SR NO.

DEFECT SECTION
1 A-4 PIPE FROM FURNANCE HEAVY LEAKAGE AND FLAME COMING OUTSIDE.( SPARK) BMII
2 WIND BOX DUCT LEAKAGES AT RHS/LHS. ALL CORNOR EXP.JOINT BMII
3 BOILER INSULATIONS DAMAGED AT CORNERS, ESPECIALLY AT 23 MTRS UNIT #6 SIDE AND AT OVERFIRED DAMPERS BMII
(ALL CORNERS), CONTINEOUS ASH COMING OUT OF FURNACE AND GETTING ACCUMULATED AT CORNERS.

4 ESP HOPPER D31 FOREIGN MATERIAL. BMII


5 DRUM VENT LINE PUNCTURE BMII
6 DRUM VENT B-56, B-72 JAM / INOPERATIVE. BMII
7 SH DRAIN STATION DRAIN V/V GLAND LEAKAGES 3 NOS. BMII
8 SOOT BLOWER FALNGE JOINT GASKET HEAVY LEAKAGES 29,31,64. BMII
9 SOOT BLOWER FALNGE JOINT GASKET LEAKAGES 23,51,54,55,61,69,85,88,103 BMII
10 ESP FIELD 4D2. 2A1, 1D2, 4B1, 1A1, 1A2 NEED INTERNAL INSPECTION TESTII/BMII/ EMII

12 CRM 1A SHAFT SHIFTED/JAM BMII


13 CBD V/V AT 23 MTRS GLAND LEAKAGE BMII
15 PAH 5A & 5B HOT AIR LEAKAGE FROM MANHOLES & EXPANSION JOINTS BMII
16 OIL GUN AB3 STEAM ISOLATING V/V BONET LEAKAGE BMII
17 ISO V/V TO SH SPRAY V/V SS12 BODY LEAKAGE BMII
18 FO STATION ATOM STEAM TRACING LINE V/V GLAND LEAKAGE BMII
19 BCW PUMP NO.1 COOLING LINE V/V GLAND LEAKAGE BMII
20 ISO V/V TO RH SPRAY V/V R11 BODY LEAKAGE BMII
21 ALL CLINKER GRINDERS NEED INTERNAL INSPECTION BMII
22 SEAL TROUGH HAVING LEAKAGE ABOVE C/G 1B, 2A & 2B BMII
23 C/A TANK NO. 1 & 2 WALKING GRILL BROKEN BMII
24 C/A FLUE GAS HOPPER NO 3 & 4 - RAILING & GRILL BROKEN BMII
25 C/A TANK NO. 1 - TEALEPIECE CHOKEUP. BMII
26 ALL COLD AIR DAMPERS TO BE PROVIDED WITH CHAIN & HANDLE & MAKE THEM FREE BMII
27 ALL B/ASH MANUAL HYJECTOR V/V NEED TO MADE FREE BMII
28 C/M 5E LOP OIL SEAL LEAKAGE. C/M 5A & 5B HAVE MINOR LOP LEAKAGE. BMII
29 C/M 5B J2 ASSY SHAFT SEAL LEAKAGE BMII
30 BOILER FILLING STATION ALL V/V NEED SERVICING BMII
31 SLURRY TRENCH STRAINER NEEDS TO BE REPLACED BMII
32 ID FAN A,B,C,D ACW LINE VALVE INOPERATIVE BMII
33 ID FAN A DUCT LEAKAGE AT LOWER SIDE NEAR INSPECTION DOOR BMII
34 ID FAN D DUCT LEAKAGE AT UPPER SIDE NEAR INSPECTION DOOR BMII
35 ID FAN A LOP II OIL LEAKAGE THROUGH INSPECTION GLASS BMII
36 ID FAN C OIL LEAKAGE THROUGH OIL LEVEL GAUGE BMII
37 ALL ID FAN INSPECTION DOOR ROPE NEEDS TO BE REPLACED BMII
38 SUMP SELECTION VALVE FOR BOTTOM ASH, FLY ASH NOT FREE BMII
39 BOTTOM ASH, FLY ASH SUMP SELECTION VALVE A,B,C SERIES NEEDS SERVICING BMII
40 ASH WATER MAKE UP VALVE PASSING BMII
41 ESP HOPPER C-11,C-21 HOPPER ASH LEAKAGE ANS INPEC. DOOR CHECKING REQ. B/M=II
42 SIDE HEAVY LEAKAGE AND HEATER BELOW LINE STEAM AND OIL LEAKAGE B/M=II
43 LDO/HFO TANK SCALE PATTY PROPER FITTING . SCREW FITTING REQ. B/M=II
44 TANK HEATING MAIN AND TANK HEATING INDIV. V/V PASSING REPL. AND CHECKING REQ. BMII
45 BMII
FD FAN-A/B, PA FAN-A/B ACW LINE PRESSURE AND TEMP. GUAGE ISO. V/V NOT OPEN/CLOSE JAM ALL PUMP ACW
INLET AND OUTLET V/V SERVICING REQ.
46 SUPER HEATER ALL DRAIN V/V JAM SERVICING REQ. AND MAKE FREE B/M=II
47 BMII
PAH-5A/5B,SAH-5A/5B ACW LINE TEMP.AND PRESSURE ISO. JAM AND REPL. REQ. AND AIR HEATER ALL ACW INLET
AND OUTLET AND DRAIN V/V JAM NOT OPEN/CLOSE REPL. REQ
48 GD-6A1/6A2,6B1/6B2,6C1/6C2,6D1/6D2 AND 7A/7B/7C/7D SERVICING REQ. B/M=II
49 NEW FITTING DUCT HOPPER NOT INOPERATIVE I&C=II U=5 HEAD TOLD NO INFORMATION AND NOT DONE PROTOCAL BMII

