Вы находитесь на странице: 1из 122

-----------------------------------------------------------------------------------

------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 1 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|ATHI RIVER |
|
| ATHI RVR 2.00 0.71 156.15 19.66 |
|
| Cubicle/Coup CB.ATHRV.1 23.86 25.47 0.68 0.13 0.00 |
|
| Feld_3 /Coup IS.ATHRV.14 23.86 25.47 0.68 0.13 0.00 |
|
| Cub_9 /Coup IS.ATHRV.20 23.86 25.47 0.68 0.13 0.00 |
|
| Cub_1 /Lne EMBAKASI-ATHI RIVE 40.50 -96.37 0.39 0.39 16.35 |
Pv: 274.57 kW cLod: 0.00 Mvar L: 25.00 km|
| Cub_1 /Tr2 ATHI RIVER 90MVA -71.58 -76.40 -0.68 0.39 163.89 |
Tap: 0.00 Min: 0 Max: 0 |
| ATHI RVR 2.00 0.71 156.15 19.66 |
|
| Cubicle/Coup CB.ATHRV.1 -23.86 -25.47 -0.68 0.13 0.00 |
|
| Feld_3 /Coup IS.ATHRV.13 16.64 -121.83 0.14 0.45 0.00 |
|
| Cub_5 /Coup IS.ATHRV.19 -23.86 -25.47 -0.68 0.13 0.00 |
|
| Cub_1 /Lne EMBAKASI-ATHI RIVE 40.50 -96.37 0.39 0.39 16.35 |
Pv: 274.57 kW cLod: 0.00 Mvar L: 25.00 km|
| Cub_1 /Lne EMBAKASI-ATHI RIVE 40.50 -96.37 0.39 0.39 16.35 |
Pv: 274.57 kW cLod: 0.00 Mvar L: 25.00 km|
| Cub_1 /Lne ISINYA-ATHI RIVER -9.42 269.13 -0.03 1.00 21.06 |
Pv: 1093.41 kW cLod: 0.00 Mvar L: 30.00 km|
| ATHI RVR66.00 0.85 56.14 -2.00 |
|
| Cub_2 /Lod athi river ld 46.59 11.29 0.97 0.49 |
Pl0: 64.40 MW Ql0: 15.60 Mvar |
| Cub_1 /Tr2 ATHI RIVER 90MVA 71.58 103.04 0.57 1.29 163.89 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 TRIUPH GEN TX -118.17 -114.32 -0.72 1.69 154.64 |
Tap: 0.00 Min: 0 Max: 0 |
| Triumph Ge.00 0.96 10.56 -25.59 |
|
| Cub_1 /Sym Triumph Power 118.17 143.14 0.64 10.15 206.24 |
Typ: PV |
| Cub_2 /Tr2 TRIUPH GEN TX 118.17 143.14 0.64 10.15 154.64 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|AWENDO |
|
| AWENDO33KV.00 0.55 18.02 25.85 |
|
| Cub_3 /Lod awendo ld 1.22 0.75 0.85 0.05 |
Pl0: 4.10 MW Ql0: 2.50 Mvar |
| Cub_2 /Tr2 AWENDO132/33 TX1 -0.61 -0.37 -0.85 0.02 5.70 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 AWENDO132/33 TX2 -0.61 -0.37 -0.85 0.02 5.70 |
Tap: 0.00 Min: 0 Max: 0 |
| AWENDO132K.00 0.55 72.44 -3.66 |
|
| Cub_1 /Lne AWENDO-KISII -2.39 -0.63 -0.97 0.02 4.64 |
Pv: 9.29 kW cLod: 0.62 Mvar L: 44.00 km|
| Cub_1 /Lne HOMABAY-AWENDO 1.17 -0.13 0.99 0.01 2.27 |
Pv: 1.55 kW cLod: 0.44 Mvar L: 31.00 km|
| Cub_1 /Tr2 AWENDO132/33 TX1 0.61 0.38 0.85 0.01 5.70 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 AWENDO132/33 TX2 0.61 0.38 0.85 0.01 5.70 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 2 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|BOMET |
|
| BOMET33KVB.00 0.54 17.81 25.19 |
|
| Cub_5 /Lod bomet ld 2.33 1.46 0.85 0.09 |
Pl0: 8.00 MW Ql0: 5.00 Mvar |
| Cub_2 /Tr2 BOMET132/33 TX1 -2.33 -1.46 -0.85 0.09 22.13 |
Tap: 0.00 Min: 0 Max: 0 |
| BOMET132KV.00 0.55 72.78 -2.92 |
|
| Cub_1 /Lne SOTIK-BOMET -2.33 -1.57 -0.83 0.02 5.24 |
Pv: 18.79 kW cLod: 1.18 Mvar L: 82.00 km|
| Cub_1 /Tr2 BOMET132/33 TX1 2.33 1.57 0.83 0.02 22.13 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|CHEM |
|
| chem132132.00 0.57 74.71 -1.06 |
|
| Cub_1 /Lne CHEM-SOTIK 10.05 3.17 0.95 0.08 13.96 |
Pv: 63.27 kW cLod: 0.45 Mvar L: 29.00 km|
| Cub_1 /Lne MUHO-CHEM -15.86 -7.57 -0.90 0.14 34.91 |
Pv: 369.74 kW cLod: 0.47 Mvar L: 30.70 km|
| Cub_1 /Tr2 CHEM132/33 TX1 2.90 2.20 0.80 0.03 27.99 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 CHEM132/33 TX2 2.90 2.20 0.80 0.03 27.99 |
Tap: 0.00 Min: 0 Max: 0 |
| chem33kbus.00 0.55 18.15 26.68 |
|
| Cub_3 /Lod chemosit ld1 2.90 2.03 0.82 0.11 |
Pl0: 9.60 MW Ql0: 6.70 Mvar |
| Cub_4 /Lod chemosit ld2 2.90 2.03 0.82 0.11 |
Pl0: 9.60 MW Ql0: 6.70 Mvar |
| Cub_5 /Shnt Chemo PF1 0.00 0.00 1.00 0.00 |
|
| Cub_6 /Shnt Chemo PF2 0.00 0.00 1.00 0.00 |
|
| Cub_2 /Tr2 CHEM132/33 TX1 -2.90 -2.03 -0.82 0.11 27.99 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 CHEM132/33 TX2 -2.90 -2.03 -0.82 0.11 27.99 |
Tap: 0.00 Min: 0 Max: 0 |
| Total ------- ------- |
|
| Load: 5.81 4.05 |
|
| Compensation: 0.00 |
|
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 3 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|DANDORA |
|
| Dand132BB2.00 0.78 102.67 18.00 |
|
| Cub_1 /Lne JUJA-DAND 1 10.59 -48.05 0.22 0.28 38.43 |
Pv: 35.02 kW cLod: 0.06 Mvar L: 2.00 km|
| Cub_1 /Lne JUJA-DAND 2 21.18 -96.05 0.22 0.55 76.82 |
Pv: 70.03 kW cLod: 0.03 Mvar L: 1.00 km|
| Cub_4 /Tr3 DANDORA TX 1 -15.88 72.05 -0.22 0.41 47.43 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_4 /Tr3 DANDORA TX2 -15.88 72.05 -0.22 0.41 47.43 |
Tap: 0.00 Min: 0 Max: 0 |
| Dand220BB1.00 0.73 161.25 18.77 |
|
| Cubicle/Coup CB.DAND.1(1) -5.29 22.56 -0.23 0.08 0.00 |
|
| Feld_3 /Coup IS.DAND.29 -5.29 22.56 -0.23 0.08 0.00 |
|
| Cub_4 /Coup IS.DAND.30 -5.29 22.56 -0.23 0.08 0.00 |
|
| Cub_9 /Coup IS.DAND.31 -5.29 22.56 -0.23 0.08 0.00 |
|
| Cub_10 /Coup IS.DAND.32 -5.29 22.56 -0.23 0.08 0.00 |
|
| Cub_11 /Coup IS.DAND.33 -5.29 22.56 -0.23 0.08 0.00 |
|
| Cub_1 /Lne DAND-EMBA 2 -4.36 31.27 -0.14 0.11 16.12 |
Pv: 37.65 kW cLod: 0.85 Mvar L: 12.50 km|
| Cub_1 /Lne DAND-EMBA1 -4.36 31.27 -0.14 0.11 16.12 |
Pv: 37.65 kW cLod: 0.85 Mvar L: 12.50 km|
| Cub_1 /Lne NNORTH-DAND2 30.49 122.28 0.24 0.45 64.13 |
Pv: 2226.25 kW cLod: 2.87 Mvar L: 46.50 km|
| Cub_3 /Tr3 DANDORA TX 1 15.88 -67.68 0.23 0.25 47.43 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_3 /Tr3 DANDORA TX2 15.88 -67.68 0.23 0.25 47.43 |
Tap: 0.00 Min: 0 Max: 0 |
| Dand220BB2.00 0.73 161.25 18.77 |
|
| Cubicle/Coup CB.DAND.1(1) 5.29 -22.56 0.23 0.08 0.00 |
|
| Feld_3 /Coup IS.DAND.24 35.78 99.72 0.34 0.38 0.00 |
|
| Cub_4 /Coup IS.DAND.25 5.29 -22.56 0.23 0.08 0.00 |
|
| Cub_5 /Coup IS.DAND.26 0.94 8.71 0.11 0.03 0.00 |
|
| Cub_6 /Coup IS.DAND.27 0.94 8.71 0.11 0.03 0.00 |
|
| Cub_7 /Coup IS.DAND.28 5.29 -22.56 0.23 0.08 0.00 |
|
| Cub_1 /Lne DAND-EMBA 2 -4.36 31.27 -0.14 0.11 16.12 |
Pv: 37.65 kW cLod: 0.85 Mvar L: 12.50 km|
| Cub_1 /Lne DAND-EMBA1 -4.36 31.27 -0.14 0.11 16.12 |
Pv: 37.65 kW cLod: 0.85 Mvar L: 12.50 km|
| Cub_1 /Lne KAM-DAND L1 -42.41 -86.60 -0.44 0.35 47.95 |
Pv: 2743.29 kW cLod: 8.67 Mvar L: 107.50 km|
| Cub_1 /Lne KAM-DAND L2 -41.63 -85.15 -0.44 0.34 47.14 |
Pv: 2693.18 kW cLod: 8.83 Mvar L: 109.50 km|
| Cub_1 /Lne NNORTH-DAND1 30.49 122.28 0.24 0.45 64.13 |
Pv: 2226.25 kW cLod: 2.87 Mvar L: 46.50 km|
| Cub_1 /Lne NNORTH-DAND2 30.49 122.28 0.24 0.45 64.13 |
Pv: 2226.25 kW cLod: 2.87 Mvar L: 46.50 km|
| |
|
|ELD |
|
| Eld132BB32.00 0.66 86.56 1.25 |
|
| Cub_1 /Lne KIT-ELD 3.70 1.24 0.95 0.03 7.03 |
Pv: 28.45 kW cLod: 1.29 Mvar L: 65.00 km|
| Cub_1 /Lne LESS-ELD -18.77 -13.88 -0.80 0.16 40.03 |
Pv: 505.75 kW cLod: 0.67 Mvar L: 32.10 km|
| Cub_1 /Tr2 ELD132/33 TX1 7.54 6.32 0.77 0.07 65.21 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 ELD132/33 TX2 7.54 6.32 0.77 0.07 65.21 |
Tap: 0.00 Min: 0 Max: 0 |
| Eld33kv BB.00 0.62 20.36 26.75 |
|
| Cub_5 /Lod eldoret ld1 7.54 5.37 0.81 0.26 |
Pl0: 19.80 MW Ql0: 14.10 Mvar |
| Cub_7 /Lod eldoret ld2 7.54 5.37 0.81 0.26 |
Pl0: 19.80 MW Ql0: 14.10 Mvar |
| Cub_2 /Tr2 ELD132/33 TX1 -7.54 -5.37 -0.81 0.26 65.21 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 ELD132/33 TX2 -7.54 -5.37 -0.81 0.26 65.21 |
Tap: 0.00 Min: 0 Max: 0 |
| Total ------- ------- |
|
| Load: 15.08 10.74 |
|
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 4 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|EMBAKASI |
|
| EMBA220KVB.00 0.73 160.19 18.89 |
|
| Cubicle/Coup CB.EMB.6 -31.84 18.57 -0.86 0.13 0.00 |
|
| Feld_3 /Coup IS.EMB.20 -31.84 18.57 -0.86 0.13 0.00 |
|
| Cub_4 /Coup IS.EMB.21 -31.84 18.57 -0.86 0.13 0.00 |
|
| Cub_1 /Lne EMBAKASI-ATHI RIVE -40.22 99.41 -0.38 0.39 16.35 |
Pv: 274.57 kW cLod: 0.00 Mvar L: 25.00 km|
| Cub_1 /Lne EMBAKASI-ATHI RIVE -40.22 99.41 -0.38 0.39 16.35 |
Pv: 274.57 kW cLod: 0.00 Mvar L: 25.00 km|
| Cub_3 /Tr3 EMBAKASI TX1 31.84 -18.57 0.86 0.13 56.25 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_3 /Tr3 EMBAKASI TX2 63.68 -37.13 0.86 0.27 56.25 |
Tap: 0.00 Min: 0 Max: 0 |
| EMBA220KVB.00 0.73 160.19 18.89 |
|
| Cubicle/Coup CB.EMB.6 31.84 -18.57 0.86 0.13 0.00 |
|
| Feld_3 /Coup IS.EMB.18 -8.38 80.84 -0.10 0.29 0.00 |
|
| Cub_4 /Coup IS.EMB.19 -8.38 80.84 -0.10 0.29 0.00 |
|
| Cub_1 /Lne DAND-EMBA 2 4.39 -31.91 0.14 0.12 16.12 |
Pv: 37.65 kW cLod: 0.85 Mvar L: 12.50 km|
| Cub_1 /Lne DAND-EMBA1 4.39 -31.91 0.14 0.12 16.12 |
Pv: 37.65 kW cLod: 0.85 Mvar L: 12.50 km|
| Cub_1 /Lne EMBAKASI-ATHI RIVE -40.22 99.41 -0.38 0.39 16.35 |
Pv: 274.57 kW cLod: 0.00 Mvar L: 25.00 km|
| Cub_1 /Lne EMBAKASI-ATHI RIVE -40.22 99.41 -0.38 0.39 16.35 |
Pv: 274.57 kW cLod: 0.00 Mvar L: 25.00 km|
| Cub_1 /Lne KIAM-EMBA -23.86 -79.31 -0.29 0.30 41.46 |
Pv: 2758.92 kW cLod: 12.62 Mvar L: 152.50 km|
| Emba66kV66.00 0.76 49.95 15.36 |
|
| Cub_9 /Lod embakasi ld 119.59 28.18 0.97 1.42 |
Pl0: 208.80 MW Ql0: 49.20 Mvar |
| Cub_3 /Tr2 EMBA 10MVA -5.31 -20.34 -0.25 0.24 277.80 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 EMBA 45MVA -18.74 -71.74 -0.25 0.86 217.72 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_4 /Tr3 EMBAKASI TX1 -31.84 21.30 -0.83 0.44 56.25 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_4 /Tr3 EMBAKASI TX2 -63.68 42.60 -0.83 0.89 56.25 |
Tap: 0.00 Min: 0 Max: 0 |
| EmbaGenBB1.00 1.02 11.20 -10.83 |
|
| Cub_2 /Sym EMBA IPP 24.06 125.75 0.19 6.60 182.91 |
Typ: PV |
| Cub_2 /Tr2 EMBA 10MVA 5.31 27.78 0.19 1.46 277.80 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 EMBA 45MVA 18.74 97.97 0.19 5.14 217.72 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|GALU |
|
| Galu132kVB.00 0.86 114.03 13.06 |
|
| Cub_1 /Lne RAB-GAL -14.63 -11.11 -0.80 0.09 21.88 |
Pv: 223.97 kW cLod: 1.72 Mvar L: 48.00 km|
| Cub_1 /Tr2 GALU132/33 TX2 14.63 11.11 0.80 0.09 92.44 |
Tap: 0.00 Min: 0 Max: 0 |
| Galu33kv33.00 0.81 26.79 7.90 |
|
| Cub_4 /Lod Galu ld 14.63 9.16 0.85 0.37 |
Pl0: 22.20 MW Ql0: 13.90 Mvar |
| Cub_2 /Tr2 GALU132/33 TX2 -14.63 -9.16 -0.85 0.37 92.44 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 5 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|GARISSA |
|
| Garissa132.00 0.90 119.27 12.57 |
|
| Cub_1 /Lne MWI-GARR -2.51 -1.64 -0.84 0.01 7.53 |
Pv: 31.19 kW cLod: 7.76 Mvar L: 204.29 km|
| Cub_1 /Tr2 GAR132/33 TX1 1.25 0.82 0.84 0.01 7.22 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 GAR132/33 TX2 1.25 0.82 0.84 0.01 7.22 |
Tap: 0.00 Min: 0 Max: 0 |
| Garissa33k.00 0.90 29.69 42.20 |
|
| Cub_5 /Lod garissa ld 2.51 1.62 0.84 0.06 |
Pl0: 3.10 MW Ql0: 2.00 Mvar |
| Cub_2 /Tr2 GAR132/33 TX1 -1.25 -0.81 -0.84 0.03 7.22 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 GAR132/33 TX2 -1.25 -0.81 -0.84 0.03 7.22 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|GARS |
|
| GARSEN220K.00 0.95 209.04 11.91 |
|
| Cub_1 /Lne GARS-LAMU 0.68 -14.65 0.05 0.04 6.85 |
Pv: 20.41 kW cLod: 10.92 Mvar L: 96.00 km|
| Cub_1 /Lne MAL-GARSEN -3.26 12.12 -0.26 0.03 11.19 |
Pv: 86.11 kW cLod: 11.51 Mvar L: 104.00 km|
| Cub_1 /Tr2 GAR132/33 TX1 1.02 1.00 0.71 0.00 10.00 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 GAR132/33 TX2 1.56 1.53 0.71 0.01 10.00 |
Tap: 0.00 Min: 0 Max: 0 |
| GARSEN33KV.00 0.94 31.12 11.46 |
|
| Cub_4 /Lod Gars ld 2.58 1.60 0.85 0.06 |
Pl0: 2.90 MW Ql0: 1.80 Mvar |
| Cub_5 /Shnt Garsen Reactor 0.00 0.89 0.00 0.02 |
|
| Cub_2 /Tr2 GAR132/33 TX1 -1.02 -0.98 -0.72 0.03 10.00 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 GAR132/33 TX2 -1.56 -1.51 -0.72 0.04 10.00 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|GATU |
|
| GATUNDU132.00 0.77 101.40 15.24 |
|
| Cub_1 /Lne MANG-GAT -4.14 -2.73 -0.84 0.03 6.65 |
Pv: 8.57 kW cLod: 0.56 Mvar L: 20.00 km|
| Cub_1 /Tr2 GATU132/33 TX 4.14 2.73 0.84 0.03 28.09 |
Tap: 0.00 Min: 0 Max: 0 |
| GATUNDU33K.00 0.75 24.87 43.51 |
|
| Cub_4 /Lod gatundu ld 4.14 2.56 0.85 0.11 |
Pl0: 7.30 MW Ql0: 4.50 Mvar |
| Cub_2 /Tr2 GATU132/33 TX -4.14 -2.56 -0.85 0.11 28.09 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|GIT |
|
| GITARU132K.00 0.95 125.89 26.95 |
|
| Cub_1 /Lne KAMB-GIT 62.38 48.32 0.79 0.36 50.37 |
Pv: 210.83 kW cLod: 0.29 Mvar L: 7.00 km|
| Cub_1 /Lne KAMB-GIT2 62.38 48.32 0.79 0.36 50.37 |
Pv: 210.83 kW cLod: 0.29 Mvar L: 7.00 km|
| Cub_1 /Tr2 GITTX1 -40.53 -29.87 -0.81 0.23 62.11 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 GITTX2 -43.69 -36.91 -0.76 0.26 63.13 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 GITTX3 -40.53 -29.87 -0.81 0.23 62.11 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|GITHA |
|
| GITHAMBO13.00 0.76 100.78 14.95 |
|
| Cub_1 /Lne MANG-GITH -4.73 -3.19 -0.83 0.03 7.69 |
Pv: 26.83 kW cLod: 1.38 Mvar L: 50.00 km|
| Cub_1 /Tr2 GITH132/33 TX 4.73 3.19 0.83 0.03 32.50 |
Tap: 0.00 Min: 0 Max: 0 |
| GITHAMBO33.00 0.75 24.63 42.94 |
|
| Cub_4 /Lod githambo ld 4.73 2.95 0.85 0.13 |
Pl0: 8.50 MW Ql0: 5.30 Mvar |
| Cub_2 /Tr2 GITH132/33 TX -4.73 -2.95 -0.85 0.13 32.50 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 6 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|HOMABAY |
|
| HOMABAY132.00 0.55 72.33 -3.82 |
|
| Cub_1 /Lne HOMABAY-AWENDO -1.17 -0.30 -0.97 0.01 2.27 |
Pv: 1.55 kW cLod: 0.44 Mvar L: 31.00 km|
| Cub_1 /Lne SONDU-HB -0.19 -0.58 -0.32 0.00 1.14 |
Pv: 0.12 kW cLod: 0.93 Mvar L: 66.00 km|
| Cub_1 /Tr2 HOMABAY132/33 TX1 0.68 0.44 0.84 0.01 6.44 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 HOMABAY132/33 TX2 0.68 0.44 0.84 0.01 6.44 |
Tap: 0.00 Min: 0 Max: 0 |
| HOMABAY 33.00 0.54 17.97 25.63 |
|
| Cub_3 /Lod homabay ld 1.36 0.86 0.85 0.05 |
Pl0: 4.60 MW Ql0: 2.90 Mvar |
| Cub_2 /Tr2 HOMABAY132/33 TX1 -0.68 -0.43 -0.85 0.03 6.44 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 HOMABAY132/33 TX2 -0.68 -0.43 -0.85 0.03 6.44 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|ISH |
|
| term336132.00 0.93 123.23 24.95 |
|
| Cub_1 /Lne ISH-KIE 0.00 -1.13 0.00 0.01 1.24 |
Pv: 0.11 kW cLod: 1.13 Mvar L: 27.58 km|
| Cub_1 /Lne ISH-MERU 17.31 4.23 0.97 0.08 14.80 |
Pv: 160.79 kW cLod: 2.85 Mvar L: 68.00 km|
| Cub_1 /Lne KAMB-ISH -17.31 -3.10 -0.98 0.08 13.94 |
Pv: 116.74 kW cLod: 2.33 Mvar L: 54.00 km|
| |
|
|ISINYA220/400 |
|
| ISINYA220K.00 |
|
| Cub_2 /Tr2 KAM TX1 |
Tap: 0 Min: 0 Max: 0 |
| Cub_2 /Tr2 KAM TX2 |
Tap: 0 Min: 0 Max: 0 |
| ISINYA400K.00 0.00 0.00 0.00 |
|
| Cubicle/Coup CB.IS.5 0.00 0.00 1.00 0.00 0.00 |
|
| Feld_3 /Coup IS.IS.29 0.00 0.00 1.00 0.00 0.00 |
|
| Cub_4 /Coup IS.IS.32 0.00 0.00 1.00 0.00 0.00 |
|
| Cub_9 /Coup IS.IS.35 0.00 0.00 1.00 0.00 0.00 |
|
| Cub_1 /Lne ISINYA-RAB1 -0.00 -0.00 -1.00 0.00 0.00 |
Pv: 0.00 kW cLod: 0.00 Mvar L: 450.00 km|
| Cub_1 /Lne ISINYA-RAB2 -0.00 -0.00 -1.00 0.00 0.00 |
Pv: 0.00 kW cLod: 0.00 Mvar L: 450.00 km|
| Cub_1 /Tr2 KAM TX1 |
Tap: 0 Min: 0 Max: 0 |
| Cub_1 /Tr2 KAM TX2 |
Tap: 0 Min: 0 Max: 0 |
| ISINYA400K.00 0.00 0.00 0.00 |
|
| Cubicle/Coup CB.IS.5 0.00 0.00 1.00 0.00 0.00 |
|
| Feld_3 /Coup IS.IS.26 0.00 0.00 1.00 0.00 0.00 |
|
| Cub_4 /Coup IS.IS.31 0.00 0.00 1.00 0.00 0.00 |
|
| Cub_5 /Coup IS.IS.34 0.00 0.00 1.00 0.00 0.00 |
|
| Cub_1 /Lne ISINYA-RAB1 -0.00 -0.00 -1.00 0.00 0.00 |
Pv: 0.00 kW cLod: 0.00 Mvar L: 450.00 km|
| Cub_1 /Lne ISINYA-RAB2 -0.00 -0.00 -1.00 0.00 0.00 |
Pv: 0.00 kW cLod: 0.00 Mvar L: 450.00 km|
| |
|
|ISIOLO |
|
| ISIOLO132K.00 0.91 120.64 23.12 |
|
| Cub_1 /Lne MER-ISIOLO -3.59 -2.38 -0.83 0.02 4.85 |
Pv: 5.55 kW cLod: 1.02 Mvar L: 26.00 km|
| Cub_1 /Tr2 ISIOLO132/33 TX 3.59 2.38 0.83 0.02 20.48 |
Tap: 0.00 Min: 0 Max: 0 |
| ISIOLO33KV.00 0.90 29.80 52.07 |
|
| Cub_4 /Lod isiolo ld 3.59 2.28 0.84 0.08 |
Pl0: 4.40 MW Ql0: 2.80 Mvar |
| Cub_2 /Tr2 ISIOLO132/33 TX -3.59 -2.28 -0.84 0.08 20.48 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 7 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|JUJA RD |
|
| IBER66KV66.00 0.94 62.04 19.19 |
|
