176 0.12903 0.04317 0.12165 0.12908
Bus193 0.480 0.00200 0.01291 0.01306 0.00201 0.01292 0.01307
Bus194 4.160 0.03437 0.14699 0.15096 0.03491 0.14761 0.15168 15.04621 0.17165 15.04719
Bus195 4.160 0.03577 0.15703 0.16105 0.03677 0.15806 0.16228 15.04610 0.16992 15.04706
Bus196 0.480 0.00202 0.01304 0.01320 0.00203 0.01306 0.01321
Bus197 4.160 0.03577 0.15703 0.16105 0.03677 0.15806 0.16228 15.04610 0.16992 15.04706
Bus198 4.160 0.03433 0.14694 0.15090 0.03486 0.14755 0.15162 15.04621 0.17165 15.04719
Bus199 2.400 0.00836 0.07962 0.08006 0.00874 0.08128 0.08175
Bus200 13.800 0.09703 0.57045 0.57864 0.11175 0.64099 0.65066 7.52562 21.04208 22.34735
Bus201 0.480 0.00190 0.01243 0.01257 0.00191 0.01243 0.01258
Bus202 0.480 0.00202 0.01304 0.01320 0.00203 0.01306 0.01321
Bus203 0.220 0.01170 0.02061 0.02370 0.01170 0.02062 0.02370 0.01150 0.01944 0.02259
Bus204 0.220 0.01170 0.02061 0.02370 0.01170 0.02062 0.02370 0.01150 0.01944 0.02259
Bus205 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus207 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus208 0.220 0.01337 0.02345 0.02699 0.01337 0.02345 0.02699 0.01318 0.02227 0.02588
Bus209 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus210 0.220 0.01170 0.02061 0.02370 0.01170 0.02062 0.02370 0.01150 0.01944 0.02259
Bus211 0.220 0.01170 0.02061 0.02370 0.01170 0.02062 0.02370 0.01150 0.01944 0.02259
Bus213 13.800 0.32284 0.77008 0.83502 0.33734 0.84059 0.90576 7.51895 21.27306 22.56275
Bus214 13.800 0.08755 0.51171 0.51915 0.10293 0.50809 0.51842 7.43705 20.96985 22.24959
Bus215 0.480 0.00562 0.02029 0.02106 0.00563 0.02029 0.02106
Bus216 0.480 0.00562 0.02035 0.02111 0.00564 0.02041 0.02118
Bus217 13.800 0.06449 0.41321 0.41821 0.07634 0.42536 0.43216 15.14104 1.57720 15.22296
Bus218 4.160 0.01498 0.16301 0.16370 0.01598 0.16403 0.16481 15.00939 0.13350 15.00999
Bus219 0.220 0.02076 0.03704 0.04246 0.02076 0.03703 0.04246 0.01917 0.03240 0.03764
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 65
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus220 13.800 0.05304 0.33248 0.33669 0.05951 0.33995 0.34512 15.50652 1.01141 15.53947
Bus221 4.160 0.01378 0.15200 0.15262 0.01433 0.15239 0.15306 15.00939 0.13350 15.00999
Bus223 0.480 0.00483 0.01936 0.01995 0.00484 0.01935 0.01994
Bus224 0.480 0.00463 0.01928 0.01983 0.00464 0.01932 0.01987
Bus225 0.480 0.00182 0.01325 0.01338 0.00183 0.01327 0.01340
Bus226 4.160 0.01940 0.16936 0.17047 0.02039 0.17038 0.17160 15.01659 0.15016 15.01734
Bus227 4.160 0.05391 0.18176 0.18958 0.05490 0.18278 0.19085 15.07361 0.18262 15.07472
Bus228 4.160 0.05397 0.18177 0.18961 0.05495 0.18279 0.19088 15.07361 0.18262 15.07472
Bus230 0.480 0.00183 0.01338 0.01351 0.00184 0.01340 0.01352
Bus231 0.480 0.00701 0.02510 0.02606 0.00702 0.02490 0.02588
Bus232 4.160 0.01941 0.16938 0.17049 0.02040 0.17040 0.17162 15.01659 0.15016 15.01734
Bus234 2.400 0.04712 0.10380 0.11400 0.04741 0.10366 0.11399
Bus235 0.480 0.00172 0.01261 0.01273 0.00173 0.01261 0.01273
Bus236 4.160 0.01808 0.15818 0.15921 0.01862 0.15856 0.15965 15.01659 0.15016 15.01734
Bus237 4.160 0.03208 0.18311 0.18590 0.03307 0.18413 0.18708 15.03709 0.18583 15.03824
Bus238 4.160 0.05299 0.17075 0.17878 0.05353 0.17113 0.17931 15.07361 0.18262 15.07472
Bus239 2.400 0.02144 0.08552 0.08817 0.02183 0.08718 0.08987
Bus240 4.160 0.03039 0.17155 0.17422 0.03092 0.17192 0.17468 15.03709 0.18583 15.03824
Bus241 4.160 0.03210 0.18313 0.18592 0.03309 0.18415 0.18710 15.03709 0.18583 15.03824
Bus242 0.480 0.00189 0.01284 0.01298 0.00190 0.01285 0.01299
Bus243 4.160 0.03044 0.17162 0.17430 0.03098 0.17200 0.17477 15.03709 0.18583 15.03824
Bus244 0.480 0.00233 0.01382 0.01402 0.00235 0.01382 0.01402
Bus245 0.480 0.00221 0.01328 0.01347 0.00223 0.01334 0.01353
Bus246 0.220 0.00201 0.00972 0.00993 0.00201 0.00973 0.00994 0.00141 0.00663 0.00678
Bus247 0.220 0.00205 0.00986 0.01007 0.00205 0.00986 0.01007 0.00141 0.00663 0.00678
Bus248 2.400 0.02144 0.09105 0.09355 0.02181 0.09102 0.09359
Bus249 2.400 0.02141 0.09223 0.09469 0.02174 0.09384 0.09632
Bus251 2.400 0.02896 0.09769 0.10189 0.02932 0.09766 0.10196
Bus252 2.400 0.02948 0.09797 0.10231 0.02984 0.09793 0.10238
Bus253 2.400 0.02994 0.09822 0.10269 0.03030 0.09819 0.10276
Bus256 0.480 0.00191 0.01299 0.01313 0.00192 0.01300 0.01314
Bus258 4.160 0.02920 0.18343 0.18574 0.03019 0.18445 0.18691 15.03252 0.18702 15.03368
Bus262 0.480 0.00196 0.01334 0.01348 0.00197 0.01335 0.01350
Bus263 4.160 0.02923 0.18348 0.18579 0.03022 0.18450 0.18696 15.03252 0.18702 15.03368
Bus264 0.480 0.00185 0.01276 0.01289 0.00186 0.01276 0.01290
Bus265 4.160 0.02757 0.17186 0.17405 0.02809 0.17220 0.17447 15.03252 0.18702 15.03368
Bus267 4.160 0.06272 0.18452 0.19489 0.06310 0.18482 0.19529 15.08954 0.21948 15.09114
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 66
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus268 2.400 0.03045 0.09972 0.10426 0.03077 0.10132 0.10589
Bus269 2.400 0.03042 0.09970 0.10424 0.03074 0.10130 0.10586
Bus270 4.160 0.03420 0.18143 0.18462 0.03471 0.18177 0.18505 15.04331 0.21201 15.04481
Bus272 0.480 0.00191 0.01273 0.01287 0.00191 0.01273 0.01287
Bus273 2.400 0.03023 0.09960 0.10408 0.03055 0.10120 0.10571
Bus275 2.400 0.03023 0.09960 0.10408 0.03055 0.10120 0.10571
Bus277 2.400 0.02958 0.09923 0.10355 0.02988 0.10083 0.10516
Bus278 2.400 0.04477 0.11056 0.11928 0.04513 0.11053 0.11938
Bus279 0.480 0.00318 0.01452 0.01486 0.00319 0.01451 0.01486
Bus280 0.480 0.00287 0.01360 0.01390 0.00288 0.01365 0.01395
Bus281 2.400 0.04361 0.11110 0.11935 0.04390 0.11268 0.12093
Bus282 4.160 0.00672 0.11572 0.11592 0.00752 0.11660 0.11684 15.00551 0.10230 15.00586
Bus283 2.400 0.04619 0.11299 0.12206 0.04651 0.11457 0.12365
Bus284 0.480 0.00335 0.01499 0.01536 0.00336 0.01504 0.01541
Bus285 0.480 0.00176 0.01259 0.01271 0.00175 0.01263 0.01275
Bus286 4.160 0.01051 0.12198 0.12244 0.01131 0.12286 0.12338 15.01184 0.11990 15.01232
Bus287 0.480 0.00165 0.01232 0.01243 0.00166 0.01233 0.01244
Bus288 0.480 0.00307 0.01407 0.01440 0.00310 0.01416 0.01449
Bus289 4.160 0.01049 0.12196 0.12241 0.01128 0.12283 0.12335 15.01184 0.11990 15.01232
Bus290 2.400 0.04491 0.11101 0.11975 0.04537 0.11107 0.11998
Bus291 0.480 0.00171 0.01268 0.01279 0.00171 0.01269 0.01280
Bus292 4.160 0.01015 0.11645 0.11689 0.01060 0.11703 0.11751 15.01199 0.11730 15.01245
Bus293 4.160 0.00627 0.11085 0.11103 0.00673 0.11143 0.11163 15.00551 0.10230 15.00586
Bus294 4.160 0.01654 0.12243 0.12354 0.01699 0.12300 0.12417 15.02481 0.13650 15.02543
Bus295 13.800 0.05928 0.48206 0.48569 0.07333 0.53599 0.54099 7.01708 20.62335 21.78444
Bus296 4.160 0.01009 0.11635 0.11678 0.01055 0.11693 0.11741 15.01199 0.11730 15.01245
Bus297 0.480 0.00159 0.01166 0.01177 0.00160 0.01171 0.01182
Bus298 13.800 0.06372 0.49756 0.50163 0.07915 0.49393 0.50024 7.10566 20.69558 21.88144
Bus300 4.160 0.02049 0.12307 0.12476 0.02093 0.12365 0.12541 15.03143 0.13742 15.03206
Bus303 4.160 0.03699 0.12535 0.13069 0.03744 0.12593 0.13138 15.05653 0.14076 15.05719
Bus304 2.400 0.06559 0.12993 0.14555 0.06606 0.12982 0.14566
Bus306 4.160 0.03775 0.13101 0.13634 0.03854 0.13189 0.13740 15.05638 0.14337 15.05706
Bus308 4.160 0.03731 0.13088 0.13609 0.03809 0.13176 0.13715 15.05638 0.14337 15.05706
Bus309 2.400 0.04381 0.11151 0.11981 0.04422 0.11304 0.12138
Bus310 2.400 0.02971 0.12514 0.12862 0.02983 0.12651 0.12998
Bus311 4.160 0.06541 0.21524 0.22496 0.06651 0.22381 0.23348 9.14132 0.26842 9.14526
Bus312 0.220 0.01953 0.03501 0.04009 0.01953 0.03502 0.04010 0.01862 0.03147 0.03657
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 67
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus313 0.220 0.03412 0.06041 0.06938 0.03413 0.06042 0.06940 0.03286 0.05554 0.06453
Bus314 0.220 0.01251 0.02490 0.02787 0.01252 0.02483 0.02781 0.01043 0.02003 0.02259
Bus315 2.400 0.04940 0.10455 0.11563 0.04978 0.10449 0.11574
Bus316 0.480 0.00538 0.01476 0.01571 0.00539 0.01485 0.01580
Bus317 4.160 0.01257 0.15655 0.15705 0.01310 0.15762 0.15816 15.00939 0.13350 15.00999
Bus318 0.220 0.00167 0.00858 0.00874 0.00167 0.00858 0.00874 0.00123 0.00578 0.00590
Bus319 0.220 0.03381 0.05973 0.06863 0.03382 0.05974 0.06865 0.03286 0.05554 0.06453
Bus320 13.800 0.15764 1.51475 1.52293 0.16060 1.52606 1.53449 30.48400 1.65520 30.52891
Bus321 0.220 0.03146 0.05496 0.06333 0.03147 0.05502 0.06338
Bus322 2.400 0.07386 0.14249 0.16050 0.07422 0.14473 0.16265
Bus323 0.220 0.00424 0.01578 0.01634 0.00424 0.01579 0.01634 0.00368 0.01271 0.01323
Bus324 13.800 0.05432 0.33262 0.33702 0.06079 0.34009 0.34548 15.50872 1.01179 15.54169
Bus325 0.480 0.01349 0.02113 0.02507 0.01350 0.02120 0.02513
Bus326 2.400 0.02769 0.14709 0.14967 0.02793 0.14705 0.14968
Bus327 0.220 0.01480 0.02740 0.03114 0.01480 0.02742 0.03116 0.01424 0.02407 0.02796
Bus328 0.480 0.00170 0.01215 0.01227 0.00170 0.01224 0.01236
Bus329 0.220 0.03416 0.06046 0.06944 0.03416 0.06046 0.06945 0.03286 0.05554 0.06453
Bus332 10.350 0.04506 0.49176 0.49382 0.04781 0.49579 0.49809 0.01762 0.32772 0.32819
Bus333 0.480 0.01184 0.02149 0.02454 0.01185 0.02150 0.02455
Bus334 13.800 0.05462 0.41359 0.41718 0.06646 0.42578 0.43094 15.12599 1.58089 15.20837
Bus335 0.220 0.03332 0.05844 0.06727 0.03332 0.05844 0.06727 0.03286 0.05554 0.06453
Bus336 0.220 0.03423 0.06051 0.06952 0.03423 0.06051 0.06952 0.03286 0.05554 0.06453
Bus337 2.400 0.03588 0.18937 0.19274 0.03598 0.18970 0.19308
Bus338 0.220 0.01187 0.02574 0.02835 0.01190 0.02607 0.02866 0.01106 0.02123 0.02394
Bus339 2.400 0.02607 0.08815 0.09193 0.02641 0.09036 0.09415
Bus340 0.220 0.00213 0.00988 0.01011 0.00214 0.00988 0.01011 0.00097 0.00454 0.00465
Bus341 0.220 0.01616 0.02894 0.03315 0.01618 0.02885 0.03308 0.01369 0.02314 0.02689
bus342 13.800 0.12503 0.55445 0.56837 0.14019 0.55103 0.56859 7.13539 20.81904 22.00786
Bus343 0.220 0.05192 0.06107 0.08016 0.05193 0.06107 0.08016 0.05132 0.05799 0.07744
Bus344 2.400 0.02971 0.12514 0.12862 0.02983 0.12651 0.12998
Bus346 4.160 0.06586 0.21539 0.22524 0.06693 0.22395 0.23373 9.14132 0.26842 9.14526
Bus347 4.160 0.01012 0.12060 0.12102 0.01061 0.12168 0.12214 15.00878 0.11210 15.00920
Bus348 2.400 0.03823 0.09690 0.10417 0.03860 0.09684 0.10425
Bus350 4.160 0.01282 0.15567 0.15620 0.01377 0.15691 0.15751 15.00939 0.13350 15.00999
Bus351 0.220 0.00168 0.00868 0.00884 0.00169 0.00869 0.00885 0.00123 0.00578 0.00590
Bus352 0.220 0.03391 0.06000 0.06892 0.03391 0.06001 0.06893 0.03286 0.05554 0.06453
Bus353 2.400 0.13909 0.18541 0.23178 0.13917 0.18571 0.23207
