BAHAN / MATERIAL FONDASI FONDASI (END BEARING)

Mutu beton, K- 250 Berat volume tanah,


Kuat tekan beton, fc ' = 20.8 MPa ws = 18.4 kN/m3
Mutu baja tulangan, U- 39 Sudut gesek dalam,
Tegangan leleh baja, fy = 390 MPa = 15
Modulus elastis beton, Ec = 21410 MPa Kohesi tanah,
Berat beton bertulang, wc = 25 3
C= 24 kPa
kN/m
DIMENSI PILE CAP
Lebar arah x, Bx = 6 m Tebal, hp = 1.2 m
Lebar arah y, By = 10 m Tebal, ht = 1.8 m
Diameter kolom D= 1.5 m Arah x, Lx = 2.25 m
Lebar, Bb = 7.5 m Arah y, Ly = 1.25 m
DATA SUSUNAN TIANG BOR (BORE PILE)
Jumlah baris tiang bor, ny = 5 buah
Jumlah tiang bor dalam satu baris, nx = 3 buah
Jarak antara tiang bor arah x, X= 2 m
Jarak antara tiang bor arah y, Y= 2 m
DIMENSI TIANG BOR (BORE PILE)
Diameter, D= 0.8 m Panjang, L= 15 m
Jarak pusat tiang bor terluar terhadap sisi luar Pile-cap a= 1.00 m
Kuat tekan beton, fc ' = 20.8
Tegangan ijin beton, fc = 0.3 * fc' *1000 = 6225
Luas tampang tiang bor, A = / 4 * D2 = 0.50265
Panjang tiang bor, L= 15
Berat tiang, W = A * L * wc = 188.5
Daya dukung ijin tiang bor, Pijin = A * fc - W = 2941
Nc = (228 + 4.3*) / (20 - ) = 59
Nq = (40 + 5*) / (20 - ) = 23
N = (6*) / (20 - ) = 18
qult = 1.3 * C * Nc + * Df * Nq + 0.6 * * R * N = 8253
Luas penampang tiang bor, A = / 4 * D2 = 0.50265
Angka aman, SF = 3
Daya dukung ijin tiang bor, P ijin = A * qult / SF = 1383
Nilai SPT hasil pengujian, N= 25
Nilai SPT terkoreksi, N' = 15 + 1/2*( N' - 15) = 20
2
8000
qult = 40 * N' = 800 Ton/m =
Luas penampang tiang bor, A = / 4 * D2 = 0.50265
Angka aman, SF = 3
Daya dukung ijin tiang bor, Pijin = A * qult / SF = 1340
2
qc = nilai konus rata-rata 76 7600
kg/cm qc =
2
qf = nilai hambatan lekat rata-rata 0.12 12
kg/cm qf =
A= luas penampang tiang bor A= 0.50265
K= keliling penampang tiang bor K=*D= 2.51327
L= panjang tiang bor L= 15
Daya dukung ijin tiang bor, Pijin = A * qc / 3 + K * L * qf / 5 = 1364
No Uraian Daya Dukung Aksial Tiang Bor P (kN)
1 Berdasarkan kekuatan bahan 2941
2 Pengujian Lab. Hasil boring (Terzaghi dan Thomlinson) 1383
3 Pengujian SPT (Meyerhoff) 1340
4 Pengujian CPT (Bagement) 1364
1340
5
3
2 m
2
0.8
Jumlah baris tiang bor, ny =
Jumlah tiang bor dlm. satu baris, nx =
Jarak antara tiang bor : X= Y= 2
Jarak antara tiang bor terkecil : Diameter tiang bor,
S=D= m
2 m
Diambil daya dukung aksial ijin tiang bor : Pijin =
Sudut gesek, = 15
Panjang tiang bor,
L = 15 m
Panjang jepitan tiang bor,
Ld = 1/3 * L = 5 m
By = 10 m
ws = 18.4 kN/m
BAG KEDALAMAN H H*ws*Kp BAGIAN
(kN/m2)
(m)
OK La + Ld = 6.8 212.503 O
FJ La + 3/4 * Ld = 5.55 173.44 FN = 1/4*FJ
EI La + 1/2 * Ld = 4.3 134.377 EM = 1/2*EI
DH La + 1/4 * Ld = 3.05 95.314 DL = 3/4*DH
CG La = 1.8 56.251 CG
KODE p1 p2 Panjang bagian F Lengan
(kN/m2) (kN/m2)
Notasi (m) thd.O (m)
(kN)
F1 0 43.36 La = 1.8 390 5.6
F2 43.36 67.189 Ld / 4 = 1.25 691 4.38
F3 67.189 63.543 Ld / 4 = 1.25 817 3.13
F4 63.543 56.251 Ld / 4 = 1.25 749 1.88
F5 56.251 0 Ld / 4 = 1.25 352 0.83
2999 M=
1085
1000 kN