| Cub_2 /Lne NAIROBI SOUTH -JUJ 78.30 164.76 0.43 1.70 259.18 |
Pv: 6041.22 kW cLod: 0.00 Mvar L: 6.50 km|
| Cub_2 /Tr2 IBER TX -44.53 -81.36 -0.48 0.86 82.22 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_3 /Tr2 IBER TX2 -33.77 -83.41 -0.38 0.84 79.77 |
Tap: 0.00 Min: 0 Max: 0 |
| JUJARD132K.00 0.78 103.03 17.91 |
|
| Cubicle/Coup CB.JJRD.2 -9.06 100.92 -0.09 0.57 0.00 |
|
| Cub_1 /Lne JUJRD-MANG 20.37 -3.14 0.99 0.12 27.18 |
Pv: 376.59 kW cLod: 1.41 Mvar L: 50.00 km|
| Cub_3 /Tr3 JJRDTX1 -8.53 -73.72 -0.11 0.42 52.82 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_3 /Tr3 JJRDTX2 -2.09 -18.04 -0.11 0.10 51.70 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_3 /Tr3 JJRDTX3 -0.70 -6.01 -0.11 0.03 51.70 |
Tap: 0.00 Min: 0 Max: 0 |
| JUJARD132K.00 0.78 103.03 17.91 |
|
| Cubicle/Coup CB.JJRD.2 9.06 -100.92 0.09 0.57 0.00 |
|
| Cub_1 /Lne JUJA-DAND 1 -10.55 48.17 -0.21 0.28 38.43 |
Pv: 35.02 kW cLod: 0.06 Mvar L: 2.00 km|
| Cub_1 /Lne JUJA-DAND 2 -21.11 96.39 -0.21 0.55 76.82 |
Pv: 70.03 kW cLod: 0.03 Mvar L: 1.00 km|
| Cub_1 /Lne JUJA-SULT 5.18 -19.74 0.25 0.11 26.90 |
Pv: 790.86 kW cLod: 3.94 Mvar L: 127.00 km|
| Cub_2 /Lne JUJRD-NAIV 16.17 10.35 0.84 0.11 26.77 |
Pv: 497.56 kW cLod: 1.93 Mvar L: 71.20 km|
| Cub_1 /Lne KIND-JUJA 1.26 -34.25 0.04 0.19 45.19 |
Pv: 2259.98 kW cLod: 3.97 Mvar L: 119.00 km|
| JUJARD66KV.00 0.84 55.65 18.40 |
|
| Cub_9 /Lod juja rd 60.94 41.10 0.83 0.76 |
Pl0: 85.70 MW Ql0: 57.80 Mvar |
| Cub_10 /Shnt juja rd pfc 0.00 0.00 1.00 0.00 |
|
| Cub_1 /Lne NAIROBI SOUTH -JUJ -72.25 -146.83 -0.44 1.70 259.18 |
Pv: 6041.22 kW cLod: 0.00 Mvar L: 6.50 km|
| Cub_4 /Tr3 JJRDTX1 8.53 79.72 0.11 0.83 52.82 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_4 /Tr3 JJRDTX2 2.09 19.51 0.11 0.20 51.70 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr3 JJRDTX3 0.70 6.50 0.11 0.07 51.70 |
Tap: 0.00 Min: 0 Max: 0 |
| IBERT9 11.00 1.01 11.13 -8.62 |
|
| Cub_2 /Sym IBERFARICA8 44.53 89.30 0.45 5.18 17.82 |
Typ: PV |
| Cub_1 /Coup CB.IB.7 44.53 89.30 0.45 5.18 0.00 |
|
| IBERT13 11.00 1.01 11.14 -9.15 |
|
| Cub_2 /Sym IBERFARICAa 33.77 90.89 0.35 5.02 242.41 |
Typ: PV |
| Cub_1 /Coup CB.IB.1 33.77 90.89 0.35 5.02 0.00 |
|
| GT1 11.00 1.01 11.13 -8.62 |
|
| Cub_1 /Coup CB.IB.7 -44.53 -89.30 -0.45 5.18 0.00 |
|
| Cub_2 /Tr2 IBER TX 44.53 89.30 0.45 5.18 82.22 |
Tap: 0.00 Min: 0 Max: 0 |
| IBERGT2 11.00 1.01 11.14 -9.15 |
|
| Cub_1 /Coup CB.IB.1 -33.77 -90.89 -0.35 5.02 0.00 |
|
| Cub_2 /Tr2 IBER TX2 33.77 90.89 0.35 5.02 79.77 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|KABAR |
|
| KABARNET13.00 0.68 89.98 2.20 |
|
| Cub_1 /Lne LESS-KAB -1.60 -1.04 -0.84 0.01 2.87 |
Pv: 3.90 kW cLod: 1.36 Mvar L: 62.13 km|
| Cub_1 /Tr2 KABARNET132/33 TX 1.60 1.04 0.84 0.01 12.14 |
Tap: 0.00 Min: 0 Max: 0 |
| KABARNET33.00 0.68 22.29 31.36 |
|
| Cub_4 /Lod kabarnet ld 1.60 1.00 0.85 0.05 |
Pl0: 3.50 MW Ql0: 2.20 Mvar |
| Cub_2 /Tr2 KABARNET132/33 TX -1.60 -1.00 -0.85 0.05 12.14 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 8 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|KAMBURU |
|
| KAMBURU220.00 0.85 187.91 21.27 |
|
| Cubicle/Coup CB.KAMB.3 10.40 10.60 0.70 0.05 0.00 |
|
| Feld_1 /Coup IS.KAMB.11 37.76 61.80 0.52 0.22 0.00 |
|
| Feld_2 /Coup IS.KAMB.14 28.07 -18.60 0.83 0.10 0.00 |
|
| Cubicle/Coup IS.KAMB.8 38.18 62.75 0.52 0.23 0.00 |
|
| Cub_1 /Lne KAM-DAND L1 45.15 93.71 0.43 0.32 47.95 |
Pv: 2743.29 kW cLod: 8.67 Mvar L: 107.50 km|
| Cub_1 /Lne KAM-DAND L2 44.32 91.82 0.43 0.31 47.14 |
Pv: 2693.18 kW cLod: 8.83 Mvar L: 109.50 km|
| Cub_1 /Lne KAMB-KIAMB 24.94 -68.98 0.34 0.23 38.13 |
Pv: 554.60 kW cLod: 3.28 Mvar L: 35.00 km|
| Cub_3 /Tr3 KAMTX -114.41 -116.55 -0.70 0.50 106.23 |
Tap: 0.00 Min: 0 Max: 0 |
| KAMBURU220.00 0.85 187.91 21.27 |
|
| Cubicle/Coup CB.KAMB.3 -10.40 -10.60 -0.70 0.05 0.00 |
|
| Feld_1 /Coup IS.KAMB.10 6.56 30.02 0.21 0.09 0.00 |
|
| Feld_2 /Coup IS.KAMB.13 -3.13 -50.38 -0.06 0.16 0.00 |
|
| Cubicle/Coup IS.KAMB.7 6.97 30.96 0.22 0.10 0.00 |
|
| Cub_1 /Lne KAM-DAND L1 45.15 93.71 0.43 0.32 47.95 |
Pv: 2743.29 kW cLod: 8.67 Mvar L: 107.50 km|
| Cub_1 /Lne KAM-DAND L2 44.32 91.82 0.43 0.31 47.14 |
Pv: 2693.18 kW cLod: 8.83 Mvar L: 109.50 km|
| Cub_1 /Lne KAMB-KIAMB 24.94 -68.98 0.34 0.23 38.13 |
Pv: 554.60 kW cLod: 3.28 Mvar L: 35.00 km|
| KAMBURU132.00 0.94 124.44 26.35 |
|
| Cub_1 /Lne KAMB-GIT -62.17 -47.40 -0.80 0.36 50.37 |
Pv: 210.83 kW cLod: 0.29 Mvar L: 7.00 km|
| Cub_1 /Lne KAMB-GIT2 -62.17 -47.40 -0.80 0.36 50.37 |
Pv: 210.83 kW cLod: 0.29 Mvar L: 7.00 km|
| Cub_1 /Lne KAMB-ISH 17.42 1.22 1.00 0.08 13.94 |
Pv: 116.74 kW cLod: 2.33 Mvar L: 54.00 km|
| Cub_1 /Lne MAS-KAMB 44.20 -1.29 1.00 0.21 28.49 |
Pv: 177.27 kW cLod: 0.82 Mvar L: 18.40 km|
| Cub_4 /Tr2 Kamb Tx1 -17.23 -14.81 -0.76 0.11 65.14 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_4 /Tr2 Kamb Tx2 -17.23 -14.81 -0.76 0.11 65.14 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_4 /Tr2 Kamb Tx3 -17.23 -14.81 -0.76 0.11 65.14 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_4 /Tr3 KAMTX 114.41 139.30 0.63 0.84 106.23 |
Tap: 0.00 Min: 0 Max: 0 |
| KambGenBB1.00 1.00 11.00 0.03 |
|
| Cub_1 /Sym KAMBG1 17.23 16.85 0.72 1.26 65.14 |
Typ: PV |
| Cub_3 /Tr2 Kamb Tx3 17.23 16.85 0.72 1.26 65.14 |
Tap: 0.00 Min: 0 Max: 0 |
| kambgenbb2.00 1.00 11.00 0.03 |
|
| Cub_2 /Sym KAMBG2 17.23 16.85 0.72 1.26 65.14 |
Typ: PV |
| Cub_3 /Tr2 Kamb Tx2 17.23 16.85 0.72 1.26 65.14 |
Tap: 0.00 Min: 0 Max: 0 |
| kamburugen.00 1.00 11.00 0.03 |
|
| Cub_1 /Sym KAMBG4 17.23 16.85 0.72 1.26 65.14 |
Typ: PV |
| Cub_3 /Tr2 Kamb Tx1 17.23 16.85 0.72 1.26 65.14 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|KBK |
|
| KIBOKO132K.00 0.85 112.09 13.74 |
|
| Cub_1 /Lne KBK-MTT.AND 0.95 -7.02 0.13 0.04 8.59 |
Pv: 41.95 kW cLod: 3.02 Mvar L: 88.00 km|
| Cub_1 /Lne SULTAN-KBK -4.71 4.62 -0.71 0.03 9.30 |
Pv: 32.98 kW cLod: 1.45 Mvar L: 43.00 km|
| Cub_1 /Tr2 KBK1132/33 TX1 3.76 2.40 0.84 0.02 105.04 |
Tap: 0.00 Min: 0 Max: 0 |
| KIBOKO33KV.00 0.80 26.34 37.44 |
|
| Cub_3 /Lod kiboko ld 3.76 1.85 0.90 0.09 |
Pl0: 5.90 MW Ql0: 2.90 Mvar |
| Cub_2 /Tr2 KBK1132/33 TX1 -3.76 -1.85 -0.90 0.09 105.04 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 9 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|KEGATI |
|
| KEGATI132K.00 0.55 72.81 -3.19 |
|
| Cub_1 /Lne AWENDO-KISII 2.40 0.02 1.00 0.02 4.64 |
Pv: 9.29 kW cLod: 0.62 Mvar L: 44.00 km|
| Cub_1 /Lne KIS-SOTIK -7.59 -3.28 -0.92 0.07 11.10 |
Pv: 45.03 kW cLod: 0.50 Mvar L: 33.00 km|
| Cub_1 /Tr2 KIS132/33 TX 5.19 3.25 0.85 0.05 48.28 |
Tap: 0.00 Min: 0 Max: 0 |
| KEGATI33KV.00 0.53 17.43 22.50 |
|
| Cub_4 /Lod kisii ld 5.19 2.73 0.88 0.19 |
Pl0: 18.60 MW Ql0: 9.80 Mvar |
| Cub_2 /Tr2 KIS132/33 TX -5.19 -2.73 -0.88 0.19 48.28 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|KIAMB |
|
| KIAMBERE22.00 0.88 193.05 20.25 |
|
| Cub_1 /Lne KAMB-KIAMB -24.38 67.99 -0.34 0.22 38.13 |
Pv: 554.60 kW cLod: 3.28 Mvar L: 35.00 km|
| Cub_1 /Lne KIAM-EMBA 26.62 82.56 0.31 0.26 41.46 |
Pv: 2758.92 kW cLod: 12.62 Mvar L: 152.50 km|
| Cub_1 /Lne KIAMB-RABAI 18.13 -31.93 0.49 0.11 18.58 |
Pv: 568.89 kW cLod: 45.49 Mvar L: 456.00 km|
| Cub_1 /Tr2 KIAMBTX1 -10.04 -58.45 -0.17 0.18 79.51 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_3 /Tr2 KIAMBTX2 -10.33 -60.17 -0.17 0.18 79.51 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|KIENI |
|
| KIENI132KV.00 0.93 123.29 24.94 |
|
| Cub_1 /Lne ISH-KIE -0.00 -0.00 -0.02 0.00 1.24 |
Pv: 0.11 kW cLod: 1.13 Mvar L: 27.58 km|
| |
|
|KIGA |
|
| KIGANJO132.00 0.83 109.82 20.57 |
|
| Cub_1 /Lne KUT-KIG -32.85 -18.10 -0.88 0.20 50.69 |
Pv: 1134.57 kW cLod: 1.53 Mvar L: 45.00 km|
| Cub_1 /Lne NANY-KIG 15.89 6.86 0.92 0.09 24.34 |
Pv: 295.96 kW cLod: 1.62 Mvar L: 52.00 km|
| Cub_1 /Tr2 KIG132/33 TX1 8.48 5.62 0.83 0.05 53.16 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 KIG132/33 TX2 8.48 5.62 0.83 0.05 53.16 |
Tap: 0.00 Min: 0 Max: 0 |
| KIGANJO33K.00 0.80 26.55 47.51 |
|
| Cub_3 /Lod kiga ld 16.96 9.97 0.86 0.43 |
Pl0: 26.20 MW Ql0: 15.40 Mvar |
| Cub_2 /Tr2 KIG132/33 TX1 -8.48 -4.99 -0.86 0.21 53.16 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 KIG132/33 TX2 -8.48 -4.99 -0.86 0.21 53.16 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|KILI |
|
| KILIMAMBOG.00 0.77 101.78 15.38 |
|
| Cub_1 /Lne KILI-MANG -0.00 -0.00 -0.06 0.00 0.63 |
Pv: 0.02 kW cLod: 0.47 Mvar L: 17.00 km|
| |
|
|KILIFI |
|
| KILIFI132K.00 0.81 106.32 9.97 |
|
| Cub_1 /Lne BAM-KILI -11.58 -5.78 -0.89 0.07 18.06 |
Pv: 78.23 kW cLod: 0.75 Mvar L: 24.60 km|
| Cub_1 /Tr2 KIL1132/33 TX1 7.01 3.50 0.89 0.04 42.28 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 KIL2132/33 TX2 4.57 2.28 0.89 0.03 42.28 |
Tap: 0.00 Min: 0 Max: 0 |
| KILIFI33KV.00 0.79 25.96 7.10 |
|
| Cub_3 /Lod kilifi ld 11.58 5.08 0.92 0.28 |
Pl0: 18.70 MW Ql0: 8.20 Mvar |
| Cub_2 /Tr2 KIL1132/33 TX1 -7.01 -3.07 -0.92 0.17 42.28 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 KIL2132/33 TX2 -4.57 -2.00 -0.92 0.11 42.28 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 10 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|KIND |
|
| KINDARUMA1.00 0.90 119.20 14.17 |
|
| Cub_1 /Lne KIND-JUJA 1.00 35.41 0.03 0.17 45.19 |
Pv: 2259.98 kW cLod: 3.97 Mvar L: 119.00 km|
| Cub_1 /Lne KIND-KAMB 0.00 -0.70 0.00 0.00 0.80 |
Pv: 0.03 kW cLod: 0.70 Mvar L: 18.40 km|
| Cub_1 /Lne KIND-MANG 10.80 33.58 0.31 0.17 44.81 |
Pv: 2230.74 kW cLod: 3.93 Mvar L: 119.00 km|
| Cub_1 /Lne KIND-MWI 8.39 2.95 0.94 0.04 10.62 |
Pv: 32.44 kW cLod: 1.11 Mvar L: 29.35 km|
| Cub_3 /Tr2 KINDGENTX1 -6.73 -23.74 -0.27 0.12 109.31 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_3 /Tr2 KINDGENTX2 -6.73 -23.74 -0.27 0.12 109.31 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_3 /Tr2 KINDGENTX3 -6.73 -23.74 -0.27 0.12 109.31 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|KIPEVU132 |
|
| KDP132KVBB.00 0.89 117.36 14.76 |
|
| Cub_1 /Lne RAB-KDP1_1 24.04 -6.07 0.97 0.12 28.70 |
Pv: 143.21 kW cLod: 0.63 Mvar L: 17.00 km|
| Cub_1 /Lne RAB-KDP1_2 24.04 -6.07 0.97 0.12 28.70 |
Pv: 143.21 kW cLod: 0.63 Mvar L: 17.00 km|
| Cub_1 /Lne tsav0-kpv1 -64.34 87.79 -0.59 0.54 90.61 |
Pv: 46.56 kW cLod: 0.02 Mvar L: 0.50 km|
| Cub_1 /Tr2 KPV1TX1 -12.24 -23.27 -0.47 0.13 98.58 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 KPV1TX2 -6.75 -24.77 -0.26 0.13 96.24 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 KPV1TX3 -12.24 -23.27 -0.47 0.13 98.58 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 KPV1TX4 -12.24 -23.27 -0.47 0.13 98.58 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 KPV1TX5 -12.24 -23.27 -0.47 0.13 98.58 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 KPVTX6 -12.24 -23.27 -0.47 0.13 98.58 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr3 KDP-KPVGIS TX1 28.08 21.82 0.79 0.17 66.66 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr3 KDP-KPVTX2 28.08 21.82 0.79 0.17 66.66 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr3 KDP-KPVTX3 28.08 21.82 0.79 0.17 66.66 |
Tap: 0.00 Min: 0 Max: 0 |
| KPV1G3BB11.00 1.02 11.22 -11.43 |
|
| Cub_3 /Sym KPV1G3 12.24 27.58 0.41 1.55 209.54 |
Typ: PV |
| Cub_2 /Tr2 KPV1TX3 12.24 27.58 0.41 1.55 98.58 |
Tap: 0.00 Min: 0 Max: 0 |
| KPV1G4BB11.00 1.02 11.22 -11.43 |
|
| Cub_3 /Sym KPV1G4 12.24 27.58 0.41 1.55 209.54 |
Typ: PV |
| Cub_2 /Tr2 KPV1TX4 12.24 27.58 0.41 1.55 98.58 |
Tap: 0.00 Min: 0 Max: 0 |
| KPV1G2BB11.00 1.03 11.30 -13.15 |
|
| Cub_3 /Sym KPV1G2 6.75 28.87 0.23 1.52 205.91 |
Typ: PV |
| Cub_2 /Tr2 KPV1TX2 6.75 28.87 0.23 1.52 96.24 |
Tap: 0.00 Min: 0 Max: 0 |
| KPV1G5 11.00 1.02 11.22 -11.43 |
|
| Cub_3 /Sym KIDPG3 12.24 27.58 0.41 1.55 209.54 |
Typ: PV |
| Cub_2 /Tr2 KPV1TX5 12.24 27.58 0.41 1.55 98.58 |
Tap: 0.00 Min: 0 Max: 0 |
| KPV1G6 11.00 1.02 11.22 -11.43 |
|
| Cub_3 /Sym KIDPG5 12.24 27.58 0.41 1.55 209.54 |
Typ: PV |
| Cub_2 /Tr2 KPVTX6 12.24 27.58 0.41 1.55 98.58 |
Tap: 0.00 Min: 0 Max: 0 |
| KPV1G1BB11.00 1.02 11.22 -11.43 |
|
| Cub_1 /Sym KPV1G1 12.24 27.58 0.41 1.55 209.54 |
Typ: PV |
| Cub_1 /Tr2 KPV1TX1 12.24 27.58 0.41 1.55 98.58 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 11 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|KIPEVU33KV |
|
| KPVGIS33KV.00 0.84 27.79 10.43 |
|
| Cub_4 /Lod kpv ld 84.23 55.80 0.83 2.10 |
Pl0: 118.80 MW Ql0: 78.70 Mvar |
| Cub_1 /Tr3 KDP-KPVGIS TX1 -28.08 -18.60 -0.83 0.70 66.66 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr3 KDP-KPVTX2 -28.08 -18.60 -0.83 0.70 66.66 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr3 KDP-KPVTX3 -28.08 -18.60 -0.83 0.70 66.66 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|KISM |
|
| KISUMU132K.00 0.55 72.46 -2.92 |
|
| Cub_1 /Lne KSM-MUHO -19.55 -7.23 -0.94 0.17 42.69 |
Pv: 873.68 kW cLod: 0.73 Mvar L: 48.50 km|
| Cub_1 /Lne KSM-SONDU 3.11 -1.55 0.89 0.03 6.53 |
Pv: 20.16 kW cLod: 0.71 Mvar L: 50.00 km|
| Cub_1 /Tr2 KIS132/33 TX1 8.22 4.39 0.88 0.07 73.79 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 KIS132/33 TX2 8.22 4.39 0.88 0.07 73.79 |
Tap: 0.00 Min: 0 Max: 0 |
| KISUMU33KV.00 0.52 17.13 20.09 |
|
| Cub_3 /Lod kisumu ld1 8.22 6.01 0.81 0.34 |
Pl0: 30.50 MW Ql0: 22.30 Mvar |
| Cub_4 /Lod kisumu ld2 8.22 6.01 0.81 0.34 |
Pl0: 30.50 MW Ql0: 22.30 Mvar |
| Cub_5 /Shnt ksm pfc 0.00 -5.66 0.00 0.19 |
|
| Cub_2 /Tr2 KIS132/33 TX1 -8.22 -3.18 -0.93 0.30 73.79 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 KIS132/33 TX2 -8.22 -3.18 -0.93 0.30 73.79 |
Tap: 0.00 Min: 0 Max: 0 |
| Total ------- ------- |
|
| Load: 16.43 12.01 |
|
| |
|
|KIT |
|
| KITALE132K.00 0.65 85.42 0.63 |
|
| Cub_1 /Lne KIT-ELD -3.67 -2.47 -0.83 0.03 7.03 |
Pv: 28.45 kW cLod: 1.29 Mvar L: 65.00 km|
| Cub_2 /Tr2 KITALE 132KV/33KV 3.67 2.47 0.83 0.03 29.72 |
Tap: 0.00 Min: 0 Max: 0 |
| KITALE33KV.00 0.63 20.84 28.46 |
|
| Cub_2 /Lod kitale ld 3.67 2.27 0.85 0.12 |
Pl0: 9.20 MW Ql0: 5.70 Mvar |
| Cub_2 /Tr2 KITALE 132KV/33KV -3.67 -2.27 -0.85 0.12 29.72 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|KITUI |
|
| KITUI132KV.00 0.88 116.43 13.81 |
|
| Cub_1 /Lne kitui-mwingi -4.54 -10.75 -0.39 0.06 13.61 |
Pv: 75.95 kW cLod: 1.69 Mvar L: 45.56 km|
| Cub_1 /Lne wote-kitui 2.84 9.66 0.28 0.05 14.39 |
Pv: 114.81 kW cLod: 2.32 Mvar L: 65.21 km|
| Cub_1 /Tr2 KIT132/33 TX1 0.85 0.55 0.84 0.01 4.99 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 KIT132/33 TX2 0.85 0.55 0.84 0.01 4.99 |
Tap: 0.00 Min: 0 Max: 0 |
| KITUI33KVB.00 0.88 29.02 43.54 |
|
| Cub_3 /Lod kitui ld 1.70 1.08 0.84 0.04 |
Pl0: 2.20 MW Ql0: 1.40 Mvar |
| Cub_2 /Tr2 KIT132/33 TX1 -0.85 -0.54 -0.84 0.02 4.99 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 KIT132/33 TX2 -0.85 -0.54 -0.84 0.02 4.99 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 12 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|KKTN |
|
| KOKOTONI11.00 0.89 9.75 13.90 |
|
| Cub_3 /Lod kokotoni ld 0.00 0.00 1.00 0.00 |
Pl0: 0.00 MW Ql0: 0.00 Mvar |
| Cub_2 /Tr2 KOKOTONI132/11KV T -0.00 0.00 -1.00 0.00 0.00 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 KOKOTONI132KV/11KV -0.00 0.00 -1.00 0.00 0.00 |
Tap: 0.00 Min: 0 Max: 0 |
| KOKOTONI 1.00 0.89 117.03 13.90 |
|
| Cub_1 /Lne kktn-rab -5.41 -0.10 -1.00 0.03 6.29 |
Pv: 2.03 kW cLod: 0.18 Mvar L: 5.00 km|
| Cub_1 /Lne mkn-kktn 5.41 0.10 1.00 0.03 6.32 |
Pv: 5.31 kW cLod: 0.48 Mvar L: 13.00 km|
| Cub_1 /Tr2 KOKOTONI132/11KV T 0.00 -0.00 1.00 0.00 0.00 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 KOKOTONI132KV/11KV 0.00 -0.00 1.00 0.00 0.00 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|KPV1 |
|
| KPV1132KVB.00 0.89 117.09 13.95 |
|
| Cub_1 /Lne RAB-KPV1 -0.00 -0.00 -0.07 0.00 0.79 |
Pv: 0.03 kW cLod: 0.62 Mvar L: 17.00 km|
| |
|
|KUT |
|
| KUTUS132KV.00 0.88 115.96 22.69 |
|
| Cub_1 /Lne KUT-KIG 33.99 18.81 0.87 0.19 50.69 |
