Академический Документы
Профессиональный Документы
Культура Документы
Product Brochure
Content
Edition 02 | 2017
Publisher
PERI GmbH
Formwork Scaffolding Engineering
Rudolf-Diesel-Strasse 19
89264 Weissenhorn
Germany
Phone +49 (0)7309.950-0
Fax +49 (0)7309.951-0
info @peri.com
www.peri.com
Project examples Components
22 Reference projects 26 SKYDECK system components
with SKYDECK
Important information
All current safety regulations and guidelines must detailed illustrations shown have been partially
be observed in those countries where our prod- reduced to certain aspects. The safety installations
ucts are used. which have possibly not been shown in these
detailed descriptions must nevertheless still be
The photos shown in this brochure feature con- available. The systems or items shown might not
struction sites in progress. For this reason, safety be available in every country.
and anchor details in particular cannot always be
considered as conclusive or final. These are sub- Safety instructions and load specifications are to
ject to the risk assessment carried out by the be strictly observed at all times. Separate structur-
contractor. al calculations are required for any deviations from
the standard design data.
In addition, computer graphics are used which are
to be understood as system representations. For The information contained herein is subject to
ensuring a better understanding, these and the technical changes in the interests of progress.
Errors and typographical mistakes reserved.
1
In the focus
2
In the focus
The drophead
accommodates the main beam and is
covered by the cover strip. The drop-
head can be lowered by 6 cm and
allows early striking to take place.
3
4
System advantages
SKYDECK panelized slab formwork SKYDECK has been designed for With SKYDECK, infill areas are reduced
allows fast as well as safe forming standard use in constructing slabs to an absolute minimum. Furthermore,
operations with a systematic assem- with thicknesses up to 43 cm. With the system makes a convincing case
bly sequence. The low weight of the the small panel span (75 cm) and, if with an extensive range of safety and
panels, compact dimensions and required, a middle support under the logistical accessories.
practical design of the system com- main beam, slabs up to 109 cm thick
ponents facilitate non-tiring and can be formed. SKYDECK's range of A further advantage is the easy hori-
ergonomic working operations. applications extends from residential zontal transportation of formwork ma-
construction through to industrial terials as the small prop requirements
construction projects. ensure more freedom of movement
under the slab formwork.
The systematic assembly sequence
and lightweight system components
made of aluminium accelerate working
operations. In addition, the possibility
of early striking with the drophead
system reduces on-site material
requirements.
5
System advantages
Effortless working
Very light and easy-to-handle components
6
Through the low individual
weights and practical dimensions,
easy and simple handling by just
one person is possible. The grip
openings make it easier to carry
the panels.
System advantages
Fast forming
Simple, systematic assembly sequence with
minimum slab prop requirements
out
No need to determine main and
With the stripping cart, shuttering and striking of With the PERI elevating platform, shuttering and
slabs up to 6.65 m high can safely be carried out. striking operations can also take place easily and
The frame simultaneously serves as ladder access. safely for larger ceiling heights from below.
8
System advantages
Cross-section through the main beam shows: View of the main beam: the main beam is
the teeth on the main beam secure the position of mounted rigidly on the drophead or prop head
the panels. and cannot tilt.
9
System advantages
Easy and simple early striking: the formwork is lowered by 6 cm with just
one blow of the hammer. After lowering the dropheads, the central panel
is removed first followed by the neighbouring panels.
6 cm
View of the main beam after shuttering has taken View of the main beam with lowered drophead:
place: the panels and cover strips form the under- the cover strips and dropheads remain in position
side of the concrete. while panels and beams are struck.
10
System advantages
After early striking is finished, only the props with dropheads and cover
strips remain in place. SKYDECK panels and beams are available for use
in the next cycle.
0.41
The formwork assembly at the position of the The formwork assembly at the position of the
drophead in the standard field. inset prop head on the wall junction.
11
System advantages
Easy cleaning
Powder-coated elements, components made of plastic,
and undercut panel edges
During concreting operations, the SKYDECK main Panels and main beams have self-draining edges.
beam lies protected under the SKYDECK panels. This guarantees only a minimum of soiling on the
side areas of the panels.
12
System advantages
13
System advantages
The GS-tested SKYDECK Platform Only one day after concreting the slab, the
SKYDECK Platform serves as safety scaffold for
ensures safe working conditions on working on structural columns and parapets this
unsecured building edges. After a saves on materials, workload and construction
simple positioning procedure, it is time.
immediately fixed against tipping or SKYDECK Platform
moving.
Anchor Chain
and Turnbuckle
M12
No safety scaffold
required
14
System advantages
Alternatively, the leading edge on a Side protection at cycle joints in the ground
plan
casting segment can be secured
with guardrails and guardrail posts.
