Вы находитесь на странице: 1из 152

Year ORE WASTE ZINC LEAD SILVER

TM TM TM TM g
-2
-1 7,016,867
0 9,055,206
1 1,620,195 7,789,878 10,438 13,832 53,494,648
2 1,800,027 7,317,583 13,114 15,752 55,045,009
3 1,800,017 6,090,797 17,658 22,948 71,820,239
4 1,799,858 4,996,394 18,502 23,989 75,820,739
5 1,800,164 5,058,166 17,400 22,346 66,222,703
6 1,799,756 4,477,688 18,017 22,111 69,497,390
7 1,800,033 4,250,895 15,937 19,613 62,376,367
8 1,800,181 4,341,798 16,915 21,114 67,429,298
9 1,799,788 4,569,814 15,500 19,011 62,762,823
10 1,800,119 3,877,993 15,134 20,717 66,374,052
11 1,800,022 5,317,440 16,311 19,395 67,979,813
12 1,799,885 5,105,328 16,037 22,273 72,646,305
13 1,800,216 4,182,112 14,799 18,430 68,618,727
14 1,799,810 4,309,251 16,101 16,867 60,991,877
15 1,800,065 3,960,826 19,379 21,186 70,356,825
16 1,799,979 4,447,939 21,120 19,549 64,756,921
17 1,800,033 3,232,410 21,517 20,039 68,475,247
18 1,799,990 4,300,409 22,319 24,642 75,133,548
19 1,799,885 4,800,882 23,794 18,886 62,286,219
20 1,800,154 4,726,063 29,532 20,710 71,603,181
21 1,799,885 3,470,222 36,769 6,184 30,085,580
22 286,697 379,100 6,198 701 5,773,451
Total 37,906,759 117,257,952 402,491 410,295 1,369,550,962

PROGRAMA DE PR
10000000

9000000

8000000

7000000

6000000
ial
8000000

7000000

6000000
Toneladas de material

5000000

4000000

3000000

2000000

1000000

0
-1 0 1 2 3 4 5 6 7 8 9 10
ZINC R LEAD R SILVER R Stripping Ratio Zinc % Lead%
TM TM g

9,136 12,359 45,366,195 4.81 0.64 0.85


11,478 14,075 46,680,980 4.07 0.73 0.88
15,455 20,504 60,907,233 3.38 0.98 1.27
16,193 21,434 64,299,861 2.65 1.03 1.33
15,229 19,966 56,160,236 2.68 0.97 1.24
15,769 19,756 58,937,338 2.38 1.00 1.23
13,948 17,524 52,898,346 2.26 0.89 1.09
14,804 18,865 57,183,490 2.30 0.94 1.17
13,566 16,987 53,226,081 2.43 0.86 1.06
13,246 18,511 56,288,588 2.06 0.84 1.15
14,276 17,329 57,650,355 2.82 0.91 1.08
14,036 19,901 61,607,779 2.71 0.89 1.24
12,952 16,467 58,192,187 2.22 0.82 1.02
14,092 15,071 51,724,229 2.29 0.89 0.94
16,961 18,929 59,666,183 2.10 1.08 1.18
18,484 17,467 54,917,178 2.36 1.17 1.09
18,832 17,905 58,070,508 1.72 1.20 1.11
19,534 22,018 63,717,088 2.28 1.24 1.37
20,825 16,875 52,821,897 2.55 1.32 1.05
25,847 18,505 60,723,156 2.51 1.64 1.15
32,181 5,525 25,514,110 1.84 2.04 0.34
5,425 627 4,896,182 0.93 2.16 0.24
352,269 366,600 1,161,449,200 3.09 1.06 1.08

PROGRAMA DE PRODUCCION
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Silver Gr Plata Oz

33.02 1.06
30.58 0.98
39.90 1.28
42.13 1.35
36.79 1.18
38.61 1.24
34.65 1.11
37.46 1.20
34.87 1.12
36.87 1.19
37.77 1.21
40.36 1.30
38.12 1.23
33.89 1.09
39.09 1.26
35.98 1.16
38.04 1.22
41.74 1.34
34.61 1.11
39.78 1.28
16.72 0.54
20.14 0.65
36.13 1.16
19 20 21 22
24 Horas
Reparaciones 0.2 3.6 3.6 Reparaciones
Disponibilidad mecanica 0.9 20 3.06 Demoras operativas
Utilizacion 0.7 17 17.3 Utilizacion efectiva

Para calcular la disponibilidad mecanica y utilizacion de los camiones y las


excavadoras, se tomaron estandares operacionales de mineras similares en el
metodo de minado de los tajos abiertos del grupo Buenaventura en sus
unidades: La Zanja, Tantahuatay y Breapampa, como se muestra en el cuadro.

EQUIPO

Excavadora Komatsu
Minera La Zanja Camion volquete de 20 m3
Camion volquete de 15 m3
Excavadora sobre orugas
Minera Coimolache Camion volquete Tova 15 m3
Camion volquete de 20 m3
Excavadora Cat
Minera Breapampa Camion volquete FMX 8 x 4
Camion volquete FMX 6 x 4

Fuente: Departamento de Planeamiento de la Compaia de minas Buenaventura.

El porcentaje de esponjamiento que se ha considerado


es de 30% para el mineral y desmonte, debido a que
las densidades tienen una variacion de 0.18

Seguidamente se detallan algunos criterios que se han tomado en cuenta para la eleccion de la maquinaria adecu
Pendiente Factor "p"
15% 0.81
10% 0.89
5% 0.95
Resistencia a la pendiente, representa el mayor
esfuerzo que debe realizar la mquina para trabajar en 0% 1
sentido contrario a la pendiente, o el menor esfuerzo si -5% 1.07
lo hace en el sentido de la pendiente, en condiciones
promedio se le asignan los valores siguientes (Aylln, -10% 1.14
p. 33). -15% 1.2

Fuente: Texto guia de maquinaria y equipo d

Condiciones del camino


Plano y firme
Resistencia a la rodadura, este factor evala la Mal conservado pero firme
resistencia que ofrece el camino al movimiento de las
ruedas, para lo cual utilizaremos los valores siguientes De arena y grava suelta
(Aylln, p. 33). Blando y sin conservacion

Fuente: Texto guia de maquinaria y equipo d

Nmero de pases: segn la combinacin excavadora,


camin lo ptimo para cargar un camin debe estar Condiciones de trabajo
entre el rango de tres a cinco pases para esta actividad.
Factor de llenado del camin: 90%
Camino plano
Con carga
Con subidas y bajadas
Camino plano
Sin carga
Con subidas y bajadas
En vas regularmente conservadas las velocidades que
pueden desarrollar los Fuente: Texto gua Maquinaria y equipo de c
camiones en condiciones promedio, pueden ser las
siguientes:
Reparaciones; 3.6
Demoras operativas; 3.06

Utilizacion efectiva; 17.3

Disponibilidad Utilizacion
Mecanica
85% 85%
85% 85%
85% 85%
85% 85%
85% 85%
85% 85%
85% 85%
85% 85%
85% 85%

ia de minas Buenaventura.

eccion de la maquinaria adecuada:


guia de maquinaria y equipo de construccion, Jaime Ayllon.

iciones del camino Factor "r"


0.98
o pero firme 0.95
va suelta 0.9
onservacion 0.85

guia de maquinaria y equipo de construccion, Jaime Ayllon.

Velocidad Km/HR
diciones de trabajo
D<1 km 1km<D>5km D>5km
amino plano 15-20 25-30 30-36
on subidas y bajadas 10-15 13-17 14-20
amino plano 20-25 30-40 40-50
on subidas y bajadas 15-18 18-25 25-40

gua Maquinaria y equipo de construccin, de Jaime Aylln.


ra e
g
pe Tim
tin
y O el
) b rav
n
io

e
on ed T

m
tid

iti ust rn

Ti
nd dj etu
on

el
gC

av
Co na R

Tr
(U aw
n
l
ia

ati
er

rn
R
er

tu
er
ad
ck

tu
om

at

Op

Re
u

Re
Lo

M
To
Fr

Tr
min min
Pit 1 Planta Volvo FMX 8xKomatsu PC Mineral Normal 18.26913244 18.2691324
ETAPA 1
Pit 1 Desmonte Volvo FMX 8xKomatsu PC Desmonte Normal 13.56381443 13.5638144
Pit 1 Planta Volvo FMX 8xKomatsu PC Mineral Normal 14.57859391 14.5785939
ETAPA 2
Pit 1 Desmonte Volvo FMX 8xKomatsu PC Desmonte Normal 9.987400804 9.9874008

ETAPA 3 Pit 1 Planta Volvo FMX 8xKomatsu PC Mineral Normal 12.17490162 12.1749016
Pit 1 Desmonte Volvo FMX 8xKomatsu PC Desmonte Normal 12.89921587 12.8992159
Pit 1 Planta Volvo FMX 8xKomatsu PC Mineral Normal 11.03401855 11.0340186
Pit 1 Desmonte Volvo FMX 8xKomatsu PC Desmonte Normal 15.78236142 15.7823614
ETAPA 4
Pit 2 Planta Volvo FMX 8xKomatsu PC Mineral Normal 7.569730927 7.56973093
Pit 2 Desmonte Volvo FMX 8xKomatsu PC Desmonte Normal 16.54246467 16.5424647
Pit 1 Planta Volvo FMX 8xKomatsu PC Mineral Normal 19.42653106 19.4265311
Pit 1 Desmonte Volvo FMX 8xKomatsu PC Desmonte Normal 24.16675832 24.1667583
ETAPA 5
Pit 2 Planta Volvo FMX 8xKomatsu PC Mineral Normal 8.094135305 8.09413531
Pit 2 Desmonte Volvo FMX 8xKomatsu PC Desmonte Normal 22.01434 22.01434

DATA EXPORTADA DEL

DEL MODULO HAUL IN


p
ph

CM
h

ph
M

tp

eB
BC

Dt
W

at
te

te

te

nR
Ra

Ra

Ra
e
m

tio
on

on

on
tio
Ti

uc
cti

cti

cti
oa
ad
Ra
cle

od

od
du

du
du
ks

yl
lo
le
Cy

Pa
uc

Pr

Pr
ay
Id

ro

ro
ro
er

er

er

er
rn

Tr

kP

kP

kP

kP
m

ad

ad

ad

ad
tu

uc

uc

uc

uc
Nu
Re

Lo

Lo

Lo

Lo
Tr

Tr

Tr

Tr
min # % wt wt BCM/h Wt/h Dt/h BCM/h
26.6666667 8 0 43 7.16666667 42.75 96.75 91.9125 342
20.5638144 6 0.02741779 41 6.83333333 55.4371857 119.627611 113.646231 332.623114
21.5785939 6 0.07315555 43 7.16666667 52.8301336 119.562934 113.584787 316.980802
16.9874008 5 0.01888071 41 6.83333333 67.1085596 144.813208 137.572547 335.542798
20 6 0 43 7.16666667 57 129 122.55 342
20 6 0 41 6.83333333 57 123 116.85 342
18.0340186 5 0.0758207 43 7.16666667 63.2138642 143.062956 135.909808 316.069321
23.3333333 7 0 41 6.83333333 48.8571429 105.428571 100.157143 342
14.5697309 4 0.0848607 43 7.16666667 78.24441 177.079454 168.225481 312.97764
23.5424647 7 0.00888315 41 6.83333333 48.4231373 104.492033 99.2674315 338.961961
26.6666667 8 0 43 7.16666667 42.75 96.75 91.9125 342
31.1667583 9 0.03743599 41 6.83333333 36.5774325 78.9302492 74.9837367 329.196893
16.6666667 5 0 43 7.16666667 68.4 154.8 147.06 342
30 9 0 41 6.83333333 38 82 77.9 342

DATA EXPORTADA DEL SOFTWARE ALASTRI

DEL MODULO HAUL INFINITY


ph

h
CM

tp
ph

tp
ph

eW

eD
eB
t
eD

at

at

at

e
at

m
nR

nR

nR

e
e

e
nR

m
Ti
m

im
tio

tio

tio

el

Ti
tio

Ti

pT
e
uc

uc

uc

av

er
el

e
uc

ad
Tr
od

od

m
e
od

im
av

Ti

im
od

e
ed

Du
Tr

Tr
Lo
ng
Pr

Pr

gT
Pr

im
eT
ed

ed
ad
er

er

er

At

At
in
pi

lT
eu
ad

ad

ad

ad

ad

ad
m
lo

ot

ot

ta
Qu
Un

Du

Sp

Sp
Lo

Lo

Lo

Lo

Lo

Lo
To
Wt/h Dt/h min min min min min min min min
774 735.3 12.3295253 5.93960716 1 2.5 1.89753422 0.5 2.5 26.6666667
717.765668 681.877385 8.48094317 5.08287126 1 2.5 0.5 0.5 2.5 20.5638144
717.377604 681.508724 9.67204439 4.90654952 1 2.5 0.5 0.5 2.5 21.5785939
724.066038 687.862736 5.47829762 4.50910319 1 2.5 0.5 0.5 2.5 16.9874008
774 735.3 7.9335724 4.24132922 1 2.5 1.32509838 0.5 2.5 20
738 701.1 7.16386293 5.73535294 1 2.5 0.60078413 0.5 2.5 20
715.314779 679.54904 6.96469542 4.06932314 1 2.5 0.5 0.5 2.5 18.0340186
738 701.1 8.54371605 7.23864536 1 2.5 1.05097192 0.5 2.5 23.3333333
708.317817 672.901926 4.81665328 2.75307765 1 2.5 0.5 0.5 2.5 14.5697309
731.444232 694.872021 8.91275643 7.62970824 1 2.5 0.5 0.5 2.5 23.5424647
774 735.3 11.3033542 8.12317681 1 2.5 0.74013561 0.5 2.5 26.6666667
710.372243 674.85363 12.8774989 11.2892594 1 2.5 0.5 0.5 2.5 31.1667583
774 735.3 4.64298823 3.45114707 1 2.5 2.07253136 0.5 2.5 16.6666667
738 701.1 12.0104878 10.0038522 1 2.5 1.48566 0.5 2.5 30
rn

rn
Bu
rn

n
ur

Bu
Bu

el
e

lB
rn
Fu

el
e

el

ue

s
Fu
Bu

n
el
Fu

ur
Ti

Di
ur

pF
av

n
er

er
lB
el
el

el
ur
lB
ad

ad
Tr

m
Fu
av

av
ue

lB
ue
e

ed

Du
Tr

Tr
Lo
o

ng

gF
im

ue
tL

eF
ed

ed
ad

At

At
in
pi
lT

lF
eu
ad

ad

ad
m
lo

ot

ot
ta

ta
Qu
Un

Du

Sp

Sp
Lo

Lo

Lo
To

To
l l l l l l l l
3.56534853 1.7259718 0.288 0.7207 0.54702117 0.1441 0.7205 7.71164149
2.45223992 1.47537697 0.288 0.7207 0.14414 0.1441 0.7205 5.94505689
2.79638604 1.42478533 0.288 0.7207 0.14414 0.1441 0.7205 6.23861137
1.58213174 1.30567159 0.288 0.7207 0.14414 0.1441 0.7205 4.90524333
2.293892 1.23127624 0.288 0.7207 0.38199936 0.1441 0.7205 5.78046761
2.06765257 1.66144574 0.288 0.7207 0.17319405 0.1441 0.7205 5.77559235
2.01565832 1.18258871 0.288 0.7207 0.14414 0.1441 0.7205 5.21568702
2.46723986 2.09762478 0.288 0.7207 0.30297418 0.1441 0.7205 6.74113883
1.39296922 0.79843671 0.288 0.7207 0.14414 0.1441 0.7205 4.20884593
2.5722862 2.20914095 0.288 0.7207 0.14414 0.1441 0.7205 6.79886715
3.27483049 2.36701395 0.288 0.7207 0.21336629 0.1441 0.7205 7.72851073
3.72500752 3.28111598 0.288 0.7207 0.14414 0.1441 0.7205 9.0235635
1.34383048 1.0041441 0.288 0.7207 0.59746934 0.1441 0.7205 4.81874392
3.46756571 2.90040064 0.288 0.7207 0.42828607 0.1441 0.7205 8.66955242
ce
n

an
ce

2
ur

1
H.

H.
an

st
lB

KP

KP
Di
ue

.1

.2
st

el

ET

ET
PH

PH
Di
rF

av
n

ce
el

ON

ON
de

ur

TK

TK
Tr
av

an
lB
oa

LI N

LI N

ST

ST
ed
Tr

ist
ue

GE

GE
ed

ad

HE

HE
lD
lF

ID

ID
ad

lo
ta

ta

IC

IC
Un

BR

BR
Lo
To

To

M
m m m tkph tkph tkph tkph
3287.56298 3287.56298 6575.12595 161.772434 80.8862168 169.835503 84.9177517
2490.56085 2490.56085 4981.12171 146.367901 73.1839504 163.212901 81.6064504
2724.28641 2724.28641 5448.57283 162.969345 81.4846726 173.921293 86.9606467
2054.02376 2054.02376 4108.04752 146.099434 73.0497172 162.944434 81.4722172
2248.76323 2248.76323 4497.52647 137.674811 68.8374057 154.894811 77.4474057
2337.5004 2337.5004 4675.0008 140.655777 70.3278886 157.500777 78.7503886
1954.31709 1954.31709 3908.63418 132.068259 66.0341293 149.288259 74.6441293
2785.859 2785.859 5571.718 149.812308 74.9061542 160.895297 80.4476483
1357.63116 1357.63116 2715.26232 111.147002 55.5735012 128.367002 64.1835012
2920.92977 2920.92977 5841.85954 156.366764 78.1833822 167.197658 83.598829
3376.18005 3376.18005 6752.3601 166.625069 83.3125345 174.413461 87.2067307
4206.58886 4206.58886 8413.17772 181.545176 90.7725878 181.886069 90.9430344
1325.10092 1325.10092 2650.20185 92.3075421 46.153771 109.527542 54.763771
3676.17786 3676.17786 7352.35571 161.634911 80.8174556 165.133909 82.5669547
ST
ON
E TK
PH
.2
RUTA PIT 1 A PLANTA
Distance Gradient Loaded (%) Segment Time Actual Max
Segment RR (%)
(m) (%) (min) Speed (kph)
Queue at Loader 0.00 0.00 0.0 0.00 1.8975 0.00
Spot at Loader 0.00 0.00 0.0 0.00 2.5000 0.00
Loading 0.00 0.00 0.0 0.00 2.5000 0.00
Loaded 1 146.81 0.00 2.0 100.00 0.5172 28.05
Loaded 2 100.11 -7.85 2.0 100.00 0.3834 15.67
Loaded 3 51.88 -8.61 2.0 100.00 0.2030 15.33
Loaded 4 88.68 0.00 2.0 100.00 0.2160 30.00
Loaded 5 78.21 0.00 2.0 100.00 0.1564 30.00
Loaded 6 106.47 0.00 2.0 100.00 0.2129 30.00
Loaded 7 99.22 2.10 2.0 100.00 0.2020 30.00
Loaded 8 68.45 11.79 2.0 100.00 0.2190 26.42
Loaded 9 114.30 -11.52 2.0 100.00 0.4786 14.33
Loaded 10 112.90 -4.71 2.0 100.00 0.4074 16.67
Loaded 11 87.56 -6.72 2.0 100.00 0.3286 16.00
Loaded 12 59.32 -8.73 2.0 100.00 0.2322 15.33
Loaded 13 65.94 -4.31 2.0 100.00 0.2394 16.67
Loaded 14 78.19 -10.13 2.0 100.00 0.3198 14.67
Loaded 15 72.69 -11.22 2.0 100.00 0.3044 14.33
Loaded 16 100.91 -11.84 2.0 100.00 0.4226 14.33
Loaded 17 119.94 -12.85 2.0 100.00 0.5140 14.00
Loaded 18 97.66 -9.06 2.0 100.00 0.3906 15.00
Loaded 19 120.94 -9.79 2.0 100.00 0.4838 15.00
Loaded 20 122.64 -8.87 2.0 100.00 0.4806 15.33
Loaded 21 123.44 -11.46 2.0 100.00 0.5169 14.33
Loaded 22 32.48 -8.41 2.0 100.00 0.1274 15.33
Loaded 23 114.96 -10.43 2.0 100.00 0.4702 14.67
Loaded 24 81.37 -6.33 2.0 100.00 0.3051 16.00
Loaded 25 42.80 2.15 2.0 100.00 0.1478 20.35
Loaded 26 94.89 -11.95 2.0 100.00 0.3973 14.33
Loaded 27 163.56 -10.74 2.0 100.00 0.6692 14.67
Loaded 28 105.25 -12.89 2.0 100.00 0.4511 14.00
Loaded 29 125.82 -11.23 2.0 100.00 0.5268 14.33
Loaded 30 156.07 -2.30 2.0 100.00 0.4839 20.00
Loaded 31 114.48 -7.05 2.0 100.00 0.4386 15.67
Loaded 32 239.62 -9.53 2.0 100.00 1.0835 15.00
Subtotal 3,287.56 -7.11 2.0 100.00 12.3295 30.00
Spot at Dump 0.00 0.00 0.0 0.00 0.5000 0.00
Dumping 0.00 0.00 0.0 0.00 1.0000 0.00
Unloaded 1 239.62 9.53 2.0 0.00 0.5835 40.00
Unloaded 2 114.48 7.05 2.0 0.00 0.1777 40.00
Unloaded 3 156.07 2.30 2.0 0.00 0.2401 40.00
Unloaded 4 125.82 11.23 2.0 0.00 0.1947 40.00
Unloaded 5 105.25 12.89 2.0 0.00 0.1654 40.00
Unloaded 6 163.56 10.74 2.0 0.00 0.2513 40.00
Unloaded 7 94.89 11.95 2.0 0.00 0.1606 39.57
Unloaded 8 42.80 -2.15 2.0 0.00 0.0856 30.00
Unloaded 9 81.37 6.33 2.0 0.00 0.1403 38.85
Unloaded 10 114.96 10.43 2.0 0.00 0.1784 40.00
Unloaded 11 32.48 8.41 2.0 0.00 0.0597 35.00
Unloaded 12 123.44 11.46 2.0 0.00 0.2015 40.00
Unloaded 13 122.64 8.87 2.0 0.00 0.1900 40.00
Unloaded 14 120.94 9.79 2.0 0.00 0.1978 40.00
Unloaded 15 97.66 9.06 2.0 0.00 0.1636 39.90
Unloaded 16 119.94 12.85 2.0 0.00 0.1978 40.00
Unloaded 17 100.91 11.84 2.0 0.00 0.1712 39.98
Unloaded 18 72.69 11.22 2.0 0.00 0.1150 40.00
Unloaded 19 78.19 10.13 2.0 0.00 0.1233 40.00
Unloaded 20 65.94 4.31 2.0 0.00 0.1058 39.80
Unloaded 21 59.32 8.73 2.0 0.00 0.1047 37.25
Unloaded 22 87.56 6.72 2.0 0.00 0.1503 39.30
Unloaded 23 112.90 4.71 2.0 0.00 0.1754 40.00
Unloaded 24 114.30 11.52 2.0 0.00 0.2288 38.00
Unloaded 25 68.45 -11.79 2.0 0.00 0.2020 20.33
Unloaded 26 99.22 -2.10 2.0 0.00 0.2147 30.00
Unloaded 27 106.47 0.00 2.0 0.00 0.1760 40.00
Unloaded 28 78.21 0.00 2.0 0.00 0.1233 40.00
Unloaded 29 88.68 0.00 2.0 0.00 0.1514 39.35
Unloaded 30 51.88 8.61 2.0 0.00 0.0936 36.75
Unloaded 31 100.11 7.85 2.0 0.00 0.1669 40.00
Unloaded 32 146.81 0.00 2.0 0.00 0.4492 35.25
Subtotal 3,287.56 7.11 2.0 0.00 5.9396 40.00

