Kaplan Tube Turbine

H: Net Head = 10,30 m


Q: Rated Discharge = 7,00 m/s
Pt: Turbine Output = 663,6 kW
N: Rated Speed = 428,4 rpm
Nr: Runaway Speed = 1071 rpm
D1: Runner Diameter = 1120 mm
zR: Number of Rotorblades = 3
Hs: Permissible suction head = 1,0 m

GUGLER does not take any responsibility for workers of 3rd parties, such as civil
workers or suppliers outside of the scope of GUGLERS supply.
Before the final assembly at site can be started following requirements have to
be fulfilled:
All construction works at the powerhouse (including the roof, windows and
doors) have to be completely finished and cleaned and free access to the
powerhouse has to be available.
Sufficient illumination, heating and power supply has to be available
(230V/400C; 16A)
All recesses have to be finished according to the installation plan and agreed
with any 3rd parties (such as cable-channels for an electrical supplier outside
GUGLERS scope of supply).
The penstock has to be finished but the end-section must not be attached
before the turbine is in its final position.
This drawing is the property of GUGLER Water Turbines GmbH and must neither be copied nor used in other way without the consent of GUGLER
Water Turbines GmbH. Neither is it to be handed over nor in other way communicated to a third party. Infringement will lead to prosecution.

The overhead crane for component positioning including its entire equipment
has to be installed, tested and approved.
Der Inhalt dieser Zeichnung ist geistiges Eigentum der Firma GUGLER Water Turbines GmbH. Die Zeichnung ist dem Empfaenger nur
zum persoenlichem Gebrauch anvertraut. Ohne schriftliche Bewilligung durch die Firma GUGLER Water Turbines GmbH darf sie

A sufficient location for installation of the hydraulic power unit has to be


weder vervielfaeltigt noch dritten Personen zugaenglich gemacht werden. Zuwiderhandeln wird von uns gerichtlich verfolgt.

assigned as close to the turbine as possible.


All safety arrangements have to be ready and complete (such fire extinguisher,
medical pack, fences and any others)
ND. - DATUM - NAME - MITTEILUNG -
rev. date name notice
dimensions without indication of tolerances Erstelldatum GEWICHT 0,000 kg WERKSTOFF
according to ISO 2768-mK date 18.10.2016 weight kg material
weld preperation according to ISO 9692-1
nderungsdatum GEPRFT VON PROJEKT
welding tolerances according to ISO 13920-B
welding class according to ISO 5817-C
GEZEICHNET
date
BLATT
21.10.2016
VON
checked by
PRFDATUM
project Lodagung (395)
drawn haderer_st sheet 1 of 4 check date
MASSTAB ZEICHENEINHEIT FORMAT BENENNUNG
scale 1:1 unit [mm] sheetsize A4 title preliminary arrangement drawing
ZEICHNUNGSNUMMER
drawing no.
TECHNOLOGY FOR HYDROPOWER PLANTS
GUGLER WATER TURBINES GMBH 995_0_02-201016
A-4102 Goldwrth, Gewerbeweg 3 DATEIPFAD/NAME
+43 7234 83 902 http://www.gugler.com filepath/name R:\395_Lodagung\Konstruktion\CAD (3D) neu\0_Einbauplan\0.dft
This drawing is the property of GUGLER Water Turbines GmbH and must neither be copied nor used in other way without the consent of GUGLER
Water Turbines GmbH. Neither is it to be handed over nor in other way communicated to a third party. Infringement will lead to prosecution.
Der Inhalt dieser Zeichnung ist geistiges Eigentum der Firma GUGLER Water Turbines GmbH. Die Zeichnung ist dem Empfaenger nur
zum persoenlichem Gebrauch anvertraut. Ohne schriftliche Bewilligung durch die Firma GUGLER Water Turbines GmbH darf sie
weder vervielfaeltigt noch dritten Personen zugaenglich gemacht werden. Zuwiderhandeln wird von uns gerichtlich verfolgt.

ND. - DATUM - NAME - MITTEILUNG -


rev. date name notice
dimensions without indication of tolerances Erstelldatum GEWICHT 0,000 kg WERKSTOFF
according to ISO 2768-mK date 18.10.2016 weight kg material
weld preperation according to ISO 9692-1
nderungsdatum GEPRFT VON PROJEKT
welding tolerances according to ISO 13920-B
welding class according to ISO 5817-C
GEZEICHNET
date
BLATT
21.10.2016
VON
checked by
PRFDATUM
project Lodagung (395)
drawn haderer_st sheet 2 of 4 check date
MASSTAB ZEICHENEINHEIT FORMAT BENENNUNG
scale 1:500 unit [mm] sheetsize A3 title preliminary arrangement drawing
PRELIMINARY TECHNOLOGY FOR HYDROPOWER PLANTS
GUGLER WATER TURBINES GMBH
A-4102 Goldwrth, Gewerbeweg 3
ZEICHNUNGSNUMMER
drawing no.