Pv: 1134.57 kW cLod: 1.53 Mvar L: 45.00 km|
| Cub_1 /Lne MAS-KUT -44.67 -26.37 -0.86 0.26 66.39 |
Pv: 1908.61 kW cLod: 1.69 Mvar L: 44.00 km|
| Cub_1 /Tr2 KUT132/33 TX 10.68 7.56 0.82 0.07 64.75 |
Tap: 0.00 Min: 0 Max: 0 |
| KUT33KVBB3.00 0.84 27.84 49.21 |
|
| Cub_4 /Lod KUT LOAD 10.68 6.62 0.85 0.26 |
Pl0: 15.00 MW Ql0: 9.30 Mvar |
| Cub_2 /Tr2 KUT132/33 TX -10.68 -6.62 -0.85 0.26 64.75 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|LAMU |
|
| LAMU33KVBB.00 0.97 31.99 11.64 |
|
| Cub_4 /Lod lamu ld 0.66 0.38 0.87 0.01 |
Pl0: 0.70 MW Ql0: 0.40 Mvar |
| Cub_5 /Shnt Lamu PF -0.00 -4.23 -0.00 0.08 |
|
| Cub_2 /Tr2 LAM132/33 TX1 -0.26 1.52 -0.17 0.03 10.61 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 LAM132/33 TX2 -0.40 2.33 -0.17 0.04 10.61 |
Tap: 0.00 Min: 0 Max: 0 |
| LMU220KV20.00 0.96 210.90 11.75 |
|
| Cub_1 /Lne GARS-LAMU -0.66 3.81 -0.17 0.01 6.85 |
Pv: 20.41 kW cLod: 10.92 Mvar L: 96.00 km|
| Cub_1 /Tr2 LAM132/33 TX1 0.26 -1.50 0.17 0.00 10.61 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 LAM132/33 TX2 0.40 -2.31 0.17 0.01 10.61 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 13 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|LANET |
|
| LANET132KV.00 0.70 91.85 9.27 |
|
| Cub_1 /Lne LANET-NAIV1 -33.63 0.78 -1.00 0.21 54.36 |
Pv: 2159.73 kW cLod: 1.75 Mvar L: 73.00 km|
| Cub_1 /Lne LANET-NAIV2 -33.63 0.78 -1.00 0.21 54.36 |
Pv: 2159.73 kW cLod: 1.75 Mvar L: 73.00 km|
| Cub_1 /Lne LANET-SOILO 16.29 -5.23 0.95 0.11 25.31 |
Pv: 117.80 kW cLod: 0.41 Mvar L: 18.00 km|
| Cub_1 /Lne LESS-LAN 16.50 -5.01 0.96 0.11 25.50 |
Pv: 808.62 kW cLod: 2.81 Mvar L: 126.00 km|
| Cub_1 /Lne LESS-LAN2 16.50 -5.01 0.96 0.11 25.50 |
Pv: 808.62 kW cLod: 2.81 Mvar L: 126.00 km|
| Cub_1 /Tr2 LANET132/33 TX1 8.99 6.85 0.80 0.07 70.60 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 LANET132/33 TX2 8.99 6.85 0.80 0.07 70.60 |
Tap: 0.00 Min: 0 Max: 0 |
| LANET33KVB.00 0.66 21.67 34.51 |
|
| Cub_3 /Lod lanetload1 11.68 7.46 0.84 0.37 |
Pl0: 27.10 MW Ql0: 17.30 Mvar |
| Cub_4 /Lod lanetload2 6.29 4.01 0.84 0.20 |
Pl0: 14.60 MW Ql0: 9.30 Mvar |
| Cub_2 /Tr2 LANET132/33 TX1 -8.99 -5.73 -0.84 0.28 70.60 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 LANET132/33 TX2 -8.99 -5.73 -0.84 0.28 70.60 |
Tap: 0.00 Min: 0 Max: 0 |
| Total ------- ------- |
|
| Load: 17.98 11.47 |
|
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 14 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|LESSOS COMPLEX |
|
| LESSOS132K.00 0.68 90.30 2.47 |
|
| Cub_3 /Lne LESS-ELD 19.28 14.21 0.81 0.15 40.03 |
Pv: 505.75 kW cLod: 0.67 Mvar L: 32.10 km|
| Cub_2 /Lne LESS-KAB 1.60 -0.31 0.98 0.01 2.87 |
Pv: 3.90 kW cLod: 1.36 Mvar L: 62.13 km|
| Cub_1 /Lne LESS-LAN -15.69 4.04 -0.97 0.10 25.50 |
Pv: 808.62 kW cLod: 2.81 Mvar L: 126.00 km|
| Cub_1 /Lne LESS-LAN2 -15.69 4.04 -0.97 0.10 25.50 |
Pv: 808.62 kW cLod: 2.81 Mvar L: 126.00 km|
| Cub_2 /Lne LESS-MAKU -15.49 3.88 -0.97 0.10 24.45 |
Pv: 302.49 kW cLod: 1.10 Mvar L: 50.00 km|
| Cub_2 /Lne LESS-MUHO 26.55 33.00 0.63 0.27 71.07 |
Pv: 2809.09 kW cLod: 1.07 Mvar L: 56.70 km|
| Cub_1 /Lne MUS-LESS1 2.60 -32.52 0.08 0.21 49.08 |
Pv: 1587.21 kW cLod: 1.64 Mvar L: 67.00 km|
| Cub_1 /Lne MUS-LESS2 2.60 -32.52 0.08 0.21 49.08 |
Pv: 1587.21 kW cLod: 1.64 Mvar L: 67.00 km|
| Cub_2 /Tr2 LESSOS 132/33KV 5.17 2.36 0.91 0.04 36.10 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_4 /Tr3 LESSOS 220/132 TX1 -5.46 1.91 -0.94 0.04 11.29 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_4 /Tr3 LESSOS 220/132 TX2 -5.46 1.91 -0.94 0.04 11.29 |
Tap: 0.00 Min: 0 Max: 0 |
| LESSOS220K.00 0.68 149.71 3.36 |
|
| Cubicle/Coup CB.LESS.3 -1.82 0.61 -0.95 0.01 0.00 |
|
| Feld_1 /Coup IS.LESS.19 -1.82 0.61 -0.95 0.01 0.00 |
|
| Feld_2 /Coup IS.LESS.22 -1.82 0.61 -0.95 0.01 0.00 |
|
| Feld_3 /Coup IS.LESS.25 -1.82 0.61 -0.95 0.01 0.00 |
|
| Cub_4 /Coup IS.LESS.28 -1.82 0.61 -0.95 0.01 0.00 |
|
| Cubicle/Coup IS.LESS.5 -1.82 0.61 -0.95 0.01 0.00 |
|
| Cub_1 /Lne TURK-LESS -10.93 3.64 -0.95 0.04 12.54 |
Pv: 230.15 kW cLod: 12.23 Mvar L: 218.00 km|
| Cub_3 /Tr3 LESSOS 220/132 TX1 5.46 -1.82 0.95 0.02 11.29 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_3 /Tr3 LESSOS 220/132 TX2 5.46 -1.82 0.95 0.02 11.29 |
Tap: 0.00 Min: 0 Max: 0 |
| LESSOS220K.00 0.68 149.71 3.36 |
|
| Cubicle/Coup CB.LESS.3 1.82 -0.61 0.95 0.01 0.00 |
|
| Feld_1 /Coup IS.LESS.18 1.82 -0.61 0.95 0.01 0.00 |
|
| Feld_2 /Coup IS.LESS.21 1.82 -0.61 0.95 0.01 0.00 |
|
| Feld_3 /Coup IS.LESS.24 1.82 -0.61 0.95 0.01 0.00 |
|
| Cub_4 /Coup IS.LESS.27 1.82 -0.61 0.95 0.01 0.00 |
|
| Cubicle/Coup IS.LESS.4 -9.11 3.03 -0.95 0.04 0.00 |
|
| Cub_1 /Lne TURK-LESS -10.93 3.64 -0.95 0.04 12.54 |
Pv: 230.15 kW cLod: 12.23 Mvar L: 218.00 km|
| LESSOS33KV.00 0.67 22.12 29.75 |
|
| Cub_2 /Lod General Load 5.17 2.07 0.93 0.15 |
Pl0: 11.50 MW Ql0: 4.60 Mvar |
| Cub_2 /Tr2 LESSOS 132/33KV -5.17 -2.07 -0.93 0.15 36.10 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|MAKUTANO |
|
| MAKUTANO13.00 0.69 90.97 5.10 |
|
| Cub_1 /Lne LESS-MAKU 15.80 -4.30 0.96 0.10 24.45 |
Pv: 302.49 kW cLod: 1.10 Mvar L: 50.00 km|
| Cub_1 /Lne MAKU-SOILO -15.80 4.30 -0.96 0.10 25.00 |
Pv: 377.68 kW cLod: 1.35 Mvar L: 60.00 km|
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 15 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|MALINDI |
|
| MALINDI220.00 0.93 205.23 12.38 |
|
| Cub_1 /Lne MAL-GARSEN 3.34 -23.27 0.14 0.07 11.19 |
Pv: 86.11 kW cLod: 11.51 Mvar L: 104.00 km|
| Cub_1 /Lne RAB-MAL -15.27 15.25 -0.71 0.06 15.55 |
Pv: 239.24 kW cLod: 13.57 Mvar L: 128.00 km|
| Cub_1 /Tr2 MAL132/33 TX1 4.71 3.17 0.83 0.02 40.54 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 MAL132/33 TX2 7.22 4.85 0.83 0.02 40.54 |
Tap: 0.00 Min: 0 Max: 0 |
| MALINDI33K.00 0.91 30.03 10.18 |
|
| Cub_4 /Lod mal ld 11.92 7.37 0.85 0.27 |
Pl0: 14.40 MW Ql0: 8.90 Mvar |
| Cub_2 /Tr2 MAL132/33 TX1 -4.71 -2.91 -0.85 0.11 40.54 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 MAL132/33 TX2 -7.22 -4.46 -0.85 0.16 40.54 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|MANGU |
|
| MANGU132KV.00 0.77 101.76 15.39 |
|
| Cub_4 /Lod mangu load 22.58 14.15 0.85 0.15 |
Pl0: 38.00 MW Ql0: 23.80 Mvar |
| Cub_1 /Lne JUJRD-MANG -20.00 2.59 -0.99 0.11 27.18 |
Pv: 376.59 kW cLod: 1.41 Mvar L: 50.00 km|
| Cub_1 /Lne KILI-MANG 0.00 -0.47 0.00 0.00 0.63 |
Pv: 0.02 kW cLod: 0.47 Mvar L: 17.00 km|
| Cub_1 /Lne KIND-MANG -8.57 -32.46 -0.26 0.19 44.81 |
Pv: 2230.74 kW cLod: 3.93 Mvar L: 119.00 km|
| Cub_1 /Lne MANG-GAT 4.15 2.20 0.88 0.03 6.65 |
Pv: 8.57 kW cLod: 0.56 Mvar L: 20.00 km|
| Cub_1 /Lne MANG-GITH 4.76 1.87 0.93 0.03 7.69 |
Pv: 26.83 kW cLod: 1.38 Mvar L: 50.00 km|
| Cub_1 /Lne THIKA P-MANG -2.93 12.13 -0.23 0.07 16.81 |
Pv: 11.53 kW cLod: 0.11 Mvar L: 4.00 km|
| |
|
|MASI |
|
| MASINGA132.00 0.94 124.03 25.12 |
|
| Cub_1 /Lne MAS-KAMB -44.02 1.42 -1.00 0.21 28.49 |
Pv: 177.27 kW cLod: 0.82 Mvar L: 18.40 km|
| Cub_1 /Lne MAS-KUT 46.57 28.46 0.85 0.25 66.39 |
Pv: 1908.61 kW cLod: 1.69 Mvar L: 44.00 km|
| Cub_3 /Tr2 MASINGAGENTX -1.28 -14.94 -0.09 0.07 53.19 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_3 /Tr2 MASINGAGENTX2 -1.28 -14.94 -0.09 0.07 53.19 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|MAUA |
|
| MAUA132KVB.00 0.91 120.70 23.07 |
|
| Cub_1 /Lne meru-maua -4.53 -2.87 -0.84 0.03 3.02 |
Pv: 6.97 kW cLod: 3.93 Mvar L: 50.00 km|
| Cub_1 /Tr2 KIT132/33 TX1 2.27 1.44 0.84 0.01 12.76 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 KIT132/33 TX2 2.27 1.44 0.84 0.01 12.76 |
Tap: 0.00 Min: 0 Max: 0 |
| MAUA33KVBB.00 0.91 29.96 52.41 |
|
| Cub_3 /Lod maua ld 4.53 2.80 0.85 0.10 |
Pl0: 5.50 MW Ql0: 3.40 Mvar |
| Cub_2 /Tr2 KIT132/33 TX1 -2.27 -1.40 -0.85 0.05 12.76 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 KIT132/33 TX2 -2.27 -1.40 -0.85 0.05 12.76 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 16 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|MAUN |
|
| MAUNGU132K.00 0.87 115.39 13.05 |
|
| Cub_1 /Lne MAU-MKN -5.37 -3.71 -0.82 0.03 7.68 |
Pv: 42.46 kW cLod: 3.25 Mvar L: 89.50 km|
| Cub_1 /Lne MAUNG-VOI 4.99 3.55 0.81 0.03 8.03 |
Pv: 18.45 kW cLod: 1.10 Mvar L: 31.00 km|
| Cub_1 /Tr2 MAU132/33 TX1 0.38 0.17 0.92 0.00 9.46 |
Tap: 0.00 Min: 0 Max: 0 |
| MAUNGU33KV.00 0.87 28.73 42.49 |
|
| Cub_3 /Lod maungu ld 0.38 0.15 0.93 0.01 |
Pl0: 0.50 MW Ql0: 0.20 Mvar |
| Cub_2 /Tr2 MAU132/33 TX1 -0.38 -0.15 -0.93 0.01 9.46 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|MEN |
|
| MENENGAI13.00 0.69 91.69 8.29 |
|
| Cub_1 /Lne MEN-SOIL -0.00 -0.00 -0.08 0.00 0.44 |
Pv: 0.01 kW cLod: 0.29 Mvar L: 13.00 km|
| |
|
|MKN |
|
| MARIAKANI1.00 0.89 9.74 13.78 |
|
| Cub_3 /Lod mkn ld 0.00 0.00 1.00 0.00 |
Pl0: 0.00 MW Ql0: 0.00 Mvar |
| Cub_2 /Tr2 MARIAKANI 132KV/11 -0.00 0.00 -1.00 0.00 0.00 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 MARIAKANI132/11KV -0.00 0.00 -1.00 0.00 0.00 |
Tap: 0.00 Min: 0 Max: 0 |
| MARIAKANI2.00 0.89 116.90 13.78 |
|
| Cub_1 /Lne MAU-MKN 5.41 0.56 0.99 0.03 7.68 |
Pv: 42.46 kW cLod: 3.25 Mvar L: 89.50 km|
| Cub_1 /Lne mkn-kktn -5.41 -0.56 -0.99 0.03 6.32 |
Pv: 5.31 kW cLod: 0.48 Mvar L: 13.00 km|
| Cub_1 /Tr2 MARIAKANI 132KV/11 0.00 -0.00 1.00 0.00 0.00 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 MARIAKANI132/11KV 0.00 -0.00 1.00 0.00 0.00 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|MRU |
|
| MERU132KVB.00 0.92 120.96 23.24 |
|
| Cub_1 /Lne ISH-MERU -17.15 -6.46 -0.94 0.09 14.80 |
Pv: 160.79 kW cLod: 2.85 Mvar L: 68.00 km|
| Cub_1 /Lne MER-ISIOLO 3.59 1.37 0.93 0.02 4.85 |
Pv: 5.55 kW cLod: 1.02 Mvar L: 26.00 km|
| Cub_1 /Lne meru-maua 4.54 -1.04 0.97 0.02 3.02 |
Pv: 6.97 kW cLod: 3.93 Mvar L: 50.00 km|
| Cub_1 /Tr2 MERU132/33 TX1 9.01 6.13 0.83 0.05 51.71 |
Tap: 0.00 Min: 0 Max: 0 |
| MERU33KVBB.00 0.89 29.34 50.57 |
|
| Cub_3 /Lod MRU LOAD 9.01 5.53 0.85 0.21 |
Pl0: 11.40 MW Ql0: 7.00 Mvar |
| Cub_2 /Tr2 MERU132/33 TX1 -9.01 -5.53 -0.85 0.21 51.71 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|MT_AND |
|
| MTTANDEI13.00 0.86 113.82 13.16 |
|
| Cub_1 /Lne KBK-MTT.AND -0.91 4.10 -0.22 0.02 8.59 |
Pv: 41.95 kW cLod: 3.02 Mvar L: 88.00 km|
| Cub_1 /Lne MTT-VOI 0.53 -4.27 0.12 0.02 5.13 |
Pv: 9.98 kW cLod: 3.16 Mvar L: 90.00 km|
| Cub_1 /Tr2 MTTAND132/33 TX1 0.19 0.08 0.91 0.00 4.72 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 MTTAND132/33 TX2 0.19 0.08 0.91 0.00 4.72 |
Tap: 0.00 Min: 0 Max: 0 |
| MTTANDEI33.00 0.86 28.40 42.88 |
|
| Cub_3 /Lod mttand ld 0.37 0.15 0.93 0.01 |
Pl0: 0.50 MW Ql0: 0.20 Mvar |
| Cub_2 /Tr2 MTTAND132/33 TX1 -0.19 -0.07 -0.93 0.00 4.72 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 MTTAND132/33 TX2 -0.19 -0.07 -0.93 0.00 4.72 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 17 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|MUHORONI |
|
| MUHORONI13.00 0.59 77.49 0.54 |
|
| Cub_1 /Lne KSM-MUHO 20.42 8.24 0.93 0.16 42.69 |
Pv: 873.68 kW cLod: 0.73 Mvar L: 48.50 km|
| Cub_1 /Lne LESS-MUHO -23.74 -28.52 -0.64 0.28 71.07 |
Pv: 2809.09 kW cLod: 1.07 Mvar L: 56.70 km|
| Cub_1 /Lne MUHO-CHEM 16.23 7.83 0.90 0.13 34.91 |
Pv: 369.74 kW cLod: 0.47 Mvar L: 30.70 km|
| Cub_1 /Tr2 MUHO132/33 TX2 -12.90 12.45 -0.72 0.13 132.82 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 Muhoroni Gen Tx 0.00 0.00 1.00 0.00 0.00 |
Tap: 0.00 Min: 0 Max: 0 |
| MUHORONI33.00 0.51 16.70 41.10 |
|
| Cub_2 /Lod muho ld 4.64 2.51 0.88 0.18 |
Pl0: 18.10 MW Ql0: 9.80 Mvar |
| Cub_2 /Tr2 MUHO132/33 TX2 12.90 -8.52 0.83 0.53 132.82 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 Muho Gen Tx -17.54 6.01 -0.95 0.64 111.01 |
Tap: 0.00 Min: 0 Max: 0 |
| muho gen b.00 0.48 5.27 90.00 |
|
| Cub_1 /Sym Muho G1 17.54 0.00 1.00 1.92 74.64 |
Typ: PV |
| Cub_1 /Tr2 Muho Gen Tx 17.54 0.00 1.00 1.92 111.01 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|MUM |
|
| MUMIAS11KV.00 0.75 8.21 -31.97 |
|
| Cub_3 /Lod mumias ld 3.62 2.23 0.85 0.30 |
Pl0: 6.50 MW Ql0: 4.00 Mvar |
| Cub_2 /Tr2 MUM 132/11 TX -3.62 -2.23 -0.85 0.30 12.65 |
Tap: 0.00 Min: 0 Max: 0 |
| MUMIAS132K.00 0.75 99.27 -1.24 |
|
| Cub_1 /Lne MUM-MUS -11.43 -3.51 -0.96 0.07 16.36 |
Pv: 73.15 kW cLod: 0.72 Mvar L: 27.00 km|
| Cub_1 /Lne MUMIAS-RANGALA 7.81 1.21 0.99 0.05 11.77 |
Pv: 121.56 kW cLod: 2.43 Mvar L: 94.00 km|
| Cub_1 /Tr2 MUM 132/11 TX 3.62 2.29 0.84 0.02 12.65 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|MUS |
|
| MUSAGA 33K.00 0.74 24.51 27.25 |
|
| Cub_3 /Lod MUS LOAD 8.44 4.69 0.87 0.23 |
Pl0: 15.30 MW Ql0: 8.50 Mvar |
| Cub_2 /Tr2 MUS132/33 TX1 -5.10 -2.83 -0.87 0.14 34.12 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 MUS132/33 TX2 -3.34 -1.86 -0.87 0.09 34.34 |
Tap: 0.00 Min: 0 Max: 0 |
| MUSAGA132K.00 0.76 100.23 -0.56 |
|
| Cub_1 /Lne MUM-MUS 11.50 2.95 0.97 0.07 16.36 |
Pv: 73.15 kW cLod: 0.72 Mvar L: 27.00 km|
| Cub_1 /Lne MUS-LESS1 -1.02 34.48 -0.03 0.20 49.08 |
Pv: 1587.21 kW cLod: 1.64 Mvar L: 67.00 km|
| Cub_1 /Lne MUS-LESS2 -1.02 34.48 -0.03 0.20 49.08 |
Pv: 1587.21 kW cLod: 1.64 Mvar L: 67.00 km|
| Cub_1 /Lne MUS-WEB 5.58 3.35 0.86 0.04 10.02 |
Pv: 17.37 kW cLod: 0.48 Mvar L: 18.00 km|
| Cub_1 /Lne TOR-MUS1 -11.75 -40.19 -0.28 0.24 56.74 |
Pv: 2341.40 kW cLod: 2.30 Mvar L: 74.00 km|
| Cub_1 /Lne TOR-MUS2 -11.75 -40.19 -0.28 0.24 56.74 |
Pv: 2341.40 kW cLod: 2.30 Mvar L: 74.00 km|
| Cub_1 /Tr2 MUS132/33 TX1 5.10 3.09 0.86 0.03 34.12 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 MUS132/33 TX2 3.34 2.03 0.86 0.02 34.34 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 18 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|MWINGI |
|
| MWINGI132K.00 0.90 118.44 13.82 |
|
| Cub_1 /Lne KIND-MWI -8.36 -3.99 -0.90 0.05 10.62 |
Pv: 32.44 kW cLod: 1.11 Mvar L: 29.35 km|
| Cub_1 /Lne MWI-GARR 2.54 -6.05 0.39 0.03 7.53 |
Pv: 31.19 kW cLod: 7.76 Mvar L: 204.29 km|
| Cub_1 /Lne kitui-mwingi 4.61 9.23 0.45 0.05 13.61 |
Pv: 75.95 kW cLod: 1.69 Mvar L: 45.56 km|
| Cub_1 /Tr2 MWING132/33 TX1 0.60 0.40 0.83 0.00 3.51 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 MWING132/33 TX2 0.60 0.40 0.83 0.00 3.51 |
Tap: 0.00 Min: 0 Max: 0 |
| MWINGI33KV.00 0.90 29.55 43.64 |
|
| Cub_5 /Lod mwingi ld 1.20 0.80 0.83 0.03 |
Pl0: 1.50 MW Ql0: 1.00 Mvar |
| Cub_2 /Tr2 MWING132/33 TX1 -0.60 -0.40 -0.83 0.01 3.51 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 MWING132/33 TX2 -0.60 -0.40 -0.83 0.01 3.51 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|N.NORTH |
|
| NNORTH220K.00 0.66 144.86 18.32 |
|
| Cubicle/Coup CB.NNORTH.5 12.17 5.64 0.91 0.05 0.00 |
|
| Feld_1 /Coup IS.NNORTH.12 -16.09 -106.71 -0.15 0.43 0.00 |
|
| Feld_2 /Coup IS.NNORTH.15 -16.09 -106.71 -0.15 0.43 0.00 |
|
| Feld_3 /Coup IS.NNORTH.18 12.17 5.64 0.91 0.05 0.00 |
|
| Cub_4 /Coup IS.NNORTH.21 10.01 103.89 0.10 0.42 0.00 |
|
| Cub_1 /Lne NNORTH-DAND1 -28.26 -112.35 -0.24 0.46 64.13 |
Pv: 2226.25 kW cLod: 2.87 Mvar L: 46.50 km|
| Cub_1 /Lne NNORTH-DAND2 -28.26 -112.35 -0.24 0.46 64.13 |
Pv: 2226.25 kW cLod: 2.87 Mvar L: 46.50 km|
| Cub_1 /Lne OLK2-NNORTH1 -2.16 98.25 -0.02 0.39 56.28 |
Pv: 2421.37 kW cLod: 3.19 Mvar L: 66.30 km|
| Cub_1 /Lne OLK2NNORTH2 -2.16 98.25 -0.02 0.39 56.28 |
Pv: 2421.37 kW cLod: 3.19 Mvar L: 66.30 km|
| NNORTH220K.00 0.66 144.86 18.32 |
|
| Cubicle/Coup CB.NNORTH.5 -12.17 -5.64 -0.91 0.05 0.00 |
|
| Feld_1 /Coup IS.NNORTH.13 -12.17 -5.64 -0.91 0.05 0.00 |
|
| Feld_2 /Coup IS.NNORTH.16 -12.17 -5.64 -0.91 0.05 0.00 |
|
| Feld_3 /Coup IS.NNORTH.19 -12.17 -5.64 -0.91 0.05 0.00 |
|
| Cub_4 /Coup IS.NNORTH.22 -12.17 -5.64 -0.91 0.05 0.00 |
|
| Cub_1 /Lne NNORTH-DAND1 -28.26 -112.35 -0.24 0.46 64.13 |
Pv: 2226.25 kW cLod: 2.87 Mvar L: 46.50 km|
| Cub_1 /Lne NNORTH-DAND2 -28.26 -112.35 -0.24 0.46 64.13 |
Pv: 2226.25 kW cLod: 2.87 Mvar L: 46.50 km|