RUTA PIT 1 A DESMONTE


Distance Gradient Loaded (%) Segment Time Actual Max
Segment RR (%)
(m) (%) (min) Speed (kph)
Queue at Loader 0.00 0.00 0.0 0.00 0.5000 0.00
Spot at Loader 0.00 0.00 0.0 0.00 2.5000 0.00
Loading 0.00 0.00 0.0 0.00 2.5000 0.00
Loaded 1 146.81 0.00 2.0 100.00 0.5172 28.05
Loaded 2 100.11 -7.85 2.0 100.00 0.3834 15.67
Loaded 3 51.88 -8.61 2.0 100.00 0.2030 15.33
Loaded 4 88.68 0.00 2.0 100.00 0.2160 30.00
Loaded 5 78.21 0.00 2.0 100.00 0.1564 30.00
Loaded 6 106.47 0.00 2.0 100.00 0.2129 30.00
Loaded 7 99.22 2.10 2.0 100.00 0.2020 30.00
Loaded 8 68.45 11.79 2.0 100.00 0.2190 26.42
Loaded 9 114.30 -11.52 2.0 100.00 0.4786 14.33
Loaded 10 112.90 -4.71 2.0 100.00 0.4074 16.67
Loaded 11 87.56 -6.72 2.0 100.00 0.3286 16.00
Loaded 12 59.32 -8.73 2.0 100.00 0.2322 15.33
Loaded 13 65.94 -4.31 2.0 100.00 0.2394 16.67
Loaded 14 78.19 -10.13 2.0 100.00 0.3198 14.67
Loaded 15 72.69 -11.22 2.0 100.00 0.3044 14.33
Loaded 16 100.91 -11.84 2.0 100.00 0.4226 14.33
Loaded 17 119.94 -12.85 2.0 100.00 0.5140 14.00
Loaded 18 97.66 -9.06 2.0 100.00 0.3907 15.00
Loaded 19 145.48 -10.28 2.0 100.00 0.5950 14.67
Loaded 20 166.19 -6.84 2.0 100.00 0.6232 16.00
Loaded 21 124.70 3.13 2.0 100.00 0.2878 30.00
Loaded 22 225.45 7.27 2.0 100.00 0.5493 30.00
Loaded 23 114.82 4.22 2.0 100.00 0.2998 27.51
Loaded 24 64.67 -7.90 2.0 100.00 0.3782 15.67
Subtotal 2,490.56 -3.74 2.0 100.00 8.4809 30.00
Spot at Dump 0.00 0.00 0.0 0.00 0.5000 0.00
Dumping 0.00 0.00 0.0 0.00 1.0000 0.00
Unloaded 1 64.67 7.90 2.0 0.00 0.2945 25.50
Unloaded 2 114.82 -4.22 2.0 0.00 0.2828 24.42
Unloaded 3 225.45 -7.27 2.0 0.00 0.5970 22.66
Unloaded 4 124.70 -3.13 2.0 0.00 0.2996 25.00
Unloaded 5 166.19 6.84 2.0 0.00 0.2829 40.00
Unloaded 6 145.48 10.28 2.0 0.00 0.2242 40.00
Unloaded 7 97.66 9.06 2.0 0.00 0.1525 40.00
Unloaded 8 119.94 12.85 2.0 0.00 0.1978 40.00
Unloaded 9 100.91 11.84 2.0 0.00 0.1712 39.98
Unloaded 10 72.69 11.22 2.0 0.00 0.1150 40.00
Unloaded 11 78.19 10.13 2.0 0.00 0.1233 40.00
Unloaded 12 65.94 4.31 2.0 0.00 0.1058 39.80
Unloaded 13 59.32 8.73 2.0 0.00 0.1047 37.25
Unloaded 14 87.56 6.72 2.0 0.00 0.1503 39.30
Unloaded 15 112.90 4.71 2.0 0.00 0.1754 40.00
Unloaded 16 114.30 11.52 2.0 0.00 0.2288 38.00
Unloaded 17 68.45 -11.79 2.0 0.00 0.2020 20.33
Unloaded 18 99.22 -2.10 2.0 0.00 0.2147 30.00
Unloaded 19 106.47 0.00 2.0 0.00 0.1760 40.00
Unloaded 20 78.21 0.00 2.0 0.00 0.1233 40.00
Unloaded 21 88.68 0.00 2.0 0.00 0.1514 39.35
Unloaded 22 51.88 8.61 2.0 0.00 0.0936 36.75
Unloaded 23 100.11 7.85 2.0 0.00 0.1669 40.00
Unloaded 24 146.81 0.00 2.0 0.00 0.4492 35.25
Subtotal 2,490.56 3.74 2.0 0.00 5.0829 40.00
A
Actual Final Average Speed Elevation Fuel
Speed (kph) (kph) Change (m) Burned (l)
0.00 0.00 0.0 0.55
0.00 0.00 0.0 0.72 DATA EXPORTADA DE HAUL INFINITY
0.00 0.00 0.0 0.72
15.67 17.03 0.0 0.15
15.33 15.67 -7.9 0.11
15.33 15.33 -4.5 0.06
30.00 24.64 0.0 0.06
30.00 30.00 0.0 0.05
30.00 30.00 0.0 0.06
26.42 29.47 2.1 0.06
14.33 18.75 8.1 0.06
14.33 14.33 -13.2 0.14
16.00 16.62 -5.3 0.12
15.33 15.99 -5.9 0.10
15.33 15.33 -5.2 0.07
14.67 16.53 -2.8 0.07
14.33 14.67 -7.9 0.09
14.33 14.33 -8.2 0.09
14.00 14.33 -11.9 0.12
14.00 14.00 -15.4 0.15
15.00 15.00 -8.9 0.11
15.00 15.00 -11.8 0.14
14.33 15.31 -10.9 0.14
14.33 14.33 -14.1 0.15
14.67 15.30 -2.7 0.04
14.67 14.67 -12.0 0.14
16.00 16.00 -5.2 0.09
14.33 17.37 0.9 0.04
14.33 14.33 -11.3 0.11
14.00 14.66 -17.6 0.19
14.00 14.00 -13.6 0.13
14.33 14.33 -14.1 0.15
15.67 19.35 -3.6 0.14
15.00 15.66 -8.1 0.13
0.00 13.27 -22.8 0.31
16.10 16.00 -233.8 3.57
0.00 0.00 0.0 0.14
0.00 0.00 0.0 0.29
35.00 24.64 22.8 0.17
35.00 38.65 8.1 0.05
35.00 39.00 3.6 0.07
35.00 38.77 14.1 0.06
35.00 38.18 13.6 0.05
35.00 39.04 17.6 0.07
30.00 35.46 11.3 0.05
30.00 30.00 -0.9 0.02
35.00 34.80 5.2 0.04
35.00 38.65 12.0 0.05
30.00 32.67 2.7 0.02
35.00 36.76 14.1 0.06
35.00 38.74 10.9 0.06
30.00 36.68 11.8 0.06
35.00 35.81 8.9 0.05
30.00 36.39 15.4 0.06
35.00 35.37 11.9 0.05
35.00 37.91 8.2 0.03
35.00 38.05 7.9 0.04
35.00 37.39 2.8 0.03
30.00 33.99 5.2 0.03
35.00 34.96 5.9 0.04
35.00 38.63 5.3 0.05
20.33 29.97 13.2 0.07
20.33 20.33 -8.1 0.06
30.00 27.73 -2.1 0.06
35.00 36.29 0.0 0.05
35.00 38.05 0.0 0.04
30.00 35.15 0.0 0.04
35.00 33.25 4.5 0.03
30.00 35.98 7.9 0.05
0.00 19.61 0.0 0.13
31.58 33.21 233.8 1.73

TE
Actual Final Average Speed Elevation Fuel
Speed (kph) (kph) Change (m) Burned (l)
0.00 0.00 0.0 0.144
0.00 0.00 0.0 0.721
0.00 0.00 0.0 0.721
15.67 17.03 0.0 0.149
15.33 15.67 -7.9 0.111
15.33 15.33 -4.5 0.059
30.00 24.64 0.0 0.062
30.00 30.00 0.0 0.045
30.00 30.00 0.0 0.062
26.42 29.47 2.1 0.059
14.33 18.75 8.1 0.063
14.33 14.33 -13.2 0.138
16.00 16.62 -5.3 0.118
15.33 15.99 -5.9 0.095
15.33 15.33 -5.2 0.067
14.67 16.53 -2.8 0.069
14.33 14.67 -7.9 0.093
14.33 14.33 -8.2 0.088
14.00 14.33 -11.9 0.122
14.00 14.00 -15.4 0.148
14.67 15.00 -8.9 0.113
14.67 14.67 -15.0 0.172
16.00 16.00 -11.4 0.180
30.00 26.00 3.9 0.083
23.27 24.63 16.4 0.158
15.67 22.98 4.8 0.087
0.00 10.26 -5.1 0.109
17.65 17.62 -93.1 2.452
0.00 0.00 0.0 0.144
0.00 0.00 0.0 0.288
24.42 13.17 5.1 0.085
22.66 24.36 -4.8 0.082
22.66 22.66 -16.4 0.172
25.00 24.97 -3.9 0.087
35.00 35.25 11.4 0.082
35.00 38.93 15.0 0.065
35.00 38.42 8.9 0.044
30.00 36.39 15.4 0.057
35.00 35.37 11.9 0.050
35.00 37.91 8.2 0.034
35.00 38.05 7.9 0.036
35.00 37.39 2.8 0.031
30.00 33.99 5.2 0.031
35.00 34.96 5.9 0.044
35.00 38.63 5.3 0.051
20.33 29.97 13.2 0.066
20.33 20.33 -8.1 0.058
30.00 27.73 -2.1 0.062
35.00 36.29 0.0 0.051
35.00 38.05 0.0 0.036
30.00 35.15 0.0 0.044
35.00 33.25 4.5 0.027
30.00 35.98 7.9 0.048
0.00 19.61 0.0 0.130
29.39 29.40 93.1 1.475
ADA DE HAUL INFINITY
RUTA PIT 1 A PLANTA

Distance Gradient Segment Actual Max Actual Final


Segment RR (%) Loaded (%) Time
(m) (%) (min) Speed (kph) Speed (kph)

Queue at Loader 0.00 0.00 0.0 0.00 0.5000 0.00 0.00


Spot at Loader 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loading 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loaded 1 78.01 -10.61 2.0 100.00 0.3989 14.67 14.67
Loaded 2 58.20 0.00 2.0 100.00 0.1592 29.07 29.07
Loaded 3 163.64 0.00 2.0 100.00 0.3273 30.00 30.00
Loaded 4 68.04 0.00 2.0 100.00 0.1361 30.00 30.00
Loaded 5 304.62 0.00 2.0 100.00 0.6092 30.00 30.00
Loaded 6 83.61 7.27 2.0 100.00 0.1875 30.00 24.32
Loaded 7 54.52 1.62 2.0 100.00 0.1558 25.37 16.67
Loaded 8 57.21 -4.83 2.0 100.00 0.2095 16.67 14.00
Loaded 9 119.30 -12.85 2.0 100.00 0.5113 14.00 14.00
Loaded 10 98.18 -9.06 2.0 100.00 0.3927 15.00 15.00
Loaded 11 121.58 -9.79 2.0 100.00 0.4863 15.00 15.00
Loaded 12 122.64 -8.87 2.0 100.00 0.4806 15.33 14.33
Loaded 13 123.44 -11.46 2.0 100.00 0.5169 14.33 14.33
Loaded 14 32.48 -8.41 2.0 100.00 0.1274 15.33 14.67
Loaded 15 114.96 -10.43 2.0 100.00 0.4702 14.67 14.67
Loaded 16 81.37 -6.33 2.0 100.00 0.3051 16.00 16.00
Loaded 17 42.80 2.15 2.0 100.00 0.1478 20.35 14.33
Loaded 18 94.89 -11.95 2.0 100.00 0.3973 14.33 14.33
Loaded 19 163.56 -10.74 2.0 100.00 0.6692 14.67 14.00
Loaded 20 105.25 -12.89 2.0 100.00 0.4511 14.00 14.00
Loaded 21 125.82 -11.23 2.0 100.00 0.5268 14.33 14.33
Loaded 22 156.07 -2.30 2.0 100.00 0.4839 20.00 15.67
Loaded 23 114.48 -7.05 2.0 100.00 0.4386 15.67 15.00
Loaded 24 239.62 -9.53 2.0 100.00 1.0835 15.00 0.00
Subtotal 2,724.29 -6.43 2.0 100.00 9.6720 30.00 17.02
Spot at Dump 0.00 0.00 0.0 0.00 0.5000 0.00 0.00
Dumping 0.00 0.00 0.0 0.00 1.0000 0.00 0.00
Unloaded 1 239.62 9.53 2.0 0.00 0.5835 40.00 35.00
Unloaded 2 114.48 7.05 2.0 0.00 0.1777 40.00 35.00
Unloaded 3 156.07 2.30 2.0 0.00 0.2401 40.00 35.00
Unloaded 4 125.82 11.23 2.0 0.00 0.1947 40.00 35.00
Unloaded 5 105.25 12.89 2.0 0.00 0.1654 40.00 35.00
Unloaded 6 163.56 10.74 2.0 0.00 0.2513 40.00 35.00
Unloaded 7 94.89 11.95 2.0 0.00 0.1606 39.57 30.00
Unloaded 8 42.80 -2.15 2.0 0.00 0.0856 30.00 30.00
Unloaded 9 81.37 6.33 2.0 0.00 0.1403 38.85 35.00
Unloaded 10 114.96 10.43 2.0 0.00 0.1784 40.00 35.00
Unloaded 11 32.48 8.41 2.0 0.00 0.0597 35.00 30.00
Unloaded 12 123.44 11.46 2.0 0.00 0.2015 40.00 35.00
Unloaded 13 122.64 8.87 2.0 0.00 0.1900 40.00 35.00
Unloaded 14 121.58 9.79 2.0 0.00 0.1988 40.00 30.00
Unloaded 15 98.18 9.06 2.0 0.00 0.1636 39.90 35.00
Unloaded 16 119.30 12.85 2.0 0.00 0.1864 40.00 35.00
Unloaded 17 57.21 4.83 2.0 0.00 0.0958 38.45 33.20
Unloaded 18 54.52 -1.62 2.0 0.00 0.1196 33.35 22.66
Unloaded 19 83.61 -7.27 2.0 0.00 0.2214 22.66 22.66
Unloaded 20 304.62 0.00 2.0 0.00 0.5010 40.00 35.00
Unloaded 21 68.04 0.00 2.0 0.00 0.1092 39.95 35.00
Unloaded 22 163.64 0.00 2.0 0.00 0.2515 40.00 35.00
Unloaded 23 58.20 0.00 2.0 0.00 0.1055 36.80 29.03
Unloaded 24 78.01 10.61 2.0 0.00 0.3250 29.18 0.00
Subtotal 2,724.29 6.43 2.0 0.00 4.9065 40.00 31.36

RUTA PIT 1 A DESMONTE

Distance Gradient Segment Actual Max Actual Final


Segment RR (%) Loaded (%) Time
(m) (%) (min) Speed (kph) Speed (kph)

Queue at Loader 0.00 0.00 0.0 0.00 0.5000 0.00 0.00


Spot at Loader 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loading 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loaded 1 78.01 -10.61 2.0 100.00 0.3989 14.67 14.67
Loaded 2 58.20 0.00 2.0 100.00 0.1592 29.07 29.07
Loaded 3 163.64 0.00 2.0 100.00 0.3273 30.00 30.00
Loaded 4 68.04 0.00 2.0 100.00 0.1361 30.00 30.00
Loaded 5 304.62 0.00 2.0 100.00 0.6092 30.00 30.00
Loaded 6 83.61 7.27 2.0 100.00 0.1875 30.00 24.32
Loaded 7 54.52 1.62 2.0 100.00 0.1558 25.37 16.67
Loaded 8 57.21 -4.83 2.0 100.00 0.2059 16.67 16.67
Loaded 9 100.43 11.84 2.0 100.00 0.3814 16.67 15.62
Loaded 10 72.69 11.22 2.0 100.00 0.2684 16.33 16.33
Loaded 11 78.17 10.13 2.0 100.00 0.2693 17.56 17.56
Loaded 12 116.29 12.26 2.0 100.00 0.4522 17.56 15.10
Loaded 13 109.02 -0.11 2.0 100.00 0.2579 30.00 30.00
Loaded 14 94.49 4.21 2.0 100.00 0.1890 30.00 30.00
Loaded 15 445.37 0.69 2.0 100.00 0.8907 30.00 30.00
Loaded 16 169.70 0.00 2.0 100.00 0.5894 30.00 0.00
Subtotal 2,054.02 2.20 2.0 100.00 5.4783 30.00 21.63
Spot at Dump 0.00 0.00 0.0 0.00 0.5000 0.00 0.00
Dumping 0.00 0.00 0.0 0.00 1.0000 0.00 0.00
Unloaded 1 169.70 0.00 2.0 0.00 0.4803 39.15 35.00
Unloaded 2 445.37 -0.69 2.0 0.00 0.7043 40.00 24.42
Unloaded 3 94.49 -4.21 2.0 0.00 0.2322 24.42 24.42
Unloaded 4 109.02 0.11 2.0 0.00 0.2411 32.97 19.75
Unloaded 5 116.29 -12.26 2.0 0.00 0.3533 19.75 19.75
Unloaded 6 78.17 -10.13 2.0 0.00 0.2244 20.91 20.33
Unloaded 7 72.69 -11.22 2.0 0.00 0.2145 20.33 20.33
Unloaded 8 100.43 -11.84 2.0 0.00 0.2964 20.33 20.33
Unloaded 9 57.21 4.83 2.0 0.00 0.1308 32.18 32.18
Unloaded 10 54.52 -1.62 2.0 0.00 0.1183 32.78 22.66
Unloaded 11 83.61 -7.27 2.0 0.00 0.2214 22.66 22.66
Unloaded 12 304.62 0.00 2.0 0.00 0.5010 40.00 35.00
Unloaded 13 68.04 0.00 2.0 0.00 0.1092 39.95 35.00
Unloaded 14 163.64 0.00 2.0 0.00 0.2515 40.00 35.00
Unloaded 15 58.20 0.00 2.0 0.00 0.1055 36.80 29.03
Unloaded 16 78.01 10.61 2.0 0.00 0.3250 29.18 0.00
Subtotal 2,054.02 -2.20 2.0 0.00 4.5091 40.00 24.74
Average Elevation Fuel Burned
Speed (kph) Change (m) (l)