995_0_02-201016
DATEIPFAD/NAME
+43 7234 83 902 http://www.gugler.com filepath/name R:\395_Lodagung\Konstruktion\CAD (3D) neu\0_Einbauplan\0.dft
Guglers scope of supply
4700 11000 (not included any concrete works)
11000

3500
+154,81m service bay
crane

end of Gugler's crane


scope of supply
manhole
+159,81m

18600
35
min. required crane
4700 hook height 4200
18000

5000

4500
4000
truck door

12000
+154,81m 1000 +154,81m
B B
manhole butterfly valve
+154,81m DN2000 / PN6
35

4500
+151,25m

A +149,81m
end of Gugler's
scope of supply

3540

2576
Section B-B
1:100

draft tube
A runner

runner O 1127
distributor 4960

suction head 1000


11000

+151,25m
3005
generator 1

350
control cabinet min. TWL +150,25m

1440
(1200x500x2000)
butterfly valve 1 +149,81m
end of Gugler's DN2000 / PN6
scope of supply hydraulic power unit 1

30
second concrete
second concrete
turbine 1 control cabinet draft tube
DN 2000

(800x300x1000)
draft tube
concreted with formwork +147,31m
18000

35

unit 1
generator 2
7000

inlet pipe
Section A-A
1:50

hydraulic power unit 2


first concrete
DN 2000

turbine 2 control cabinet


(800x300x1000)
PRELIMINARY
This drawing is the property of GUGLER Water Turbines GmbH and must neither be copied nor used in other way without the consent of GUGLER
Water Turbines GmbH. Neither is it to be handed over nor in other way communicated to a third party. Infringement will lead to prosecution.

Information about the unloading:


35

500

unit 2 second concrete


0

estimated cable duct dimensions,


574
Der Inhalt dieser Zeichnung ist geistiges Eigentum der Firma GUGLER Water Turbines GmbH. Die Zeichnung ist dem Empfaenger nur

Turbine and equipment should be transported with the truck into


zum persoenlichem Gebrauch anvertraut. Ohne schriftliche Bewilligung durch die Firma GUGLER Water Turbines GmbH darf sie

second concrete
weder vervielfaeltigt noch dritten Personen zugaenglich gemacht werden. Zuwiderhandeln wird von uns gerichtlich verfolgt.

butterfly valve 2 because power cables and


3005 DN2000 / PN6 the house and unloaded with the installed crane to their position.
related electrical equipment Instructions:
end of Gugler's aren't in Gugler's scope of supply The maximum allowed size of floating refuse in the water is 22mm.
scope of supply 145 The last part of the inlet pipe (penstock)
60

ND. - DATUM - NAME - MITTEILUNG -


103

should be installed(adapted) after the turbine is at the right position. rev. date name notice
0
362

dimensions without indication of tolerances Erstelldatum GEWICHT 0,000 kg WERKSTOFF


according to ISO 2768-mK date 18.10.2016 weight kg material

cable duct (500x500) Remarks: weld preperation according to ISO 9692-1


welding tolerances according to ISO 13920-B
welding class according to ISO 5817-C
nderungsdatum
date 21.10.2016 GEPRFT VON
checked by
PROJEKT
project Lodagung (395)
Stairs, handrails, covers, covers for cable ducsts,... GEZEICHNET
drawn haderer_st BLATT
sheet 3 VON
of 4 PRFDATUM
check date
are not in Gugler's scope of supply: MASSTAB
scale 1:100 ZEICHENEINHEIT FORMAT
unit [mm] sheetsize A1 BENENNUNG
title preliminary arrangement drawing
Concrete phases for second concreting have to be done in several steps
cable duct (200x200) according to the civil engineer. TECHNOLOGY FOR HYDROPOWER PLANTS
ZEICHNUNGSNUMMER
drawing no.

GUGLER WATER TURBINES GMBH 995_0_02-201016


A-4102 Goldwrth, Gewerbeweg 3 DATEIPFAD/NAME
+43 7234 83 902 http://www.gugler.com filepath/name R:\395_Lodagung\Konstruktion\CAD (3D) neu\0_Einbauplan\0.dft
61910

371
30

0
93 6
tur
bine
o utle
t
10000

500
35

10
500

30410 28620

existing channel existing channel

+154,81m
This drawing is the property of GUGLER Water Turbines GmbH and must neither be copied nor used in other way without the consent of GUGLER
Water Turbines GmbH. Neither is it to be handed over nor in other way communicated to a third party. Infringement will lead to prosecution.

min. TWL +150,25m


Der Inhalt dieser Zeichnung ist geistiges Eigentum der Firma GUGLER Water Turbines GmbH. Die Zeichnung ist dem Empfaenger nur
zum persoenlichem Gebrauch anvertraut. Ohne schriftliche Bewilligung durch die Firma GUGLER Water Turbines GmbH darf sie
weder vervielfaeltigt noch dritten Personen zugaenglich gemacht werden. Zuwiderhandeln wird von uns gerichtlich verfolgt.

ND. - DATUM - NAME - MITTEILUNG -


rev. date name notice
dimensions without indication of tolerances Erstelldatum GEWICHT 0,000 kg WERKSTOFF
according to ISO 2768-mK date 18.10.2016 weight kg material
weld preperation according to ISO 9692-1
nderungsdatum GEPRFT VON PROJEKT
welding tolerances according to ISO 13920-B
welding class according to ISO 5817-C
GEZEICHNET
date
BLATT
21.10.2016
VON
checked by
PRFDATUM
project Lodagung (395)
drawn haderer_st sheet 4 of 4 check date
MASSTAB ZEICHENEINHEIT FORMAT BENENNUNG
scale 1:200 unit [mm] sheetsize A2 title preliminary arrangement drawing

PRELIMINARY TECHNOLOGY FOR HYDROPOWER PLANTS


GUGLER WATER TURBINES GMBH
A-4102 Goldwrth, Gewerbeweg 3
ZEICHNUNGSNUMMER
drawing no.

DATEIPFAD/NAME
995_0_02-201016
+43 7234 83 902 http://www.gugler.com filepath/name R:\395_Lodagung\Konstruktion\CAD (3D) neu\0_Einbauplan\0.dft