FORMATO No 071

MOVIMIENTO DE MAQUINARIA PESADA N 01

CORRESPONDENTE A LOS MESES DE MAYO -2016 HASTA DICIEMBRE-2016

HORAS TRABAJADAS : 1086.90 hrs DEPARTAMENTO : CUSCO


VALORIZACION DE MAQUINARIA EXP TEC S/. 134,571.03

VALORIZACION DE MAQUINARIA 2016 : S/. 96,782.16 S/. 73,188.48


PROVINCIA : CUSCO

TOTAL COMBUSTIBLE EXPEDIENTE T. (GLN) : 34512.54 gln


1715.18 DISTRITO : CUSCO
COSTO COMBUSTIBLE : S/. 9.95
32797.36 LOCALIDAD : Urb.LOS INCAS
SALDO : S/. 37,788.87
34512.54
DIC 96,782.16
GASOLINA 1,054.70 NOV 73,188.48
PETROLEO S/. 33,053.48
34,108.18
CORRESPONDIENTE AL MES DE : MAYO

TOTAL
FECHA MAQUINARIA COMB. CANT. GL P.U HM/TRAB %REND COSTO HM IMPORTE HM ACTIVIDAD REALIZADA
COMBUSTIBLE

20-Apr-16 CAMION PLATAFORMA V-87 PETROLEO 10.00 S/. 10.15 S/. 101.50 5.50 85.00% S/. 75.36 S/. 352.31 TRASLADO DE MATERIALES
22-Apr-16 VOLQUETE V-85 PETROLEO 8.00 S/. 10.15 S/. 81.20 5.50 85.00% S/. 75.36 S/. 352.31 TRASLADO DE MATERIALES
11-May-16 VOLQUETE V-82 PETROLEO 10.00 S/. 10.15 S/. 101.50 6.00 85.00% S/. 75.36 S/. 384.34 TRASLADO DE MATERIALES
30-May-16 CAMIONETA EGE 225 GASOLINA 3.00 S/. 9.95 S/. 29.85 2.50 85.00% S/. 60.00 S/. 127.50 TRASLADO DE MATERIALES
GASOLINA 3.00 S/. 29.85 2.50 S/. 127.50
PETROLEO 28.00 S/. 284.20 17.00 S/. 1,088.95
S/. 314.05 19.50 S/. 1,216.45

CORRESPONDIENTE AL MES DE : JUNIO

TOTAL
FECHA MAQUINARIA COMB. CANT. GL P.U HM/TRAB %REND COSTO HM IMPORTE HM ACTIVIDAD REALIZADA
COMBUSTIBLE

8-Jun-16 CAMIONETA EGE 873 GASOLINA 3.00 S/. 9.95 S/. 29.85 5.50 85.00% S/. 60.00 S/. 280.50 TRASLADO DE MATERIALES
22-Jun-16 CAMIONETA EGE 873 GASOLINA 2.00 S/. 9.95 S/. 19.90 5.50 85.00% S/. 60.00 S/. 280.50 TRASLADO DE MATERIALES
27-Jun-16 VOLQUETE V-86 PETROLEO 5.00 S/. 10.15 S/. 50.75 6.00 85.00% S/. 75.36 S/. 384.34 TRASLADO DE MATERIALES

GASOLINA 0.00 S/. 49.75 0.00 S/. 561.00


PETROLEO 5.00 S/. 50.75 6.00 S/. 384.34
S/. 100.50 11.50 S/. 945.34
CORRESPONDIENTE AL MES DE : JULIO

TOTAL
FECHA MAQUINARIA N Part. Diar. COMB. CANT. GL P.U HM/TRAB %REND COSTO HM IMPORTE HM ACTIVIDAD REALIZADA
COMBUSTIBLE
9-Jul-16 VOLQUETE V-71 37356 PETROLEO 5.00 S/. 10.15 S/. 50.75 3.00 37.50% S/. 75.36 S/. 84.78 TRASLADO DE CEMENTO DE ALMACEN MIRADOR A OBRA
12-Jul-16 MINICARGADOR MC-01 29392 PETROLEO 13.00 S/. 10.15 S/. 131.95 15.00 187.50% S/. 63.35 S/. 1,781.72 Demolicion de pavimento en Pasaje IncaRoca
13-Jul-16 RETROEXCAVADORA CR-14 25654 PETROLEO 15.00 S/. 10.15 S/. 152.25 7.00 87.50% S/. 150.00 S/. 918.75 CARGUIO DE DESMONTE A VOLQUETES
13-Jul-16 VOLQUETE V - 153 29926 PETROLEO 12.00 S/. 10.15 S/. 121.80 7.00 87.50% S/. 125.00 S/. 765.63 Traslado de Piedra Chancada y eliminacion de desmonte
13-Jul-16 VOLQUETE V - 157 28795 PETROLEO 10.00 S/. 10.15 S/. 101.50 6.00 75.00% S/. 125.00 S/. 562.50 ELIMINACION DE MATERIAL EXCEDENTE
13-Jul-16 VOLQUETE V-159 29864 PETROLEO 10.00 S/. 10.15 S/. 101.50 4.30 53.75% S/. 125.00 S/. 288.91 ELIMINACION DE MATERIAL EXCEDENTE
15-Jul-16 VOLQUETE V-152 25605 PETROLEO 20.00 S/. 10.15 S/. 203.00 6.00 75.00% S/. 125.00 S/. 562.50 ELIMINACION DE MATERIAL EXCEDENTE
15-Jul-16 VOLQUETE V-151 29583 PETROLEO 20.00 S/. 10.15 S/. 203.00 6.00 75.00% S/. 125.00 S/. 562.50 ELIMINACION DE MATERIAL EXCEDENTE
15-Jul-16 VOLQUETE V-157 28797 PETROLEO 18.00 S/. 10.15 S/. 182.70 7.00 87.50% S/. 125.00 S/. 765.63 ELIMINACION DE MATERIAL EXCEDENTE
15-Jul-16 CARGADOR FRONTAL C-42 25455 PETROLEO 35.00 S/. 10.15 S/. 355.25 7.00 87.50% S/. 150.00 S/. 918.75 ACUMULACION Y CARGUIO DE DESMONTE
21-Jul-16 CAMIONETA EGE 862 PETROLEO 5.00 S/. 10.15 S/. 50.75 1.50 18.75% S/. 50.00 S/. 14.06 TRASLADO DE COMBUSTIBLE DE GRIFO A OBRA
22-Jul-16 VOLQUETE V-71 PETROLEO 5.00 S/. 10.15 S/. 50.75 4.00 50.00% S/. 125.00 S/. 250.00 TRASLADO DE COMBUSTIBLE DE GRIFO A OBRA
25-Jul-16 CARGADOR FRONTAL C-42 25461 PETROLEO 30.00 S/. 10.15 S/. 304.50 7.00 87.50% S/. 150.00 S/. 918.75 ACUMULACION Y CARGUIO DE DESMONTE
25-Jul-16 CAMIONETA EGE 873 37003 GASOLINA 3.00 S/. 9.95 S/. 29.85 2.00 25.00% S/. 60.00 S/. 30.00 AUXILIO MECANICO CR-42
25-Jul-16 VOLQUETE V-152 25613 PETROLEO 20.00 S/. 10.15 S/. 203.00 7.00 87.50% S/. 125.00 S/. 765.63 ELIMINACION DE MATERIAL EXCEDENTE
25-Jul-16 VOLQUETE V-153 29935 PETROLEO 20.00 S/. 10.15 S/. 203.00 6.50 81.25% S/. 125.00 S/. 660.16 ELIMINACION DE MATERIAL EXCEDENTE
26-Jul-16 VOLQUETE V-152 25614 PETROLEO 15.00 S/. 10.15 S/. 152.25 6.00 75.00% S/. 0.00 S/. 0.00 ELIMINACION DE MATERIAL EXCEDENTE
26-Jul-16 CARGADOR FRONTAL C-42 25462 PETROLEO 30.00 S/. 10.15 S/. 304.50 6.00 75.00% S/. 150.00 S/. 675.00 ACUMULACION Y CARGUIO DE DESMONTE
26-Jul-16 VOLQUETE V-151 29590 PETROLEO 18.00 S/. 10.15 S/. 182.70 5.00 62.50% S/. 125.00 S/. 390.63 ELIMINACION DE MATERIAL EXCEDENTE
26-Jul-16 VOLQUETE V-153 29937 PETROLEO 15.00 S/. 10.15 S/. 152.25 6.00 75.00% S/. 125.00 S/. 562.50 ELIMINACION DE MATERIAL EXCEDENTE
27-Jul-16 CARGADOR FRONTAL C-42 25463 PETROLEO 20.00 S/. 10.15 S/. 203.00 5.00 62.50% S/. 150.00 S/. 468.75 TERRAPLENEO DE BOTADERO DE DESMONTE
GASOLINA 3.00 S/. 9.95 S/. 29.85 2.00 S/. 30.00
PETROLEO 331.00 S/. 10.15 S/. 3,410.40 119.30 S/. 11,917.12
S/. 3,440.25 121.30 S/. 11,947.12

CORRESPONDIENTE AL MES DE : AGOSTO

TOTAL
FECHA MAQUINARIA N Part. Diar. COMB. CANT. GL P.U HM/TRAB %REND COSTO HM IMPORTE HM ACTIVIDAD REALIZADA
COMBUSTIBLE
1-Aug-16 CAMA BAJA CB-01 25814 PETROLEO 10.00 S/. 10.15 S/. 101.50 2.00 0.25 S/. 100.00 S/. 50.00 TRASLADO DEL TO - 73 A OBRA
1-Aug-16 TRACTOR ORUGA TO-73 29144 PETROLEO 30.00 S/. 10.15 S/. 304.50 5.00 0.625 S/. 250.00 S/. 781.25 CORTE, ACARREO , ACUMULACION DE PAVIMENTO RIGIDO
1-Aug-16 CARGADOR FRONTAL C-43 25855 PETROLEO 20.00 S/. 10.15 S/. 203.00 4.00 0.5 S/. 120.00 S/. 240.00 ACUMULACION Y CARGUIO DE DESMONTE
1-Aug-16 VOLQUETE V-157 25906 PETROLEO 15.00 S/. 10.15 S/. 152.25 4.00 0.5 S/. 150.00 S/. 300.00 ELIMINACION DE MATERIAL EXCEDENTE
1-Aug-16 VOLQUETE V-158 29734 PETROLEO 15.00 S/. 10.15 S/. 152.25 6.00 0.75 S/. 150.00 S/. 675.00 ELIMINACION DE MATERIAL EXCEDENTE
1-Aug-16 VOLQUETE V-159 29873 PETROLEO 15.00 S/. 10.15 S/. 152.25 5.00 0.625 S/. 150.00 S/. 468.75 ELIMINACION DE MATERIAL EXCEDENTE
2-Aug-16 TRACTOR ORUGA TO-73 29145 PETROLEO 20.00 S/. 10.15 S/. 203.00 5.00 0.625 S/. 250.00 S/. 781.25 CORTE, ACARREO , ACUMULACION DE PAVIMENTO RIGIDO
2-Aug-16 CARGADOR FRONTAL C-42 25464 PETROLEO 20.00 S/. 10.15 S/. 203.00 7.00 0.875 S/. 120.00 S/. 735.00 ACUMULACION Y CARGUIO DE DESMONTE
2-Aug-16 VOLQUETE V-158 29735 PETROLEO 20.00 S/. 10.15 S/. 203.00 6.00 0.75 S/. 150.00 S/. 675.00 ELIMINACION DE MATERIAL EXCEDENTE
2-Aug-16 VOLQUETE V-159 29874 PETROLEO 20.00 S/. 10.15 S/. 203.00 8.00 1 S/. 150.00 S/. 1,200.00 ELIMINACION DE MATERIAL EXCEDENTE
3-Aug-16 CARGADOR FRONTAL C-42 25465 PETROLEO 20.00 S/. 10.15 S/. 203.00 4.00 0.5 S/. 120.00 S/. 240.00 ACUMULACION Y CARGUIO DE DESMONTE
3-Aug-16 VOLQUETE V-158 29736 PETROLEO 20.00 S/. 10.15 S/. 203.00 6.00 0.75 S/. 150.00 S/. 675.00 ELIMINACION DE MATERIAL EXCEDENTE
3-Aug-16 VOLQUETE V-159 29875 PETROLEO 15.00 S/. 10.15 S/. 152.25 5.50 0.6875 S/. 150.00 S/. 567.19 ELIMINACION DE MATERIAL EXCEDENTE
3-Aug-16 TRACTOR ORUGA TO-73 29146 PETROLEO 20.00 S/. 10.15 S/. 203.00 4.00 0.5 S/. 250.00 S/. 500.00 CORTE, ACARREO , ACUMULACION DE PAVIMENTO RIGIDO
3-Aug-16 VOLQUETE V-153 29941 PETROLEO 20.00 S/. 10.15 S/. 203.00 7.00 0.875 S/. 150.00 S/. 918.75 ELIMINACION DE MATERIAL EXCEDENTE
3-Aug-16 CAMIONETA EGE 873 37005 GASOLINA 3.00 S/. 9.95 S/. 29.85 2.00 0.25 S/. 60.00 S/. 30.00 TRASLADO DE MATERIALES DE OBRA
4-Aug-16 TRACTOR ORUGA TO-73 29147 PETROLEO 5.00 S/. 10.15 S/. 50.75 1.00 0.125 S/. 250.00 S/. 31.25 CORTE, ACARREO , ACUMULACION DE PAVIMENTO RIGIDO
4-Aug-16 RODILLO R-02 28928 PETROLEO 8.00 S/. 10.15 S/. 81.20 3.00 0.375 S/. 50.00 S/. 56.25 COMPACTADO DE AREA EN ENROCADO
4-Aug-16 CAMA BAJA CB-01 25818 PETROLEO 10.00 S/. 10.15 S/. 101.50 2.50 0.3125 S/. 100.00 S/. 78.13 TRASLADO DEL TO - 73 A EQUIPO MECANICO
5-Aug-16 VOLQUETE V-151 29596 PETROLEO 30.00 S/. 10.15 S/. 304.50 7.00 0.875 S/. 150.00 S/. 918.75 ELIMINACION DE MATERIAL EXCEDENTE
5-Aug-16 CARGADOR FRONTAL C-42 25466 PETROLEO 25.00 S/. 10.15 S/. 253.75 3.00 0.375 S/. 120.00 S/. 135.00 ACUMULACION Y CARGUIO DE DESMONTE
5-Aug-16 VOLQUETE V-152 25620 PETROLEO 30.00 S/. 10.15 S/. 304.50 5.00 0.625 S/. 120.00 S/. 375.00 ELIMINACION DE MATERIAL EXCEDENTE
5-Aug-16 CAMIONETA EGE 873 37009 GASOLINA 2.00 S/. 9.95 S/. 19.90 2.00 0.25 S/. 60.00 S/. 30.00 AUXILIO MECANICO V-151
10-Aug-16 CAMIONETA EGE 862 1516 GASOLINA 5.00 S/. 9.95 S/. 49.75 2.00 0.25 S/. 60.00 S/. 30.00 TRASLADO DE MATERIALES DE OBRA
16-Aug-16 CAMIONETA EGE 862 887 PETROLEO 3.00 S/. 10.15 S/. 30.45 1.00 0.125 S/. 60.00 S/. 7.50 TRASLADO DE COMBUSTIBLE
18-Aug-16 CAMIONETA EGE 873 37018 GASOLINA 3.00 S/. 9.95 S/. 29.85 3.00 0.375 S/. 50.00 S/. 56.25 TRASLADO DE MATERIALES DE OBRA
19-Aug-16 MINICARGADOR MC-01 37066 PETROLEO 5.00 S/. 10.15 S/. 50.75 3.00 0.375 S/. 80.00 S/. 90.00 ROTUTA DE CONCRETO EN PAVIMENTO DE COLLASUYO
19-Aug-16 CAMIONETA EGE 862 885 PETROLEO 3 S/. 10.15 S/. 30.45 2 0.25 60 S/. 30.00 TRASLADO DE MATERIALES DE OBRA
20-Aug-16 MINICARGADOR MC-01 37067 PETROLEO 3.00 S/. 10.15 S/. 30.45 4.50 0.5625 S/. 80.00 S/. 202.50 ROTUTA DE CONCRETO EN PAVIMENTO
25-Aug-16 CAMIONETA EGE 873 37021 GASOLINA 4.00 S/. 9.95 S/. 39.80 3.00 0.375 S/. 50.00 S/. 56.25 TRASLADO DE HERRAMIENTAS DE SAPHI A OBRA
29-Aug-16 RODILLO VIBRATORIO R-4 25379 PETROLEO 5.00 S/. 10.15 S/. 50.75 1.50 0.1875 S/. 60.00 S/. 16.88 COMPACTADO DE SUB RAZANTE
29-Aug-16 MOTONIVELADORA M-32 25770 PETROLEO 25.00 S/. 10.15 S/. 253.75 7.00 0.875 S/. 180.00 S/. 1,102.50 CORTE Y NIVELADO DE SUB RAZANTE
31-Aug-16 CAMIONETA EGE 864 PETROLEO 5.00 S/. 10.15 S/. 50.75 2.00 0.25 S/. 181.00 S/. 90.50 CORTE Y NIVELADO DE SUB RAZANTE