| Cub_1 /Lne OLK2-NNORTH1 -2.16 98.25 -0.02 0.39 56.28 |
Pv: 2421.37 kW cLod: 3.19 Mvar L: 66.30 km|
| Cub_3 /Tr3 NNORTH 1 30.42 14.11 0.91 0.13 56.58 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_3 /Tr3 NNORTH 2 30.42 14.11 0.91 0.13 56.58 |
Tap: 0.00 Min: 0 Max: 0 |
| NNORTH66KV.00 0.64 42.08 13.89 |
|
| Cub_7 /Lod nairobonorth ld 60.84 22.68 0.94 0.89 |
Pl0: 149.70 MW Ql0: 55.80 Mvar |
| Cub_4 /Tr3 NNORTH 1 -30.42 -11.34 -0.94 0.45 56.58 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_4 /Tr3 NNORTH 2 -30.42 -11.34 -0.94 0.45 56.58 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 19 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|NAIV |
|
| NAIV132KVB.00 0.74 97.91 16.26 |
|
| Cub_1 /Lne JUJRD-NAIV_a 24.70 3.77 0.99 0.15 34.69 |
Pv: 61.89 kW cLod: 0.13 Mvar L: 5.00 km|
| Cub_1 /Lne LANET-NAIV1 35.79 1.74 1.00 0.21 54.36 |
Pv: 2159.73 kW cLod: 1.75 Mvar L: 73.00 km|
| Cub_1 /Lne LANET-NAIV2 35.79 1.74 1.00 0.21 54.36 |
Pv: 2159.73 kW cLod: 1.75 Mvar L: 73.00 km|
| Cub_1 /Lne OLKAU-NAIV -101.05 -8.99 -1.00 0.60 83.09 |
Pv: 1892.37 kW cLod: 0.66 Mvar L: 23.10 km|
| Cub_1 /Tr2 NAIV132/33 TX1 2.88 1.05 0.94 0.02 17.96 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 NAIV132/33 TX2 1.89 0.69 0.94 0.01 18.07 |
Tap: 0.00 Min: 0 Max: 0 |
| NAIV33KVBB.00 0.74 24.29 44.98 |
|
| Cub_3 /Lod naivload1 2.38 0.81 0.95 0.06 |
Pl0: 4.40 MW Ql0: 1.50 Mvar |
| Cub_4 /Lod naivload2 2.38 0.81 0.95 0.06 |
Pl0: 4.40 MW Ql0: 1.50 Mvar |
| Cub_2 /Tr2 NAIV132/33 TX1 -2.88 -0.98 -0.95 0.07 17.96 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 NAIV132/33 TX2 -1.89 -0.64 -0.95 0.05 18.07 |
Tap: 0.00 Min: 0 Max: 0 |
| Total ------- ------- |
|
| Load: 4.77 1.62 |
|
| |
|
|NAN |
|
| NANY132KVB.00 0.81 106.60 19.24 |
|
| Cub_1 /Lne NANY-KIG -15.59 -7.90 -0.89 0.09 24.34 |
Pv: 295.96 kW cLod: 1.62 Mvar L: 52.00 km|
| Cub_1 /Lne nanyuki-nyahururu 8.88 4.10 0.91 0.05 14.02 |
Pv: 145.17 kW cLod: 2.41 Mvar L: 80.95 km|
| Cub_1 /Tr2 NANY132/33 TX2 6.71 3.80 0.87 0.04 41.55 |
Tap: 0.00 Min: 0 Max: 0 |
| NANY33KVBB.00 0.79 26.02 46.69 |
|
| Cub_2 /Lod nanyuki ld 6.71 3.42 0.89 0.17 |
Pl0: 10.80 MW Ql0: 5.50 Mvar |
| Cub_2 /Tr2 NANY132/33 TX2 -6.71 -3.42 -0.89 0.17 41.55 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|NAROK |
|
| NAROK132KV.00 0.76 100.87 21.47 |
|
| Cub_1 /Lne narok-olk1 -1.28 -0.82 -0.84 0.01 2.09 |
Pv: 1.90 kW cLod: 1.71 Mvar L: 62.50 km|
| Cub_1 /Tr2 NAROK132/33 TX1 0.64 0.41 0.84 0.00 4.32 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 NAROK132/33 TX2 0.64 0.41 0.84 0.00 4.32 |
Tap: 0.00 Min: 0 Max: 0 |
| NAROK33KVB.00 0.76 25.14 51.21 |
|
| Cub_3 /Lod narok ld 1.28 0.81 0.84 0.03 |
Pl0: 2.20 MW Ql0: 1.40 Mvar |
| Cub_2 /Tr2 NAROK132/33 TX1 -0.64 -0.41 -0.84 0.02 4.32 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 NAROK132/33 TX2 -0.64 -0.41 -0.84 0.02 4.32 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 20 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|NBAM |
|
| NBAM132KVB.00 0.82 108.48 10.92 |
|
| Cub_1 /Lne BAM-KILI_a 11.73 4.33 0.94 0.07 17.48 |
Pv: 71.65 kW cLod: 0.74 Mvar L: 24.00 km|
| Cub_1 /Lne RAB-BAMB -31.92 -17.19 -0.88 0.19 49.61 |
Pv: 1557.34 kW cLod: 2.20 Mvar L: 65.00 km|
| Cub_3 /Tr3 BAMB TX 20.20 12.86 0.84 0.13 64.76 |
Tap: 0.00 Min: 0 Max: 0 |
| NBAM33KVBB.00 0.79 26.14 7.36 |
|
| Cub_3 /Lod nbam ld1 10.10 5.58 0.88 0.25 |
Pl0: 16.10 MW Ql0: 8.90 Mvar |
| Cub_4 /Lod nbam ld2 10.10 5.58 0.88 0.25 |
Pl0: 16.10 MW Ql0: 8.90 Mvar |
| Cub_4 /Tr3 BAMB TX -20.20 -11.17 -0.88 0.51 64.76 |
Tap: 0.00 Min: 0 Max: 0 |
| Total ------- ------- |
|
| Load: 20.20 11.17 |
|
| |
|
|NYAHURURU |
|
| NYAHURURU1.00 0.78 103.60 18.06 |
|
| Cub_1 /Lne nanyuki-nyahururu -8.74 -6.17 -0.82 0.06 14.02 |
Pv: 145.17 kW cLod: 2.41 Mvar L: 80.95 km|
| Cub_1 /Tr2 NYAHURURU132/33 TX 8.73 6.17 0.82 0.06 59.25 |
Tap: 0.00 Min: 0 Max: 0 |
| NYAHURURU3.00 0.75 24.85 44.49 |
|
| Cub_4 /Lod nyahururu ld 8.74 5.39 0.85 0.24 |
Pl0: 15.40 MW Ql0: 9.50 Mvar |
| Cub_2 /Tr2 NYAHURURU132/33 TX -8.73 -5.39 -0.85 0.24 59.25 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|OLKA2 |
|
| OLKA2220KV.00 0.57 124.85 20.13 |
|
| Cub_1 /Lne OLK2-NNORTH1 4.58 -87.51 0.05 0.41 56.28 |
Pv: 2421.37 kW cLod: 3.19 Mvar L: 66.30 km|
| Cub_1 /Lne OLK2-OLKAU220_1 -37.76 -73.98 -0.45 0.38 16.25 |
Pv: 86.28 kW cLod: 0.53 Mvar L: 8.00 km|
| Cub_1 /Lne OLK2-OLKAU220_2 -37.76 -73.98 -0.45 0.38 16.25 |
Pv: 86.28 kW cLod: 0.53 Mvar L: 8.00 km|
| Cub_1 /Lne OLK2NNORTH2 4.58 -87.51 0.05 0.41 56.28 |
Pv: 2421.37 kW cLod: 3.19 Mvar L: 66.30 km|
| Cub_1 /Lne ORP-OLK2 30.80 -163.62 0.18 0.77 32.57 |
Pv: 347.59 kW cLod: 0.54 Mvar L: 8.00 km|
| Cub_3 /Tr2 OLK2TX1 3.91 163.58 0.02 0.76 182.10 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_3 /Tr2 OLK2TX2 3.91 163.58 0.02 0.76 182.10 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_3 /Tr2 OLK2TX3 27.74 159.43 0.17 0.75 180.10 |
Tap: 0.00 Min: 0 Max: 0 |
| Olk2GenBus.00 1.02 11.18 -10.24 |
|
| Cub_2 /Sym olk2g1 -3.91 -128.86 -0.03 6.66 291.01 |
Typ: PV |
| Cub_3 /Tr2 OLK2TX1 -3.91 -128.86 -0.03 6.66 182.10 |
Tap: 0.00 Min: 0 Max: 0 |
| Olk2GenBus.00 1.02 11.18 -10.24 |
|
| Cub_2 /Sym olk2g2 -3.91 -128.86 -0.03 6.66 291.01 |
Typ: PV |
| Cub_3 /Tr2 OLK2TX2 -3.91 -128.86 -0.03 6.66 182.10 |
Tap: 0.00 Min: 0 Max: 0 |
| Olk2GenBus.00 1.02 11.27 -12.47 |
|
| Cub_2 /Sym olk2g3 -27.74 -125.47 -0.22 6.59 290.07 |
Typ: PV |
| Cub_3 /Tr2 OLK2TX3 -27.74 -125.47 -0.22 6.59 180.10 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 21 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|OLKA4 |
|
| term148720.00 0.53 117.22 23.78 |
|
| Cub_1 /Lne OLK4-SUSWA 38.97 -98.19 0.37 0.52 72.27 |
Pv: 1540.96 kW cLod: 0.97 Mvar L: 25.00 km|
| Cub_1 /Lne OLK4-SUSWA(1) 38.97 -98.19 0.37 0.52 72.27 |
Pv: 1540.96 kW cLod: 0.97 Mvar L: 25.00 km|
| Cub_3 /Tr2 OLKA4.TX1 -38.97 98.19 -0.37 0.52 139.96 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_3 /Tr2 OLKA4.TX2 -38.97 98.19 -0.37 0.52 139.96 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 22 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|OLKAU220/132 |
|
| OLKAU220KV.00 0.57 126.19 20.37 |
|
| Cubicle/Coup CB.OLKAU220.1 -0.89 -9.90 -0.09 0.05 0.00 |
|
| Feld_2 /Coup IS.OLKAU220.13 17.58 22.34 0.62 0.13 0.00 |
|
| Feld_3 /Coup IS.OLKAU220.18 17.58 22.34 0.62 0.13 0.00 |
|
| Cub_4 /Coup IS.OLKAU220.21 -16.47 -9.96 -0.86 0.09 0.00 |
|
| Cub_5 /Coup IS.OLKAU220.24 -16.47 -9.96 -0.86 0.09 0.00 |
|
| Cubicle/Coup IS.OLKAU220.5 -1.34 -14.86 -0.09 0.07 0.00 |
|
| Cub_1 /Lne OLK2-OLKAU220_1 37.85 74.40 0.45 0.38 16.25 |
Pv: 86.28 kW cLod: 0.53 Mvar L: 8.00 km|
| Cub_1 /Lne OLK2-OLKAU220_2 37.85 74.40 0.45 0.38 16.25 |
Pv: 86.28 kW cLod: 0.53 Mvar L: 8.00 km|
| Cub_1 /Lne OLKAU-SUSWA -30.25 9.78 -0.95 0.15 20.37 |
Pv: 97.92 kW cLod: 0.84 Mvar L: 20.00 km|
| Cub_1 /Lne OLKAU-SUSWA2 -30.25 9.78 -0.95 0.15 20.37 |
Pv: 97.92 kW cLod: 0.84 Mvar L: 20.00 km|
| OLKAU220KV.00 0.57 126.19 20.37 |
|
| Cubicle/Coup CB.OLKAU220.1 0.89 9.90 0.09 0.05 0.00 |
|
| Feld_2 /Coup IS.OLKAU220.16 20.26 52.06 0.36 0.26 0.00 |
|
| Feld_3 /Coup IS.OLKAU220.19 20.26 52.06 0.36 0.26 0.00 |
|
| Cub_4 /Coup IS.OLKAU220.22 -13.79 19.75 -0.57 0.11 0.00 |
|
| Cub_9 /Coup IS.OLKAU220.25 -13.79 19.75 -0.57 0.11 0.00 |
|
| Cubicle/Coup IS.OLKAU220.6 1.34 14.86 0.09 0.07 0.00 |
|
| Cub_1 /Lne OLK2-OLKAU220_1 37.85 74.40 0.45 0.38 16.25 |
Pv: 86.28 kW cLod: 0.53 Mvar L: 8.00 km|
| Cub_1 /Lne OLK2-OLKAU220_2 37.85 74.40 0.45 0.38 16.25 |
Pv: 86.28 kW cLod: 0.53 Mvar L: 8.00 km|
| Cub_1 /Lne OLKAU-SUSWA -30.25 9.78 -0.95 0.15 20.37 |
Pv: 97.92 kW cLod: 0.84 Mvar L: 20.00 km|
| Cub_1 /Lne OLKAU-SUSWA2 -30.25 9.78 -0.95 0.15 20.37 |
Pv: 97.92 kW cLod: 0.84 Mvar L: 20.00 km|
| Cub_1 /Tr2 OLKAUTX1 -7.60 -84.18 -0.09 0.39 640.70 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 OLKAUTX2 -7.60 -84.18 -0.09 0.39 640.70 |
Tap: 0.00 Min: 0 Max: 0 |
| OLKAUGB111.00 1.00 11.02 -3.51 |
|
| Cub_1 /Sym OLKAUG1 54.13 190.60 0.27 10.38 247.68 |
Typ: PV |
| Cub_2 /Tr2 OLKAUTX3 54.13 190.60 0.27 10.38 208.18 |
Tap: 0.00 Min: 0 Max: 0 |
| OLKAUGB211.00 1.00 11.02 -3.50 |
|
| Cub_1 /Sym OLKAUG2 54.18 190.60 0.27 10.38 247.69 |
Typ: PV |
| Cub_2 /Tr2 OLKAUTX4 54.18 190.60 0.27 10.38 208.20 |
Tap: 0.00 Min: 0 Max: 0 |
| OLKA1132KV.00 0.77 101.01 21.67 |
|
| Cub_13 /Lne OLK1-OLKAU -106.95 -283.23 -0.35 1.73 240.34 |
Pv: 1371.30 kW cLod: 0.06 Mvar L: 2.00 km|
| Cub_1 /Lne OLKAU-NAIV 102.94 18.40 0.98 0.60 83.09 |
Pv: 1892.37 kW cLod: 0.66 Mvar L: 23.10 km|
| Cub_1 /Lne narok-olk1 1.28 -0.89 0.82 0.01 2.09 |
Pv: 1.90 kW cLod: 1.71 Mvar L: 62.50 km|
| Cub_3 /Tr2 OLKA1TX1 1.86 12.68 0.14 0.07 19.71 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_3 /Tr2 OLKA1TX2 -7.16 14.01 -0.46 0.09 24.19 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_3 /Tr2 OLKA1TX3 -7.16 14.01 -0.46 0.09 24.19 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 OLKAUTX1 7.60 112.51 0.07 0.64 640.70 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 OLKAUTX2 7.60 112.51 0.07 0.64 640.70 |
Tap: 0.00 Min: 0 Max: 0 |
| OLKAU132KV.00 0.78 103.45 21.91 |
|
| Cub_3 /Lne OLK1-OLKAU 108.32 290.46 0.35 1.73 240.34 |
Pv: 1371.30 kW cLod: 0.06 Mvar L: 2.00 km|
| Cub_2 /Tr2 OLKAUTX3 -54.13 -145.23 -0.35 0.87 208.18 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 OLKAUTX4 -54.18 -145.23 -0.35 0.87 208.20 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 23 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|ORPOWER |
|
| ORPOWER220.00 0.58 127.64 19.77 |
|
| Cub_1 /Lne ORP-OLK2 -30.45 166.93 -0.18 0.77 32.57 |
Pv: 347.59 kW cLod: 0.54 Mvar L: 8.00 km|
| Cub_1 /Tr2 Olkaria 3 tx1 27.75 -23.47 0.76 0.16 104.41 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 orpower tx1 -22.10 -122.48 -0.18 0.56 476.69 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 orpowertx2 12.40 -10.49 0.76 0.07 84.83 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 orpowertx3 12.40 -10.49 0.76 0.07 84.83 |
Tap: 0.00 Min: 0 Max: 0 |
| ORPOWERG1B.00 0.67 7.35 41.54 |
|
| Cub_1 /Sym ORPG1 -27.75 31.32 -0.66 3.29 77.49 |
Typ: PV |
| Cub_1 /Tr2 Olkaria 3 tx1 -27.75 31.32 -0.66 3.29 104.41 |
Tap: 0.00 Min: 0 Max: 0 |
| ORPG2BB 11.00 1.01 11.06 -5.88 |
|
| Cub_1 /Sym ORPG2 22.10 214.51 0.10 11.26 539.11 |
Typ: PV |
| Cub_1 /Tr2 orpower tx1 22.10 214.51 0.10 11.26 476.69 |
Tap: 0.00 Min: 0 Max: 0 |
| ORPG3BB 11.00 0.67 7.35 41.54 |
|
| Cub_1 /Sym ORPG3 -12.40 14.00 -0.66 1.47 64.48 |
Typ: PV |
| Cub_1 /Tr2 orpowertx2 -12.40 14.00 -0.66 1.47 84.83 |
Tap: 0.00 Min: 0 Max: 0 |
| ORPG4BB 11.00 0.67 7.35 41.54 |
|
| Cub_1 /Sym ORPG4 -12.40 14.00 -0.66 1.47 57.54 |
Typ: PV |
| Cub_1 /Tr2 orpowertx3 -12.40 14.00 -0.66 1.47 84.83 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 24 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|RABAI |
|
| RABAI132KV.00 0.89 117.07 13.95 |
|
| Cub_1 /Lne RAB-BAMB 33.48 18.07 0.88 0.19 49.61 |
Pv: 1557.34 kW cLod: 2.20 Mvar L: 65.00 km|
| Cub_1 /Lne RAB-GAL 14.85 9.89 0.83 0.09 21.88 |
Pv: 223.97 kW cLod: 1.72 Mvar L: 48.00 km|
| Cub_1 /Lne RAB-KDP1_1 -23.89 5.77 -0.97 0.12 28.70 |
Pv: 143.21 kW cLod: 0.63 Mvar L: 17.00 km|
| Cub_1 /Lne RAB-KDP1_2 -23.89 5.77 -0.97 0.12 28.70 |
Pv: 143.21 kW cLod: 0.63 Mvar L: 17.00 km|
| Cub_1 /Lne RAB-KPV1 0.00 -0.62 0.00 0.00 0.79 |
Pv: 0.03 kW cLod: 0.62 Mvar L: 17.00 km|
| Cub_1 /Lne RAB-TSAVO -27.33 4.43 -0.99 0.14 23.20 |
Pv: 109.40 kW cLod: 0.69 Mvar L: 18.00 km|
| Cub_1 /Lne kktn-rab 5.42 -0.08 1.00 0.03 6.29 |
Pv: 2.03 kW cLod: 0.18 Mvar L: 5.00 km|
| Cub_2 /Tr2 RAB GEN TX1 1.70 -6.84 0.24 0.03 17.65 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 RAB GEN TX2 1.70 -6.84 0.24 0.03 17.65 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 RABAI 132/33 TX1 10.01 4.26 0.92 0.05 53.34 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 RABAI 132/33 TX2 10.01 4.26 0.92 0.05 53.34 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_4 /Tr3 RABAI 220KV/132KV_ -1.03 -19.03 -0.05 0.09 23.88 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_4 /Tr3 RABAI 220KV/132KV_ -1.03 -19.03 -0.05 0.09 23.88 |
Tap: 0.00 Min: 0 Max: 0 |
| RABAI220KV.00 0.91 200.15 14.03 |
|
| Cubicle/Coup CB.RAB.1 -0.21 -3.90 -0.05 0.01 0.00 |
|
| Feld_1 /Coup IS.RAB.23 -0.21 -3.90 -0.05 0.01 0.00 |
|
| Feld_2 /Coup IS.RAB.26 -0.21 -3.90 -0.05 0.01 0.00 |
|
| Feld_3 /Coup IS.RAB.29 -0.21 -3.90 -0.05 0.01 0.00 |
|
| Cub_4 /Coup IS.RAB.32 -0.21 -3.90 -0.05 0.01 0.00 |
|
| Cub_9 /Coup IS.RAB.35 -0.21 -3.90 -0.05 0.01 0.00 |
|
| Cub_10 /Coup IS.RAB.37 -0.21 -3.90 -0.05 0.01 0.00 |
|
| Cub_11 /Coup IS.RAB.40 -0.21 -3.90 -0.05 0.01 0.00 |
|
| Cub_12 /Coup IS.RAB.43 -0.21 -3.90 -0.05 0.01 0.00 |
|
| Cubicle/Coup IS.RAB.6 -0.21 -3.90 -0.05 0.01 0.00 |
|
| Cub_1 /Lne ISINYA-RAB1 0.00 -0.00 0.00 0.00 0.00 |
Pv: 0.00 kW cLod: 0.00 Mvar L: 450.00 km|
| Cub_1 /Lne ISINYA-RAB2 0.00 -0.00 0.00 0.00 0.00 |
Pv: 0.00 kW cLod: 0.00 Mvar L: 450.00 km|
| Cub_1 /Lne KIAMB-RABAI -17.56 -11.21 -0.84 0.06 18.58 |
Pv: 568.89 kW cLod: 45.49 Mvar L: 456.00 km|
| Cub_1 /Lne RAB-MAL 15.51 -27.84 0.49 0.09 15.55 |
Pv: 239.24 kW cLod: 13.57 Mvar L: 128.00 km|
| Cub_3 /Tr3 RABAI 220KV/132KV_ 1.03 19.52 0.05 0.06 23.88 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_3 /Tr3 RABAI 220KV/132KV_ 1.03 19.52 0.05 0.06 23.88 |
Tap: 0.00 Min: 0 Max: 0 |
| RABAI220KV.00 0.91 200.15 14.03 |
|
| Cubicle/Coup CB.RAB.1 0.21 3.90 0.05 0.01 0.00 |
|
| Feld_1 /Coup IS.RAB.22 0.21 3.90 0.05 0.01 0.00 |
|
| Feld_2 /Coup IS.RAB.25 0.21 3.90 0.05 0.01 0.00 |
|
| Feld_3 /Coup IS.RAB.28 15.71 -23.93 0.55 0.08 0.00 |
|
| Cub_4 /Coup IS.RAB.31 0.21 3.90 0.05 0.01 0.00 |
|
| Cub_5 /Coup IS.RAB.34 0.21 3.90 0.05 0.01 0.00 |
|
| Cub_7 /Coup IS.RAB.39 0.21 3.90 0.05 0.01 0.00 |
|
| Cub_8 /Coup IS.RAB.42 0.21 3.90 0.05 0.01 0.00 |
|
| Cubicle/Coup IS.RAB.5 -17.36 -7.30 -0.92 0.05 0.00 |
|
| Cub_6 /Coup IS.RAB.55 0.21 3.90 0.05 0.01 0.00 |
|
| Cub_1 /Lne ISINYA-RAB1 0.00 -0.00 0.00 0.00 0.00 |
Pv: 0.00 kW cLod: 0.00 Mvar L: 450.00 km|
| Cub_1 /Lne ISINYA-RAB2 0.00 -0.00 0.00 0.00 0.00 |
Pv: 0.00 kW cLod: 0.00 Mvar L: 450.00 km|
| Cub_1 /Lne KIAMB-RABAI -17.56 -11.21 -0.84 0.06 18.58 |
Pv: 568.89 kW cLod: 45.49 Mvar L: 456.00 km|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 25 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
| Cub_1 /Lne RAB-MAL 15.51 -27.84 0.49 0.09 15.55 |
Pv: 239.24 kW cLod: 13.57 Mvar L: 128.00 km|
| RABAI3KVBB.00 0.87 28.63 10.74 |
|
| Cub_4 /Lod rabai ld 10.01 3.61 0.94 0.21 |
Pl0: 13.30 MW Ql0: 4.80 Mvar |
| Cub_5 /Lod rabai ld2 10.01 3.61 0.94 0.21 |
Pl0: 13.30 MW Ql0: 4.80 Mvar |
| Cub_1 /Tr2 RABAI 132/33 TX1 -10.01 -3.61 -0.94 0.21 53.34 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 RABAI 132/33 TX2 -10.01 -3.61 -0.94 0.21 53.34 |
Tap: 0.00 Min: 0 Max: 0 |
| Total ------- ------- |
|
| Load: 20.02 7.23 |
|
| term156311.00 0.89 9.81 13.87 |
|
| Cub_1 /Sym G1-RABAI -3.40 13.76 -0.24 0.83 15.75 |
Typ: PV |
| Cub_2 /Tr2 RAB GEN TX1 -1.70 6.88 -0.24 0.42 17.65 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 RAB GEN TX2 -1.70 6.88 -0.24 0.42 17.65 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|RAN |
|
| RANGALA132.00 0.73 96.90 -2.86 |
|
| Cub_1 /Lne MUMIAS-RANGALA -7.69 -3.37 -0.92 0.05 11.77 |
Pv: 121.56 kW cLod: 2.43 Mvar L: 94.00 km|
| Cub_1 /Tr2 RANG132/33 TX 7.69 3.37 0.92 0.05 49.74 |
Tap: 0.00 Min: 0 Max: 0 |
| RANGALA33K.00 0.72 23.63 23.60 |
|
| Cub_4 /Lod rangala ld 7.69 2.82 0.94 0.20 |
Pl0: 15.00 MW Ql0: 5.50 Mvar |
| Cub_2 /Tr2 RANG132/33 TX -7.69 -2.82 -0.94 0.20 49.74 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|RUAR |
|
| RUARAKA132.00 0.74 97.35 15.83 |
|
| Cub_1 /Lne RRK TEE -40.24 -14.82 -0.94 0.25 65.38 |
Pv: 64.06 kW cLod: 0.04 Mvar L: 1.50 km|