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 68
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus354 0.220 0.03154 0.05513 0.06351 0.03154 0.05516 0.06354
Bus355 0.220 0.01131 0.02303 0.02566 0.01132 0.02305 0.02568 0.01058 0.02032 0.02291
Bus356 13.800 0.09191 0.49851 0.50691 0.10391 0.57297 0.58232 6.92942 20.64168 21.77374
Bus357 0.220 0.01950 0.03482 0.03991 0.01949 0.03485 0.03993 0.01862 0.03147 0.03657
Bus358 0.480 0.00756 0.02733 0.02836 0.00757 0.02742 0.02845
Bus359 0.480 0.01304 0.01929 0.02328 0.01309 0.01961 0.02358
Bus360 0.220 0.03416 0.06048 0.06946 0.03417 0.06049 0.06947 0.03286 0.05554 0.06453
Bus361 2.400 0.03178 0.08560 0.09130 0.03215 0.08553 0.09138
Bus362 13.800 0.03238 0.30965 0.31133 0.03875 0.31714 0.31950 15.07934 0.75711 15.09833
Bus363 0.220 0.03411 0.06030 0.06927 0.03411 0.06031 0.06928 0.03286 0.05554 0.06453
Bus364 0.480 0.00854 0.02179 0.02340 0.00855 0.02197 0.02357
Bus365 0.480 0.00429 0.01369 0.01435 0.00429 0.01369 0.01435
Bus366 0.220 0.00184 0.00898 0.00917 0.00184 0.00900 0.00918 0.00129 0.00606 0.00620
Bus367 13.800 0.01634 0.41680 0.41712 0.02026 0.42079 0.42127 15.05046 0.68711 15.06614
Bus369 0.480 0.00169 0.01192 0.01204 0.00169 0.01204 0.01216
Bus372 13.800 0.05352 0.50213 0.50498 0.05623 0.50619 0.50930 0.03280 0.35693 0.35843
Bus373 0.480 0.01181 0.02219 0.02514 0.01182 0.02221 0.02516
Bus374 4.160 0.01086 0.12501 0.12548 0.01181 0.12626 0.12681 15.00625 0.09671 15.00656
Bus375 0.220 0.03334 0.05866 0.06747 0.03334 0.05866 0.06747 0.03286 0.05554 0.06453
Bus376 0.220 0.03227 0.05764 0.06606 0.03228 0.05765 0.06607 0.03286 0.05554 0.06453
Bus377 13.800 1.87716 6.03968 6.32467 1.87716 6.03968 6.32467 7.20077 21.55116 22.72231
Bus378 13.800 1.88447 1.73947 2.56456 1.89851 1.80982 2.62294 12.67280 26.20220 29.10593
Bus379 0.220 0.01310 0.02756 0.03051 0.01312 0.02791 0.03084 0.01106 0.02123 0.02394
Bus381 0.220 0.00274 0.01126 0.01159 0.00274 0.01127 0.01160 0.00097 0.00454 0.00465
Bus383 0.220 0.05192 0.06107 0.08016 0.05193 0.06107 0.08016 0.05132 0.05799 0.07744
Bus386 0.220 0.05254 0.06774 0.08572 0.05254 0.06775 0.08574 0.04918 0.05558 0.07421
Bus387 4.160 0.06578 0.21537 0.22519 0.06686 0.22392 0.23369 9.14132 0.26842 9.14526
Bus388 2.400 0.03252 0.08931 0.09505 0.03271 0.09115 0.09684
Bus389 0.480 0.00171 0.01237 0.01249 0.00171 0.01238 0.01250
Bus390 0.220 0.00423 0.01576 0.01631 0.00423 0.01576 0.01632 0.00368 0.01271 0.01323
Bus391 2.400 0.03997 0.10143 0.10902 0.04016 0.10327 0.11080
Bus392 0.480 0.00199 0.01333 0.01347 0.00200 0.01334 0.01349
Bus393 0.220 0.00520 0.01254 0.01357 0.00521 0.01260 0.01364 0.00246 0.00849 0.00883
Bus394 2.400 0.02794 0.14734 0.14997 0.02818 0.14730 0.14997
Bus395 0.220 0.02722 0.04833 0.05547 0.02722 0.04833 0.05547 0.02547 0.04304 0.05001
Bus396 2.400 0.14378 0.20053 0.24675 0.14422 0.20266 0.24874
Bus397 0.220 0.01486 0.02710 0.03091 0.01486 0.02711 0.03092 0.01424 0.02407 0.02796
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 69
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus398 13.800 0.05144 0.47215 0.47495 0.06546 0.52604 0.53009 7.09747 20.64873 21.83447
Bus399 0.480 0.00848 0.02141 0.02303 0.00849 0.02148 0.02310
Bus400 0.220 0.00182 0.00898 0.00917 0.00182 0.00900 0.00919 0.00129 0.00606 0.00620
Bus401 13.800 0.01623 0.41656 0.41688 0.02013 0.42053 0.42101 15.03843 0.67836 15.05372
Bus403 13.800 0.02419 0.29593 0.29692 0.03068 0.30341 0.30495 15.06444 0.71785 15.08153
Bus404 10.350 0.03808 0.48179 0.48329 0.04078 0.48579 0.48750
Bus406 0.220 0.00406 0.01154 0.01223 0.00406 0.01154 0.01223 0.00144 0.00679 0.00694
Bus407 13.800 0.04561 0.33296 0.33607 0.05219 0.34044 0.34442 15.49728 0.98008 15.52824
Bus409 2.400 0.03588 0.18937 0.19274 0.03598 0.18970 0.19308
Bus410 2.400 0.03588 0.18937 0.19274 0.03598 0.18970 0.19308
Bus411 13.800 1.87065 6.03433 6.31763 1.87065 6.03433 6.31763 7.19042 21.53757 22.70614
Bus414 0.480 0.00537 0.02065 0.02134 0.00538 0.02074 0.02143
Bus415 0.220 0.01409 0.02482 0.02854 0.01409 0.02482 0.02854 0.01395 0.02358 0.02739
Bus417 34.500 0.12022 1.48401 1.48888 0.13750 1.55793 1.56398 12.23437 70.39762 71.45282
Bus418 2.400 0.03012 0.12692 0.13045 0.03041 0.12687 0.13046
bus419 13.800 0.12463 0.51008 0.52508 0.13576 0.58355 0.59913 6.98973 20.68725 21.83617
Bus421 2.400 0.02134 0.08418 0.08684 0.02169 0.08410 0.08685
Bus422 4.160 0.00972 0.11995 0.12034 0.01021 0.12102 0.12145 15.00813 0.11040 15.00854
Bus423 0.480 0.00292 0.01415 0.01445 0.00292 0.01415 0.01445 0.00188 0.01086 0.01102
Bus425 0.480 0.00169 0.01201 0.01213 0.00170 0.01208 0.01220
Bus426 0.220 0.04993 0.05869 0.07705 0.04994 0.05871 0.07707 0.04918 0.05558 0.07421
Bus428 0.220 0.02713 0.04809 0.05522 0.02714 0.04809 0.05522 0.02547 0.04304 0.05001
Bus429 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus430 0.480 0.00828 0.03714 0.03805 0.00830 0.03722 0.03814
Bus431 2.400 0.03611 0.15496 0.15912 0.03636 0.15491 0.15912
Bus432 0.480 0.00267 0.01543 0.01566 0.00269 0.01552 0.01575 0.00225 0.01305 0.01325
Bus433 0.220 0.05254 0.06774 0.08572 0.05254 0.06775 0.08574 0.04918 0.05558 0.07421
Bus434 0.220 0.01486 0.02710 0.03091 0.01486 0.02711 0.03092 0.01424 0.02407 0.02796
Bus436 13.800 0.05415 0.43162 0.43500 0.06619 0.50618 0.51049 6.96750 20.54404 21.69340
Bus438 0.480 0.06883 0.11809 0.13669 0.06885 0.11818 0.13677 0.06779 0.11457 0.13312
Bus439 2.400 0.14378 0.20053 0.24675 0.14422 0.20266 0.24874
Bus440 0.480 0.00879 0.02266 0.02431 0.00880 0.02279 0.02442
Bus441 0.480 0.00249 0.01324 0.01347 0.00248 0.01329 0.01352
Bus443 13.800 0.03256 0.37715 0.37856 0.04443 0.38935 0.39187 15.09012 1.48637 15.16315
Bus445 4.160 0.04705 0.15958 0.16638 0.04759 0.16020 0.16712 15.06602 0.20301 15.06739
Bus446 0.220 0.00406 0.01168 0.01237 0.00406 0.01169 0.01237 0.00144 0.00679 0.00694
Bus447 4.160 0.01041 0.11744 0.11790 0.01093 0.11821 0.11871 15.00636 0.09844 15.00669
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 70
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus448 2.400 0.04164 0.19197 0.19643 0.04173 0.19230 0.19677
Bus449 2.400 0.04949 0.19551 0.20167 0.04958 0.19584 0.20202
Bus450 13.800 1.88644 6.04080 6.32851 1.88644 6.04080 6.32851 7.22284 21.55579 22.73371
Bus452 0.220 0.02482 0.04513 0.05151 0.02487 0.04548 0.05183 0.02311 0.03906 0.04539
Bus454 34.500 0.11314 1.47630 1.48063 0.13020 1.55005 1.55551 12.22865 70.39587 71.45011
Bus455 2.400 0.02974 0.12675 0.13019 0.03003 0.12670 0.13021
Bus456 13.800 0.06507 0.49160 0.49589 0.07912 0.54553 0.55124 7.02653 20.64824 21.81106
Bus458 0.220 0.01719 0.02779 0.03268 0.01720 0.02781 0.03270 0.01315 0.02222 0.02581
Bus460 0.480 0.00631 0.01785 0.01894 0.00633 0.01787 0.01896
Bus462 0.220 0.04993 0.05869 0.07705 0.04994 0.05871 0.07707 0.04918 0.05558 0.07421
Bus463 4.160 0.59908 0.45785 0.75400 0.60039 0.46425 0.75894 36.87373 0.74979 36.88135
Bus465 0.480 0.00796 0.02083 0.02230 0.00798 0.02091 0.02238
Bus466 0.480 0.00536 0.01951 0.02023 0.00537 0.01951 0.02023
Bus467 0.220 0.00397 0.01500 0.01552 0.00397 0.01502 0.01554 0.00359 0.01240 0.01291
Bus468 0.480 0.00880 0.02270 0.02435 0.00881 0.02273 0.02438
Bus469 0.480 0.00239 0.01323 0.01345 0.00240 0.01333 0.01354
Bus470 13.800 0.02010 0.28928 0.28998 0.02675 0.29677 0.29797 15.10112 0.71118 15.11786
Bus472 0.220 0.00158 0.00551 0.00573 0.00158 0.00551 0.00574 0.00134 0.00440 0.00460
Bus473 10.350 0.04168 0.52556 0.52721 0.04711 0.53207 0.53415
Bus474 0.480 0.00499 0.01940 0.02003 0.00500 0.01941 0.02004
Bus475 0.220 0.00194 0.00982 0.01001 0.00194 0.00982 0.01001 0.00144 0.00679 0.00694
Bus476 0.480 0.00474 0.01595 0.01664 0.00475 0.01595 0.01665
Bus478 0.220 0.00200 0.00935 0.00956 0.00200 0.00935 0.00956 0.00165 0.00773 0.00791
Bus479 0.220 0.00826 0.01670 0.01863 0.00826 0.01670 0.01863 0.00784 0.01505 0.01697
bus481 0.220 0.01577 0.03289 0.03647 0.01583 0.03328 0.03685 0.01491 0.02862 0.03227
Bus481 0.120 0.02025 0.02434 0.03166 0.02025 0.02435 0.03167 0.01463 0.01654 0.02208
Bus482 0.480 0.00983 0.04269 0.04381 0.00983 0.04270 0.04382
Bus483 0.440 0.00631 0.02074 0.02168 0.00639 0.02039 0.02137 0.00429 0.01698 0.01751
Bus484 13.800 0.07542 0.51684 0.52232 0.09085 0.51324 0.52121 7.12455 20.74537 21.93466
Bus486 2.400 0.05752 0.15857 0.16868 0.05795 0.15848 0.16874
Bus488 4.160 0.00950 0.11960 0.11997 0.01000 0.12067 0.12109 15.00781 0.10954 15.00821
Bus489 0.480 0.00634 0.01803 0.01911 0.00635 0.01805 0.01913
Bus490 0.220 0.02856 0.07191 0.07737 0.02857 0.07191 0.07737 0.02785 0.06879 0.07421
Bus491 2.400 0.03232 0.17370 0.17668 0.03250 0.17537 0.17836
Bus492 13.800 0.12316 0.55448 0.56799 0.13862 0.55077 0.56795 7.78094 21.28911 22.66648
Bus493 13.800 0.57548 0.93711 1.09971 0.58952 1.00747 1.16727 10.59139 24.16416 26.38341
Bus495 2.400 0.03287 0.13928 0.14310 0.03326 0.14120 0.14506
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 71
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus496 0.220 0.00635 0.01657 0.01775 0.00636 0.01658 0.01776 0.00352 0.01214 0.01264
Bus497 0.480 0.00559 0.02025 0.02101 0.00560 0.02032 0.02108
Bus498 0.220 0.00486 0.01427 0.01508 0.00486 0.01429 0.01510 0.00365 0.01259 0.01311
Bus499 2.400 0.07060 0.13982 0.15663 0.07097 0.14206 0.15880
Bus500 0.220 0.00157 0.00550 0.00572 0.00157 0.00550 0.00572 0.00132 0.00435 0.00455
Bus501 13.800 0.02673 0.36795 0.36892 0.03864 0.38012 0.38207 15.12680 1.47970 15.19900
Bus502 0.480 0.00168 0.01195 0.01207 0.00169 0.01196 0.01208
Bus503 0.220 0.00195 0.00987 0.01006 0.00195 0.00988 0.01007 0.00144 0.00679 0.00694
Bus504 0.480 0.00479 0.01640 0.01708 0.00480 0.01641 0.01710
Bus505 0.220 0.02720 0.04748 0.05472 0.02724 0.04781 0.05503 0.02306 0.03897 0.04528
Bus506 13.800 1.89105 6.04150 6.33055 1.89105 6.04150 6.33055 7.22284 21.55579 22.73371
Bus507 0.220 0.00310 0.01308 0.01344 0.00311 0.01309 0.01346 0.00255 0.01199 0.01226
Bus508 0.220 0.00774 0.01608 0.01784 0.00774 0.01608 0.01785 0.00718 0.01379 0.01555
Bus509 2.400 0.54719 0.16718 0.57216 0.54751 0.16710 0.57244
Bus510 0.220 0.00697 0.01822 0.01950 0.00698 0.01824 0.01953 0.00391 0.01349 0.01405
Bus511 4.160 0.03934 0.13184 0.13759 0.03983 0.13292 0.13875 15.05602 0.14096 15.05668
Bus512 0.220 0.00268 0.01001 0.01036 0.00269 0.01001 0.01036
Bus513 0.220 0.04989 0.05869 0.07703 0.04990 0.05869 0.07704 0.04918 0.05558 0.07421
Bus514 2.400 0.03111 0.18417 0.18678 0.03120 0.18450 0.18712
Bus516 0.480 0.01679 0.02722 0.03198 0.01680 0.02722 0.03199
Bus518 13.800 0.02360 0.36251 0.36328 0.03558 0.37469 0.37637 15.07605 1.44930 15.14555
