Вы находитесь на странице: 1из 4

PROJECT : 15MLD SEWAGE TREATMENT PLANT

CHECKLIST FOR EPOXY COATING OVER C

Structure / Location

Area in sqm. :
Description
S.No
MATERIALS

1 Approved Brand

2 Check for self life and curing period

Check for surface preparation such as loose


particles,dirt, dust scrubbed off from the dry
3
surface,sweep blasting/wire brushing,
grinding
APPLICATION

4 Surface honey comp packing

5 Primer coat Application-1st Coat

6 Check for Curing period of First Coat(4hrs .)

Check for Second coat application


7
Note:-

SMC KEC
E TREATMENT PLANT -YELLAMALLAPACHETTY
OXY COATING OVER CONCRETE SURFACE

Date :

SMC KEC NMT Remarks

Inertol Poxitar(Sika)

12 Months

0.2kg/sqm

0.2kg/sqm

NMT BWSSB
FIELD Quality plan
Sewage Treatment
Doddabele,Yellamal
QP.No-1 and Intermediat
KEC-WATERLEAU (JV) REV.no-0 pumping Station an
Mains at Sadarm

FIELD QUALITY ASSURANCE DEPARTMENT

MIR FOR INERTOL POXITAR ANTI-CORROSIVE PAINTING


DATE :
AGENCY :SMCIPL
MATERIAL :INERTOL POXITAR ANTI-CORROSIVE/PROTECTIVE FLEXIBLE COAL TAR EPOXY COATING
LOCATION : 15 MLD Yellamallapachetty site

AS PER BWSSB LETTER NO.BWSSB/EE(K)Ele/AEE(K)Ele-1/AE/879/2016-17, DATE : 07/01/2017 & NMT LETTE


NMT/24285/2016,DATE : 28.12.2016
DESCRIPTION OF REQUIRED ACTUAL
S.NO. TYPE ITEM BRAND BRAND

INERTOL PART A:
INERTOL POXITAR LIGHT YELLOW M/s SIKA M/s SIKA
ANTI-CORROSIVE
1 LIQUID & INERTOL (INERTOL (INERTOL
COAL TAR EPOXY PART B: BLACK POXITAR) POXITAR)
COATING LIQUID

For KEC waterleu NMT


Sewage Treatment Plants at
Doddabele,Yellamalappachetty
and Intermediate Sewage
pumping Station and Pumping
Mains at Sadarmangala

AINTING

EXIBLE COAL TAR EPOXY COATING

ATE : 07/01/2017 & NMT LETTER NO.

REMARKS

MFG DATE :

EXP DATE :

BWSSB

Вам также может понравиться