| Cub_1 /Tr2 RUAR132/66 TX1 20.12 7.41 0.94 0.13 48.46 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 RUAR132/66TX2 20.12 7.41 0.94 0.13 48.46 |
Tap: 0.00 Min: 0 Max: 0 |
| RUARAKA66K.00 0.72 47.68 -17.70 |
|
| Cub_3 /Lod RRK ld 40.24 12.06 0.96 0.51 |
Pl0: 77.10 MW Ql0: 23.10 Mvar |
| Cub_4 /Shnt RRK Reactor 0.00 -0.00 1.00 0.00 |
|
| Cub_2 /Tr2 RUAR132/66 TX1 -20.12 -6.03 -0.96 0.25 48.46 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 RUAR132/66TX2 -20.12 -6.03 -0.96 0.25 48.46 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|SANG |
|
| SANGORO132.00 0.55 72.41 -3.78 |
|
| Cub_1 /Lne SOND-SANG -0.00 -0.00 -0.19 0.00 0.13 |
Pv: 0.00 kW cLod: 0.07 Mvar L: 5.00 km|
| Cub_1 /Tr2 SANG132/33 TX1 0.00 -0.00 1.00 0.00 0.00 |
Tap: 0.00 Min: 0 Max: 0 |
| SANGORO33K.00 0.55 18.10 -33.78 |
|
| Cub_2 /Tr2 SANG132/33 TX1 -0.00 0.00 -1.00 0.00 0.00 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 26 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|SOILO |
|
| SOILO132KV.00 0.69 91.68 8.29 |
|
| Cub_1 /Lne LANET-SOILO -16.18 5.09 -0.95 0.11 25.31 |
Pv: 117.80 kW cLod: 0.41 Mvar L: 18.00 km|
| Cub_1 /Lne MAKU-SOILO 16.18 -4.79 0.96 0.11 25.00 |
Pv: 377.68 kW cLod: 1.35 Mvar L: 60.00 km|
| Cub_1 /Lne MEN-SOIL 0.00 -0.29 0.00 0.00 0.44 |
Pv: 0.01 kW cLod: 0.29 Mvar L: 13.00 km|
| Cub_1 /Tr2 SOILO132/33 TX1 0.00 0.00 1.00 0.00 0.00 |
Tap: 0.00 Min: 0 Max: 0 |
| SOILO33KVB.00 0.69 22.92 38.29 |
|
| Cub_2 /Tr2 SOILO132/33 TX1 -0.00 -0.00 -1.00 0.00 0.00 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|SONDU |
|
| SONDU132KV.00 0.55 72.41 -3.78 |
|
| Cub_6 /Lod sondu ld 2.05 1.26 0.85 0.02 |
Pl0: 6.80 MW Ql0: 4.20 Mvar |
| Cub_1 /Lne KSM-SONDU -3.09 0.89 -0.96 0.03 6.53 |
Pv: 20.16 kW cLod: 0.71 Mvar L: 50.00 km|
| Cub_1 /Lne SOND-SANG 0.00 -0.07 0.00 0.00 0.13 |
Pv: 0.00 kW cLod: 0.07 Mvar L: 5.00 km|
| Cub_1 /Lne SONDU-HB 0.19 -0.35 0.48 0.00 1.14 |
Pv: 0.12 kW cLod: 0.93 Mvar L: 66.00 km|
| Cub_2 /Tr2 SONDU TX1 0.43 -0.87 0.44 0.01 5.34 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 SONDU TX2 0.43 -0.87 0.44 0.01 5.34 |
Tap: 0.00 Min: 0 Max: 0 |
| SONDUGENBB.00 0.56 6.11 25.86 |
|
| Cub_3 /Sym SONDU G1 -0.43 0.88 -0.44 0.09 2.88 |
Typ: PV |
| Cub_2 /Tr2 SONDU TX1 -0.43 0.88 -0.44 0.09 5.34 |
Tap: 0.00 Min: 0 Max: 0 |
| SONDUGEN B.00 0.56 6.11 25.86 |
|
| Cub_3 /Sym SONDU G2 -0.43 0.88 -0.44 0.09 2.88 |
Typ: PV |
| Cub_2 /Tr2 SONDU TX2 -0.43 0.88 -0.44 0.09 5.34 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|SOTIK |
|
| SOTIK33KVB.00 0.56 18.44 27.80 |
|
| Cub_2 /Tr2 SOTIK132/33 TX1 -0.00 0.00 -1.00 0.00 0.00 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 SOTIK132/33 TX2 -0.00 0.00 -1.00 0.00 0.00 |
Tap: 0.00 Min: 0 Max: 0 |
| SOTIK132KV.00 0.56 73.76 -2.20 |
|
| Cub_1 /Lne CHEM-SOTIK -9.99 -3.38 -0.95 0.08 13.96 |
Pv: 63.27 kW cLod: 0.45 Mvar L: 29.00 km|
| Cub_1 /Lne KIS-SOTIK 7.64 2.95 0.93 0.06 11.10 |
Pv: 45.03 kW cLod: 0.50 Mvar L: 33.00 km|
| Cub_1 /Lne SOTIK-BOMET 2.35 0.42 0.98 0.02 5.24 |
Pv: 18.79 kW cLod: 1.18 Mvar L: 82.00 km|
| Cub_1 /Tr2 SOTIK132/33 TX1 0.00 -0.00 1.00 0.00 0.00 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 SOTIK132/33 TX2 0.00 -0.00 1.00 0.00 0.00 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|SULTAN |
|
| SULTANH33K.00 0.83 27.44 42.55 |
|
| Cub_3 /Lod sultanload 1.11 0.55 0.89 0.03 |
Pl0: 1.60 MW Ql0: 0.80 Mvar |
| Cub_2 /Tr2 SULT132/33 TX1 -1.11 -0.55 -0.89 0.03 29.84 |
Tap: 0.00 Min: 0 Max: 0 |
| SULTAN1322.00 0.85 111.55 14.34 |
|
| Cub_1 /Lne JUJA-SULT -4.39 17.59 -0.24 0.09 26.90 |
Pv: 790.86 kW cLod: 3.94 Mvar L: 127.00 km|
| Cub_1 /Lne SULTAN-KBK 4.74 -5.99 0.62 0.04 9.30 |
Pv: 32.98 kW cLod: 1.45 Mvar L: 43.00 km|
| Cub_1 /Lne sultan-wote -1.46 -12.20 -0.12 0.06 14.97 |
Pv: 85.89 kW cLod: 1.43 Mvar L: 41.85 km|
| Cub_1 /Tr2 SULT132/33 TX1 1.11 0.61 0.88 0.01 29.84 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 27 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|SUSWA220 |
|
| SUSWA220KV.00 0.57 125.87 21.39 |
|
| Cubicle/Coup CB.SUSWA.1 0.00 0.00 0.11 0.00 0.00 |
|
| Feld_3 /Coup IS.SUSWA.14 -0.00 -0.00 -0.61 0.00 0.00 |
|
| Cub_4 /Coup IS.SUSWA.17 0.00 0.00 0.11 0.00 0.00 |
|
| Cub_9 /Coup IS.SUSWA.20 0.00 0.00 0.11 0.00 0.00 |
|
| Cub_1 /Lne ISINYA- SUSWA_1 7.08 -108.31 0.07 0.50 21.06 |
Pv: 1822.35 kW cLod: 0.00 Mvar L: 100.00 km|
| Cub_1 /Lne OLK4-SUSWA(1) -37.43 106.09 -0.33 0.52 72.27 |
Pv: 1540.96 kW cLod: 0.97 Mvar L: 25.00 km|
| Cub_1 /Lne SUSWA-ISINYA_2 7.08 -108.31 0.07 0.50 21.06 |
Pv: 1822.35 kW cLod: 0.00 Mvar L: 100.00 km|
| SUSWA220KV.00 0.57 125.87 21.39 |
|
| Cub_6 /Shnt Suswa Reactor -0.00 24.55 -0.00 0.11 |
|
| Cubicle/Coup CB.SUSWA.1 -0.00 -0.00 -0.11 0.00 0.00 |
|
| Feld_3 /Coup IS.SUSWA.13 -37.43 106.09 -0.33 0.52 0.00 |
|
| Cub_4 /Coup IS.SUSWA.16 7.08 -108.31 0.07 0.50 0.00 |
|
| Cub_5 /Coup IS.SUSWA.19 7.08 -108.31 0.07 0.50 0.00 |
|
| Cub_1 /Lne ISINYA- SUSWA_1 7.08 -108.31 0.07 0.50 21.06 |
Pv: 1822.35 kW cLod: 0.00 Mvar L: 100.00 km|
| Cub_1 /Lne OLK4-SUSWA -37.43 106.09 -0.33 0.52 72.27 |
Pv: 1540.96 kW cLod: 0.97 Mvar L: 25.00 km|
| Cub_1 /Lne OLK4-SUSWA(1) -37.43 106.09 -0.33 0.52 72.27 |
Pv: 1540.96 kW cLod: 0.97 Mvar L: 25.00 km|
| Cub_1 /Lne OLKAU-SUSWA 30.35 -10.05 0.95 0.15 20.37 |
Pv: 97.92 kW cLod: 0.84 Mvar L: 20.00 km|
| Cub_1 /Lne OLKAU-SUSWA2 30.35 -10.05 0.95 0.15 20.37 |
Pv: 97.92 kW cLod: 0.84 Mvar L: 20.00 km|
| Cub_1 /Lne SUSWA-ISINYA_2 7.08 -108.31 0.07 0.50 21.06 |
Pv: 1822.35 kW cLod: 0.00 Mvar L: 100.00 km|
| |
|
|THIKA POWER |
|
| THIKA POWE.00 0.77 101.58 15.46 |
|
| Cub_1 /Lne THIKA P-MANG 2.94 -12.22 0.23 0.07 16.81 |
Pv: 11.53 kW cLod: 0.11 Mvar L: 4.00 km|
| Cub_1 /Tr2 THIKA P TX1 -4.87 4.79 -0.71 0.04 26.89 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 THIKA POWER TX3 1.93 7.43 0.25 0.04 10.50 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|TOR |
|
| TOROR0132K.00 0.87 114.35 -1.45 |
|
| Cub_1 /Xnet UECTTL 28.18 86.39 0.31 0.46 |
Sk": 10000.00 MVA |
| Cub_1 /Lne TOR-MUS1 14.09 43.19 0.31 0.23 56.74 |
Pv: 2341.40 kW cLod: 2.30 Mvar L: 74.00 km|
| Cub_1 /Lne TOR-MUS2 14.09 43.19 0.31 0.23 56.74 |
Pv: 2341.40 kW cLod: 2.30 Mvar L: 74.00 km|
| |
|
|TSAVO |
|
| TSAVO132KV.00 0.89 117.24 14.84 |
|
| Cub_1 /Lne RAB-TSAVO 27.44 -4.70 0.99 0.14 23.20 |
Pv: 109.40 kW cLod: 0.69 Mvar L: 18.00 km|
| Cub_1 /Lne tsav0-kpv1 64.38 -87.63 0.59 0.54 90.61 |
Pv: 46.56 kW cLod: 0.02 Mvar L: 0.50 km|
| Cub_2 /Tr2 TSAVO POWER TX1 -45.91 46.17 -0.71 0.32 99.07 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 TSAVO POWER TX2 -45.91 46.17 -0.71 0.32 99.07 |
Tap: 0.00 Min: 0 Max: 0 |
| TSAVO11KVB.00 0.80 8.82 51.40 |
|
| Cub_3 /Sym TSAVO POWER 13.57M 91.82 -73.31 0.78 7.70 123.69 |
Typ: PV |
| Cub_2 /Tr2 TSAVO POWER TX1 45.91 -36.66 0.78 3.85 99.07 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 TSAVO POWER TX2 45.91 -36.66 0.78 3.85 99.07 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 28 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rated Active Reactive Power |
|
| Voltage Bus-voltage Power Power Factor Current Loading|
Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] |
|
-----------------------------------------------------------------------------------
------------------------------------------------
|TURK |
|
| TURK220KVB.00 0.66 145.23 6.78 |
|
| Cub_1 /Lne TURK-LESS 11.16 -14.93 0.60 0.07 12.54 |
Pv: 230.15 kW cLod: 12.23 Mvar L: 218.00 km|
| Cub_3 /Tr2 TURKX1 -5.58 7.46 -0.60 0.04 23.93 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_3 /Tr2 TURKX2 -5.58 7.46 -0.60 0.04 23.93 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|VIPR |
|
| VIPR132KVB.00 0.81 107.46 10.44 |
|
| Cub_1 /Lne REA TEE -0.00 -0.00 -0.10 0.00 0.36 |
Pv: 0.00 kW cLod: 0.26 Mvar L: 8.50 km|
| |
|
|VOI |
|
| VOI33KVBB3.00 0.80 26.38 33.86 |
|
| Cub_3 /Lod voi ld 5.49 2.36 0.92 0.13 |
Pl0: 8.60 MW Ql0: 3.70 Mvar |
| Cub_2 /Tr2 VOI132/33 TX1 -5.49 -2.36 -0.92 0.13 149.75 |
Tap: 0.00 Min: 0 Max: 0 |
| VOI132KVBB.00 0.87 114.66 12.87 |
|
| Cub_1 /Lne MAUNG-VOI -4.97 -4.61 -0.73 0.03 8.03 |
Pv: 18.45 kW cLod: 1.10 Mvar L: 31.00 km|
| Cub_1 /Lne MTT-VOI -0.52 1.13 -0.42 0.01 5.13 |
Pv: 9.98 kW cLod: 3.16 Mvar L: 90.00 km|
| Cub_1 /Tr2 VOI132/33 TX1 5.49 3.48 0.84 0.03 149.75 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|WEB |
|
| WEBUYE132K.00 0.76 99.73 -0.73 |
|
| Cub_1 /Lne MUS-WEB -5.56 -3.79 -0.83 0.04 10.02 |
Pv: 17.37 kW cLod: 0.48 Mvar L: 18.00 km|
| Cub_1 /Tr2 WEB132/33 TX2 5.56 3.79 0.83 0.04 38.75 |
Tap: 0.00 Min: 0 Max: 0 |
| WEBUYE33KV.00 0.74 24.26 26.85 |
|
| Cub_2 /Lod webuye ld 5.56 3.46 0.85 0.16 |
Pl0: 10.30 MW Ql0: 6.40 Mvar |
| Cub_2 /Tr2 WEB132/33 TX2 -5.56 -3.46 -0.85 0.16 38.75 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
|WOTE |
|
| WOTE132KVB.00 0.86 113.52 14.05 |
|
| Cub_1 /Lne sultan-wote 1.54 10.97 0.14 0.06 14.97 |
Pv: 85.89 kW cLod: 1.43 Mvar L: 41.85 km|
| Cub_1 /Lne wote-kitui -2.72 -11.71 -0.23 0.06 14.39 |
Pv: 114.81 kW cLod: 2.32 Mvar L: 65.21 km|
| Cub_1 /Tr2 NAROK132/33 TX1 0.59 0.37 0.85 0.00 3.52 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_1 /Tr2 NAROK132/33 TX2 0.59 0.37 0.85 0.00 3.52 |
Tap: 0.00 Min: 0 Max: 0 |
| WOTE33KVBB.00 0.86 28.32 43.85 |
|
| Cub_3 /Lod wote ld 1.18 0.74 0.85 0.03 |
Pl0: 1.60 MW Ql0: 1.00 Mvar |
| Cub_2 /Tr2 NAROK132/33 TX1 -0.59 -0.37 -0.85 0.01 3.52 |
Tap: 0.00 Min: 0 Max: 0 |
| Cub_2 /Tr2 NAROK132/33 TX2 -0.59 -0.37 -0.85 0.01 3.52 |
Tap: 0.00 Min: 0 Max: 0 |
| |
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 29 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rtd.V Bus - voltage
Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5
0 +5 +10 |
-----------------------------------------------------------------------------------
------------------------------------------------
|ATHI RIVER
|
| ATHI RVR 220KVB 220.00 0.710 156.15 19.66
<\\\\\\\\\\\\\\\\\\\\\\\| |
| ATHI RVR 220KVB 220.00 0.710 156.15 19.66
<\\\\\\\\\\\\\\\\\\\\\\\| |
| ATHI RVR66KV 66.00 0.851 56.14 -2.00
<\\\\\\\\\\\\\\\\\\\\\\\| |
| Triumph Gen BB 11.00 0.960 10.56 -25.59
<<<<<<<<<| |
|AWENDO
|
| AWENDO33KVBB 33.00 0.546 18.02 25.85
<\\\\\\\\\\\\\\\\\\\\\\\| |
| AWENDO132KVBB 132.00 0.549 72.44 -3.66
<\\\\\\\\\\\\\\\\\\\\\\\| |
|BOMET
|
| BOMET33KVBB 33.00 0.540 17.81 25.19
<\\\\\\\\\\\\\\\\\\\\\\\| |
| BOMET132KVBB 132.00 0.551 72.78 -2.92
<\\\\\\\\\\\\\\\\\\\\\\\| |
|CHEM
|
| chem132 132.00 0.566 74.71 -1.06
<\\\\\\\\\\\\\\\\\\\\\\\| |
| chem33kbus 33.00 0.550 18.15 26.68
<\\\\\\\\\\\\\\\\\\\\\\\| |
|DANDORA
|
| Dand132BB 132.00 0.778 102.67 18.00
<\\\\\\\\\\\\\\\\\\\\\\\| |
| Dand220BB1 220.00 0.733 161.25 18.77
<\\\\\\\\\\\\\\\\\\\\\\\| |
| Dand220BB2 220.00 0.733 161.25 18.77
<\\\\\\\\\\\\\\\\\\\\\\\| |
|ELD
|
| Eld132BB 132.00 0.656 86.56 1.25
<\\\\\\\\\\\\\\\\\\\\\\\| |
| Eld33kv BB 33.00 0.617 20.36 26.75
<\\\\\\\\\\\\\\\\\\\\\\\| |
|EMBAKASI
|
| EMBA220KVBB1 220.00 0.728 160.19 18.89
<\\\\\\\\\\\\\\\\\\\\\\\| |
| EMBA220KVBB2 220.00 0.728 160.19 18.89
<\\\\\\\\\\\\\\\\\\\\\\\| |
| Emba66kV 66.00 0.757 49.95 15.36
<\\\\\\\\\\\\\\\\\\\\\\\| |
| EmbaGenBB 11.00 1.018 11.20 -10.83
|>>>> |
|GALU
|
| Galu132kVBB 132.00 0.864 114.03 13.06
<\\\\\\\\\\\\\\\\\\\\\\\| |
| Galu33kv 33.00 0.812 26.79 7.90
<\\\\\\\\\\\\\\\\\\\\\\\| |
|GARISSA
|
| Garissa132kVBB 132.00 0.904 119.27 12.57
<<<<<<<<<<<<<<<<<<<<<<<| |
| Garissa33kVBB 33.00 0.900 29.69 42.20
<<<<<<<<<<<<<<<<<<<<<<<<| |
|GARS
|
| GARSEN220KVBB 220.00 0.950 209.04 11.91
<<<<<<<<<<<<| |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 30 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rtd.V Bus - voltage
Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5
0 +5 +10 |
-----------------------------------------------------------------------------------
------------------------------------------------
| GARSEN33KVBB 33.00 0.943 31.12 11.46
<<<<<<<<<<<<<<| |
|GATU
|
| GATUNDU132KVBB 132.00 0.768 101.40 15.24
<\\\\\\\\\\\\\\\\\\\\\\\| |
| GATUNDU33KVBB 33.00 0.754 24.87 43.51
<\\\\\\\\\\\\\\\\\\\\\\\| |
|GIT
|
| GITARU132KVBB 132.00 0.954 125.89 26.95
<<<<<<<<<<<| |
|GITHA
|
| GITHAMBO132KVBB 132.00 0.763 100.78 14.95
<\\\\\\\\\\\\\\\\\\\\\\\| |
| GITHAMBO33KVBB 33.00 0.746 24.63 42.94
<\\\\\\\\\\\\\\\\\\\\\\\| |
|HOMABAY
|
| HOMABAY132KVBB 132.00 0.548 72.33 -3.82
<\\\\\\\\\\\\\\\\\\\\\\\| |
| HOMABAY 33KVBB 33.00 0.545 17.97 25.63
<\\\\\\\\\\\\\\\\\\\\\\\| |
|ISH
|
| term336 132.00 0.934 123.23 24.95
<<<<<<<<<<<<<<<<| |
|ISINYA220/400
|
| ISINYA220KVBB 220.00
<\\\\\\\\\\\\\\\\\\\\\\\| |
| ISINYA400KVBB1 220.00 0.000 0.00 0.00
<\\\\\\\\\\\\\\\\\\\\\\\| |
| ISINYA400KVBB2 220.00 0.000 0.00 0.00
<\\\\\\\\\\\\\\\\\\\\\\\| |
|ISIOLO
|
| ISIOLO132KVBB 132.00 0.914 120.64 23.12
<<<<<<<<<<<<<<<<<<<<<| |
| ISIOLO33KVBB 33.00 0.903 29.80 52.07
<<<<<<<<<<<<<<<<<<<<<<<| |
|JUJA RD
|
| IBER66KV 66.00 0.940 62.04 19.19
<<<<<<<<<<<<<<| |
| JUJARD132KVBB1 132.00 0.781 103.03 17.91
<\\\\\\\\\\\\\\\\\\\\\\\| |
| JUJARD132KVBB2 132.00 0.781 103.03 17.91
<\\\\\\\\\\\\\\\\\\\\\\\| |
| JUJARD66KVBB 66.00 0.843 55.65 18.40
<\\\\\\\\\\\\\\\\\\\\\\\| |
| IBERT9 11.00 1.011 11.13 -8.62
|>>> |
| IBERT13 11.00 1.013 11.14 -9.15
|>>> |
| GT1 11.00 1.011 11.13 -8.62
|>>> |
| IBERGT2 11.00 1.013 11.14 -9.15
|>>> |
|KABAR
|
| KABARNET132KVBB 132.00 0.682 89.98 2.20
<\\\\\\\\\\\\\\\\\\\\\\\| |
| KABARNET33KVBB 33.00 0.675 22.29 31.36
<\\\\\\\\\\\\\\\\\\\\\\\| |
|KAMBURU
|
| KAMBURU220KVBB1 220.00 0.854 187.91 21.27
<\\\\\\\\\\\\\\\\\\\\\\\| |
| KAMBURU220KVBB2 220.00 0.854 187.91 21.27
<\\\\\\\\\\\\\\\\\\\\\\\| |
| KAMBURU132KVBB 132.00 0.943 124.44 26.35
<<<<<<<<<<<<<<| |
| KambGenBB1 11.00 1.000 11.00 0.03
| |
| kambgenbb2 11.00 1.000 11.00 0.03
| |
| kamburugen3 11.00 1.000 11.00 0.03
| |
|KBK
|
| KIBOKO132KVBB 132.00 0.849 112.09 13.74
<\\\\\\\\\\\\\\\\\\\\\\\| |
| KIBOKO33KVBB 33.00 0.798 26.34 37.44
<\\\\\\\\\\\\\\\\\\\\\\\| |
|KEGATI
|
| KEGATI132KVBB 132.00 0.552 72.81 -3.19
<\\\\\\\\\\\\\\\\\\\\\\\| |
| KEGATI33KVBB 33.00 0.528 17.43 22.50
<\\\\\\\\\\\\\\\\\\\\\\\| |
|KIAMB
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 31 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rtd.V Bus - voltage
Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5
0 +5 +10 |
-----------------------------------------------------------------------------------
------------------------------------------------
| KIAMBERE220KVBB 220.00 0.877 193.05 20.25
<\\\\\\\\\\\\\\\\\\\\\\\| |
|KIENI
|
| KIENI132KV 132.00 0.934 123.29 24.94
<<<<<<<<<<<<<<<<| |
|KIGA
|
| KIGANJO132KVBB 132.00 0.832 109.82 20.57
<\\\\\\\\\\\\\\\\\\\\\\\| |
| KIGANJO33KVBB 33.00 0.805 26.55 47.51
<\\\\\\\\\\\\\\\\\\\\\\\| |
|KILI
|
| KILIMAMBOGO32BB 132.00 0.771 101.78 15.38
<\\\\\\\\\\\\\\\\\\\\\\\| |
|KILIFI
|
| KILIFI132KVBB 132.00 0.805 106.32 9.97
<\\\\\\\\\\\\\\\\\\\\\\\| |
| KILIFI33KVBB 33.00 0.787 25.96 7.10
<\\\\\\\\\\\\\\\\\\\\\\\| |
|KIND
|
| KINDARUMA132KV 132.00 0.903 119.20 14.17
<<<<<<<<<<<<<<<<<<<<<<<| |
|KIPEVU132
|
| KDP132KVBB 132.00 0.889 117.36 14.76
<\\\\\\\\\\\\\\\\\\\\\\\| |
| KPV1G3BB 11.00 1.020 11.22 -11.43
|>>>>> |
| KPV1G4BB 11.00 1.020 11.22 -11.43
|>>>>> |
| KPV1G2BB 11.00 1.027 11.30 -13.15
|>>>>>> |
| KPV1G5 11.00 1.020 11.22 -11.43
|>>>>> |
| KPV1G6 11.00 1.020 11.22 -11.43
|>>>>> |
| KPV1G1BB 11.00 1.020 11.22 -11.43
|>>>>> |
|KIPEVU33KV
|
| KPVGIS33KVBB 33.00 0.842 27.79 10.43
<\\\\\\\\\\\\\\\\\\\\\\\| |
|KISM
|
| KISUMU132KVBB 132.00 0.549 72.46 -2.92
<\\\\\\\\\\\\\\\\\\\\\\\| |
| KISUMU33KVBB 33.00 0.519 17.13 20.09
<\\\\\\\\\\\\\\\\\\\\\\\| |
|KIT
|
| KITALE132KV 132.00 0.647 85.42 0.63
<\\\\\\\\\\\\\\\\\\\\\\\| |
| KITALE33KVBB 33.00 0.632 20.84 28.46
<\\\\\\\\\\\\\\\\\\\\\\\| |
|KITUI
|
| KITUI132KVBB 132.00 0.882 116.43 13.81