15
System overview
SKYDECK at a glance
Standard applications, execution details and logistics
accessories
16
System overview
17
Standard applications
Standard propheads
18
Standard applications
19
Standard applications
Shuttering of columns
For shuttering of columns under construction, If the edge beams are used longitudinally as well
SKYDECK Edge Beam SRT 150 or SRT 75 is as transversely, they must be installed upside
used. down.
20
Standard applications
14 panels with 150 cm x 75 cm dimensions can Stackable pallets are available for the SKYDECK Suitably-sized pallets are also available for PERI
be stacked in the SKYDECK pallets. The pallet guardrail units these provide space for 10 guard- slab props, e.g. 25 MULTIPROP props can be
lifting truck is used for moving operations. rails. stored in a single pallet.
21
Project examples
SKYDECK in use
Reference projects with the panelized slab formwork
The MainTor Porta connects the banking district and the old town in close proxim-
ity to the Main, with offices and roof terraces offering impressive views. The con-
fined space of the inner city location brought with it special logistical challenges
in the actual construction while, in addition, hospital capacity was extremely limit-
ed. In order to ensure fast upward construction, it was possible to regulate the
building process by means of suitable PERI climbing technology with the CB 240
Climbing System and the TRIO panel formwork. Subsequently, the SKYDECK
panelized slab formwork guaranteed fast shuttering times for the realization of
the storey slabs.
22
Project examples
23
Project examples
SKYDECK in use
Reference projects with the panelized slab formwork
Saving time with MAXIMO and SKYDECK High level of safety at the slab edges Elliptical slab area with standard components
Residental and office building at the De Rotterdam, Rotterdam, Warsaw Spire, Warsaw,
Nordbahnhof, Vienna, Austria Netherlands Poland
On the site of the former Vienna Nord- The 150 m high multi-storey ensemble The 220 m high, waist-like office tower
bahnhof, two eight-storey residential consists of three complex-designed of- with an elliptical ground plan is flanked
buildings with a total of 91 residential fice, hotel and residential towers by a 55 m high building on each side.
units were realized. Increased architec- standing side by side and connected to The PERI formwork solution took into
tural concrete requirements were to be each other. At the halfway point, the account both the challenges of the
met for the walls and undersides of the Rotterdam-based architect, Rem Kool- complex building form as well as mak-
balconies; in addition, the 10-month haas, provided the structure with a ing it possible to comply with the
construction schedule for the structural horizontal offset to the west and north. strictly defined construction phase.
work was extremely tight. As a result, the storeys cantilever in
part almost 9 m at a height of 86 m. SKYDECK Panelized Slab Formwork
Through the use of MAXIMO Panel was used for constructing the floor
Formwork and SKYDECK Panelized With SKYDECK, the floor slabs could slabs of the office tower which could
Slab Formwork, the walls and slabs be formed without the need of a crane; be easily adapted to suit the elliptical
could be formed much faster which striking manually in particular support- shape using standard components. In
meant, in conjunction with the well ed fast working operations. The con- addition, through the drophead and
thought-out cycle planning, on-site ma- struction team only required eight days possibility of early striking, on-site re-
terial requirements remained manage for one complete standard floor. For quirements of panels and main beams
able. When forming the floor slabs with the floors in the base section, a high were clearly reduced.
SKYDECK, the recurring assembly se- degree of safety was ensured using
quence and easy handling in particular cantilevered main beams and
accelerated shuttering and striking pro- SKYDECK platforms, also at the slab
cedures. edges. For the large supporting heights
reaching over several storeys, the con-
struction crew combined SKYDECK
with the MULTIPROP shoring system.
24
Project examples
200,000 m floor slabs brought into shape SKYDECK and MAXIMO set a fast pace Efficient complete solution with competent ser-
vice
The new headquarters of the interna- The name "villanova" embodies the Ital- The ADAC Europe's largest automo-
tionally operating oil and chemical com- ian approach to life, a message con- bile association moved to new head-
pany, Sasol, has a total of 17 storeys veyed by the new residential complex quarters in Munich. The impressive
which provides 200,000 m of usable at the Alanovaplatz which is situated building complex consists of a five-sto-
floor space. An extraordinary glass fa- close to the town centre. Four modern rey, undulating curved base construc-
cade encloses the futuristic-looking residential blocks, each with 5 floors, tion along with a large courtyard.
building. accommodate a total of around 100 Above the base is an office tower with
apartments. Using the MAXIMO 18 floors featuring rounded corners.
