FOR SQUARE FOOTING


Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the yellow

Thickness 1.50
Width 5.00 S
S
No. of bars 5.00 one way only E
N
K
No. of footing C
on this size 1.00 HI
T

Materials needed: WIDTH


Cement 388.13 bags
Sand 21.56 cu.m.
Gravel 43.13 cu.m.
bars 9.63 pcs. specify diameter
Tie wire 0.17 kg.

Footing total 37.50 cu.m.


ase just type "0" zero on the yellow box

37.50 388.13
18.75
5.25
52.5
9.625
25.00

WIDTH
FOR CONCRETE COLUMN
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero o

COLUMN FROM GROUND FLOOR TO FIRST FLOOR CEILING 2


###
vo E
###
to Height col. - Number of column D
###
to Side 1 col. - this size - I
S
###
st Side 2 col. -
Thickness of footing (TF)
ly
###
s on
###
s Number of for this column - ab
###
s vertical bars - sl
or
###
r flo
###
no Confinement of stirrups: d
###
no No. of stirrups S1 0 S1 Spaced at - 2n
No. of stirrups S2 0 S2 Spaced at -
of
m
No. of stirrups S3 0 S3 Spaced at - tto
rest spaced at - bo
to
up
Materials needed: t
Cement - bags gh
Sand - cu.m.
ei
H
Gravel - cu.m.
Vertical bars - pcs. specify diameter
Stirrups #DIV/0! pcs. specify diameter
Tie wire #DIV/0! klg.
nt to erase just type "0" zero on the yellow box

SIDE 1

Stirrup - rest

NOTE:If stirrups
spaced uniformly, type
"0" zero on "no. of
stirrups" yellow box
Stirrup - S3

Stirrup - S2

Stirrup - S1

Thickness
Footing (TF)
FOR CONCRETE COLUMN
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero
COLUMN FROM SECOND FLOOR LINE TO PRECEEDING FLOOR CEILING

### Height col. Number of column


2
V - E
###
###
T Side 1 col. - this size - D
###
S Side 2 col. - I
###
S
S
### Number of
or
S flo
###R vertical bars - ng
###R
edi
### Confinement of stirrups:
ce
N pre
###
S No. of stirrups S1 0 S1 Spaced at - of
###
T No. of stirrups S2 0 S2 Spaced at - ing
### No. of stirrups S3 0 S3 Spaced at -
ceil
T to
rest spaced at - e
lin
Materials needed:
or
flo
Cement - bags d
Sand - cu.m. un
Gravel - cu.m.
gro
m
Vertical bars - pcs. specify diameter fro
Stirrups #DIV/0! pcs. specify diameter ght
Tie wire #DIV/0! klg.
Hei
nt to erase just type "0" zero on the yellow box
OOR CEILING
SIDE 1

SLAB 2ND FLOOR

STIRRUP - REST

NOTE:If stirrups
spaced uniformly, type
"0" zero on "no. of
stirrups" yellow box

STIRRUP - S3

STIRRUP - S2

STIRRUP - S1

GROUND FLOOR SLAB


FOR CONCRETE COLUMN
### Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero o
###
r2
### COLUMN FROM GROUND FLOOR TO FIRST FLOOR CEILING
###
vo
###
to Height col. - Number of column
###
to Diameter - this size -
###
st
Thickness of footing (TF)
ly
###
s on
###
s Number of for this column - ab
###
s vertical bars - sl
or
###
r flo
###
no Confinement of stirrups: d
###
no No. of stirrups S1 0 S1 Spaced at - 2n
No. of stirrups S2 0 S2 Spaced at -
of
m
No. of stirrups S3 0 S3 Spaced at - tto
rest spaced at - bo
to
up
Materials needed: t
Cement - bags gh
Sand - cu.m.
ei
H
Gravel - cu.m.
Vertical bars - pcs. specify diameter
Stirrups #DIV/0! pcs. specify diameter
Tie wire #DIV/0! klg.
nt to erase just type "0" zero on the yellow box

DIAMETER

Stirrup - rest

NOTE:If stirrups spaced


uniformly, type "0" zero
on "no. of stirrups" yellow
box
Stirrup - S3

Stirrup - S2

Stirrup - S1

Thickness
Footing (TF)
FOR CONCRETE COLUMN
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero
###
ra COLUMN FROM SECOND FLOOR LINE TO PRECEEDING FLOOR CEILING
###
###
V Height col. - Number of column
###
###
T Diameter - this size -
###
S
###
S
###
S Number of
###
R vertical bars -
###
R
###
N Confinement of stirrups:
###
S No. of stirrups S1 0 S1 Spaced at -
###
T No. of stirrups S2 0 S2 Spaced at -
###
T No. of stirrups S3 0 S3 Spaced at -
rest spaced at -
floor
Materials needed: ding
precee
Cement - bags of
Sand - cu.m. ceiling
Gravel - cu.m. line to
floor
Vertical bars - pcs. specify diameter ground
Stirrups #DIV/0! pcs. specify diameter from
Tie wire #DIV/0! klg. Height
to erase just type "0" zero on the yellow box
OR CEILING
DIAMETER

