ITEMIZADO ESTIMATIVO PRESUPUESTO

PROYECTO:
DIRECCION:
MANDANTE :
OFERENTE:
FECHA:

UNIDAD
1 INSTALACION DE FAENAS/ OBRAS PREVIAS

2 ESTRUCTURA
2.1 EXCAVACIONES m3
2.2 EXCAVACIONES POYOS m3
2.3 EMPLANTILLADO m3
2.4 POLIETILENO FUNDACION ROLLO m
2.5 HORMIGON FUNDACION m3
2.6 ENCOFRADO SOBRECIMIENTOS ( 2 usos) m2
2.7 ENFIERRADURAS MARCOS , FE PILARES/VIGAS/CAD/ kgs
2.8 HORMIGON SOBRECIMIENTOS m3
2.9 IMPRIMACION HIDROFUGA CIMIENTOS m2
2.10 MONTAJE ARMADO ESTRUCTURA METALICA kgs
2.11 ANCLAJES/PERNOS FE SOPORTES UN
2.12 RELLENO DE PISOS m3
2.13 CAMA DE RIPIO m2
2.14 POLIETILENO RADIER ROLLO 20 MTS m2
2.15 MALLA ACMA C-92 RADIER 2.60 x 5.00 m2
2.16 HORMIGON RADIER e = 8 CMS m3

COSTO DIRECTO
G.G.( 12 %)
Utilidad ( x %)
COSTO NETO
IVA(19%)
TOTAL FINAL PROYECTO
PUESTO

CANTIDAD P. UNIT P. TOTAL

6.4 $ 14,682 $ 93,422


14.5 $ 14,682 $ 212,372
1.0 $ 40,016 $ 40,295
56.2 $ 991 $ 55,673
62.0 $ 80,022 $ 4,961,357
62.5 $ 7,800 $ 487,469
5,680.0 $ 3,733 $ 21,202,513
4.9 $ 80,022 $ 388,690
16.1 $ 1,500 $ 24,192
5,863.3 $ 963 $ 5,646,359
18.9 $ 44,498 $ 841,015
62.9 $ 5,788 $ 363,949
209.6 $ 1,694 $ 355,165
209.6 $ 991 $ 207,733
209.6 $ 1,800 $ 377,291
16.8 $ 80,022 $ 1,341,847

$ 36,599,341
$ 4,391,921
$ 4,757,914
$ 45,749,177
$ 8,692,344
$ 54,441,520
Albailera 50 m2

Materiales factor Unidad 50.16 Sub total


Ladrillos fisc 0.1 un 577 577
Escalerilla 3.2 ml 161 161
Mortero 1.5 saco 75 75

Hormign 4 m3
Muros 2.2
Pilares 2.1
Polietileno 0 mL
Fundaciones 54
unidad
ml
saco
ITEMIZADO ESTIMATIVO PRESUPUESTO
PROYECTO:
DIRECCION:
MANDANTE :
OFERENTE:
FECHA:

UNIDAD CANTIDAD P. UNIT P. TOTAL


1 INSTALACION DE FAENAS/ OBRAS PREVIAS

2 ESTRUCTURA Avance Monto


2.1 EXCAVACIONES m3 6.4 $ 14,682 $ 93,422 95% $ 88,750
2.2 EXCAVACIONES m3 14.5 $ 14,682 $ 212,372 85% $ 180,516
2.3 EMPLANTILLADO m3 1.0 $ 40,016 $ 40,295 75% $ 30,221
2.4 POLIETILENO FU m 56.2 $ 991 $ 55,673 45% $ 25,053
2.5 HORMIGON FUND m3 62.0 $ 80,022 $ 4,961,357 20% $ 992,271
2.6 ENCOFRADO SOBR m2 62.5 $ 7,800 $ 487,469 23% $ 112,118
2.7 ENFIERRADURAS kgs 5,680.0 $ 3,733 $ 21,202,513 25% $ 5,300,628
2.8 HORMIGON SOB m3 4.9 $ 80,022 $ 388,690 10% $ 38,869
2.9 IMPRIMACION H m2 16.1 $ 1,500 $ 24,192 14% $ 3,387
2.10 MONTAJE ARMAD kgs 5,863.3 $ 963 $ 5,646,359 15% $ 846,954
2.11 ANCLAJES/PERN UN 18.9 $ 44,498 $ 841,015 16% $ 134,562
2.12 RELLENO DE PI m3 62.9 $ 5,788 $ 363,949 25% $ 90,987
2.13 CAMA DE RIPIO m2 209.6 $ 1,694 $ 355,165 28% $ 99,446
2.14 POLIETILENO RA m2 209.6 $ 991 $ 207,733 30% $ 62,320
2.15 MALLA ACMA C-9 m2 209.6 $ 1,800 $ 377,291 15% $ 56,594
2.16 HORMIGON RADIER m3 16.8 $ 80,022 $ 1,341,847 2% $ 26,837

