E 1 C1 E C
d1 d2
D1 D
6) Floor thickness
The maximum static head will occur on the floor when there is no flow in the canal
The maximum static head = 2.18 m
At 1.5 m from d.s. end
Unbalanced head =(65.02-48.45)/100*2.18*1.50/10.00+48.45*2.18/100 = 1.11 m
Up lift pressure = 1000 * 1.11 = 1111.42 kg/sqm
Slab weight = 2500* 0.25 = 625.00 kg/sqm
Net uplift pressure = 486.42 kg/sqm
Mr = w*l2/12 = 2052065 Nmm
for c=7,j=0.289, k=0.904, Rb =1/2xc x j x k 0.914
d = ( Mr/Rb*b)0.5 47 mm
say 100 mm
Provide cover on top of slab 50 mm, so total thickness is = 150 mm
Floor thickness provided = 250 mm
77.581
77.381
77.181 75.699 76.981
75.199 2
250 1 74.999
1200 250 1200
300
300
8500 1500
8) Downstream Protection : shall be provided to cater a scoure of D2= 1.2 m below the floor
Block Protection (dimension in roundup values)
8.1) Chute Blocks Height y1 = 0.2 m
spacing s=y1 0.2 m
end block spacing =y1/2 0.1 m
8.2) Baffle Blocks Height=0.2*y2 0.5 m
spacing =0.75*D2 0.9 m
Spacing Between block rows=0.8*D2 1.0 m
8.3) End Sills: Continuous End Sills are to be provided
=d/s floor level -cistern level 0.000 m
9) CR Gate:
Nos. 4
Width of Each Gate=each water way+.1+.1 2.45 m
Height of Each Gate=FSL-Crest Level+.1+.2 1.79 m
Design of Head Regulator
Design of Secondary head regulator
1) Fixation of crest level & waterway
The crestlevel of Intake shall be 0.3 m higher than its floor level
u/s floor level = bed level of Parent canal 75.199 m
crest level = 75.499 m
Waterway shall be worked out with the following formula
Q = C*Be*He3/2
hd = 0.3 m
He = 1.682 m
hd/He = 0.18 m
Ratio modified coefficient to free discharge = 0.920 (from fig 6.5)
Thus the coefficient of discharge = 1.705
Required Water Way, Be = 0.30 m
Minimum clear water =60% of Intake width = 0.90 m
Provide clear waterway = 1.50 Same as Intake Canal Bed Width
2) Level & length of d/s floor
Q= 0.975 cumecs
discharge intensity (q) = 0.650 cumecs/m
Head loss = 0.3 m
Ef2 = 0.539
D/s floor level = 76.342 m
Bed level = 76.025 m
Adopt cistern level 75.925 m
Ef1 = Ef2+HL = 0.839 m
y1 = 0.078
y2 = 0.416
Cistern length require, Lc = 5(y2 -y1) = 1.69 m
Provide Lc = 4.5 m
3) Vertical cut-offs
d1 = 1 (refer table 6.1 of v. & Gupta)
d2 = 1 (refer table 6.1 of v. & Gupta)
Provide d/s cut-off = 1 m
U/s cut-off level 74.199 m
D/s cut-off level 75.025 m
4) Total floor length & Exit gradient
Maximum static head (H) = u/s water level - d/s floor level
H= 1.16 m Ge = H/dx1/Lamda
1/Lamda = 0.173
for this value of 1/Lamda , = 5.00 From Khosla pressure curve
Total floor length required = d2 = 5.00 m
Provide total floor length = 10.00 m
Total floor length should be provided as given below
Cistern floor length = 4.50 m
D/s glacis length with 2:1 slope= -0.85 m
Crest width = 0.50 m
u/s glacis with 1:1 slope = 0.30 m
U/s floor length= 5.55 m
Total = 10.00 m
5) Pressure calculations
a) U/s cut-off
d= 1
b= 10
= 10.000 = (1+(1+2)0.5)/2 5.53
100-1/*Cos-1((-1)/)=D = 88.90 %
c = 20.00 %
D -c = 68.9 %
assume u/s floor thickness near cut-off 0.25 m
c correction due to floor thickness = 17.23 % (+ve)
c corrected 37.23 %
(correction of interference of d.s. cut-off may be neglected)
b) D/s cut-off
d= 1
b= 10
1/ = d/b = 10.000 = (1+(1+2)0.5)/2 5.53
1/*Cos-1((-2)/)=E = 16.00 %
1/*Cos-1((-1)/)=D = 11.10 %
E -D = 4.9 %
assume d/s floor thickness near cut-off = 0.25 m
E correction due to floor thickness = 1.23 % (-ve)
E corrected 14.78 %
(correction of interference of d.s. cut-off may be neglected)
E 1 C1 E C
d1 d2
D1 D
6) Floor thickness
The maximum static head will occur when FSL is maintained in u/s but no water in secondary canal
The maximum static head = 1.16 m
At 4.5 m from d.s. end
Unbalanced head =(37.23-14.78)/100*1.16*4.50/10.00+14.78*1.16/100 = 0.29 m
Up lift pressure = 1000 * 0.29 = 287.58 kg/sqm
Slab weight= 2500* 0.25 = 625.00 kg/sqm
Net uplift pressure = 0.00 kg/sqm
Mr = w*l2/12 = 0 Nmm
d = ( Mr/Rb*b)0.5 = 0 mm
say 170 mm
Provide cover on top of slab 30 mm, so total thickness is = 200 mm
Floor thickness provided = 250 mm
At 0.30 m from d.s. end
Unbalanced head =(14.78*1.16/100) = 0.17 m
Up lift pressure = 1000 * 0.17 = 170.80 kg/sqm
Slab weight = 2500* 0.25 = 625.00 kg/sqm
Net uplift pressure = 0.00 kg/sqm
Mr = w*l2/12 Mr = 0 Nmm
d = ( Mr/Rb*b)0.5 = 0 mm
say, d = 170 mm
Provide cover on top of slab 30 mm, so total thickness is = 200 mm
Floor thickness required = 200 mm at end of floor
Provide 250 mm floor throughout the d/s floor
7) Reinforcement
Ast = Mr/(pst*jd)
Ast = 0/(230*0.904*)250= 0 mm2
Calculation of minimum reinforcement > 0.25% Ac.
Ast =0.25% Ac =0.25/100*1000*250= 625 mm2
Maximun area of reinforcement 625 mm2
Spacing of 12 mm dia bar = 181 mm
provide 12 mm dia bar @ 150 mm c/c across the floor
Area provide 753.6 mm2 OK
Distribution steel
Bottom mat steel is greater of
0.10% Ac = 250 mm2
or 20 % Ast 151 mm2
Provide 250 mm2.
Choose 8 mm bars 201 mm centres
Provide 8 mm bars @ 150 mm centres
Area provide 334.93333 mm2 OK
77.681
77.181
77.181 75.499 76.881
500
75.199 2 76.025
250 1 75.925
1000 250 1000
300
300
5500 4500
Ef1 y1+q2/(y12*2*g)
Ef1 0.739 m
Ef2 Ef1 -HL
Ef2=y2+(q2/(y22*2*g) = 0.539 m
Post jump depth, y2 = {-1+(1+8F12)1/2}*y1/2 0.416
Check for headloss, HL: 0.29943726 0.2
Final values:
y1 = 0.078
y2 = 0.416
Ef1 = 0.739
Ef2 = 0.539
Ef1-Ef2 = 0.200 0.2 OK
GE = H/dx1/
= (H/(xGExd))
2
= ((2-1)2-1)0.5
GE = 0.2
d= 1
H= 0.604
= 0.925027
= #VALUE!