The around 200,000 m slab area could Panelized Formwork System and TRIO Panel Formwork was used for
be concreted in fast cycle sequences SKYDECK Slab Formwork, the shell the up to 14 m high walls.
with the SKYDECK Panelized Slab construction was completed in only
Formwork. Furthermore, both time and 12 months. The floor slabs of the base construction
costs could be saved through the sys- were formed with modular and custom-
tematic assembly sequence and light- MAXIMO Panel Formwork was used ised tables as well as the MULTIFLEX
weight elements also when dealing for realizing most of the walls. The sin- Girder Slab Formwork. For the tower,
with the challenging building geometry. gle-sided MX Tie Technology along with SKYDECK Panelized Slab Formwork
In addition, SKYDECK platforms en- the reduced number of anchor points was selected with protection provid-
sured safe working conditions at the and simultaneous elimination of spacer ed by the RCS Climbing Protection
slab edges. Even the infill areas on the tubes and cones saved valuable con- Panel which securely and reliably en-
partly inclined props were closed with struction time from the beginning on- closed the topmost three floors under
system components. In the area of the wards. Consistent with the rapid pro- construction. MULTIPROP Aluminium
building's acute-angled corners, pro- gress through the use of MAXIMO, all Slab Props served as temporary sup-
ject-specific slab tables were used to storey slabs were systematically and port. Due to the high load-bearing ca-
great effect. efficiently formed with the help of pacity of the MULTIPROP, fewer props
SKYDECK. In particular, the logical and were required. This, in connection with
clearly specified assembly sequence the low weight, led to enormous
as well as the simple handling due to time-savings.
the lightweight components reduced
shuttering times.
25
SKYDECK Panel Slab Formwork
Item no. Weight kg
Panels SDP L B
061000 15.500 Panel SDP 150 x 75 1500 750
061011 11.700 Panel SDP 150 x 50 1500 500
061020 9.780 Panel SDP 150 x 37.5 1500 375
061010 8.560 Panel SDP 75 x 75 750 750
061013 6.350 Panel SDP 75 x 50 750 500
061030 5.250 Panel SDP 75 x 37.5 750 375
Panel with 9 mm plywood.
B
L
120
21
99
061160 25.700 Main Beam SLT 375
For cantilevers.
3750
240
1042 1042
12
82 266
2250
240
82 266
26
SKYDECK Panel Slab Formwork
Item no. Weight kg
061110 9.690 Main Beam SLT 150
For filler areas.
1500
190
190 1120 190
12
80
78
53
22
1500 / 750
1488 / 738
49
98
27
SKYDECK Panel Slab Formwork
Item no. Weight kg
061210 6.180 Drophead SFK
With self-locking coupling. Supports main beam as
well as cover strip and formlining. Lowering height
6 cm. For 21 mm plywood formlining.
40 250
258
390
549
60
061200 3.860 Prophead SSK
With self-locking coupling. Supports main beams,
panels, edge girders and filler timber.
50
260
250
161
161
305
250
28
SKYDECK Panel Slab Formwork
Item no. Weight kg
Filler Timbers SPH
061049 3.350 Filler Timber SPH 150
061036 5.020 Filler Timber SPH 225
For compensations with 21 mm plywood
formlining.
1500 / 2250
49
98
Triangular Frames SDR
061021 8.660 Triangular Frame SDR 150 x 75
061022 5.350 Triangular Frame SDR 75 x 75
For compensations on inclined walls. For compen-
sations with 21 mm plywood formlining.
1102
202 100
29
SKYDECK Panel Slab Formwork
Item no. Weight kg
061023 2.140 End Support SSL
To be used as compensation to the filler area and
to be fixed to the drophead SFK.
102
160
165 86
121
50 33
116 80
330 86
70
2325 - 3750
30
SKYDECK Panel Slab Formwork
Item no. Weight kg
061310 0.996 Tension Sleeve SAO Technical Data
For bracing cantilevered main beams. Permissible tension force 3.0 kN.
62
125
143 70
80
3855
156
061060 108.000 Platform SDB 150 Technical Data
Work and safety scaffold. Scaffold width 1.30 m. Permissible load 150 kg/m2.
With continuous 39 mm thick decking and foldable
handrail frame.
1006
1220
1288
1490 1433
2240
31
SKYDECK Panel Slab Formwork
Item no. Weight kg
061062 185.000 Platform SDB 300 Technical Data
Work and safety scaffold. Scaffold width 1.30 m. Permissible load 150 kg/m2.
With continuous 39 mm thick decking and foldable
handrail frame.
2990
5
300
368
245
1500
1640
300
Accessories
061260 6.150 Guardrail Post SGP
1768
35 65
32
SKYDECK Panel Slab Formwork
Item no. Weight kg
065073 1.370 Anchor Chain 3.0 kN, l = 2.5 m Technical Data
Permissible tension force 3.0 kN.