GASOLINA 17.00 S/. 10.15 S/. 169.15 12.00 S/. 202.50


PETROLEO 174.00 S/. 9.95 S/. 4,435.55 119.00 S/. 11,891.44
S/. 4,604.70 131.00 S/. 12,093.94
CORRESPONDIENTE AL MES DE : SETIEMBRE
TOTAL
FECHA MAQUINARIA N Part. Diar. COMB. CANT. GL P.U HM/TRAB %REND COSTO HM IMPORTE HM ACTIVIDAD REALIZADA
COMBUSTIBLE

TRASALDO DE MATERIALES, TUBO Y OTROS INDEPENDENCIA TRAMO II


28-Sep-16 VOLQUETE V-155 39657 PETROLEO 10.00 3.00 0.375 S/. 119.13
TUPAC AMARU
S/. 10.15 S/. 101.50 S/. 134.02
27-Sep-16 RETROESCAVADORA CR-14 39512 PETROLEO 15.00 S/. 10.15 S/. 152.25 6.00 0.75 S/. 70.73 S/. 318.29 CARGUEO DE DESMONTE AL VOLQUETE Y ACUMULACION DE DESMONTE
26-Sep-16 RETROESCAVADORA CR-13 39610 PETROLEO 15.00 S/. 10.15 S/. 152.25 6.00 0.75 S/. 70.73 S/. 318.29 ACARREO DE MATERIAL PARA RRELLENO DE MURO Y DE LIMPIEZA
22-Sep-16 CAMIONETA EGE 873 37031 GASOLINA 3.00 S/. 9.95 S/. 29.85 2.00 0.25 S/. 250.00 S/. 125.00 APOYO A LA OBRA TRASLADO DE MATERIAL
21-Sep-16 VOLQUETE V-84 37723 PETROLEO 5.00 S/. 10.15 S/. 50.75 7.00 0.875 S/. 75.36 S/. 461.58 APOYO A LA OBRA TRASLADO DE MATERIAL
20-Sep-16 VOLQUETE V-72 37469 PETROLEO 10.00 S/. 10.15 S/. 101.50 7.00 0.875 S/. 56.20 S/. 344.23 TRASLADO MATERIAL FIERROS DE LA OBRA AV.TUPAC AMARU TRAMO 2
CARGUEO DE MATERIAL DE NUEVA ALTA Y CARGUEO DE PIEDRA PARA
14-Sep-16 RETROESCAVADORA CR-13 25550 PETROLEO 20.00 S/. 10.15 S/. 203.00 7.00 0.875 S/. 70.73 S/. 433.22 MURO DE SAN SEBASTIAN
Y EXCAVACION PARA AGUAS PLUVIALES
TRASLADO DE AGREGADO DE OBRA NUEVA ALTA A OBRA,TRASLADO DE
14-Sep-16 VOLQUETE V-157 25933 PETROLEO 15.00 S/. 10.15 S/. 152.25 5.00 0.625 S/. 119.13 S/. 372.28 PIEDRA
DE MALECON A OBRA
CARGUEO DE DESMONTE Y ESCAVACION DE ZANJA PARA MURO DE
13-Sep-16 RETROESCAVADORA CR-12 39214 PETROLEO 15.00 S/. 10.15 S/. 152.25 7.00 0.875 S/. 70.73 S/. 433.22 CONTENCION,
CARGUEO DE MATERIAL PARA MURO DE CONTENCION
ELIMINACION DE DESMONTE POR UN VIAJE A BOTADERO MAS 6 VIAJES A
13-Sep-16 VOLQUETE V-153 39017 PETROLEO 20.00 S/. 10.15 S/. 203.00 6.00 0.75 S/. 119.13 S/. 536.09 AREAS
VERDES
TRASLADO DE CEMENTO DE ALMUDENA ALA OBRA MAS FORMAS DE
12-Sep-16 VOLQUETE V-81 37188 PETROLEO 10.00 S/. 10.15 S/. 101.50 4.50 0.5625 S/. 119.13 S/. 301.55 MANELON
A LA OBRA
10-Sep-16 CAMIONETA EGE 862 1519 PETROLEO 0.50 S/. 10.15 S/. 5.08 2.00 0.25 S/. 60.00 S/. 30.00 TRASLADO DE COMBUSTIBLE A OBRA
9-Sep-16 CARGADOR FRONTAL C-42 25486 PETROLEO 30.00 S/. 10.15 S/. 304.50 7.00 0.875 S/. 136.94 S/. 838.76 ELIMINACION DE DESMONTE DE OBRA POR 4 VIAJES
9-Sep-16 VOLQUETE V-153 39015 PETROLEO 20.00 S/. 10.15 S/. 203.00 7.00 0.875 S/. 119.13 S/. 729.67 ELIMINACION DE DESMONTE DE OBRA POR 4 VIAJES
9-Sep-16 VOLQUETE V-154 39066 PETROLEO 25.00 S/. 10.15 S/. 253.75 7.00 0.875 S/. 119.13 S/. 729.67 ELIMINACION DE DESMONTE CON C-42 A PILLAO MATAO 03 Y 03 A ARCOPATA
9-Sep-16 VOLQUETE V-152 25640 PETROLEO 20.00 S/. 10.15 S/. 203.00 7.00 0.875 S/. 119.13 S/. 729.67 ELIMINACION DE DESMONTE 04 VIAJES A BOTADERO DE PILLAO MATAO
9-Sep-16 VOLQUETE V-151 37871 PETROLEO 22.00 S/. 10.15 S/. 223.30 6.00 0.75 S/. 119.13 S/. 536.09 ELIMINACION DE DESMONTE A PILLAO MATAO 4 VIAJES
8-Sep-16 MOTONIVELADORA M-33 37910 PETROLEO 25.00 S/. 10.15 S/. 253.75 7.00 0.875 S/. 250.00 S/. 1,531.25 CORTE DE SUB RASANTE
8-Sep-16 RETROESCAVADORA CR-14 25698 PETROLEO 18.00 S/. 10.15 S/. 182.70 7.50 0.9375 S/. 70.73 S/. 497.32 CARGUEO DE DESMONTE A LOS VOLQUETES Y EXCAVACION PARA MURO
8-Sep-16 VOLQUETE V-156 25283 PETROLEO 15.00 S/. 10.15 S/. 152.25 5.00 0.625 S/. 119.13 S/. 372.28 TRASLADO DE MATERIAL DE ELIMINACION 4 VIAJES
ELIMINACION DE DESMONTE DE LA OBRA AL BOTADERO MATAO PILLAO ,
8-Sep-16 VOLQUETE V-159 29899 PETROLEO 20.00 S/. 10.15 S/. 203.00 6.50 0.8125 S/. 119.13 S/. 629.16
TRASLADO DE COMBUSTIBLE DEL GRIFO A LA OBRA
7-Sep-16 RODILLO VIBRATORIO R-2 28943 PETROLEO 5.00 S/. 10.15 S/. 50.75 1.00 0.125 S/. 100.00 S/. 12.50 PLANCHA DE SUBRASANTE DE LA CALLE ANTISUYO
TRASLADO TUBO DE LA OBRA CALVARIO A LA OBRA Y OTROS
7-Sep-16 VOLQUETE V-159 29898 PETROLEO 8.00 S/. 10.15 S/. 81.20 4.00 0.5 S/. 119.13 S/. 238.26
TRASLADOS CILINDROS ABIERTOS DEL ALMACEN GRAU A OBRA
7-Sep-16 MOTONIVELADORA M-33 37909 PETROLEO 25.00 S/. 10.15 S/. 253.75 7.00 0.875 S/. 120.00 S/. 735.00 CORTE DE SUBRASANTE
STAND BY POR NIVELAMIENTO DE SUELO, LUEGO PLANCHADO DE VIA
6-Sep-16 RODILLO VIBRATORIO R-2 28942 PETROLEO RESERVA S/. 10.15 S/. 0.00 1.00 0.125 S/. 120.00 S/. 15.00 ANTISUYO, RODAMIENTO
DE OBRA DE BUENA VISTA A OBRA
6-Sep-16 VOLQUETE V-153 39012 PETROLEO 20.00 S/. 10.15 S/. 203.00 7.00 0.875 S/. 119.13 S/. 729.67 ELIMINACION DE DESMONTE DE OBRA A BOTADERO PILLAO MATAO POR 4 VIAJES
6-Sep-16 VOLQUETE V-154 39063 PETROLEO 20.00 S/. 10.15 S/. 203.00 8.50 1.0625 S/. 119.13 S/. 1,075.89 ELIMINACION DE DESMONTE A PILLAO MATAO CON CR-12, 4 VIAJES
6-Sep-16 RETROESCAVADORA CR-12 39206 PETROLEO 15.00 S/. 10.15 S/. 152.25 8.00 1 S/. 70.73 S/. 565.84 ELIMINACION DE DESMONTE , LIMPIEZA, ACUMULACION DE TIERRA
6-Sep-16 MOTONIVELADORA M-33 37908 PETROLEO 25.00 S/. 10.15 S/. 253.75 7.00 0.875 S/. 50.00 S/. 306.25 CORTE DE SUB RASANTE
GASOLINA 3.00 S/. 10.15 S/. 29.85 2.00 S/. 125.00
PETROLEO 448.50 S/. 9.95 S/. 4,552.28 164.00 S/. 13,955.03
S/. 4,582.13 166.00 S/. 14,080.03
CORRESPONDIENTE AL MES DE : OCTUBRE
TOTAL
FECHA MAQUINARIA N Part. Diar. COMB. CANT. GL P.U HM/TRAB %REND COSTO HM IMPORTE HM ACTIVIDAD REALIZADA
COMBUSTIBLE
1-Oct-16 CAMIONETA EGE-866, 1538 GASOLINA 3 S/. 9.95 S/. 29.85 2 0.25 S/. 60.00 S/. 30.00 TRASLADO DE COMBUSTIBLE
3-Oct-16 CAMIONETA EGE 873 37036 GASOLINA 3.00 S/. 9.95 S/. 29.85 2.00 0.25 S/. 60.00 S/. 30.00 TRASALDO DE MATERIALES, TUBO Y OTROS INDEPENDENCIA TRAMO II TUPAC AMARU
3-Oct-16 VOLQUETE V-155 39661 PETROLEO 15.00 S/. 10.15 S/. 152.25 5.50 0.6875 S/. 119.13 S/. 450.46 ELIMACION DE DESMONTE
3-Oct-16 VOLQUETE V-153 39032 PETROLEO 10.00 S/. 10.15 S/. 101.50 5.00 0.625 S/. 119.13 S/. 372.28 ELIMACION DE DESMONTE DE OBRA A VOTADERO
3-Oct-16 VOLQUETE V-154 39082 PETROLEO 15.00 S/. 10.15 S/. 152.25 7.00 0.875 S/. 119.13 S/. 729.67 ELIMACION DE DESMONTE DE OBRA A VOTADERO
3-Oct-16 MOTONIVELADORA M-32 25792 PETROLEO 25.00 S/. 10.15 S/. 253.75 7.00 0.875 S/. 90.93 S/. 556.95 CORTE A NIVEL DE SUBRASANTE
3-Oct-16 RETROESCAVADORA CR-14 39517 PETROLEO 20.00 S/. 10.15 S/. 203.00 7.00 0.875 S/. 70.73 S/. 433.22 CARGUIO DE DESMONTE A LOS VOLQUETES
3-Oct-16 VOLQUETE V-157 25950 PETROLEO 5.00 S/. 10.15 S/. 50.75 2.00 0.25 S/. 119.13 S/. 59.57 TRASLADO DE AGREGADO DE OBRA GRAU A OBRA.
4-Oct-16 RODILLO VIBRATORIO R-4 25388 PETROLEO 5.00 S/. 10.15 S/. 50.75 3.00 0.375 S/. 96.93 S/. 109.05 COMPACTACION DE JR ANTISUYO PARA COLOCADO DE MATERIAL
4-Oct-16 TRACTOR CISTERNA TA.01 29639 PETROLEO 5.00 S/. 10.15 S/. 50.75 7.00 0.875 S/. 36.67 S/. 224.60 TRASLADO DE AGUA PARA RIEGO DE CONFORMACION
4-Oct-16 MOTONIVELADORA M-32 25793 PETROLEO 30.00 S/. 10.15 S/. 304.50 7.30 0.9125 S/. 90.93 S/. 605.71 CORTE A NIVEL DE SUBRASANTE
5-Oct-16 VOLQUETE R-4 25389 PETROLEO 8.00 S/. 10.15 S/. 81.20 4.00 0.5 S/. 119.13 S/. 238.26 COMPACTACION DE JR ANTISUYO PARA COLOCADO DE MATERIAL