SLAB 2ND FLOOR

STIRRUP - REST

NOTE:If stirrups spaced


uniformly, type "0" zero
on "no. of stirrups" yellow
box

STIRRUP - S3

STIRRUP - S2

STIRRUP - S1

GROUND FLOOR SLAB


FOR ZOCALLO
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero

Width -
Thickness -
Length -

No. of Longitudinal bars -


Spacing of Transverse bars -

Materials needed:
Cement - bags
Sand - cu.m.
Gravel - cu.m.
Def. Bars #DIV/0! pcs.
Tie wire #DIV/0! klg.
vol
-
long
0
trans
###
###
want to erase just type "0" zero on the yellow box

Natural ground

CHB

Longitudinal bars
Transverse bars

Thickness

Width
FOR CONCRETE BEAM
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero o
STIRRUPS - S1
STIRRUPS - S2
STIRRUPS - S3
STIRRUPS - REST
###
v HT
###
m G
###
L EI
H
###
s
###
s
###
s
###
r WIDTH L/2 L/4
###
s
###
t Height -
###
t Width -
LENGTH O.C. OF COLUMN
###
j Length -
###
ti
No. of beams Confinement of stirrups:
this size - No. of stirrups S1 0 S1 Spaced at -
No. of stirrups S2 0 S2 Spaced at -
Number of No. of stirrups S3 0 S3 Spaced at -
main bars - rest spaced at -
erase just type "0" zero on the yellow box

STIRRUPS - REST

L/2

Materials needed:
Cement - bags
Sand - cu.m.
Gravel - cu.m.
Main bars - pcs.
Stirrups #DIV/0! pcs.
Tie wire #DIV/0! klg.

Beam total 0.00 cu.m.


FOR CHB WALLING/PARTITION
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero o
you may include height from zocallo to ceiling
Total length -
Height - 1 floor
floor
TO DESIGNATE WHAT SIZE OF CHB e
YOU'RE USING, TYPE " 1" ONE ON THE singl
YELLOW BOX BELOW for a
just
Using 4"x8"x16" - HT
Using 6"x8"x16" - HEIG

TOTAL LENGTH
FOR PLASTERING (class "B") METHOD,
CHOOSE BY TYPING " 1 " ONE ON Less: OPENNINGS on one floor only, CHB quantit
YELLOW BOX BELOW Description Area No. of units
Plastering 1 side only - Door 1 - -
Plastering 2 sides - Door 2 - -
Door 3 - -
Materials needed: Door 4 - -
Cement - bags Door 5 - -
Sand - cu.m. Door 6 - -
Def. Bars - pcs. specify diameter
C.H.B. - pcs. specify size (thickness) Total window opennings
Tie wire - klg. for this floor only
Note: Steel Reinforcement for CHB; Vertical bars - dist. @ 0.60m o.c., Horizontal bars - @ every 3 layers
ase just type "0" zero on the yellow box
###
D
CEILING LINE
###
W
###
T
LESS OPENNINGS OF
###
A
WINDOWS & DOORS
###
N###
4"6"
###
ce
###
###
m
###
FLOOR LINE
###
ce
###
###
s###
###
sa
###
ne floor only, CHB quantity for another floor must be done separately.
Description Area No. of units###
ce
###
Window 1 - ######
- ###
sa ###
Window 2 - - 1 2######
fac
Window 3 - ######
- ###
ce ###
Window 4 - c######
- ### ###
Window 5 - ve ###
- ### ###
Window 6 - h ###
- ### ###
###
otal window opennings
for this floor only - sq.m.
FOR TWO WAY CONCRETE SLAB
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the ye

For bar spacing, choose by tping "1"


###V
on the yellow box below
###A
USE SPACING OF
tie
bars
wire
Bar Spacing MAIN )
###
###
###
### 0.100 m. o.c. - REINFORCEMENT (m
###
###
###
### 0.125 m. o.c. - H
###
###
###
### 0.150 m. o.c. - DT
###
###
###
### 0.175 m. o.c. -
WI

###
###
###
### 0.200 m. o.c. -
###
###
###
### 0.225 m. o.c. -
###
###
###
### 0.250 m. o.c. -
###
###
###
### 0.275 m. o.c. -
###
###
###
### 0.300 m. o.c. 1
###
###
L/2 L / 4 Spaced at ___ L/2
Length 7.00
Width 12.50 LENGTH (m)
Thickness 0.10 Materials needed:
Cement 90.56 bags
No. of Slab this size 1.00 Sand 5.03 cu.m.
Gravel 10.06 cu.m.
Def. Bars 241.30 pcs. specify diameter
Tie wire 15.16 klg.
ust type "0" zero on the yellow box

specify diameter
FOR CONCRETE FLOORING
###
v Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero o
###
###
b
###
###
b For ground floor only: (REINFORCED CONCRETE FLOOR)
###
to
###
###
t Width - Reinforced bars
Length -
Thickness -
Note: If flooring is not reinforced,leave bar spacing blank
Bar Spacing
bothways -
WIDTH
Note: If you are not using tiles, just leave tile size blank
Choose size of tiles you will use by
###
a typing one "1" on the box below Materials needed:
###
### 4" x 4" - Cement - bags
###
### 8" x 8" - Sand - cu.m.
###
### 12" x 12" - Gravel - cu.m.
###
### 16" x 16" - Def. Bars #DIV/0! pcs. specify diameter
### Tiles - pcs. specify size
Tie wire #DIV/0! klg.
erase just type "0" zero on the yellow box

LENGTH

Вам также может понравиться