0.00 0.0 0.144


0.00 0.0 0.721
0.00 0.0 0.721
11.73 -8.3 0.115 DATA EXPORTADA DE HAUL INFINITY
21.94 0.0 0.046
30.00 0.0 0.095
30.00 0.0 0.039
30.00 0.0 0.176
26.76 6.1 0.054
20.99 0.9 0.046
16.39 -2.8 0.061
14.00 -15.3 0.148
15.00 -8.9 0.113
15.00 -11.9 0.140
15.31 -10.9 0.139
14.33 -14.1 0.149
15.30 -2.7 0.037
14.67 -12.0 0.136
16.00 -5.2 0.088
17.37 0.9 0.043
14.33 -11.3 0.115
14.66 -17.6 0.193
14.00 -13.6 0.130
14.33 -14.1 0.152
19.35 -3.6 0.140
15.66 -8.1 0.127
13.27 -22.8 0.313
16.90 -175.3 2.796
0.00 0.0 0.144
0.00 0.0 0.288
24.64 22.8 0.169
38.65 8.1 0.052
39.00 3.6 0.070
38.77 14.1 0.057
38.18 13.6 0.048
39.04 17.6 0.073
35.46 11.3 0.047
30.00 -0.9 0.025
34.80 5.2 0.041
38.65 12.0 0.052
32.67 2.7 0.018
36.76 14.1 0.059
38.74 10.9 0.055
36.70 11.9 0.058
36.00 8.9 0.048
38.40 15.3 0.054
35.82 2.8 0.028
27.35 -0.9 0.035
22.66 -6.1 0.064
36.48 0.0 0.145
37.40 0.0 0.032
39.04 0.0 0.073
33.08 0.0 0.031
14.40 8.3 0.094
33.31 175.3 1.425

Average Elevation Fuel Burned


Speed (kph) Change (m) (l)

0.00 0.0 0.144


0.00 0.0 0.721
0.00 0.0 0.721
11.73 -8.3 0.115
21.94 0.0 0.046
30.00 0.0 0.095
30.00 0.0 0.039
30.00 0.0 0.176
26.76 6.1 0.054
20.99 0.9 0.046
16.67 -2.8 0.060
15.80 11.9 0.110
16.25 8.2 0.077
17.42 7.9 0.078
15.43 14.3 0.130
25.36 -0.1 0.075
30.00 4.0 0.055
30.00 3.1 0.257
17.28 0.0 0.170
22.50 45.1 1.582
0.00 0.0 0.144
0.00 0.0 0.288
21.20 0.0 0.139
37.94 -3.1 0.203
24.42 -4.0 0.067
27.14 0.1 0.070
19.75 -14.3 0.102
20.90 -7.9 0.065
20.33 -8.2 0.062
20.33 -11.9 0.086
26.24 2.8 0.038
27.66 -0.9 0.035
22.66 -6.1 0.064
36.48 0.0 0.145
37.40 0.0 0.032
39.04 0.0 0.073
33.08 0.0 0.031
14.40 8.3 0.094
27.33 -45.1 1.306
TADA DE HAUL INFINITY
RUTA PIT 1 A PLANTA
Distance Gradient Segment Actual Max Actual Final
Segment RR (%) Loaded (%)
(m) (%) Time (min) Speed (kph) Speed (kph)
Queue at Loader 0.00 0.00 0.0 0.00 1.3251 0.00 0.00
Spot at Loader 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loading 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loaded 1 76.48 0.00 2.0 100.00 0.3192 28.80 28.80
Loaded 2 254.14 0.00 2.0 100.00 0.5083 30.00 30.00
Loaded 3 112.43 0.00 2.0 100.00 0.2249 30.00 30.00
Loaded 4 119.30 0.00 2.0 100.00 0.2386 30.00 30.00
Loaded 5 28.95 2.06 2.0 100.00 0.0579 30.00 30.00
Loaded 6 94.59 12.30 2.0 100.00 0.3075 30.00 15.13
Loaded 7 43.22 0.00 2.0 100.00 0.1486 20.23 14.67
Loaded 8 124.91 -10.08 2.0 100.00 0.5110 14.67 14.33
Loaded 9 123.47 -11.46 2.0 100.00 0.5170 14.33 14.33
Loaded 10 32.48 -8.41 2.0 100.00 0.1274 15.33 14.67
Loaded 11 114.96 -10.43 2.0 100.00 0.4702 14.67 14.67
Loaded 12 81.37 -6.33 2.0 100.00 0.3051 16.00 16.00
Loaded 13 42.80 2.15 2.0 100.00 0.1478 20.35 14.33
Loaded 14 94.89 -11.95 2.0 100.00 0.3973 14.33 14.33
Loaded 15 163.56 -10.74 2.0 100.00 0.6692 14.67 14.00
Loaded 16 105.25 -12.89 2.0 100.00 0.4511 14.00 14.00
Loaded 17 125.82 -11.23 2.0 100.00 0.5268 14.33 14.33
Loaded 18 156.07 -2.30 2.0 100.00 0.4839 20.00 15.67
Loaded 19 114.48 -7.05 2.0 100.00 0.4386 15.67 15.00
Loaded 20 239.62 -9.53 2.0 100.00 1.0835 15.00 0.00
Subtotal 2,248.76 -5.54 2.0 100.00 7.9336 30.00 17.71
Spot at Dump 0.00 0.00 0.0 0.00 0.5000 0.00 0.00
Dumping 0.00 0.00 0.0 0.00 1.0000 0.00 0.00
Unloaded 1 239.62 9.53 2.0 0.00 0.5835 40.00 35.00
Unloaded 2 114.48 7.05 2.0 0.00 0.1777 40.00 35.00
Unloaded 3 156.07 2.30 2.0 0.00 0.2401 40.00 35.00
Unloaded 4 125.82 11.23 2.0 0.00 0.1947 40.00 35.00
Unloaded 5 105.25 12.89 2.0 0.00 0.1654 40.00 35.00
Unloaded 6 163.56 10.74 2.0 0.00 0.2513 40.00 35.00
Unloaded 7 94.89 11.95 2.0 0.00 0.1606 39.57 30.00
Unloaded 8 42.80 -2.15 2.0 0.00 0.0856 30.00 30.00
Unloaded 9 81.37 6.33 2.0 0.00 0.1403 38.85 35.00
Unloaded 10 114.96 10.43 2.0 0.00 0.1784 40.00 35.00
Unloaded 11 32.48 8.41 2.0 0.00 0.0597 35.00 30.00
Unloaded 12 123.47 11.46 2.0 0.00 0.2125 39.60 30.00
Unloaded 13 124.91 10.08 2.0 0.00 0.2173 39.45 29.27
Unloaded 14 43.22 0.00 2.0 0.00 0.1083 29.42 19.75
Unloaded 15 94.59 -12.30 2.0 0.00 0.2874 19.75 19.75
Unloaded 16 28.95 -2.06 2.0 0.00 0.0742 26.50 26.50
Unloaded 17 119.30 0.00 2.0 0.00 0.2066 40.00 35.00
Unloaded 18 112.43 0.00 2.0 0.00 0.1746 40.00 35.00
Unloaded 19 254.14 0.00 2.0 0.00 0.4014 40.00 28.74
Unloaded 20 76.48 0.00 2.0 0.00 0.3218 28.89 0.00
Subtotal 2,248.76 5.54 2.0 0.00 4.2413 40.00 29.70

RUTA PIT 1 A DESMONTE


Distance Gradient Segment Actual Max Actual Final
Segment RR (%) Loaded (%)
(m) (%) Time (min) Speed (kph) Speed (kph)
Queue at Loader 0.00 0.00 0.0 0.00 0.6008 0.00 0.00
Spot at Loader 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loading 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loaded 1 76.48 0.00 2.0 100.00 0.3192 28.80 28.80
Loaded 2 254.14 0.00 2.0 100.00 0.5083 30.00 30.00
Loaded 3 112.43 0.00 2.0 100.00 0.2249 30.00 30.00
Loaded 4 119.30 0.00 2.0 100.00 0.2386 30.00 30.00
Loaded 5 28.95 2.06 2.0 100.00 0.0579 30.00 30.00
Loaded 6 94.59 12.30 2.0 100.00 0.3075 30.00 15.13
Loaded 7 43.22 0.00 2.0 100.00 0.1486 20.23 14.67
Loaded 8 124.91 -10.08 2.0 100.00 0.5109 14.67 14.67
Loaded 9 122.63 8.87 2.0 100.00 0.4025 18.97 18.97
Loaded 10 121.58 9.79 2.0 100.00 0.4074 18.97 17.76
Loaded 11 98.18 9.06 2.0 100.00 0.3242 18.32 18.32
Loaded 12 119.94 12.85 2.0 100.00 0.4954 18.32 13.80
Loaded 13 100.91 11.84 2.0 100.00 0.3955 15.56 15.56
Loaded 14 72.69 11.22 2.0 100.00 0.2686 16.33 16.33
Loaded 15 78.17 10.13 2.0 100.00 0.2693 17.56 17.56
Loaded 16 117.16 12.26 2.0 100.00 0.4557 17.56 15.10
Loaded 17 65.95 12.20 2.0 100.00 0.2609 15.17 15.17
Loaded 18 80.54 8.62 2.0 100.00 0.2625 19.43 19.43
Loaded 19 67.50 5.68 2.0 100.00 0.1758 24.87 24.87
Loaded 20 243.80 0.00 2.0 100.00 0.4915 30.00 30.00
Loaded 21 194.44 0.00 2.0 100.00 0.6389 30.00 0.00
Subtotal 2,337.50 4.62 2.0 100.00 7.1639 30.00 19.82
Spot at Dump 0.00 0.00 0.0 0.00 0.5000 0.00 0.00
Dumping 0.00 0.00 0.0 0.00 1.0000 0.00 0.00
Unloaded 1 194.44 0.00 2.0 0.00 0.5157 40.00 35.00
Unloaded 2 243.80 0.00 2.0 0.00 0.4046 40.00 23.83
Unloaded 3 67.50 -5.68 2.0 0.00 0.1707 23.83 22.08
Unloaded 4 80.54 -8.62 2.0 0.00 0.2202 22.08 19.75
Unloaded 5 65.95 -12.20 2.0 0.00 0.2004 19.75 19.75
Unloaded 6 117.16 -12.26 2.0 0.00 0.3559 19.75 19.75
Unloaded 7 78.17 -10.13 2.0 0.00 0.2244 20.91 20.33
Unloaded 8 72.69 -11.22 2.0 0.00 0.2145 20.33 20.33
Unloaded 9 100.91 -11.84 2.0 0.00 0.2979 20.33 19.75
Unloaded 10 119.94 -12.85 2.0 0.00 0.3644 19.75 19.75
Unloaded 11 98.18 -9.06 2.0 0.00 0.2740 21.50 21.50
Unloaded 12 121.58 -9.79 2.0 0.00 0.3393 21.50 21.50
Unloaded 13 122.63 -8.87 2.0 0.00 0.3332 22.08 22.08
Unloaded 14 124.91 10.08 2.0 0.00 0.2459 36.78 29.27
Unloaded 15 43.22 0.00 2.0 0.00 0.1083 29.42 19.75
Unloaded 16 94.59 -12.30 2.0 0.00 0.2874 19.75 19.75
Unloaded 17 28.95 -2.06 2.0 0.00 0.0742 26.50 26.50
Unloaded 18 119.30 0.00 2.0 0.00 0.2066 40.00 35.00
Unloaded 19 112.43 0.00 2.0 0.00 0.1746 40.00 35.00
Unloaded 20 254.14 0.00 2.0 0.00 0.4014 40.00 28.74
Unloaded 21 76.48 0.00 2.0 0.00 0.3218 28.89 0.00
Subtotal 2,337.50 -4.62 2.0 0.00 5.7354 40.00 22.83
Average Elevation Fuel Burned
Speed (kph) Change (m) (l)
0.00 0.0 0.382
0.00 0.0 0.721
0.00 0.0 0.721
14.38 0.0 0.092
30.00 0.0 0.147 DATA EXPORTADA DE HAUL INFINITY
30.00 0.0 0.065
30.00 0.0 0.069
30.00 0.6 0.017
18.46 11.6 0.089
17.45 0.0 0.043
14.67 -12.6 0.148
14.33 -14.1 0.149
15.30 -2.7 0.037
14.67 -12.0 0.136
16.00 -5.2 0.088
17.37 0.9 0.043
14.33 -11.3 0.115
14.66 -17.6 0.193
14.00 -13.6 0.130
14.33 -14.1 0.152
19.35 -3.6 0.140
15.66 -8.1 0.127
13.27 -22.8 0.313
17.01 -124.6 2.294
0.00 0.0 0.144
0.00 0.0 0.288
24.64 22.8 0.169
38.65 8.1 0.052
39.00 3.6 0.070
38.77 14.1 0.057
38.18 13.6 0.048
39.04 17.6 0.073
35.46 11.3 0.047
30.00 -0.9 0.025
34.80 5.2 0.041
38.65 12.0 0.052
32.67 2.7 0.018
34.86 14.1 0.061
34.50 12.6 0.063
23.94 0.0 0.032
19.75 -11.6 0.083
23.42 -0.6 0.022
34.64 0.0 0.060
38.62 0.0 0.051
37.99 0.0 0.116
14.26 0.0 0.093
31.81 124.6 1.231

Average Elevation Fuel Burned


Speed (kph) Change (m) (l)
0.00 0.0 0.173
0.00 0.0 0.721
0.00 0.0 0.721
14.38 0.0 0.092
30.00 0.0 0.147
30.00 0.0 0.065
30.00 0.0 0.069
30.00 0.6 0.017
18.46 11.6 0.089
17.45 0.0 0.043
14.67 -12.6 0.148
18.28 10.9 0.116
17.91 11.9 0.117
18.17 8.9 0.093
14.53 15.4 0.143
15.31 11.9 0.114
16.24 8.2 0.078
17.42 7.9 0.078
15.43 14.4 0.131
15.17 8.0 0.075
18.41 6.9 0.076
23.03 3.8 0.051
29.76 0.0 0.142
18.26 0.0 0.184
19.58 107.9 2.068
0.00 0.0 0.144
0.00 0.0 0.288
22.62 0.0 0.149
36.16 0.0 0.117
23.73 -3.8 0.050
21.94 -6.9 0.064
19.75 -8.0 0.058
19.75 -14.4 0.103
20.90 -7.9 0.065
20.33 -8.2 0.062
20.32 -11.9 0.086
19.75 -15.4 0.105
21.50 -8.9 0.079
21.50 -11.9 0.098
22.08 -10.9 0.096
30.47 12.6 0.072
23.94 0.0 0.032
19.75 -11.6 0.083
23.42 -0.6 0.022
34.64 0.0 0.060
38.62 0.0 0.051
37.99 0.0 0.116
14.26 0.0 0.093
24.45 -107.9 1.661
TADA DE HAUL INFINITY
RUTA PIT 1 A PLANTA
Distance Gradient Segment Actual Max Actual Final
Segment RR (%) Loaded (%) Time
(m) (%) (min) Speed (kph) Speed (kph)
Queue at Loader 0.00 0.00 0.0 0.00 0.5000 0.00 0.00
Spot at Loader 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loading 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loaded 1 250.35 0.00 2.0 100.00 0.6657 30.00 30.00
Loaded 2 12.00 0.00 2.0 100.00 0.0240 30.00 30.00
Loaded 3 50.86 9.31 2.0 100.00 0.1192 30.00 22.34
Loaded 4 24.30 5.47 2.0 100.00 0.0625 24.36 24.36
Loaded 5 41.91 8.37 2.0 100.00 0.1092 24.36 21.99
Loaded 6 31.31 8.15 2.0 100.00 0.0858 21.99 21.60
Loaded 7 13.95 0.00 2.0 100.00 0.0358 24.90 24.90
Loaded 8 28.44 7.29 2.0 100.00 0.0708 24.90 23.71
Loaded 9 17.58 6.48 2.0 100.00 0.0442 23.99 23.99
Loaded 10 39.76 8.30 2.0 100.00 0.1042 23.99 22.04
Loaded 11 29.19 8.56 2.0 100.00 0.0808 22.04 21.14
Loaded 12 50.29 9.65 2.0 100.00 0.1558 21.14 18.23
Loaded 13 25.37 9.33 2.0 100.00 0.0842 18.23 17.91
Loaded 14 28.64 8.80 2.0 100.00 0.0942 18.54 18.54
Loaded 15 12.89 7.22 2.0 100.00 0.0408 19.98 19.98
Loaded 16 27.04 7.77 2.0 100.00 0.0901 20.17 15.33
Loaded 17 31.83 -8.41 2.0 100.00 0.1248 15.33 14.67
Loaded 18 114.96 -10.43 2.0 100.00 0.4702 14.67 14.67
Loaded 19 81.37 -6.33 2.0 100.00 0.3051 16.00 16.00
Loaded 20 42.80 2.15 2.0 100.00 0.1478 20.35 14.33
Loaded 21 94.93 -11.95 2.0 100.00 0.3975 14.33 14.33
Loaded 22 163.30 -10.74 2.0 100.00 0.6682 14.67 14.00
Loaded 23 105.25 -12.89 2.0 100.00 0.4511 14.00 14.00
Loaded 24 125.82 -11.23 2.0 100.00 0.5268 14.33 14.33
Loaded 25 156.07 -2.30 2.0 100.00 0.4839 20.00 15.67
Loaded 26 114.48 -7.05 2.0 100.00 0.4386 15.67 15.00
Loaded 27 239.62 -9.53 2.0 100.00 1.0835 15.00 0.00
Subtotal 1,954.32 -3.89 2.0 100.00 6.9647 30.00 18.63
Spot at Dump 0.00 0.00 0.0 0.00 0.5000 0.00 0.00
Dumping 0.00 0.00 0.0 0.00 1.0000 0.00 0.00
Unloaded 1 239.62 9.53 2.0 0.00 0.5835 40.00 35.00
Unloaded 2 114.48 7.05 2.0 0.00 0.1777 40.00 35.00
Unloaded 3 156.07 2.30 2.0 0.00 0.2401 40.00 35.00
Unloaded 4 125.82 11.23 2.0 0.00 0.1947 40.00 35.00
Unloaded 5 105.25 12.89 2.0 0.00 0.1654 40.00 35.00
Unloaded 6 163.30 10.74 2.0 0.00 0.2510 40.00 35.00
Unloaded 7 94.93 11.95 2.0 0.00 0.1606 39.57 30.00
Unloaded 8 42.80 -2.15 2.0 0.00 0.0856 30.00 30.00
Unloaded 9 81.37 6.33 2.0 0.00 0.1403 38.85 35.00
Unloaded 10 114.96 10.43 2.0 0.00 0.1909 40.00 29.28
Unloaded 11 31.83 8.41 2.0 0.00 0.0760 29.43 22.66
Unloaded 12 27.04 -7.77 2.0 0.00 0.0716 22.66 22.66
Unloaded 13 12.89 -7.22 2.0 0.00 0.0342 22.66 22.08
Unloaded 14 28.64 -8.80 2.0 0.00 0.0779 22.08 21.50
Unloaded 15 25.37 -9.33 2.0 0.00 0.0708 21.50 21.50
Unloaded 16 50.29 -9.65 2.0 0.00 0.1404 21.50 21.50
Unloaded 17 29.19 -8.56 2.0 0.00 0.0793 22.08 22.08
Unloaded 18 39.76 -8.30 2.0 0.00 0.1081 22.08 22.08
Unloaded 19 17.58 -6.48 2.0 0.00 0.0454 23.25 22.66
Unloaded 20 28.44 -7.29 2.0 0.00 0.0753 22.66 22.66
Unloaded 21 13.95 0.00 2.0 0.00 0.0357 24.01 22.08
Unloaded 22 31.31 -8.15 2.0 0.00 0.0851 22.08 22.08
Unloaded 23 41.91 -8.37 2.0 0.00 0.1139 22.08 22.08
Unloaded 24 24.30 -5.47 2.0 0.00 0.0624 23.83 21.50
Unloaded 25 50.86 -9.31 2.0 0.00 0.1419 21.50 21.50
Unloaded 26 12.00 0.00 2.0 0.00 0.0308 24.35 24.35
Unloaded 27 250.35 0.00 2.0 0.00 0.6306 40.00 0.00
Subtotal 1,954.32 3.89 2.0 0.00 4.0693 40.00 25.53