Bus519 4.160 0.01105 0.14370 0.14412 0.01151 0.14456 0.14502 15.00939 0.13350 15.00999
Bus520 0.480 0.00172 0.01234 0.01246 0.00173 0.01234 0.01246
Bus521 4.160 0.04759 0.16877 0.17535 0.04858 0.16979 0.17661 15.06591 0.20129 15.06725
Bus522 0.220 0.00195 0.00973 0.00993 0.00195 0.00973 0.00993 0.00144 0.00679 0.00694
Bus523 0.220 0.00227 0.00931 0.00959 0.00227 0.00932 0.00959 0.00127 0.00596 0.00610
Bus524 0.277 0.42817 0.49567 0.65500 0.42817 0.49568 0.65500 0.42375 0.47883 0.63941
Bus526 2.400 0.04381 0.11151 0.11981 0.04422 0.11304 0.12138
Bus565 0.480 0.00356 0.02019 0.02050 0.00357 0.02028 0.02059
Bus566 0.480 0.00404 0.01397 0.01454 0.00404 0.01398 0.01456
Bus567 13.800 0.02648 0.36753 0.36848 0.03837 0.37969 0.38162 15.12680 1.47970 15.19900
Bus568 0.220 0.00194 0.00970 0.00989 0.00194 0.00970 0.00989 0.00141 0.00663 0.00678
Bus569 4.160 0.01493 0.13090 0.13174 0.01589 0.13217 0.13312 15.01332 0.11308 15.01375
Bus570 0.460 0.00317 0.01813 0.01840 0.00326 0.01958 0.01985 0.00102 0.00723 0.00730
Bus571 13.800 0.06194 0.48232 0.48628 0.07741 0.47861 0.48483 6.78151 20.35969 21.45940
Bus572 0.220 0.04969 0.05861 0.07684 0.04970 0.05862 0.07685 0.04918 0.05558 0.07421
Bus573 0.220 0.01461 0.02500 0.02896 0.01461 0.02502 0.02897 0.00712 0.01203 0.01398
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 72
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus575 2.400 0.01980 0.08903 0.09120 0.02017 0.09068 0.09290
Bus576 2.400 0.03008 0.10205 0.10639 0.03042 0.10194 0.10638
Bus577 0.220 0.01544 0.02987 0.03363 0.01544 0.02988 0.03363 0.01424 0.02407 0.02796
Bus578 13.800 0.09029 0.47787 0.48633 0.10163 0.55149 0.56078 6.93281 20.60307 21.73822
Bus579 0.220 0.01016 0.02141 0.02370 0.01016 0.02143 0.02371 0.00870 0.01671 0.01884
Bus580 0.220 0.03140 0.05454 0.06294 0.03141 0.05456 0.06296 0.03067 0.05184 0.06023
Bus581 0.480 0.00405 0.01388 0.01446 0.00405 0.01392 0.01450
Bus582 4.160 0.03531 0.15561 0.15957 0.03585 0.15623 0.16029 15.04734 0.19327 15.04858
Bus583 0.460 0.00338 0.01938 0.01967 0.00349 0.02075 0.02104 0.00102 0.00721 0.00728
Bus584 34.500 0.11419 1.47558 1.47999 0.13358 1.55105 1.55679 12.17475 70.37837 71.42367
Bus585 2.400 0.07521 0.12567 0.14646 0.07562 0.12720 0.14798
Bus586 0.220 0.05316 0.06228 0.08188 0.05316 0.06226 0.08187 0.04961 0.05606 0.07486
Bus588 0.220 0.00696 0.01825 0.01953 0.00697 0.01827 0.01955 0.00391 0.01349 0.01405
Bus589 4.160 0.03648 0.16542 0.16940 0.03748 0.16645 0.17062 15.04722 0.19155 15.04844
Bus590 0.220 0.02045 0.03603 0.04143 0.02045 0.03605 0.04145 0.01972 0.03332 0.03872
Bus591 13.800 0.09226 0.52344 0.53151 0.10748 0.51993 0.53093 7.07847 20.73486 21.90979
Bus592 2.400 0.02134 0.08418 0.08684 0.02169 0.08410 0.08685
Bus593 4.160 0.03924 0.13181 0.13753 0.03972 0.13288 0.13870 15.05602 0.14096 15.05668
Bus594 2.400 0.00999 0.04933 0.05033 0.01041 0.05094 0.05199
Bus595 0.480 0.00204 0.01321 0.01336 0.00205 0.01321 0.01337
Bus596 115.000 189.30020 1086.17200 1102.54500 194.15460 1147.53900 1163.84700 518.76560 2593.65500 2645.02600
Bus598 13.800 0.06244 0.47732 0.48139 0.07651 0.53128 0.53676 6.78151 20.35969 21.45940
Bus599 0.480 0.01010 0.03300 0.03451 0.01011 0.03306 0.03457 0.00583 0.02740 0.02802
Bus600 0.480 0.00302 0.01044 0.01087 0.00303 0.01052 0.01095
Bus602 2.400 0.03586 0.18934 0.19271 0.03595 0.18967 0.19305
Bus603 0.480 0.00355 0.02017 0.02048 0.00357 0.02023 0.02054
Bus604 0.480 0.00206 0.01333 0.01349 0.00207 0.01335 0.01350
Bus605 115.000 189.29360 1086.15700 1102.52900 194.14810 1147.52400 1163.83200 518.76560 2593.65500 2645.02600
Bus606 13.800 0.06640 0.53054 0.53468 0.08155 0.60156 0.60706 6.78151 20.35968 21.45939
Bus607 0.220 0.00428 0.01355 0.01421 0.00429 0.01356 0.01422 0.00359 0.01240 0.01291
Bus608 0.480 0.00573 0.02764 0.02823 0.00573 0.02765 0.02824
Bus609 4.160 0.27055 1.69865 1.72006 0.27691 1.77895 1.80037 18.02285 0.27733 18.02499
Bus610 13.800 0.01981 0.43944 0.43989 0.02065 0.44025 0.44074 15.04805 0.67661 15.06325
Bus611 0.220 0.04623 0.07906 0.09158 0.04623 0.07907 0.09159 0.04190 0.07081 0.08228
Bus612 13.800 0.12316 0.55448 0.56799 0.13862 0.55077 0.56795 7.78094 21.28911 22.66648
Bus613 0.220 0.00469 0.01577 0.01645 0.00469 0.01579 0.01647 0.00365 0.01259 0.01311
Bus614 0.220 0.02076 0.03705 0.04247 0.02076 0.03706 0.04248 0.01917 0.03240 0.03764
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 73
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus615 2.400 0.02234 0.10439 0.10675 0.02278 0.10652 0.10893
Bus617 34.500 0.11902 1.48104 1.48581 0.13839 1.55656 1.56270 12.17714 70.38012 71.42580
Bus618 0.220 0.00910 0.01927 0.02131 0.00911 0.01929 0.02133 0.01879 0.02648 0.03247
Bus619 4.160 0.03881 0.13169 0.13729 0.03931 0.13277 0.13846 15.05602 0.14096 15.05668
Bus620 0.220 0.02085 0.03642 0.04197 0.02085 0.03644 0.04199 0.01972 0.03332 0.03872
Bus621 0.480 0.00735 0.02251 0.02368 0.00736 0.02254 0.02371
Bus622 0.220 0.01497 0.02679 0.03069 0.01498 0.02680 0.03070 0.01424 0.02407 0.02796
Bus623 4.160 0.03870 0.13165 0.13722 0.03918 0.13273 0.13839 15.05602 0.14096 15.05668
Bus624 34.500 0.11902 1.48104 1.48581 0.13839 1.55656 1.56270 12.15425 70.37312 71.41500
Bus627 0.480 0.03750 0.07671 0.08539 0.03750 0.07672 0.08540 0.03690 0.07084 0.07987
Bus629 4.160 0.01901 0.12948 0.13087 0.01956 0.13062 0.13207 15.02430 0.13670 15.02493
Bus630 13.800 0.11709 0.52795 0.54078 0.13255 0.52424 0.54074 7.10937 20.72607 21.91149
Bus632 13.800 0.11058 0.52193 0.53351 0.12604 0.51822 0.53333 7.09902 20.71077 21.89365
Bus635 4.160 0.07262 0.42573 0.43188 0.07394 0.43214 0.43842
Bus637 13.800 0.04163 0.45940 0.46128 0.05723 0.45525 0.45884 7.04019 20.58831 21.75874
Bus638 0.480 0.01066 0.03039 0.03221 0.01067 0.03048 0.03230
Bus639 4.160 0.00917 0.11906 0.11941 0.00967 0.12013 0.12052 15.00727 0.10812 15.00766
Bus640 13.800 0.03770 0.41050 0.41223 0.05042 0.48631 0.48892 6.89453 20.45652 21.58712
Bus641 2.400 0.03928 0.09888 0.10640 0.03966 0.10054 0.10808
Bus642 0.480 0.01066 0.03039 0.03221 0.01067 0.03048 0.03230
Bus644 4.160 0.00994 0.12867 0.12905 0.01084 0.12980 0.13025 15.00720 0.10674 15.00758
Bus647 0.480 0.01066 0.03039 0.03221 0.01067 0.03048 0.03230
Bus648 0.220 0.02654 0.04592 0.05303 0.02654 0.04593 0.05305 0.02191 0.03703 0.04302
Bus650 0.220 0.01714 0.03500 0.03898 0.01715 0.03502 0.03899 0.01491 0.02862 0.03227
Bus651 13.800 0.08667 1.39741 1.40009 0.08966 1.40875 1.41161 30.09097 1.22453 30.11588
Bus653 13.800 0.04513 0.50709 0.50910 0.05772 0.57396 0.57685 7.26880 20.77145 22.00656
Bus655 2.400 0.09768 0.42221 0.43336 0.09770 0.42239 0.43354 0.11792 0.24505 0.27195
Bus657 13.800 0.03980 0.45075 0.45250 0.05155 0.50141 0.50405 7.26840 20.72578 21.96333
Bus658 2.400 0.03699 0.09634 0.10320 0.03731 0.09622 0.10320
Bus660 2.400 0.03695 0.16071 0.16490 0.03702 0.16100 0.16521
Bus661 13.800 0.02311 0.44534 0.44594 0.02402 0.44617 0.44682 15.04704 0.67712 15.06226
Bus662 13.800 0.04416 0.41903 0.42135 0.05172 0.48872 0.49145 7.16650 20.71309 21.91782
Bus665 13.800 0.03943 0.45579 0.45750 0.05470 0.45378 0.45707 7.26840 20.72578 21.96333
Bus667 0.220 0.01338 0.02302 0.02662 0.01338 0.02301 0.02662 0.01320 0.02231 0.02592
Bus668 4.160 0.03786 0.14078 0.14578 0.03874 0.14191 0.14711 15.05594 0.13957 15.05659
Bus671 0.480 0.00213 0.01119 0.01139 0.00214 0.01120 0.01140 0.00091 0.00648 0.00654
Bus673 2.400 0.04149 0.16357 0.16875 0.04156 0.16386 0.16905
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 74
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus676 2.400 0.07936 0.40586 0.41354 0.07939 0.40605 0.41373 0.03082 0.16952 0.17230
Bus677 0.220 0.01338 0.02302 0.02662 0.01338 0.02301 0.02662 0.01320 0.02231 0.02592
Bus679 0.220 0.01338 0.02303 0.02663 0.01338 0.02304 0.02665 0.01320 0.02231 0.02592
Bus680 4.160 0.04015 0.14146 0.14705 0.04100 0.14257 0.14834 15.05594 0.13957 15.05659
Bus685 4.160 0.10371 0.20530 0.23001 0.10479 0.20570 0.23085 18.22393 0.30204 18.22643
Bus688 0.220 0.05000 0.05890 0.07727 0.05001 0.05891 0.07728 0.04918 0.05558 0.07421
Bus690 4.160 0.01060 0.12975 0.13018 0.01151 0.13088 0.13138 15.00828 0.10958 15.00868
Bus693 4.160 0.01095 0.13033 0.13079 0.01185 0.13146 0.13200 15.00882 0.11101 15.00923
Bus695 0.480 0.00365 0.01681 0.01720 0.00366 0.01683 0.01722
Bus696 0.220 0.01613 0.02963 0.03373 0.01613 0.02958 0.03369 0.01424 0.02407 0.02796
Bus697 0.480 0.00289 0.01231 0.01264 0.00289 0.01232 0.01265 0.00528 0.01085 0.01207
Bus698 4.160 0.01128 0.13086 0.13135 0.01219 0.13200 0.13256 15.00936 0.11243 15.00978
Bus699 2.400 0.02719 0.14273 0.14530 0.02762 0.14263 0.14528
Bus700 2.400 0.07751 0.40434 0.41171 0.07755 0.40453 0.41190 0.02282 0.16198 0.16358
Bus701 0.220 0.01832 0.03703 0.04131 0.01832 0.03703 0.04132 0.01669 0.03205 0.03614
Bus705 0.220 0.04946 0.05744 0.07580 0.04946 0.05744 0.07580 0.04918 0.05558 0.07421
Bus706 0.220 0.02166 0.03817 0.04389 0.02166 0.03818 0.04390 0.02136 0.03610 0.04195
Bus708 0.480 0.00157 0.01183 0.01193 0.00158 0.01192 0.01202
Bus709 0.480 0.00407 0.01647 0.01697 0.00408 0.01649 0.01699
Bus710 0.220 0.01170 0.02061 0.02370 0.01170 0.02062 0.02370 0.01150 0.01944 0.02259
Bus711 0.220 0.02549 0.04588 0.05248 0.02549 0.04589 0.05249 0.02465 0.04165 0.04840
Bus712 0.480 0.00157 0.01194 0.01204 0.00159 0.01198 0.01209
Bus713 13.800 0.08520 1.39490 1.39750 0.08819 1.40625 1.40901 30.06492 1.20755 30.08916
Bus715 2.400 0.01545 0.09259 0.09387 0.01581 0.09396 0.09528
Bus717 2.400 0.01666 0.10196 0.10331 0.01704 0.10370 0.10509
Bus718 0.220 0.01170 0.02061 0.02370 0.01170 0.02062 0.02370 0.01150 0.01944 0.02259
Bus719 13.800 6.66964 20.89141 21.93023 6.68169 20.96598 22.00494
Bus723 0.480 0.00158 0.01145 0.01155 0.00158 0.01152 0.01163
Bus725 0.220 0.01297 0.02492 0.02809 0.01298 0.02493 0.02811 0.00835 0.01603 0.01807
Bus726 0.480 0.00163 0.01166 0.01177 0.00163 0.01174 0.01185
Bus727 0.220 0.01452 0.02598 0.02977 0.01453 0.02599 0.02977 0.01424 0.02407 0.02796
Bus728 2.400 0.10235 0.12318 0.16015 0.10244 0.12490 0.16154
Bus730 2.400 0.10299 0.12311 0.16051 0.10326 0.12483 0.16200
Bus731 0.220 0.01175 0.02071 0.02381 0.01175 0.02071 0.02381 0.01156 0.01953 0.02269
Bus733 0.220 0.01230 0.02163 0.02488 0.01230 0.02163 0.02489 0.01210 0.02046 0.02377
Bus734 2.400 0.06656 0.10551 0.12475 0.06678 0.10686 0.12601
Bus735 0.220 0.01170 0.02061 0.02370 0.01170 0.02062 0.02370 0.01150 0.01944 0.02259
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 75
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus738 0.480 0.00164 0.01199 0.01211 0.00164 0.01205 0.01216
