DESCRIPTION
Project: Mulberry Height Safety Audit Report No.: 23
DISTRIBUTION
Original to: Copy to:
Contractor Employer Quantity Surveyor Architects File Other:
DESCRIPTION
PARTICULARS E VG G P ACTION DATE
Safety Officer
Competency of Site Safety Representative
First Aider
Availability of First Aider
At Deep Excavations
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 SAFETY AUDIT REPORT No. 23
07.10.2017
Rev 00/ Page 2|8
DESCRIPTION
PARTICULARS E VG G P ACTION DATE
Personnel Protective Equipment (PPE)
Helmets
Safety Shoes
Goggles
Gloves
Ear Protection
Nose mask
Safety Harness
Housekeeping
to be
General Standard of Site Cleanliness All times
maintained
Regularity of Debris Removal from Site
Excavations
Safety Barriers
At Deep Excavations
De-Nailing area
Power Connection
Fire Extinguishers
DESCRIPTION
PARTICULARS E VG G P ACTION DATE
Identification of Assembly Point in Case of Fire.
Scaffolding
Heavy Equipment
Lifting Equipment
1. No Certified Lifting Supervisor designated in the project in compliance to the requirement of HSE plan.
Consequently, Lifting Permits are not effectuated. (Refer to HSE plan, Item 5. Training, Clause 4.4.6 Operational
Control)
2. Internal Audits are not performed on required frequency in contradictory to the established policy (Clause 4.5.5
Internal Audit)
3. Site Logistics Layout Plan is not updated to incorporate latest changes administered.
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 SAFETY AUDIT REPORT No. 23
07.10.2017
Rev 00/ Page 4|8
4. Evaluation of Performance of relevant parties, individuals, and controls is not exercised. (Clause 4.5.1 Performance
Measurement and Monitoring)
5. Temporary electrical systems inspection regime is not implemented in the project site. DBs, cables, portable electric
appliances/equipment, generators etc. must be inspected on a weekly basis and prior to usage at site as need be.
6. Fall Protection Systems such as edge protection, lifelines, etc. is implemented but not thoroughly compliant to the
requirements.
7. Installation of Passenger Hoist for buildings higher than 5m as per DM BCS Periodical Inspection Report is not complied in
the project.
8. Fire Prevention plan is not fully implemented such as removal of combustible materials, cable management and
inspection, adequate fire points with signage, etc.
9. Required PPEs are not strictly adhered to by the ECCs labor force including their sub-contractors such as suitable hand
protection, goggles, mask, etc.
10. Scaffolding safety is not fully administered in the site as evident on unsafe scaffoldings erected and used without tags.
11. Site fence and adjacent asphalt road is not maintained on regular basis by ECC
12. ECCs housekeeping daily regime is not effective and implemented thoroughly.
13. Adequate illumination to enable safe operations must be provided in all floors and buildings.
14. Minimum of two staircases clear of any obstruction for safe access and egress is not provided for some buildings.
15. Safety net fans not provided as per DM regulation stipulated in Code of Construction Safety Practice.
16. Hot works Permit System not thoroughly and strictly implemented.
*Note: Complete DM Periodical Inspection for Under Construction Buildings report ref: DM-BLD-P4-F8 attached
herewith.
SIGNATURES
Received By: Date :
Incl.:
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 SAFETY AUDIT REPORT No. 23
07.10.2017
Rev 00/ Page 6|8
4608 MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 SAFETY AUDIT REPORT No. 23
07.10.2017
Rev 00/ Page 7|8
T +971 4 294 2042 F +971 4 294 2101 E info@bsbgulf.com W www.bsbgulf.com A P.O.Box 50667, Dubai, United Arab Emirates
4608 MULBERRY HEIGHT PROJECT
BSBG-L04-007_F13 SAFETY AUDIT REPORT No. 23
07.10.2017
Rev 00/ Page 8|8