15
2500
16
min 220 max 300
13
85
21
10
150 90
SW 24
14
130
23
189
155
Accessories
123973 0.240 Bolt ISO 4014 M16 x 130-8.8, galv.
33
SKYDECK Panel Slab Formwork
Item no. Weight kg
061530 82.400 Pallet SD 150 x 225, galv. Complete with
For stacking and transportation of 48 SKYDECK 5 pc. 100707 Lashing 25 x 5750 mm
Panels 150 x 75. Note
Follow Instructions for Use!
Technical Data
Permissible load-bearing capacity 750 kg.
2110
250
1550
2310
1510 640
1630 760
34
SKYDECK Panel Slab Formwork
Item no. Weight kg
061510 105.000 Pallet Lifting Trolley 1800 mm Note
For moving pallets and crate pallets. Follow Instructions for Use!
Technical Data
Forklift arm length 1800 mm, forklift arm width
550 mm, stroke range 115 mm.
Permissible load-bearing capacity 2.0 t.
3240
2800
1429
3900 1224
35
SKYDECK Panel Slab Formwork
Item no. Weight kg
035500 72.800 Stripping Cart, Alu Note
Mobile working scaffold. Height-adjustable in Follow Instructions for Use!
25-cm-increments. Platform height max. 2.00 m. Technical Data
Permissible load 100 kg/m2.
3035
1800 750
36
SKYDECK Panel Slab Formwork
Item no. Weight kg
102031 363.000 Stripping Cart ASW 465, compl. Complete with
Mobile working scaffold. Height-adjustable in 1 pc. 102025 Folding Base Unit 160/190 ASW
30-cm-increments. Platform height max. 4.65 m. 6 pc. 102035 Vertical Frame 70/90 ASW
6 pc. 102034 Vertical Frame 70/120 ASW
Packed in: 2 pc. 102026 Entry Platform 190 ASW
Ring Pallet USP 104 Item no. 100678, with 1 pc. 102030 Toe-Board Set 70/190 ASW
Lashing Strap 25 x 5750 Item no. 100707 (x 1) 4 pc. 102027 Double Guardrail 190 ASW
and Scaffold Tube Steel L = 1000 Item no. 100706 3 pc. 102028 Diagonal Brace 210 ASW
(x 6). 2 pc. 102029 Horizontal Brace 190 ASW
12 pc. 102807 Ballast 10 kg ASW
2 pc. 103040 Lateral complete ASW
1 pc. 102587 Center part ASW galv.
Note
Follow Instructions for Use!
Technical Data
Permissible load 100 kg/m2.
102807 100678
102587
103040
102034
102035
102025
102026
1150
102027
2360 1100
102028
102030 102029
37
SKYDECK Panel Slab Formwork
Item no. Weight kg
Handrail Units SD
118331 13.500 Handrail Unit SD 75
118323 18.000 Handrail Unit SD 150
For assembling a Guardrail on a casting segment
with SKYDECK. Assembling in a rectangular angle
on top of the Main Beams.
1537
126630 123.000 Pallet Handrail Unit SD 75 Note
For stacking and transportation of 10 SKYDECK Follow Instructions for Use!
Handrail Units SD 75. Technical Data
Permissible load-bearing capacity 150 kg.
1995 1030
1038
750
100
2115 1150
38
SKYDECK Panel Slab Formwork
Item no. Weight kg
126580 134.000 Pallet Handrail Unit SD 150 Note
For stacking and transportation of 10 SKYDECK Follow Instructions for Use!
Handrail Units SD 150. Technical Data
Permissible load-bearing capacity 200 kg.
1500
1788
1995 1030
100
2115 1150
129
266 250
155 355
39
SKYDECK Panel Slab Formwork
Item no. Weight kg
114755 567.000 Lifting Plattform 290 Complete with
For shuttering and striking of SKYDECK Panels. 1 pc. 129377 Panel Holder SD, right
2 pc. 129378 Panel Holder SD, left
Note
Follow Instruction for Use!
Technical Data
Platform height max. 2.90 m; working height max.
4.90 m. Required tension force for the charging
process 110/220 V, 50/60 Hz. Permissible load-
bearing capacity 180 kg.
40
41
The optimal System
for every Project and
every Requirement
PERI GmbH
Formwork Scaffolding Engineering
Rudolf-Diesel-Strasse 19
89264 Weissenhorn
Germany
Tel. +49 (0)7309.950 - 0
Fax +49 (0)7309.951- 0
info@peri.com
www.peri.com