CALCULOS HIDRULICOS DE AGUA POTABLE

AGUA FRIA POTABLE.

DOTACIN DE AGUA POTABLE: (VER: R.N.E)

Primer Nivel: Restaurante


rea til = 845 m

rea (m2) Dotacin Parcial


Hasta 40 2000 L/d 40 = 2000
41 - 100 50 L/d/m 60 x 50 = 3000
Mayor 100 40 L/d/m 745 x 40 = 29800
Dotacin = 34800

Segundo Nivel: Departamentos


N Dorm../Dpto = 3
N Dptos = 10

N Dorm. / Dpto Dotacin / Dpto (L/d)


1 500
2 850
3 1200
4 1350
5 1500

10 x 1200 = 12000
Dotacin = 12000

Tercer Nivel: Departamentos


N Dorm../Dpto = 2
N Dptos = 10

N Dorm. / Dpto Dotacin / Dpto (L/d)


1 500
2 850
3 1200
4 1350
5 1500

10 x 850 = 8500
Dotacin = 8500

Cuarto Nivel: Departamentos


N Dorm../Dpto = 2
N Dptos = 10
N Dorm. / Dpto Dotacin / Dpto (L/d)
1 500
2 850
3 1200

4 1350
5 1500

10 x 850 = 8500
Dotacin = 8500
DOTACIN TOTAL DE AGUA PARA EL EDIFICIO:
AMBIENTE USO (Lit./da)

PRIMER NIVEL RESTAURANTE 34800


SEGUNDO NIVEL DEPARTAMENTOS 12000

TERCER NIVEL DEPARTAMENTOS 8500


CUARTO NIVEL DEPARTAMENTOS 8500
TOTAL 63800

Como el primer nivel es un sistema directo, no se incluye en la Dotacin.

:. DOTACIN = 29000 L/d

DOTACIN DE AGUA PARA RIEGO:

rea verde = 66.5 m

Dotacin = 2 L/d/m (Sin incluir reas pavimentadas u otras no sembradas)

2 x 66.5 = 133

Dotacin = 133

SERVICIO CONTRA INCENDIOS:


Todo edificio mayor de 15m de altura, debe tener obligatoriamente dispositivos
CONTRA INCENDIOS, para el uso de los ocupantes; o maniobra de los BOMBEROS.

Se dispone de la siguiente tabla:

LONG. Dimetro Perifrico Dimetro Boquilla Gasto N mangueras


Manguera (m) (pulg.) (pulg.) (L/s) c/(0.5 horas)
Menor a 20 1 1/2 1/2 3 2

20 a 45 2 3/4 4 2

0.5 x 3600 x 2 x 3 = 10800


Gabinete contra incendio =
0.5 x 3600 x 2 x 4 = 14400
Adoptamos una manguera de 40 m para cubrir toda el rea del edificio

:. VCI = 14400
A POTABLE

L/d
L/d
L/d
L/d

L/d
L/d

L/d
L/d
L/d
L/d
L/d

L/d

obra de los BOMBEROS.

N mangueras
c/(0.5 horas)
2

Lit.

Lit.
Lit.
DISEO HIDRULICO DE TUBERAS

CALCULO DE PRESIONES

TRAMO A-B B-C C- D D-E E-F


UNIDADES HUNTER 209.00 97.00 32.00 24.00 20.00
Q (Lt/seg) 3.432 2.520 1.590 1.420 1.330
(cm.) 3.81 3.81 3.81 3.81 3.81
DIMETRO
(pulg.) 1 1/2 1 1/2 1 1/2 1 1/2 1 1/2
VELOCIDAD (m/seg) 3.01 2.21 1.39 1.25 1.17
VELOCIDAD MAX. 3.05 3.05 3.05 3.05 3.05
LONGITUD (m) 17.08 0.88 14.98 5.90 4.42
Cantidad 1 1 2 1 1
90

Long. Equiv. 2.44 2.44 2.44 2.44 2.44


CODO

Sub total 2.44 2.44 4.88 2.44 2.44


Cantidad 0 0 0 0 0
45

Long. Equiv. 0 0 0 0 0
Sub total 0 0 0 0 0
Cantidad 0 0 0 0 0
RECTO
TEE

Long. Equiv. 0 0 0 0 0
Sub total 0 0 0 0 0
Cantidad 1 0 0 0 0
VLVULAY OTROS

COMP.