RUTA PIT 1 A DESMONTE


Distance Gradient Segment Actual Max Actual Final
Segment RR (%) Loaded (%)
(m) (%) Time (min) Speed (kph) Speed (kph)
Queue at Loader 0.00 0.00 0.0 0.00 1.0510 0.00 0.00
Spot at Loader 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loading 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loaded 1 250.35 0.00 2.0 100.00 0.6657 30.00 30.00
Loaded 2 12.00 0.00 2.0 100.00 0.0240 30.00 30.00
Loaded 3 50.86 9.31 2.0 100.00 0.1192 30.00 22.34
Loaded 4 24.30 5.47 2.0 100.00 0.0625 24.36 24.36
Loaded 5 41.91 8.37 2.0 100.00 0.1092 24.36 21.99
Loaded 6 31.31 8.15 2.0 100.00 0.0858 21.99 21.60
Loaded 7 13.95 0.00 2.0 100.00 0.0358 24.90 24.90
Loaded 8 28.44 7.29 2.0 100.00 0.0708 24.90 23.71
Loaded 9 17.58 6.48 2.0 100.00 0.0442 23.99 23.99
Loaded 10 39.76 8.30 2.0 100.00 0.1042 23.99 22.04
Loaded 11 29.19 8.56 2.0 100.00 0.0808 22.04 21.14
Loaded 12 50.29 9.65 2.0 100.00 0.1558 21.14 18.23
Loaded 13 25.37 9.33 2.0 100.00 0.0842 18.23 17.91
Loaded 14 28.64 8.80 2.0 100.00 0.0942 18.54 18.54
Loaded 15 12.89 7.22 2.0 100.00 0.0408 19.98 19.98
Loaded 16 27.04 7.77 2.0 100.00 0.0792 21.12 21.12
Loaded 17 122.60 11.46 2.0 100.00 0.4392 21.12 16.07
Loaded 18 122.64 8.87 2.0 100.00 0.3992 18.99 18.99
Loaded 19 121.58 9.79 2.0 100.00 0.4073 18.99 17.76
Loaded 20 98.18 9.06 2.0 100.00 0.3242 18.32 18.32
Loaded 21 119.94 12.85 2.0 100.00 0.4954 18.32 13.80
Loaded 22 100.91 11.84 2.0 100.00 0.3955 15.56 15.56
Loaded 23 72.69 11.22 2.0 100.00 0.2686 16.33 16.33
Loaded 24 78.17 10.13 2.0 100.00 0.2693 17.56 17.56
Loaded 25 117.16 12.26 2.0 100.00 0.4557 17.56 15.10
Loaded 26 66.47 12.20 2.0 100.00 0.2630 15.17 15.17
Loaded 27 57.51 9.98 2.0 100.00 0.2025 17.68 17.68
Loaded 28 35.76 7.59 2.0 100.00 0.1108 20.66 20.66
Loaded 29 48.17 10.44 2.0 100.00 0.1575 20.66 17.38
Loaded 30 53.41 6.77 2.0 100.00 0.1558 22.75 22.75
Loaded 31 60.94 10.97 2.0 100.00 0.1975 22.75 16.84
Loaded 32 94.77 12.74 2.0 100.00 0.3875 16.84 14.09
Loaded 33 226.28 2.17 2.0 100.00 0.4989 30.00 30.00
Loaded 34 239.01 0.00 2.0 100.00 0.4780 30.00 30.00
Loaded 35 265.76 0.00 2.0 100.00 0.7815 30.00 0.00
Subtotal 2,785.86 6.69 2.0 100.00 8.5437 30.00 19.88
Spot at Dump 0.00 0.00 0.0 0.00 0.5000 0.00 0.00
Dumping 0.00 0.00 0.0 0.00 1.0000 0.00 0.00
Unloaded 1 265.76 0.00 2.0 0.00 0.6227 40.00 35.00
Unloaded 2 239.01 0.00 2.0 0.00 0.3749 40.00 30.00
Unloaded 3 226.28 -2.17 2.0 0.00 0.4720 30.00 19.75
Unloaded 4 94.77 -12.74 2.0 0.00 0.2879 19.75 19.75
Unloaded 5 60.94 -10.97 2.0 0.00 0.1749 20.91 20.91
Unloaded 6 53.41 -6.77 2.0 0.00 0.1395 23.25 20.91
Unloaded 7 48.17 -10.44 2.0 0.00 0.1382 20.91 20.91
Unloaded 8 35.76 -7.59 2.0 0.00 0.0950 22.66 21.50
Unloaded 9 57.51 -9.98 2.0 0.00 0.1613 21.50 19.75
Unloaded 10 66.47 -12.20 2.0 0.00 0.2019 19.75 19.75
Unloaded 11 117.16 -12.26 2.0 0.00 0.3559 19.75 19.75
Unloaded 12 78.17 -10.13 2.0 0.00 0.2244 20.91 20.33
Unloaded 13 72.69 -11.22 2.0 0.00 0.2145 20.33 20.33
Unloaded 14 100.91 -11.84 2.0 0.00 0.2979 20.33 19.75
Unloaded 15 119.94 -12.85 2.0 0.00 0.3644 19.75 19.75
Unloaded 16 98.18 -9.06 2.0 0.00 0.2740 21.50 21.50
Unloaded 17 121.58 -9.79 2.0 0.00 0.3393 21.50 21.50
Unloaded 18 122.64 -8.87 2.0 0.00 0.3340 22.08 20.33
Unloaded 19 122.60 -11.46 2.0 0.00 0.3618 20.33 20.33
Unloaded 20 27.04 -7.77 2.0 0.00 0.0720 22.66 22.66
Unloaded 21 12.89 -7.22 2.0 0.00 0.0342 22.66 22.08
Unloaded 22 28.64 -8.80 2.0 0.00 0.0779 22.08 21.50
Unloaded 23 25.37 -9.33 2.0 0.00 0.0708 21.50 21.50
Unloaded 24 50.29 -9.65 2.0 0.00 0.1404 21.50 21.50
Unloaded 25 29.19 -8.56 2.0 0.00 0.0793 22.08 22.08
Unloaded 26 39.76 -8.30 2.0 0.00 0.1081 22.08 22.08
Unloaded 27 17.58 -6.48 2.0 0.00 0.0454 23.25 22.66
Unloaded 28 28.44 -7.29 2.0 0.00 0.0753 22.66 22.66
Unloaded 29 13.95 0.00 2.0 0.00 0.0357 24.01 22.08
Unloaded 30 31.31 -8.15 2.0 0.00 0.0851 22.08 22.08
Unloaded 31 41.91 -8.37 2.0 0.00 0.1139 22.08 22.08
Unloaded 32 24.30 -5.47 2.0 0.00 0.0624 23.83 21.50
Unloaded 33 50.86 -9.31 2.0 0.00 0.1419 21.50 21.50
Unloaded 34 12.00 0.00 2.0 0.00 0.0308 24.35 24.35
Unloaded 35 250.35 0.00 2.0 0.00 0.6306 40.00 0.00
Subtotal 2,785.86 -6.69 2.0 0.00 7.2386 40.00 21.26

RUTA PIT 2 A PLANTA

Segment Distance Gradient RR (%) Loaded (%) Segment Actual Max Actual Final
(m) (%) Time (min) Speed (kph) Speed (kph)
Queue at Loader 0.00 0.00 0.0 0.00 0.5000 0.00 0.00
Spot at Loader 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loading 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loaded 1 134.12 0.00 2.0 100.00 0.4332 30.00 30.00
Loaded 2 133.08 6.36 2.0 100.00 0.2892 30.00 26.10
Loaded 3 45.32 0.24 2.0 100.00 0.0925 30.00 30.00
Loaded 4 43.43 2.18 2.0 100.00 0.0869 30.00 30.00
Loaded 5 34.38 0.75 2.0 100.00 0.0736 30.00 25.83
Loaded 6 62.76 0.28 2.0 100.00 0.1893 25.98 14.67
Loaded 7 163.30 -10.74 2.0 100.00 0.6682 14.67 14.00
Loaded 8 105.25 -12.89 2.0 100.00 0.4511 14.00 14.00
Loaded 9 125.82 -11.23 2.0 100.00 0.5268 14.33 14.33
Loaded 10 156.07 -2.30 2.0 100.00 0.4839 20.00 15.67
Loaded 11 114.48 -7.05 2.0 100.00 0.4386 15.67 15.00
Loaded 12 239.62 -9.53 2.0 100.00 1.0835 15.00 0.00
Subtotal 1,357.63 -5.14 2.0 100.00 4.8167 30.00 19.13
Spot at Dump 0.00 0.00 0.0 0.00 0.5000 0.00 0.00
Dumping 0.00 0.00 0.0 0.00 1.0000 0.00 0.00
Unloaded 1 239.62 9.53 2.0 0.00 0.5835 40.00 35.00
Unloaded 2 114.48 7.05 2.0 0.00 0.1777 40.00 35.00
Unloaded 3 156.07 2.30 2.0 0.00 0.2401 40.00 35.00
Unloaded 4 125.82 11.23 2.0 0.00 0.1947 40.00 35.00
Unloaded 5 105.25 12.89 2.0 0.00 0.1654 40.00 35.00
Unloaded 6 163.30 10.74 2.0 0.00 0.2510 40.00 35.00
Unloaded 7 62.76 -0.28 2.0 0.00 0.1025 39.65 35.00
Unloaded 8 34.38 -0.75 2.0 0.00 0.0629 35.00 30.00
Unloaded 9 43.43 -2.18 2.0 0.00 0.0869 30.00 30.00
Unloaded 10 45.32 -0.24 2.0 0.00 0.1008 31.20 23.25
Unloaded 11 133.08 -6.36 2.0 0.00 0.3434 23.25 23.25
Unloaded 12 134.12 0.00 2.0 0.00 0.4442 31.65 0.00
Subtotal 1,357.63 5.14 2.0 0.00 2.7531 40.00 29.29

RUTA PIT 2 A DESMONTE


Distance Gradient Segment Actual Max Actual Final
Segment RR (%) Loaded (%)
(m) (%) Time (min) Speed (kph) Speed (kph)
Queue at Loader 0.00 0.00 0.0 0.00 0.5000 0.00 0.00
Spot at Loader 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loading 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loaded 1 134.12 0.00 2.0 100.00 0.4332 30.00 30.00
Loaded 2 133.08 6.36 2.0 100.00 0.2892 30.00 26.10
Loaded 3 45.32 0.24 2.0 100.00 0.0925 30.00 30.00
Loaded 4 43.43 2.18 2.0 100.00 0.0869 30.00 30.00
Loaded 5 34.38 0.75 2.0 100.00 0.0688 30.00 30.00
Loaded 6 62.76 0.28 2.0 100.00 0.1255 30.00 30.00
Loaded 7 94.93 11.95 2.0 100.00 0.3008 30.00 15.58
Loaded 8 42.80 -2.15 2.0 100.00 0.1328 20.00 20.00
Loaded 9 81.37 6.33 2.0 100.00 0.2125 24.16 24.16
Loaded 10 114.96 10.43 2.0 100.00 0.3707 24.16 17.30
Loaded 11 31.83 8.41 2.0 100.00 0.1042 19.07 19.07
Loaded 12 122.60 11.46 2.0 100.00 0.4475 19.07 16.07
Loaded 13 122.64 8.87 2.0 100.00 0.3992 18.99 18.99
Loaded 14 121.58 9.79 2.0 100.00 0.4073 18.99 17.76
Loaded 15 98.18 9.06 2.0 100.00 0.3242 18.32 18.32
Loaded 16 119.94 12.85 2.0 100.00 0.4954 18.32 13.80
Loaded 17 100.91 11.84 2.0 100.00 0.3955 15.56 15.56
Loaded 18 72.69 11.22 2.0 100.00 0.2686 16.33 16.33
Loaded 19 78.17 10.13 2.0 100.00 0.2693 17.56 17.56
Loaded 20 117.16 12.26 2.0 100.00 0.4557 17.56 15.10
Loaded 21 66.47 12.20 2.0 100.00 0.2630 15.17 15.17
Loaded 22 57.51 9.98 2.0 100.00 0.2025 17.68 17.68
Loaded 23 35.76 7.59 2.0 100.00 0.1108 20.66 20.66
Loaded 24 48.17 10.44 2.0 100.00 0.1575 20.66 17.38
Loaded 25 53.41 6.77 2.0 100.00 0.1558 22.75 22.75
Loaded 26 60.94 10.97 2.0 100.00 0.1975 22.75 16.84
Loaded 27 94.77 12.74 2.0 100.00 0.3875 16.84 14.09
Loaded 28 226.28 2.17 2.0 100.00 0.4989 30.00 30.00
Loaded 29 239.01 0.00 2.0 100.00 0.4780 30.00 30.00
Loaded 30 265.76 0.00 2.0 100.00 0.7815 30.00 0.00
Subtotal 2,920.93 6.59 2.0 100.00 8.9128 30.00 20.21
Spot at Dump 0.00 0.00 0.0 0.00 0.5000 0.00 0.00
Dumping 0.00 0.00 0.0 0.00 1.0000 0.00 0.00
Unloaded 1 265.76 0.00 2.0 0.00 0.6227 40.00 35.00
Unloaded 2 239.01 0.00 2.0 0.00 0.3749 40.00 30.00
Unloaded 3 226.28 -2.17 2.0 0.00 0.4720 30.00 19.75
Unloaded 4 94.77 -12.74 2.0 0.00 0.2879 19.75 19.75
Unloaded 5 60.94 -10.97 2.0 0.00 0.1749 20.91 20.91
Unloaded 6 53.41 -6.77 2.0 0.00 0.1395 23.25 20.91
Unloaded 7 48.17 -10.44 2.0 0.00 0.1382 20.91 20.91
Unloaded 8 35.76 -7.59 2.0 0.00 0.0950 22.66 21.50
Unloaded 9 57.51 -9.98 2.0 0.00 0.1613 21.50 19.75
Unloaded 10 66.47 -12.20 2.0 0.00 0.2019 19.75 19.75
Unloaded 11 117.16 -12.26 2.0 0.00 0.3559 19.75 19.75
Unloaded 12 78.17 -10.13 2.0 0.00 0.2244 20.91 20.33
Unloaded 13 72.69 -11.22 2.0 0.00 0.2145 20.33 20.33
Unloaded 14 100.91 -11.84 2.0 0.00 0.2979 20.33 19.75
Unloaded 15 119.94 -12.85 2.0 0.00 0.3644 19.75 19.75
Unloaded 16 98.18 -9.06 2.0 0.00 0.2740 21.50 21.50
Unloaded 17 121.58 -9.79 2.0 0.00 0.3393 21.50 21.50
Unloaded 18 122.64 -8.87 2.0 0.00 0.3340 22.08 20.33
Unloaded 19 122.60 -11.46 2.0 0.00 0.3618 20.33 20.33
Unloaded 20 31.83 -8.41 2.0 0.00 0.0868 22.08 20.91
Unloaded 21 114.96 -10.43 2.0 0.00 0.3299 20.91 20.91
Unloaded 22 81.37 -6.33 2.0 0.00 0.2104 23.25 23.25
Unloaded 23 42.80 2.15 2.0 0.00 0.1083 26.70 20.33
Unloaded 24 94.93 -11.95 2.0 0.00 0.2802 20.33 20.33
Unloaded 25 62.76 -0.28 2.0 0.00 0.1408 33.08 33.08
Unloaded 26 34.38 -0.75 2.0 0.00 0.0634 34.43 30.00
Unloaded 27 43.43 -2.18 2.0 0.00 0.0869 30.00 30.00
Unloaded 28 45.32 -0.24 2.0 0.00 0.1008 31.20 23.25
Unloaded 29 133.08 -6.36 2.0 0.00 0.3434 23.25 23.25
Unloaded 30 134.12 0.00 2.0 0.00 0.4442 31.65 0.00
Subtotal 2,920.93 -6.59 2.0 0.00 7.6297 40.00 21.90
Average Elevation Fuel Burned
Speed (kph) Change (m) (l)
0.00 0.0 0.144
0.00 0.0 0.721
0.00 0.0 0.721
22.56 0.0 0.192 DATA EXPORTADA DE HAUL INFINITY
30.00 0.0 0.007
25.61 4.7 0.035
23.32 1.3 0.018
23.03 3.5 0.032
21.89 2.6 0.025
23.37 0.0 0.011
24.09 2.1 0.021
23.88 1.1 0.013
22.90 3.3 0.030
21.67 2.5 0.023
19.36 4.9 0.045
18.09 2.4 0.024
18.25 2.5 0.027
18.94 0.9 0.012
18.00 2.1 0.026
15.30 -2.7 0.036
14.67 -12.0 0.136
16.00 -5.2 0.088
17.37 0.9 0.043
14.33 -11.3 0.115
14.66 -17.5 0.193
14.00 -13.6 0.130
14.33 -14.1 0.152
19.35 -3.6 0.140
15.66 -8.1 0.127
13.27 -22.8 0.313
16.84 -76.1 2.016
0.00 0.0 0.144
0.00 0.0 0.288
24.64 22.8 0.169
38.65 8.1 0.052
39.00 3.6 0.070
38.77 14.1 0.057
38.18 13.6 0.048
39.04 17.5 0.073
35.48 11.3 0.047
30.00 -0.9 0.025
34.80 5.2 0.041
36.12 12.0 0.055
25.12 2.7 0.023
22.66 -2.1 0.021
22.61 -0.9 0.010
22.06 -2.5 0.023
21.50 -2.4 0.021
21.50 -4.9 0.041
22.08 -2.5 0.023
22.08 -3.3 0.031
23.21 -1.1 0.013
22.66 -2.1 0.022
23.43 0.0 0.011
22.08 -2.6 0.025
22.08 -3.5 0.033
23.35 -1.3 0.018
21.50 -4.7 0.041
23.35 0.0 0.009
23.82 0.0 0.182
28.82 76.1 1.183

Average Elevation Fuel Burned


Speed (kph) Change (m) (l)
0.00 0.0 0.303
0.00 0.0 0.721
0.00 0.0 0.721
22.56 0.0 0.192
30.00 0.0 0.007
25.61 4.7 0.035
23.32 1.3 0.018
23.03 3.5 0.032
21.89 2.6 0.025
23.37 0.0 0.011
24.09 2.1 0.021
23.88 1.1 0.013
22.90 3.3 0.030
21.67 2.5 0.023
19.36 4.9 0.045
18.09 2.4 0.024
18.25 2.5 0.027
18.94 0.9 0.012
20.49 2.1 0.023
16.75 14.0 0.127
18.43 10.9 0.115
17.91 11.9 0.117
18.17 8.9 0.093
14.53 15.4 0.143
15.31 11.9 0.114
16.24 8.2 0.078
17.42 7.9 0.078
15.43 14.4 0.131
15.17 8.1 0.076
17.04 5.7 0.058
19.36 2.7 0.032
18.35 5.0 0.046
20.57 3.6 0.045
18.51 6.7 0.057
14.67 12.1 0.112
27.21 4.9 0.144
30.00 0.0 0.138
20.40 0.0 0.226
19.56 186.3 2.467
0.00 0.0 0.144
0.00 0.0 0.288
25.61 0.0 0.180
38.25 0.0 0.108
28.76 -4.9 0.137
19.75 -12.1 0.083
20.91 -6.7 0.051
22.97 -3.6 0.041
20.91 -5.0 0.040
22.58 -2.7 0.028
21.39 -5.7 0.047
19.75 -8.1 0.058
19.75 -14.4 0.103
20.90 -7.9 0.065
20.33 -8.2 0.062
20.32 -11.9 0.086
19.75 -15.4 0.105
21.50 -8.9 0.079
21.50 -11.9 0.098
22.03 -10.9 0.097
20.33 -14.0 0.105
22.53 -2.1 0.021
22.61 -0.9 0.010
22.06 -2.5 0.023
21.50 -2.4 0.021
21.50 -4.9 0.041
22.08 -2.5 0.023
22.08 -3.3 0.031
23.21 -1.1 0.013
22.66 -2.1 0.022
23.43 0.0 0.011
22.08 -2.6 0.025
22.08 -3.5 0.033
23.35 -1.3 0.018
21.50 -4.7 0.041
23.35 0.0 0.009
23.82 0.0 0.182
23.09 -186.3 2.098

Average Elevation Fuel Burned


Speed (kph) Change (m) (l)
0.00 0.0 0.144
0.00 0.0 0.721
0.00 0.0 0.721
18.57 0.0 0.125
27.61 8.5 0.083
29.39 0.1 0.027
30.00 0.9 0.025
28.03 0.3 0.022
19.89 0.2 0.055
14.66 -17.5 0.193
14.00 -13.6 0.130
14.33 -14.1 0.152
19.35 -3.6 0.140
15.66 -8.1 0.127
13.27 -22.8 0.313
16.91 -69.8 1.393
0.00 0.0 0.144
0.00 0.0 0.288
24.64 22.8 0.169
38.65 8.1 0.052
39.00 3.6 0.070
38.77 14.1 0.057
38.18 13.6 0.048
39.04 17.5 0.073
36.74 -0.2 0.030
32.79 -0.3 0.019
30.00 -0.9 0.025
26.97 -0.1 0.029
23.25 -8.5 0.099
18.12 0.0 0.128
29.59 69.8 0.798