COSTO DIRECTO ### $ 8,089,514


G.G.( 12 %) $ 4,391,921 $ 970,742
Utilidad ( x %) $ 4,757,914 $ 808,951
COSTO NETO $ 45,749,177 $ 9,869,207
IVA(19%) $ 8,692,344 $ 1,875,149
TOTAL FINAL PROYECTO ### $ 11,744,357
Albailera 50

Materiales factor
Ladrillos fis 0.1
Escalerilla 3.2
Mortero 1.5

Hormign 4
Muros 2.2
Pilares 2.1
Polietileno 0
Fundaciones 54

$ 789,537 $ 9,079,671
$ 1,725,137
$ 10,804,808
m2

Unidad 50.16 Sub total


un 577 577 unidad
ml 161 161 ml
saco 75 75 saco

m3

mL
Muros - Cadenas

CUBICACIONES OBRA GRUESA

OBRA : CESFAM

ESTRUCTURA Albaileria
Muros = 1 Cadena = 2 Losas = 3 Pilares = 4 Muros = 5
Elemento T Altura P/Vig. Ancho Largo Cant. Horm. Moldaje Horm. Moldaje Horm. Moldaje Horm. Moldaje Albail. Estucos Fierro
i
Altura Muros Muros Cadena Cadena Losa Losa Pilares Pilares Muros Muros KG
p
o Losa 2.17 17.33 6.45 73.12 0.00 0.00 2.05 32.80 50.16 100.32 0.00

CENTRO CESFAM Plano Elevacin de ejes 2.17 17.33 6.45 73.12 0.00 0.00 2.05 32.80 50.16 100.32 0.00
Eje A 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
Cadena 2 0.30 0.25 10.80 1 0.00 0.00 0.81 9.18 0.00 0.00 0.00 0.00 0.00 0.00 ###
Eje B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
Muro 1 2.40 0.25 0.75 1 0.45 3.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
Muro 1 2.40 0.25 1.77 1 1.06 8.50
Muro 1 2.40 0.25 1.09 1 0.65 5.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
Pilares 4 2.40 0.25 0.25 3 0.00 0.00 0.00 0.00 0.00 0.00 0.45 7.20 0.00 0.00 ###
Cadenas 2 0.30 0.25 10.80 2 0.00 0.00 1.62 18.36 0.00 0.00 0.00 0.00 0.00 0.00
Albailera 5 1.10 0.25 1.20 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.96 7.92
Albailera 5 2.40 0.25 1.05 1 2.52 5.04

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Eje C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
Pilares 4 3.40 0.25 0.25 4 0.00 0.00 0.00 0.00 0.00 0.00 0.85 13.60 0.00 0.00 ###
Cadenas 2 0.30 0.25 10.30 3 0.00 0.00 2.32 26.27
Albailera 5 0.70 0.25 2.37 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.66 3.32
Albailera 5 0.70 0.25 3.78 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.65 5.29
Albailera 5 0.70 0.25 3.21 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.25 4.49
Albailera 5 2.40 0.25 2.37 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.69 11.38
Albailera 5 2.40 0.25 3.78 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.07 18.14
Albailera 5 2.40 0.25 3.21 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.70 15.41
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Eje 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
Pilares 4 2.40 0.25 0.25 3 0.00 0.00 0.00 0.00 0.00 0.00 0.45 7.20 0.00 0.00 ###
Cadenas 2 0.30 0.25 4.43 1 0.00 0.00 0.33 3.77
Cadenas 2 0.30 0.25 6.93 1 0.00 0.00 0.52 5.89
Albailera 5 2.40 0.25 2.18 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.23 10.46
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Eje 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
Pilares 4 2.40 0.25 0.25 2 0.00 0.00 0.00 0.00 0.00 0.00 0.30 4.80 0.00 0.00 ###
Cadenas 2 0.30 0.25 4.43 1 0.00 0.00 0.33 3.77
Cadenas 2 0.30 0.25 6.93 1 0.00 0.00 0.52 5.89
Albailera 5 2.40 0.25 3.93 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.43 18.86
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###

Pgina 8 de 8

Вам также может понравиться