5-Oct-16 MOTONIVELADORA M-32 25794 PETROLEO 25.00 S/. 10.15 S/. 253.75 6.00 0.75 S/. 90.93 S/. 409.19 CORTE A NIVEL DE SUBRASANTE
5-Oct-16 RETROESCAVADORA CR-14 39519 PETROLEO 15.00 S/. 10.15 S/. 152.25 6.00 0.75 S/. 70.73 S/. 318.29 CARGUIO DE DESMONTE A LOS VOLQUETES Y ACUMULACION
5-Oct-16 TRACTOR CISTERNA TA.01 29640 PETROLEO REMANENTE S/. 10.15 5.00 0.625 S/. 36.67 S/. 114.59 TRASLADO DE AGUA PARA RIEGO DE CONFORMACION DE SUBRASANTE
5-Oct-16 VOLQUETE V-157 39952 PETROLEO 10.00 S/. 10.15 S/. 101.50 7.00 0.875 S/. 119.13 S/. 729.67 RECOJO DE COMBUSTIBLE A OBRA , TRASLADO DE MATERIALES EN OBRA
6-Oct-16 MOTONIVELADORA M-32 25795 PETROLEO 30.00 S/. 10.15 S/. 304.50 7.00 0.875 S/. 90.93 S/. 556.95 CORTE A NIVEL DE SUBRASANTE
6-Oct-16 TRACTOR CISTERNA TA.01 29641 PETROLEO 3.00 S/. 10.15 S/. 30.45 6.00 0.75 S/. 36.67 S/. 165.02 TRASLADO DE AGUA PARA RIEGO DE CONFORMACION DE SUBRASANTE
6-Oct-16 RODILLO VIBRATORIO R-4 25390 PETROLEO 5.00 S/. 10.15 S/. 50.75 3.00 0.375 S/. 96.93 S/. 109.05 COMPACTACION DE JR ANTISUYO PARA COLOCADO DE MATERIAL
6-Oct-16 CAMIONETA EGE-864 1548 GASOLINA 5.00 S/. 9.95 S/. 49.75 7.50 0.9375 S/. 60.00 S/. 421.88 TRASLADO DE COMBUSTIBLE
7-Oct-16 MOTONIVELADORA M-32 25796 PETROLEO 30.00 S/. 10.15 S/. 304.50 7.50 0.9375 S/. 90.93 S/. 639.35 CORTE A NIVEL DE SUBRASANTE
7-Oct-16 RETROESCAVADORA CR-13 39621 PETROLEO 13.00 S/. 10.15 S/. 131.95 13.00 1.625 S/. 70.73 S/. 1,494.17 ELIMACION DE DESMONTE
7-Oct-16 RODILLO VIBRATORIO R-4 25391 PETROLEO 10.00 S/. 10.15 S/. 101.50 4.00 0.5 S/. 96.93 S/. 193.86 COMPACTACION DE JR ANTISUYO PARA COLOCADO DE MATERIAL
7-Oct-16 VOLQUETE V-151 37894 PETROLEO 7.00 S/. 10.15 S/. 71.05 2.00 0.25 S/. 119.13 S/. 59.57 ELIMINACION DE DESMONTE
7-Oct-16 VOLQUETE V-152 39760 PETROLEO 5.00 S/. 10.15 S/. 50.75 2.00 0.25 S/. 119.13 S/. 59.57 ELIIMINACION DE DESMONTE
7-Oct-16 TRACTOR CISTERNA TA.01 29642 PETROLEO 3.00 S/. 10.15 S/. 30.45 7.00 0.875 S/. 36.67 S/. 224.60 TRASLADO DE AGUA PARA RIEGO DE CONFORMACION DE SUBRASANTE
10-Oct-16 RODILLO VIBRATORIO R-4 25393 PETROLEO 4.00 S/. 10.15 S/. 40.60 1.50 0.1875 S/. 96.93 S/. 27.26 COMPACTACION DE JR ANTISUYO PARA COLOCADO DE MATERIAL
12-Oct-16 TRACTOR ORUGA TO.74 29470 PETROLEO 10.00 S/. 10.15 S/. 101.50 2.00 0.25 S/. 208.18 S/. 104.09 NIVELACION DE VOTADERO EN PILLAO MATAO
18-Oct-16 CARGADOR FRONTAL C-42 38162 PETROLEO 25.00 S/. 10.15 S/. 253.75 7.00 0.875 S/. 136.94 S/. 838.76 PREPARADO Y CARGIO DE MATERIAL DEL RIO SAPI
18-Oct-16 VOLQUETE V-157 39960 PETROLEO 20.00 S/. 10.15 S/. 203.00 7.00 0.875 S/. 119.13 S/. 729.67 TRASLADO DE MATERIAL OVER DE RIO SAPI A OBRA
18-Oct-16 VOLQUETE V-158 39189 PETROLEO 20.00 S/. 10.15 S/. 203.00 7.50 0.9375 S/. 119.13 S/. 837.63 TRASLADO DE MATERIAL OVER DE RIO SAPI A OBRA
18-Oct-16 MINIBUS EGI-612 22137 PETROLEO 2.00 S/. 10.15 S/. 20.30 2.00 0.25 S/. 60.00 S/. 30.00 AUXILIO MECANICO A MOTONIVELADORA MT-35
18-Oct-16 MOTONIVELADORA M-35 37623 PETROLEO 20.00 S/. 10.15 S/. 203.00 7.00 0.875 S/. 90.93 S/. 556.95 CORTE A NIVEL DE SUBRASANTE Y CONFORMADO
18-Oct-16 CAMIONETA EGE 866 1549 GASOLINA 5.00 S/. 9.95 S/. 49.75 2.00 0.25 S/. 60.00 S/. 30.00 TRASLADO DE MATERIAL OVER DE RIO SAPI A OBRA
19-Oct-16 MOTONIVELADORA MT-35 37624 PETROLEO 20.00 S/. 10.15 S/. 203.00 7.00 0.875 S/. 90.93 S/. 556.95 CORTE A NIVEL DE SUBRASANTE Y ACOMODO DE DESMONTE
19-Oct-16 RODILLO VIBRATORIO R-3 37985 PETROLEO 8.00 S/. 10.15 S/. 81.20 4.00 0.5 S/. 96.93 S/. 193.86 COMPACTACION SUBRASANTE
20-Oct-16 RODILLO VIBRATORIO R-3 37986 PETROLEO 0.00 S/. 10.15 S/. 0.00 0.00 0 S/. 96.93 S/. 0.00 COMPACTADO DE SUBRSANTE
21-Oct-16 MOTONIVELADORA M-32 25799 PETROLEO 25.00 S/. 10.15 S/. 253.75 7.00 0.875 S/. 90.93 S/. 556.95 TENDIDO DE MATERIAL , CORTE A NIVEL DE SUBRASANTE
21-Oct-16 RODILLO VIBRATORIO R-3 37987 PETROLEO 5.00 S/. 10.15 S/. 50.75 6.00 0.75 S/. 96.93 S/. 436.19 COMPACTADO DE SUBRSANTE
24-Oct-16 RODILLO VIBRATORIO R-3 37987 PETROLEO 5.00 S/. 10.15 S/. 50.75 6.00 0.75 S/. 96.93 S/. 436.19 COMPACTACION DE SUBRASANTE
25-Oct-16 RETROESCAVADORA CR-14 39534 PETROLEO 15.00 S/. 10.15 S/. 152.25 7.00 0.875 S/. 70.73 S/. 433.22 CARGUIO DE DESMONTE A VOLQUETES
25-Oct-16 MOTONIVELADORA M-32 32001 PETROLEO 10.00 S/. 10.15 S/. 101.50 2.00 0.25 S/. 90.93 S/. 45.47 CORTE A NIVEL DE SUBRASANTE
25-Oct-16 CAMIONETA EGE 873 38751 GASOLINA 5.00 S/. 9.95 S/. 49.75 2.00 0.25 S/. 70.73 S/. 35.37 AXULIO MECANICO A M-35
25-Oct-16 VOLQUETE V-153 39050 PETROLEO 20.00 S/. 10.15 S/. 203.00 6.50 0.8125 S/. 119.13 S/. 629.16 TRASLADO DE DESMONTE BOTADERO
25-Oct-16 VOLQUETE V-152 39775 PETROLEO 15.00 S/. 10.15 S/. 152.25 7.00 0.875 S/. 119.13 S/. 729.67 TRASLADO DE DESMONTE BOTADERO
26-Oct-16 MOTONIVELADORA M-35 37629 PETROLEO 20.00 S/. 10.15 S/. 203.00 7.00 0.875 S/. 90.93 S/. 556.95 CORTE DE SUBRASANTE Y CONFORMADO
26-Oct-16 RODILLO VIBRATORIO R-3 37988 PETROLEO 15.00 S/. 10.15 S/. 152.25 4.00 0.5 S/. 96.93 S/. 193.86 COMPACTACION Y MEJORAMIENTO DE SUBRASANTE
27-Oct-16 CAMIONETA EGE-873 38754 GASOLINA 3.00 S/. 9.95 S/. 29.85 2.00 0.25 S/. 60.00 S/. 30.00 TRASLADO DE MATERIAL OVER DE RIO SAPI A OBRA
28-Oct-16 RETROESCAVADORA CR-14 39537 PETROLEO 15.00 S/. 10.15 S/. 152.25 6.00 0.75 S/. 70.73 S/. 318.29 CARGUIO DE DESMONTE A LOS VOLQUETES
28-Oct-16 VOLQUETE V-158 39198 PETROLEO 20.00 S/. 10.15 S/. 203.00 5.00 0.625 S/. 119.13 S/. 372.28 ELIMINACION DE DESMONTE A PILLAO MATAO
28-Oct-16 MOTONIVELADORA M-32 32002 PETROLEO 20.00 S/. 10.15 S/. 203.00 6.00 0.75 S/. 90.93 S/. 409.19 CORTE A NIVEL DE SUBRASANTE
28-Oct-16 RODILLO VIBRATORIO R-3 37989 PETROLEO 5.00 S/. 10.15 S/. 50.75 2.00 0.25 S/. 96.93 S/. 48.47 COMPACTACION Y MEJORAMIENTO DE SUBRASANTE
28-Oct-16 VOLQUETE V-157 39968 PETROLEO 20.00 S/. 10.15 S/. 203.00 7.00 0.875 S/. 119.13 S/. 729.67 TRASLADO DE DESMONTE BOTADERO
28-Oct-16 CAMIONETA EGE-864 2152 GASOLINA 5.00 S/. 9.95 S/. 49.75 2.00 0.25 S/. 60.00 S/. 30.00 TRASLADO DE MATERIAL OVER DE RIO SAPI A OBRA
29-Oct-16 RETROESCAVADORA CR-14 39538 PETROLEO 10.00 S/. 10.15 S/. 101.50 4.00 0.5 S/. 70.73 S/. 141.46 CARGUIO DE DESMONTE A LOS VOLQUETES
29-Oct-16 VOLQUETE V-159 39489 PETROLEO 10.00 S/. 10.15 S/. 101.50 3.00 0.375 S/. 119.13 S/. 134.02 ELIMINACION DE DESMONTE A PILLAO MATAO
29-Oct-16 MOTONIVELADORA M-32 32003 PETROLEO 15.00 S/. 10.15 S/. 152.25 4.50 0.5625 S/. 90.93 S/. 230.17 MEJORAMIENTO DE SUBRASANTE
29-Oct-16 VOLQUETE V-158 39199 PETROLEO 10.00 S/. 10.15 S/. 101.50 3.50 0.4375 S/. 119.13 S/. 182.42 ELIMINACION DE DESMONTE A PILLAO MATAO
29-Oct-16 RODILLO VIBRATORIO R-3 37990 PETROLEO 5.00 S/. 10.15 S/. 50.75 1.50 0.1875 S/. 96.93 S/. 27.26 COMPACTACION Y MEJORAMIENTO DE SUBRASANTE
31-Oct-16 VOLQUETE V-84 37749 PETROLEO 15.00 S/. 10.15 S/. 152.25 7.00 0.875 S/. 119.13 S/. 729.67 ELIMINACION DE DESMONTE
31-Oct-16 MINICARGADOR MC-01 38078 PETROLEO 5.00 S/. 10.15 S/. 50.75 6.00 0.75 S/. 63.35 S/. 285.08 ACARREO DE DESMONTE AL VOLQUETE
GASOLINA 29.00 S/. 10.15 S/. 288.55 19.50 S/. 607.24
PETROLEO 703.00 S/. 9.95 S/. 7,135.45 283.30 S/. 20,354.38
S/. 7,424.00 302.80 S/. 20,961.62
CORRESPONDIENTE AL MES DE : NOVIEMBRE