Long. Equiv. 0 0 0 0 0
Sub total 0 0 0 0 0
Cantidad 0 0 0 0 0
GLOBO

Long. Equiv. 0 0 0 0 0
Sub total 0 0 0 0 0
LONGITUD ADICIONAL 2.44 2.44 4.88 2.44 2.44
LONGITUD TOTAL 19.52 3.32 19.86 8.34 6.86
Sf (m/m) 0.205 0.111 0.044 0.035 0.031
PERDIDA DE CARGA 4.009 0.368 0.876 0.293 0.212
PRESIN DE SALIDA 12.4 0 0 0 0
PERDIDA CARGA EN MEDIDOR 0 0 0 0 0
PRESIN NECESARIA 16.409 16.042 15.166 14.873 14.661
F-G G-H H-I I-J
16.00 12.00 4.00 2.00
1.220 1.120 0.880 0.820
2.54 2.54 2.54 2.54
1 1 1 1
2.41 2.21 1.74 1.62
2.48 2.48 2.48 2.48
1.01 11.88 14.03 4.43
1 2 1 1
2.44 1.73 1.73 1.73
2.44 3.46 1.73 1.73
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 1
0 0 0 1.06
0 0 0 1.06
0 0 0 1
0 0 0 0.37
0 0 0 0.37
0 0 0 0
0 0 0 0
0 0 0 0
2.44 3.46 1.73 3.16
3.45 15.34 15.76 7.59
0.197 0.166 0.103 0.089
0.680 2.548 1.616 0.676
0 0 0 0
0 0 0 0
13.981 11.433 9.817 9.141
DISEO HIDRULICO DE TUBERAS

SEGUNDO NIVEL: CONSULTORIOS y OFICINAS


Vmax =5 m/s y Vmin =0.6m/s

TRAMO G-F F-E E-D D-C C-A


UNIDADES HUNTER 8.00 25.00 30.00 63.00 111.00
Q (Lt/seg) 1.000 1.430 1.550 2.140 2.630
(cm.) 3.18 3.18 3.18 3.18 3.81
DIMETRO
(pulg.) 1 1/4 1 1/4 1 1/4 1 1/4 1 1/2
VELOCIDAD (m/seg) 1.26 1.81 1.96 2.70 2.31

LONGITUD (m) 5.55 5.22 5.97 3.48 37.37


Cantidad 5 5 5 3 4
90

Long. Equiv. 1.2 1.2 1.2 1.2 1.5


CODO

Sub total 6 6 6 3.6 6


Cantidad 0 0 0 0 0
45

Long. Equiv. 0.8 0.8 0.8 0.8 0.9


Sub total 0 0 0 0 0
Cantidad 3 5 5 0 1
RECTO

Long. Equiv. 0.4 0.4 0.4 0.4 0.45


Sub total 1.2 2 2 0 0.45
Cantidad 0 0 0 1 1
COMP.

Long. Equiv. 0.25 0.25 0.25 0.25 0.3


VLVULA

Sub total 0 0 0 0.25 0.3


Cantidad 0 0 0 0 0
GLOBO

Long. Equiv. 10.5 10.5 10.5 10.5 13.5


Sub total 0 0 0 0 0
LONGITUD ADICIONAL #REF! #REF! #REF! #REF! #REF!
LONGITUD TOTAL #REF! #REF! #REF! #REF! #REF!
Sf (m/m) 0.043 0.089 0.104 0.199 0.121
PERDIDA DE CARGA #REF! #REF! #REF! #REF! #REF!
PRESIN DE SALIDA 0 0 0 0 0
PERDIDA CARGA EN MEDIDOR 0 0 0 0 5.127
PRESIN NECESARIA #REF! #REF! #REF! #REF! #REF!
DISEO HIDRULICO DE TUBERAS

TERCER0 AL QUINTO NIVEL: DEPARTAMENTOS


Vmax =5 m/s y Vmin =0.6m/s

TRAMO F-E E-D D-C C-A


UNIDADES HUNTER 9.00 9.00 15.00 19.00
Q (Lt/seg) 0.320 0.320 0.440 0.520
(cm.) 1.91 1.91 1.91 1.91
DIMETRO
(pulg.) 3/4 3/4 3/4 3/4
VELOCIDAD (m/seg) 1.12 1.12 1.54 1.82

LONGITUD (m) 4.24 3.44 0.41 47.89


Cantidad 4 4 1 5
90

Long. Equiv. 0.75 0.75 0.75 1.5


CODO

Sub total 3 3 0.75 7.5


Cantidad 0 0 0 0
45

Long. Equiv. 0.45 0.45 0.45 0.9


Sub total 0 0 0 0
Cantidad 3 1 0 0
RECTO

Long. Equiv. 0.25 0.25 0.4 0.45


Sub total 0.75 0.25 0 0
Cantidad 1 1 0 1
COMP.