Average Elevation Fuel Burned


Speed (kph) Change (m) (l)
0.00 0.0 0.144
0.00 0.0 0.721
0.00 0.0 0.721
18.57 0.0 0.125
27.61 8.5 0.083
29.39 0.1 0.027
30.00 0.9 0.025
30.00 0.3 0.020
30.00 0.2 0.036
18.93 11.3 0.087
19.34 -0.9 0.039
22.97 5.2 0.061
18.60 12.0 0.107
18.33 2.7 0.030
16.44 14.0 0.129
18.43 10.9 0.115
17.91 11.9 0.117
18.17 8.9 0.093
14.53 15.4 0.143
15.31 11.9 0.114
16.24 8.2 0.078
17.42 7.9 0.078
15.43 14.4 0.131
15.17 8.1 0.076
17.04 5.7 0.058
19.36 2.7 0.032
18.35 5.0 0.046
20.57 3.6 0.045
18.51 6.7 0.057
14.67 12.1 0.112
27.21 4.9 0.144
30.00 0.0 0.138
20.40 0.0 0.226
19.66 192.6 2.572
0.00 0.0 0.144
0.00 0.0 0.288
25.61 0.0 0.180
38.25 0.0 0.108
28.76 -4.9 0.137
19.75 -12.1 0.083
20.91 -6.7 0.051
22.97 -3.6 0.041
20.91 -5.0 0.040
22.58 -2.7 0.028
21.39 -5.7 0.047
19.75 -8.1 0.058
19.75 -14.4 0.103
20.90 -7.9 0.065
20.33 -8.2 0.062
20.32 -11.9 0.086
19.75 -15.4 0.105
21.50 -8.9 0.079
21.50 -11.9 0.098
22.03 -10.9 0.097
20.33 -14.0 0.105
21.99 -2.7 0.025
20.91 -12.0 0.095
23.21 -5.2 0.061
23.72 0.9 0.032
20.33 -11.3 0.081
26.74 -0.2 0.041
32.54 -0.3 0.019
30.00 -0.9 0.025
26.97 -0.1 0.029
23.25 -8.5 0.099
18.12 0.0 0.128
22.97 -192.6 2.209
TADA DE HAUL INFINITY
RUTA PIT 1 A PLANTA
Distance Gradient Segment Actual Max Actual Final
Segment RR (%) Loaded (%) Time
(m) (%) (min) Speed (kph) Speed (kph)
Queue at Loader 0.00 0.00 0.0 0.00 0.7401 0.00 0.00
Spot at Loader 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loading 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loaded 1 19.82 5.92 2.0 100.00 0.1625 14.70 14.70
Loaded 2 15.16 5.63 2.0 100.00 0.0525 19.19 19.19
Loaded 3 19.14 5.53 2.0 100.00 0.0542 22.41 22.41
Loaded 4 15.25 5.81 2.0 100.00 0.0392 23.70 23.70
Loaded 5 25.11 8.33 2.0 100.00 0.0658 23.70 22.36
Loaded 6 17.51 8.35 2.0 100.00 0.0475 22.36 21.80
Loaded 7 19.51 7.33 2.0 100.00 0.0525 22.32 22.32
Loaded 8 15.01 7.89 2.0 100.00 0.0408 22.32 22.17
Loaded 9 26.86 7.95 2.0 100.00 0.0727 22.17 21.95
Loaded 10 34.79 8.62 2.0 100.00 0.0975 21.95 20.91
Loaded 11 19.77 9.63 2.0 100.00 0.0592 20.91 19.59
Loaded 12 18.91 6.16 2.0 100.00 0.0542 22.08 22.08
Loaded 13 16.49 0.00 2.0 100.00 0.0408 25.83 25.83
Loaded 14 42.50 8.10 2.0 100.00 0.1058 25.83 22.79
Loaded 15 22.75 8.45 2.0 100.00 0.0608 22.79 21.82
Loaded 16 30.19 8.25 2.0 100.00 0.0842 21.82 21.40
Loaded 17 35.58 8.57 2.0 100.00 0.1008 21.40 20.74
Loaded 18 17.86 7.20 2.0 100.00 0.0508 21.79 21.79
Loaded 19 21.21 7.22 2.0 100.00 0.0575 22.46 22.46
Loaded 20 37.44 9.04 2.0 100.00 0.1058 22.46 20.44
Loaded 21 21.00 5.35 2.0 100.00 0.0575 23.48 23.48
Loaded 22 16.59 0.00 2.0 100.00 0.0392 27.08 27.08
Loaded 23 48.31 8.60 2.0 100.00 0.1192 27.08 22.30
Loaded 24 50.47 9.04 2.0 100.00 0.1442 22.30 20.04
Loaded 25 43.08 8.58 2.0 100.00 0.1292 20.18 20.18
Loaded 26 38.35 8.93 2.0 100.00 0.1158 20.18 19.60
Loaded 27 38.75 8.22 2.0 100.00 0.1158 20.57 20.57
Loaded 28 68.93 9.50 2.0 100.00 0.2175 20.57 17.89
Loaded 29 40.35 8.98 2.0 100.00 0.1342 18.33 18.33
Loaded 30 23.29 5.22 2.0 100.00 0.0675 22.82 22.82
Loaded 31 20.35 0.00 2.0 100.00 0.0492 27.32 27.32
Loaded 32 59.58 8.66 2.0 100.00 0.1492 27.32 21.76
Loaded 33 58.99 9.44 2.0 100.00 0.1775 21.76 18.71
Loaded 34 30.25 9.16 2.0 100.00 0.0975 18.71 18.44
Loaded 35 86.80 9.39 2.0 100.00 0.2889 18.44 17.89
Loaded 36 38.15 8.87 2.0 100.00 0.1258 18.52 18.52
Loaded 37 66.66 9.41 2.0 100.00 0.2211 18.52 17.89
Loaded 38 46.87 9.05 2.0 100.00 0.1558 18.22 18.22
Loaded 39 56.31 9.52 2.0 100.00 0.1881 18.22 17.88
Loaded 40 28.25 5.52 2.0 100.00 0.0825 22.89 22.89
Loaded 41 18.84 0.00 2.0 100.00 0.0458 27.09 27.09
Loaded 42 57.87 9.01 2.0 100.00 0.1492 27.09 21.12
Loaded 43 47.18 9.22 2.0 100.00 0.1408 21.12 19.31
Loaded 44 37.19 6.97 2.0 100.00 0.1058 22.23 22.23
Loaded 45 17.84 0.00 2.0 100.00 0.0442 26.28 26.28
Loaded 46 44.57 8.09 2.0 100.00 0.1108 26.28 22.88
Loaded 47 53.02 9.25 2.0 100.00 0.1525 22.88 19.71
Loaded 48 43.08 8.47 2.0 100.00 0.1292 20.24 20.24
Loaded 49 12.47 0.00 2.0 100.00 0.0342 23.39 23.39
Loaded 50 50.86 9.31 2.0 100.00 0.1442 23.39 19.83
Loaded 51 24.30 5.47 2.0 100.00 0.0675 23.39 23.39
Loaded 52 41.91 8.37 2.0 100.00 0.1125 23.39 21.68
Loaded 53 31.31 8.15 2.0 100.00 0.0875 21.68 21.46
Loaded 54 13.95 0.00 2.0 100.00 0.0358 24.76 24.76
Loaded 55 28.44 7.29 2.0 100.00 0.0708 24.76 23.67
Loaded 56 17.58 6.48 2.0 100.00 0.0442 23.98 23.98
Loaded 57 39.76 8.30 2.0 100.00 0.1042 23.98 22.04
Loaded 58 29.19 8.56 2.0 100.00 0.0808 22.04 21.14
Loaded 59 50.29 9.65 2.0 100.00 0.1558 21.14 18.23
Loaded 60 25.37 9.33 2.0 100.00 0.0842 18.23 17.91
Loaded 61 28.64 8.80 2.0 100.00 0.0942 18.54 18.54
Loaded 62 12.89 7.22 2.0 100.00 0.0408 19.98 19.98
Loaded 63 27.04 7.77 2.0 100.00 0.0901 20.16 15.33
Loaded 64 31.83 -8.41 2.0 100.00 0.1248 15.33 14.67
Loaded 65 114.96 -10.43 2.0 100.00 0.4702 14.67 14.67
Loaded 66 81.37 -6.33 2.0 100.00 0.3051 16.00 16.00
Loaded 67 42.80 2.15 2.0 100.00 0.1478 20.35 14.33
Loaded 68 94.89 -11.95 2.0 100.00 0.3973 14.33 14.33
Loaded 69 163.56 -10.74 2.0 100.00 0.6692 14.67 14.00
Loaded 70 105.25 -12.89 2.0 100.00 0.4511 14.00 14.00
Loaded 71 125.70 -11.23 2.0 100.00 0.5263 14.33 14.33
Loaded 72 155.98 -2.30 2.0 100.00 0.4836 20.00 15.67
Loaded 73 114.48 -7.05 2.0 100.00 0.4386 15.67 15.00
Loaded 74 239.62 -9.53 2.0 100.00 1.0835 15.00 0.00
Subtotal 3,376.18 1.71 2.0 100.00 11.3034 27.32 20.05
Spot at Dump 0.00 0.00 0.0 0.00 0.5000 0.00 0.00
Dumping 0.00 0.00 0.0 0.00 1.0000 0.00 0.00
Unloaded 1 239.62 9.53 2.0 0.00 0.5835 40.00 35.00
Unloaded 2 114.48 7.05 2.0 0.00 0.1777 40.00 35.00
Unloaded 3 155.98 2.30 2.0 0.00 0.2400 40.00 35.00
Unloaded 4 125.70 11.23 2.0 0.00 0.1946 40.00 35.00
Unloaded 5 105.25 12.89 2.0 0.00 0.1654 40.00 35.00
Unloaded 6 163.56 10.74 2.0 0.00 0.2513 40.00 35.00
Unloaded 7 94.89 11.95 2.0 0.00 0.1606 39.57 30.00
Unloaded 8 42.80 -2.15 2.0 0.00 0.0856 30.00 30.00
Unloaded 9 81.37 6.33 2.0 0.00 0.1403 38.85 35.00
Unloaded 10 114.96 10.43 2.0 0.00 0.1909 40.00 29.28
Unloaded 11 31.83 8.41 2.0 0.00 0.0760 29.43 22.66
Unloaded 12 27.04 -7.77 2.0 0.00 0.0716 22.66 22.66
Unloaded 13 12.89 -7.22 2.0 0.00 0.0342 22.66 22.08
Unloaded 14 28.64 -8.80 2.0 0.00 0.0779 22.08 21.50
Unloaded 15 25.37 -9.33 2.0 0.00 0.0708 21.50 21.50
Unloaded 16 50.29 -9.65 2.0 0.00 0.1404 21.50 21.50
Unloaded 17 29.19 -8.56 2.0 0.00 0.0793 22.08 22.08
Unloaded 18 39.76 -8.30 2.0 0.00 0.1081 22.08 22.08
Unloaded 19 17.58 -6.48 2.0 0.00 0.0454 23.25 22.66
Unloaded 20 28.44 -7.29 2.0 0.00 0.0753 22.66 22.66
Unloaded 21 13.95 0.00 2.0 0.00 0.0357 24.01 22.08
Unloaded 22 31.31 -8.15 2.0 0.00 0.0851 22.08 22.08
Unloaded 23 41.91 -8.37 2.0 0.00 0.1139 22.08 22.08
Unloaded 24 24.30 -5.47 2.0 0.00 0.0624 23.83 21.50
Unloaded 25 50.86 -9.31 2.0 0.00 0.1419 21.50 21.50
Unloaded 26 12.47 0.00 2.0 0.00 0.0327 23.30 22.08
Unloaded 27 43.08 -8.47 2.0 0.00 0.1171 22.08 21.50
Unloaded 28 53.02 -9.25 2.0 0.00 0.1480 21.50 21.50
Unloaded 29 44.57 -8.09 2.0 0.00 0.1211 22.08 22.08
Unloaded 30 17.84 0.00 2.0 0.00 0.0462 24.78 23.25
Unloaded 31 37.19 -6.97 2.0 0.00 0.0967 23.25 21.50
Unloaded 32 47.18 -9.22 2.0 0.00 0.1317 21.50 21.50
Unloaded 33 57.87 -9.01 2.0 0.00 0.1615 21.50 21.50
Unloaded 34 18.84 0.00 2.0 0.00 0.0499 24.95 23.83
Unloaded 35 28.25 -5.52 2.0 0.00 0.0724 23.83 21.50
Unloaded 36 56.31 -9.52 2.0 0.00 0.1571 21.50 21.50
Unloaded 37 46.87 -9.05 2.0 0.00 0.1308 21.50 21.50
Unloaded 38 66.66 -9.41 2.0 0.00 0.1860 21.50 21.50
Unloaded 39 38.15 -8.87 2.0 0.00 0.1038 22.08 21.50
Unloaded 40 86.80 -9.39 2.0 0.00 0.2422 21.50 21.50
Unloaded 41 30.25 -9.16 2.0 0.00 0.0844 21.50 21.50
Unloaded 42 58.99 -9.44 2.0 0.00 0.1646 21.50 21.50
Unloaded 43 59.58 -8.66 2.0 0.00 0.1619 22.08 22.08
Unloaded 44 20.35 0.00 2.0 0.00 0.0531 25.38 23.83
Unloaded 45 23.29 -5.22 2.0 0.00 0.0593 23.83 22.08
Unloaded 46 40.35 -8.98 2.0 0.00 0.1097 22.08 21.50
Unloaded 47 68.93 -9.50 2.0 0.00 0.1924 21.50 21.50
Unloaded 48 38.75 -8.22 2.0 0.00 0.1053 22.08 22.08
Unloaded 49 38.35 -8.93 2.0 0.00 0.1042 22.08 22.08
Unloaded 50 43.08 -8.58 2.0 0.00 0.1172 22.08 21.50
Unloaded 51 50.47 -9.04 2.0 0.00 0.1408 21.50 21.50
Unloaded 52 48.31 -8.60 2.0 0.00 0.1313 22.08 22.08
Unloaded 53 16.59 0.00 2.0 0.00 0.0431 24.93 23.83
Unloaded 54 21.00 -5.35 2.0 0.00 0.0541 23.83 21.50
Unloaded 55 37.44 -9.04 2.0 0.00 0.1045 21.50 21.50
Unloaded 56 21.21 -7.22 2.0 0.00 0.0561 22.66 22.66
Unloaded 57 17.86 -7.20 2.0 0.00 0.0474 22.66 22.08
Unloaded 58 35.58 -8.57 2.0 0.00 0.0967 22.08 22.08
Unloaded 59 30.19 -8.25 2.0 0.00 0.0820 22.08 22.08
Unloaded 60 22.75 -8.45 2.0 0.00 0.0618 22.08 22.08
Unloaded 61 42.50 -8.10 2.0 0.00 0.1155 22.08 22.08
Unloaded 62 16.49 0.00 2.0 0.00 0.0428 24.63 23.25
Unloaded 63 18.91 -6.16 2.0 0.00 0.0495 23.25 21.50
Unloaded 64 19.77 -9.63 2.0 0.00 0.0552 21.50 21.50
Unloaded 65 34.79 -8.62 2.0 0.00 0.0945 22.08 22.08
Unloaded 66 26.86 -7.95 2.0 0.00 0.0711 22.66 22.66
Unloaded 67 15.01 -7.89 2.0 0.00 0.0397 22.66 22.66
Unloaded 68 19.51 -7.33 2.0 0.00 0.0518 22.66 22.08
Unloaded 69 17.51 -8.35 2.0 0.00 0.0476 22.08 22.08
Unloaded 70 25.11 -8.33 2.0 0.00 0.0682 22.08 22.08
Unloaded 71 15.25 -5.81 2.0 0.00 0.0384 23.83 23.83
Unloaded 72 19.14 -5.53 2.0 0.00 0.0527 23.83 19.44
Unloaded 73 15.16 -5.63 2.0 0.00 0.0559 19.59 14.63
Unloaded 74 19.82 -5.92 2.0 0.00 0.1651 14.78 0.00
Subtotal 3,376.18 -1.71 2.0 0.00 8.1232 40.00 23.16