FECHA MAQUINARIA N Part. Diar. COMB. CANT. GL P.U TOTAL COMBUSTIBLE HM/TRAB %REND COSTO HM IMPORTE HM ACTIVIDAD REALIZADA
2-Nov-16 CARGADOR FRONTAL C-42 38172 PETROLEO 15.00 S/. 10.15 S/. 152.25 4.00 0.50 S/. 136.94 S/. 273.88 CARGUIO DE DESMONTE EN OBRA
2-Nov-16 VOLQUETE V-158 32053 PETROLEO 15.00 S/. 10.15 S/. 152.25 3.50 0.44 S/. 119.13 S/. 182.42 ELIMINACION DE DESMONTE VOTADERO A MATAO PILLAO
2-Nov-16 VOLQUETE V-152 39780 PETROLEO 18.00 S/. 10.15 S/. 182.70 4.00 0.50 S/. 119.13 S/. 238.26 ELIMINACION DE DESMONTE A VOTADERO MATAO PILLAO
2-Nov-16 VOLQUETE V- 151 38516 PETROLEO 15.00 S/. 10.15 S/. 152.25 4.00 0.50 S/. 119.13 S/. 238.26 ELIMINACION DE DESMONTE A VOTADERO MATAO PILLAO
3-Nov-16 MINI CARGADOR MC-01 38079 PETROLEO 7.00 S/. 10.15 S/. 71.05 4.00 0.50 S/. 63.35 S/. 126.70 PERFORACION DE CONCRETO CON MARTILLO HIDRULICO
8-Nov-16 VOLQUETE V-84 38952 PETROLEO 15.00 S/. 10.15 S/. 152.25 5.00 0.63 S/. 119.13 S/. 372.28 ELIMINACION DE DESMONTE
8-Nov-16 MINI CARGADOR MC- 01 38081 PETROLEO 8.00 S/. 10.15 S/. 81.20 6.00 0.75 S/. 63.35 S/. 285.08 ACUMULADION DE DESMONTE Y CARGUIO AL VOLQUETE
11-Nov-16 CAMIONETA EGE-873 38767 GASOLINA 3.00 S/. 9.95 S/. 29.85 2.00 0.25 S/. 60.00 S/. 30.00 AUXILIO MECANICO
11-Nov-16 MOTONIVELADORA M-35 37632 PETROLEO 20.00 S/. 10.15 S/. 203.00 7.00 0.88 S/. 90.93 S/. 556.95 PROCESADO DE MATERIAL LASTRE Y CONFORMADO DE SUB BASE
11-Nov-16 RODILLO VIBRATORIO R-3 37995 PETROLEO 10.00 S/. 10.15 S/. 101.50 4.00 0.50 S/. 96.93 S/. 193.86 COMPACTACION Y MEJORAMIENTO DE SUB RASANTE
12-Nov-16 VOLQUETE V-151 38324 PETROLEO 18.00 S/. 10.15 S/. 182.70 4.00 0.50 S/. 119.13 S/. 238.26 ELIMINACION DE DESMONTE A VOTADERO MATAO PILLAO
12-Nov-16 VOLQUETE V-152 39787 PETROLEO 18.00 S/. 10.15 S/. 182.70 5.00 0.63 S/. 119.13 S/. 372.28 ELIMINACION DE DESMONTE A VOTADERO MATAO PILLAO
12-Nov-16 RODILLO VIBRATORIO R-3 37996 PETROLEO REMANENTE S/. 10.15 1.00 0.13 S/. 96.93 S/. 12.12 RECOMPACTACION DE SUBRAZANTE
12-Nov-16 CARGADOR FRONTAL C-93 39877 PETROLEO 15.00 S/. 10.15 S/. 152.25 5.00 0.63 S/. 136.94 S/. 427.94 CARGUIO DE DESMONTE A VOLQUETES
14-Nov-16 MOTONIVELADORA M-35 37634 PETROLEO 15.00 S/. 10.15 S/. 152.25 4.50 0.56 S/. 90.93 S/. 230.17 PERFILADO Y CORTE DE SUBRASANTE
14-Nov-16 RODILLO VIBRATORIO R-3 37997 PETROLEO 5.00 S/. 10.15 S/. 50.75 2.00 0.25 S/. 96.93 S/. 48.47 COMPACTACION Y MEJORAMIENTO DE SUB RASANTE
16-Nov-16 VOLQUETE V-152 39790 PETROLEO 28.00 S/. 10.15 S/. 284.20 7.00 0.88 S/. 119.13 S/. 729.67 TRASLADO DE PIEDRA DE MAMELON A OBRA
16-Nov-16 RETROEXCAVADORA CR-12 38860 PETROLEO 18.00 S/. 10.15 S/. 182.70 7.00 0.88 S/. 70.73 S/. 433.22 CARGIO DE DESMONTE Y TRASLADO DE PIEDRA DEL MAMELON
16-Nov-16 VOLQUETE V-151 38527 PETROLEO 21.00 S/. 10.15 S/. 213.15 6.00 0.75 S/. 119.13 S/. 536.09 ELIMACION DE DESMONTE Y TRASLADO DE PIEDRA
16-Nov-16 CARGADOR FRONTAL C-42 38183 PETROLEO 10.00 S/. 10.15 S/. 101.50 3.00 0.38 S/. 136.94 S/. 154.06 CARGIO DE DESMONTE Y TRASLADO DE PIEDRA DEL MAMELON
18-Nov-16 CAMIONETA EGE-873 38777 GASOLINA 3.00 S/. 9.95 S/. 29.85 2.00 0.25 S/. 60.00 S/. 30.00 AUXILIO MECANICO
18-Nov-16 MOTONIVELADORA M-35 37635 PETROLEO 10.00 S/. 10.15 S/. 101.50 4.00 0.50 S/. 90.93 S/. 181.86 BATIDO Y CONFORMADO DE SUBRASANTE
18-Nov-16 RODILLO VIBRATORIO R-3 37999 PETROLEO 5.00 S/. 10.15 S/. 50.75 2.00 0.50 S/. 96.93 S/. 96.93 COMPACTACION Y MEJORAMIENTO DE SUB RASANTE
18-Nov-16 CARGADOR FRONTAL C-42 38183 PETROLEO 10.00 S/. 10.15 S/. 101.50 4.00 0.50 S/. 136.94 S/. 273.88 ACARREO DE MATERIAL A VOLQUETE
18-Nov-16 VOLQUETE V-84 PETROLEO 13.00 S/. 10.15 S/. 131.95 5.00 0.50 S/. 119.13 S/. 297.83 ACARREO DE MATERIALES A OBRA
19-Nov-16 CAMIONETA EGE-873 38778 GASOLINA 3.00 S/. 9.95 S/. 29.85 2.00 0.50 S/. 60.00 S/. 60.00 AUXILIO MECANICO
21-Nov-16 MOTONIVELADORA M-32 32017 PETROLEO 25.00 S/. 10.15 S/. 253.75 5.50 0.50 S/. 90.93 S/. 250.06 PERFILADO Y CORTE DE SUBRASANTE
21-Nov-16 RODILLO VIBRATORIO R-3 32601 PETROLEO 5.00 S/. 10.15 S/. 50.75 1.50 0.50 S/. 96.93 S/. 72.70 COMPACTACION Y MEJORAMIENTO DE SUB RASANTE
22-Nov-16 MOTONIVELADORA M-32 32018 PETROLEO 25.00 S/. 10.15 S/. 253.75 6.50 0.50 S/. 90.93 S/. 295.52 PERFILADO Y CORTE DE SUBRASANTE
22-Nov-16 TRACTOR CISTERNA TA-01 38613 PETROLEO 5.00 S/. 10.15 S/. 50.75 6.00 0.50 S/. 136.94 S/. 410.82 TRASLADO DE AGUA Y RIEGO PARA CONFORMADO DE SUBRASANTE
23-Nov-16 VOLQUETE V-156 38341 PETROLEO 3.00 S/. 10.15 S/. 30.45 6.00 0.50 S/. 119.13 S/. 357.39 ELIMINACION DE DESMONTE VOTADERO A MATAO PILLAO
23-Nov-16 TRACTOR CISTERNA TA-01 38614 PETROLEO 5.00 S/. 10.15 S/. 50.75 5.00 0.50 S/. 36.67 S/. 91.68 TRASLADO DE AGUA Y RIEGO PARA CONFORMADO DE SUBRASANTE
23-Nov-16 RODILLO VIBRATORIO R-3 32603 PETROLEO 5.00 S/. 10.15 S/. 50.75 5.00 0.63 S/. 96.93 S/. 302.91 COMPACTACION Y MEJORAMIENTO DE SUB RASANTE
23-Nov-16 MOTONIVELADORA M-33 37923 PETROLEO 20.00 S/. 10.15 S/. 203.00 5.50 0.69 S/. 90.93 S/. 343.83 COMPACTACION Y MEJORAMIENTO DE SUB RASANTE
24-Nov-16 MOTONIVELADORA M-33 37924 PETROLEO 20.00 S/. 10.15 S/. 203.00 5.00 0.63 S/. 90.93 S/. 284.16 CORTE Y NIVELACION DE SUBRASANTE
24-Nov-16 RETROEXCAVADORA CR-13 32261 PETROLEO 15.00 S/. 10.15 S/. 152.25 7.00 0.88 S/. 70.73 S/. 433.22 ACARREO DE AGREGADO DE NUEVA ALTA Y TUPAC AMARU A OBRA
24-Nov-16 VOLQUETE V-159 32456 PETROLEO 20.00 S/. 10.15 S/. 203.00 4.00 0.50 S/. 119.13 S/. 238.26 ACARREO DE AGREGADO DE NUEVA ALTA Y TUPAC AMARU A OBRA
24-Nov-16 RODILLO VIBRATORIO R-2 38661 PETROLEO 8.00 S/. 10.15 S/. 81.20 2.30 0.29 S/. 96.93 S/. 64.09 COMPACTACION Y MEJORAMIENTO DE SUB RASANTE
24-Nov-16 TRACTOR CISTERNA TA-01 38615 PETROLEO REMANENTE S/. 10.15 4.00 0.50 S/. 36.67 S/. 73.34 TRASLADO DE AGUA Y RIEGO PARA CONFORMADO DE SUBRASANTE
24-Nov-16 CAMIONETA EGE-864 2180 GASOLINA 5.00 S/. 9.95 S/. 49.75 2.00 S/. 60.00 S/. 0.00 TRASLADO DE MATERIALES A OBRA
29-Nov-16 CAMIONETA EGE-873 38785 GASOLINA 4.00 S/. 9.95 S/. 39.80 2.00 0.25 S/. 60.00 S/. 30.00 TRASLADO DE COMBUSTIBLE A OBRA
29-Nov-16 VOLQUETE V-154 38722 PETROLEO 24.00 S/. 10.15 S/. 243.60 7.00 0.88 S/. 119.13 S/. 729.67 ELIMINACION DE DESMONTE A VOTADERO MATAO PILLAO
29-Nov-16 VOLQUETE V-153 38826 PETROLEO 18.00 S/. 10.15 S/. 182.70 7.00 0.88 S/. 119.13 S/. 729.67 ELIMINACION DE DESMONTE A VOTADERO MATAO PILLAO
29-Nov-16 CARGADOR FRONTAL C-42 38192 PETROLEO 18.00 S/. 10.15 S/. 182.70 6.00 0.75 S/. 136.94 S/. 616.23 CARGIO DE DESMONTE EN OBRA
GASOLINA 18.00 S/. 10.15 S/. 179.10 10.00 S/. 150.00
PETROLEO 525.00 S/. 9.95 S/. 5,328.75 142.80 S/. 11,793.98
S/. 5,507.85 152.80 S/. 11,943.98
CORRESPONDIENTE AL MES DE : DICIEMBRE