Long. Equiv. 0.15 0.15 0.15 0.3


VLVULA

Sub total 0.15 0.15 0 0.3


Cantidad 0 0 0 0
GLOBO

Long. Equiv. 6.1 6.1 6.1 13.5


Sub total 0 0 0 0
LONGITUD ADICIONAL #REF! #REF! #REF! #REF!
LONGITUD TOTAL #REF! #REF! #REF! #REF!
Sf (m/m) 0.057 0.057 0.108 0.151
PERDIDA DE CARGA #REF! #REF! #REF! #REF!
PRESIN DE SALIDA 0 0 0 0
PERDIDA CARGA EN MEDID 0 0 0 1.04
PRESIN NECESARIA #REF! #REF! #REF! #REF!
SEGUNDO NIVEL: DEPARTAMENTOS
Vmedia = 1.2 m/s

TRAMO I-H H-G G-F F-E E-D D-C


UNIDADES HUNTER 4 6 16 22 40 58
Q (Lt/seg) 0.160 0.250 0.460 0.580 0.910 1.220
(cm.) 1.303 1.629 2.209 2.481 3.107 3.598
DIMETRO
(pulg.) 1/2 1/2 3/4 3/4 1 1 1/2
LONGITUD (m) 7.80 2.25 1.25 4.20 16.00 16.00
Cantidad 6 0 0 4 0 0
90

Long. Equiv. 0.74 0.74 1.08 1.08 1.42 2.16


CODO

Sub total 4.44 0 0 4.32 0 0


Cantidad 0 0 0 0 0 0
45

Long. Equiv. 0.25 0.25 0.36 0.36 0.48 0.72


Sub total 0 0 0 0 0 0
Cantidad 0 0 1 1 0 0
TEE

90

Long. Equiv. 1.06 1.06 1.55 1.55 2.04 3.11


Sub total 0 0 1.55 1.55 0 0
Cantidad 1 1 0 0 1 1
RECTO

Long. Equiv. 0.35 0.35 0.52 0.52 0.68 1.04


Sub total 0.35 0.35 0 0 0.68 1.04
Cantidad 1 0 0 1 0 0
VLVULA

COMP.

Long. Equiv. 0.11 0.11 0.16 0.16 0.22 0.33


Sub total 0.11 0 0 0.16 0 0
Cantidad 0 0 0 0 0 0
GLOBO

Long. Equiv. 5.91 5.91 8.64 8.64 11.36 17.27


Sub total 0 0 0 0 0 0
LONGITUD ADICIONAL 4.9 0.35 1.55 6.03 0.68 1.04
LONGITUD TOTAL 12.70 2.60 2.80 10.23 16.68 17.04
Sf (m/m) 0.095 0.076 0.056 0.050 0.040 0.035
PERDIDA DE CARGA 1.212 0.199 0.158 0.513 0.668 0.589
ALT. DEL APAR. MAS DESFAV. 1.1 0 0 0 0 0
PRESIN DE SALIDA 2 0 0 0 0 0
PERDIDA CARGA EN MEDIDOR 0 0 0 0.95 0 0
PRESIN NECESARIA 4.312 4.511 4.668 6.131 6.799 7.388
C-B B-A
94 113
1.590 2.630
4.107 5.283
1 1/2 1 1/2
22.95 37.37
1 4
2.16 2.16
2.16 8.64
0 0
0.72 0.72
0 0
1 0
3.11 3.11
3.11 0
0 0
1.04 1.04
0 0
0 1
0.33 0.33
0 0.33
0 0
17.27 17.27
0 0
5.27 8.97
28.22 46.34
0.030 0.024
0.854 1.091
0 0
0 0
0 1.64
8.242 10.973
TERCER NIVEL: DEPARTAMENTOS
Vmedia = 1.2 m/s