<\\\\\\\\\\\\\\\\\\\\\\\| |
| KITUI33KVBB 33.00 0.879 29.02 43.54
<\\\\\\\\\\\\\\\\\\\\\\\| |
|KKTN
|
| KOKOTONI11KVBB 11.00 0.887 9.75 13.90
<\\\\\\\\\\\\\\\\\\\\\\\| |
| KOKOTONI 132KVB 132.00 0.887 117.03 13.90
<\\\\\\\\\\\\\\\\\\\\\\\| |
|KPV1
|
| KPV1132KVBB 132.00 0.887 117.09 13.95
<\\\\\\\\\\\\\\\\\\\\\\\| |
|KUT
|
| KUTUS132KV 132.00 0.878 115.96 22.69
<\\\\\\\\\\\\\\\\\\\\\\\| |
| KUT33KVBB 33.00 0.844 27.84 49.21
<\\\\\\\\\\\\\\\\\\\\\\\| |
|LAMU
|
| LAMU33KVBB 33.00 0.970 31.99 11.64
<<<<<<<| |
| LMU220KV 220.00 0.959 210.90 11.75
<<<<<<<<<<| |
|LANET
|
| LANET132KVBB 132.00 0.696 91.85 9.27
<\\\\\\\\\\\\\\\\\\\\\\\| |
| LANET33KVBB 33.00 0.657 21.67 34.51
<\\\\\\\\\\\\\\\\\\\\\\\| |
|LESSOS COMPLEX
|
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 32 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rtd.V Bus - voltage
Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5
0 +5 +10 |
-----------------------------------------------------------------------------------
------------------------------------------------
| LESSOS132KVBB 132.00 0.684 90.30 2.47
<\\\\\\\\\\\\\\\\\\\\\\\| |
| LESSOS220KVBB1 220.00 0.681 149.71 3.36
<\\\\\\\\\\\\\\\\\\\\\\\| |
| LESSOS220KVBB2 220.00 0.681 149.71 3.36
<\\\\\\\\\\\\\\\\\\\\\\\| |
| LESSOS33KVBB 33.00 0.670 22.12 29.75
<\\\\\\\\\\\\\\\\\\\\\\\| |
|MAKUTANO
|
| MAKUTANO132BB 132.00 0.689 90.97 5.10
<\\\\\\\\\\\\\\\\\\\\\\\| |

| MALINDI220KVBB 220.00 0.933 205.23 12.38


<<<<<<<<<<<<<<<<| |
| MALINDI33KVBB 33.00 0.910 30.03 10.18
<<<<<<<<<<<<<<<<<<<<<<| |
|MANGU
|
| MANGU132KVBB 132.00 0.771 101.76 15.39
<\\\\\\\\\\\\\\\\\\\\\\\| |
|MASI
|
| MASINGA132KVBB 132.00 0.940 124.03 25.12
<<<<<<<<<<<<<<| |
|MAUA
|
| MAUA132KVBB 132.00 0.914 120.70 23.07
<<<<<<<<<<<<<<<<<<<<| |
| MAUA33KVBB 33.00 0.908 29.96 52.41
<<<<<<<<<<<<<<<<<<<<<<| |
|MAUN
|
| MAUNGU132KVBB 132.00 0.874 115.39 13.05
<\\\\\\\\\\\\\\\\\\\\\\\| |
| MAUNGU33KVBB 33.00 0.871 28.73 42.49
<\\\\\\\\\\\\\\\\\\\\\\\| |
|MEN
|
| MENENGAI132KVBB 132.00 0.695 91.69 8.29
<\\\\\\\\\\\\\\\\\\\\\\\| |
|MKN
|
| MARIAKANI11KVBB 11.00 0.886 9.74 13.78
<\\\\\\\\\\\\\\\\\\\\\\\| |
| MARIAKANI 132.00 0.886 116.90 13.78
<\\\\\\\\\\\\\\\\\\\\\\\| |
|MRU
|
| MERU132KVBB 132.00 0.916 120.96 23.24
<<<<<<<<<<<<<<<<<<<<| |
| MERU33KVBB 33.00 0.889 29.34 50.57
<\\\\\\\\\\\\\\\\\\\\\\\| |
|MT_AND
|
| MTTANDEI132KVBB 132.00 0.862 113.82 13.16
<\\\\\\\\\\\\\\\\\\\\\\\| |
| MTTANDEI33KVBB 33.00 0.860 28.40 42.88
<\\\\\\\\\\\\\\\\\\\\\\\| |
|MUHORONI
|
| MUHORONI132KVBB 132.00 0.587 77.49 0.54
<\\\\\\\\\\\\\\\\\\\\\\\| |
| MUHORONI33KVBB 33.00 0.506 16.70 41.10
<\\\\\\\\\\\\\\\\\\\\\\\| |
| muho gen bus 11.00 0.479 5.27 90.00
<\\\\\\\\\\\\\\\\\\\\\\\| |
|MUM
|
| MUMIAS11KVBB 11.00 0.746 8.21 -31.97
<\\\\\\\\\\\\\\\\\\\\\\\| |
| MUMIAS132KVBB 132.00 0.752 99.27 -1.24
<\\\\\\\\\\\\\\\\\\\\\\\| |
|MUS
|
| MUSAGA 33KV 33.00 0.743 24.51 27.25
<\\\\\\\\\\\\\\\\\\\\\\\| |
| MUSAGA132KV 132.00 0.759 100.23 -0.56
<\\\\\\\\\\\\\\\\\\\\\\\| |
|MWINGI
|
| MWINGI132KVBB 132.00 0.897 118.44 13.82
<\\\\\\\\\\\\\\\\\\\\\\\| |
| MWINGI33KVBB 33.00 0.895 29.55 43.64
<\\\\\\\\\\\\\\\\\\\\\\\| |
|N.NORTH
|
| NNORTH220KVBB 220.00 0.658 144.86 18.32
<\\\\\\\\\\\\\\\\\\\\\\\| |
| NNORTH220KVBB1 220.00 0.658 144.86 18.32
<\\\\\\\\\\\\\\\\\\\\\\\| |
| NNORTH66KVBB 66.00 0.638 42.08 13.89
<\\\\\\\\\\\\\\\\\\\\\\\| |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 33 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rtd.V Bus - voltage
Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5
0 +5 +10 |
-----------------------------------------------------------------------------------
------------------------------------------------
|NAIV
|
| NAIV132KVBB 132.00 0.742 97.91 16.26
<\\\\\\\\\\\\\\\\\\\\\\\| |
| NAIV33KVBB 33.00 0.736 24.29 44.98
<\\\\\\\\\\\\\\\\\\\\\\\| |
|NAN
|
| NANY132KVBB 132.00 0.808 106.60 19.24
<\\\\\\\\\\\\\\\\\\\\\\\| |
| NANY33KVBB 33.00 0.788 26.02 46.69
<\\\\\\\\\\\\\\\\\\\\\\\| |
|NAROK
|
| NAROK132KVBB 132.00 0.764 100.87 21.47
<\\\\\\\\\\\\\\\\\\\\\\\| |
| NAROK33KVBB 33.00 0.762 25.14 51.21
<\\\\\\\\\\\\\\\\\\\\\\\| |
|NBAM
|
| NBAM132KVBB 132.00 0.822 108.48 10.92
<\\\\\\\\\\\\\\\\\\\\\\\| |
| NBAM33KVBB 33.00 0.792 26.14 7.36
<\\\\\\\\\\\\\\\\\\\\\\\| |
|NYAHURURU
|
| NYAHURURU132KVB 132.00 0.785 103.60 18.06
<\\\\\\\\\\\\\\\\\\\\\\\| |
| NYAHURURU33KVBB 33.00 0.753 24.85 44.49
<\\\\\\\\\\\\\\\\\\\\\\\| |
|OLKA2
|
| OLKA2220KVBB 220.00 0.567 124.85 20.13
<\\\\\\\\\\\\\\\\\\\\\\\| |
| Olk2GenBus 11.00 1.016 11.18 -10.24
|>>>> |
| Olk2GenBus2 11.00 1.016 11.18 -10.24
|>>>> |
| Olk2GenBus3 11.00 1.024 11.27 -12.47
|>>>>>> |
|OLKA4
|
| term1487 220.00 0.533 117.22 23.78
<\\\\\\\\\\\\\\\\\\\\\\\| |
|OLKAU220/132
|
| OLKAU220KVBB 220.00 0.574 126.19 20.37
<\\\\\\\\\\\\\\\\\\\\\\\| |
| OLKAU220KVBB1 220.00 0.574 126.19 20.37
<\\\\\\\\\\\\\\\\\\\\\\\| |
| OLKAUGB1 11.00 1.002 11.02 -3.51
| |
| OLKAUGB2 11.00 1.002 11.02 -3.50
| |
| OLKA1132KVBB 132.00 0.765 101.01 21.67
<\\\\\\\\\\\\\\\\\\\\\\\| |
| OLKAU132KVBB 132.00 0.784 103.45 21.91
<\\\\\\\\\\\\\\\\\\\\\\\| |
|ORPOWER
|
| ORPOWER220KVBB 220.00 0.580 127.64 19.77
<\\\\\\\\\\\\\\\\\\\\\\\| |
| ORPOWERG1BB 11.00 0.668 7.35 41.54
<\\\\\\\\\\\\\\\\\\\\\\\| |
| ORPG2BB 11.00 1.005 11.06 -5.88
|> |
| ORPG3BB 11.00 0.668 7.35 41.54
<\\\\\\\\\\\\\\\\\\\\\\\| |
| ORPG4BB 11.00 0.668 7.35 41.54
<\\\\\\\\\\\\\\\\\\\\\\\| |
|RABAI
|
| RABAI132KVBB 132.00 0.887 117.07 13.95
<\\\\\\\\\\\\\\\\\\\\\\\| |
| RABAI220KVBB1 220.00 0.910 200.15 14.03
<<<<<<<<<<<<<<<<<<<<<<| |
| RABAI220KVBB2 220.00 0.910 200.15 14.03
<<<<<<<<<<<<<<<<<<<<<<| |
| RABAI3KVBB 33.00 0.868 28.63 10.74
<\\\\\\\\\\\\\\\\\\\\\\\| |
| term1563 11.00 0.892 9.81 13.87
<\\\\\\\\\\\\\\\\\\\\\\\| |
|RAN
|
| RANGALA132KVBB 132.00 0.734 96.90 -2.86
<\\\\\\\\\\\\\\\\\\\\\\\| |
| RANGALA33KV 33.00 0.716 23.63 23.60
<\\\\\\\\\\\\\\\\\\\\\\\| |
|RUAR
|
| RUARAKA132KVBB 132.00 0.737 97.35 15.83
<\\\\\\\\\\\\\\\\\\\\\\\| |
| RUARAKA66KVBB 66.00 0.722 47.68 -17.70
<\\\\\\\\\\\\\\\\\\\\\\\| |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 34 |
-----------------------------------------------------------------------------------
------------------------------------------------
| rtd.V Bus - voltage
Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5
0 +5 +10 |
-----------------------------------------------------------------------------------
------------------------------------------------
|SANG
|
| SANGORO132KVBB 132.00 0.549 72.41 -3.78
<\\\\\\\\\\\\\\\\\\\\\\\| |
| SANGORO33KVBB 33.00 0.549 18.10 -33.78
<\\\\\\\\\\\\\\\\\\\\\\\| |
|SOILO
|
| SOILO132KVBB 132.00 0.695 91.68 8.29
<\\\\\\\\\\\\\\\\\\\\\\\| |
| SOILO33KVBB 33.00 0.695 22.92 38.29
<\\\\\\\\\\\\\\\\\\\\\\\| |
|SONDU
|
| SONDU132KVBB 132.00 0.549 72.41 -3.78
<\\\\\\\\\\\\\\\\\\\\\\\| |
| SONDUGENBB1 11.00 0.556 6.11 25.86
<\\\\\\\\\\\\\\\\\\\\\\\| |
| SONDUGEN BB2 11.00 0.556 6.11 25.86
<\\\\\\\\\\\\\\\\\\\\\\\| |
|SOTIK
|
| SOTIK33KVBB 33.00 0.559 18.44 27.80
<\\\\\\\\\\\\\\\\\\\\\\\| |
| SOTIK132KVBB 132.00 0.559 73.76 -2.20
<\\\\\\\\\\\\\\\\\\\\\\\| |
|SULTAN
|
| SULTANH33KVBB 33.00 0.831 27.44 42.55
<\\\\\\\\\\\\\\\\\\\\\\\| |
| SULTAN132 132.00 0.845 111.55 14.34
<\\\\\\\\\\\\\\\\\\\\\\\| |
|SUSWA220
|
| SUSWA220KVBB1 220.00 0.572 125.87 21.39
<\\\\\\\\\\\\\\\\\\\\\\\| |
| SUSWA220KVBB2 220.00 0.572 125.87 21.39
<\\\\\\\\\\\\\\\\\\\\\\\| |
|THIKA POWER
|
| THIKA POWER132K 132.00 0.770 101.58 15.46
<\\\\\\\\\\\\\\\\\\\\\\\| |
|TOR
|
| TOROR0132KVBB 132.00 0.866 114.35 -1.45
<\\\\\\\\\\\\\\\\\\\\\\\| |
|TSAVO
|
| TSAVO132KVBB 132.00 0.888 117.24 14.84
<\\\\\\\\\\\\\\\\\\\\\\\| |
| TSAVO11KVBB 11.00 0.801 8.82 51.40
<\\\\\\\\\\\\\\\\\\\\\\\| |
|TURK
|
| TURK220KVBB 220.00 0.660 145.23 6.78
<\\\\\\\\\\\\\\\\\\\\\\\| |
|VIPR
|
| VIPR132KVBB 132.00 0.814 107.46 10.44
<\\\\\\\\\\\\\\\\\\\\\\\| |
|VOI
|
| VOI33KVBB 33.00 0.799 26.38 33.86
<\\\\\\\\\\\\\\\\\\\\\\\| |
| VOI132KVBB 132.00 0.869 114.66 12.87
<\\\\\\\\\\\\\\\\\\\\\\\| |
|WEB
|
| WEBUYE132KVBB 132.00 0.756 99.73 -0.73
<\\\\\\\\\\\\\\\\\\\\\\\| |
| WEBUYE33KVBB 33.00 0.735 24.26 26.85
<\\\\\\\\\\\\\\\\\\\\\\\| |
|WOTE
|
| WOTE132KVBB 132.00 0.860 113.52 14.05
<\\\\\\\\\\\\\\\\\\\\\\\| |
| WOTE33KVBB 33.00 0.858 28.32 43.85
<\\\\\\\\\\\\\\\\\\\\\\\| |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 35 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 11.00 614.85 0.00 3.62 0.00 0.00
0.00 0.00 0.00 |
| 773.22 0.00 2.23 0.00 0.00
0.00 0.00 0.00 |
| 33.00 kV
-8.11 0.00 0.00 0.00 |
|
-18.13 2.65 2.65 0.00 |
| 66.00 kV
232.07 0.00 0.00 0.00 |
|
540.43 54.66 54.66 0.00 |
| 132.00 kV
385.56 -0.00 -0.00 0.00 |
|
1471.56 1257.42 1257.42 0.00 |
| 220.00 kV
1.70 0.00 0.00 0.00 |
|
-1222.86 -825.43 -825.43 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 15.00 145.12 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 245.90 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 132.00 kV
124.75 -0.00 -0.00 0.00 |
|
108.74 12.09 12.09 0.00 |
| 220.00 kV
20.37 -0.00 -0.00 0.00 |
|
137.15 18.54 18.54 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 33.00 0.00 0.00 360.82 0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 213.92 -9.89 0.00
0.00 0.00 0.00 |
| 11.00 kV
8.11 0.00 0.00 0.00 |
|
20.78 2.65 2.65 0.00 |
| 132.00 kV
-353.77 -0.00 -0.00 0.00 |
|
-219.70 37.46 37.40 0.05 |
| 220.00 kV
-15.16 -0.00 -0.00 0.00 |
|
-6.01 0.73 0.73 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Grid: Kenya Transmission System Stage: Kenya Transmiss | Study Case: Study Case
| Annex: / 36 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 66.00 0.00 0.00 328.20 0.00 0.00
6.04 6.04 0.00 |
| 0.00 0.00 115.30 0.00 0.00
17.94 17.94 -0.00 |
| 11.00 kV
-232.07 0.00 0.00 0.00 |
|
-485.77 54.66 54.66 0.00 |
| 132.00 kV
-16.68 0.00 0.00 0.00 |
|
208.09 19.32 19.32 0.00 |
| 220.00 kV
-85.49 0.00 0.00 0.00 |
|
144.45 40.43 40.43 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 132.00 0.00 0.00 24.63 0.00 28.18
36.49 36.49 -0.00 |
| 0.00 0.00 15.41 0.00 86.39
-18.67 91.81 -110.47 |
| 11.00 kV
-385.56 -0.00 -0.00 0.00 |
|
-214.14 1257.42 1257.42 0.00 |
| 15.00 kV
-124.75 -0.00 -0.00 0.00 |
|
-96.65 12.09 12.09 0.00 |
| 33.00 kV
353.77 -0.00 -0.00 0.00 |
|
257.16 37.46 37.40 0.05 |
| 66.00 kV
16.68 0.00 0.00 0.00 |
|
-188.77 19.32 19.32 0.00 |
| 220.00 kV
106.92 0.00 0.00 0.00 |
|
332.05 80.96 80.96 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 220.00 0.00 0.00 0.00 -0.00 0.00
28.35 28.35 -0.00 |
| 0.00 0.00 0.00 0.00 0.00
45.12 191.28 -146.16 |
| 11.00 kV
-1.70 0.00 0.00 0.00 |
|
397.30 -825.43 -825.43 0.00 |
| 15.00 kV
-20.37 -0.00 -0.00 0.00 |
|
-118.61 18.54 18.54 0.00 |
| 33.00 kV
15.16 -0.00 -0.00 0.00 |
|
6.74 0.73 0.73 0.00 |
| 66.00 kV
85.49 0.00 0.00 0.00 |
|
-104.01 40.43 40.43 0.00 |
| 132.00 kV
-106.92 0.00 0.00 0.00 |
|
-251.09 80.96 80.96 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Total: 759.97 0.00 717.27 -0.00 28.18
0.00 70.88 70.88 -0.00 |
| 1019.12 0.00 346.86 -9.89 86.39
0.00 743.10 999.68 -256.58 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Total System Summary | Study Case: Study Case
| Annex: / 37 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Generation Motor Load Compen- External Inter
Area Total Load Noload |
| Load sation Infeed
Flow Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/
[MW]/ [MW]/ [MW]/ [MW]/ |
| [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| \admin\Kenya Power Transmission\Network Model\Network Data\Kenya Transmission
|
| 759.97 0.00 717.27 -0.00 28.18
0.00 70.88 70.88 -0.00 |
| 1019.12 0.00 346.86 -9.89 86.39
0.00 743.10 999.68 -256.58 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Total:
|
| 759.97 0.00 717.27 -0.00 28.18
70.88 70.88 -0.00 |
| 1019.12 0.00 346.86 -9.89 86.39
743.10 999.68 -256.58 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Zone: 7 Forks Hydros | Study Case: Study Case
| Annex: / 38 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 15.00 20.37 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 137.15 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 220.00 kV
20.37 -0.00 -0.00 0.00 |
|
137.15 18.54 18.54 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 220.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 15.00 kV
-20.37 -0.00 -0.00 0.00 |
|
-118.61 18.54 18.54 0.00 |
| Nairobi
23.86 2.76 2.76 0.00 |
|
79.31 3.25 15.87 -12.62 |
| Coast
17.56 0.57 0.57 0.00 |
|
11.21 -43.14 2.35 -45.49 |
| Mt.Kenya
-24.94 0.55 0.55 0.00 |
|
68.98 -0.99 2.29 -3.28 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Total: 20.37 0.00 0.00 0.00 0.00
16.49 3.88 3.88 0.00 |
| 137.15 0.00 0.00 0.00 0.00
159.50 -22.34 39.04 -61.39 |
| Nairobi
23.86 2.76 2.76 0.00 |
|
79.31 3.25 15.87 -12.62 |
| Coast
17.56 0.57 0.57 0.00 |
|
11.21 -43.14 2.35 -45.49 |
| Mt.Kenya
-24.94 0.55 0.55 0.00 |
|
68.98 -0.99 2.29 -3.28 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Zone: Coast | Study Case: Study Case
| Annex: / 39 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 11.00 156.38 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 107.21 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 33.00 kV
-20.20 0.00 0.00 0.00 |
|
-13.71 -2.55 -2.55 0.00 |
| 132.00 kV
176.57 -0.00 -0.00 0.00 |
|
120.75 45.60 45.60 0.00 |
| 220.00 kV
0.01 -0.00 -0.00 0.00 |
|
0.17 -0.00 -0.00 0.00 |
| Mt.Kenya
0.01 -0.00 -0.00 0.00 |
|
0.17 -0.00 -0.00 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 33.00 0.00 0.00 171.31 -0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 100.13 -4.23 0.00
0.00 0.00 0.00 |
| 11.00 kV
25.65 0.00 0.00 0.00 |
|
14.78 -3.36 -3.36 0.00 |
| 132.00 kV
-181.79 -0.00 -0.00 0.00 |
|
-105.56 18.77 18.76 0.01 |
| 220.00 kV
-15.16 -0.00 -0.00 0.00 |
|
-6.01 0.73 0.73 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 132.00 0.00 0.00 0.00 0.00 0.00
2.22 2.22 0.00 |
| 0.00 0.00 0.00 0.00 0.00
-1.68 4.83 -6.52 |
| 11.00 kV
-182.02 -0.00 -0.00 0.00 |
|
-79.39 45.78 45.78 0.00 |
| 33.00 kV
181.79 -0.00 -0.00 0.00 |
|
124.33 18.77 18.76 0.01 |
| 220.00 kV
-2.07 0.00 0.00 0.00 |
|
-38.23 0.99 0.99 0.00 |
| Nairobi
-0.10 0.07 0.07 -0.00 |
|
-1.86 -7.35 0.16 -7.51 |
| Mt.Kenya
-2.06 0.01 0.01 0.00 |
|
-38.41 0.34 1.01 -0.66 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Zone: Coast | Study Case: Study Case
| Annex: / 40 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| 220.00 0.00 0.00 0.00 0.00 0.00
0.35 0.35 0.00 |
| 0.00 0.00 0.00 0.00 0.00
-34.58 1.43 -36.00 |
| 33.00 kV
15.16 -0.00 -0.00 0.00 |
|
6.74 0.73 0.73 0.00 |
| Mt.Kenya
2.06 0.00 0.00 0.00 |
|
39.05 0.00 0.00 0.00 |
| Olkaria Complex
0.00 0.00 0.00 0.00 |
|
-0.00 -0.00 0.00 -0.00 |
| 7 Forks Hydros
-17.56 0.57 0.57 0.00 |
|
-11.21 -43.14 2.35 -45.49 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Total: 156.38 0.00 171.31 -0.00 0.00
-17.59 2.67 2.67 0.00 |
| 107.21 0.00 100.13 -4.23 0.00
-12.86 23.28 68.38 -45.10 |
| Nairobi
-0.10 0.07 0.07 -0.00 |
|
-1.86 -7.35 0.16 -7.51 |
| Mt.Kenya
0.00 0.01 0.01 0.00 |
|
0.81 0.34 1.00 -0.66 |
| Olkaria Complex
0.00 0.00 0.00 0.00 |
|
-0.00 -0.00 0.00 -0.00 |
| 7 Forks Hydros
-17.56 0.57 0.57 0.00 |
|
-11.21 -43.14 2.35 -45.49 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Zone: Mt.Kenya | Study Case: Study Case
| Annex: / 41 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 11.00 155.68 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 332.89 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 66.00 kV
90.54 -0.00 -0.00 0.00 |
|
271.35 -7.83 -7.83 0.00 |
| 132.00 kV
67.65 -0.00 -0.00 0.00 |
|
64.08 33.52 33.52 0.00 |
| 220.00 kV
-2.51 0.00 0.00 0.00 |
|
-2.54 0.02 0.02 0.00 |
| Nairobi
32.32 0.00 0.00 0.00 |
|
935.66 -1076.07 -1076.07 0.00 |