RUTA PIT 1 A DESMONTE


Distance Gradient Segment Actual Max Actual Final
Segment RR (%) Loaded (%)
(m) (%) Time (min) Speed (kph) Speed (kph)
Queue at Loader 0.00 0.00 0.0 0.00 0.5000 0.00 0.00
Spot at Loader 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loading 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loaded 1 19.82 5.92 2.0 100.00 0.1625 14.70 14.70
Loaded 2 15.16 5.63 2.0 100.00 0.0525 19.19 19.19
Loaded 3 19.14 5.53 2.0 100.00 0.0542 22.41 22.41
Loaded 4 15.25 5.81 2.0 100.00 0.0392 23.70 23.70
Loaded 5 25.11 8.33 2.0 100.00 0.0658 23.70 22.36
Loaded 6 17.51 8.35 2.0 100.00 0.0475 22.36 21.80
Loaded 7 19.51 7.33 2.0 100.00 0.0525 22.32 22.32
Loaded 8 15.01 7.89 2.0 100.00 0.0408 22.32 22.17
Loaded 9 26.86 7.95 2.0 100.00 0.0727 22.17 21.95
Loaded 10 34.79 8.62 2.0 100.00 0.0975 21.95 20.91
Loaded 11 19.77 9.63 2.0 100.00 0.0592 20.91 19.59
Loaded 12 18.91 6.16 2.0 100.00 0.0542 22.08 22.08
Loaded 13 16.49 0.00 2.0 100.00 0.0408 25.83 25.83
Loaded 14 42.50 8.10 2.0 100.00 0.1058 25.83 22.79
Loaded 15 22.75 8.45 2.0 100.00 0.0608 22.79 21.82
Loaded 16 30.19 8.25 2.0 100.00 0.0842 21.82 21.40
Loaded 17 35.58 8.57 2.0 100.00 0.1008 21.40 20.74
Loaded 18 17.86 7.20 2.0 100.00 0.0508 21.79 21.79
Loaded 19 21.21 7.22 2.0 100.00 0.0575 22.46 22.46
Loaded 20 37.44 9.04 2.0 100.00 0.1058 22.46 20.44
Loaded 21 21.00 5.35 2.0 100.00 0.0575 23.48 23.48
Loaded 22 16.59 0.00 2.0 100.00 0.0392 27.08 27.08
Loaded 23 48.31 8.60 2.0 100.00 0.1192 27.08 22.30
Loaded 24 50.47 9.04 2.0 100.00 0.1442 22.30 20.04
Loaded 25 43.08 8.58 2.0 100.00 0.1292 20.18 20.18
Loaded 26 38.35 8.93 2.0 100.00 0.1158 20.18 19.60
Loaded 27 38.75 8.22 2.0 100.00 0.1158 20.57 20.57
Loaded 28 68.93 9.50 2.0 100.00 0.2175 20.57 17.89
Loaded 29 40.35 8.98 2.0 100.00 0.1342 18.33 18.33
Loaded 30 23.29 5.22 2.0 100.00 0.0675 22.82 22.82
Loaded 31 20.35 0.00 2.0 100.00 0.0492 27.32 27.32
Loaded 32 59.58 8.66 2.0 100.00 0.1492 27.32 21.76
Loaded 33 58.99 9.44 2.0 100.00 0.1775 21.76 18.71
Loaded 34 30.25 9.16 2.0 100.00 0.0975 18.71 18.44
Loaded 35 86.80 9.39 2.0 100.00 0.2889 18.44 17.89
Loaded 36 38.15 8.87 2.0 100.00 0.1258 18.52 18.52
Loaded 37 66.66 9.41 2.0 100.00 0.2211 18.52 17.89
Loaded 38 46.87 9.05 2.0 100.00 0.1558 18.22 18.22
Loaded 39 56.31 9.52 2.0 100.00 0.1881 18.22 17.88
Loaded 40 28.25 5.52 2.0 100.00 0.0825 22.89 22.89
Loaded 41 18.84 0.00 2.0 100.00 0.0458 27.09 27.09
Loaded 42 57.87 9.01 2.0 100.00 0.1492 27.09 21.12
Loaded 43 47.18 9.22 2.0 100.00 0.1408 21.12 19.31
Loaded 44 37.19 6.97 2.0 100.00 0.1058 22.23 22.23
Loaded 45 17.84 0.00 2.0 100.00 0.0442 26.28 26.28
Loaded 46 44.57 8.09 2.0 100.00 0.1108 26.28 22.88
Loaded 47 53.02 9.25 2.0 100.00 0.1525 22.88 19.71
Loaded 48 43.08 8.47 2.0 100.00 0.1292 20.24 20.24
Loaded 49 12.47 0.00 2.0 100.00 0.0342 23.39 23.39
Loaded 50 50.86 9.31 2.0 100.00 0.1442 23.39 19.83
Loaded 51 24.30 5.47 2.0 100.00 0.0675 23.39 23.39
Loaded 52 41.91 8.37 2.0 100.00 0.1125 23.39 21.68
Loaded 53 31.31 8.15 2.0 100.00 0.0875 21.68 21.46
Loaded 54 13.95 0.00 2.0 100.00 0.0358 24.76 24.76
Loaded 55 28.44 7.29 2.0 100.00 0.0708 24.76 23.67
Loaded 56 17.58 6.48 2.0 100.00 0.0442 23.98 23.98
Loaded 57 39.76 8.30 2.0 100.00 0.1042 23.98 22.04
Loaded 58 29.19 8.56 2.0 100.00 0.0808 22.04 21.14
Loaded 59 50.29 9.65 2.0 100.00 0.1558 21.14 18.23
Loaded 60 25.37 9.33 2.0 100.00 0.0842 18.23 17.91
Loaded 61 28.64 8.80 2.0 100.00 0.0942 18.54 18.54
Loaded 62 12.89 7.22 2.0 100.00 0.0408 19.98 19.98
Loaded 63 27.04 7.77 2.0 100.00 0.0792 21.12 21.12
Loaded 64 122.60 11.46 2.0 100.00 0.4392 21.12 16.07
Loaded 65 122.60 8.87 2.0 100.00 0.3992 18.99 18.99
Loaded 66 121.48 9.79 2.0 100.00 0.4070 18.99 17.76
Loaded 67 98.18 9.06 2.0 100.00 0.3242 18.32 18.32
Loaded 68 119.94 12.85 2.0 100.00 0.4954 18.32 13.80
Loaded 69 100.91 11.84 2.0 100.00 0.3955 15.56 15.56
Loaded 70 72.54 11.22 2.0 100.00 0.2680 16.33 16.33
Loaded 71 77.99 10.13 2.0 100.00 0.2687 17.56 17.56
Loaded 72 117.16 12.26 2.0 100.00 0.4557 17.56 15.10
Loaded 73 66.47 12.20 2.0 100.00 0.2630 15.17 15.17
Loaded 74 57.51 9.98 2.0 100.00 0.2025 17.68 17.68
Loaded 75 35.76 7.59 2.0 100.00 0.1108 20.66 20.66
Loaded 76 48.17 10.44 2.0 100.00 0.1575 20.66 17.39
Loaded 77 53.14 6.77 2.0 100.00 0.1542 22.72 22.72
Loaded 78 60.54 10.97 2.0 100.00 0.1958 22.72 16.84
Loaded 79 94.77 12.74 2.0 100.00 0.3875 16.84 14.09
Loaded 80 226.28 2.17 2.0 100.00 0.4989 30.00 30.00
Loaded 81 239.01 0.00 2.0 100.00 0.4780 30.00 30.00
Loaded 82 265.76 0.00 2.0 100.00 0.7815 30.00 0.00
Subtotal 4,206.59 7.61 2.0 100.00 12.8775 30.00 20.44
Spot at Dump 0.00 0.00 0.0 0.00 0.5000 0.00 0.00
Dumping 0.00 0.00 0.0 0.00 1.0000 0.00 0.00
Unloaded 1 265.76 0.00 2.0 0.00 0.6227 40.00 35.00
Unloaded 2 239.01 0.00 2.0 0.00 0.3749 40.00 30.00
Unloaded 3 226.28 -2.17 2.0 0.00 0.4720 30.00 19.75
Unloaded 4 94.77 -12.74 2.0 0.00 0.2879 19.75 19.75
Unloaded 5 60.54 -10.97 2.0 0.00 0.1737 20.91 20.91
Unloaded 6 53.14 -6.77 2.0 0.00 0.1388 23.25 20.91
Unloaded 7 48.17 -10.44 2.0 0.00 0.1382 20.91 20.91
Unloaded 8 35.76 -7.59 2.0 0.00 0.0950 22.66 21.50
Unloaded 9 57.51 -9.98 2.0 0.00 0.1613 21.50 19.75
Unloaded 10 66.47 -12.20 2.0 0.00 0.2019 19.75 19.75
Unloaded 11 117.16 -12.26 2.0 0.00 0.3559 19.75 19.75
Unloaded 12 77.99 -10.13 2.0 0.00 0.2239 20.91 20.33
Unloaded 13 72.54 -11.22 2.0 0.00 0.2141 20.33 20.33
Unloaded 14 100.91 -11.84 2.0 0.00 0.2979 20.33 19.75
Unloaded 15 119.94 -12.85 2.0 0.00 0.3644 19.75 19.75
Unloaded 16 98.18 -9.06 2.0 0.00 0.2740 21.50 21.50
Unloaded 17 121.48 -9.79 2.0 0.00 0.3390 21.50 21.50
Unloaded 18 122.60 -8.87 2.0 0.00 0.3339 22.08 20.33
Unloaded 19 122.60 -11.46 2.0 0.00 0.3618 20.33 20.33
Unloaded 20 27.04 -7.77 2.0 0.00 0.0720 22.66 22.66
Unloaded 21 12.89 -7.22 2.0 0.00 0.0342 22.66 22.08
Unloaded 22 28.64 -8.80 2.0 0.00 0.0779 22.08 21.50
Unloaded 23 25.37 -9.33 2.0 0.00 0.0708 21.50 21.50
Unloaded 24 50.29 -9.65 2.0 0.00 0.1404 21.50 21.50
Unloaded 25 29.19 -8.56 2.0 0.00 0.0793 22.08 22.08
Unloaded 26 39.76 -8.30 2.0 0.00 0.1081 22.08 22.08
Unloaded 27 17.58 -6.48 2.0 0.00 0.0454 23.25 22.66
Unloaded 28 28.44 -7.29 2.0 0.00 0.0753 22.66 22.66
Unloaded 29 13.95 0.00 2.0 0.00 0.0357 24.01 22.08
Unloaded 30 31.31 -8.15 2.0 0.00 0.0851 22.08 22.08
Unloaded 31 41.91 -8.37 2.0 0.00 0.1139 22.08 22.08
Unloaded 32 24.30 -5.47 2.0 0.00 0.0624 23.83 21.50
Unloaded 33 50.86 -9.31 2.0 0.00 0.1419 21.50 21.50
Unloaded 34 12.47 0.00 2.0 0.00 0.0327 23.30 22.08
Unloaded 35 43.08 -8.47 2.0 0.00 0.1171 22.08 21.50
Unloaded 36 53.02 -9.25 2.0 0.00 0.1480 21.50 21.50
Unloaded 37 44.57 -8.09 2.0 0.00 0.1211 22.08 22.08
Unloaded 38 17.84 0.00 2.0 0.00 0.0462 24.78 23.25
Unloaded 39 37.19 -6.97 2.0 0.00 0.0967 23.25 21.50
Unloaded 40 47.18 -9.22 2.0 0.00 0.1317 21.50 21.50
Unloaded 41 57.87 -9.01 2.0 0.00 0.1615 21.50 21.50
Unloaded 42 18.84 0.00 2.0 0.00 0.0499 24.95 23.83
Unloaded 43 28.25 -5.52 2.0 0.00 0.0724 23.83 21.50
Unloaded 44 56.31 -9.52 2.0 0.00 0.1571 21.50 21.50
Unloaded 45 46.87 -9.05 2.0 0.00 0.1308 21.50 21.50
Unloaded 46 66.66 -9.41 2.0 0.00 0.1860 21.50 21.50
Unloaded 47 38.15 -8.87 2.0 0.00 0.1038 22.08 21.50
Unloaded 48 86.80 -9.39 2.0 0.00 0.2422 21.50 21.50
Unloaded 49 30.25 -9.16 2.0 0.00 0.0844 21.50 21.50
Unloaded 50 58.99 -9.44 2.0 0.00 0.1646 21.50 21.50
Unloaded 51 59.58 -8.66 2.0 0.00 0.1619 22.08 22.08
Unloaded 52 20.35 0.00 2.0 0.00 0.0531 25.38 23.83
Unloaded 53 23.29 -5.22 2.0 0.00 0.0593 23.83 22.08
Unloaded 54 40.35 -8.98 2.0 0.00 0.1097 22.08 21.50
Unloaded 55 68.93 -9.50 2.0 0.00 0.1924 21.50 21.50
Unloaded 56 38.75 -8.22 2.0 0.00 0.1053 22.08 22.08
Unloaded 57 38.35 -8.93 2.0 0.00 0.1042 22.08 22.08
Unloaded 58 43.08 -8.58 2.0 0.00 0.1172 22.08 21.50
Unloaded 59 50.47 -9.04 2.0 0.00 0.1408 21.50 21.50
Unloaded 60 48.31 -8.60 2.0 0.00 0.1313 22.08 22.08
Unloaded 61 16.59 0.00 2.0 0.00 0.0431 24.93 23.83
Unloaded 62 21.00 -5.35 2.0 0.00 0.0541 23.83 21.50
Unloaded 63 37.44 -9.04 2.0 0.00 0.1045 21.50 21.50
Unloaded 64 21.21 -7.22 2.0 0.00 0.0561 22.66 22.66
Unloaded 65 17.86 -7.20 2.0 0.00 0.0474 22.66 22.08
Unloaded 66 35.58 -8.57 2.0 0.00 0.0967 22.08 22.08
Unloaded 67 30.19 -8.25 2.0 0.00 0.0820 22.08 22.08
Unloaded 68 22.75 -8.45 2.0 0.00 0.0618 22.08 22.08
Unloaded 69 42.50 -8.10 2.0 0.00 0.1155 22.08 22.08
Unloaded 70 16.49 0.00 2.0 0.00 0.0428 24.63 23.25
Unloaded 71 18.91 -6.16 2.0 0.00 0.0495 23.25 21.50
Unloaded 72 19.77 -9.63 2.0 0.00 0.0552 21.50 21.50
Unloaded 73 34.79 -8.62 2.0 0.00 0.0945 22.08 22.08
Unloaded 74 26.86 -7.95 2.0 0.00 0.0711 22.66 22.66
Unloaded 75 15.01 -7.89 2.0 0.00 0.0397 22.66 22.66
Unloaded 76 19.51 -7.33 2.0 0.00 0.0518 22.66 22.08
Unloaded 77 17.51 -8.35 2.0 0.00 0.0476 22.08 22.08
Unloaded 78 25.11 -8.33 2.0 0.00 0.0682 22.08 22.08
Unloaded 79 15.25 -5.81 2.0 0.00 0.0384 23.83 23.83
Unloaded 80 19.14 -5.53 2.0 0.00 0.0527 23.83 19.44
Unloaded 81 15.16 -5.63 2.0 0.00 0.0559 19.59 14.63
Unloaded 82 19.82 -5.92 2.0 0.00 0.1651 14.78 0.00
Subtotal 4,206.59 -7.61 2.0 0.00 11.2893 40.00 21.57

RUTA PIT 2 A PLANTA


Distance Gradient Segment Actual Max Actual Final
Segment RR (%) Loaded (%)
(m) (%) Time (min) Speed (kph) Speed (kph)
Queue at Loader 0.00 0.00 0.0 0.00 2.0725 0.00 0.00
Spot at Loader 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loading 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loaded 1 24.40 0.00 2.0 100.00 0.1792 16.20 16.20
Loaded 2 12.56 0.91 2.0 100.00 0.0408 19.95 19.95
Loaded 3 22.03 8.82 2.0 100.00 0.0662 19.95 19.77
Loaded 4 20.26 7.46 2.0 100.00 0.0592 21.09 21.09
Loaded 5 23.19 8.60 2.0 100.00 0.0660 21.09 20.71
Loaded 6 19.36 7.08 2.0 100.00 0.0542 21.92 21.92
Loaded 7 21.35 6.96 2.0 100.00 0.0575 22.78 22.78
Loaded 8 24.71 8.21 2.0 100.00 0.0658 22.78 22.02
Loaded 9 26.57 6.81 2.0 100.00 0.0708 23.13 23.13
Loaded 10 12.43 0.00 2.0 100.00 0.0308 25.98 25.98
Loaded 11 29.10 7.47 2.0 100.00 0.0692 25.98 24.04
Loaded 12 26.49 8.73 2.0 100.00 0.0692 24.04 22.03
Loaded 13 41.73 8.67 2.0 100.00 0.1175 22.03 20.75
Loaded 14 34.16 8.86 2.0 100.00 0.1008 20.75 20.08
Loaded 15 19.33 5.65 2.0 100.00 0.0542 22.86 22.86
Loaded 16 13.67 -0.14 2.0 100.00 0.0342 26.01 26.01
Loaded 17 10.67 8.32 2.0 100.00 0.0258 26.01 24.75
Loaded 18 64.23 11.90 2.0 100.00 0.2108 24.75 15.78
Loaded 19 64.68 0.00 2.0 100.00 0.1656 30.00 30.00
Loaded 20 37.95 4.16 2.0 100.00 0.0759 30.00 30.00
Loaded 21 266.14 12.58 2.0 100.00 1.0240 30.00 14.45
Loaded 22 155.98 -2.30 2.0 100.00 0.4833 20.00 15.67
Loaded 23 114.48 -7.05 2.0 100.00 0.4386 15.67 15.00
Loaded 24 239.62 -9.53 2.0 100.00 1.0835 15.00 0.00
Subtotal 1,325.10 2.53 2.0 100.00 4.6430 30.00 20.62
Spot at Dump 0.00 0.00 0.0 0.00 0.5000 0.00 0.00
Dumping 0.00 0.00 0.0 0.00 1.0000 0.00 0.00
Unloaded 1 239.62 9.53 2.0 0.00 0.5835 40.00 35.00
Unloaded 2 114.48 7.05 2.0 0.00 0.1777 40.00 35.00
Unloaded 3 155.98 2.30 2.0 0.00 0.2935 40.00 19.75
Unloaded 4 266.14 -12.58 2.0 0.00 0.8085 19.75 19.75
Unloaded 5 37.95 -4.16 2.0 0.00 0.0972 24.42 24.42
Unloaded 6 64.68 0.00 2.0 0.00 0.1513 29.22 20.33
Unloaded 7 64.23 -11.90 2.0 0.00 0.1896 20.33 20.33
Unloaded 8 10.67 -8.32 2.0 0.00 0.0290 22.08 22.08
Unloaded 9 13.67 0.14 2.0 0.00 0.0364 24.63 23.83
Unloaded 10 19.33 -5.65 2.0 0.00 0.0494 23.83 22.08
Unloaded 11 34.16 -8.86 2.0 0.00 0.0928 22.08 22.08
Unloaded 12 41.73 -8.67 2.0 0.00 0.1134 22.08 22.08
Unloaded 13 26.49 -8.73 2.0 0.00 0.0720 22.08 22.08
Unloaded 14 29.10 -7.47 2.0 0.00 0.0770 22.66 22.66
Unloaded 15 12.43 0.00 2.0 0.00 0.0326 24.46 23.25
Unloaded 16 26.57 -6.81 2.0 0.00 0.0689 23.25 22.08
Unloaded 17 24.71 -8.21 2.0 0.00 0.0671 22.08 22.08
Unloaded 18 21.35 -6.96 2.0 0.00 0.0552 23.25 22.66
Unloaded 19 19.36 -7.08 2.0 0.00 0.0513 22.66 22.08
Unloaded 20 23.19 -8.60 2.0 0.00 0.0630 22.08 22.08
Unloaded 21 20.26 -7.46 2.0 0.00 0.0537 22.66 22.08
Unloaded 22 22.03 -8.82 2.0 0.00 0.0610 22.08 19.98
Unloaded 23 12.56 -0.91 2.0 0.00 0.0441 20.13 16.23
Unloaded 24 24.40 0.00 2.0 0.00 0.1829 16.38 0.00
Subtotal 1,325.10 -2.53 2.0 0.00 3.4511 40.00 21.83

RUTA PIT 2 A DESMONTE


Distance Gradient Segment Actual Max Actual Final
Segment RR (%) Loaded (%)
(m) (%) Time (min) Speed (kph) Speed (kph)
Queue at Loader 0.00 0.00 0.0 0.00 1.4857 0.00 0.00
Spot at Loader 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loading 0.00 0.00 0.0 0.00 2.5000 0.00 0.00
Loaded 1 24.40 0.00 2.0 100.00 0.1792 16.20 16.20
Loaded 2 12.56 0.91 2.0 100.00 0.0408 19.95 19.95
Loaded 3 22.03 8.82 2.0 100.00 0.0662 19.95 19.77
Loaded 4 20.26 7.46 2.0 100.00 0.0592 21.09 21.09
Loaded 5 23.19 8.60 2.0 100.00 0.0660 21.09 20.71
Loaded 6 19.36 7.08 2.0 100.00 0.0542 21.92 21.92
Loaded 7 21.35 6.96 2.0 100.00 0.0575 22.78 22.78
Loaded 8 24.71 8.21 2.0 100.00 0.0658 22.78 22.02
Loaded 9 26.57 6.81 2.0 100.00 0.0708 23.13 23.13
Loaded 10 12.43 0.00 2.0 100.00 0.0308 25.98 25.98
Loaded 11 29.10 7.47 2.0 100.00 0.0692 25.98 24.04
Loaded 12 26.49 8.73 2.0 100.00 0.0692 24.04 22.03
Loaded 13 41.73 8.67 2.0 100.00 0.1175 22.03 20.75
Loaded 14 34.16 8.86 2.0 100.00 0.1008 20.75 20.08
Loaded 15 19.33 5.65 2.0 100.00 0.0542 22.86 22.86
Loaded 16 13.67 -0.14 2.0 100.00 0.0342 26.01 26.01
Loaded 17 10.67 8.32 2.0 100.00 0.0258 26.01 24.75
Loaded 18 64.23 11.90 2.0 100.00 0.2108 24.75 15.78
Loaded 19 64.68 0.00 2.0 100.00 0.1656 30.00 30.00
Loaded 20 37.95 4.16 2.0 100.00 0.0759 30.00 30.00
Loaded 21 266.14 12.58 2.0 100.00 1.0240 30.00 14.45
Loaded 22 125.70 11.23 2.0 100.00 0.4674 16.33 16.33
Loaded 23 105.25 12.89 2.0 100.00 0.4425 16.33 13.74
Loaded 24 163.56 10.74 2.0 100.00 0.5899 16.92 16.92
Loaded 25 94.89 11.95 2.0 100.00 0.3618 16.92 15.49
Loaded 26 42.80 -2.15 2.0 100.00 0.1330 20.00 20.00
Loaded 27 81.37 6.33 2.0 100.00 0.2125 24.16 24.16
Loaded 28 114.96 10.43 2.0 100.00 0.3707 24.16 17.30
Loaded 29 31.83 8.41 2.0 100.00 0.1042 19.07 19.07
Loaded 30 122.60 11.46 2.0 100.00 0.4475 19.07 16.07
Loaded 31 122.60 8.87 2.0 100.00 0.3992 18.99 18.99
Loaded 32 121.48 9.79 2.0 100.00 0.4070 18.99 17.76
Loaded 33 98.18 9.06 2.0 100.00 0.3242 18.32 18.32
Loaded 34 119.94 12.85 2.0 100.00 0.4954 18.32 13.80
Loaded 35 100.91 11.84 2.0 100.00 0.3955 15.56 15.56
Loaded 36 72.54 11.22 2.0 100.00 0.2680 16.33 16.33
Loaded 37 77.99 10.13 2.0 100.00 0.2687 17.56 17.56
Loaded 38 117.16 12.26 2.0 100.00 0.4557 17.56 15.10
Loaded 39 66.47 12.20 2.0 100.00 0.2630 15.17 15.17
Loaded 40 57.51 9.98 2.0 100.00 0.2025 17.68 17.68
Loaded 41 35.76 7.59 2.0 100.00 0.1108 20.66 20.66
Loaded 42 48.17 10.44 2.0 100.00 0.1575 20.66 17.38
Loaded 43 53.14 6.77 2.0 100.00 0.1542 22.72 22.72
Loaded 44 60.54 10.97 2.0 100.00 0.1958 22.72 16.84
Loaded 45 94.77 12.74 2.0 100.00 0.3875 16.84 14.09
Loaded 46 226.28 2.17 2.0 100.00 0.4989 30.00 30.00
Loaded 47 239.01 0.00 2.0 100.00 0.4780 30.00 30.00
Loaded 48 265.76 0.00 2.0 100.00 0.7815 30.00 0.00
Subtotal 3,676.18 8.05 2.0 100.00 12.0105 30.00 19.61
Spot at Dump 0.00 0.00 0.0 0.00 0.5000 0.00 0.00
Dumping 0.00 0.00 0.0 0.00 1.0000 0.00 0.00
Unloaded 1 265.76 0.00 2.0 0.00 0.6227 40.00 35.00
Unloaded 2 239.01 0.00 2.0 0.00 0.3749 40.00 30.00
Unloaded 3 226.28 -2.17 2.0 0.00 0.4720 30.00 19.75
Unloaded 4 94.77 -12.74 2.0 0.00 0.2879 19.75 19.75
Unloaded 5 60.54 -10.97 2.0 0.00 0.1737 20.91 20.91
Unloaded 6 53.14 -6.77 2.0 0.00 0.1388 23.25 20.91
Unloaded 7 48.17 -10.44 2.0 0.00 0.1382 20.91 20.91
Unloaded 8 35.76 -7.59 2.0 0.00 0.0950 22.66 21.50
Unloaded 9 57.51 -9.98 2.0 0.00 0.1613 21.50 19.75
Unloaded 10 66.47 -12.20 2.0 0.00 0.2019 19.75 19.75
Unloaded 11 117.16 -12.26 2.0 0.00 0.3559 19.75 19.75
Unloaded 12 77.99 -10.13 2.0 0.00 0.2239 20.91 20.33
Unloaded 13 72.54 -11.22 2.0 0.00 0.2141 20.33 20.33
Unloaded 14 100.91 -11.84 2.0 0.00 0.2979 20.33 19.75
Unloaded 15 119.94 -12.85 2.0 0.00 0.3644 19.75 19.75
Unloaded 16 98.18 -9.06 2.0 0.00 0.2740 21.50 21.50
Unloaded 17 121.48 -9.79 2.0 0.00 0.3390 21.50 21.50
Unloaded 18 122.60 -8.87 2.0 0.00 0.3339 22.08 20.33
Unloaded 19 122.60 -11.46 2.0 0.00 0.3618 20.33 20.33
Unloaded 20 31.83 -8.41 2.0 0.00 0.0868 22.08 20.91
Unloaded 21 114.96 -10.43 2.0 0.00 0.3299 20.91 20.91
Unloaded 22 81.37 -6.33 2.0 0.00 0.2104 23.25 23.25
Unloaded 23 42.80 2.15 2.0 0.00 0.1083 26.70 20.33
Unloaded 24 94.89 -11.95 2.0 0.00 0.2800 20.33 20.33
Unloaded 25 163.56 -10.74 2.0 0.00 0.4697 20.91 19.75
Unloaded 26 105.25 -12.89 2.0 0.00 0.3197 19.75 19.75
Unloaded 27 125.70 -11.23 2.0 0.00 0.3711 20.33 19.75
Unloaded 28 266.14 -12.58 2.0 0.00 0.8085 19.75 19.75
Unloaded 29 37.95 -4.16 2.0 0.00 0.0972 24.42 24.42
Unloaded 30 64.68 0.00 2.0 0.00 0.1513 29.22 20.33
Unloaded 31 64.23 -11.90 2.0 0.00 0.1896 20.33 20.33
Unloaded 32 10.67 -8.32 2.0 0.00 0.0290 22.08 22.08
Unloaded 33 13.67 0.14 2.0 0.00 0.0364 24.63 23.83
Unloaded 34 19.33 -5.65 2.0 0.00 0.0494 23.83 22.08
Unloaded 35 34.16 -8.86 2.0 0.00 0.0928 22.08 22.08
Unloaded 36 41.73 -8.67 2.0 0.00 0.1134 22.08 22.08
Unloaded 37 26.49 -8.73 2.0 0.00 0.0720 22.08 22.08
Unloaded 38 29.10 -7.47 2.0 0.00 0.0770 22.66 22.66
Unloaded 39 12.43 0.00 2.0 0.00 0.0326 24.46 23.25
Unloaded 40 26.57 -6.81 2.0 0.00 0.0689 23.25 22.08
Unloaded 41 24.71 -8.21 2.0 0.00 0.0671 22.08 22.08
Unloaded 42 21.35 -6.96 2.0 0.00 0.0552 23.25 22.66
Unloaded 43 19.36 -7.08 2.0 0.00 0.0513 22.66 22.08
Unloaded 44 23.19 -8.60 2.0 0.00 0.0630 22.08 22.08
Unloaded 45 20.26 -7.46 2.0 0.00 0.0537 22.66 22.08
Unloaded 46 22.03 -8.82 2.0 0.00 0.0610 22.08 19.98
Unloaded 47 12.56 -0.91 2.0 0.00 0.0441 20.13 16.23
Unloaded 48 24.40 0.00 2.0 0.00 0.1829 16.38 0.00
Subtotal 3,676.18 -8.05 2.0 0.00 10.0039 40.00 21.06
Average Elevation Fuel Burned
Speed (kph) Change (m) (l)
0.00 0.0 0.213
0.00 0.0 0.721
0.00 0.0 0.721
7.32 1.2 0.047 DATA EXPORTADA DE HAUL INFINITY
17.33 0.9 0.015
21.21 1.1 0.016
23.36 0.9 0.012
22.88 2.1 0.019
22.12 1.5 0.014
22.30 1.4 0.015
22.05 1.2 0.012
22.17 2.1 0.021
21.41 3.0 0.028
20.05 1.9 0.017
20.94 1.2 0.016
24.23 0.0 0.012
24.10 3.4 0.031
22.44 1.9 0.018
21.52 2.5 0.024
21.17 3.1 0.029
21.08 1.3 0.015
22.13 1.5 0.017
21.23 3.4 0.031
21.91 1.1 0.017
25.41 0.0 0.012
24.32 4.2 0.035
21.00 4.6 0.042
20.01 3.7 0.037
19.87 3.4 0.034
20.07 3.2 0.034
19.02 6.5 0.063
18.04 3.6 0.039
20.70 1.2 0.020
24.84 0.0 0.014
23.97 5.2 0.043
19.94 5.6 0.051
18.61 2.8 0.028
18.03 8.1 0.083
18.19 3.4 0.036
18.09 6.3 0.064
18.05 4.2 0.045
17.96 5.4 0.054
20.54 1.6 0.024
24.66 0.0 0.013
23.28 5.2 0.043
20.10 4.3 0.041
21.08 2.6 0.031
24.23 0.0 0.013
24.13 3.6 0.032
20.86 4.9 0.044
20.01 3.6 0.037
21.90 0.0 0.010
21.17 4.7 0.042
21.60 1.3 0.020
22.35 3.5 0.033
21.47 2.6 0.025
23.37 0.0 0.011
24.09 2.1 0.021
23.88 1.1 0.013
22.90 3.3 0.030
21.67 2.5 0.023
19.36 4.9 0.045
18.09 2.4 0.024
18.25 2.5 0.027
18.94 0.9 0.012
18.00 2.1 0.026
15.30 -2.7 0.036
14.67 -12.0 0.136
16.00 -5.2 0.088
17.37 0.9 0.043
14.33 -11.3 0.115
14.66 -17.6 0.193
14.00 -13.6 0.130
14.33 -14.1 0.152
19.35 -3.6 0.140
15.66 -8.1 0.127
13.27 -22.8 0.313
17.92 57.7 3.275
0.00 0.0 0.144
0.00 0.0 0.288
24.64 22.8 0.169
38.65 8.1 0.052
39.00 3.6 0.070
38.76 14.1 0.057
38.18 13.6 0.048
39.04 17.6 0.073
35.46 11.3 0.047
30.00 -0.9 0.025
34.80 5.2 0.041
36.12 12.0 0.055
25.12 2.7 0.023
22.66 -2.1 0.021
22.61 -0.9 0.010
22.06 -2.5 0.023
21.50 -2.4 0.021
21.50 -4.9 0.041
22.08 -2.5 0.023
22.08 -3.3 0.031
23.21 -1.1 0.013
22.66 -2.1 0.022
23.43 0.0 0.011
22.08 -2.6 0.025
22.08 -3.5 0.033
23.35 -1.3 0.018
21.50 -4.7 0.041
22.87 0.0 0.010
22.06 -3.6 0.034
21.50 -4.9 0.043
22.08 -3.6 0.035
23.18 0.0 0.014
23.07 -2.6 0.028
21.50 -4.3 0.038
21.50 -5.2 0.047
22.63 0.0 0.015
23.41 -1.6 0.021
21.50 -5.4 0.046
21.50 -4.2 0.038
21.50 -6.3 0.054
22.06 -3.4 0.030
21.50 -8.1 0.070
21.50 -2.8 0.025
21.50 -5.6 0.048
22.08 -5.2 0.047
23.02 0.0 0.016
23.54 -1.2 0.018
22.06 -3.6 0.032
21.50 -6.5 0.056
22.08 -3.2 0.031
22.08 -3.4 0.030
22.06 -3.7 0.034
21.50 -4.6 0.041
22.08 -4.2 0.038
23.12 0.0 0.013
23.27 -1.1 0.016
21.50 -3.4 0.030
22.66 -1.5 0.016
22.62 -1.3 0.014
22.08 -3.1 0.028
22.08 -2.5 0.024
22.08 -1.9 0.018
22.08 -3.4 0.034
23.10 0.0 0.013
22.91 -1.2 0.015
21.50 -1.9 0.016
22.08 -3.0 0.027
22.66 -2.1 0.021
22.66 -1.2 0.012
22.62 -1.4 0.015
22.08 -1.5 0.014
22.08 -2.1 0.020
23.83 -0.9 0.011
21.80 -1.1 0.016
16.27 -0.9 0.017
7.21 -1.2 0.048
24.94 -57.7 2.367