50 SUPER HEATER SPRAY DRAINS V/V ARE PASSING AND NOT OPEN/CLOSE JAM AND REPL. REQ. BMII
51 C/M-5A TO 5H HOT AIR GATE SEAL PASSING AND DUCT LEAKAGE, C/M 5B - HOT AIR DUCT RUPTURED. B/M=II
52 ALL ID FAN ACW LINE DRAINS V/V AND INLET AND OUTLET V/VS ARE JAM AND THREAD DAMAGED SERVICING AND BMII
REPL. REQ.
53 GH ELEVATION GH-2/3 OIL GUN NO PROPER SPACE TO BE FIT OIL GUN AND RAILLING CUT REQ. BMII
54 ALL DRUM VENT AND STARTUP VENT SERVICING REQ. B/M=II
55 F.O HEATING U=5 MAIN V/V AND INTER CONNECTION V/V AT OHP JAM MAKE FREE B/M=II
56 PAH-5A/5B SAH-5A/5B AIR HEATER FLUSHING LINE ALL V/VS ARE JAM NOT OPEN/CLOSE AND SAH-5A FLUSHING LINE BMII
HEAVY LEAKAGE NEAR AIR HEATER
57 GAS DAMPER GD-4B2 UNDER PERMIT ABOVE ONE YEAR GD-4A1,4A2,4B1 FULL NOT OPEN CLOSE FROM LOCAL AND BMII
LEVER NOT ENGAGE SERVING REQ.
58 BSWBOOSTER PUMP-5A NRV PASSING AND SERVING REQ. B/M=II
59 PRI GAS INLET DAMPER GD1A - INOPERATIVE FROM DESK BMII/TESTII/EMII
60 C/M 5D & 5F HAVE ONLY ONE LUB OIL COOLER BMII
61 BOTTOM RING HEADER INSULATION ESP SIDE - SHEETS HANGING BMII
62 HFO PUMP 5C - STEAM LEAKAGE NEAR SUCTION V/V BMII
63 IMPULSE LINE OF ECONOMISER FEED LINE HEAVY LEAKAGE BMII
64 ID FAN A,B,C,D - DROP BY DROP OIL LEAKAGE FROM PRESSURE GAUGES INCII
65 BCW PUMP 5A/5B/5C ITS ACW COOLER INLET AND OUTLET V/V JAM SERVICING REQ. BMII
66 PAH-5A/5B SAH-5A/5B ITS PRESSURE GUAGE AND TEMP. GUAGES LOP CALIBRATION REQ. I&C=II
67 ACW FD-5A/5B PA FAN-5A/5B PRESSURE AND TEMP. GUAGES FAULTY AND CALIBRATION REQ. I&C=II
68 C/M-5A TO 5H MOTOR TEMP. GUAGES ARE FAULTY AND CALIBRATION REQ. I&C=II
69 ESP PASS -A/B/C/D FIELD AND CRM/ERM PANEL BOX DISPLACED AND GROUND POSITION TEST=II
BRATION AND REPL. REQ. I&C=II
PI
PNI

PI
PI
PI
PI
PI
PI
PI

PI
PI
PNI
PI
PI
PI
PNI
PI
PI
PI
PI
PNI
PNI
PI
PI
PNI
PI
PI
PI
PNI
PNI
PI
PI
PI
PI
PI
PNI
PNI
PI
PI
PNI
PNI
PNI

PNI
PI

PNI
PI

PI
PI
PNI

PNI
PNI
PI
PNI

PNI

PI
PNI
PI
PI
PNI
PNI
PI
PI
PNI
PNI
PNI
PNI
PNI
PNI