Bus739 2.400 0.06714 0.10552 0.12507 0.06746 0.10688 0.12639
Bus740 0.480 0.00165 0.01224 0.01235 0.00166 0.01229 0.01240
Bus741 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus742 34.500 12.27328 71.85416 72.89481 12.29264 71.92968 72.97251
Bus743 0.480 0.00861 0.02681 0.02816 0.00861 0.02683 0.02817
Bus744 0.480 0.00809 0.02519 0.02646 0.00811 0.02519 0.02646
Bus745 13.800 0.04509 0.50718 0.50918 0.05746 0.57374 0.57661 7.29491 20.78815 22.03095
Bus748 2.400 0.02741 0.14689 0.14943 0.02784 0.14902 0.15160
Bus749 2.400 0.02639 0.14169 0.14413 0.02676 0.14362 0.14609
Bus750 0.220 0.05192 0.06107 0.08016 0.05193 0.06107 0.08016 0.05132 0.05799 0.07744
Bus751 13.800 0.51235 0.94629 1.07609 0.52674 1.01672 1.14507 7.82278 21.72242 23.08808
Bus752 4.160 0.20101 0.98310 1.00344 0.20232 0.98950 1.00998 0.16221 0.90737 0.92176
Bus754 0.220 0.01613 0.02963 0.03373 0.01613 0.02958 0.03369 0.01424 0.02407 0.02796
Bus755 4.160 0.01526 0.14973 0.15050 0.01573 0.15060 0.15142 15.01659 0.15016 15.01734
Bus756 0.220 0.04993 0.05869 0.07705 0.04994 0.05871 0.07707 0.04918 0.05558 0.07421
Bus757 4.160 0.01626 0.15302 0.15388 0.01713 0.15488 0.15582 15.01659 0.15016 15.01734
Bus758 4.160 0.25457 0.48724 0.54974 0.25584 0.49364 0.55600 0.14189 0.41693 0.44042
Bus759 0.220 0.01376 0.01799 0.02265 0.01376 0.01799 0.02265 0.01090 0.00959 0.01452
Bus760 2.400 0.05112 0.13952 0.14859 0.05121 0.13986 0.14894
Bus761 2.400 0.04373 0.11147 0.11974 0.04413 0.11297 0.12129
Bus762 0.480 0.01303 0.05907 0.06049 0.01302 0.05927 0.06068 0.01151 0.05409 0.05530
Bus764 13.800 0.17085 0.53329 0.55999 0.18291 0.60786 0.63478 7.05436 20.72836 21.89586
Bus767 0.220 0.00293 0.01086 0.01125 0.00294 0.01088 0.01127 0.00141 0.00663 0.00678
Bus769 0.220 0.04993 0.05869 0.07705 0.04994 0.05871 0.07707 0.04918 0.05558 0.07421
Bus770 0.480 0.05107 0.09803 0.11054 0.05109 0.09812 0.11062 0.04768 0.09155 0.10322
Bus774 0.480 0.00893 0.03449 0.03562 0.00894 0.03448 0.03562
Bus775 0.480 0.00168 0.01187 0.01199 0.00167 0.01192 0.01204
Bus776 0.220 0.03271 0.05783 0.06644 0.03271 0.05784 0.06644 0.03040 0.05137 0.05969
Bus777 0.480 0.00168 0.01202 0.01214 0.00168 0.01211 0.01223
Bus778 13.800 6.69237 21.00479 22.04516 6.70753 21.07581 22.11743
Bus779 0.220 0.03260 0.05749 0.06609 0.03260 0.05749 0.06609 0.03040 0.05137 0.05969
Bus780 4.160 0.23032 0.47307 0.52616 0.23160 0.47947 0.53247 0.02772 0.29578 0.29708
Bus781 13.800 6.68841 20.95157 21.99325 6.70248 21.00553 22.04893
Bus782 0.220 0.07612 0.09207 0.11946 0.07613 0.09206 0.11946 0.07377 0.08336 0.11132
Bus784 13.800 6.68792 20.95657 21.99786 6.70338 20.95286 21.99903
Bus785 2.400 0.03874 0.13963 0.14490 0.03912 0.14155 0.14686
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 76
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus787 13.800 1.86264 6.02885 6.31002 1.86264 6.02885 6.31002 7.17375 21.52125 22.68539
Bus788 13.800 0.02701 0.30095 0.30216 0.03338 0.30838 0.31018 15.07199 0.73777 15.09004
Bus790 13.800 0.04438 0.41960 0.42194 0.05173 0.48896 0.49169 7.19262 20.72980 21.94216
Bus793 13.800 0.03962 0.45057 0.45231 0.05116 0.50093 0.50354 7.29452 20.74248 21.98774
Bus794 0.220 0.01761 0.03061 0.03532 0.01761 0.03061 0.03532 0.01742 0.02944 0.03420
Bus795 13.800 0.03926 0.45562 0.45731 0.05452 0.45377 0.45703 7.29452 20.74248 21.98774
Bus797 2.400 0.54719 0.16718 0.57216 0.54751 0.16710 0.57244
Bus798 4.160 0.02494 0.15598 0.15796 0.02538 0.15684 0.15888 15.03603 0.17028 15.03699
Bus799 4.160 0.01527 0.14973 0.15051 0.01573 0.15061 0.15143 15.01659 0.15016 15.01734
Bus800 2.400 0.10662 0.13983 0.17585 0.10703 0.14136 0.17730
Bus801 0.480 0.00766 0.03653 0.03732 0.00768 0.03661 0.03741
Bus802 4.160 0.01523 0.14962 0.15039 0.01569 0.15049 0.15130 15.01659 0.15016 15.01734
Bus804 4.160 0.04304 0.16201 0.16763 0.04389 0.16387 0.16964 15.06113 0.17363 15.06213
Bus806 4.160 0.02057 0.15934 0.16066 0.02148 0.16127 0.16270 15.02415 0.16765 15.02508
Bus807 4.160 0.04434 0.17087 0.17653 0.04528 0.17211 0.17797 15.06113 0.17363 15.06213
Bus809 13.800 0.04367 0.41716 0.41944 0.05572 0.49173 0.49488 6.78152 20.35968 21.45940
Bus810 13.800 0.04367 0.41716 0.41944 0.05572 0.49173 0.49488 6.90230 20.47087 21.60320
Bus811 4.160 0.04309 0.16202 0.16766 0.04394 0.16388 0.16966 15.06113 0.17363 15.06213
Bus812 4.160 0.04376 0.16222 0.16802 0.04459 0.16406 0.17001 15.06113 0.17363 15.06213
Bus814 4.160 0.01617 0.15287 0.15372 0.01704 0.15475 0.15568 15.01659 0.15016 15.01734
Bus815 4.160 0.01624 0.15293 0.15379 0.01710 0.15478 0.15572 15.01659 0.15016 15.01734
Bus816 0.480 0.00156 0.01076 0.01087 0.00156 0.01096 0.01107
Bus817 0.480 0.00170 0.01222 0.01234 0.00170 0.01232 0.01244
Bus818 0.480 0.00178 0.01132 0.01146 0.00179 0.01134 0.01148
Bus819 0.480 0.00180 0.01125 0.01139 0.00180 0.01129 0.01143
Bus820 13.800 0.03266 0.31003 0.31174 0.03907 0.31752 0.31992 15.07934 0.75711 15.09833
Bus821 13.800 0.04162 0.39208 0.39428 0.05346 0.40426 0.40778 15.10502 1.52564 15.18187
Bus822 4.160 0.01694 0.16282 0.16370 0.01747 0.16390 0.16483 15.01659 0.15016 15.01734
Bus823 4.160 0.01705 0.16173 0.16262 0.01800 0.16297 0.16397 15.01659 0.15016 15.01734
Bus824 4.160 0.04256 0.17034 0.17558 0.04349 0.17158 0.17701 15.06113 0.17363 15.06213
Bus826 4.160 0.01700 0.16293 0.16381 0.01754 0.16401 0.16494 15.01659 0.15016 15.01734
Bus827 4.160 0.01688 0.16273 0.16360 0.01742 0.16383 0.16475 15.01659 0.15016 15.01734
Bus828 4.160 0.01839 0.16324 0.16427 0.01892 0.16432 0.16540 15.01879 0.15088 15.01954
Bus829 4.160 0.01831 0.16313 0.16415 0.01885 0.16422 0.16530 15.01879 0.15088 15.01954
Bus830 2.400 0.00825 0.07828 0.07871 0.00861 0.07820 0.07867
Bus831 4.160 0.01841 0.16205 0.16309 0.01937 0.16330 0.16444 15.01879 0.15088 15.01954
Bus832 4.160 0.01852 0.16219 0.16325 0.01947 0.16343 0.16459 15.01879 0.15088 15.01954
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 77
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus833 4.160 0.01705 0.16173 0.16263 0.01800 0.16298 0.16397 15.01659 0.15016 15.01734
Bus834 4.160 0.01713 0.16186 0.16277 0.01808 0.16310 0.16410 15.01659 0.15016 15.01734
Bus835 0.480 0.00157 0.01166 0.01176 0.00158 0.01180 0.01191
Bus836 0.480 0.00166 0.01204 0.01215 0.00167 0.01210 0.01221
Bus837 0.480 0.00180 0.01323 0.01335 0.00181 0.01324 0.01336
Bus838 0.480 0.00179 0.01306 0.01318 0.00180 0.01308 0.01320
Bus839 0.480 0.00413 0.01774 0.01822 0.00416 0.01794 0.01842
Bus840 0.480 0.00402 0.01725 0.01771 0.00403 0.01735 0.01781
Bus841 0.480 0.00179 0.01313 0.01325 0.00180 0.01315 0.01327
Bus842 0.480 0.00180 0.01322 0.01334 0.00181 0.01323 0.01335
Bus844 4.160 0.01447 0.12325 0.12409 0.01499 0.12401 0.12492 15.01311 0.11406 15.01354
Bus845 4.160 0.01440 0.12314 0.12398 0.01492 0.12391 0.12480 15.01311 0.11406 15.01354
Bus846 4.160 0.01441 0.12316 0.12400 0.01493 0.12393 0.12482 15.01311 0.11406 15.01354
Bus847 4.160 0.04201 0.13241 0.13892 0.04254 0.13318 0.13980 15.05765 0.13752 15.05828
Bus849 4.160 0.04196 0.13239 0.13888 0.04248 0.13316 0.13977 15.05765 0.13752 15.05828
Bus850 4.160 0.04200 0.13241 0.13891 0.04252 0.13317 0.13980 15.05765 0.13752 15.05828
Bus853 4.160 0.01436 0.12310 0.12393 0.01489 0.12386 0.12475 15.01311 0.11406 15.01354
Bus854 4.160 0.01492 0.13084 0.13169 0.01587 0.13210 0.13305 15.01300 0.11233 15.01342
Bus855 4.160 0.01497 0.13092 0.13178 0.01593 0.13218 0.13313 15.01300 0.11233 15.01342
Bus856 4.160 0.01492 0.13085 0.13169 0.01587 0.13210 0.13305 15.01300 0.11233 15.01342
Bus857 4.160 0.01496 0.13090 0.13175 0.01591 0.13216 0.13311 15.01300 0.11233 15.01342
Bus859 4.160 0.04247 0.14004 0.14633 0.04341 0.14129 0.14781 15.05754 0.13580 15.05815
Bus861 4.160 0.04109 0.15202 0.15748 0.04204 0.15328 0.15894 15.05560 0.16705 15.05653
Bus863 0.480 0.00154 0.01078 0.01089 0.00155 0.01079 0.01090
Bus864 0.480 0.00168 0.01192 0.01204 0.00169 0.01194 0.01206
Bus865 0.480 0.00164 0.01140 0.01152 0.00165 0.01142 0.01153
Bus866 0.480 0.00174 0.01247 0.01259 0.00175 0.01249 0.01262
Bus867 0.480 0.00163 0.01123 0.01134 0.00163 0.01123 0.01135
Bus868 0.480 0.00167 0.01194 0.01205 0.00169 0.01195 0.01207
Bus869 0.480 0.00178 0.01227 0.01240 0.00178 0.01228 0.01241
Bus870 0.480 0.00180 0.01268 0.01280 0.00181 0.01269 0.01282
Bus872 4.160 0.04436 0.13705 0.14405 0.04488 0.13783 0.14495 15.06337 0.15077 15.06413
Bus873 4.160 0.01778 0.12807 0.12930 0.01832 0.12887 0.13016 15.01883 0.12730 15.01937
Bus874 13.800 0.01716 0.28415 0.28467 0.02388 0.29165 0.29263 15.04911 0.67718 15.06434
Bus875 4.160 0.01825 0.13567 0.13690 0.01922 0.13697 0.13832 15.01872 0.12557 15.01925
Bus877 4.160 0.04475 0.14463 0.15140 0.04569 0.14591 0.15290 15.06326 0.14904 15.06400
Bus878 0.480 0.00164 0.01178 0.01189 0.00165 0.01193 0.01205
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 78
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus879 0.480 0.00164 0.01180 0.01192 0.00166 0.01203 0.01215
Bus880 13.800 0.02364 0.44618 0.44681 0.02454 0.44702 0.44769 15.04816 0.67994 15.06352
Bus881 13.800 0.01641 0.41705 0.41737 0.02029 0.42101 0.42150 15.03840 0.67839 15.05369
Bus882 13.800 0.01754 0.28570 0.28624 0.02416 0.29317 0.29416 15.04881 0.67756 15.06406
Bus883 13.800 0.02402 0.36399 0.36478 0.03587 0.37612 0.37783 15.06265 1.43701 15.13105
Bus884 13.800 0.14546 0.59848 0.61590 0.16020 0.66918 0.68809 7.15242 20.78974 21.98569
Bus885 2.400 0.00923 0.07671 0.07727 0.00963 0.07864 0.07923
Bus886 2.400 0.03087 0.09306 0.09804 0.03123 0.09496 0.09996
Bus887 0.480 0.00260 0.01310 0.01335 0.00261 0.01319 0.01345
Bus888 0.480 0.00279 0.01429 0.01456 0.00280 0.01442 0.01469
Bus889 2.400 0.03307 0.10004 0.10536 0.03341 0.10226 0.10758
Bus900 2.400 0.06715 0.11591 0.13396 0.06743 0.11811 0.13600
Bus991 2.400 0.06990 0.11612 0.13553 0.07024 0.11833 0.13761
Bus992 2.400 0.08013 0.10150 0.12931 0.08039 0.10339 0.13096
Bus993 2.400 0.06573 0.10911 0.12738 0.06605 0.11100 0.12916
Bus995 13.800 0.13998 0.50480 0.52385 0.15190 0.57927 0.59886 7.00676 20.65795 21.81389
Bus996 2.400 0.02607 0.08815 0.09193 0.02641 0.09036 0.09415
Bus997 13.800 0.09906 0.52994 0.53912 0.11426 0.52646 0.53872 7.09089 20.75323 21.93119
Bus998 13.800 0.09906 0.52994 0.53912 0.11426 0.52646 0.53872 7.09089 20.75323 21.93119
Bus999 13.800 0.09690 0.48424 0.49384 0.10809 0.55777 0.56815 6.94523 20.62144 21.75959
Bus1000 13.800 0.09690 0.48424 0.49384 0.10809 0.55777 0.56815 6.94523 20.62144 21.75959
Bus1001 13.800 0.13552 0.61095 0.62580 0.14913 0.66439 0.68093 7.22555 21.01151 22.21919
Bus1002 4.160 0.02314 0.21058 0.21185 0.02416 0.21527 0.21662 9.01251 0.17792 9.01426
