Академический Документы
Профессиональный Документы
Культура Документы
Thickness 1.50
Width 5.00 S
S
No. of bars 5.00 one way only E
N
K
No. of footing C
on this size 1.00 HI
T
37.50 388.13
18.75
5.25
52.5
9.625
25.00
WIDTH
FOR CONCRETE COLUMN
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero o
SIDE 1
Stirrup - rest
NOTE:If stirrups
spaced uniformly, type
"0" zero on "no. of
stirrups" yellow box
Stirrup - S3
Stirrup - S2
Stirrup - S1
Thickness
Footing (TF)
FOR CONCRETE COLUMN
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero
COLUMN FROM SECOND FLOOR LINE TO PRECEEDING FLOOR CEILING
STIRRUP - REST
NOTE:If stirrups
spaced uniformly, type
"0" zero on "no. of
stirrups" yellow box
STIRRUP - S3
STIRRUP - S2
STIRRUP - S1
DIAMETER
Stirrup - rest
Stirrup - S2
Stirrup - S1
Thickness
Footing (TF)
FOR CONCRETE COLUMN
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero
###
ra COLUMN FROM SECOND FLOOR LINE TO PRECEEDING FLOOR CEILING
###
###
V Height col. - Number of column
###
###
T Diameter - this size -
###
S
###
S
###
S Number of
###
R vertical bars -
###
R
###
N Confinement of stirrups:
###
S No. of stirrups S1 0 S1 Spaced at -
###
T No. of stirrups S2 0 S2 Spaced at -
###
T No. of stirrups S3 0 S3 Spaced at -
rest spaced at -
floor
Materials needed: ding
precee
Cement - bags of
Sand - cu.m. ceiling
Gravel - cu.m. line to
floor
Vertical bars - pcs. specify diameter ground
Stirrups #DIV/0! pcs. specify diameter from
Tie wire #DIV/0! klg. Height
to erase just type "0" zero on the yellow box
OR CEILING
DIAMETER
STIRRUP - REST
STIRRUP - S3
STIRRUP - S2
STIRRUP - S1
Width -
Thickness -
Length -
Materials needed:
Cement - bags
Sand - cu.m.
Gravel - cu.m.
Def. Bars #DIV/0! pcs.
Tie wire #DIV/0! klg.
vol
-
long
0
trans
###
###
want to erase just type "0" zero on the yellow box
Natural ground
CHB
Longitudinal bars
Transverse bars
Thickness
Width
FOR CONCRETE BEAM
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero o
STIRRUPS - S1
STIRRUPS - S2
STIRRUPS - S3
STIRRUPS - REST
###
v HT
###
m G
###
L EI
H
###
s
###
s
###
s
###
r WIDTH L/2 L/4
###
s
###
t Height -
###
t Width -
LENGTH O.C. OF COLUMN
###
j Length -
###
ti
No. of beams Confinement of stirrups:
this size - No. of stirrups S1 0 S1 Spaced at -
No. of stirrups S2 0 S2 Spaced at -
Number of No. of stirrups S3 0 S3 Spaced at -
main bars - rest spaced at -
erase just type "0" zero on the yellow box
STIRRUPS - REST
L/2
Materials needed:
Cement - bags
Sand - cu.m.
Gravel - cu.m.
Main bars - pcs.
Stirrups #DIV/0! pcs.
Tie wire #DIV/0! klg.
TOTAL LENGTH
FOR PLASTERING (class "B") METHOD,
CHOOSE BY TYPING " 1 " ONE ON Less: OPENNINGS on one floor only, CHB quantit
YELLOW BOX BELOW Description Area No. of units
Plastering 1 side only - Door 1 - -
Plastering 2 sides - Door 2 - -
Door 3 - -
Materials needed: Door 4 - -
Cement - bags Door 5 - -
Sand - cu.m. Door 6 - -
Def. Bars - pcs. specify diameter
C.H.B. - pcs. specify size (thickness) Total window opennings
Tie wire - klg. for this floor only
Note: Steel Reinforcement for CHB; Vertical bars - dist. @ 0.60m o.c., Horizontal bars - @ every 3 layers
ase just type "0" zero on the yellow box
###
D
CEILING LINE
###
W
###
T
LESS OPENNINGS OF
###
A
WINDOWS & DOORS
###
N###
4"6"
###
ce
###
###
m
###
FLOOR LINE
###
ce
###
###
s###
###
sa
###
ne floor only, CHB quantity for another floor must be done separately.
Description Area No. of units###
ce
###
Window 1 - ######
- ###
sa ###
Window 2 - - 1 2######
fac
Window 3 - ######
- ###
ce ###
Window 4 - c######
- ### ###
Window 5 - ve ###
- ### ###
Window 6 - h ###
- ### ###
###
otal window opennings
for this floor only - sq.m.
FOR TWO WAY CONCRETE SLAB
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the ye
###
###
###
### 0.200 m. o.c. -
###
###
###
### 0.225 m. o.c. -
###
###
###
### 0.250 m. o.c. -
###
###
###
### 0.275 m. o.c. -
###
###
###
### 0.300 m. o.c. 1
###
###
L/2 L / 4 Spaced at ___ L/2
Length 7.00
Width 12.50 LENGTH (m)
Thickness 0.10 Materials needed:
Cement 90.56 bags
No. of Slab this size 1.00 Sand 5.03 cu.m.
Gravel 10.06 cu.m.
Def. Bars 241.30 pcs. specify diameter
Tie wire 15.16 klg.
ust type "0" zero on the yellow box
specify diameter
FOR CONCRETE FLOORING
###
v Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero o
###
###
b
###
###
b For ground floor only: (REINFORCED CONCRETE FLOOR)
###
to
###
###
t Width - Reinforced bars
Length -
Thickness -
Note: If flooring is not reinforced,leave bar spacing blank
Bar Spacing
bothways -
WIDTH
Note: If you are not using tiles, just leave tile size blank
Choose size of tiles you will use by
###
a typing one "1" on the box below Materials needed:
###
### 4" x 4" - Cement - bags
###
### 8" x 8" - Sand - cu.m.
###
### 12" x 12" - Gravel - cu.m.
###
### 16" x 16" - Def. Bars #DIV/0! pcs. specify diameter
### Tiles - pcs. specify size
Tie wire #DIV/0! klg.
erase just type "0" zero on the yellow box
LENGTH