TRAMO I-H H-G G-F F-E E-D D-C


UNIDADES HUNTER 4 6 16 22 40 58
Q (Lt/seg) 0.160 0.250 0.460 0.580 0.910 1.220
(cm.) 1.303 1.629 2.209 2.481 3.107 3.598
DIMETRO
(pulg.) 1/2 1/2 3/4 3/4 1 1 1/2
LONGITUD (m) 7.80 2.25 1.25 4.20 16.00 16.00
Cantidad 6 0 0 4 0 0
90

Long. Equiv. 0.74 0.74 1.08 1.08 1.42 2.16


CODO

Sub total 4.44 0 0 4.32 0 0


Cantidad 0 0 0 0 0 0
45

Long. Equiv. 0.25 0.25 0.36 0.36 0.48 0.72


Sub total 0 0 0 0 0 0
Cantidad 0 0 1 1 0 0
TEE

90

Long. Equiv. 1.06 1.06 1.55 1.55 2.04 3.11


Sub total 0 0 1.55 1.55 0 0
Cantidad 1 1 0 0 1 1
RECTO

Long. Equiv. 0.35 0.35 0.52 0.52 0.68 1.04


Sub total 0.35 0.35 0 0 0.68 1.04
Cantidad 1 0 0 1 0 0
VLVULA

COMP.

Long. Equiv. 0.11 0.11 0.16 0.16 0.22 0.33


Sub total 0.11 0 0 0.16 0 0
Cantidad 0 0 0 0 0 0
GLOBO

Long. Equiv. 5.91 5.91 8.64 8.64 11.36 17.27


Sub total 0 0 0 0 0 0
LONGITUD ADICIONAL 4.9 0.35 1.55 6.03 0.68 1.04
LONGITUD TOTAL 12.70 2.60 2.80 10.23 16.68 17.04
Sf (m/m) 0.095 0.076 0.056 0.050 0.040 0.035
PERDIDA DE CARGA 1.212 0.199 0.158 0.513 0.668 0.589
ALT. DEL APAR. MAS DESFAV. 1.1 0 0 0 0 0
PRESIN DE SALIDA 2 0 0 0 0 0
PERDIDA CARGA EN MEDIDOR 0 0 0 0.95 0 0
PRESIN NECESARIA 4.312 4.511 4.668 6.131 6.799 7.388
C-B B-A
94 188
1.590 2.221
4.107 4.854
1 1/2 1 1/2
22.95 1.05
1 4
2.16 2.16
2.16 8.64
0 0
0.72 0.72
0 0
1 0
3.11 3.11
3.11 0
0 0
1.04 1.04
0 0
0 1
0.33 0.33
0 0.33
0 0
17.27 17.27
0 0
5.27 8.97
28.22 10.02
0.030 0.026
0.854 0.257
0 0
0 0
0 1.64
8.242 10.139
CUARTO NIVEL: DEPARTAMENTOS
Vmedia = 1.2 m/s

TRAMO I-H H-G G-F F-E E-D D-C


UNIDADES HUNTER 4 6 16 22 40 58
Q (Lt/seg) 0.160 0.250 0.460 0.580 0.910 1.220
(cm.) 1.303 1.629 2.209 2.481 3.107 3.598
DIMETRO
(pulg.) 1/2 1/2 3/4 3/4 1 1 1/2
LONGITUD (m) 7.80 2.25 1.25 4.20 16.00 16.00
Cantidad 6 0 0 4 0 0
90

Long. Equiv. 0.74 0.74 1.08 1.08 1.42 2.16


CODO

Sub total 4.44 0 0 4.32 0 0


Cantidad 0 0 0 0 0 0
45

Long. Equiv. 0.25 0.25 0.36 0.36 0.48 0.72


Sub total 0 0 0 0 0 0
Cantidad 0 0 1 1 0 0
TEE

90

Long. Equiv. 1.06 1.06 1.55 1.55 2.04 3.11


Sub total 0 0 1.55 1.55 0 0
Cantidad 1 1 0 0 1 1
RECTO

Long. Equiv. 0.35 0.35 0.52 0.52 0.68 1.04


Sub total 0.35 0.35 0 0 0.68 1.04
Cantidad 1 0 0 1 0 0
VLVULA

COMP.