Bus1003 4.160 0.03280 0.18805 0.19089 0.03374 0.19645 0.19932 9.03461 0.19423 9.03669
Bus1004 0.480 0.00184 0.01220 0.01234 0.00186 0.01249 0.01263
Bus1005 0.480 0.00206 0.01379 0.01395 0.00207 0.01386 0.01401
Bus1006 4.160 0.03688 0.21799 0.22109 0.03790 0.22268 0.22588 9.03483 0.19746 9.03699
Bus1009 4.160 0.05209 0.22620 0.23211 0.05303 0.23086 0.23687 9.06396 0.22110 9.06666
Bus1010 4.160 0.05240 0.23569 0.24144 0.05347 0.24044 0.24631 9.08266 0.24549 9.08598
Bus1011 0.480 0.00260 0.01418 0.01441 0.00263 0.01427 0.01451
Bus1012 0.220 0.17889 0.20457 0.27175 0.17890 0.20459 0.27177 0.17820 0.20136 0.26889
Bus1013 0.220 0.02616 0.04625 0.05314 0.02617 0.04627 0.05316 0.02547 0.04304 0.05001
Bus1014 0.220 0.02616 0.04625 0.05314 0.02617 0.04627 0.05316 0.02547 0.04304 0.05001
Bus1015 0.480 0.00276 0.01504 0.01529 0.00278 0.01515 0.01540
Bus1016 4.160 0.04804 0.20510 0.21065 0.04905 0.21362 0.21918 9.08243 0.24226 9.08566
Bus1017 4.160 0.05248 0.23574 0.24151 0.05358 0.24051 0.24640 9.08266 0.24549 9.08598
Bus1018 0.480 0.00265 0.01451 0.01475 0.00267 0.01469 0.01493
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 79
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus1019 0.480 0.00232 0.01283 0.01304 0.00234 0.01308 0.01329
Bus1020 4.160 0.04726 0.20469 0.21007 0.04829 0.21323 0.21863 9.08243 0.24226 9.08566
Bus1021 4.160 0.10526 0.24810 0.26951 0.10637 0.25288 0.27434 9.14552 0.27527 9.14967
Bus1022 0.480 0.00345 0.01513 0.01551 0.00346 0.01525 0.01564 0.14159 0.23786 0.27682
Bus1023 0.480 0.00312 0.01386 0.01421 0.00314 0.01411 0.01445 0.14880 0.25005 0.29097
Bus1024 4.160 0.09934 0.21773 0.23932 0.10038 0.22618 0.24745 9.14530 0.27205 9.14934
Bus1025 4.160 0.04892 0.19670 0.20269 0.04970 0.20501 0.21095 9.06374 0.21788 9.06635
Bus1026 4.160 0.04994 0.19703 0.20326 0.05114 0.20553 0.21180 9.06374 0.21788 9.06635
Bus1027 4.160 0.04982 0.19699 0.20319 0.05085 0.20542 0.21162 9.06374 0.21788 9.06635
Bus1028 4.160 0.01976 0.18113 0.18221 0.02064 0.18948 0.19060 9.01228 0.17470 9.01397
Bus1029 13.800 0.12199 0.55106 0.56441 0.13334 0.62476 0.63883 6.99132 20.80750 21.95064
Bus1030 4.160 0.02767 0.24924 0.25078 0.02793 0.25025 0.25180 18.01748 0.12394 18.01790
Bus1031 0.480 0.00123 0.00931 0.00940 0.00123 0.00933 0.00941
Bus1032 0.480 0.00116 0.00806 0.00815 0.00118 0.00814 0.00823
Bus1033 4.160 0.02188 0.15894 0.16044 0.02296 0.16557 0.16716 18.01748 0.12394 18.01790
Bus1036 13.800 0.09533 0.47703 0.48646 0.10690 0.55114 0.56142 7.37346 20.91774 22.17926
Bus1037 4.160 0.01688 0.17457 0.17539 0.01777 0.18029 0.18116 18.01052 0.14961 18.01114
Bus1038 0.220 0.01480 0.02740 0.03114 0.01480 0.02742 0.03116 0.01424 0.02407 0.02796
Bus1039 0.480 0.00211 0.01503 0.01517 0.00213 0.01511 0.01526
Bus1040 0.220 0.01486 0.02710 0.03091 0.01486 0.02711 0.03092 0.01424 0.02407 0.02796
Bus1041 0.480 0.00188 0.01352 0.01365 0.00189 0.01359 0.01372
Bus1042 4.160 0.02608 0.18609 0.18791 0.02695 0.19179 0.19367 18.02590 0.18022 18.02680
Bus1044 4.160 0.20179 0.23384 0.30887 0.20240 0.23948 0.31355 18.31395 0.39937 18.31830
Bus1045 4.160 0.02072 0.17906 0.18025 0.02158 0.18475 0.18600 18.01786 0.16298 18.01860
Bus1049 4.160 0.02028 0.20256 0.20358 0.02165 0.20901 0.21013 18.01052 0.14961 18.01114
Bus1050 13.800 0.10747 0.58271 0.59254 0.12254 0.65362 0.66500 7.60252 21.11410 22.44111
Bus1051 13.800 0.12845 0.58256 0.59655 0.14360 0.65358 0.66917 7.12034 20.74230 21.93039
Bus1052 2.400 0.00895 0.07916 0.07966 0.00941 0.08131 0.08185
Bus1053 0.220 0.02271 0.04058 0.04650 0.02271 0.04059 0.04651 0.02136 0.03610 0.04195
Bus1054 2.400 0.02769 0.07500 0.07994 0.02796 0.07680 0.08173
Bus1055 0.480 0.00533 0.01974 0.02045 0.00535 0.01981 0.02052
Bus1056 0.480 0.00500 0.01891 0.01956 0.00501 0.01898 0.01963
Bus1057 2.400 0.02742 0.07494 0.07980 0.02768 0.07674 0.08158
Bus1059 2.400 0.01110 0.07297 0.07381 0.01135 0.07475 0.07561
Bus1060 2.400 0.01339 0.07371 0.07492 0.01365 0.07551 0.07673
Bus1061 2.400 0.00729 0.06865 0.06903 0.00756 0.07045 0.07086
Bus1062 2.400 0.00973 0.08205 0.08263 0.01007 0.08426 0.08486
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 80
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus1063 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
Bus1064 4.160 0.05232 0.17055 0.17839 0.05286 0.17094 0.17892 15.07361 0.18262 15.07472
Bus1065 4.160 0.01812 0.15824 0.15928 0.01867 0.15863 0.15972 15.01659 0.15016 15.01734
Bus1066 0.480 0.00180 0.01313 0.01326 0.00181 0.01314 0.01326
Bus1067 0.480 0.00529 0.02058 0.02125 0.00531 0.02052 0.02120
Bus1068 2.400 0.04706 0.10962 0.11930 0.04739 0.10951 0.11932
Bus1069 0.480 0.00198 0.01317 0.01332 0.00199 0.01318 0.01333
Bus1070 0.480 0.00182 0.01228 0.01241 0.00183 0.01227 0.01240
Bus1071 4.160 0.02077 0.12855 0.13022 0.02155 0.12943 0.13121 15.03128 0.14002 15.03193
Bus1073 4.160 0.01684 0.12790 0.12901 0.01761 0.12878 0.12997 15.02466 0.13911 15.02531
Bus1074 2.400 0.06568 0.12950 0.14520 0.06612 0.13107 0.14681
Bus1075 4.160 0.02198 0.23352 0.23455 0.02319 0.23884 0.23996 15.01649 0.20007 15.01783
Bus1076 13.800 0.06829 0.41678 0.42234 0.08020 0.42895 0.43639 15.14594 1.58394 15.22854
Bus1077 4.160 0.01566 0.17030 0.17102 0.01672 0.17144 0.17225 15.01053 0.14961 15.01127
Bus1078 0.480 0.00182 0.01337 0.01350 0.00183 0.01338 0.01351
Bus1079 4.160 0.01904 0.16831 0.16938 0.01962 0.16900 0.17014 15.01772 0.16627 15.01864
Bus1080 4.160 0.02311 0.23894 0.24005 0.02444 0.23902 0.24027 1441.08300 0.20007 1441.08300
Bus1081 0.480 0.00449 0.01889 0.01941 0.00450 0.01893 0.01946
Bus1082 4.160 0.02039 0.16857 0.16979 0.02097 0.16926 0.17056 15.01992 0.16699 15.02085
Bus1083 13.800 0.05762 0.33736 0.34225 0.06426 0.34485 0.35079 15.56660 1.04561 15.60168
Bus1084 4.160 0.01454 0.16183 0.16248 0.01513 0.16252 0.16322 15.01053 0.14961 15.01127
Bus1088 4.160 0.04637 0.17733 0.18329 0.04695 0.17803 0.18411 15.06226 0.18974 15.06346
Bus1089 4.160 0.02016 0.17679 0.17793 0.02122 0.17792 0.17918 15.01772 0.16627 15.01864
Bus1091 4.160 0.04818 0.18607 0.19221 0.04924 0.18721 0.19358 15.06226 0.18974 15.06346
Bus1094 4.160 0.02635 0.24359 0.24501 0.02769 0.24368 0.24525 1441.08800 0.21256 1441.08800
Bus1096 0.480 0.00182 0.01350 0.01362 0.00184 0.01350 0.01363
Bus1098 4.160 0.02017 0.17681 0.17796 0.02123 0.17795 0.17921 15.01772 0.16627 15.01864
Bus1099 0.480 0.00191 0.01394 0.01407 0.00192 0.01401 0.01414
Bus1100 0.480 0.00184 0.01349 0.01361 0.00185 0.01350 0.01363
Bus1101 4.160 0.02521 0.23815 0.23948 0.02643 0.24348 0.24491 15.02189 0.21256 15.02339
Bus1102 4.160 0.01903 0.16829 0.16937 0.01961 0.16899 0.17012 15.01772 0.16627 15.01864
Bus1103 0.480 0.00181 0.01326 0.01339 0.00182 0.01327 0.01340
Bus1104 4.160 0.01904 0.16831 0.16938 0.01962 0.16900 0.17014 15.01772 0.16627 15.01864
Bus1105 0.480 0.00182 0.01337 0.01350 0.00183 0.01338 0.01351
Bus1107 4.160 0.02017 0.17681 0.17795 0.02123 0.17794 0.17921 15.01772 0.16627 15.01864
Bus1108 4.160 0.02152 0.17707 0.17837 0.02258 0.17821 0.17963 15.01992 0.16699 15.02085
Bus1109 0.480 0.00189 0.01364 0.01377 0.00191 0.01371 0.01384
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 81
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus1110 4.160 0.02686 0.24051 0.24201 0.02808 0.24584 0.24744 15.02459 0.21881 15.02618
Bus1111 0.480 0.00198 0.01416 0.01429 0.00200 0.01416 0.01430
Bus1112 4.160 0.02823 0.24651 0.24812 0.02956 0.24660 0.24837 1441.09700 0.21947 1441.09700
Bus1114 4.160 0.05505 0.25498 0.26085 0.05649 0.25513 0.26131 1441.13500 0.24228 1441.13500
Bus1115 0.480 0.00182 0.01330 0.01342 0.00183 0.01331 0.01344
Bus1117 4.160 0.05390 0.24950 0.25526 0.05521 0.25488 0.26079 15.06913 0.24228 15.07107
Bus1118 4.160 0.05390 0.24950 0.25526 0.05521 0.25488 0.26079 15.06913 0.24228 15.07107
Bus1119 0.480 0.00184 0.01346 0.01358 0.00186 0.01348 0.01360
Bus1121 0.480 0.00450 0.01898 0.01951 0.00452 0.01903 0.01956
Bus1122 0.480 0.00725 0.02016 0.02142 0.00727 0.02023 0.02149
Bus1123 0.480 0.00738 0.02073 0.02201 0.00740 0.02073 0.02201
Bus1124 4.160 0.02906 0.29046 0.29191 0.03005 0.29188 0.29342 15.02298 0.26204 15.02526
Bus1125 13.800 0.07176 0.42126 0.42733 0.08366 0.43344 0.44144 15.15188 1.59614 15.23572
Bus1127 13.800 0.06700 0.34924 0.35561 0.07334 0.35680 0.36426 15.61979 1.10332 15.65871
Bus1128 13.800 0.05989 0.34187 0.34707 0.06628 0.34941 0.35564 15.60697 1.08250 15.64447
Bus1129 4.160 0.02850 0.28537 0.28679 0.02905 0.28600 0.28747 15.02338 0.26664 15.02575
Bus1130 2.400 0.05684 0.10310 0.11773 0.05720 0.10447 0.11910
Bus1131 2.400 0.00762 0.08407 0.08441 0.00800 0.08544 0.08581
Bus1132 13.800 0.05994 0.47268 0.47647 0.07394 0.52658 0.53174 7.11880 20.67484 21.86610
Bus1133 13.800 0.06378 0.52580 0.52966 0.07883 0.59673 0.60191 7.12079 20.67648 21.86830
Bus1134 2.400 0.00889 0.09381 0.09423 0.00929 0.09556 0.09601
Bus1135 2.400 0.05835 0.11279 0.12699 0.05872 0.11453 0.12871
Bus1136 4.160 0.03343 0.29243 0.29434 0.03397 0.29306 0.29503 15.03148 0.28538 15.03419
Bus1139 4.160 0.03336 0.29231 0.29421 0.03391 0.29294 0.29490 15.03148 0.28538 15.03419
Bus1141 4.160 0.06091 0.30646 0.31246 0.06190 0.30789 0.31405 15.07561 0.30425 15.07868
Bus1142 13.800 0.05982 0.47257 0.47634 0.07384 0.52648 0.53163 7.11839 20.67423 21.86539
Bus1143 4.160 0.03400 0.29754 0.29948 0.03500 0.29897 0.30101 15.03108 0.28078 15.03370
Bus1144 4.160 0.03400 0.29756 0.29949 0.03500 0.29900 0.30104 15.03108 0.28078 15.03370
Bus1145 4.160 0.05913 0.31440 0.31991 0.05967 0.31503 0.32063 15.07408 0.34329 15.07799
Bus1146 13.800 0.06369 0.52565 0.52949 0.07877 0.59659 0.60177 7.11839 20.67423 21.86539
Bus1147 0.480 0.00199 0.01464 0.01478 0.00199 0.01465 0.01479
Bus1148 0.480 0.00198 0.01468 0.01481 0.00199 0.01477 0.01490
Bus1149 0.480 0.00076 0.01473 0.01475 0.00077 0.01475 0.01477
Bus1150 0.480 0.00082 0.01414 0.01416 0.00082 0.01415 0.01417
Bus1153 2.400 0.06933 0.10546 0.12620 0.06967 0.10682 0.12753
Bus1157 13.800 0.04158 0.38567 0.38791 0.05344 0.39783 0.40140 15.10439 1.50671 15.17936
Bus1158 4.160 0.01749 0.20662 0.20736 0.01834 0.20755 0.20836 15.01649 0.20007 15.01783
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 82
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus1159 0.480 0.00167 0.01303 0.01313 0.00168 0.01304 0.01315
Bus1160 4.160 0.01953 0.21260 0.21350 0.02038 0.21353 0.21450 15.02009 0.21635 15.02164
Bus1170 4.160 0.05320 0.24009 0.24591 0.05403 0.24102 0.24700 15.07757 0.29057 15.08037
Bus1171 4.160 0.05320 0.24009 0.24591 0.05403 0.24102 0.24700 15.07757 0.29057 15.08037