| Western Kenya
-13.44 0.00 0.00 0.00 |
|
5.18 -0.70 -0.70 0.00 |
| Coast
-0.01 -0.00 -0.00 0.00 |
|
-0.17 -0.00 -0.00 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 15.00 124.75 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 108.74 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 132.00 kV
124.75 -0.00 -0.00 0.00 |
|
108.74 12.09 12.09 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 33.00 0.00 0.00 74.41 0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 44.95 0.00 0.00
0.00 0.00 0.00 |
| 132.00 kV
-74.41 -0.00 -0.00 0.00 |
|
-44.95 4.60 4.60 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 66.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 11.00 kV
-78.30 -0.00 -0.00 0.00 |
|
-164.76 15.43 15.43 0.00 |
| Nairobi
211.79 6.04 6.04 0.00 |
|
-96.79 48.29 48.29 -0.00 |
| Olkaria Complex
-71.58 -0.00 -0.00 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Zone: Mt.Kenya | Study Case: Study Case
| Annex: / 42 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
|
-103.04 26.64 26.64 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 132.00 0.00 0.00 22.58 0.00 0.00
9.35 9.35 0.00 |
| 0.00 0.00 14.15 0.00 0.00
-18.62 22.67 -41.30 |
| 11.00 kV
-67.65 -0.00 -0.00 0.00 |
|
-30.56 33.52 33.52 0.00 |
| 15.00 kV
-124.75 -0.00 -0.00 0.00 |
|
-96.65 12.09 12.09 0.00 |
| 33.00 kV
74.41 -0.00 -0.00 0.00 |
|
49.55 4.60 4.60 0.00 |
| 66.00 kV
-23.56 0.00 0.00 0.00 |
|
-203.59 16.56 16.56 0.00 |
| 220.00 kV
116.92 0.00 0.00 0.00 |
|
142.36 23.25 23.25 0.00 |
| Nairobi
-28.52 0.90 0.90 0.00 |
|
132.60 -2.02 2.01 -4.03 |
| Western Kenya
22.77 0.00 0.00 0.00 |
|
-9.57 -0.93 0.43 -1.36 |
| Coast
2.06 0.01 0.01 0.00 |
|
38.41 0.34 1.01 -0.66 |
| neast
4.61 0.08 0.08 0.00 |
|
9.23 -1.52 0.17 -1.69 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 220.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 11.00 kV
21.38 0.00 0.00 0.00 |
|
-133.67 -1076.76 -1076.76 0.00 |
| 66.00 kV
85.49 0.00 0.00 0.00 |
|
-104.01 40.43 40.43 0.00 |
| 132.00 kV
-91.73 0.00 0.00 0.00 |
|
-82.72 24.32 24.32 0.00 |
| Nairobi
-104.10 5.44 5.44 -0.00 |
|
334.61 13.78 31.27 -17.50 |
| Western Kenya
-10.93 0.00 0.00 0.00 |
|
3.64 0.00 0.00 0.00 |
| Olkaria Complex
71.58 0.00 0.00 0.00 |
|
76.40 0.00 0.00 0.00 |
| Coast
-2.06 0.00 0.00 0.00 |
|
-39.05 0.00 0.00 0.00 |
| 7 Forks Hydros
24.94 0.55 0.55 0.00 |
|
-68.98 -0.99 2.29 -3.28 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Total: 280.44 0.00 97.00 0.00 0.00
167.36 16.08 16.08 -0.00 |
| 441.64 0.00 59.09 0.00 0.00
258.03 124.51 189.36 -64.85 |
| Nairobi
111.49 12.37 12.37 -0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Zone: Mt.Kenya | Study Case: Study Case
| Annex: / 43 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
|
1306.07 -1016.02 -994.50 -21.53 |
| Western Kenya
-1.60 0.00 0.00 0.00 |
|
-0.75 -1.63 -0.28 -1.36 |
| Olkaria Complex
-0.00 0.00 0.00 0.00 |
|
-26.64 26.64 26.64 0.00 |
| Coast
-0.00 0.01 0.01 0.00 |
|
-0.81 0.34 1.00 -0.66 |
| neast
4.61 0.08 0.08 0.00 |
|
9.23 -1.52 0.17 -1.69 |
| 7 Forks Hydros
24.94 0.55 0.55 0.00 |
|
-68.98 -0.99 2.29 -3.28 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Zone: Nairobi | Study Case: Study Case
| Annex: / 44 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 11.00 24.06 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 125.75 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 66.00 kV
23.37 0.00 0.00 0.00 |
|
125.94 33.68 33.68 0.00 |
| 132.00 kV
33.01 0.00 0.00 0.00 |
|
935.48 1085.20 1085.20 0.00 |
| 220.00 kV
-32.32 0.00 0.00 0.00 |
|
-935.66 -1076.07 -1076.07 0.00 |
| Mt.Kenya
-32.32 0.00 0.00 0.00 |
|
-935.66 -1076.07 -1076.07 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 33.00 0.00 0.00 5.61 0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 2.70 0.00 0.00
0.00 0.00 0.00 |
| 132.00 kV
-5.61 -0.00 -0.00 0.00 |
|
-2.70 0.64 0.60 0.05 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 66.00 0.00 0.00 281.61 0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 104.01 0.00 0.00
0.00 0.00 0.00 |
| 11.00 kV
-35.61 0.00 0.00 0.00 |
|
-206.68 10.41 10.41 0.00 |
| 132.00 kV
-16.68 0.00 0.00 0.00 |
|
208.09 19.32 19.32 0.00 |
| 220.00 kV
-157.06 0.00 0.00 0.00 |
|
41.41 13.79 13.79 0.00 |
| Mt.Kenya
-211.79 6.04 6.04 0.00 |
|
96.79 48.29 48.29 -0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Zone: Nairobi | Study Case: Study Case
| Annex: / 45 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 132.00 0.00 0.00 0.00 0.00 0.00
0.07 0.07 0.00 |
| 0.00 0.00 0.00 0.00 0.00
-4.30 0.17 -4.47 |
| 11.00 kV
-33.01 0.00 0.00 0.00 |
|
149.72 1085.20 1085.20 0.00 |
| 33.00 kV
5.61 -0.00 -0.00 0.00 |
|
3.34 0.64 0.60 0.05 |
| 66.00 kV
40.24 0.00 0.00 0.00 |
|
14.82 2.76 2.76 0.00 |
| 220.00 kV
1.24 0.00 0.00 0.00 |
|
-5.63 -0.34 -0.34 0.00 |
| Mt.Kenya
28.52 0.90 0.90 0.00 |
|
-132.60 -2.02 2.01 -4.03 |
| Coast
0.10 0.07 0.07 -0.00 |
|
1.86 -7.35 0.16 -7.51 |
| neast
-1.54 0.09 0.09 0.00 |
|
-10.97 -1.23 0.19 -1.43 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 220.00 0.00 0.00 0.00 0.00 0.00
4.53 4.53 0.00 |
| 0.00 0.00 0.00 0.00 0.00
18.60 26.05 -7.44 |
| Mt.Kenya
104.10 5.44 5.44 -0.00 |
|
-334.61 13.78 31.27 -17.50 |
| Olkaria Complex
-84.76 5.39 5.39 -0.00 |
|
395.31 27.57 33.94 -6.38 |
| 7 Forks Hydros
-23.86 2.76 2.76 0.00 |
|
-79.31 3.25 15.87 -12.62 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Total: 24.06 0.00 287.22 0.00 0.00
-274.05 10.89 10.89 -0.00 |
| 125.75 0.00 106.71 0.00 0.00
-43.23 62.27 82.06 -19.79 |
| Mt.Kenya
-111.49 12.37 12.37 -0.00 |
|
-1306.07 -1016.02 -994.50 -21.53 |
| Coast
0.10 0.07 0.07 -0.00 |
|
1.86 -7.35 0.16 -7.51 |
| neast
-1.54 0.09 0.09 0.00 |
|
-10.97 -1.23 0.19 -1.43 |
| Olkaria Complex
-84.76 5.39 5.39 -0.00 |
|
395.31 27.57 33.94 -6.38 |
| 7 Forks Hydros
-23.86 2.76 2.76 0.00 |
|
-79.31 3.25 15.87 -12.62 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Zone: Olkaria Complex | Study Case: Study Case
| Annex: / 46 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 11.00 250.88 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 219.72 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 66.00 kV
118.17 0.00 0.00 0.00 |
|
143.14 28.82 28.82 0.00 |
| 132.00 kV
120.79 0.00 0.00 0.00 |
|
342.11 92.35 92.35 0.00 |
| 220.00 kV
11.92 0.00 0.00 0.00 |
|
-265.53 250.51 250.51 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 33.00 0.00 0.00 4.77 0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 1.62 0.00 0.00
0.00 0.00 0.00 |
| 132.00 kV
-4.77 -0.00 -0.00 0.00 |
|
-1.62 0.12 0.12 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 66.00 0.00 0.00 46.59 0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 11.29 0.00 0.00
0.00 0.00 0.00 |
| 11.00 kV
-118.17 0.00 0.00 0.00 |
|
-114.32 28.82 28.82 0.00 |
| 220.00 kV
71.58 -0.00 -0.00 0.00 |
|
103.04 26.64 26.64 0.00 |
| Mt.Kenya
71.58 -0.00 -0.00 0.00 |
|
103.04 26.64 26.64 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 132.00 0.00 0.00 0.00 0.00 0.00
3.26 3.26 0.00 |
| 0.00 0.00 0.00 0.00 0.00
16.64 17.36 -0.72 |
| 11.00 kV
-120.79 0.00 0.00 0.00 |
|
-249.76 92.35 92.35 0.00 |
| 33.00 kV
4.77 -0.00 -0.00 0.00 |
|
1.74 0.12 0.12 0.00 |
| 220.00 kV
15.19 0.00 0.00 0.00 |
|
225.02 56.65 56.65 0.00 |
| Western Kenya
72.87 4.32 4.32 -0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Zone: Olkaria Complex | Study Case: Study Case
| Annex: / 47 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
|
2.59 3.33 8.55 -5.21 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 220.00 0.00 0.00 0.00 -0.00 0.00
8.54 8.54 0.00 |
| 0.00 0.00 0.00 0.00 0.00
71.92 77.14 -5.22 |
| 11.00 kV
-11.92 0.00 0.00 0.00 |
|
516.04 250.51 250.51 0.00 |
| 132.00 kV
-15.19 0.00 0.00 0.00 |
|
-168.37 56.65 56.65 0.00 |
| Nairobi
84.76 5.39 5.39 -0.00 |
|
-395.31 27.57 33.94 -6.38 |
| Coast
-0.00 0.00 0.00 0.00 |
|
0.00 -0.00 0.00 -0.00 |
| Mt.Kenya
-71.58 0.00 0.00 0.00 |
|
-76.40 0.00 0.00 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Total: 250.88 0.00 51.36 -0.00 0.00
182.33 17.19 17.19 -0.00 |
| 219.72 0.00 12.91 0.00 0.00
-362.31 544.57 556.89 -12.31 |
| Nairobi
84.76 5.39 5.39 -0.00 |
|
-395.31 27.57 33.94 -6.38 |
| Coast
-0.00 0.00 0.00 0.00 |
|
0.00 -0.00 0.00 -0.00 |
| Mt.Kenya
0.00 0.00 0.00 0.00 |
|
26.64 26.64 26.64 0.00 |
| Western Kenya
72.87 4.32 4.32 -0.00 |
|
2.59 3.33 8.55 -5.21 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Zone: Western Kenya | Study Case: Study Case
| Annex: / 48 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 11.00 27.85 0.00 3.62 0.00 0.00
0.00 0.00 0.00 |
| -12.35 0.00 2.23 0.00 0.00
0.00 0.00 0.00 |
| 33.00 kV
17.54 0.00 0.00 0.00 |
|
0.00 6.01 6.01 0.00 |
| 132.00 kV
-17.91 -0.00 -0.00 0.00 |
|
4.72 0.56 0.56 0.00 |
| 220.00 kV
24.60 -0.00 -0.00 0.00 |
|
-19.30 0.11 0.11 0.00 |
| Mt.Kenya
13.44 0.00 0.00 0.00 |
|
-5.18 -0.70 -0.70 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 33.00 0.00 0.00 101.84 0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 62.70 -5.66 0.00
0.00 0.00 0.00 |
| 11.00 kV
-17.54 0.00 0.00 0.00 |
|
6.01 6.01 6.01 0.00 |
| 132.00 kV
-84.30 -0.00 -0.00 0.00 |
|
-63.05 13.31 13.31 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 132.00 0.00 0.00 2.05 0.00 28.18
15.23 15.23 -0.00 |
| 0.00 0.00 1.26 0.00 86.39
3.95 33.37 -29.42 |
| 11.00 kV
17.91 -0.00 -0.00 0.00 |
|
-4.15 0.56 0.56 0.00 |
| 33.00 kV
84.30 -0.00 -0.00 0.00 |
|
76.36 13.31 13.31 0.00 |
| 220.00 kV
-24.37 0.00 0.00 0.00 |
|
8.54 0.42 0.42 0.00 |
| Olkaria Complex
-72.87 4.32 4.32 -0.00 |
|
-2.59 3.33 8.55 -5.21 |
| Mt.Kenya
-22.77 0.00 0.00 0.00 |
|
9.57 -0.93 0.43 -1.36 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Zone: Western Kenya | Study Case: Study Case
| Annex: / 49 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 220.00 0.00 0.00 0.00 0.00 0.00
0.23 0.23 0.00 |
| 0.00 0.00 0.00 0.00 0.00
-11.29 0.95 -12.23 |
| 11.00 kV
-11.16 -0.00 -0.00 0.00 |
|
14.93 0.81 0.81 0.00 |
| Mt.Kenya
10.93 0.00 0.00 0.00 |
|
-3.64 0.00 0.00 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Total: 27.85 0.00 107.51 0.00 28.18
-71.27 19.78 19.78 -0.00 |
| -12.35 0.00 66.19 -5.66 86.39
-1.37 14.87 63.10 -48.22 |
| Olkaria Complex
-72.87 4.32 4.32 -0.00 |
|
-2.59 3.33 8.55 -5.21 |
| Mt.Kenya
1.60 0.00 0.00 0.00 |
|
0.75 -1.63 -0.28 -1.36 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Zone: neast | Study Case: Study Case
| Annex: / 50 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 33.00 0.00 0.00 2.88 0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 1.82 0.00 0.00
0.00 0.00 0.00 |
| 132.00 kV
-2.88 -0.00 -0.00 0.00 |
|
-1.82 0.02 0.02 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 132.00 0.00 0.00 0.00 0.00 0.00
0.11 0.11 0.00 |
| 0.00 0.00 0.00 0.00 0.00
-2.06 0.26 -2.32 |
| 33.00 kV
2.88 -0.00 -0.00 0.00 |
|
1.84 0.02 0.02 0.00 |
| Mt.Kenya
-4.61 0.08 0.08 0.00 |
|
-9.23 -1.52 0.17 -1.69 |
| Nairobi
1.54 0.09 0.09 0.00 |
|
10.97 -1.23 0.19 -1.43 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Total: 0.00 0.00 2.88 0.00 0.00
-3.07 0.19 0.19 0.00 |
| 0.00 0.00 1.82 0.00 0.00
1.74 -3.56 0.45 -4.01 |
| Mt.Kenya
-4.61 0.08 0.08 0.00 |
|
-9.23 -1.52 0.17 -1.69 |
| Nairobi
1.54 0.09 0.09 0.00 |
|
10.97 -1.23 0.19 -1.43 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Zone Summaries | Study Case: Study Case
| Annex: / 51 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Generation Motor Load Compen- External Inter
Area Total Load Noload |
| Load sation Infeed
Flow Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/
[MW]/ [MW]/ [MW]/ [MW]/ |
| [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| \admin\Kenya Power Transmission\Network Model\Network Data\Zones\7 Forks Hydros
|
| 20.37 0.00 0.00 0.00 0.00
16.49 3.88 3.88 0.00 |
| 137.15 0.00 0.00 0.00 0.00
159.50 -22.34 39.04 -61.39 |
-----------------------------------------------------------------------------------
------------------------------------------------
| \admin\Kenya Power Transmission\Network Model\Network Data\Zones\Coast
|
| 156.38 0.00 171.31 -0.00 0.00
-17.59 2.67 2.67 0.00 |
| 107.21 0.00 100.13 -4.23 0.00
-12.86 23.28 68.38 -45.10 |
-----------------------------------------------------------------------------------
------------------------------------------------
| \admin\Kenya Power Transmission\Network Model\Network Data\Zones\Mt.Kenya
|
| 280.44 0.00 97.00 0.00 0.00
167.36 16.08 16.08 -0.00 |
| 441.64 0.00 59.09 0.00 0.00
258.03 124.51 189.36 -64.85 |
-----------------------------------------------------------------------------------
------------------------------------------------
| \admin\Kenya Power Transmission\Network Model\Network Data\Zones\Nairobi
|
| 24.06 0.00 287.22 0.00 0.00
-274.05 10.89 10.89 -0.00 |
| 125.75 0.00 106.71 0.00 0.00
-43.23 62.27 82.06 -19.79 |
-----------------------------------------------------------------------------------
------------------------------------------------
| \admin\Kenya Power Transmission\Network Model\Network Data\Zones\Olkaria Complex
|
| 250.88 0.00 51.36 -0.00 0.00
182.33 17.19 17.19 -0.00 |
| 219.72 0.00 12.91 0.00 0.00
-362.31 544.57 556.89 -12.31 |
-----------------------------------------------------------------------------------
------------------------------------------------
| \admin\Kenya Power Transmission\Network Model\Network Data\Zones\Western Kenya
|
| 27.85 0.00 107.51 0.00 28.18
-71.27 19.78 19.78 -0.00 |
| -12.35 0.00 66.19 -5.66 86.39
-1.37 14.87 63.10 -48.22 |
-----------------------------------------------------------------------------------
------------------------------------------------
| \admin\Kenya Power Transmission\Network Model\Network Data\Zones\neast
|
| 0.00 0.00 2.88 0.00 0.00
-3.07 0.19 0.19 0.00 |
| 0.00 0.00 1.82 0.00 0.00
1.74 -3.56 0.45 -4.01 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Area: NAIROBI | Study Case: Study Case
| Annex: / 52 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 11.00 102.35 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 305.95 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 66.00 kV
113.91 0.00 0.00 0.00 |
|
397.29 25.84 25.84 0.00 |
| 132.00 kV
20.76 0.00 0.00 0.00 |
|
844.33 1099.86 1099.86 0.00 |
| 220.00 kV
-32.32 0.00 0.00 0.00 |
|
-935.66 -1076.07 -1076.07 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 33.00 0.00 0.00 5.61 0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 2.70 0.00 0.00
0.00 0.00 0.00 |
| 132.00 kV
-5.61 -0.00 -0.00 0.00 |
|
-2.70 0.64 0.60 0.05 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 66.00 0.00 0.00 281.61 0.00 0.00
6.04 6.04 0.00 |
| 0.00 0.00 104.01 0.00 0.00
17.94 17.94 -0.00 |
| 11.00 kV
-113.91 0.00 0.00 0.00 |
|
-371.45 25.84 25.84 0.00 |
| 132.00 kV
-16.68 0.00 0.00 0.00 |
|
208.09 19.32 19.32 0.00 |
| 220.00 kV
-157.06 0.00 0.00 0.00 |
|
41.41 13.79 13.79 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Area: NAIROBI | Study Case: Study Case
| Annex: / 53 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 132.00 0.00 0.00 0.00 0.00 0.00
0.97 0.97 0.00 |
| 0.00 0.00 0.00 0.00 0.00
-5.98 2.52 -8.50 |
| 11.00 kV
-20.76 0.00 0.00 0.00 |
|
255.54 1099.86 1099.86 0.00 |
| 33.00 kV
5.61 -0.00 -0.00 0.00 |
|
3.34 0.64 0.60 0.05 |
| 66.00 kV
16.68 0.00 0.00 0.00 |
|
-188.77 19.32 19.32 0.00 |
| 220.00 kV
1.24 0.00 0.00 0.00 |
|
-5.63 -0.34 -0.34 0.00 |
| COAST
0.10 0.07 0.07 -0.00 |
|
1.86 -7.35 0.16 -7.51 |
| NEAST
-1.54 0.09 0.09 0.00 |
|
-10.97 -1.23 0.19 -1.43 |
| MOUNT KENYA
20.37 0.38 0.38 0.00 |
|
-3.14 -0.56 0.85 -1.41 |
| HYDROS
1.26 2.26 2.26 0.00 |
|
-34.25 1.15 5.12 -3.97 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 220.00 0.00 0.00 0.00 0.00 0.00
4.53 4.53 0.00 |
| 0.00 0.00 0.00 0.00 0.00