FECHA MAQUINARIA N Part. Diar. COMB. CANT. GL P.U TOTAL COMBUSTIBLE


HM/TRAB %REND COSTO HM IMPORTE HM ACTIVIDAD REALIZADA
1-Dec-16 VOLQUETE V-154 38724 PETROLEO 10.00 S/. 10.15 S/. 101.50 8.00 100.00% S/. 119.13 S/. 953.04 TRASLADO DE CEMENTO DEL ALMACEN MIRADOR A LA OBRA
1-Dec-16 VOLQUETE V-153 38828 PETROLEO 10.00 S/. 10.15 S/. 101.50 7.00 87.50% S/. 119.13 S/. 729.67 TRASALDO DE CEMENTO DE ALMACEN CENTRAL A OBRA
6-Dec-16 MOTONIVELADORA M-33 37926 PETROLEO 10.00 S/. 10.15 S/. 101.50 2.00 25.00% S/. 90.93 S/. 45.47 TENDIDO DE MATERIAL LASTRE PARA BASE
6-Dec-16 RODILLO VIBRATORIO R-2 38662 PETROLEO 5.00 S/. 10.15 S/. 50.75 1.00 12.50% S/. 96.93 S/. 12.12 COMPACTADO DE MATERIAL LASTRE
7-Dec-16 MOTONIVELADORA M-33 37927 PETROLEO 20.00 S/. 10.15 S/. 203.00 6.00 75.00% S/. 90.93 S/. 409.19 BATIDO Y ALMACENADO DE MATERIAL LASTRE PARA BASE
7-Dec-16 VOLQUETE V-156 38346 PETROLEO 15.00 S/. 10.15 S/. 152.25 7.50 93.75% S/. 119.13 S/. 837.63 TRASLADO DE AGREGADO Y DE GEOMALLA
7-Dec-16 RODILLO VIBRATORIO R-2 38663 PETROLEO 5.00 S/. 10.15 S/. 50.75 3.00 37.50% S/. 96.93 S/. 109.05 COMPACTADO DE MATERIAL LASTRE
9-Dec-16 MOTONIVELADORA M-33 37928 PETROLEO 35.00 S/. 10.15 S/. 355.25 10.00 125.00% S/. 90.93 S/. 1,136.63 BATIDO,CONFORMADO DE GEOMALLA BIAXIAL
9-Dec-16 RODILLO VIBRATORIO R-2 38664 PETROLEO 5.00 S/. 10.15 S/. 50.75 6.50 81.25% S/. 96.93 S/. 511.91 COMPACTADO,CONFORMADO DE BASE
10-Dec-16 RODILLO VIBRATORIO R-2 38665 PETROLEO 15.00 S/. 10.15 S/. 152.25 6.50 81.25% S/. 96.93 S/. 511.91 COMPACTADO,CONFORMADO DE BASE
10-Dec-16 MOTONIVELADORA M-33 37929 PETROLEO 20.00 S/. 10.15 S/. 203.00 6.50 81.25% S/. 90.93 S/. 480.22 BATIDO YCONFORMADO DE BASE
12-Dec-16 CAMIONETA EGE 873 38791 GASOLINA 3.00 S/. 9.95 S/. 29.85 0.00 0.00% S/. 150.00 S/. 0.00 AUXILIO MECANICO AL M-33, SISTEMA DE TRANSMISION
12-Dec-16 MOTONIVELADORA M-33 37930 PETROLEO 25.00 S/. 10.15 S/. 253.75 7.50 93.75% S/. 90.93 S/. 639.35 BATIDO Y CONFORMADO DE BASE Y CORTE DE NIVELACION
12-Dec-16 RODILLO VIBRATORIO R-2 38666 PETROLEO 5.00 S/. 10.15 S/. 50.75 7.00 87.50% S/. 96.93 S/. 593.70 COMPACTADO Y CONFORMADO DE BASE
13-Dec-16 RETROESCAVADORA CR-14 32377 PETROLEO 8.00 S/. 10.15 S/. 81.20 8.00 100.00% S/. 150.00 S/. 1,200.00 ACARREO , ACUMULACION Y TRASLADO DE MATERIAL Y ARENA
13-Dec-16 RODILLO VIBRATORIO R-2 38667 PETROLEO 10.00 S/. 10.15 S/. 101.50 7.00 87.50% S/. 96.93 S/. 593.70 COMPACTADO CONFORMADO DE BASE
13-Dec-16 MOTONIVELADORA M-33 37931 PETROLEO 25.00 S/. 10.15 S/. 253.75 7.00 87.50% S/. 50.00 S/. 306.25 BATIDO Y CONFORMADO Y CORTE DE NIVELACION DE BASE
TRASLADO DE MATERIAL PIEDRA CHANCADA Y PIEDRA PARA MURO DE LA
13-Dec-16 VOLQUETE V-152 32910 PETROLEO 14.00 S/. 10.15 S/. 142.10 5.00 62.50% S/. 119.13 S/. 372.28 OBRA
TUPAC AMARU Y TRASLADA DE CHAVA
14-Dec-16 RETROESCAVADORA CR-13 32207 PETROLEO 10.00 S/. 10.15 S/. 101.50 3.00 37.50% S/. 70.73 S/. 79.57 TENDIDO DE MATERIAL LASTRE PARA SUB BASE
14-Dec-16 CANTER EGH-964 2458 PETROLEO 5.00 S/. 10.15 S/. 50.75 2.00 25.00% S/. 60.00 S/. 30.00 TRASLADO DE EQUIPO DE SEGUNDO USO A PATRIMONIO
14-Dec-16 MOTONIVELADORA M-33 37972 PETROLEO 30.00 S/. 10.15 S/. 304.50 8.00 100.00% S/. 90.93 S/. 727.44 BATIDO Y CONFORMADO DE BASE Y CORTE DE NIVELACION
14-Dec-16 RODILLO VIBRATORIO R-2 38668 PETROLEO 10.00 S/. 10.15 S/. 101.50 6.50 81.25% S/. 96.93 S/. 511.91 COMPACTADO Y CONFORMADO DE BASE, RECONFORMADO DE SUBRASANTE
15-Dec-16 RETROESCAVADORA CR-3 32268 PETROLEO 10.00 S/. 10.15 S/. 101.50 6.00 75.00% S/. 70.73 S/. 318.29 ACARREO , ACUMULACION Y TRASLADO DE MATERIAL LASTRE
15-Dec-16 RODILLO VIBRATORIO R-2 38669 PETROLEO 10.00 S/. 10.15 S/. 101.50 6.50 81.25% S/. 96.93 S/. 511.91 COMPACTADO Y CONFORMADO DE BASE, RECONFORMADO DE SUBRASANTE
15-Dec-16 MOTONIVELADORA M-33 37934 PETROLEO 25.00 S/. 10.15 S/. 253.75 7.00 87.50% S/. 90.93 S/. 556.95 BATIDO, CONFORMAD Y ALMACENADO DE MATERIAL LASTRE PARA BASE
16-Dec-16 CAMIONETA EGE 873 38798 GASOLINA 8.00 S/. 9.95 S/. 79.60 2.00 25.00% S/. 60.00 S/. 30.00 TRASLADO DE COMBUSTIBLE DE GRIFO A OBRA
16-Dec-16 RODILLO VIBRATORIO R-2 38670 PETROLEO 10.00 S/. 10.15 S/. 101.50 7.00 87.50% S/. 96.93 S/. 593.70 COMPACTADO Y CONFORMADO DE BASE, RECONFORMADO DE SUBRASANTE
16-Dec-16 MOTONIVELADORA M-33 37935 PETROLEO 30.00 S/. 10.15 S/. 304.50 7.00 87.50% S/. 90.93 S/. 556.95 BATIDO, CONFORMAD Y ALMACENADO DE MATERIAL LASTRE PARA BASE
16-Dec-16 TRACTOR CISTERNA TA-01 38619 PETROLEO 5.00 S/. 10.15 S/. 50.75 2.00 25.00% S/. 36.67 S/. 18.34 TRASLADO DE AGUA PARA RIEGO Y CONFORMADO DE SUB BASE
17-Dec-16 VOLQUETE V-154 38735 PETROLEO 5.00 S/. 10.15 S/. 50.75 2.00 25.00% S/. 119.13 S/. 59.57 TRASLADO DE MATERIAL EN OBRA.
17-Dec-16 RODILLO VIBRATORIO R-2 38671 PETROLEO RESERVA S/. 10.15 5.00 62.50% S/. 96.93 S/. 302.91 COMPACTADO DE MATERIAL LASTRE
17-Dec-16 MOTONIVELADORA M-33 37936 PETROLEO 15.00 S/. 10.15 S/. 152.25 4.00 50.00% S/. 90.93 S/. 181.86 BATIDO, CONFORMADO Y ALMACENADO DE MATERIAL LASTRE PARA BASE
17-Dec-16 CARGADOR FRONTAL C-42 6609 PETROLEO 10.00 S/. 10.15 S/. 101.50 3.50 43.75% S/. 136.94 S/. 209.69 MOVIMIENTO DE LASTRE EN OBRA
17-Dec-16 MOTONIVELADORA M-32 32034 PETROLEO 20.00 S/. 10.15 S/. 203.00 5.00 62.50% S/. 90.93 S/. 284.16 BATIDO DE MATERIAL SATURADO
19-Dec-16 MOTONIVELADORA M-32 32035 PETROLEO 25.00 S/. 10.15 S/. 253.75 6.00 75.00% S/. 90.93 S/. 409.19 BATIDO DE MATERIAL SATURADO
19-Dec-16 VOLQUETE V-151 6756 PETROLEO 11.00 S/. 10.15 S/. 111.65 3.00 37.50% S/. 119.13 S/. 134.02 TRASLADO DE MATERIAL ARENA DE OBRA 5 DE ABRIL A ANTISUYO
19-Dec-16 MINIBUS EGI-612 32717 PETROLEO 3.00 S/. 10.15 S/. 30.45 2.00 25.00% S/. 60.00 S/. 30.00 AUXILIO MECANICO AL M-33, LLANTA AVERIADA
19-Dec-16 RODILLO VIBRATORIO R-2 38672 PETROLEO 10.00 S/. 10.15 S/. 101.50 7.00 87.50% S/. 96.93 S/. 593.70 COMPACTADO DE MATERIAL LASTRE PARA SUB BASE
19-Dec-16 CAMIONETA EGE-866 2464 PETROLEO 5.00 S/. 10.15 S/. 50.75 2.00 25.00% S/. 60.00 S/. 30.00 TRASLADO DE COMBUSTIBLE DE GRIFO A OBRA
20-Dec-16 CAMIONETA EGE 873 38789 GASOLINA 3.00 S/. 9.95 S/. 29.85 2.00 25.00% S/. 60.00 S/. 30.00 TRASLADO DE MATERIALES A OBRA
20-Dec-16 RODILLO VIBRATORIO R-2 38673 PETROLEO 10.00 S/. 10.15 S/. 101.50 6.00 75.00% S/. 96.93 S/. 436.19 COMPACTADO DE MATERIAL LASTRE
20-Dec-16 MOTONIVELADORA M-32 37938 PETROLEO 25.00 S/. 10.15 S/. 253.75 7.00 87.50% S/. 90.93 S/. 556.95 BATIDO, CONFORMADO Y ALMACENADO DE MATERIAL LASTRE PARA BASE
21-Dec-16 RETROESCAVADORA CR-12 38886 PETROLEO 10.00 S/. 10.15 S/. 101.50 6.00 75.00% S/. 70.73 S/. 318.29 ACARREO DE MATERIAL A VOLQUETE
21-Dec-16 MOTONIVELADORA M-33 37939 PETROLEO 25.00 S/. 10.15 S/. 253.75 7.30 91.25% S/. 90.93 S/. 605.71 BATIDO, CONFORMADO Y ALMACENADO DE MATERIAL LASTRE PARA BASE
21-Dec-16 RODILLO VIBRATORIO R-2 38674 PETROLEO 10.00 S/. 10.15 S/. 101.50 7.30 91.25% S/. 96.93 S/. 645.67 COMPACTADO DE MATERIAL LASTRE
22-Dec-16 MOTONIVELADORA M-32 32038 PETROLEO 30.00 S/. 10.15 S/. 304.50 8.00 100.00% S/. 90.93 S/. 727.44 BATIDO, CONFORMADO Y ALMACENADO DE MATERIAL LASTRE PARA BASE
22-Dec-16 CARGADOR FRONTAL C-24 9885 PETROLEO 10.00 S/. 10.15 S/. 101.50 3.00 37.50% S/. 136.94 S/. 154.06 ACARREO DE MATERIAL A VOLQUETE
22-Dec-16 VOLQUETE V-157 6852 PETROLEO 15.00 S/. 10.15 S/. 152.25 5.00 62.50% S/. 119.13 S/. 372.28 ACARREO DE MATERIAL A PILLAO MATAO
22-Dec-16 RODILLO VIBRATORIO R-2 38675 PETROLEO 15.00 S/. 10.15 S/. 152.25 7.00 87.50% S/. 96.93 S/. 593.70 COMPACTADO DE MATERIAL LASTRE
22-Dec-16 MOTONIVELADORA M-33 37940 PETROLEO 20.00 S/. 10.15 S/. 203.00 6.30 78.75% S/. 90.93 S/. 451.13 BATIDO, CONFORMADO Y ALMACENADO DE MATERIAL LASTRE PARA BASE
23-Dec-16 TRACTOR CISTERNA TA-01 38620 PETROLEO 5.00 S/. 10.15 S/. 50.75 2.00 25.00% S/. 36.67 S/. 18.34 RIEGO DE CAPA SUB BASE PARA CONFORMADO
23-Dec-16 MOTONIVELADORA M-32 32039 PETROLEO 20.00 S/. 10.15 S/. 203.00 6.00 75.00% S/. 90.93 S/. 409.19 BATIDO, CONFORMADO Y ALMACENADO DE MATERIAL LASTRE PARA BASE
23-Dec-16 RODILLO VIBRATORIO R-3 32614 PETROLEO 10.00 S/. 10.15 S/. 101.50 4.00 50.00% S/. 96.93 S/. 193.86 COMPACTADO DE MATERIAL LASTRE
23-Dec-16 VOLQUETE V-81 32681 PETROLEO 5.00 S/. 10.15 S/. 50.75 2.00 25.00% S/. 119.13 S/. 59.57 ACARREO DE MATERIAL A PILLAO MATAO
23-Dec-16 CARGADOR FRONTAL C-42 6614 PETROLEO 8.00 S/. 10.15 S/. 81.20 2.00 25.00% S/. 136.94 S/. 68.47 ACARREO DE MATERIAL A VOLQUETE
23-Dec-16 RODILLO VIBRATORIO R-2 38676 PETROLEO 10.00 S/. 10.15 S/. 101.50 6.00 75.00% S/. 96.93 S/. 436.19 COMPACTADO DE MATERIAL LASTRE
23-Dec-16 MOTONIVELADORA M-33 37941 PETROLEO 20.00 S/. 10.15 S/. 203.00 6.00 75.00% S/. 90.93 S/. 409.19 BATIDO, CONFORMADO Y ALMACENADO DE MATERIAL LASTRE PARA BASE
23-Dec-16 CAMIONETA EGE 873 6902 GASOLINA 3.00 S/. 9.95 S/. 29.85 2.00 25.00% S/. 60.00 S/. 30.00 TRASLADO DE MATERIALES A OBRA
26-Dec-16 CAMIONETA EGE 873 6904 GASOLINA 3.00 S/. 9.95 S/. 29.85 2.00 25.00% S/. 60.00 S/. 30.00 TRASLADO DE MATERIALES A OBRA
26-Dec-16 MOTONIVELADORA M-33 37942 PETROLEO 20.00 S/. 10.15 S/. 203.00 5.50 68.75% S/. 90.93 S/. 343.83 CONFORMADO Y ALMACENADO DE MATERIAL LASTRE PARA BASE
26-Dec-16 RODILLO VIBRATORIO R-2 38677 PETROLEO 10.00 S/. 10.15 S/. 101.50 7.00 87.50% S/. 96.93 S/. 593.70 COMPACTADO DE MATERIAL LASTRE
27-Dec-16 RODILLO VIBRATORIO R-2 38678 PETROLEO 5.00 S/. 10.15 S/. 50.75 4.00 50.00% S/. 96.93 S/. 193.86 COMPACTADO DE MATERIAL LASTRE
27-Dec-16 CARGADOR FRONTAL C-42 6617 PETROLEO 5.00 S/. 10.15 S/. 50.75 4.00 50.00% S/. 136.94 S/. 273.88 CARGIO DE MATERIAL LASTRE EN OBRA
27-Dec-16 CAMIONETA EGE-884 2477 GASOLINA 8.00 S/. 9.95 S/. 79.60 2.00 25.00% S/. 60.00 S/. 30.00 TRANSPORTE DE COMBUSTIBLE DE GRIFO A OBRA
GASOLINA 28.00 S/. 9.95 S/. 278.60 10.00 S/. 150.00
PETROLEO 774.00 S/. 10.15 S/. 7,856.10 172.00 S/. 23,443.68
S/. 8,134.70 182.00 S/. 23,593.68
FORMATO No 071
MOVIMIENTO DE MAQUINARIA LIVIANA N 1