Bus1172 13.800 0.03393 0.30722 0.30909 0.04056 0.31470 0.31731 15.23466 0.81901 15.25666
Bus1173 4.160 0.01740 0.20345 0.20420 0.01788 0.20409 0.20488 15.01649 0.20007 15.01783
Bus1174 4.160 0.05316 0.23698 0.24287 0.05364 0.23762 0.24360 15.07757 0.29057 15.08037
Bus1177 4.160 0.01894 0.20766 0.20852 0.01942 0.20830 0.20921 15.01925 0.21176 15.02074
Bus1178 0.480 0.00160 0.01249 0.01259 0.00160 0.01250 0.01260
Bus1179 0.480 0.00435 0.01925 0.01973 0.00437 0.01929 0.01978
Bus1180 4.160 0.03036 0.22744 0.22945 0.03120 0.22838 0.23050 15.03935 0.25832 15.04156
Bus1181 4.160 0.06183 0.25408 0.26150 0.06265 0.25501 0.26260 15.09593 0.33305 15.09960
Bus1182 4.160 0.06336 0.23551 0.24389 0.06383 0.23617 0.24464 15.09835 0.29000 15.10113
Bus1183 4.160 0.03009 0.22396 0.22597 0.03058 0.22462 0.22669 15.03935 0.25832 15.04156
Bus1184 0.480 0.00398 0.01813 0.01856 0.00399 0.01820 0.01864
Bus1185 13.800 0.10182 0.39621 0.40909 0.10847 0.40370 0.41802 16.10207 1.43289 16.16570
Bus1186 4.160 0.01865 0.16933 0.17036 0.01926 0.17001 0.17110 15.00939 0.13350 15.00999
Bus1187 13.800 0.11503 0.47418 0.48793 0.12696 0.48643 0.50272 15.22139 1.73177 15.31958
Bus1188 4.160 0.01967 0.17329 0.17440 0.02072 0.17466 0.17589 15.00939 0.13350 15.00999
Bus1194 4.160 0.02271 0.18100 0.18242 0.02332 0.18168 0.18317 15.01585 0.16319 15.01674
Bus1195 0.480 0.00187 0.01350 0.01363 0.00188 0.01351 0.01364
Bus1196 0.480 0.00170 0.01229 0.01241 0.00172 0.01244 0.01255
Bus1197 13.800 0.04550 0.50621 0.50825 0.06124 0.57815 0.58139 7.04019 20.58831 21.75874
Bus1198 13.800 0.04181 0.45362 0.45554 0.05643 0.50849 0.51161 7.04019 20.58831 21.75874
Bus1199 13.800 0.13498 0.49820 0.51616 0.14689 0.51037 0.53108 15.25183 1.79034 15.35655
Bus1200 4.160 0.02165 0.17877 0.18008 0.02273 0.17988 0.18131 15.00939 0.13350 15.00999
Bus1201 4.160 0.02359 0.18455 0.18605 0.02464 0.18596 0.18759 15.01585 0.16319 15.01674
Bus1202 0.480 0.00473 0.01975 0.02030 0.00474 0.01976 0.02032
Bus1203 4.160 0.02755 0.18561 0.18764 0.02863 0.18671 0.18890 15.01879 0.15088 15.01954
Bus1206 13.800 0.11946 0.41934 0.43602 0.12611 0.42683 0.44507 16.32850 1.59313 16.40603
Bus1207 4.160 0.02024 0.17161 0.17280 0.02084 0.17229 0.17354 15.00939 0.13350 15.00999
Bus1211 4.160 0.02614 0.17844 0.18035 0.02675 0.17912 0.18111 15.01879 0.15088 15.01954
Bus1212 0.480 0.00471 0.01965 0.02021 0.00472 0.01966 0.02022
Bus1217 0.480 0.00580 0.02129 0.02206 0.00581 0.02130 0.02208
Bus1218 4.160 0.10769 0.30125 0.31991 0.10877 0.30235 0.32132 15.14619 0.44576 15.15275
Bus1221 4.160 0.10628 0.29408 0.31269 0.10688 0.29476 0.31354 15.14619 0.44576 15.15275
Bus1222 0.480 0.00578 0.02119 0.02196 0.00579 0.02120 0.02197
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 83
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus1225 13.800 0.03245 0.31048 0.31217 0.03907 0.31800 0.32039 15.29963 0.84506 15.32296
Bus1226 13.800 0.03999 0.38949 0.39154 0.05185 0.40166 0.40499 15.10184 1.51725 15.17786
Bus1227 2.400 0.09825 0.14940 0.17881 0.09862 0.15056 0.17998
Bus1228 4.160 0.07568 0.23991 0.25157 0.07666 0.24460 0.25633 9.09870 0.25476 9.10226
Bus1229 0.480 0.00315 0.01546 0.01577 0.00316 0.01552 0.01584
Bus1230 2.400 0.04147 0.08232 0.09217 0.04188 0.08393 0.09380
Bus1231 0.480 0.00289 0.01205 0.01240 0.00291 0.01212 0.01246
Bus1232 2.400 0.04156 0.08143 0.09142 0.04192 0.08367 0.09358
Bus1233 0.480 0.00289 0.01200 0.01235 0.00291 0.01209 0.01244
Bus1234 0.480 0.00304 0.01481 0.01512 0.00305 0.01493 0.01524
Bus1235 4.160 0.07194 0.21019 0.22216 0.07279 0.21853 0.23034 9.09847 0.25154 9.10194
Bus1236 4.160 0.08602 0.21811 0.23446 0.08685 0.22644 0.24252 9.12180 0.27198 9.12586
Bus1237 4.160 0.08960 0.24777 0.26347 0.09057 0.25244 0.26820 9.12203 0.27521 9.12618
Bus1238 0.480 0.00492 0.02015 0.02074 0.00493 0.02019 0.02079
Bus1239 0.480 0.00500 0.02053 0.02113 0.00501 0.02054 0.02115
Bus1240 4.160 0.03788 0.20821 0.21162 0.03848 0.20889 0.21240 15.03998 0.23240 15.04178
Bus1241 4.160 0.03878 0.21190 0.21541 0.03983 0.21329 0.21697 15.03998 0.23240 15.04178
Bus1242 13.800 0.07104 0.50979 0.51471 0.08641 0.50637 0.51369 7.12088 20.73569 21.92432
Bus1243 4.160 0.01178 0.12766 0.12820 0.01283 0.12795 0.12859 18.00640 0.09913 18.00668
Bus1244 4.160 0.03071 0.14963 0.15275 0.03185 0.15614 0.15935 18.06089 0.12078 18.06130
Bus1245 0.480 0.00280 0.01558 0.01583 0.00281 0.01570 0.01595
Bus1246 0.480 0.00281 0.01561 0.01586 0.00282 0.01564 0.01589
Bus1247 4.160 0.02920 0.13615 0.13925 0.03025 0.13646 0.13977 18.06089 0.12078 18.06130
Bus1249 4.160 0.05059 0.14663 0.15511 0.05162 0.14695 0.15575 18.13540 0.14801 18.13601
Bus1250 4.160 0.05108 0.14675 0.15539 0.05212 0.14707 0.15603 18.13540 0.14801 18.13601
Bus1254 4.160 0.01320 0.14103 0.14165 0.01433 0.14753 0.14823 18.00640 0.09913 18.00668
Bus1255 13.800 0.07672 0.55970 0.56494 0.09166 0.63053 0.63715 7.12088 20.73569 21.92432
Bus1256 4.160 0.02438 0.14753 0.14953 0.02551 0.15403 0.15613 18.02434 0.11593 18.02471
Bus1257 4.160 0.02285 0.13404 0.13597 0.02390 0.13434 0.13645 18.02434 0.11593 18.02471
Bus1258 0.220 0.00387 0.01421 0.01473 0.00387 0.01424 0.01476 0.00201 0.00947 0.00968
Bus1259 0.220 0.00387 0.01422 0.01474 0.00387 0.01423 0.01474 0.00201 0.00947 0.00968
Bus1260 4.160 0.03195 0.14711 0.15054 0.03311 0.15363 0.15716 18.06540 0.11462 18.06577
Bus1261 0.480 0.00264 0.01481 0.01504 0.00266 0.01503 0.01526
Bus1262 4.160 0.02886 0.13601 0.13904 0.02994 0.13634 0.13959 18.06089 0.12078 18.06130
Bus1263 0.480 0.00242 0.01391 0.01412 0.00244 0.01406 0.01427
Bus1264 4.160 0.02889 0.13599 0.13903 0.02998 0.13634 0.13960 18.06089 0.12078 18.06130
Bus1265 0.480 0.00250 0.01388 0.01410 0.00251 0.01410 0.01432
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 84
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus1266 4.160 0.03058 0.14955 0.15264 0.03173 0.15607 0.15927 18.06089 0.12078 18.06130
Bus1267 0.480 0.00274 0.01496 0.01521 0.00273 0.01517 0.01541
Bus1268 4.160 0.03139 0.15041 0.15365 0.03253 0.15693 0.16027 18.06216 0.12298 18.06258
Bus1269 0.480 0.00278 0.01526 0.01551 0.00277 0.01544 0.01569
Bus1270 0.200 0.00583 0.01843 0.01933 0.00583 0.01844 0.01934 0.00404 0.01395 0.01452
Bus1271 0.200 0.00584 0.01851 0.01941 0.00584 0.01855 0.01945 0.00404 0.01395 0.01452
Bus1272 4.160 0.02973 0.13686 0.14006 0.03079 0.13718 0.14059 18.06216 0.12298 18.06258
Bus1273 0.480 0.00260 0.01473 0.01496 0.00261 0.01477 0.01500
Bus1274 4.160 0.03275 0.14796 0.15154 0.03392 0.15448 0.15816 18.06667 0.11682 18.06705
Bus1275 0.480 0.00269 0.01509 0.01533 0.00272 0.01534 0.01558
Bus1276 4.160 0.02977 0.13688 0.14008 0.03085 0.13721 0.14063 18.06216 0.12298 18.06258
Bus1277 0.480 0.00265 0.01487 0.01511 0.00267 0.01502 0.01526
Bus1278 4.160 0.02976 0.13686 0.14006 0.03082 0.13718 0.14060 18.06216 0.12298 18.06258
Bus1279 0.480 0.00261 0.01445 0.01468 0.00262 0.01450 0.01473
Bus1280 4.160 0.03133 0.15039 0.15362 0.03247 0.15691 0.16024 18.06216 0.12298 18.06258
Bus1281 0.480 0.00265 0.01480 0.01504 0.00265 0.01496 0.01520
Bus1287 4.160 0.05203 0.14700 0.15593 0.05307 0.14730 0.15657 18.13540 0.14801 18.13601
Bus1296 4.160 0.03065 0.13436 0.13781 0.03169 0.13467 0.13835 18.06667 0.11682 18.06705
Bus1302 4.160 0.08170 0.19436 0.21083 0.08281 0.19476 0.21163 18.14942 0.27481 18.15150
Bus1303 0.480 0.00598 0.02665 0.02731 0.00603 0.02690 0.02757
Bus1304 4.160 0.08090 0.20599 0.22131 0.08183 0.21232 0.22755 18.14942 0.27481 18.15150
Bus1305 0.480 0.00623 0.02751 0.02821 0.00625 0.02759 0.02828
Bus1307 4.160 0.10034 0.21662 0.23873 0.10116 0.22291 0.24479 18.22393 0.30204 18.22643
Bus1308 4.160 0.13210 0.23123 0.26630 0.13259 0.23230 0.26748 15.20270 0.39297 15.20778
Bus1309 4.160 0.09713 0.23948 0.25843 0.09804 0.24061 0.25982 15.14581 0.38816 15.15079
Bus1310 4.160 0.00820 0.11747 0.11775 0.00869 0.11854 0.11886 15.00559 0.10368 15.00595
Bus1311 4.160 0.00894 0.12703 0.12734 0.00984 0.12816 0.12854 15.00551 0.10230 15.00586
BusESCUELA BJ 0.220 0.01200 0.01841 0.02197 0.01200 0.01841 0.02198 0.01962 0.01927 0.02750
BusTAR 0.220 0.00660 0.02049 0.02153 0.00662 0.02042 0.02146 0.00453 0.01562 0.01626
CASAVISITAS-CCM-480 0.220 0.01192 0.02098 0.02413 0.01192 0.02099 0.02413 0.01172 0.01981 0.02302
CASETAPALMAS-CCM-480 0.220 0.01175 0.02071 0.02381 0.01175 0.02071 0.02381 0.01156 0.01953 0.02269
CASETAPALMAS-CCM-480A 0.220 0.01405 0.02458 0.02831 0.01405 0.02459 0.02832 0.01385 0.02341 0.02720
CCM-1/3 SE-1 0.480 0.00142 0.00985 0.00996 0.00144 0.00991 0.01002
CCM-01 480 V 0.480 0.01904 0.06498 0.06771 0.01905 0.06521 0.06793 0.03104 0.06914 0.07579
CCM-1 B-1 0.480 0.00674 0.02574 0.02661 0.00675 0.02580 0.02667
CCM-1 SE-1 0.480 0.00142 0.00985 0.00996 0.00144 0.00991 0.01002
CCM-01 SE-1 2.400 0.01134 0.09616 0.09682 0.01172 0.09790 0.09860
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 85
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
CCM-1 SE-20 2.400 0.00809 0.07815 0.07857 0.00844 0.08007 0.08051
CCM-2 A/A SE-1 0.480 0.00129 0.00888 0.00898 0.00130 0.00896 0.00906
CCM-2 B-1 0.480 0.00679 0.02583 0.02671 0.00680 0.02588 0.02676
CCM-2 SE-1 0.480 0.00129 0.00888 0.00898 0.00130 0.00896 0.00906
CCM-02 SE-1 2.400 0.00981 0.08645 0.08701 0.01018 0.08782 0.08841
CCM-2 SE-20 2.400 0.00817 0.07850 0.07893 0.00858 0.07974 0.08020
CCM-3 SE-1 0.480 0.00129 0.00888 0.00898 0.00130 0.00896 0.00906
CCM-4 SE-1 0.480 0.00142 0.00985 0.00996 0.00144 0.00991 0.01002
CCM-5 SE-1 0.480 0.00142 0.00985 0.00996 0.00144 0.00991 0.01002
CCM-6 SE-1 0.480 0.00129 0.00888 0.00898 0.00130 0.00896 0.00906
CCM-190-1A 0.480 0.00764 0.02989 0.03085 0.00765 0.02996 0.03092
CCM-190-1B 0.480 0.00723 0.02880 0.02970 0.00730 0.02910 0.03000
CCM-480 SE-MFA 0.480 0.00402 0.02011 0.02050 0.00403 0.02015 0.02055
CCM-4160 4.160 0.27693 1.39400 1.42124 0.28281 1.48789 1.51453 18.08764 0.36512 18.09133
CCM-5207A-2 0.480 0.00354 0.01971 0.02002 0.00367 0.02113 0.02145 0.00351 0.01044 0.01101
CCM-5207B-1 0.460 0.00410 0.02034 0.02075 0.00440 0.02220 0.02263 0.01550 0.02595 0.03023
CCM-5207C-1 0.460 0.00795 0.02610 0.02728 0.00807 0.02762 0.02878 0.01850 0.02983 0.03510
CCM-5207C-2 0.460 0.00748 0.02653 0.02757 0.00767 0.02805 0.02908 0.01850 0.02981 0.03508
CCM-5207D-1 0.460 0.00634 0.02473 0.02553 0.00659 0.02634 0.02715 0.01550 0.02593 0.03021
CCM-5207E-1 0.460 0.00890 0.02766 0.02906 0.00902 0.02918 0.03055 0.02150 0.03370 0.03997
CCM-5420-2 0.480 0.00319 0.01823 0.01850 0.00331 0.01975 0.02002 0.00352 0.01046 0.01103
CCM-5420-3 0.460 0.02107 0.03861 0.04399 0.02125 0.04006 0.04535 0.06924 0.06338 0.09387
