Вы находитесь на странице: 1из 3

TUGAS KELOMPOK

BAHASA INGGRIS KESEHATAN

OLEH
KELOMPOK VIII
KELAS B2 / SEMESTER I

YUNITA FLORENCA 173112540120158


ANDI ANJELIATI 173112540120183
WILDA RIANTI 173112540120184
KAROLINA N. KRISTY 173112540120332

FAKULTAS ILMU KESEHATAN


PROGRAM STUDI DIV BIDAN PENDIDIK
UNIVERSITAS NASIONAL
JAKARTA
2017
Passive Voice Exercises

Practicing I
Read the paired sentences aloud. Write "A" in the blank beside the sentence in the
active voice, "P" in the blank beside the sentence in the passive voice.
a. A Louise made the coffee.
b. P The coffee was made by Louise.
c. P The package was advertised by the travel agent.
d. A The travel agent advertised the package.

Practicing II
Rewrite these sentences to put them in the active voice.
a. The sugar water was relished by the hummingbirds.
Answer : The hummingbirds relished the sugar water.
b. Jogging is done by many people for exercise.
Answer : Many people done jogging for exercise.
c. A standing ovation was given to the guitar player.
Answer : The guitar player given a standing ovation.
d. The syllabus was handed out by the professor.
Answer : The professor handed out the syllabus.

Practicing III
Using either a computer or a piece of scratch paper, rewrite the following paragraph
in the active voice.
Last summer our house was painted by me. The job took about two weeks.
First, the exterior was washed using warm water and a mild detergent. Then
all the chinks and pores in the walls were sealed with putty. After the putty had
had a chance to dry, the exterior could be painted. A latex paint was used
because it is easy to apply and cleans up with water. A whole week was
needed to finish this part of the job. I was very careful to apply the paint evenly
because I did not want to have to apply two coats. A color was used that was
very close to the original color. Our house is a two-story house, which meant
that a tall ladder was needed to do the second story. The paint can had to be
balanced on the top rung of the ladder while I worked. When the job was
finished, a great deal of satisfaction was felt by me. I had to pat myself on the
back. Even my dad said that a good job was done.

Answer :
Last summer I painted our house. The job took about two weeks. First,
washed the exterior using warm water and a mild detergent. Then sealed all
the chinks and pores in the walls with putty. Painted the exterior after the
putty had had a chance to dry. used a latex paint because it is easy to apply
and cleans up with water. To finish this part of the job needed a whole week. I
was very careful to apply the paint evenly because I did not want to have to
apply two coats. used a color that was very close to the original color. Our
house is a two-story house, which meant to do the second story needed a tall
ladder. I worked while can balanced the paint on the top rung of the ladder. I
felt a great deal of satisfaction when the job was finished. I had pat myself on
the back. Even my dad said that I done a good job.

Вам также может понравиться