Long. Equiv. 0.11 0.11 0.16 0.16 0.22 0.33


Sub total 0.11 0 0 0.16 0 0
Cantidad 0 0 0 0 0 0
GLOBO

Long. Equiv. 5.91 5.91 8.64 8.64 11.36 17.27


Sub total 0 0 0 0 0 0
LONGITUD ADICIONAL 4.9 0.35 1.55 6.03 0.68 1.04
LONGITUD TOTAL 12.70 2.60 2.80 10.23 16.68 17.04
Sf (m/m) 0.095 0.076 0.056 0.050 0.040 0.035
PERDIDA DE CARGA 1.212 0.199 0.158 0.513 0.668 0.589
ALT. DEL APAR. MAS DESFAV. 1.1 0 0 0 0 0
PRESIN DE SALIDA 2 0 0 0 0 0
PERDIDA CARGA EN MEDIDOR 0 0 0 0.95 0 0
PRESIN NECESARIA 4.312 4.511 4.668 6.131 6.799 7.388
C-B B-A
94 188
1.590 2.221
4.107 4.854
1 1/2 1 1/2
22.95 1.05
1 4
2.16 2.16
2.16 8.64
0 0
0.72 0.72
0 0
1 0
3.11 3.11
3.11 0
0 0
1.04 1.04
0 0
0 1
0.33 0.33
0 0.33
0 0
17.27 17.27
0 0
5.27 8.97
28.22 10.02
0.030 0.026
0.854 0.257
0 0
0 0
0 1.64
8.242 10.139
DISEO: TANQUES DE ALMACENAMIENTO

DIMENCIONAMIENTO: TANQUE CISTERNA.


El volumen del tanque cisterna ser 1*(Dotacin) + VCI, pero como la dotacin
es mayor que VCI = 14.4 m3 para dos mangueras de 40m. Entonces se adopta.

- CAPACIDAD: V = (DOTACIN)
V = 1 x 29 = 29 m3
Adoptamos: V = 29.00 m3

- PREDIMENCIONAMIEMTO: ANCHO / LARGO = 2/3

Para: LARGO = 4 m

A fin de dimencinar la altura (h), del tanque.


ADOPTAMOS: ANCHO (a) = 3.0 m
LARGO (L) = 4.0 m

ENTONCES: ALTURA TIL (hu) = 29.00 / 3.0 * 4.0m =

Altura (uh)' = (0.15 - 0.20) m. =


(Para cebado de Bomba)

ALTURA LIBRE (hl) = (he) + (hre) + (hr)

Donde: (he) : Distancia vertical, entre el techo del tanque; y el eje del tubo de entrada

(hre) : Distancia vertical, entre el eje de la tubera de rebose; y del eje del tubo de ent
Es igual al doble del dimetro (tubera de rebose); y en ningn caso menor de

(hr) : Distancia vertical, entre el Tubo de Rebose y el Nivel Mximo de agua.


Es igual al dimetro de Tub. De Rebose, y nunca inferior a 0.10 m.

Segn RNE. Para una capacidad de Tanque: 12001 a 30000 Lit.


dimetro de Rebose =

Por lo tanto: ALTURA LIBRE (hl) = 0.2 + 0.2 +


hl = 0.5 m

ALTURA TOTAL DEL TANQUE: (h) = 2.42 + 0.2 +

(h) = 3.1 m
DIMENCIONAMIENTO: TANQUE HIDRONEOMATICO

a. determinacion de la presion de operacin:

PT= HT+HF+PS donde:

PT= presion de trabajo


Hf=perdida de carga en todo el rrecorrido
PS= presion minima requerida en el aparato sanitario mas elevado.
HT= altura estatica del edificio

a-1. Calculo de HT:


El tanque hidroneumatico se ubica sobre la losa del primer nivel:
Altura de cada nivel: 2.60
Altura de aparato sanitario mas elevado: 2.00
Espesor de losa: 0.25

HT=2.60*3+0.25*3+2
HT= 10.3 m

a-2) Calculo de Hf:

Las perdidas por friccion para cada nivel es:


hf2= 5.28 m
hf3= 4.45 m
hf4= 1.21 m

HF= 10.94 m

a-3) presion minima en el aparato mas elevado(ducha)


PS= 2 mca

PT= 23.24 PSI

a-4) considerando que el gasto de Bombeo es la dotacion de los tres pisos superiores:
Gasto de bombeo= 29000 l/d
Factor de multiplicacion segn RNE Para 25 psi:
b) Volumen tanque hidroneumatico(VH):

VH= 665.969 galones

segn RNE: el diametro del TH es 0.97m y 3m de altura


ENAMIENTO

ces se adopta.