CCM-BT-480 BA 0.480 0.00615 0.02702 0.02771 0.00617 0.02706 0.02776
CCM-BT-480 BB 0.480 0.00590 0.02674 0.02738 0.00592 0.02678 0.02743
CCM-BT-CB-1A 0.480 0.00755 0.02208 0.02333 0.00757 0.02207 0.02333
CCM-BT-CB-1B 0.480 0.00756 0.02213 0.02338 0.00757 0.02220 0.02345
CCM-CB-2 0.480 0.00129 0.00888 0.00898 0.00130 0.00896 0.00906
CCM-CB3-1 0.480 0.08105 0.05046 0.09547 0.08106 0.05046 0.09548
CCM-CB3-2 0.220 0.02475 0.02542 0.03548 0.02475 0.02541 0.03548 0.00775 0.01488 0.01678
CCM-DAF 0.480 0.00132 0.00887 0.00897 0.00133 0.00888 0.00898
CCM-E BUS B 0.460 0.01811 0.03720 0.04137 0.01829 0.03865 0.04276 0.05932 0.05983 0.08425
CCM-LV-BT-5414 0.220 0.00377 0.01016 0.01083 0.00377 0.01016 0.01084 0.00723 0.00973 0.01212
CCM-MZ-BA-1 0.480 0.00132 0.00887 0.00897 0.00133 0.00888 0.00898
CCM-MZ-BB-1 0.480 0.00135 0.00912 0.00922 0.00137 0.00914 0.00924
CCM-MZ-BC-1 0.480 0.00132 0.00887 0.00897 0.00133 0.00888 0.00898
CCM-S.AUX-TG-4 BA 0.480 0.00142 0.00985 0.00996 0.00144 0.00991 0.01002
CCM-S.AUX-TG-4 BB 0.480 0.00129 0.00888 0.00898 0.00130 0.00896 0.00906
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 86
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
CCM-SA-01/SA-02 BA 0.480 0.00132 0.00887 0.00897 0.00133 0.00888 0.00898
CCM-SA3 0.480 0.00135 0.00912 0.00922 0.00137 0.00914 0.00924
CCM-SA-04 BB 0.480 0.00135 0.00912 0.00922 0.00137 0.00914 0.00924
CCM-TD-102 BA 0.480 0.00243 0.01677 0.01694 0.00244 0.01682 0.01699
CCM-TD-102 BB 0.480 0.00222 0.01562 0.01577 0.00223 0.01567 0.01583
CCM-TDB-1A 0.480 0.00348 0.01294 0.01341 0.00350 0.01301 0.01347
CCM-TDB-1B 0.480 0.00349 0.01289 0.01336 0.00350 0.01298 0.01345
CCM-URV 0.480 0.00986 0.02319 0.02520 0.00995 0.02284 0.02491 0.01019 0.02346 0.02557
CF-07 0.480 0.00246 0.01166 0.01192 0.00246 0.01167 0.01193 0.00273 0.00830 0.00873
DER SE-MFA 2.400 0.03317 0.10518 0.11029 0.03360 0.10636 0.11155
DERIVADOR 1 SE-7 13.800 0.23957 0.69281 0.73306 0.25285 0.74570 0.78740 9.00383 22.42365 24.16379
DERIVADOR SE-9 13.800 0.24452 1.59331 1.61196 0.24749 1.60463 1.62360 31.74741 2.69299 31.86142
DERIVADOR SE-17 13.800 0.17310 1.54032 1.55001 0.17604 1.55160 1.56155 30.48855 1.71726 30.53687
DERIVADOR SE-MZ METRO 2.400 0.05513 0.13161 0.14269 0.05554 0.13278 0.14393
ENLACE SE-8 13.800 0.36608 0.81081 0.88962 0.38048 0.88124 0.95987 7.58994 21.37805 22.68542
ENTRADA 19MV-4160 BA 4.160 0.03207 0.19528 0.19789 0.03290 0.20130 0.20397 18.06241 0.17220 18.06323
ENTRADA 19MV-4160 BB 4.160 0.04197 0.29976 0.30269 0.04224 0.30079 0.30374 18.06241 0.17220 18.06323
EXT. MP-TD-1 13.800 0.04996 0.51570 0.51811 0.06502 0.58660 0.59020 7.07645 20.61862 21.79917
EXT. MP-TD-2 13.800 0.04617 0.46293 0.46523 0.06020 0.51681 0.52031 7.07645 20.61862 21.79917
EXT. MP-TD-3 13.800 0.04552 0.46759 0.46980 0.06096 0.46394 0.46793 7.07645 20.61862 21.79917
FUERZA SECC73 13.800 0.17513 1.58054 1.59021 0.17810 1.59187 1.60180 31.58158 2.39427 31.67220
28-HV-28G22
FUERZA SECC78 13.800 0.10191 0.55014 0.55950 0.11292 0.62279 0.63295 8.02699 21.38075 22.83789
28-HV-28G21
HR 13.800 1.89105 6.04150 6.33055 1.89105 6.04150 6.33055 7.22284 21.55579 22.73371
HR-CCM 0.480 0.00299 0.01429 0.01459 0.00299 0.01429 0.01459 0.00237 0.01150 0.01175
HR-HV-CFE 13.800 1.87065 6.03433 6.31763 1.87065 6.03433 6.31763 7.19042 21.53757 22.70614
HR-HV-CFE/RFM 13.800 1.87065 6.03433 6.31763 1.87065 6.03433 6.31763 7.19042 21.53757 22.70614
HR-HV-REF 13.800 1.88447 1.73947 2.56456 1.89851 1.80982 2.62294 12.67280 26.20220 29.10593
HR-I-LINE C 0.480 0.00299 0.01429 0.01459 0.00299 0.01429 0.01459 0.00237 0.01150 0.01175
HR-TBT BA 0.220 0.00103 0.00461 0.00473 0.00103 0.00461 0.00473 0.00051 0.00294 0.00298
HV-20 BA 13.800 0.09343 0.50224 0.51086 0.10533 0.57655 0.58610 6.93226 20.65188 21.78431
HV-20 BB 13.800 0.09680 0.54403 0.55258 0.11069 0.59769 0.60786 7.07792 20.78367 21.95581
I-21.1 13.800 0.11056 0.47814 0.49076 0.12200 0.55225 0.56557 6.96433 20.59520 21.74084
I-21.2 13.800 0.12194 0.57653 0.58929 0.13709 0.64756 0.66191 7.10999 20.72699 21.91256
INT ENLACE 15-LV-BA02-480 0.480 0.00474 0.02197 0.02248 0.00475 0.02206 0.02257
LP-01 0.220 0.01733 0.03450 0.03860 0.01733 0.03450 0.03861 0.01669 0.03205 0.03614
LV-22A61 BA 0.220 0.00173 0.00563 0.00589 0.00173 0.00563 0.00589 0.00250 0.00520 0.00577
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 87
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
LV-22A61 BB 0.220 0.00173 0.00563 0.00589 0.00173 0.00563 0.00589 0.00250 0.00520 0.00577
LV-22B51 BA 0.480 0.00216 0.01272 0.01290 0.00218 0.01280 0.01298
LV-22B51 BB 0.480 0.00221 0.01313 0.01331 0.00222 0.01314 0.01332
LV-22B53 BA 0.480 0.00236 0.01392 0.01412 0.00237 0.01393 0.01413
LV-22B53 BB 0.480 0.00238 0.01411 0.01431 0.00239 0.01412 0.01432
LV-22B54 BA 0.480 0.00489 0.01861 0.01924 0.00492 0.01873 0.01937
LV-22B54 BB 0.480 0.00508 0.01920 0.01986 0.00513 0.01944 0.02010
LV-22B61 BA 0.220 0.00365 0.01090 0.01149 0.00366 0.01090 0.01150
LV-22B61 BB 0.220 0.00365 0.01081 0.01141 0.00365 0.01082 0.01141
LV-41L51 0.480 0.02202 0.04232 0.04771 0.02204 0.04240 0.04779
LV-MCC-01A 0.480 0.00301 0.01164 0.01203 0.00301 0.01165 0.01204
LV-MCC-01B 0.480 0.00302 0.01044 0.01087 0.00303 0.01052 0.01095
LV-MCC-02 0.220 0.00564 0.01947 0.02027 0.00565 0.01948 0.02029 0.00501 0.01728 0.01799
LVM-0001B BB 0.480 0.00426 0.01635 0.01689 0.00427 0.01648 0.01703 0.13880 0.23457 0.27256
LVMCC-0001A BA 0.480 0.00376 0.01487 0.01534 0.00380 0.01514 0.01561 0.14601 0.24676 0.28672
LVMCC-002 BA 0.220 0.05246 0.06175 0.08103 0.05247 0.06181 0.08107
LVMCC-002 BB 0.220 0.05231 0.06179 0.08096 0.05231 0.06182 0.08099
MC LV-CCM-1-480 0.480 0.01589 0.02518 0.02977 0.01590 0.02525 0.02984
MC LV-CCM-2-220 0.220 0.01758 0.02936 0.03422 0.01758 0.02937 0.03423 0.01424 0.02407 0.02796
MC-CCM-03 0.480 0.04248 0.04306 0.06049 0.04198 0.04277 0.05993
MC-LV-CCM-02 0.480 0.00900 0.02647 0.02795 0.00898 0.02624 0.02774
MC-MV-CCM-2400 2.400 0.03699 0.09634 0.10320 0.03731 0.09622 0.10320
MC2 TD 220V BA 0.220 0.01179 0.02391 0.02666 0.01180 0.02394 0.02668 0.01910 0.02758 0.03355
MC2 TD 220V BB 0.220 0.01179 0.02397 0.02671 0.01179 0.02399 0.02673 0.01910 0.02758 0.03355
MC2-LV-CCM1A 0.480 0.00331 0.01525 0.01561 0.00334 0.01536 0.01572
MC2-LV-CCM1B 0.480 0.00331 0.01525 0.01561 0.00334 0.01536 0.01572
MC2-LV-CCM2A 0.480 0.00290 0.01373 0.01403 0.00293 0.01401 0.01432
MC2-LV-CCM2B 0.480 0.00338 0.01562 0.01598 0.00342 0.01583 0.01620
MC2-MV-BA01 4.160 0.03469 0.19751 0.20053 0.03570 0.20603 0.20910 9.04037 0.22358 9.04314
MC2-MV-BB01 4.160 0.03956 0.22838 0.23178 0.04062 0.23312 0.23663 9.04060 0.22680 9.04344
MFA-LV-CCM1 0.480 0.00402 0.02011 0.02050 0.00403 0.02015 0.02055
MFA-LV-CCM2 0.480 0.00402 0.02011 0.02050 0.00403 0.02015 0.02055
MFA-LV-CCM3 0.480 0.00402 0.02011 0.02050 0.00403 0.02015 0.02055
MFA-LV-CCM4 0.480 0.00402 0.02011 0.02050 0.00403 0.02015 0.02055
MFA-MV-1 2.400 0.03317 0.10518 0.11029 0.03360 0.10636 0.11155
MFA-MV-1A 2.400 0.03361 0.10565 0.11086 0.03404 0.10683 0.11212
MFA-MV-2 2.400 0.03404 0.10611 0.11144 0.03447 0.10729 0.11269
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 88
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
MFA-MV-2A 2.400 0.03448 0.10657 0.11201 0.03491 0.10775 0.11327
MFA-MV-3 2.400 0.03491 0.10704 0.11259 0.03534 0.10822 0.11384
MJA-CCM-480-1 0.480 0.00674 0.02349 0.02444 0.00675 0.02342 0.02437
MJA-CCM-480-2 0.480 0.01691 0.02961 0.03410 0.01692 0.02954 0.03404
MJA-LV-1 0.480 0.01119 0.04142 0.04290 0.01121 0.04142 0.04291
MJA-MV-1 2.400 0.04065 0.12062 0.12729 0.04111 0.12051 0.12733
MJA-MV-2 2.400 0.04274 0.12177 0.12906 0.04321 0.12166 0.12911
MJN-131-IT-4 2.400 0.01514 0.13361 0.13447 0.01523 0.13395 0.13482
MJN-133-IT-1 0.480 0.00646 0.02631 0.02709 0.00646 0.02632 0.02710
MJN-CCM-PN 0.480 0.00646 0.02631 0.02709 0.00646 0.02632 0.02710
MLA 0.480 0.00142 0.00985 0.00996 0.00144 0.00991 0.01002
MP LV-CCM-1-480 0.480 0.00495 0.01516 0.01594 0.00496 0.01522 0.01601
MP LV-CCM-2-480 0.480 0.00495 0.01510 0.01589 0.00496 0.01519 0.01598
MP-TD-1 13.800 0.04513 0.50544 0.50745 0.06028 0.57646 0.57960 6.98788 20.54639 21.70218
MP-TD-2 13.800 0.04116 0.45222 0.45409 0.05523 0.50618 0.50918 6.98788 20.54639 21.70218
MP-TD-3 13.800 0.04067 0.45722 0.45903 0.05613 0.45351 0.45697 6.98788 20.54639 21.70218
MP-TD-4 13.800 0.03741 0.40977 0.41148 0.04946 0.48435 0.48687 6.84222 20.41460 21.53072
MSW-MCC-01A 0.480 0.00759 0.02263 0.02387 0.00761 0.02262 0.02386
MSW-MCC-01B 0.480 0.00735 0.02251 0.02368 0.00736 0.02254 0.02371
MSW-MCC-02 0.220 0.08851 0.09892 0.13274 0.08840 0.09886 0.13261 0.07912 0.08941 0.11939
MV-1A-1 2.400 0.03151 0.10073 0.10554 0.03198 0.10193 0.10683
MV-1A-2 2.400 0.02518 0.09372 0.09705 0.02565 0.09493 0.09833
MV-MZ- BB 2.4 kV 13.800 0.10359 0.42673 0.43912 0.11549 0.43890 0.45384 15.60541 1.97856 15.73034
MV-MZ-BA 2.4 kV 13.800 0.09686 0.34800 0.36122 0.10350 0.35549 0.37025 15.57973 1.21003 15.62665
MV-SWGR-01A 13.800 0.15531 1.51195 1.51990 0.15827 1.52326 1.53146 30.48021 1.64790 30.52472
MV-SWGR-01B 13.800 0.08954 0.49566 0.50368 0.10154 0.57013 0.57910 6.92562 20.63438 21.76561
MV-SWGR/MCC-01A 4.160 0.02144 0.24415 0.24509 0.02170 0.24516 0.24612 18.00713 0.11035 18.00747
MV-SWGR/MCC-01B 4.160 0.01553 0.15375 0.15453 0.01662 0.16039 0.16125 18.00713 0.11035 18.00747
MZ-LV-CCM1 0.480 0.01082 0.04539 0.04667 0.01084 0.04544 0.04671
MZ-LV-CCM2 0.480 0.01111 0.04574 0.04707 0.01113 0.04578 0.04711
MZ-MV-01 2.400 0.05513 0.13161 0.14269 0.05554 0.13278 0.14393
OLEODUCTO-CCM-2400V 2.400 0.08752 0.41305 0.42222 0.08755 0.41323 0.42240 0.06798 0.20452 0.21552
PARTE SUP SUPTCIA FUERZA 2.400 0.04381 0.11151 0.11981 0.04422 0.11304 0.12138
PATOS-HV-CCM13.8A 13.800 0.57597 0.89092 1.06089 0.59133 0.88738 1.06636 10.59140 24.16416 26.38341
PATOS-HV-CCM13.8B 13.800 0.57548 0.93711 1.09971 0.58952 1.00747 1.16727 10.59139 24.16416 26.38341
PATOS-MV-CCM2.4A 2.400 0.02934 0.14512 0.14806 0.02977 0.14503 0.14805
PATOS-MV-CCM2.4B1 2.400 0.02842 0.14398 0.14676 0.02878 0.14591 0.14872
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 89
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
PRIM 19-MV-TR3 4.160 0.10030 0.31902 0.33442 0.10057 0.32005 0.33548 18.28978 0.24366 18.29140
PRIM 19-MV-TR4 4.160 0.66659 2.08417 2.18817 0.66728 2.08914 2.19312
PRIM CERO-CORTES-TRA2 0.480 0.00541 0.01178 0.01296 0.00542 0.01185 0.01303 0.00404 0.00840 0.00932
PRIM CERO-CORTES-TRA3 0.480 0.00403 0.01109 0.01180 0.00404 0.01115 0.01185 0.00404 0.00840 0.00932
PRIMARIO 19-TR1 13.800 0.24568 0.79230 0.82951 0.25573 0.86352 0.90059 8.27251 22.02771 23.52986
