OPERARIO
CLV = 1 OPERARIO (mezcladora) =
= 9.52
0.015 + 0.09 + 0.015 OPERARIO (vibrador) =
2 2 OFICIAL
PEON
CLH = 1
= 7.58
0.012 + 0.12 + 0.012
2 2
PARTIDA: Curado
MANO DE OBRA UND CANTIDAD PRECIO PARCIAL
CAPATAZ = 0.018 CAPATAZ HH 0.018 S/. 18.36 0.334
PEON = 0.182 PEON HH 0.182 S/. 13.84 2.516
C.U. 2.850
PARTIDA: habilitacion
MANO DE OBRA UND CANTIDAD PRECIO PARCIAL
CAPATAZ = 0.011 CAPATAZ HH 0.011 S/. 18.36 0.198
OPERARIO = 0.108 OPERARIO HH 0.108 S/. 18.36 1.985
OFICIAL = 0.108 OFICIAL HH 0.108 S/. 15.39 1.664
C.U. 30.456
PARTIDA: encofrado
MANO DE OBRA UND CANTIDAD PRECIO PARCIAL
CAPATAZ = 0.073 CAPATAZ HH 0.073 S/. 18.36 1.335
OPERARIO = 0.727 OPERARIO HH 0.727 S/. 18.36 13.353
OFICIAL = 0.727 OFICIAL HH 0.727 S/. 15.39 11.193
C.U. 30.456
PARTIDA: desencofrado
MANO DE OBRA UND CANTIDAD PRECIO PARCIAL
CAPATAZ = 0.024 CAPATAZ HH 0.024 S/. 18.36 0.432
OFICIAL = 0.235 OFICIAL HH 0.235 S/. 15.39 3.621
PEON = 0.471 PEON HH 0.471 S/. 13.84 6.513
C.U. 30.456
MATERIALES UND SIN DESPERDICIO A.U.M.
Cemento bolsas 9.73 10.2165
Arena Gruesa m3 0.51 0.5355
Piedra chancada m3 0.53 0.5565
mezcladora und 1 1.1
vibrador und 1 1.1
winche und 1 1.1