CORRESPONDIENTE AL MES DE : MAYO 2016 HASTA DICIEMBRE 2016

DEPARTAMENT
HORAS TRABAJADAS
VALORIZACION DE : 477.50 O CUSCO
MAQUINARIA : PROVINCIA CUSCO
TOTAL COMBUSTIBLE (GLN) : 113.00 DISTRITO CUSCO
COSTO COMBUSTIBLE : S/. 9.95 LOCALIDAD Urb.LOS INCAS
GASTO ACUMULADO : S/. 1,124.35
SALDO : S/. 31,658.08

CORRESPONDIENTE AL MES DE : JUNIO

N Part.
FECHA MAQUINARIA COMB. CANT. GL P.U HM/TRAB ACTIVIDAD REALIZADA
Diar.

21-Jun-16 CORTADORA DE CONCRETO 391 GASOLINA 1.00 S/. 9.95 2.00 CORTADO DE PAVIMENTO RIGIDO
22-Jun-16 COMPACTADO TIPO CANGURO 323 GASOLINA 1.00 S/. 9.95 2.00 TRASLADO DE MATERIALES

GASOLINA 2.00 S/. 9.95 4.00


PETROLEO 0.00 0.00

CORRESPONDIENTE AL MES DE : JULIO

N Part.
FECHA MAQUINARIA COMB. CANT. GL P.U HM/TRAB ACTIVIDAD REALIZADA
Diar.
11-Jul-16 CORTADORA DE CONCRETO 392 GASOLINA 1.00 S/. 9.95 3.00 CORTE DE PAVIMENTO DE CONCRETO
13-Jul-16 COMPACTADOR TIPO CANGURO 393 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
14-Jul-16 COMPACTADOR TIPO CANGURO 394 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
15-Jul-16 COMPACTADOR TIPO CANGURO 396 GASOLINA 2.00 S/. 9.95 5.50 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
16-Jul-16 MESCLADORA DE 9 P3 397 GASOLINA 1.00 S/. 9.95 3.00 MESCLADORA DE CONCRETO PARA BUZONES
16-Jul-16 VIBRADORA DE CONCRETO 398 GASOLINA 1.00 S/. 9.95 1.00 VIBRADO EN EL VACIADO DE CONCRETO
16-Jul-16 COMPACTADOR TIPO CANGURO 399 GASOLINA RESERVA S/. 9.95 3.50 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
18-Jul-16 COMPACTADOR TIPO CANGURO 310 GASOLINA 1.00 S/. 9.95 8.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
18-Jul-16 COMPACTADOR TIPO CANGURO 311 GASOLINA RESERVA S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
19-Jul-16 COMPACTADOR TIPO CANGURO 312 GASOLINA 1.00 S/. 9.95 7.50 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
20-Jul-16 COMPACTADOR TIPO CANGURO 313 GASOLINA 1.00 S/. 9.95 7.50 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
21-Jul-16 COMPACTADOR TIPO CANGURO 314 GASOLINA 1.00 S/. 9.95 5.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
21-Jul-16 MESCLADORA DE 9 P3 315 GASOLINA 1.00 S/. 9.95 2.50 MESCLADORA DE CONCRETO PARA BUZONES
21-Jul-16 VIBRADORA DE CONCRETO 316 GASOLINA RESERVA S/. 9.95 0.50 VIBRADO EN EL VACIADO DE CONCRETO
22-Jul-16 COMPACTADOR TIPO CANGURO 333 GASOLINA 1.00 S/. 9.95 3.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
23-Jul-16 GENERADOR DE SEDA QOSQO 335 GASOLINA 1.00 S/. 9.95 1.00 PARA TRABAJO CON ROTOMARTILLO EN RUPTURA DE BASE DE BUZON
23-Jul-16 COMPACTADOR TIPO CANGURO 334 GASOLINA 2.00 S/. 9.95 3.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
26-Jul-16 COMPACTADOR TIPO CANGURO 337 GASOLINA 1.00 S/. 9.95 3.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
27-Jul-16 COMPACTADOR TIPO CANGURO 338 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
GASOLINA 18.00 S/. 9.95 73.00
CORRESPONDIENTE AL MES DE : AGOSTO

N Part.
FECHA MAQUINARIA COMB. CANT. GL P.U HM/TRAB ACTIVIDAD REALIZADA
Diar.
1-Aug-16 COMPACTADOR TIPO CANGURO 339 GASOLINA 1.00 S/. 9.95 2.50 COMPACTADO DE ZANJA DE DESAGUE RELLENO DE NIVELACION
2-Aug-16 COMPACTADOR TIPO CANGURO 342 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO DE NIVELACION
3-Aug-16 COMPACTADOR TIPO CANGURO 344 GASOLINA 1.00 S/. 9.95 5.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
4-Aug-16 COMPACTADOR TIPO CANGURO 346 GASOLINA RESERVA S/. 9.95 3.50 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
4-Aug-16 COMPACTADOR TIPO CANGURO 347 GASOLINA RESERVA S/. 9.95 3.50 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
5-Aug-16 COMPACTADOR TIPO CANGURO 340 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
5-Aug-16 GENERADOR DE FLUIDO ELECTRICO 350 GASOLINA 1.00 S/. 9.95 PROVICIONAMIENTO DE ELECTRICIDAD A CORTADO DE CONCRETO
8-Aug-16 MESCLADORA DE 9 P3 865 GASOLINA 1.00 S/. 9.95 1.50 MESCLADORA DE CONCRETO PARA BUZONES
8-Aug-16 VIBRADORA DE CONCRETO 866 GASOLINA RESERVA S/. 9.95 0.50 VIBRADO EN EL VACIADO DE CONCRETO
9-Aug-16 COMPACTADOR TIPO CANGURO 867 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
10-Aug-16 COMPACTADOR TIPO CANGURO 868 GASOLINA 1.00 S/. 9.95 3.50 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
12-Aug-16 COMPACTADOR TIPO CANGURO 869 GASOLINA 0.50 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
12-Aug-16 COMPACTADOR TIPO CANGURO 870 GASOLINA 0.50 S/. 9.95 5.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
13-Aug-16 COMPACTADOR TIPO CANGURO 871 GASOLINA 1.50 S/. 9.95 0.00 MANTENIMIENTO DE COMPACTADORES 606 Y 605
15-Aug-16 COMPACTADOR TIPO CANGURO 872 GASOLINA 1.00 S/. 9.95 4.50 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
16-Aug-16 COMPACTADOR TIPO CANGURO 873 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
17-Aug-16 COMPACTADOR TIPO CANGURO 874 GASOLINA 1.00 S/. 9.95 5.00 COMPACTADO DE ZANJA DE MATRIZ DE AGUA RELLENO SOBRE TUBERIA
17-Aug-16 COMPACTADOR TIPO CANGURO 875 GASOLINA 1.00 S/. 9.95 5.00 COMPACTADO DE ZANJA DE MATRIZ DE AGUA RELLENO SOBRE TUBERIA
17-Aug-16 COMPACTADOR TIPO CANGURO 876 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE MATRIZ DE AGUA RELLENO SOBRE TUBERIA
18-Aug-16 COMPACTADOR TIPO CANGURO 877 GASOLINA 1.00 S/. 9.95 5.00 COMPACTADO DE ZANJA DEDOMICILIARIA RELLENO SOBRE TUBERIA
18-Aug-16 COMPACTADOR TIPO CANGURO 878 GASOLINA 1.00 S/. 9.95 5.00 COMPACTADO DE ZANJA DEDOMICILIARIA RELLENO SOBRE TUBERIA
18-Aug-16 COMPACTADOR TIPO CANGURO 879 GASOLINA 1.00 S/. 9.95 5.00 COMPACTADO DE ZANJA DEDOMICILIARIA RELLENO SOBRE TUBERIA
18-Aug-16 MESCLADORA DE 9 P3 880 GASOLINA 0.00 S/. 9.95 3.00 PREPARADO DE MESCLA F'C= 175 Kg/cm2
18-Aug-16 VIBRADORA DE CONCRETO 881 GASOLINA 0.00 S/. 9.95 1.00 VIBRADO EN EL VACIADO DE CONCRETO
19-Aug-16 COMPACTADOR TIPO CANGURO 882 GASOLINA 1.50 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
19-Aug-16 COMPACTADOR TIPO CANGURO 883 GASOLINA 1.50 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
19-Aug-16 GENERADOR DE FLUIDO ELECTRICO 884 GASOLINA 2.00 S/. 9.95 2.00 SUMINISTRO DE ENERGIA PARA ROTOMARTILLO Y REFLECTORES
19-Aug-16 CORTADORA DE CONCRETO 889 GASOLINA 1.00 S/. 9.95 3.00 CORTADO DE PAVIMENTO AV COLLASUYO
22-Aug-16 COMPACTADOR TIPO CANGURO 888 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
23-Aug-16 COMPACTADOR TIPO CANGURO 890 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
23-Aug-16 COMPACTADOR TIPO CANGURO 891 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
23-Aug-16 GENERADOR DE FLUIDO ELECTRICO 892 GASOLINA 1.00 S/. 9.95 0.00 MANTENIMIENTO DE COMPACTADORES 606 Y 605
24-Aug-16 COMPACTADOR TIPO CANGURO 893 GASOLINA 1.00 S/. 9.95 5.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
24-Aug-16 COMPACTADOR TIPO CANGURO 894 GASOLINA 0.50 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
24-Aug-16 GENERADOR DE FLUIDO ELECTRICO 895 GASOLINA 1.00 S/. 9.95 1.00 SUMINISTRO DE ENERGIA PARA ROTOMARTILLO
25-Aug-16 COMPACTADOR TIPO CANGURO 896 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
25-Aug-16 COMPACTADOR TIPO CANGURO 897 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
26-Aug-16 COMPACTADOR TIPO CANGURO 898 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
26-Aug-16 COMPACTADOR TIPO CANGURO 899 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
27-Aug-16 COMPACTADOR TIPO CANGURO 890 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
27-Aug-16 COMPACTADOR TIPO CANGURO 1501 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
29-Aug-16 COMPACTADOR TIPO CANGURO 1502 GASOLINA 1.50 S/. 9.95 5.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
31-Aug-16 COMPACTADOR TIPO CANGURO 1503 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
31-Aug-16 COMPACTADOR TIPO CANGURO 1504 GASOLINA 1.00 S/. 9.95 4.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
GASOLINA 40.50 132.00
CORRESPONDIENTE AL MES DE : SETIEMBRE