ANCHO = 2/3 (LARGO)

ANCHO = 2.68 m

2.4 m

0.2 m

el eje del tubo de entrada = 0.2 m

rebose; y del eje del tubo de entrada de agua.


ose); y en ningn caso menor de 0.15 m.

el Nivel Mximo de agua.


nca inferior a 0.10 m.
4 '' 0.1 m

0.1

0.5
e los tres pisos superiores:

NE Para 25 psi: 7.5


DISEO DE TUBERAS

TUBERA DE ADUCCION: Se disea considerando, que el TANQUE CISTERNA, debe

abastecerse, dentro de un periodo (4 a 6) horas.

CAUDAL DE ENTRADA: Qe = VTC = 29000 = 2.01

t 4 * 3600
1
4Q
2

DIMETRO DE TUBERA:
v

Velocidad mnima = 0.6 m/s max = 6.54


max = 2.57
Velocidad mxima = 3.0 m/s min = 2.92
min = 1.15

= 2.57 + 1.15 = 1.86 = 2

2
2.3.2 TUBERA DE IMPULSIN: Se disea considerando, que el TANQUE ELEVADO, debe

abastecerse, dentro de un periodo mximo de (2 horas).

CAUDAL DE BOMBEO: Qb = VTE = 29000 = 4.03

t 2 * 3600

1
4Q
2

DIMETRO DE TUBERA:
v

Velocidad mnima = 0.6 m/s max = 9.25


max = 3.64
Velocidad mxima = 3.0 m/s min = 4.13
min = 1.63
= 3.64 + 1.63 = 2.63 = 2 1/2
2
TUBERA DE SUCCIN (BOMBA): Se puede considerar, igual o inmediatamente superior,

al DIMETRO DE IMPULSIN.

ADOPTAMOS: = 2 1/2 ''

TUBERA DE REBOSE: TANQUE CISTERNA: 4 ''

TUBERAS DE ALIMENTACIN:
1
4Q
2

FORMULA: Donde:
v
Q: Caudal
v: Velacidad 0.6 3.0m

DISEO DE LOS ALIMENTADORES

UH CAUDAL DIMETRO
NIVEL
PARCIAL ACUMUL. (Lt/s) (Pulg.)
1 PISO 85.00 85.00 1.500 1 1/2

2 PISO 160.00 160.00 2.140 1 1/2


3 PISO 160.00 320.00 3.370 2
4 PISO 160.00 480.00 4.570 2 1/2

DISEO DE LOS RAMALES (ALIMENTADORES POR CADA NIVEL)

UH CAUDAL DIMETRO
NIVEL
(Lt/s) (Pulg.)
1 PISO 85.00 1.500 1 1/2

2 PISO 160.00 2.140 1 1/2


3 PISO 160.00 2.140 1 1/2

4 PISO 160.00 2.140 1 1/2


2.3.6 SELECCIN DE MEDIDORES:

Utilizando la tabla: PERDIDA DE CARGA EN MEDIDORES. Se calculara el dimetro


de los medidores.

CUADRO DE SELECCIN DE MEDIDORES

RAMAL SUB RAMAL DIMETRO


NIVEL
(Pulg.) (Pulg.) (Pulg.)
1 PISO 1 1/2 1 1

2 PISO 1 1/2 1 1
3 PISO 1 1/2 1 1
4 PISO 1 1/2 1 1

SELECCIN DEL MEDIDOR GENERAL

CAUDAL DE ENTRADA (CISTERNA) = 1.53 Lit/s = 92


DIAMETRO DE TUBERI (ADUCCION) = 2 ''
PRESION MINIMA DE SALIDA = 2 mca.

Hfm 0.50 Hf Donde: Hf = Pm-Ht-Ps

Pm : Presin en la matriz : 15
Ps : Presin de salida (mnima) : 2
Ht :Altura esttica del edificio : 0.5
Hf : Perdidas de carga
(Referido al nivel de RED PUBLICA)

Hf = 15 - 0.5 - 2
Hf = 12.5 mca

Hfm = 0.5 x 12.5

Hfm = 6.25
DIAMETRO Hfm
3/4 12 Para Q=100 Lt/min

1 4.7
1 1/2 1.3

Por lo tanto el medidor tendra un dianetro de = 1 1/2 ''


Lit/s

cm.