(kN/m2)
0
43.36
67.189
63.543
56.251
M

(kNm)
2185
3023
2553
1404
293
9458
1900.3
5
3
126.689
1.2
106
Kode hi Mhi Fi * yi (kNm) Diagram
F1 F2 F3 F4 F5 Mi
(m) (kNm)
390 691 817 749 352 (kNm)
M1 1.2 2280 2280
M2 2.43 4608 478 4130
M3 3.68 6984 966 864 5154
M4 4.93 9359 1454 1727 1021 5157
M5 6.18 11735 1941 2591 2043 936 4224
10 19003 3434 5234 5168 3800 1345 23
11 20904 3824 5925 5985 4548 1696 -1075
12 22804 4215 6616 6802 5297 2048 -2173
5154
5
3
3
1000
16800
800
20.8
21409.5
2E+10
550
11550
0.00293
109.89
0.10989
110
a X

a Y Y

15
No Xmax = 2 m Ymax =
1 X1 = 2 X12 = 40 Y1 =
2 X2 = 0 X22 = 0 Y2 =
3 X3 = tdk.ada X32 = tdk.ada Y3 =
4 X4 = tdk.ada X42 = tdk.ada Y4 =
5 X5 = tdk.ada X52 = tdk.ada Y5 =
6 Y6 =
7 Y7 =
8 Y8 =
9 Y9 =
10 y10 =
40
4 m
4 Y12 = 96
2 Y22 = 24
0 Y32 = 0
tdk.ada Y42 = tdk.ada
tdk.ada Y52 = tdk.ada
tdk.ada Y62 = tdk.ada
tdk.ada Y72 = tdk.ada
tdk.ada Y82 = tdk.ada
tdk.ada Y92 = tdk.ada
tdk.ada Y102 = tdk.ada
Y2 = 120
2
NO KOMBINASI P Mx P/n Mx*X/X Pmax Pmin
(kN) (kNm) (kN) (kN) (kN) (kN)
BEBAN KERJA
1 KOMBINASI - 1 12059.20 0.00 803.95 0 803.95 803.95
2 KOMBINASI - 2 12059.20 592.20 803.95 29.61 833.56 774.34
3 KOMBINASI - 3 12090.45 3059.40 806.03 152.97 959 653.06
4 KOMBINASI - 4 10220.60 14234.62 681.37 711.73 1393.1 -30.36
NO KOMBINASI P My P/n My*Y/Y Pmax
2
Pmin
(kN) (kNm) (kN) (kN) (kN) (kN)
BEBAN KERJA
1 KOMBINASI - 1 12059.20 0.00 803.95 0 803.95 803.95
2 KOMBINASI - 2 12059.20 3663.24 803.95 122.11 926.05 681.84
3 KOMBINASI - 3 12090.45 5969.08 806.03 198.97 1005 607.06
4 KOMBINASI - 4 10220.60 21258.88 681.37 708.63 1390 -27.26
No KOMBINASI Tx Ty hx hy hmax
(kN) (kN) (kN) (kN) (kN)
BEBAN KERJA
1 KOMBINASI - 1 0 0 0 0 0
2 KOMBINASI - 2 123.37 527.97 8.22 35.2 35.2
3 KOMBINASI - 3 294.68 680.9 19.65 45.39 45.39
4 KOMBINASI - 4 1283.36 1896.83 85.56 126.46 126.46
No KOMBINASI Persen Pmax Kontrol terhadap Pijin Ketera-
Pijin (kN) (kN)
BEBAN KERJA Daya dukung ijin ngan
1 KOMBINASI - 1 100% 803.95 < 100% * Pijin = 1000 AMAN
2 KOMBINASI - 2 125% 833.56 < 125% * Pijin = 1250 AMAN
3 KOMBINASI - 3 140% 959 < 140% * Pijin = 1400 AMAN
4 KOMBINASI - 4 150% 1393.1 < 150% * Pijin = 1500 AMAN
No KOMBINASI Persen Pmax Kontrol terhadap Pijin Ketera-
Pijin (kN) (kN)
BEBAN KERJA Daya dukung ijin ngan
1 KOMBINASI - 1 100% 803.95 < 100% * Pijin = 1000 AMAN
2 KOMBINASI - 2 125% 926.05 < 125% * Pijin = 1250 AMAN
3 KOMBINASI - 3 140% 1005 < 140% * Pijin = 1400 AMAN
4 KOMBINASI - 4 150% 1390 < 150% * Pijin = 1500 AMAN
No KOMBINASI Persen Hmax Kontrol terhadap hijin Ketera-
Pijin (kN) (kN)
BEBAN KERJA Daya dukung ijin ngan
1 KOMBINASI - 1 100% 0 < 100% * hijin = 100 AMAN
2 KOMBINASI - 2 125% 35.2 < 125% * hijin = 125 AMAN
3 KOMBINASI - 3 140% 45.39 < 140% * hijin = 140 AMAN
4 KOMBINASI - 4 150% 126.46 < 150% * hijin = 150 AMAN
1000
110
1.5
1500
164.835
502655
0.144
0.02
15000
800
3267
20.8
390
Gaya aksial ultimit, Pu = 1500 kN = 1500000
Momen ultimit, Mu = 164.835 160000000
Gaya lateral ijin, hijin = kNm =
100 100000
kN =
Faktor reduksi kekuatan geser, = 0.6
Gaya geser ultimit akibat momen, Vu = Mu / L = 10989
Gaya geser ultimit akibat gaya lateral, Vu = K * hijin = 150000
Diambil, gaya geser ultimit rencana, Vu = 150000
Jarak tul. thd. sisi luar beton, d' = 100
2 502655