Average Elevation Fuel Burned


Speed (kph) Change (m) (l)
0.00 0.0 0.144
0.00 0.0 0.721
0.00 0.0 0.721
7.32 1.2 0.047
17.33 0.9 0.015
21.21 1.1 0.016
23.36 0.9 0.012
22.88 2.1 0.019
22.12 1.5 0.014
22.30 1.4 0.015
22.05 1.2 0.012
22.17 2.1 0.021
21.41 3.0 0.028
20.05 1.9 0.017
20.94 1.2 0.016
24.23 0.0 0.012
24.10 3.4 0.031
22.44 1.9 0.018
21.52 2.5 0.024
21.17 3.1 0.029
21.08 1.3 0.015
22.13 1.5 0.017
21.23 3.4 0.031
21.91 1.1 0.017
25.41 0.0 0.012
24.32 4.2 0.035
21.00 4.6 0.042
20.01 3.7 0.037
19.87 3.4 0.034
20.07 3.2 0.034
19.02 6.5 0.063
18.04 3.6 0.039
20.70 1.2 0.020
24.84 0.0 0.014
23.97 5.2 0.043
19.94 5.6 0.051
18.61 2.8 0.028
18.03 8.1 0.083
18.19 3.4 0.036
18.09 6.3 0.064
18.05 4.2 0.045
17.96 5.4 0.054
20.54 1.6 0.024
24.66 0.0 0.013
23.28 5.2 0.043
20.10 4.3 0.041
21.08 2.6 0.031
24.23 0.0 0.013
24.13 3.6 0.032
20.86 4.9 0.044
20.01 3.6 0.037
21.90 0.0 0.010
21.17 4.7 0.042
21.60 1.3 0.020
22.35 3.5 0.033
21.47 2.6 0.025
23.37 0.0 0.011
24.09 2.1 0.021
23.88 1.1 0.013
22.90 3.3 0.030
21.67 2.5 0.023
19.36 4.9 0.045
18.09 2.4 0.024
18.25 2.5 0.027
18.94 0.9 0.012
20.49 2.1 0.023
16.75 14.0 0.127
18.43 10.9 0.115
17.91 11.9 0.117
18.17 8.9 0.093
14.53 15.4 0.143
15.31 11.9 0.114
16.24 8.1 0.077
17.42 7.9 0.078
15.43 14.4 0.131
15.17 8.1 0.076
17.04 5.7 0.058
19.36 2.7 0.032
18.35 5.0 0.046
20.68 3.6 0.045
18.55 6.6 0.057
14.67 12.1 0.112
27.21 4.9 0.144
30.00 0.0 0.138
20.40 0.0 0.226
19.60 320.0 3.725
0.00 0.0 0.144
0.00 0.0 0.288
25.61 0.0 0.180
38.25 0.0 0.108
28.76 -4.9 0.137
19.75 -12.1 0.083
20.91 -6.6 0.050
22.97 -3.6 0.040
20.91 -5.0 0.040
22.58 -2.7 0.028
21.39 -5.7 0.047
19.75 -8.1 0.058
19.75 -14.4 0.103
20.90 -7.9 0.065
20.33 -8.1 0.062
20.32 -11.9 0.086
19.75 -15.4 0.105
21.50 -8.9 0.079
21.50 -11.9 0.098
22.03 -10.9 0.097
20.33 -14.0 0.105
22.53 -2.1 0.021
22.61 -0.9 0.010
22.06 -2.5 0.023
21.50 -2.4 0.021
21.50 -4.9 0.041
22.08 -2.5 0.023
22.08 -3.3 0.031
23.21 -1.1 0.013
22.66 -2.1 0.022
23.43 0.0 0.011
22.08 -2.6 0.025
22.08 -3.5 0.033
23.35 -1.3 0.018
21.50 -4.7 0.041
22.87 0.0 0.010
22.06 -3.6 0.034
21.50 -4.9 0.043
22.08 -3.6 0.035
23.18 0.0 0.014
23.07 -2.6 0.028
21.50 -4.3 0.038
21.50 -5.2 0.047
22.63 0.0 0.015
23.41 -1.6 0.021
21.50 -5.4 0.046
21.50 -4.2 0.038
21.50 -6.3 0.054
22.06 -3.4 0.030
21.50 -8.1 0.070
21.50 -2.8 0.025
21.50 -5.6 0.048
22.08 -5.2 0.047
23.02 0.0 0.016
23.54 -1.2 0.018
22.06 -3.6 0.032
21.50 -6.5 0.056
22.08 -3.2 0.031
22.08 -3.4 0.030
22.06 -3.7 0.034
21.50 -4.6 0.041
22.08 -4.2 0.038
23.12 0.0 0.013
23.27 -1.1 0.016
21.50 -3.4 0.030
22.66 -1.5 0.016
22.62 -1.3 0.014
22.08 -3.1 0.028
22.08 -2.5 0.024
22.08 -1.9 0.018
22.08 -3.4 0.034
23.10 0.0 0.013
22.91 -1.2 0.015
21.50 -1.9 0.016
22.08 -3.0 0.027
22.66 -2.1 0.021
22.66 -1.2 0.012
22.62 -1.4 0.015
22.08 -1.5 0.014
22.08 -2.1 0.020
23.83 -0.9 0.011
21.80 -1.1 0.016
16.27 -0.9 0.017
7.21 -1.2 0.048
22.36 -320.0 3.281

Average Elevation Fuel Burned


Speed (kph) Change (m) (l)
0.00 0.0 0.597
0.00 0.0 0.721
0.00 0.0 0.721
8.17 0.0 0.052
18.46 0.1 0.012
19.95 1.9 0.019
20.54 1.5 0.017
21.09 2.0 0.019
21.45 1.4 0.016
22.28 1.5 0.017
22.52 2.0 0.019
22.51 1.8 0.021
24.18 0.0 0.009
25.24 2.2 0.020
22.98 2.3 0.020
21.31 3.6 0.034
20.33 3.0 0.029
21.42 1.1 0.016
24.01 0.0 0.010
24.79 0.9 0.008
18.28 7.6 0.061
23.44 0.0 0.048
30.00 1.6 0.022
15.59 33.5 0.295
19.37 -3.6 0.140
15.66 -8.1 0.127
13.27 -22.8 0.313
17.12 33.5 1.344
0.00 0.0 0.144
0.00 0.0 0.288
24.64 22.8 0.169
38.65 8.1 0.052
31.89 3.6 0.085
19.75 -33.5 0.233
23.42 -1.6 0.028
25.65 0.0 0.044
20.33 -7.6 0.055
22.08 -0.9 0.009
22.54 0.0 0.011
23.49 -1.1 0.015
22.08 -3.0 0.027
22.08 -3.6 0.033
22.08 -2.3 0.021
22.66 -2.2 0.022
22.87 0.0 0.010
23.14 -1.8 0.020
22.08 -2.0 0.020
23.21 -1.5 0.016
22.62 -1.4 0.015
22.08 -2.0 0.018
22.63 -1.5 0.016
21.68 -1.9 0.018
17.08 -0.1 0.013
8.01 0.0 0.053
23.04 -33.5 1.004

Average Elevation Fuel Burned


Speed (kph) Change (m) (l)
0.00 0.0 0.4
0.00 0.0 0.7
0.00 0.0 0.7
8.17 0.0 0.1
18.46 0.1 0.0
19.95 1.9 0.0
20.54 1.5 0.0
21.09 2.0 0.0
21.45 1.4 0.0
22.28 1.5 0.0
22.52 2.0 0.0
22.51 1.8 0.0
24.18 0.0 0.0
25.24 2.2 0.0
22.98 2.3 0.0
21.31 3.6 0.0
20.33 3.0 0.0
21.42 1.1 0.0
24.01 0.0 0.0
24.79 0.9 0.0
18.28 7.6 0.1
23.44 0.0 0.0
30.00 1.6 0.0
15.59 33.5 0.3
16.14 14.1 0.1
14.27 13.6 0.1
16.64 17.6 0.2
15.74 11.3 0.1
19.30 -0.9 0.0
22.97 5.2 0.1
18.60 12.0 0.1
18.33 2.7 0.0
16.44 14.0 0.1
18.43 10.9 0.1
17.91 11.9 0.1
18.17 8.9 0.1
14.53 15.4 0.1
15.31 11.9 0.1
16.24 8.1 0.1
17.42 7.9 0.1
15.43 14.4 0.1
15.17 8.1 0.1
17.04 5.7 0.1
19.36 2.7 0.0
18.35 5.0 0.0
20.68 3.6 0.0
18.55 6.6 0.1
14.67 12.1 0.1
27.21 4.9 0.1
30.00 0.0 0.1
20.40 0.0 0.2
18.36 295.8 3.5
0.00 0.0 0.1
0.00 0.0 0.3
25.61 0.0 0.2
38.25 0.0 0.1
28.76 -4.9 0.1
19.75 -12.1 0.1
20.91 -6.6 0.1
22.97 -3.6 0.0
20.91 -5.0 0.0
22.58 -2.7 0.0
21.39 -5.7 0.0
19.75 -8.1 0.1
19.75 -14.4 0.1
20.90 -7.9 0.1
20.33 -8.1 0.1
20.32 -11.9 0.1
19.75 -15.4 0.1
21.50 -8.9 0.1
21.50 -11.9 0.1
22.03 -10.9 0.1
20.33 -14.0 0.1
21.99 -2.7 0.0
20.91 -12.0 0.1
23.21 -5.2 0.1
23.72 0.9 0.0
20.33 -11.3 0.1
20.89 -17.6 0.1
19.75 -13.6 0.1
20.32 -14.1 0.1
19.75 -33.5 0.2
23.42 -1.6 0.0
25.65 0.0 0.0
20.33 -7.6 0.1
22.08 -0.9 0.0
22.54 0.0 0.0
23.49 -1.1 0.0
22.08 -3.0 0.0
22.08 -3.6 0.0
22.08 -2.3 0.0
22.66 -2.2 0.0
22.87 0.0 0.0
23.14 -1.8 0.0
22.08 -2.0 0.0
23.21 -1.5 0.0
22.62 -1.4 0.0
22.08 -2.0 0.0
22.63 -1.5 0.0
21.68 -1.9 0.0
17.08 -0.1 0.0
8.01 0.0 0.1
22.05 -295.8 2.9
TADA DE HAUL INFINITY
OPCION 1

Excavadora Komatsu PC 600 de 3.5 m3


Camiones de 20 m3

Consideraciones generales
Capacidad de camion 20 m3
Capacidad de camion 16 BCM
Capacidad de camion real (promedio) 39.67 tn
Costo horario 48.34 $/Hr
Costo de posesion 12.54 $/Hr
Costo de operacin 35.79 $/Hr
Distancia de transporte (promedio) 2453.445447 Kms
Ciclo de transporte (promedio) 4906.890894 Kms
Cantidad de llantas 12 #

1ra Etapa 2da Etapa


Capacidad de camion m3 20 20
Capacidad de camion BCM 16 16
Capacidad de camion real (promedio) tn 39.67 39.67
Costo horario $/Hr 48.34 48.34
Costo de posesion $/Hr 12.54 12.54
Costo de operacin $/Hr 35.79 35.79
Distancia de transporte (promedio) Kms 3287.5629775 2724.2864133
Ciclo de transporte (promedio) Kms 6575.125955 5448.5728266
Cantidad de llantas # 12 12

Periodo -1 0
Numero de camiones # 0 0
Consumo de combustible diesel gls/hr 4.56 4.56
Tiempo de ciclo tramo minutos 26.67 26.67
Total de horas operativas Hrs/mes 0 0
Disponibilidad % 85% 85%
Utilizacion % 85% 85%
Horas operativas Hrs/dia 17.34 17.34
Horas por camion operativas Hrs/mes 520.2 520.2
Rendimiento tn/hr 89.26 89.26
Extraccion de equipos de acarreo Tn/dia 1547.73 1547.73
Extraccion de equipos de acarreo tn/mes 46431.75 46431.75
PRODUCCION MATERIAL Tn 0 0
Requerimiento de camiones Und 0 0

Camiones
Ao Stand By
rodando

-1 0 0
0 0 0
1 3 1
2 3 1
3 3 1
4 3 1
5 3 1
6 3 1
7 3 1
8 3 1
9 3 1
10 3 1
11 3 1
12 2 1
13 2 1
14 2 1
15 2 1
16 2 1
17 3 1
18 3 1
19 3 1
20 3 1
21 3 1
22 1 1

Consideraciones para el calculo de excavadora Komatsu PC 600 de 3.5 m3

1ra Etapa 2da Etapa


Capacidad balde m3 3.5 3.5
Capacidad balde BCM 2.8 2.8
Capacidad balde real tn 6.94 6.94
Costo horario $/Hr 122.47 122.47
Costo de posesion $/Hr 30.54 30.54
Costo de operacin $/Hr 91.93 91.93

Periodo -1 0
Numero de excavadoras # 0 0
Consumo de combustible diesel gls/hr 15.56 15.56
Tiempo por baldada seg 30 30
Numero de pases # 5 5
Tiempo de carguio min 2.5 2.5
Tiempo de ciclo/camion minutos 2.5 2.5
Total de horas operativas Hrs/mes 0 0
Disponibilidad % 85% 85%
Utilizacion % 85% 85%
Horas operativas Hrs/dia 17.34 17.34
Horas por excavadora operativas Hrs/mes 520.2 520.2
Rendimiento tn/hr 832.8 832.8
Extraccion tn/mes 433222.56 433222.56
Extraccion de equipos de carguio Tn/dia 24984 24984
PRODUCCION MATERIAL Tn 0 0
Requerimiento de excavadoras Und 0 0

Ao Minado Stand By

-1 0 0
0 0 0
1 1 1
2 1 1
3 1 1
4 1 1
5 1 1
6 1 1
7 1 1
8 1 1
9 1 1
10 1 1
11 1 1
12 1 1
13 1 1
14 1 1
15 1 1
16 1 1
17 1 1
18 1 1
19 1 1
20 1 1
21 1 1
22 1 1
3ra Etapa 4ta Etapa 5ta Etapa
20 20 20
16 16 16
39.67 39.67 39.67
48.34 48.34 48.34
12.54 12.54 12.54
35.79 35.79 35.79
2248.7632326 1655.9741249542 2350.64048714
4497.5264651 3311.9482499085 4701.28097427
12 12 12

Calculo del numero d


1 2 3 4 5 6 7
3 3 3 3 3 3 3
4.56 4.56 4.56 4.56 4.56 4.56 4.56
26.67 21.58 21.58 21.58 21.58 21.58 20.00
1512.66 1359.90 1359.89 1359.77 1360.01 1359.70 1260.42
85% 85% 85% 85% 85% 85% 85%
85% 85% 85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2 520.2 520.2
89.26 110.30 110.30 110.30 110.30 110.30 119.01
1547.73 1912.67 1912.67 1912.67 1912.67 1912.67 2063.63
46431.75 57380.01 57380.01 57380.01 57380.01 57380.01 61909.00
1620195 1800027 1800017 1799858 1800164 1799756 1800033
2.908 2.614 2.614 2.614 2.614 2.614 2.423

