F.Y. 2067/68
2 Aqueduct Abutment
4 Bridge Beams
5 Bridge Slab
6 Kerb
7 Parapet
Main Bars 10 10 226 1 226 0.62
8 Aqueduct Beams
9 Trough Slab
10 Trough Wall
11 Approach Slab
886.38
516.2
3602.742
996.8
399.74
227.128
1397.526
313.28
1233.98
722.68
4314.102
996.8
995.904
239.232
528.84
1005.7
708.288
83.328
106.704
140.12
69.888
995.904
239.232
784.672
442.508
319.424
482.736
227.136
907.8
907.8
1835.82
1840.16
28468.554
Sunsari Morang Irrigation Project
Arrangement of Reinforcement
F.Y. 2067/68
Work: Construction of Aqueduct
Location: At Ch 17+988 of S14 Harinagara Branch Canal
Total
S. No. Description Diameter Spacing No Length
Length
1 Abutment (2 Nos.) 2.80 m Length
Main Bars in Base 16 20 56 3.50 196.00
Distribution Bars in Base 12 20 72 2.70 194.40
Main Bars in Wall 20 12 48 5.55 266.40
Main Bars in Wall 16 12 48 6.35 304.80
Distribution Bars in wall 12 12 164 2.70 442.80
2 Pier 1 No. 3.40 m. Length
Main Bars in Base 16 20 36 2.75 99.00
Distribution Bars in Base 12 20 30 1.50 45.00
Main Bars in pier 20 12 62 6.70 415.40
Distribution Bars in pier 8 15 36 7.40 266.40
3 wing walls (4 Nos.) 9 m Length
Main Bars in Base 16 20 360 3.10 1116.00
Distribution Bars in Base 10 20 128 8.90 1139.20
Main Bars in Wall 16 15 304 6.05 1839.20
Main Bars in Wall 16 15 304 7.75 2356.00
Distribution Bars in wall 10 15 280 4.80 1344.00
4 Right Side Beam
Main Bars 20 6 nos. in 3 36 8.80 316.80
rows
Side Bars 12 18 8 11.20 89.60
Stirrups 8 15 240 3.00 720.00
Spacer 20 150 14 0.45 6.30
5 Left Side Beam
Main Bars 20 7nos. in 42 8.80 369.60
3rows
Side Bars 12 18 8 11.20 89.60
Stirrups 8 15 240 3.00 720.00
Spacer 20 150 14 0.45 6.30
6 Trough and footpath Slab(Length 9.60)
Main Bars 12 12 81 3.25 263.25
Main Negative 12 12 81 2.60 210.60
Distribution Bars 10 15 23 9.55 219.65
7 Trough and footpath Wall
Main Bars 12 12 228 1.12 254.22
Distribution Bars 10 12 33 11.20 369.60
8 Canal Lining(2*10 m Length)
Main Bars in Bed and Side 10 20 102 6.30 642.60
Distribution Bars 10 20 64 10.00 640.00
Lap
Total
20 mm dia. Bars
16 mm dia. Bars
12 mm dia. Bars
10 mm dia. Bars
8 mm dia. Bars
Sunsari Morang Irrigation Project
Arrangement of Reinforcement
F.Y. 2067/68
Weight /m.
Total weight Remarks
Length
1.58 309.68
0.89 173.02
2.47 658.01
1.58 481.58
0.89 394.09
1.58 156.42
0.89 40.05
2.47 1026.04
0.39 103.90
1.58 1763.28
0.62 706.30
1.58 2905.94
1.58 3722.48
0.62 833.28
2.47 782.50
0.89 79.74
0.39 280.80
2.47 15.56
2.47 912.91
0.89 79.74
0.39 280.80
2.47 15.56
0.89 234.29
0.89 187.43
0.62 136.18
0.89 226.26
0.62 229.15
0.62 398.41
0.62 396.80
17530.21 Kg.
500.00
18030.21 Kg.
3512.89 Kg.
9619.56 Kg.
1457.07 Kg.
2781.13 Kg.
665.50 Kg.