Luas penampang tiang bor, Ag = / 4 * D = 709


Tebal ekivalen penampang, h = Ag =
Lebar ekivalen penampang, b=h= 709
Tebal efektif, d = h - d' = 608.98
Vc = [ 1 + Pu / (14 * Ag) ]*[ (fc' ) / 6 * b * d ] = 397661
Vs = Vu / = 250000
Panjang Bor pile, L= mm
Diameter Bor pile, D = As = mm mm2
Luas tulangan longitudinal Bor pile,

Kuat tekan beton, fc ' = MPa


2
0
tdk.ada
tdk.ada
NO KOMBINASI Pu Mux P1 P2 P3 P4
(kN) (kNm) (kN) (kN) (kN) (kN)
BEBAN KERJA
1 KOMBINASI - 1 17417.74 4767.20 1399.54 1161.18 --- ---
2 KOMBINASI - 2 17048.02 4630.64 1368.07 1136.53 --- ---
3 KOMBINASI - 3 17455.24 1047.84 1216.07 1163.68 --- ---
4 KOMBINASI - 4 17455.24 5222.84 1424.82 1163.68 --- ---
5 KOMBINASI - 5 13740.52 14234.62 1627.77 916.03 --- ---
2 40 2
ny = 5 bh
m X = m
m n= 15 bh D = 1.5 m
No Xi Xi - D/2 Pi ny * Pi Mupi
(m) (m) (kN) (kN) (kNm)
1 2 1.25 1627.77 8138.8 10173.5
2 0
3 tdk.ada
4 tdk.ada
8138.8 10173.5
KODE PARAMETER BERAT BAGIAN BETON VOLUME BERAT (kN) LENGAN MOMEN (kNm)
(m3) xw (m)
b h Panjang Shape
W1 2.25 1.2 10 1 27 675 1.125 759.4
W2 2.25 0.6 10 0.5 6.75 168.8 0.75 126.6
Vs = 843.8 Ms = 885.9
1.3
1151.7
1096.9
9021.8
10
902.18
7295.1
10
729.51
Momen rencana ultimit, Mu = 902.18
Mutu beton, K - 250 Kuat tekan beton, fc ' = 20.75
Mutu baja, U - 39 Tegangan leleh baja, fy = 390
Tebal pile cap, h = ht = 1800
Jarak tulangan terhadap sisi luar beton, d' = 100
Modulus elastis baja, Es = 200000
Faktor bentuk distribusi tegangan beton, 1 = 0.85
b = 1* 0.85 * fc/ fy * 600 / ( 600 + fy ) = 0.0233
Rmax = 0.75 * b * fy *[1 *0.75* b * fy / ( 0.85 * fc )] = 5.49805
Faktor reduksi kekuatan lentur, = 0.8
Tebal efektif pile cap, d = h - d' = 1700
Lebar pile cap yang ditinjau, b= 1000
Momen nominal rencana, Mn = Mu / = 1127.73
-6 2 0.39022
Faktor tahanan momen, Rn = Mn * 10 /(b*d )=
= 0.85 * fc / fy * [ 1 - * [1 2 * Rn / ( 0.85 * fc ) ] =0.00101
Rasio tulangan minimum, min = 0.50 / fy = 0.00128
Rasio tulangan yang digunakan, = 0.00128
Luas tulangan yang diperlukan, As = b * d = 2179
Diameter tulangan yang digunakan, D 25
Jarak tulangan yang diperlukan, s = / 4 * D2 * b / A = 225.224
s
D 25 - 200
Gaya geser ultimit, Vu = 729508

Faktor reduksi kekuatan geser, = 0.6


Kapasitas geser ultimit, Vucmax = 0.5 * * ( fc') * b * d = 2323161

Vu < Vucmax Dimensi aman thd geser


Vc = 1/6*( fc') * b * d = 1290645

Gaya geser yang ditahan oleh beton, .Vc = 774387

Vu < .Vc Hanya perlu tul.geser min.


