Name of Work : Construction of Minor bridge at Km 3/4 of Bhuvnagiri - Kurinjipady Road (MD

816) across the Therkkuthittai Channel

ABSTRACT ESTIMATE

Approach road

Estimate Amount: .00 Lakhs

Sl.No Description Quantity. Rate Amount

1
Excavation including removal and satisfactory
disposal of all materials necessary for the
construction of road way and side drains in
accordance with specifications and the lines ,
grades and cross sections shown in the
drawings or as indicated by the Engineer for
Carted Eath with a lead of 8km for formation of
Approach Road.

405.38 M3 265.67 /M3 107696


2
Providing and Laying Granular Sub base as per
table No 400-1/400-2 and Grading III of MORTH
Revision IV with and any other Granular material
or a combination those of for 150 mm thick to
give a CBR of 20 on prepared sub grade in
accordance with the requirements of the
specifications For Aggregate Mix

177.81 M3 1585.00 /M3 281833


3 Providing and laying Wet Mix Macadam Base
Course 0f 250mm thickness in two layers of
125mm each or else as specified on the
prepared sub-Base with graded stone aggregate
and granular materials of quality size and
grading placed in layers as specified including
mixing in Base mix plant,spreading in nuiform
layer in motor grader and compacting with
Vibrating Roller of 80 to 100kN static weight and
ffine dressing for required grade and cross slope
as shown on the drawing,equipment safety
measures, testing and incidentals necessary to
complete the work as per Technical
Specification Clause 406 and as directed by
Engineer.
158.56 M3 1720.00 /M3 272728
4
Proivding and applying Prime coat with Bitumen
Emulsion (SS-1) Emulsion distributor at the rate
of 0.60kg/sq.m on the prepared Surface &
cleaned with Hydraulic broom as per Technical
Specification clause 503 and as directed by the
Engineer - in - charge.

788.75 M3 49.19 /M3 38799


5
Proivding and applying tack coat with Bitumen
Emulsion (RS-1) Emulsion distributor at the rate
of 0.25kg/sq.m on the prepared Surface &
cleaned with Hydraulic broom as per Technical
Specification clause 503 and as directed by the
Engineer - in - charge

788.75 M3 9.65 /M3 7611


6

Providing and laying Bituminous Macadam


which work shall consist of construction, using
crushed aggregates, premixed with VG 30
Grade Bitumen at the rate of 3.40% by weight of
the total mix confirming to the aggregates and
binder as per table no.500-7 in the Hot mix
plant, transporiting the mix to the worksite,
laying with paver finisher and compaction with
smooth wheeld and vibratory roller in
accordance with the requirements of the
specification and in confirmity with the drawing
as directed by the Engineer for BM (Grade-II)
as per MORTH No. 111, 112, 504 900

210991
39.44 m3 5350.00
7 Providing and laying Bituminous Concrete
Grade-II using 0.13 cum of 19.00-9.50mm
graded metal, 0.17 cum of 9.50-2.36mm graded
metal and 0.26 cum of 2.36 and below metal by
adding the shredded plastic 6% of bitumen
quantity 3.02Kg (50.30x6%=3.02Kg) shredded
plastic waste over the aggregate heated in the
central hot mix plant mixed well with 47.28 Kgs
of VG30-40 grade bitumen for premixing per
10m2 to lay bituminous concrete including the
cost of materials to CMP site, heating the
bitumen and aggregate to the required
temperature and mixing in Central Hot Mix plant,
conveying the mix by tipper trucks to paver site,
spreading the mix to uniform thickness with
mechanical paver to the specified grades and
cross sections and consolidated by 80-100 kn
vibratory roller / pneumatic roller to the require
density etc. including labour for loading bitumen
into bitumen tank and metal to feeder unit,
labour for attending to paver to site etc.,
including hire charges and fuel charges for CMP
with bitumen boiler, tipper trucks, paver finisher /
vibratory / pneumatic roller and all other tools
and plants required, including fuel and all other
incidental charges etc. complete as per
specification using CMP as per clause 507 of
MORTH Rev-5 and IRC SP 98-2013.
23.66 /MT 157356
m3 6650.00
Sub total = 1077013

ASSISTANT DIVISIONAL ENGINEER, ASSISTANT ENGINEER,


HIGHWAYS, C&M, Kurinjipady HIGHWAYS, C&M, Kurinjipady
Name of Work : Construction of Minor bridge at Km 3/4 of
Bhuvnagiri - Kurinjipady Road (MD 816) across the Therkkuthittai
Channel
Detailed Estimate
Approach road

Sl. Measurement
Description No Qty Unit
No L B D

Excavation including removal and satisfactory disposal of all materials


necessary for the construction of road way and side drains in accordance
1 with specifications and the lines , grades and cross sections shown in the
drawings or as indicated by the Engineer for Carted Eath with a lead of 8km
for formation of Approach Road.

