Proper Use
Commissioning
Instruction Manual The device must only be used for the applications provided. To ensure
safe and reliable operation, the product must be properly transported,
Before commissioning, ensure that:
The distribution box has been installed in compliance with
stored, mounted and installed, and it must be operated and serviced regulations.
with appropriate care. The distribution box is not damaged.
EAPL is not responsible for any consequential damages arising out of The connection has been established properly.
use of our products, though the technology is cautiously chosen and The cables have been laid correctly.
implemented like any other well designed good electric control panels All screws have been tightened properly.
Selecting the installation location The distribution box functions properly.
ACDB-01 Maintenance and fault Clearance
Installation The operator of the distribution box must keep it in good
AC Distribution Box ! WARNING condition, monitor it and clean it regularly.
Within the scope of maintenance:
Danger of fatal electric shock Check distribution box, cable entries, sealings and cables
When working on the photovoltaic system, the section to be worked on regularly for cracks and damage.
must always be previously isolated to prevent the danger of the Make sure that they are properly established.
electric shock. The distribution box is defective if the encapsulation is
The specifications for installing the relevant system section must be damaged and/or if one of the components does not
carefully observed. function any longer.
EAPL Selecting the installation location In this case:
Replace defective parts in the encapsulation with original
Select a location that is protected from the weather and is easily
parts immediately.
accessible for installation work and later maintenance work.
Replace or repair the defective components with original
When selecting the location, ensure unauthorized personnel cannot
parts.(eg:cable glands, terminals)
access the distribution box.
The installation foundation area must be stable enough to allow Technical Specification
Introduction installation/maintenance work to proceed safely.
ACDBs are used for connections and distribution of incoming and When installing, ensure rain cannot penetrate the distribution box.
Function Distribution of power
The installation location must offer the option of horizontal
outgoing cables and wires with certified connecting or rail mounted
installation. The cable feed-through must be installed vertically, Rated Supply Voltage 230V AC
terminals. The feeders are fed into the ACDB with MCB of suitable leading down. The distribution box must not be installed horizontally
capacity. Proper rating of MCB shall be installed to protect the feeders with the cover uppermost. Power Capacity 2KWP
from short circuit current as per the requirements of the site. A separate The installation site must not be in close proximity to easily
Ambient Temperature -5C to 40C
change over switch of proper rating should be suitably installed in the inflammable materials, gases or vapors.
ACDB to isolate the existing connected load from solar system and cater The installation site must be inaccessible to rodents. The distribution CT operated digital multi function
box and especially the feeder conductors must be installed in such a Indicating Instruments
the power from the conventional system in case of emergency. meter to measure V,I,KW,PF etc.
way that damage cannot be caused by rodents.
eg: Lay feeder conductor in metal conduits. Surge
Safety Precautions Please take into account of the existing circulation of air when Protection(230V,1) 1.5kV
selecting the installation site.
Degree of Protection IP54
Photovoltaic systems can generate hazardous voltages. The installation engineer must decide on the basis of the installation
The installation job must only be carried out by qualified electricians height whether additional strain relief such as a cable propping bar, Enclosure Type Indoor,ABS,Wall Mounting
who are familiar with the system. is to be attached.
The requirements regarding the installation location and the Overall Dimension 450x350x200mm
Information on laying cables
installation itself must be taken into account. Insulation Resistance
Only use electrical cables rated for the voltages, currents and >100M ohm @500V DC
If the installation regulations are violated, all warranty and liability environmental conditions (temperature, UV, etc.)Expected at the
claims are void. 2.5kV AC,50Hz for 1minute.(Between
site of installation.
Unauthorized persons must not open the AC distribution box Ensure that cable laying is done with short-circuit protection and Dielectric Strength current carrying & non-current
ground fault protection. carrying parts)
The weight of the cables can subject the housing of mechanical
forces. For this reason, attach a strain relief underneath the
distribution box depending on the installation height. Disposition
Cable diameter selection depends upon the rating of the panel.
Connecting conductors Once the product life is over, you may send back the unit to EAPL for
Ensure there is sufficient strain relief for the main lines when installing. disposition.
Run the main lines through the cable glands into the housing interior.
Prepare the ends of fine-stranded and multi stranded conductors: Contact
Crimp wire end sleeves with suitable crimping tool in order to Electronic Automation Pvt. Ltd
achieve constant pressure quality. #20, KHB Industrial Area
Take care not to damage individual wires.
Yelahanka, Bangalore -560064
Tighten the metric cable glands.
Close all unused cable feed-troughs with filler plugs to prevent Ph: +91-80-28567561/2, /42802345
moisture penetrating the distribution box. Customer Care :-+91-80-42802323
Email: info@eaplindiamail.com,
www.eaplindia.com
CREATED ON: Feb 09,2017 OD RZ WN 060000 REV 00/09-02-17 Page 1 of 1

Вам также может понравиться