PRIMARIO SE-19 TR-2 13.800 0.32955 1.83523 1.86458 0.33253 1.84656 1.87626 31.82710 3.04122 31.97207
S. AUX. TD-480 V 0.480 0.00861 0.02681 0.02816 0.00861 0.02683 0.02817
S.E-16-MV-TDA-2 13.800 0.37891 0.82278 0.90584 0.39329 0.89321 0.97596 7.61064 21.40866 22.72120
S.E 25 TAB 13.8 BA 13.800 0.11901 0.54601 0.55882 0.13038 0.61973 0.63330 6.98592 20.79327 21.93544
S.E 25 TAB 13.8 BB 13.800 0.13232 0.60562 0.61990 0.14595 0.65908 0.67504 7.22015 20.99729 22.20398
S.E 25 TDA-1 BB 4.160 0.02390 0.21141 0.21275 0.02492 0.21609 0.21753 9.01403 0.18057 9.01583
S.E 25 TDA-1 BB2 4.160 0.02031 0.18173 0.18286 0.02121 0.19010 0.19128 9.01380 0.17734 9.01554
S.E-CH-LV-CCM-480 0.480 0.05527 0.10053 0.11472 0.05529 0.10062 0.11481 0.06091 0.09770 0.11513
S.E-U100 CCM-A-1 4160 BA 4.160 0.08693 0.21198 0.22911 0.08794 0.22042 0.23731 9.12449 0.25706 9.12811
S.E-U100 CCM-A-2 4160 BB 4.160 0.09242 0.24228 0.25931 0.09351 0.24704 0.26415 9.12472 0.26029 9.12843
S.E.CH-MV-CCMBA 4.160 0.24933 0.48488 0.54523 0.25061 0.49128 0.55150 0.13357 0.41094 0.43210
SE GIS 115 kV BA 115.000 0.52397 4.03109 4.06500 0.52454 4.03149 4.06547 1.27809 7.21866 7.33093
SE GIS 115 kV BB 115.000 0.50166 3.89217 3.92437 0.50643 3.90360 3.93631 0.87394 5.84906 5.91399
SE-1 TD-1 2.400 0.00995 0.09464 0.09516 0.01033 0.09638 0.09693
SE-1 TD-2 2.400 0.00843 0.08494 0.08536 0.00880 0.08631 0.08676
SE-2-MV- BA 2.400 0.00736 0.08156 0.08189 0.00780 0.08314 0.08350
SE-2-MV- BB 2.400 0.00750 0.08221 0.08255 0.00796 0.08210 0.08248
SE-10 INT DE 2400V 2.400 0.03183 0.18495 0.18767 0.03192 0.18528 0.18801
SE 13 2400 2.400 0.00825 0.09103 0.09141 0.00871 0.09093 0.09134
SE-14-CCM-MV-TD-2 4.160 0.19841 0.98096 1.00083 0.19972 0.98736 1.00736 0.15807 0.90194 0.91569
SE-19 BUS TR-ALUMBRADO 0.220 0.18148 0.21385 0.28048 0.18148 0.21386 0.28049 0.17820 0.20136 0.26889
SE-19A 28-MV-28G31 BA 4.160 0.03189 0.25389 0.25589 0.03261 0.25890 0.26094 18.05028 0.26567 18.05223
SE-19A 28-MV-28G31 BB 4.160 0.19457 0.95839 0.97794 0.19453 0.96089 0.98038
SE-19A BUS TAB 480 0.480 0.00281 0.00979 0.01019 0.00281 0.00984 0.01023 0.00139 0.00470 0.00490
SE-21 CCM 480V BA 0.480 0.00641 0.02130 0.02225 0.00642 0.02137 0.02231
SE-21 CCM 480V BB 0.480 0.00692 0.02236 0.02341 0.00693 0.02244 0.02348
SE-171-HV-4221A 13.800 0.04699 0.46481 0.46718 0.06101 0.51870 0.52228 7.09034 20.62995 21.81440
SE-171-HV-4221B 13.800 0.04968 0.42425 0.42715 0.06173 0.49882 0.50262 6.96038 20.52526 21.67333
SE-ANIDES TABLERO 2.400 0.02318 0.13981 0.14172 0.02327 0.14015 0.14207
SE-CAF BUS ALUM. 220 0.220 0.00175 0.00743 0.00763 0.00175 0.00744 0.00765 0.00138 0.00649 0.00664
SE-CAF CCM-LV-480-2 0.480 0.00265 0.01086 0.01118 0.00267 0.01090 0.01123
SE-CAF CCM-LV-BUS 440 0.480 0.00265 0.01086 0.01118 0.00267 0.01090 0.01123
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 90
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
SE-CAF CCM-LV-VENT DB-25 0.480 0.00265 0.01086 0.01118 0.00267 0.01090 0.01123
SE-CAF COMP. Y VENT. 0.480 0.00265 0.01086 0.01118 0.00267 0.01090 0.01123
SE-CAF LV-DB-50 0.220 0.00175 0.00743 0.00763 0.00175 0.00744 0.00765 0.00138 0.00649 0.00664
SE-CAF UBICADO DIB.-220-1 0.220 0.05402 0.06269 0.08275 0.05402 0.06270 0.08276 0.05346 0.06041 0.08067
SE-CAF UBICADO DIB.-220-2 0.220 0.05402 0.06269 0.08275 0.05402 0.06270 0.08276 0.05346 0.06041 0.08067
SE-CAF UBICADO DIBUJO 0.480 0.00265 0.01086 0.01118 0.00267 0.01090 0.01123
SE-ED PER LV-CCM-480-1 0.480 0.02059 0.03925 0.04432 0.02061 0.03931 0.04438 0.03890 0.04278 0.05782
SE-ED PER LV-CCM-480-2 0.480 0.02059 0.03925 0.04432 0.02061 0.03931 0.04438 0.03890 0.04278 0.05782
SE-ED PER UBICADO DIB 0.220 0.01461 0.02500 0.02896 0.01461 0.02502 0.02897 0.00712 0.01203 0.01398
SE-LAB. CCM-BA_220V 0.220 0.00620 0.01614 0.01729 0.00621 0.01615 0.01731 0.01232 0.01952 0.02308
SE-LAB. CCM-BA-480 0.480 0.01360 0.03998 0.04223 0.01361 0.03998 0.04223
SE-LAB. CCM-BB-220V 0.220 0.00620 0.01614 0.01729 0.00621 0.01615 0.01731 0.01232 0.01952 0.02308
SE-LAB. CCM-BB-480 0.480 0.01360 0.03998 0.04223 0.01361 0.03998 0.04223
SE-U100 LP-1 220 0.220 0.07346 0.06854 0.10047 0.07346 0.06860 0.10051
SE-U100 LPE-2 0.220 0.07331 0.06859 0.10039 0.07331 0.06862 0.10041
SEC CERO-CORTES-TRA1 0.480 0.00146 0.00892 0.00904 0.00147 0.00898 0.00910 0.00180 0.00542 0.00571
SEC-2 CERO-CORTES-TRA1 0.480 0.00541 0.01178 0.01296 0.00542 0.01185 0.01303 0.00404 0.00840 0.00932
SEC-3 CERO-CORTES-TRA1 0.480 0.00403 0.01109 0.01180 0.00404 0.01115 0.01185 0.00404 0.00840 0.00932
SECCIONAD-124 13.800 0.05722 0.51967 0.52281 0.07230 0.59062 0.59503 7.10804 20.65892 21.84755
SECCIONAD-0244 13.800 0.05333 0.46657 0.46961 0.06736 0.52048 0.52482 7.10804 20.65893 21.84755
SECCIONAD-0246 13.800 0.05359 0.46680 0.46987 0.06761 0.52071 0.52509 7.10845 20.65954 21.84826
SECCIONAD-0248 13.800 0.05746 0.51996 0.52312 0.07254 0.59090 0.59534 7.11044 20.66117 21.85046
SECUNDARIO 19-TR1 4.160 0.02934 0.18953 0.19179 0.03019 0.19557 0.19789 18.00891 0.12660 18.00935
SECUNDARIO 19-TR2 4.160 0.03884 0.29337 0.29593 0.03911 0.29440 0.29698 18.00891 0.12660 18.00935
SGM-5176 BA 4.160 0.23788 1.36190 1.38251 0.24375 1.45579 1.47606 18.02555 0.28358 18.02778
SGM-5176 BB 4.160 0.23788 1.36190 1.38251 0.24375 1.45579 1.47606 18.02555 0.28358 18.02778
T.C LV-CCM-220 0.220 0.04349 0.02438 0.04986 0.04350 0.02440 0.04987 0.00775 0.01488 0.01678
T.C LV-CCM-480 0.480 0.17015 0.04523 0.17606 0.17017 0.04531 0.17610
TA-A TD-102 0.220 0.02187 0.03962 0.04526 0.02187 0.03963 0.04527 0.02136 0.03610 0.04195
TAB SE-7 1/2 0.220 0.02170 0.02062 0.02993 0.02170 0.02064 0.02995 0.05991 0.03783 0.07085
TAB-E-EDIFICIO 0.220 0.00490 0.01062 0.01169 0.00490 0.01064 0.01171 0.00700 0.01323 0.01496
TAB. EMERG. SITE 0.220 0.00490 0.01062 0.01169 0.00490 0.01064 0.01171 0.00700 0.01323 0.01496
TAB.LAB B1 2.400 0.05917 0.12415 0.13753 0.05961 0.12572 0.13914
TAB.LAB B2 2.400 0.05912 0.12461 0.13792 0.05958 0.12450 0.13802
TABLERO 04-CB-01 13.800 0.06950 0.50723 0.51197 0.08487 0.50380 0.51090 7.11818 20.72858 21.91672
TABLERO 04-CB-02 13.800 0.07510 0.55703 0.56207 0.09004 0.62786 0.63428 7.11818 20.72858 21.91672
TAR-CCM-1 0.480 0.00986 0.02319 0.02520 0.00995 0.02284 0.02491 0.01019 0.02346 0.02557
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 91
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
TAR-CCM-2 0.480 0.00969 0.02310 0.02505 0.00968 0.02261 0.02459 0.01019 0.02346 0.02557
TAR-CCM-220V 0.220 0.00431 0.01270 0.01341 0.00433 0.01262 0.01334 0.00234 0.00806 0.00839
TBS-1 34.500 0.11187 1.47304 1.47728 0.13123 1.54856 1.55411 12.16570 70.37663 71.42039
TBT-01 0.480 0.00108 0.00777 0.00784 0.00109 0.00782 0.00790 0.00115 0.00428 0.00444
TBT-01 CC 0.480 0.00246 0.01166 0.01192 0.00246 0.01167 0.01193 0.00273 0.00830 0.00873
TCC-TAB-DIS-INT 0.480 0.01066 0.03039 0.03221 0.01067 0.03048 0.03230
TD-1 0.220 0.01446 0.02746 0.03103 0.01446 0.02747 0.03104 0.01304 0.02203 0.02560
TD-1 BA SE-1 0.480 0.00142 0.00985 0.00996 0.00144 0.00991 0.01002
TD-1 BB SE-1 0.480 0.00129 0.00888 0.00898 0.00130 0.00896 0.00906
TD-2 0.220 0.01461 0.02771 0.03133 0.01462 0.02773 0.03135 0.01320 0.02231 0.02592
TD-5 13.800 0.10244 1.42432 1.42800 0.10541 1.43565 1.43952 30.37075 1.40688 30.40332
TD-6 13.800 0.10397 1.42760 1.43138 0.10695 1.43893 1.44290 30.39680 1.42812 30.43033
TD-34.5 kV-SP 34.500 0.11307 1.47601 1.48034 0.13034 1.54993 1.55540 12.22292 70.39412 71.44741
TD-BT-220 BA SE-7A 0.220 0.00738 0.01741 0.01891 0.00738 0.01742 0.01892 0.00614 0.01179 0.01329
TD-BT-220 BB SE-7A 0.220 0.00738 0.01741 0.01891 0.00738 0.01742 0.01892 0.00614 0.01179 0.01329
TD-BT-CB-1A 0.220 0.02076 0.03704 0.04246 0.02076 0.03703 0.04246 0.01917 0.03240 0.03764
TD-BT-CB-1B 0.220 0.02076 0.03705 0.04247 0.02076 0.03706 0.04248 0.01917 0.03240 0.03764
TD-MT-CB-1A 2.400 0.03832 0.10299 0.10989 0.03868 0.10291 0.10994
TD-MT-CB-1B 2.400 0.03843 0.10434 0.11119 0.03881 0.10600 0.11288
TD-MT-CB-CCM 2.400 0.03008 0.10205 0.10639 0.03042 0.10194 0.10638
TD-SP BA 0.480 0.01099 0.03075 0.03265 0.01099 0.03076 0.03267
TD-SP BB 0.480 0.01047 0.02913 0.03095 0.01048 0.02912 0.03095
TDA-1 BUS A 2.400 0.02436 0.14154 0.14363 0.02480 0.14367 0.14580
TDA-1 BUS B 2.400 0.02239 0.13353 0.13539 0.02278 0.13545 0.13735
TDA-1 SE 17 2.400 0.01508 0.14680 0.14757 0.01516 0.14710 0.14788
TDA-21 BA 2.400 0.00729 0.06865 0.06903 0.00756 0.07045 0.07086
TDA-21 BB 2.400 0.00729 0.06865 0.06903 0.00756 0.07045 0.07086
TDA-190-01A 4.160 0.06417 0.19813 0.20826 0.06511 0.20446 0.21458 18.09619 0.25536 18.09799
TDA-190-01B 4.160 0.06510 0.18652 0.19756 0.06619 0.18691 0.19828 18.09619 0.25536 18.09799
TDB-190-1A 0.220 0.00566 0.02020 0.02098 0.00567 0.02021 0.02099 0.00404 0.01395 0.01452
TDB-190-1B 0.220 0.00557 0.01998 0.02074 0.00559 0.02004 0.02081 0.00404 0.01395 0.01452
TDB-SP-SE-7 0.480 0.03738 0.07416 0.08305 0.03740 0.07421 0.08310
TE-MT-CB-1 2.400 0.04636 0.10714 0.11674 0.04666 0.10702 0.11675
TEM-CCM-1-480 0.480 0.00821 0.02008 0.02169 0.00822 0.02014 0.02175
TEM-CCM-2-480 0.480 0.00821 0.02002 0.02164 0.00822 0.02011 0.02173
TEM-CCM-3-220 0.220 0.00444 0.01696 0.01753 0.00444 0.01698 0.01755 0.00271 0.01275 0.01304
TG-01 BA 0.220 0.00280 0.01385 0.01413 0.00281 0.01387 0.01415 0.00251 0.01178 0.01205
Project: REFINERA FRANCISCO I. MADERO ETAP Page: 92
12.6.0H
Location: CD. MADERO, TAMP. Date: 11-05-2016
Contract: DCPA-SO-RMAD-SP-GMAD-E-16-15 SN:
Engineer: ING. ISRAEL SALAZAR CASTRO Revision: Base
Study Case: SC
Filename: BD_REF_FRANCISCO_I_MADERO Config.: Normal

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
TG-01 BB 0.220 0.00255 0.01260 0.01285 0.00256 0.01261 0.01287 0.00228 0.01073 0.01097
TGD-1 SE BUNKER 0.480 0.00674 0.02574 0.02661 0.00675 0.02580 0.02667
TGD-2 SE BUNKER 0.480 0.00679 0.02583 0.02671 0.00680 0.02588 0.02676
TM-4.16-01 4.160 0.07482 0.32034 0.32896 0.07572 0.32399 0.33272 15.10807 0.41555 15.11379
U30-HV-1121A 13.800 0.02797 0.30210 0.30339 0.03452 0.30957 0.31149 15.06859 0.72879 15.08620
U30-HV-1121B 13.800 0.03444 0.38047 0.38203 0.04619 0.39264 0.39535 15.09427 1.49731 15.16835
URA LV-CCM-220 0.220 0.00796 0.01733 0.01907 0.00796 0.01735 0.01909 0.01342 0.02011 0.02418
URA-COMB INT 2.400 0.13561 0.19748 0.23956 0.13605 0.19961 0.24156
VINE SE-14 13.800 0.37240 0.81676 0.89765 0.38678 0.88718 0.96783 7.60029 21.39336 22.70331
XXI-MV-CCM1A 2.400 0.02457 0.07441 0.07837 0.02499 0.07602 0.08002
XXI-MV-CCM1B 2.400 0.02466 0.07352 0.07755 0.02503 0.07576 0.07979

Вам также может понравиться