0.5/2
1 x 1 20.000 12.900 0.250 64.50
(14.8+11.0)/2
1 x 1 25.000 12.900 0.500 161.25
1 x 1 80.000 12.900 0.500 516.00
Deduct GSB -177.81
Deduct WMM -158.56
405.38 m3

Providing and Laying Granular Sub base as per table No 400-1/400-2 and
Grading III of MORTH Revision IV with and any other Granular material or a
2 combination those of for 150 mm thick to give a CBR of 20 on prepared sub
grade in accordance with the requirements of the specifications For Aggregate
Mix

1x 1 20.000 7.750 0.125 19.38


(5.5+10)/2 avg.
1x 1 25.000 7.750 0.250 48.44
1x 1 80.000 5.500 0.250 110.00
177.81 m3

Providing and laying Wet Mix Macadam Base Course 0f 250mm thickness in
two layers of 125mm each or else as specified on the prepared sub-Base with
graded stone aggregate and granular materials of quality size and grading
placed in layers as specified including mixing in Base mix plant,spreading in
3 nuiform layer in motor grader and compacting with Vibrating Roller of 80 to
100kN static weight and ffine dressing for required grade and cross slope as
shown on the drawing,equipment safety measures, testing and incidentals
necessary to complete the work as per Technical Specification Clause 406 and
as directed by Engineer.

1x 1 20.000 7.750 0.125 0.125


(5.5+10)/2 avg.
1x 1 25.000 7.750 0.250 48.44
1x 1 80.000 5.500 0.250 110.00
158.56 m3
Proivding and applying Prime coat with Bitumen Emulsion (SS-1) Emulsion
distributor at the rate of 0.60kg/sq.m on the prepared Surface & cleaned
4
with Hydraulic broom as per Technical Specification clause 503 and as
directed by the Engineer - in - charge.

1x 1 20.000 7.750 155.00


(5.5+10)/2
1x 1 25.000 7.750 193.75
1x 1 80.000 5.500 440.00
788.75 m3

Proivding and applying tack coat with Bitumen Emulsion (RS-1) Emulsion
distributor at the rate of 0.25kg/sq.m on the prepared Surface & cleaned
5
with Hydraulic broom as per Technical Specification clause 503 and as
directed by the Engineer - in - charge

1x 1 20.000 7.750 155.00


(5.5+10)/2
1x 1 25.000 7.750 193.75
1x 1 80.000 5.500 440.00
788.75 m3

Providing and laying Bituminous Macadam which work shall consist of


construction, using crushed aggregates, premixed with VG 30 Grade Bitumen
at the rate of 3.40% by weight of the total mix confirming to the aggregates
and binder as per table no.500-7 in the Hot mix plant, transporiting the mix
6
to the worksite, laying with paver finisher and compaction with smooth wheeld
and vibratory roller in accordance with the requirements of the specification
and in confirmity with the drawing as directed by the Engineer for BM (Grade-
II) as per MORTH No. 111, 112, 504 900

1x 1 20.000 7.750 0.050 7.75


(5.5+10)/2
1x 1 25.000 7.750 0.050 9.69
1x 1 80.000 5.500 0.050 22.00
39.44 m3

Providing and laying Bituminous Concrete 30mm thick which shall consist of
construction of single course on a previously prepared bitumenous base to the
7
requirement of the specfication in cclause 511 of MORT&H using crumb
rubber modified bitumen 55 grade etc., complete.

1x 1 20.000 7.750 0.030 4.65


(5.5+10)/2
1x 1 25.000 7.750 0.030 5.81
1x 1 80.000 5.500 0.030 13.20
23.66 m3
BAR BENDING SCHEDULE - ( as per SD 109)
TOTAL UNIT
TYPE OF DIA IN SPACING LENGTH
Sl No SHAPE OF BARS Nos LENGTH (in WEIGHT ( in TOTAL WEIGHT ( in Kg)
BARS mm IN mm (in m) m) Kg/ m)
1 1 12 200 #REF! #REF! #REF! 0.888 #REF!
#REF! #REF!
#VALUE!
2 2 12 200 5.208 #REF! #REF! 0.888 #REF!

3.48

0.90
3 #VALUE! #VALUE! 3 12 130 #VALUE! #REF! #VALUE! 0.888 #VALUE!

#REF!
4
4 Bar not used

5 5 10 200 #REF! #REF! #REF! 0.617 #REF!

0.2 #REF!

#REF!
6 #VALUE! 6 12 180 #VALUE! #REF! #VALUE! 0.888 #VALUE!
0.20 0.2

7
7 Bar not used

8 #VALUE! 8 12 200 #REF! #REF! #REF! 0.888 #REF!


#REF! #REF!
9 0.2 9 10 250 1.222 #REF! #REF! 0.617 #REF!
0.862
0.2
10 0.2 10 12 250 1.242 #REF! #REF! 0.888 #REF!
0.89
0.2
11 #REF! 11 10 250 #REF! #VALUE! #REF! 0.617 #REF!
0.18 0.18

12 #REF! 12 10 250 #REF! #VALUE! #REF! 0.617 #REF!


0.18 0.18

13 #REF! 13 10 250 #REF! #REF! #REF! 0.617 #REF!


0.18 0.18

14 #REF! 14 10 250 #REF! 12 #REF! 0.617 #REF!


0.18 0.18

15 #REF! 15 10 250 #REF! #REF! #REF! 0.617 #REF!


0.18 0.18

16 #REF! 16 10 #REF! 12 #REF! 0.617 #REF!


0.16 0.16

17
17 Bar not used
18 0.15 18 10 150 1.092 #VALUE! #VALUE! 0.617 #VALUE!

0.45

19 0.16 0.16 19 10 - 2.860 4 11.44 0.617 7.058

2.60
20 1.30 20 10 150 4.207 #VALUE! #VALUE! 0.617 #VALUE!

1.1 1.556
0.20

21 0.2 0.2 21 12 - 2.928 20 58.56 0.888 52.001

2.60
#VALUE!

#VALUE!
(or) #VALUE!