FECHA MAQUINARIA N Part. Diar. COMB. CANT. GL HM/TRAB ACTIVIDAD REALIZADA

1-Sep-16 COMPACTADOR TIPO CANGURO 605 1505 GASOLINA 0.50 3.00 COMPACTADO DE ZANJA PARA AGUAS PLUVIALES
1-Sep-16 COMPACTADOR TIPO CANGURO 605 1506 GASOLINA 0.50 3.00 COMPACTADO DE ZANJA PARA AGUAS PLUVIALES
2-Sep-16 COMPACTADOR TIPO CANGURO 606 1507 GASOLINA 0.50 3.00 COMPACTADO DE ZANJA PARA AGUAS PLUVIALES
2-Sep-16 COMPACTADOR TIPO CANGURO 605 1508 GASOLINA 0.50 3.00 COMPACTADO DE ZANJA
3-Sep-16 COMPACTADOR TIPO CANGURO 605 1509 GASOLINA 0.50 3.00 COMPACTADO DE ZANJA PARA AGUAS PLUVIALES
3-Sep-16 COMPACTADOR TIPO CANGURO 606 1510 GASOLINA 0.50 3.00 COMPACTADO DE ZANJA PARA AGUAS PLUVIALES
5-Sep-16 COMPACTADOR TIPO CANGURO 605 1511 GASOLINA 0.50 3.00 COMPACTADO DE ZANJA
5-Sep-16 COMPACTADOR TIPO CANGURO 606 1512 GASOLINA 0.50 3.00 COMPACTADO DE ZANJA
7-Sep-16 COMPACTADOR TIPO CANGURO 606 1513 GASOLINA 1.00 3.00 COMPACTADO DE ZANJA
8-Sep-16 COMPACTADOR TIPO CANGURO 605 1514 GASOLINA 0.50 2.50 COMPACTADO DE ZANJA
8-Sep-16 COMPACTADOR TIPO CANGURO 606 1515 GASOLINA 0.50 5.00 COMPACTADO DE VEREDA
9-Sep-16 COMPACTADOR TIPO CANGURO 606 1517 GASOLINA 1.00 5.00 COMPACTADO DE VEREDA
13-Sep-16 COMPACTADOR TIPO CANGURO 606 1520 GASOLINA 1.00 5.00 COMPACTADO DE VEREDA
14-Sep-16 MEZCLADORA M-428 1521 GASOLINA 1.00 3.50 MEZCLADO PARA EL MURO DE CONTENCION
14-Sep-16 VIBRADORA DE CONCRETO V-25 1522 GASOLINA 0.00 0.50 TRABAJO DESPUES DEL MEZCLADO
14-Sep-16 COMPACTADOR TIPO CANGURO 606 1523 GASOLINA 0.00 2.00 COMPACTADO DE VEREDA
16-Sep-16 MEZCLADORA M-428 1524 GASOLINA 1.50 4.50 SE REALIZO MEZCLADO DE CONCRETO PARA EL MURO DE CONTENCION
16-Sep-16 VIBRADORA DE CONCRETO V-25 1525 GASOLINA 0.50 0.50 SE HIZO VIBRADO EN LA MEZCLA DE CONCRETO
17-Sep-16 COMPACTADOR TIPO CANGURO 606 1528 GASOLINA 1.00 4.00 COMPACTADO DE ZANJA DE AGUAS PLUVIALES
20-Sep-16 MEZCLADORA M-428 1529 GASOLINA REMANENTE 1.00 MEZCLADO DE CONCRETO
20-Sep-16 VIBRADORA DE CONCRETO V-25 1530 GASOLINA 1.00 0.50 SE IZO EL VIBRADO DE MEZCLA DE CONCRETO
22-Sep-16 COMPACTADOR TIPO CANGURO 606 1531 GASOLINA REMANENTE 2.00 COMPACTADO DE ZANJA DE AGUAS PLUVIALES
23-Sep-16 COMPACTADOR TIPO CANGURO 606 1532 GASOLINA 0.50 2.00 COMPACTADO DE ZANJA DE AGUAS PLUVIALES
23-Sep-16 MEZCLADORA M-428 1533 GASOLINA 0.50 1.00 MEZCLADO DE CONCRETO
23-Sep-16 VIBRADORA DE CONCRETO V-25 1534 GASOLINA REMANENTE 1.00 VIBRADO DE MEZCLA DE CONCRETO
24-Sep-16 MEZCLADORA M-428 1535 GASOLINA REMANENTE 1.00 MEZCLADO DE CONCRETO
24-Sep-16 VIBRADORA DE CONCRETO V-25 1536 GASOLINA 0.50 0.50 VIBRADO DE MEZCLA DE CONCRETO
26-Sep-16 COMPACTADOR TIPO CANGURO 606 1537 GASOLINA 1.00 4.00 COMPACTADO DE ZANJA DE MATRIZ DE AGUA
27-Sep-16 MEZCLADORA M-428 1539 GASOLINA 0.50 2.00 MEZCLADO DE CONCRETO
27-Sep-16 VIBRADORA DE CONCRETO V-25 1540 GASOLINA 0.50 2.00 VIBRADO DE MEZCLA DE CONCRETO
27-Sep-16 COMPACTADOR TIPO CANGURO 605 1541 GASOLINA REMANENTE 3.00 COMPCTADO DE ZANJA PARA AGUAS PLUVIALES
27-Sep-16 COMPACTADOR TIPO CANGURO 606 1542 GASOLINA REMANENTE 3.00 COMPCTADO DE ZANJA
28-Sep-16 GENERADOR SEDA 1544 GASOLINA 1.00 2.00 EL GENERADOR ES DE SEDA CUSCO
28-Sep-16 COMPACTADOR TIPO CANGURO 605 1545 GASOLINA 1.00 3.00 COMPACTADO DE ZANJAS DE AGUAS PLUVIALES
28-Sep-16 COMPACTADOR TIPO CANGURO 606 1546 GASOLINA 1.00 4.00 COMPACTADO DE ZANJAS
30-Sep-16 COMPACTADOR TIPO CANGURO 606 1547 GASOLINA 1.00 4.00 COMPACTADO DE ZANJA DE AGUAS PLUVIALES
GASOLINA 20.50 95.50
PETROLEO 0.00 0.00

CORRESPONDIENTE AL MES DE : OCTUBRE

FECHA MAQUINARIA N Part. Diar. COMB. CANT. GL HM/TRAB ACTIVIDAD REALIZADA

1-Oct-16 COMPACTADOR TIPO CANGURO 1832 GASOLINA REMANENTE 2.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
4-Oct-16 COMPACTADOR TIPO CANGURO 1833 GASOLINA 1.00 3.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
5-Oct-16 COMPACTADOR TIPO CANGURO 1834 GASOLINA REMANENTE 1.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
6-Oct-16 COMPACTADOR TIPO CANGURO 1835 GASOLINA 1.00 3.00 MESCLADORA DE CONCRETO PARA BUZONES
7-Oct-16 COMPACTADOR TIPO CANGURO 1836 GASOLINA REMANENTE 2.00 VIBRADO EN EL VACIADO DE CONCRETO
10-Oct-16 COMPACTADOR TIPO CANGURO 1837 GASOLINA 1.00 3.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
12-Oct-16 COMPACTADOR TIPO CANGURO 1838 GASOLINA REMANENTE 2.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
13-Oct-16 COMPACTADOR TIPO CANGURO 1839 GASOLINA REMANENTE 3.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
14-Oct-16 COMPACTADOR TIPO CANGURO 1840 GASOLINA REMANENTE 3.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
15-Oct-16 COMPACTADOR TIPO CANGURO 1841 GASOLINA REMANENTE 2.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
17-Oct-16 COMPACTADOR TIPO CANGURO 1842 GASOLINA 1.00 2.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
18-Oct-16 MESCLADORA DE 9 P3 1843 GASOLINA REMANENTE 2.00 MESCLADORA DE CONCRETO PARA BUZONES
19-Oct-16 COMPACTADOR TIPO CANGURO 1844 GASOLINA REMANENTE 2.00 VIBRADO EN EL VACIADO DE CONCRETO
G 20-Oct-16 COMPACTADOR TIPO CANGURO 1845 GASOLINA REMANENTE 3.00 COMPACTADO DE ZANJA DE DESAGUE RELLENO SOBRE TUBERIA
21-Oct-16 COMPACTADOR TIPO CANGURO 1840 GASOLINA 1.00 3.00 PARA TRABAJO CON ROTOMARTILLO EN RUPTURA DE BASE DE BUZON
22-Oct-16 COMPACTADOR TIPO CANGURO 1847 GASOLINA 1.00 3.00 COMPACTADO DE ZANJA EN JR CHASQUIS
25-Oct-16 COMPACTADOR TIPO CANGURO 1848 GASOLINA REMANENTE 3.00 COMPACTADO DE ZANJA EN JR CHASQUIS
26-Oct-16 COMPACTADOR TIPO CANGURO 1849 GASOLINA REMANENTE 2.00 COMPACTADO DE ZANJA EN JR CHASQUIS
27-Oct-16 COMPACTADOR TIPO CANGURO 1850 GASOLINA 1.00 2.00 COMPACTADO DE ZANJA EN JR CHASQUIS
28-Oct-16 COMPACTADOR TIPO CANGURO 2151 GASOLINA REMANENTE 3.00 COMPACTADO DE ZANJA EN JR CHASQUIS
29-Oct-16 COMPACTADOR TIPO CANGURO 2153 GASOLINA REMANENTE 3.00 COMPACTADO DE ZANJAS PARA DESAGUE
31-Oct-16 COMPACTADOR TIPO CANGURO 2154 GASOLINA 1.00 3.00 COMPACDO DE VEREDAS PARA EMPEDRADO
GASOLINA 5.00 S/. 55.00
PETROLEO 0.00 S/. 0.00