''
cm.

''

''

Lit/s

cm.

''
cm.

''
''
iatamente superior,
Lt/min

m
m
m
POTENCIA DE LA BOMBA:

Q H Donde: Q: Caudal de bombeo: 2.00 Lt/s


P
75 n H: Altura dinmica (m)
n: Rendimiento de la bomba (60-75)%
: Diametro: 2 ''
Altura Dinamica: H = Alt. Est. + Hf + Presion min. Salida

Hf: Perdida de carga total = (Le)(hf)


Le: Longitud equivalente = (Lr)(hl)
Lr: Longitud real = 25.5 m ( del Plano)
Altura estatica = 16.7 m

2
Q Donde:
Sf
5
= 14 Tub. PVC rigido
Sf = 0.01655 (m/m)
PERDIDAS DE CARGA LOCALES (Perdida de carga por accesorios)

4 codos (90) 2'' = 2.15 x 6 = 12.90


1 tee (paso recto) 2'' = 0.6 x 1 = 0.60
2 codos (90) 2 1/2'' = 2.45 x 2 = 4.90
2 valv. Compuerta 2'' = 0.4 x 2 = 0.80
2 valv. Check 2'' = 4.23 x 2 = 8.46
Entrada a la bomba = 1.00
Reduccion = 0.44
hf = 29.1 m

Le = 25.5 + 29.1 = 54.6 m


Hf = 54.6 x 0.0166 = 0.904 m
Hf = 16.7 + 0.9038 + 2 = 19.60 m

POTENCIA DE LA BOMBA:
P = 2.00 x 19.60 = 0.747 HP
75 x 0.7

ADOPTAMOS: P = 1.0 HP ( 2 BOMBAS DE 0.5 HP


para uso simultaneo )
DISEO DE LA RED CONTRA INCENDIO

GASTO: Q = 4 Lt/s
DIMETRO: = 2 1/2 '' (mnimo)

TUBERA ALIMENTADORA:
Para el funcionamiento de dos (2) mangueras se tiene:

1
4 Q
2

DIMETRO DE TUBERA:
v
Velocidad mnima = 0.6 m/s max = 9.21
max = 3.63

Velocidad mxima = 3.0 m/s min = 4.12


min = 1.62

= 3.63 + 1.62 = 2.62 = 3


2

PERDIDA DE CARAGA. (al punto de conexin (G.C.I.) mas desfaborable:

2
Q
Sf Donde:
5

= 14 Tub. PVC rigido


Sf = 0.00872

LONGITUD VERTICAL: = 10.6 m (del PLANO)

LONGITUD HORIZONTAL: = 1.3 m


33.4
4.85
cm.
''

cm.
''

''

Tub. PVC rigido


5.3 DISEO: SISTEMA DE ABASTECIMIENTO DE AGUA CALIENTE

Primer Nivel: Restaurante

En el primer piso no se coloco agua contra incendio.

Segundo Nivel: Departamentos

Se colocaron THERMAS ELECTRICAS.


THERMA ELECTRICA:
Dos cuartos de bao por departamento con una (01) DUCHA y
un (01) LAVATORIO por departamento.

Gasto: Ducha = 280 Lt/h = 560


Lavatorio = 8 Lt/h = 16
TOTAL = 576 Lt/h

Coeficiente de demanda probabl 0.3


Coeficiente de almacenamiento: 0.7

Volumen: 576 x 0.3 x 0.7 = 120.96 Lt/h

Por lo tanto la THERMA debe tener un volumen de: 120 Litros

Nota: El tercer y cuarto nivel son iguales por lo tanto tienen las mismas
caracteristicas en agua caliente.

DISEO DE LA RED DE AGUA CALIENTE:

1
4Q
DIMETRO DE TUBERA:
2


v
Gasto = 120 Lt/h

Velocidad mnima = 0.6 m/s max = 0.84 cm.


max = 0.33 ''
Velocidad mxima = 3.0 m/s min = 0.38 cm.
min = 0.15 ''

= 0.33 + 0.15 = 0.24 = 1/2 ''


2

Por lo tanto el diametro de las tuberias de alimentacion de agua


caliente seran de: 1/2''