BOQ of PLTU BENGKULU 2X100MW Civil Construction

Estimated Amount
No. Work Item Unit Remark
Quantity (Rp.)
1 Preparation Work
1.1 Mobilization Ls. 1.00
1.2 Demobilization Ls. 1.00 #REF!
1.3 Temporary facility Ls. 1.00
400,000
2 Ls. 1.00 #REF!
3 #REF! Ls. 1.00 #REF!
4 #REF! Ls. 1.00 #REF!
5 #REF! Ls. 1.00 #REF!
6 #REF! Ls. 1.00 #REF!
7 #REF! Ls. 1.00 #REF!
8 Chemical Building Foundation Civil Construction Ls. 1.00 #REF!
9 #REF! Ls. 1.00 #REF!

Totalexcluding VAT #REF!

10% VAT #REF!

Totalincluding VAT #REF!

The quantity in the above items mentioned is only an estimated figure which shall not be regarded as basis for final claim.


Estimated
No. Work Item Unit -RMB Direction Measurement
Quantity

1 Preparation Work
Including all survey and setting
1.1 Survey and Setting Out Ls. 1.00 - out works lump sum price

Including draining works, sloping
2 Earth Work - supporting and others
construction measurement.
Calculated base on
Disposal area within 1 km Radius,
2.1 Soil Excavation and Disposal m3 9,000 - confirmedcontractor
the subcontractor shall level the
survey data
Calculated base on
disposal material.
Incl. material and Compaction
confirmed survey
2.2 Backfill Gravel() m3 1 - 1 dataafter compacted)
Test

Calculated
base on
2.3 Backfill soil m3 1 - Incl. material and Test,
Compaction Compaction
the Test confirmed survey
materials shall excavated and dataafter compacted)
Calculated base on
2.4 Backfill soilMaterial supply by contractor m3 4 - transported from storage area confirmed survey
within 1KM Radius
dataafter compacted)
1
3 Concrete Work - Including
foundation cleaning,
form works, concrete pouring,
Plain concrete layer construction(C15) concrete curing etc. Concrete according to the detail
3.1 m3 191.00 - shall submit
Including formbyworks,
contractor
concrete design drawing
C15

pouring, concrete curing etc,
Raft foundation concrete Boiler foundation
concrete shall submit by according to the detail
3.2 m3 3700.00 -
contractor design drawing
Independent foundation, cushion cap Including form works, concrete

foundation, continuous beam including
pouring, concrete curing etc, according to the detail
3.3 m3 250.00 -
columns, etc.) concrete shall submit by design drawing
contractorform works, concrete
Including
pouring, concrete curing etc, according to the detail
3.4 m3 50.00 -
Ponds structure concrete construction concrete shall submit by design drawing
Including
contractorform works, concrete
pouring, concrete curing etc, according to the detail
3.5 Ditch concrete construction m3 30.00 -
concrete shall submit by design drawing
contractor
Material supplied by
according to the detail
3.6 Asphalt coatingIf required
3000.00 - subcontractor design drawing


Estimated
No. Work Item Unit -RMB Direction Measurement
Quantity PHC600 Pile cutting, the cut pipe
will remove to storage area
3.7 PHC Pile Cutting PHC pcs 277.00 - within 1KM
Piles hole Radius.phc600
cleaning, pile's hole
1
covered plate and rebar

fabrication, installation. The plate
3.8 PHC Pile Cap Fabrication PHC pcs 277.00 -
supply by subcontractor.

Including
material and others according to the detail
3.9 Grouting m3 10.00 -
works design drawing

4 Steel Work - Including rebar fabrication,


installation, and related
Steel Bar binding, machining, maintenance, etc. auxiliary materials.( including according to the detail
4.1 t 600.00 -
PHT rebars
Including embedded
plate, anchor design drawing
bolt, embedded pipe etc.
according to the detail
4.2 Embedded installation t 2.00 - material
PHT supply by contractor) design drawing

Including embedded plate, anchor
Embedded fabrication and installation bolt, embedded pipe etc. according to the detail
4.3 t 0.50 -
material supply by design drawing
subcontractor)

1 Preparation Work
Including all survey and setting
1.1 Survey and Setting Out Ls. 1.00 - out works

Including draining works, sloping
2 Earth Work - supporting and others
construction measurement.
Calculated base on
Disposal area within 1 km Radius,
2.1 Soil Excavation and Disposal m3 15,797 - confirmed survey data
the subcontractor shall level the

Calculated base on
disposal material.
Incl. material and Compaction
confirmed survey
2.2 Backfill Gravel m3 2,500 - 1 dataafter compacted)
Test

Calculated
base on
2.3 Backfill soil m3 1,500 - Incl. material and Test,
Compaction Compaction
the Test confirmed survey
materials shall excavated and dataafter compacted)
Calculated base on
Backfill soilMaterial supply by contractor transported from storage area
2.4 m3 5,000 - confirmed survey
within 1KM Radius dataafter compacted)
1


Estimated
No. Work Item Unit -RMB Direction Measurement
Quantity

3 Concrete Work - Including foundation cleaning,


form works, concrete pouring,
Plain concrete layer construction(C15) concrete curing etc. Concrete according to the detail
3.1 m3 169.71 - shall submit
Including byworks,
form contractor
concrete
C15 design drawing

pouring, concrete curing etc,
Raft foundation concretethe continue
concrete shall submit by according to the detail
3.2 m3 2690.07 -
square>20> 20 contractor design drawing
Independent foundation, cushion cap
Including form works, concrete
foundation, continuous beam including
pouring, concrete curing etc, according to the detail
3.3 m3 450.00 -
columns, etc.) concrete shall submit by design drawing
contractor
Including form works, concrete
pouring, concrete curing etc, according to the detail
3.4 m3 149.50 -
Ponds structure concrete construction concrete shall submit by design drawing
Including
contractorform works, concrete
Steam turbine column and plate Floor/Beam pouring, concrete curing etc, according to the detail
3.5 m3 450.00 -
concrete shall submit by design drawing
Including
contractorform works, concrete
pouring, concrete curing etc, according to the detail
3.6 Main building floor construction m3 600.00 -
concrete shall submit by design drawing
contractor
3000.00

m3 457.07
Including form works, concrete
pouring, concrete curing etc, according to the detail
3.7 Ditch concrete construction m3 100.00 -
concrete shall submit by design drawing
contractor
according to the detail
3.8 Asphalt coating 2500.00 - Material supplied by subcontrac design drawing
PHC600 Pile cutting, the cut pipe
will remove to storage area
3.9 PHC Pile Cutting PHC pc 400.00 - within 1KM
Piles hole Radius.phc600
cleaning, pile's hole
1
covered plate and rebar

fabrication, installation. The plate
3.10 PHC Pile Cap FabricationPHC pcs 400.00 -
supply by subcontractor.

Including
material and others according to the detail
3.11 Grouting m3 10.00 -
works design drawing

Estimated
No. Work Item Unit -RMB Direction Measurement
Quantity

4 Steel Work - Including rebar fabrication,


installation, and related
4.1 Steel Bar binding, machining, maintenance, etc. t 665.93 - auxiliary materials.( including according to the detail
PHT rebars design drawing

Including embedded plate, anchor
PHT
bolt, embedded pipe etc. according to the detail
4.2 Embedded installation t 10.00 - material supply by contractor)
design drawing

Including embedded plate, anchor
Embedded fabrication and installation bolt, embedded pipe etc. according to the detail
4.3 t 15.00 -
material supply by design drawing
subcontractor)
1.00 -

1.00 -

1.00 -

Totalexcluding VAT -

10% VAT -

Totalincluding VAT -

Total