.Vs = Vu / 2 = 364754
Gaya geser yang ditahan oleh tulangan geser, Vs = 607923
Diameter tul. yang digunakan, D 16 Ambil jarak arah Y 500
402.12
1.367
0.6
2000
2000
1000
1000
2250
1733
1633
5570.8
9700000
13000000
7917.37
1627.77
r = X/2 = 1000 m
r = Y/2 = 1000 m maka diambil, r= m
hp = 1200 m ht = 1800 m Lt = m
4
2
0
tdk.ada
NO KOMBINASI Pu Muy P1 P2 P3 P4
(kN) (kNm) (kN) (kN) (kN) (kN)
BEBAN KERJA
1 KOMBINASI - 1 17417.74 3663.24 1283.29 1222.24 1161.18 ---
2 KOMBINASI - 2 17048.02 2767.01 1228.77 1182.65 1136.53 ---
3 KOMBINASI - 3 17455.24 6430.25 1378.02 1270.85 1163.68 ---
4 KOMBINASI - 4 17455.24 6430.25 1378.02 1270.85 1163.68 ---
5 KOMBINASI - 5 13740.52 21258.88 1624.66 1270.35 916.03 ---
2 120 2
nx = 3 bh
m Y = m
m n= 15 bh Bb = 7.5 m
No Yi Yi - Bb/2 Pi nx * Pi Mupi
(m) (m) (kN) (kN) (kNm)
1 4 0.25 1624.66 4874 1218.5
2 2
3 0
4 tdk.ada
4874 1218.5
KODE PARAMETER BERAT BAGIAN BETON VOLUME BERAT (kN) LENGAN MOMEN (kNm)
(m3) yw (m)
b h Panjang Shape
W1 1.25 1.2 6 1 9 225 0.625 140.6
W2 1.25 0.6 6 0.5 2.25 56.3 0.417 23.4
Vs = 281.3 Ms = 164.1
1.3
213.3
365.6
1005.2
6
167.54
4592.7
6
765.46
Momen rencana ultimit, Mu = 167.54
Mutu beton, K - 250 Kuat tekan beton, fc ' = 20.75
Mutu baja, U - 39 Tegangan leleh baja, fy = 390
Tebal pile cap, h = ht = 1800
Jarak tulangan terhadap sisi luar beton, d' = 100
Modulus elastis baja, Es = 200000
Faktor bentuk distribusi tegangan beton, 1 = 0.85
b = 1* 0.85 * fc/ fy * 600 / ( 600 + fy ) = 0.0233
Rmax = 0.75 * b * fy *[1 *0.75* b * fy / ( 0.85 * fc )] = 5.49805
Faktor reduksi kekuatan lentur, = 0.8
Faktor reduksi kekuatan geser, = 0.6
Tebal efektif pile cap, d = h - d' = 1700
Lebar pile cap yang ditinjau, b= 1000
Momen nominal rencana, Mn = Mu / = 209.42
= 0.85 * fc / fy * [ 1 - * [1 2 * Rn / ( 0.85 * fc ) ] = 0.00019
Rasio tulangan minimum, min = 0.50 / fy = 0.00128
Rasio tulangan yang digunakan, = 0.00128
Luas tulangan yang diperlukan, As = b * d = 2179
Diameter tulangan yang digunakan, D 25
Jarak tulangan yang diperlukan, s = / 4 * D2 * b / A = 225.224
s
D 25 - 200
Gaya geser ultimit, Vu = 765457
Faktor reduksi kekuatan geser, = 0.6
Kapasitas geser ultimit, Vucmax = 0.5 * * ( fc') * b * d = 2323161

Vu < Vucmax Dimensi aman thd geser


Vc = 1/6*( fc') * b * d = 1290645

Gaya geser yang ditahan oleh beton, .Vc = 774387

Vu < .Vc Tdk. Perlu tul.geser


765457
400
502.65
S x = A v * fy * d / V s = 435.37
Digunakan tulangan, D 16 Jarak arah X 400
Jarak arah Y 400
435.37 mm
400 mm