CORRESPONDIENTE AL MES DE : NOVIEMBRE


FECHA MAQUINARIA CODIGO N Part. Diar. COMB. CANT. GL HM/TRAB ACTIVIDAD REALIZADA

2-Nov-16 COMPACTADOR TIPO CANGURO Nro 01 2155 GASOLINA 1.00 1.00 COMPACTADO DE ZANJA CON TERRENO NATURAL
3-Nov-16 COMPACTADOR TIPO CANGURO Nro 02 1832 GASOLINA REMANENTE 1.00 COMPACTADO DE ZONA DE TRABAJO PARA EMPEDRADO DE VEREDAS
4-Nov-16 COMPACTADOR TIPO CANGURO Nro 01 1833 GASOLINA REMANENTE 3.00 COMPACTADO DE ZANJA DE DESAGUE CONEXIN NUEVA
5-Nov-16 COMPACTADOR TIPO CANGURO Nro 01 1834 GASOLINA REMANENTE 2.50 COMPACTADO DE ZANJA CON TERRENO NATURAL
7-Nov-16 COMPACTADOR TIPO CANGURO Nro 02 1835 GASOLINA REMANENTE 3.00 COMPACTADO DE ZANJA DE DESAGUE CONEXIN NUEVA JR CHASQUIS
8-Nov-16 COMPACTADOR TIPO CANGURO Nro 02 1836 GASOLINA 1.00 3.50 COMPACTADO DE ZANJA CON TERRENO NATURAL
8-Nov-16 COMPACTADOR TIPO CANGURO Nro 01 2161 GASOLINA REMANENTE 2.00 COMPACTADO DE ZANJA CON TERRENO NATURAL
9-Nov-16 COMPACTADOR TIPO CANGURO Nro 01 1837 GASOLINA 1.00 3.50 COMPACTADO DE ZONA DE TRABAJO PARA EMPEDRADO DE VEREDAS
9-Nov-16 COMPACTADOR TIPO CANGURO Nro 02 1838 GASOLINA 1.00 3.50 COMPACTADO DE ZONA DE TRABAJO PARA EMPEDRADO DE VEREDAS
10-Nov-16 COMPACTADOR TIPO CANGURO Nro 01 1839 GASOLINA REMANENTE 3.00 COMPACTADO DE ZONA DE TRABAJO PARA EMPEDRADO DE VEREDAS
11-Nov-16 COMPACTADOR TIPO CANGURO Nro 01 1840 GASOLINA 1.00 3.50 COMPACTADO DE ZONA DE TRABAJO PARA EMPEDRADO DE VEREDAS
12-Nov-16 COMPACTADOR TIPO CANGURO Nro 02 1841 GASOLINA REMANENTE 3.00 COMPACTADO DE ZANJA DE DESAGUE CONEXIN NUEVA JR CHASQUIS
14-Nov-16 COMPACTADOR TIPO CANGURO Nro 02 2167 GASOLINA REMANENTE 2.00 COMPACTADO DE ZANJA CON TERRENO NATURAL
14-Nov-16 COMPACTADOR TIPO CANGURO Nro 01 2168 GASOLINA REMANENTE 2.00 COMPACTADO DE ZONA DE TRABAJO PARA EMPEDRADO DE VEREDAS
15-Nov-16 COMPACTADOR TIPO CANGURO Nro 01 2169 GASOLINA 0.50 2.00 COMPACTADO DE ZANJA CON TERRENO NATURAL
15-Nov-16 COMPACTADOR TIPO CANGURO Nro 02 2170 GASOLINA 0.50 2.00 COMPACTADO DE ZONA DE TRABAJO PARA EMPEDRADO DE VEREDAS
16-Nov-16 COMPACTADOR TIPO CANGURO Nro 02 2171 GASOLINA REMANENTE 2.00 COMPACTADO DE ZONA DE TRABAJO PARA EMPEDRADO DE VEREDAS
17-Nov-16 COMPACTADOR TIPO CANGURO Nro 02 2172 GASOLINA 1.00 3.00 COMPACTADO DE ZONA DE TRABAJO PARA EMPEDRADO DE VEREDAS
18-Nov-16 COMPACTADOR TIPO CANGURO Nro 02 2173 GASOLINA REMANENTE 2.00 COMPACTADO DE ZANJA CON TERRENO NATURAL
19-Nov-16 COMPACTADOR TIPO CANGURO Nro 02 2174 GASOLINA REMANENTE 2.00 COMPACTADO DE ZANJA CON TERRENO NATURAL
21-Nov-16 COMPACTADOR TIPO CANGURO Nro 02 2175 GASOLINA REMANENTE 1.00 COMPACTADO DE ZONA DE TRABAJO PARA EMPEDRADO DE VEREDAS
23-Nov-16 COMPACTADOR TIPO CANGURO Nro 01 2176 GASOLINA 0.50 1.00 COMPACTADO DE ZANJA CON TERRENO NATURAL
23-Nov-16 COMPACTADOR TIPO CANGURO Nro 02 2177 GASOLINA 0.50 1.00 COMPACTADO DE ZONA DE TRABAJO PARA EMPEDRADO DE VEREDAS
24-Nov-16 COMPACTADOR TIPO CANGURO Nro 01 2178 GASOLINA REMANENTE 1.00 COMPACTADO DE ZONA DE TRABAJO PARA EMPEDRADO DE VEREDAS
24-Nov-16 COMPACTADOR TIPO CANGURO Nro 02 2179 GASOLINA REMANENTE 1.00 COMPACTADO DE ZANJA CON TERRENO NATURAL
25-Nov-16 COMPACTADOR TIPO CANGURO Nro 01 2181 GASOLINA REMANENTE 1.00 COMPACTADO DE ZONA DE TRABAJO PARA EMPEDRADO DE VEREDAS
25-Nov-16 COMPACTADOR TIPO CANGURO Nro 02 2182 GASOLINA REMANENTE 1.00 COMPACTADO DE ZONA DE TRABAJO PARA EMPEDRADO DE VEREDAS
25-Nov-16 MEZCLADORA 2183 GASOLINA 0.50 1.00 PREPARADO DE MEZCLA PARA MURO DE CONCRETO CICLOPEO
25-Nov-16 VIBRADORA 2184 GASOLINA 0.50 1.00 VIBRADO DE CONCRETO EN EL VACIADO QUE SE REALIZO
26-Nov-16 COMPACTADOR TIPO CANGURO Nro 01 2185 GASOLINA REMANENTE 1.00 COMPACTADO DE ZONA DE TRABAJO PARA EMPEDRADO DE VEREDAS
26-Nov-16 MEZCLADORA 2186 GASOLINA REMANENTE 1.00 PREPARADO DE MEZCLA PARA MURO DE CONCRETO CICLOPEO
26-Nov-16 VIBRADORA 2187 GASOLINA REMANENTE 1.00 VIBRADO DE CONCRETO EN EL VACIADO QUE SE REALIZO
28-Nov-16 COMPACTADOR TIPO CANGURO Nro 01 2188 GASOLINA 1.00 1.00 COMPACTADO DE ZONA DE TRABAJO PARA EMPEDRADO DE VEREDAS
29-Nov-16 MEZCLADORA 2189 GASOLINA 0.50 2.00 PREPARADO DE MEZCLA PARA MURO DE CONCRETO CICLOPEO
29-Nov-16 VIBRADORA 2190 GASOLINA 0.50 2.00 VIBRADO DE CONCRETO EN EL VACIADO QUE SE REALIZO
30-Nov-16 MEZCLADORA 2191 GASOLINA 1.00 1.00 PREPARADO DE MEZCLA PARA MURO DE CONCRETO CICLOPEO
30-Nov-16 VIBRADORA 2192 GASOLINA REMANENTE 1.00 VIBRADO DE CONCRETO EN EL VACIADO QUE SE REALIZO
30-Nov-16 COMPACTADOR TIPO CANGURO Nro 01 2193 GASOLINA 1.00 2.00 COMPACTADO DE ZONA DE TRABAJO PARA EMPEDRADO DE VEREDAS
30-Nov-16 CORTADORA DE CONCRETO 2194 GASOLINA 2.00 3.00 CORTA DO DE VEREDA Y PAVIMENTO
GASOLINA 15.00 73.5
PETROLEO 0.00
CORRESPONDIENTE AL MES DE : DICIEMBRE
FECHA MAQUINARIA CODIGO N Part. Diar. COMB. CANT. GL HM/TRAB ACTIVIDAD REALIZADA
1-Dec-16 COMPACTADO TIPO CANGURO NR01 2195 GASOLINA REMANETE 1.00 COMPACTADO DE VEREDAS PARA EMPEDRADO
2-Dec-16 MEZCLADORA 2196 GASOLINA 1.00 1.00 PREPARADO DE MEZCLA PARA MURO
2-Dec-16 VIBRADORA 2197 GASOLINA REMANETE 0,5 VIBRADO DE MEZCLA PARA MURO
2-Dec-16 COMPACTADO TIPO CANGURO NRO2 2198 GASOLINA REMANETE 1.00 COMPACTADO DE VEREDAS PARA EMPEDRADO
2-Dec-16 COMPACTADO TIPO CANGURO NRO01 2199 GASOLINA REMANETE 1.00 COMPACTADO DE VEREDAS PARA EMPEDRADO
3-Dec-16 COMPACTADO TIPO CANGURO NR01 2200 GASOLINA 0.50 2.00 COMPACTADO DE VEREDAS PARA EMPEDRADO
3-Dec-16 COMPACTADO TIPO CANGURO NR02 2451 GASOLINA 0.50 2.00 COMPACTADO DE VEREDAS PARA EMPEDRADO
5-Dec-16 MEZCLADORA 2452 GASOLINA 1.00 1.00 PREPARADO DE MEZCLA PARA MURO
5-Dec-16 VIBRADORA 2453 GASOLINA REMANETE 0.50 VIBRADO DE MEZCLA PARA MURO
6-Dec-16 MEZCLADORA 2454 GASOLINA REMANETE 1.00 PREPARADO DE MEZCLA PARA MURO
6-Dec-16 VIBRADORA 2455 GASOLINA REMANETE 0.50 VIBRADO DE MEZCLA PARA MURO
14-Dec-16 COMPACTADO TIPO CANGURO NR02 2456 GASOLINA 1.00 3.00 COMPACTADO DE VEREDAS PARA EMPEDRADO
14-Dec-16 COMPACTADO TIPO CANGURO NR01 2457 GASOLINA 1.00 3.00 COMPACTADO DE VEREDAS PARA EMPEDRADO
15-Dec-16 COMPACTADO TIPO CANGURO NR02 2459 GASOLINA REMANETE 1.00 COMPACTADO DE VEREDAS PARA EMPEDRADO
16-Dec-16 COMPACTADO TIPO CANGURO NR01 2460 GASOLINA REMANETE 1.00 COMPACTADO DE VEREDAS PARA EMPEDRADO
17-Dec-16 COMPACTADO TIPO CANGURO NRO02 2461 GASOLINA REMANETE 1.00 COMPACTADO DE VEREDAS PARA EMPEDRADO
17-Dec-16 MEZCLADORA 2462 GASOLINA REMANETE 1.00 PREPARADO DE MEZCLA PARA MURO
17-Dec-16 VIBRADORA 2463 GASOLINA REMANETE 0.50 VIBRADO DE MEZCLA PARA MURO
20-Dec-16 COMPACTADO TIPO CANGURO NR02 2465 GASOLINA 1.00 2.00 COMPACTADO DE AREAS LATERALES DE VIA PRINCIPAL
20-Dec-16 COMPACTADO TIPO CANGURO NR01 2466 GASOLINA 1.00 2.00 COMPACTADO DE AREAS LATERALES DE VIA PRINCIPAL
21-Dec-16 COMPACTADO TIPO CANGURO NR02 2467 GASOLINA 0.50 2.00 COMPACTADO DE AREAS LATERALES DE VIA PRINCIPAL
21-Dec-16 COMPACTADO TIPO CANGURO NR01 2468 GASOLINA 0.50 2.00 COMPACTADO DE AREAS LATERALES DE VIA PRINCIPAL
22-Dec-16 COMPACTADO TIPO CANGURO NR02 2469 GASOLINA REMANETE 2.00 COMPACTADO DE AREAS LATERALES DE VIA PRINCIPAL
22-Dec-16 COMPACTADO TIPO CANGURO NR01 2470 GASOLINA REMANETE 2.00 COMPACTADO DE AREAS LATERALES DE VIA PRINCIPAL
23-Dec-16 COMPACTADO TIPO CANGURO NR02 2471 GASOLINA 1.00 2.00 COMPACTADO DE AREAS LATERALES DE VIA PRINCIPAL
23-Dec-16 COMPACTADO TIPO CANGURO NR01 2472 GASOLINA 1.00 2.00 COMPACTADO DE AREAS LATERALES DE VIA PRINCIPAL
26-Dec-16 COMPACTADO TIPO CANGURO NR01 2473 GASOLINA REMANETE 2.00 COMPACTADO DE AREAS LATERALES DE VIA PRINCIPAL
27-Dec-16 VIBRADORA 2474 GASOLINA 1.00 3.00 VIBRADO DE MEZCLA PARA VEREDAS
28-Dec-16 VIBRADORA 2475 GASOLINA REMANETE 2.00 VIBRADO DE MEZCLA PARA ENCIMADO DE BUZON
28-Dec-16 MEZCLADORA 2476 GASOLINA REMANETE 1.00 PREPARADO DE MEZCLA PARA ENCIMADO DE BUZON
29-Dec-16 VIBRADORA 2476 GASOLINA 1.00 1.00 VIBRADO DE MEZCLA PARA VEREDAS
GASOLINA 12.00 44.50
FORMATO N 07
RESUMEN DE VALORIZACION DE MAQUINARIA PESADA AO 2016
RESUMEN DE VALORIZACION DE MAQUINARIA PESADA N 1

MES: DICIEMBRE 2016


PROYECTO: OBRA: " MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL EN EL JR. ANTISUYO , JR. CHASQUI Y PASAJE
INCA ROCA DE LA URB.LOS INCAS DEL DISTRITO DE CUSCO,PROVINCIA DE CUSCO - CUSCO."

MONTO ASIGNADO 11,315.50 REGION : CUSCO


FECHA DE INICIO DE OBRA 5/9/2016 DEPARTAMENT : CUSCO
PLAZO DE EJECUCIN 06 MESES PROVINCIA : CUSCO
DISTRITO : CUSCO
LOCALIDAD : Urb. LOS INCAS

CUADRO RESUMEN VALORIZACION DE MAQUINARIA


PRESUPUESTO (S/.) EXP. TEC. PRESUPUESTO (S/.) MENOS GASTOSPOR ALQUILES DE MAQUINARIA
MES ANTERIOR % ACTUAL % ACUMULADO % SALDO %

S/.134,571.03 S/.73,188.48 54.39% S/.23,593.68 17.53% S/.96,782.16 71.92% S/.37,788.87 28.08%


S/.176,187.03
EQUIPO PROGRAMADO MAQUINA SECA

TOTAL S/.73,188.48 54.39% S/.23,593.68 17.53% S/.96,782.16 71.92% S/.37,788.87 28.08%

SERVICIO EFECTUADOS POR TERCEROS DE MAQUINARIA ALQUILADA

COSTO HORA
EQUIPO TOTAL HORAS PARCIAL (S/.)
MAQUINARIA SERVIDA

RETROEXCAVADORA 118 120 S/.14,160.00


DEMOLICION DE PAVIMIENTO DE CONCRETO
24 S/.27,456.00
RIGIDO EXISTENTE Y SU DEMOLICION
TOTAL S/.41,616.00

COSTO COMBUSTIBLE SEGUN EXPEDIENTE TECNICO


COMBUSTIBLE MONTO EXP. TEC ACUMULADO SALDO9
VALORIZADO % VALORIZADO %
GASOLINA S/.1,715.18 S/.1,124.35 0.66 590.83 0.34

PETROLEO S/.32,797.36 S/.32,797.36 1.00 S/.0.00 0.00 S/.296.71

COSTO COMBUSTIBLE SEGUN EXPEDIENTE TECNICO MODIFICADO


GLN COMBUSTIBLE MONTO EXP. TEC ACUMULADO SALDO9
VALORIZADO GLN VALORIZADO GLN VALORIZADO GLN
GASOLINA 0.00 0 S/.0.00 0.00 S/.0.00 0.00

PETROLEO S/.20,982.41 2038 S/.0.00 0.00 S/.0.00 0.00

Вам также может понравиться