18.60 26.05 -7.44 |
| 11.00 kV
32.31 0.00 0.00 0.00 |
|
-140.53 -1076.07 -1076.07 0.00 |
| 66.00 kV
157.06 0.00 0.00 0.00 |
|
-27.61 13.79 13.79 0.00 |
| 132.00 kV
-1.24 0.00 0.00 0.00 |
|
5.29 -0.34 -0.34 0.00 |
| GEOTHERMAL
-89.50 10.13 10.13 -0.00 |
|
342.79 80.09 86.47 -6.38 |
| COAST
-0.00 0.00 0.00 0.00 |
|
0.00 -0.00 0.00 -0.00 |
| HYDROS
-107.90 8.20 8.20 -0.00 |
|
-251.06 17.03 47.14 -30.12 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Total: 102.35 0.00 287.22 0.00 0.00
-201.78 16.91 16.91 -0.00 |
| 305.95 0.00 106.71 0.00 0.00
41.55 157.69 183.35 -25.66 |
| GEOTHERMAL
-89.50 10.13 10.13 -0.00 |
|
342.79 80.09 86.47 -6.38 |
| COAST
0.10 0.07 0.07 -0.00 |
|
1.86 -7.35 0.16 -7.51 |
| NEAST
-1.54 0.09 0.09 0.00 |
|
-10.97 -1.23 0.19 -1.43 |
| MOUNT KENYA
20.37 0.38 0.38 0.00 |
|
-3.14 -0.56 0.85 -1.41 |
| HYDROS
-106.64 10.46 10.46 -0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Area: NAIROBI | Study Case: Study Case
| Annex: / 54 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
|
-285.32 18.18 52.27 -34.09 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Area: COAST | Study Case: Study Case
| Annex: / 55 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 11.00 156.38 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 107.21 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 33.00 kV
-20.20 0.00 0.00 0.00 |
|
-13.71 -2.55 -2.55 0.00 |
| 132.00 kV
176.57 -0.00 -0.00 0.00 |
|
120.75 45.60 45.60 0.00 |
| 220.00 kV
0.01 -0.00 -0.00 0.00 |
|
0.17 -0.00 -0.00 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 33.00 0.00 0.00 171.31 -0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 100.13 -4.23 0.00
0.00 0.00 0.00 |
| 11.00 kV
25.65 0.00 0.00 0.00 |
|
14.78 -3.36 -3.36 0.00 |
| 132.00 kV
-181.79 -0.00 -0.00 0.00 |
|
-105.56 18.77 18.76 0.01 |
| 220.00 kV
-15.16 -0.00 -0.00 0.00 |
|
-6.01 0.73 0.73 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 132.00 0.00 0.00 0.00 0.00 0.00
2.23 2.23 0.00 |
| 0.00 0.00 0.00 0.00 0.00
-2.33 4.85 -7.18 |
| 11.00 kV
-182.02 -0.00 -0.00 0.00 |
|
-79.39 45.78 45.78 0.00 |
| 33.00 kV
181.79 -0.00 -0.00 0.00 |
|
124.33 18.77 18.76 0.01 |
| 220.00 kV
-2.07 0.00 0.00 0.00 |
|
-38.23 0.99 0.99 0.00 |
| NAIROBI
-0.10 0.07 0.07 -0.00 |
|
-1.86 -7.35 0.16 -7.51 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Area: COAST | Study Case: Study Case
| Annex: / 56 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 220.00 0.00 0.00 0.00 0.00 0.00
0.35 0.35 0.00 |
| 0.00 0.00 0.00 0.00 0.00
-34.58 1.43 -36.00 |
| 11.00 kV
-0.01 -0.00 -0.00 0.00 |
|
-0.17 -0.00 -0.00 0.00 |
| 33.00 kV
15.16 -0.00 -0.00 0.00 |
|
6.74 0.73 0.73 0.00 |
| 132.00 kV
2.07 0.00 0.00 0.00 |
|
39.22 0.99 0.99 0.00 |
| NAIROBI
0.00 0.00 0.00 0.00 |
|
-0.00 -0.00 0.00 -0.00 |
| HYDROS
-17.56 0.57 0.57 0.00 |
|
-11.21 -43.14 2.35 -45.49 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Total: 156.38 0.00 171.31 -0.00 0.00
-17.59 2.67 2.67 0.00 |
| 107.21 0.00 100.13 -4.23 0.00
-13.67 24.09 69.37 -45.29 |
| NAIROBI
-0.10 0.07 0.07 -0.00 |
|
-1.86 -7.35 0.16 -7.51 |
| HYDROS
-17.56 0.57 0.57 0.00 |
|
-11.21 -43.14 2.35 -45.49 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Area: GEOTHERMAL | Study Case: Study Case
| Annex: / 57 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 11.00 250.88 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 219.72 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 66.00 kV
118.17 0.00 0.00 0.00 |
|
143.14 28.82 28.82 0.00 |
| 132.00 kV
120.79 0.00 0.00 0.00 |
|
342.11 92.35 92.35 0.00 |
| 220.00 kV
11.92 0.00 0.00 0.00 |
|
-265.53 250.51 250.51 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 33.00 0.00 0.00 4.77 0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 1.62 0.00 0.00
0.00 0.00 0.00 |
| 132.00 kV
-4.77 -0.00 -0.00 0.00 |
|
-1.62 0.12 0.12 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 66.00 0.00 0.00 46.59 0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 11.29 0.00 0.00
0.00 0.00 0.00 |
| 11.00 kV
-118.17 0.00 0.00 0.00 |
|
-114.32 28.82 28.82 0.00 |
| 220.00 kV
71.58 -0.00 -0.00 0.00 |
|
103.04 26.64 26.64 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 132.00 0.00 0.00 0.00 0.00 0.00
3.26 3.26 0.00 |
| 0.00 0.00 0.00 0.00 0.00
16.64 17.36 -0.72 |
| 11.00 kV
-120.79 0.00 0.00 0.00 |
|
-249.76 92.35 92.35 0.00 |
| 33.00 kV
4.77 -0.00 -0.00 0.00 |
|
1.74 0.12 0.12 0.00 |
| 220.00 kV
15.19 0.00 0.00 0.00 |
|
225.02 56.65 56.65 0.00 |
| WESTERN
72.87 4.32 4.32 -0.00 |
|
2.59 3.33 8.55 -5.21 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Area: GEOTHERMAL | Study Case: Study Case
| Annex: / 58 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 220.00 0.00 0.00 0.00 -0.00 0.00
3.80 3.80 0.00 |
| 0.00 0.00 0.00 0.00 0.00
19.40 24.62 -5.22 |
| 11.00 kV
-11.92 0.00 0.00 0.00 |
|
516.04 250.51 250.51 0.00 |
| 66.00 kV
-71.58 -0.00 -0.00 0.00 |
|
-76.40 26.64 26.64 0.00 |
| 132.00 kV
-15.19 0.00 0.00 0.00 |
|
-168.37 56.65 56.65 0.00 |
| NAIROBI
89.50 10.13 10.13 -0.00 |
|
-342.79 80.09 86.47 -6.38 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Total: 250.88 0.00 51.36 -0.00 0.00
187.07 12.45 12.45 -0.00 |
| 219.72 0.00 12.91 0.00 0.00
-336.43 518.69 531.01 -12.31 |
| NAIROBI
89.50 10.13 10.13 -0.00 |
|
-342.79 80.09 86.47 -6.38 |
| WESTERN
72.87 4.32 4.32 -0.00 |
|
2.59 3.33 8.55 -5.21 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Area: HYDROS | Study Case: Study Case
| Annex: / 59 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 11.00 74.45 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 164.44 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 132.00 kV
76.96 -0.00 -0.00 0.00 |
|
166.98 18.39 18.39 0.00 |
| 220.00 kV
-2.51 0.00 0.00 0.00 |
|
-2.54 0.02 0.02 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 15.00 145.12 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 245.90 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 132.00 kV
124.75 -0.00 -0.00 0.00 |
|
108.74 12.09 12.09 0.00 |
| 220.00 kV
20.37 -0.00 -0.00 0.00 |
|
137.15 18.54 18.54 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 132.00 0.00 0.00 0.00 0.00 0.00
0.60 0.60 0.00 |
| 0.00 0.00 0.00 0.00 0.00
1.27 3.37 -2.10 |
| 11.00 kV
-76.96 -0.00 -0.00 0.00 |
|
-148.59 18.39 18.39 0.00 |
| 15.00 kV
-124.75 -0.00 -0.00 0.00 |
|
-96.65 12.09 12.09 0.00 |
| 220.00 kV
116.92 0.00 0.00 0.00 |
|
142.36 23.25 23.25 0.00 |
| NAIROBI
-1.26 2.26 2.26 0.00 |
|
34.25 1.15 5.12 -3.97 |
| MOUNT KENYA
72.78 4.26 4.26 0.00 |
|
63.05 1.33 9.28 -7.95 |
| NEAST
8.39 0.03 0.03 0.00 |
|
2.95 -1.04 0.07 -1.11 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Area: HYDROS | Study Case: Study Case
| Annex: / 60 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 220.00 0.00 0.00 0.00 0.00 0.00
0.55 0.55 0.00 |
| 0.00 0.00 0.00 0.00 0.00
-0.99 2.29 -3.28 |
| 11.00 kV
2.51 0.00 0.00 0.00 |
|
2.56 0.02 0.02 0.00 |
| 15.00 kV
-20.37 -0.00 -0.00 0.00 |
|
-118.61 18.54 18.54 0.00 |
| 132.00 kV
-116.92 0.00 0.00 0.00 |
|
-119.11 23.25 23.25 0.00 |
| NAIROBI
107.90 8.20 8.20 -0.00 |
|
251.06 17.03 47.14 -30.12 |
| COAST
17.56 0.57 0.57 0.00 |
|
11.21 -43.14 2.35 -45.49 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Total: 219.57 0.00 0.00 0.00 0.00
205.37 14.20 14.20 -0.00 |
| 410.34 0.00 0.00 0.00 0.00
362.52 47.82 136.78 -88.96 |
| NAIROBI
106.64 10.46 10.46 -0.00 |
|
285.32 18.18 52.27 -34.09 |
| MOUNT KENYA
72.78 4.26 4.26 0.00 |
|
63.05 1.33 9.28 -7.95 |
| COAST
17.56 0.57 0.57 0.00 |
|
11.21 -43.14 2.35 -45.49 |
| NEAST
8.39 0.03 0.03 0.00 |
|
2.95 -1.04 0.07 -1.11 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Area: NEAST | Study Case: Study Case
| Annex: / 61 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 33.00 0.00 0.00 6.59 0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 4.24 0.00 0.00
0.00 0.00 0.00 |
| 132.00 kV
-6.59 0.00 0.00 0.00 |
|
-4.24 0.05 0.05 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 132.00 0.00 0.00 0.00 0.00 0.00
0.22 0.22 0.00 |
| 0.00 0.00 0.00 0.00 0.00
-11.27 0.50 -11.77 |
| 33.00 kV
6.59 0.00 0.00 0.00 |
|
4.29 0.05 0.05 0.00 |
| HYDROS
-8.39 0.03 0.03 0.00 |
|
-2.95 -1.04 0.07 -1.11 |
| NAIROBI
1.54 0.09 0.09 0.00 |
|
10.97 -1.23 0.19 -1.43 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Total: 0.00 0.00 6.59 0.00 0.00
-6.85 0.25 0.25 0.00 |
| 0.00 0.00 4.24 0.00 0.00
8.03 -12.27 0.62 -12.89 |
| HYDROS
-8.39 0.03 0.03 0.00 |
|
-2.95 -1.04 0.07 -1.11 |
| NAIROBI
1.54 0.09 0.09 0.00 |
|
10.97 -1.23 0.19 -1.43 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Area: WESTERN | Study Case: Study Case
| Annex: / 62 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 11.00 27.85 0.00 3.62 0.00 0.00
0.00 0.00 0.00 |
| -12.35 0.00 2.23 0.00 0.00
0.00 0.00 0.00 |
| 33.00 kV
17.54 0.00 0.00 0.00 |
|
0.00 6.01 6.01 0.00 |
| 132.00 kV
-17.91 -0.00 -0.00 0.00 |
|
4.72 0.56 0.56 0.00 |
| 220.00 kV
24.60 -0.00 -0.00 0.00 |
|
-19.30 0.11 0.11 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 33.00 0.00 0.00 101.84 0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 62.70 -5.66 0.00
0.00 0.00 0.00 |
| 11.00 kV
-17.54 0.00 0.00 0.00 |
|
6.01 6.01 6.01 0.00 |
| 132.00 kV
-84.30 -0.00 -0.00 0.00 |
|
-63.05 13.31 13.31 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 132.00 0.00 0.00 2.05 0.00 28.18
15.23 15.23 -0.00 |
| 0.00 0.00 1.26 0.00 86.39
3.95 33.37 -29.42 |
| 11.00 kV
17.91 -0.00 -0.00 0.00 |
|
-4.15 0.56 0.56 0.00 |
| 33.00 kV
84.30 -0.00 -0.00 0.00 |
|
76.36 13.31 13.31 0.00 |
| 220.00 kV
-24.37 0.00 0.00 0.00 |
|
8.54 0.42 0.42 0.00 |
| GEOTHERMAL
-72.87 4.32 4.32 -0.00 |
|
-2.59 3.33 8.55 -5.21 |
| MOUNT KENYA
1.60 0.00 0.00 0.00 |
|
1.04 -1.35 0.01 -1.36 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Area: WESTERN | Study Case: Study Case
| Annex: / 63 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 220.00 0.00 0.00 0.00 0.00 0.00
0.23 0.23 0.00 |
| 0.00 0.00 0.00 0.00 0.00
-11.29 0.95 -12.23 |
| 11.00 kV
-24.60 -0.00 -0.00 0.00 |
|
19.40 0.11 0.11 0.00 |
| 132.00 kV
24.37 0.00 0.00 0.00 |
|
-8.12 0.42 0.42 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Total: 27.85 0.00 107.51 0.00 28.18
-71.27 19.78 19.78 -0.00 |
| -12.35 0.00 66.19 -5.66 86.39
-1.56 15.06 63.28 -48.22 |
| GEOTHERMAL
-72.87 4.32 4.32 -0.00 |
|
-2.59 3.33 8.55 -5.21 |
| MOUNT KENYA
1.60 0.00 0.00 0.00 |
|
1.04 -1.35 0.01 -1.36 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Area: MOUNT KENYA | Study Case: Study Case
| Annex: / 64 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Volt. Generation Motor Load Compen- External
Power Total Load Noload |
| Level Load sation Infeed Interchange
Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to
[MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| 11.00 2.94 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| -11.75 0.00 0.00 0.00 0.00
0.00 0.00 0.00 |
| 132.00 kV
2.94 0.00 0.00 0.00 |
|
-11.75 0.47 0.47 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 33.00 0.00 0.00 70.70 0.00 0.00
0.00 0.00 0.00 |
| 0.00 0.00 42.53 0.00 0.00
0.00 0.00 0.00 |
| 132.00 kV
-70.70 -0.00 -0.00 0.00 |
|
-42.53 4.57 4.57 0.00 |
-----------------------------------------------------------------------------------
------------------------------------------------
| 132.00 0.00 0.00 22.58 0.00 0.00
1.80 1.80 0.00 |
| 0.00 0.00 14.15 0.00 0.00
-13.09 3.91 -17.00 |
| 11.00 kV
-2.94 0.00 0.00 0.00 |
|
12.22 0.47 0.47 0.00 |
| 33.00 kV
70.70 -0.00 -0.00 0.00 |
|
47.10 4.57 4.57 0.00 |
| NAIROBI
-20.37 0.38 0.38 0.00 |
|
3.14 -0.56 0.85 -1.41 |
| HYDROS
-72.78 4.26 4.26 0.00 |
|
-63.05 1.33 9.28 -7.95 |
| WESTERN
-1.60 0.00 0.00 0.00 |
|
-1.04 -1.35 0.01 -1.36 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Total: 2.94 0.00 93.28 0.00 0.00
-94.75 4.40 4.40 0.00 |
| -11.75 0.00 56.67 0.00 0.00
-60.94 -7.48 14.86 -22.34 |
| NAIROBI
-20.37 0.38 0.38 0.00 |
|
3.14 -0.56 0.85 -1.41 |
| HYDROS
-72.78 4.26 4.26 0.00 |
|
-63.05 1.33 9.28 -7.95 |
| WESTERN
-1.60 0.00 0.00 0.00 |
|
-1.04 -1.35 0.01 -1.36 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.2 | Date: 11/8/2017 |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid
Interchange, Zone Interchange, Area Interchan |
-----------------------------------------------------------------------------------
------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model
Adaptation for Convergence Yes |
| Automatic Tap Adjust of Transformers Yes | Max. Acceptable
Load Flow Error for |
| Consider Reactive Power Limits Yes | Nodes
1.00 kVA |
| | Model
Equations 0.10 % |
-----------------------------------------------------------------------------------
------------------------------------------------
-----------------------------------------------------------------------------------
------------------------------------------------
| Area Summaries | Study Case: Study Case
| Annex: / 65 |
-----------------------------------------------------------------------------------
------------------------------------------------
| Generation Motor Load Compen- External Inter
Area Total Load Noload |
| Load sation Infeed
Flow Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/
[MW]/ [MW]/ [MW]/ [MW]/ |
| [Mvar] [Mvar] [Mvar] [Mvar] [Mvar]
[Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------
------------------------------------------------
| \admin\Kenya Power Transmission\Network Model\Network Data\Areas\NAIROBI
|
| 102.35 0.00 287.22 0.00 0.00
-201.78 16.91 16.91 -0.00 |
| 305.95 0.00 106.71 0.00 0.00
41.55 157.69 183.35 -25.66 |
-----------------------------------------------------------------------------------
------------------------------------------------
| \admin\Kenya Power Transmission\Network Model\Network Data\Areas\COAST
|
| 156.38 0.00 171.31 -0.00 0.00
-17.59 2.67 2.67 0.00 |
| 107.21 0.00 100.13 -4.23 0.00
-13.67 24.09 69.37 -45.29 |
-----------------------------------------------------------------------------------
------------------------------------------------
| \admin\Kenya Power Transmission\Network Model\Network Data\Areas\GEOTHERMAL
|
| 250.88 0.00 51.36 -0.00 0.00
187.07 12.45 12.45 -0.00 |
| 219.72 0.00 12.91 0.00 0.00
-336.43 518.69 531.01 -12.31 |
-----------------------------------------------------------------------------------
------------------------------------------------
| \admin\Kenya Power Transmission\Network Model\Network Data\Areas\HYDROS
|
| 219.57 0.00 0.00 0.00 0.00
205.37 14.20 14.20 -0.00 |
| 410.34 0.00 0.00 0.00 0.00
362.52 47.82 136.78 -88.96 |
-----------------------------------------------------------------------------------
------------------------------------------------
| \admin\Kenya Power Transmission\Network Model\Network Data\Areas\NEAST
|
| 0.00 0.00 6.59 0.00 0.00
-6.85 0.25 0.25 0.00 |
| 0.00 0.00 4.24 0.00 0.00
8.03 -12.27 0.62 -12.89 |
-----------------------------------------------------------------------------------
------------------------------------------------
| \admin\Kenya Power Transmission\Network Model\Network Data\Areas\WESTERN
|
| 27.85 0.00 107.51 0.00 28.18
-71.27 19.78 19.78 -0.00 |
| -12.35 0.00 66.19 -5.66 86.39
-1.56 15.06 63.28 -48.22 |
-----------------------------------------------------------------------------------
------------------------------------------------
| \admin\Kenya Power Transmission\Network Model\Network Data\Areas\MOUNT KENYA
|
| 2.94 0.00 93.28 0.00 0.00
-94.75 4.40 4.40 0.00 |
| -11.75 0.00 56.67 0.00 0.00
-60.94 -7.48 14.86 -22.34 |
-----------------------------------------------------------------------------------
------------------------------------------------
0.00 0.00 4.24 0.00 0.00 8.03
-12.27 0.62 -12.89 |

Вам также может понравиться