Horas Costo $/hr


Total Costo total
Operativas Efectivas Operativo Satnd By
0 0.00 0.00 48.34 18.84 0 5
0 0.00 0.00 48.34 18.84 0
4 2080.80 1512.66 48.34 18.84 83825.74
4 2080.80 1359.90 48.34 18.84 79319.37
4 2080.80 1359.89 48.34 18.84 79319.14 4
4 2080.80 1359.77 48.34 18.84 79315.60
4 2080.80 1360.01 48.34 18.84 79322.42
4 2080.80 1359.70 48.34 18.84 79313.33
4 2080.80 1260.42 48.34 18.84 76384.70
4 2080.80 1260.53 48.34 18.84 76387.76 3
4 2080.80 1260.25 48.34 18.84 76379.64
4 2080.80 1260.48 48.34 18.84 76386.48 3
4 2080.80 1260.41 48.34 18.84 76384.48
3 1560.60 1027.28 48.34 18.84 59706.38 2
3 1560.60 1027.47 48.34 18.84 59711.95
3 1560.60 1027.23 48.34 18.84 59705.12
3 1560.60 1027.38 48.34 18.84 59709.41
3 1560.60 1027.33 48.34 18.84 59707.96
4 2080.80 1365.46 48.34 18.84 79483.24 1
4 2080.80 1365.42 48.34 18.84 79482.28
4 2080.80 1365.34 48.34 18.84 79479.93 1
4 2080.80 1365.55 48.34 18.84 79485.95
4 2080.80 1365.34 48.34 18.84 79479.93 0 0
-1
0
0 1
2 1040.40 217.48 48.34 18.84 26016.82

3ra Etapa 4ta Etapa 5ta Etapa


3.5 3.5 3.5
2.8 2.8 2.8
6.94 6.94 6.94
122.47 122.47 122.47
30.54 30.54 30.54
91.93 91.93 91.93

Calculo del numero de unid


1 2 3 4 5 6 7
1 1 1 1 1 1 1
15.56 15.56 15.56 15.56 15.56 15.56 15.56
30 30 30 30 30 30 30
5 5 5 5 5 5 5
2.5 2.5 2.5 2.5 2.5 2.5 2.5
2.5 2.5 2.5 2.5 2.5 2.5 2.5
162.12 180.12 180.12 180.10 180.13 180.09 180.12
85% 85% 85% 85% 85% 85% 85%
85% 85% 85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2 520.2 520.2
832.8 832.8 832.8 832.8 832.8 832.8 832.8
433222.56 433222.56 433222.56 433222.56 433222.56 433222.56 433222.56
24984 24984 24984 24984 24984 24984 24984
1,620,195 1,800,027 1,800,017 1,799,858 1,800,164 1,799,756 1,800,033
0.3116556303 0.34624755 0.3462456264 0.3462150417 0.3462739 0.34619542 0.3462487

Horas Costo $/hr


Total Costo total
Operativas Efectivas Operativo Satnd By
2.5
0 0 0 125.47 35.46 0
0 0 0 122.47 35.46 0
2 1040.4 162.123258886 122.47 35.46 50998.9288
2 1040.4 180.117975504 122.47 35.46 52564.649
2 1040.4 180.116974864 122.47 35.46 52564.562 2
2 1040.4 180.101064681 122.47 35.46 52563.1776
2 1040.4 180.131684278 122.47 35.46 52565.8418
2 1040.4 180.090858149 122.47 35.46 52562.2896
2 1040.4 180.118575889 122.47 35.46 52564.7013
1.5 1
2 1040.4 180.133385367 122.47 35.46 52565.9899
2 1040.4 180.094060199 122.47 35.46 52562.5682
2 1040.4 180.127181396 122.47 35.46 52565.4501

1
1.5 1

2 1040.4 180.117475184 122.47 35.46 52564.6055


2 1040.4 180.103766411 122.47 35.46 52563.4127 1
2 1040.4 180.136887608 122.47 35.46 52566.2946
2 1040.4 180.096261607 122.47 35.46 52562.7597
2 1040.4 180.121777938 122.47 35.46 52564.9799
2 1040.4 180.11317243 122.47 35.46 52564.2311
0.5 1
2 1040.4 180.118575889 122.47 35.46 52564.7013
2 1040.4 180.114273135 122.47 35.46 52564.3269
2 1040.4 180.103766411 122.47 35.46 52563.4127
2 1040.4 180.130683638 122.47 35.46 52565.7548
2 1040.4 180.103766411 122.47 35.46 52563.4127 0 0 0
-1 0 1
2 1040.4 28.6880803714 122.47 35.46 39388.7339
Calculo del numero de unidades de la flota de camiones de 20 m3
8 9 10 11 12 13 14
3 3 3 3 2 2 2
4.56 4.56 4.56 4.56 4.56 4.56 4.56
20.00 20.00 20.00 20.00 16.30 16.30 16.30
1260.53 1260.25 1260.48 1260.41 1027.28 1027.47 1027.23
85% 85% 85% 85% 85% 85% 85%
85% 85% 85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2 520.2 520.2
119.01 119.01 119.01 119.01 146.01 146.01 146.01
2063.63 2063.63 2063.63 2063.63 2531.77 2531.77 2531.77
61909.00 61909.00 61909.00 61909.00 75953.23 75953.23 75953.23
1800181 1799788 1800119 1800022 1799885 1800216 1799810
2.423 2.423 2.423 2.423 1.975 1.975 1.975

FLOTA DE CAMIONES
5

3 3 3 3 3 3 3 3 3 3 3 3

2 2 2 2 2 2

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

0 0
-1
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Calculo del numero de unidades de la flota dela excavadora PC 600 de 3.5 m3
8 9 10 11 12 13 14
1 1 1 1 1 1 1
15.56 15.56 15.56 15.56 15.56 15.56 15.56
30 30 30 30 30 30 30
5 5 5 5 5 5 5
2.5 2.5 2.5 2.5 2.5 2.5 2.5
2.5 2.5 2.5 2.5 2.5 2.5 2.5
180.13 180.09 180.13 180.12 180.10 180.14 180.10
85% 85% 85% 85% 85% 85% 85%
85% 85% 85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2 520.2 520.2
832.8 832.8 832.8 832.8 832.8 832.8 832.8
433222.56 433222.56 433222.56 433222.56 433222.56 433222.56 433222.56
24984 24984 24984 24984 24984 24984 24984
1,800,181 1,799,788 1,800,119 1,800,022 1,799,885 1,800,216 1,799,810
0.3462771729 0.34620158 0.34626525 0.3462465882 0.3462202353 0.3462839054 0.3462058085

Excavadoras
2.5

1.5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1
1.5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

0.5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

0 0 0
-1 0 1 2 3 4 5 6 7 8 9 10 11 12 13
15 16 17 18 19 20 21 22
2 2 3 3 3 3 3 1
4.56 4.56 4.56 4.56 4.56 4.56 4.56 4.56
16.30 16.30 21.67 21.67 21.67 21.67 21.67 21.67
1027.38 1027.33 1365.46 1365.42 1365.34 1365.55 1365.34 217.48
85% 85% 85% 85% 85% 85% 85% 85%
85% 85% 85% 85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2 520.2 520.2 520.2
146.01 146.01 109.86 109.86 109.86 109.86 109.86 109.86
2531.77 2531.77 1904.89 1904.89 1904.89 1904.89 1904.89 1904.89
75953.23 75953.23 57146.77 57146.77 57146.77 57146.77 57146.77 57146.77
1800065 1799979 1800033 1799990 1799885 1800154 1799885 286,697
1.975 1.975 2.625 2.625 2.625 2.625 2.625 0.418

3 3 3 3 3

2 2 2 2

1 1 1 1 1 1 1 1 1 1

13 14 15 16 17 18 19 20 21 22
15 16 17 18 19 20 21 22
1 1 1 1 1 1 1 1
15.56 15.56 15.56 15.56 15.56 15.56 15.56 15.56
30 30 30 30 30 30 30 30
5 5 5 5 5 5 5 5
2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5
2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5
180.12 180.11 180.12 180.11 180.10 180.13 180.10 28.69
85% 85% 85% 85% 85% 85% 85% 85%
85% 85% 85% 85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2 520.2 520.2 520.2
832.8 832.8 832.8 832.8 832.8 832.8 832.8 832.8
433222.56 433222.56 433222.56 433222.56 433222.56 433222.56 433222.56 433222.56
24984 24984 24984 24984 24984 24984 24984 24984
1,800,065 1,799,979 1,800,033 1,799,990 1,799,885 1,800,154 1,799,885 286,697
0.34625486 0.34623832 0.3462487 0.34624043 0.34622024 0.34627198 0.34622024 0.05514817

1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1
Consideraciones generales
Capacidad de camion 20 m3
Capacidad de camion 16 BCM
Capacidad de camion real (promedio) 39.67 tn
Costo horario 48.34 $/Hr
Costo de posesion 12.54 $/Hr
Costo de operacin 35.79 $/Hr
Distancia de transporte (promedio) 2735.37255 Kms
Ciclo de transporte (promedio) 5470.7451 Kms
Cantidad de llantas 12 #

1ra Etapa
Capacidad de camion m3 20
Capacidad de camion BCM 16
Capacidad de camion real (promedio) tn 39.67
Costo horario $/Hr 48.34
Costo de posesion $/Hr 12.54
Costo de operacin $/Hr 35.79
Distancia de transporte (promedio) Kms 2490.5608530855
Ciclo de transporte (promedio) Kms 4981.1217061711
Cantidad de llantas # 12

Periodo -1
Numero de camiones # 10
Consumo de combustible diesel gls/hr 4.56
Tiempo de ciclo tramo minutos 20.56
Total de horas operativas Hrs/mes 5051.87
Disponibilidad % 85%
Utilizacion % 85%
Horas operativas Hrs/dia 17.34
Horas por camion operativas Hrs/mes 520.2
Rendimiento tn/hr 115.75
Extraccion de equipos de acarreo Tn/dia 2007.05
Extraccion de equipos de acarreo tn/mes 60211.59
PRODUCCION MATERIAL Tn 7016867.00
Requerimiento de camiones Und 9.71
Camiones
Ao rodando
-1 10
0 12
1 11
2 8
3 7
4 6
5 6
6 6
7 6
8 6
9 6
10 6
11 7
12 8
13 7
14 7
15 7
16 7
17 7
18 9
19 10
20 10
21 8
22 1

Consideraciones para el calculo de excavadora Komatsu PC 600 de 3.5 m3

1ra Etapa
Capacidad balde m3 3.5
Capacidad balde BCM 2.8
Capacidad balde real tn 6.94
Costo horario $/Hr 122.47
Costo de posesion $/Hr 30.54
Costo de operacin $/Hr 91.93
Periodo -1
Numero de excavadoras # 2
Consumo de combustible diesel gls/hr 15.56
Tiempo por baldada seg 30
Numero de pases # 5
Tiempo de carguio min 2.5
Tiempo de ciclo/camion minutos 2.5
Total de horas operativas Hrs/mes 702.14
Disponibilidad % 85%
Utilizacion % 85%
Horas operativas Hrs/dia 17.34
Horas por excavadora operativas Hrs/mes 520.2
Rendimiento tn/hr 832.8
Extraccion tn/mes 433222.56
Extraccion de equipos de carguio Tn/dia 24984.00
PRODUCCION MATERIAL Tn 7016867.00
Requerimiento de excavadoras Und 1.35

Ao Minado

-1 2
0 2
1 2
2 1
3 1
4 1
5 1
6 1
7 1
8 1
9 1
10 1
11 1
12 1
13 1
14 1
15 1
16 1
17 1
18 1
19 1
20 1
21 1
22 1
2da Etapa 3ra Etapa 4ta Etapa 5ta Etapa
20 20 20 20
16 16 16 16
39.67 39.67 39.67 39.67
48.34 48.34 48.34 48.34
12.54 12.54 12.54 12.54
35.79 35.79 35.79 35.79
2054.0237580132 2337.5004023144 2853.3943850944 3941.3833580413
4108.0475160265 4675.0008046287 5706.7887701887 7882.7667160827
12 12 12 12

0 1 2 3 4
12 11 8 7 6
4.56 4.56 4.56 4.56 4.56
20.56 20.56 16.99 16.99 16.99
6519.40 5608.41 4352.11 3622.48 2971.59
85% 85% 85% 85% 85%
85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2
115.75 115.75 140.12 140.12 140.12
2007.05 2007.05 2429.60 2429.60 2429.60
60211.59 60211.59 72888.14 72888.14 72888.14
9055206.06 7789877.88 7317582.55 6090796.72 4996393.73
12.53 10.78 8.37 6.96 5.71
Horas Costo $/hr
Stand By Total
Operativas Efectivas Operativo
1 11 5722.2 5051.87 48.34
1 13 6762.6 6519.40 48.34
1 12 6242.4 5608.41 48.34
1 9 4681.8 4352.11 48.34
1 8 4161.6 3622.48 48.34
1 7 3641.4 2971.59 48.34
1 7 3641.4 3008.33 48.34
1 7 3641.4 2663.09 48.34
1 7 3641.4 2976.57 48.34
1 7 3641.4 3040.22 48.34
1 7 3641.4 3199.88 48.34
1 7 3641.4 2715.45 48.34
1 8 4161.6 3723.38 48.34
1 9 4681.8 4189.36 48.34
1 8 4161.6 3431.78 48.34
1 8 4161.6 3536.11 48.34
1 8 4161.6 3250.20 48.34
1 8 4161.6 3649.92 48.34
1 8 4161.6 3461.12 48.34
1 10 5202 4604.69 48.34
1 11 5722.2 5140.58 48.34
1 11 5722.2 5060.46 48.34
1 9 4681.8 3715.76 48.34
1 2 1040.4 405.92 48.34

u PC 600 de 3.5 m3

2da Etapa 3ra Etapa 4ta Etapa 5ta Etapa


3.5 3.5 3.5 3.5
2.8 2.8 2.8 2.8
6.94 6.94 6.94 6.94
122.47 122.47 122.47 122.47
30.54 30.54 30.54 30.54
91.93 91.93 91.93 91.93
0 1 2 3 4
2 2 1 1 1
15.56 15.56 15.56 15.56 15.56
30 30 30 30 30
5 5 5 5 5
2.5 2.5 2.5 2.5 2.5
2.5 2.5 2.5 2.5 2.5
906.10 779.49 732.23 609.47 499.96
85% 85% 85% 85% 85%
85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2
832.8 832.8 832.8 832.8 832.8
433222.56 433222.56 433222.56 433222.56 433222.56
24984.00 24984.00 24984.00 24984.00 24984.00
9055206.06 7789877.88 7317582.55 6090796.72 4996393.73
1.74 1.50 1.41 1.17 0.96

Horas Costo $/hr


Stand By Total
Operativas Efectivas Operativo
1 3 1560.6 702.14 122.47
1 3 1560.6 906.10 122.47
1 3 1560.6 779.49 122.47
1 2 1040.4 732.23 122.47
1 2 1040.4 609.47 122.47
1 2 1040.4 499.96 122.47
1 2 1040.4 506.14 122.47
1 2 1040.4 448.06 122.47
1 2 1040.4 425.36 122.47
1 2 1040.4 434.46 122.47
1 2 1040.4 457.27 122.47
1 2 1040.4 388.05 122.47
1 2 1040.4 532.08 122.47
1 2 1040.4 510.86 122.47
1 2 1040.4 418.48 122.47
1 2 1040.4 431.20 122.47
1 2 1040.4 396.34 122.47
1 2 1040.4 445.08 122.47
1 2 1040.4 323.45 122.47
1 2 1040.4 430.32 122.47
1 2 1040.4 480.40 122.47
1 2 1040.4 472.91 122.47
1 2 1040.4 347.24 122.47
1 2 1040.4 37.93 122.47
Calculo del numero de unidades de la flota de cam
5 6 7 8 9
6 6 6 6 6
4.56 4.56 4.56 4.56 4.56
16.99 16.99 20.00 20.00 20.00
3008.33 2663.09 2976.57 3040.22 3199.88
85% 85% 85% 85% 85%
85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2
140.12 140.12 119.01 119.01 119.01
2429.60 2429.60 2063.63 2063.63 2063.63
72888.14 72888.14 61909.00 61909.00 61909.00
5058166.31 4477688.09 4250894.55 4341798.26 4569814.23
5.78 5.12 5.72 5.84 6.15
Costo $/hr
Costo total
Satnd By
18.84 256836.43
18.84 319729.55 14

18.84 283054.86
18.84 216592.36
18.84 185267.79 12

18.84 156265.88
18.84 157349.68
18.84 147165.17 10
18.84 156412.70
18.84 158290.45
18.84 163000.47 8
18.84 148709.85
12
18.84 188244.39 11
18.84 211791.23 6 10
18.84 179642.10
8
18.84 182719.79 7
18.84 174285.36 4 6 6 6 6
18.84 186077.06
18.84 180507.72
18.84 233844.09 2
18.84 259453.25
18.84 257089.90 1 1 1 1 1 1 1 1 1
18.84 197820.13 0
-1 0 1 2 3 4 5 6 7
18.84 31575.88
Calculo del numero de unidades de la flota dela excavad
5 6 7 8 9
1 1 1 1 1
15.56 15.56 15.56 15.56 15.56
30 30 30 30 30
5 5 5 5 5
2.5 2.5 2.5 2.5 2.5
2.5 2.5 2.5 2.5 2.5
506.14 448.06 425.36 434.46 457.27
85% 85% 85% 85% 85%
85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2
832.8 832.8 832.8 832.8 832.8
433222.56 433222.56 433222.56 433222.56 433222.56
24984.00 24984.00 24984.00 24984.00 24984.00
5058166.31 4477688.09 4250894.55 4341798.26 4569814.23
0.97 0.86 0.82 0.84 0.88

Costo $/hr
Costo total
Satnd By
35.46 116431.74
35.46 134178.68 3.5
35.46 123162.01
35.46 100603.64
35.46 89922.55 3
35.46 80394.05
35.46 80931.87
35.46 75877.90 2.5
35.46 73903.30
35.46 74694.76
35.46 76680.00 2 2 2 2
35.46 70656.61
35.46 83189.26
35.46 81342.49 1.5 1 1 1 1 1
35.46 73304.44
35.46 74411.39
35.46 71377.80 1
35.46 75618.89
35.46 65035.80
35.46 74334.41 0.5 1 1 1 1 1 1 1 1
35.46 78691.81

0
-1 0 1 2 3 4 5 6
0.5 1 1 1 1 1 1 1 1

35.46 78040.39
35.46 67106.32
0
35.46 40193.24 -1 0 1 2 3 4 5 6
el numero de unidades de la flota de camiones de 20 m3
10 11 12 13 14
6 7 8 7 7
4.56 4.56 4.56 4.56 4.56
20.00 20.00 23.44 23.44 23.44
2715.45 3723.38 4189.36 3431.78 3536.11
85% 85% 85% 85% 85%
85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2
119.01 119.01 101.55 101.55 101.55
2063.63 2063.63 1760.94 1760.94 1760.94
61909.00 61909.00 52828.12 52828.12 52828.12
3877993.19 5317440.11 5105328.31 4182111.83 4309251.01
5.22 7.16 8.05 6.60 6.80
FLOTA DE CAMIONES

10 10
9
8
7 7 7 7 7 7 7
6 6 6 6 6 6 6

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
mero de unidades de la flota dela excavadora PC 600 de 3.5 m3
10 11 12 13 14
1 1 1 1 1
15.56 15.56 15.56 15.56 15.56
30 30 30 30 30
5 5 5 5 5
2.5 2.5 2.5 2.5 2.5
2.5 2.5 2.5 2.5 2.5
388.05 532.08 510.86 418.48 431.20
85% 85% 85% 85% 85%
85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2
832.8 832.8 832.8 832.8 832.8
433222.56 433222.56 433222.56 433222.56 433222.56
24984.00 24984.00 24984.00 24984.00 24984.00
3877993.19 5317440.11 5105328.31 4182111.83 4309251.01
0.75 1.02 0.98 0.80 0.83

Excavadoras

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
15 16 17 18 19
7 7 7 9 10
4.56 4.56 4.56 4.56 4.56
23.44 23.44 30.58 30.58 30.58
3250.20 3649.92 3461.12 4604.69 5140.58
85% 85% 85% 85% 85%
85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2
101.55 101.55 77.83 77.83 77.83
1760.94 1760.94 1349.51 1349.51 1349.51
52828.12 52828.12 40485.39 40485.39 40485.39
3960825.51 4447939.45 3232410.01 4300409.31 4800882.09
6.25 7.02 6.65 8.85 9.88
10 10
9
8
7 7

1 1 1 1 1 1 1
16 17 18 19 20 21 22
15 16 17 18 19
1 1 1 1 1
15.56 15.56 15.56 15.56 15.56
30 30 30 30 30
5 5 5 5 5
2.5 2.5 2.5 2.5 2.5
2.5 2.5 2.5 2.5 2.5
396.34 445.08 323.45 430.32 480.40
85% 85% 85% 85% 85%
85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2
832.8 832.8 832.8 832.8 832.8
433222.56 433222.56 433222.56 433222.56 433222.56
24984.00 24984.00 24984.00 24984.00 24984.00
3960825.51 4447939.45 3232410.01 4300409.31 4800882.09
0.76 0.86 0.62 0.83 0.92

1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1

14 15 16 17 18 19 20 21 22
1 1 1 1 1 1 1 1 1

14 15 16 17 18 19 20 21 22
20 21 22
10 8 1
4.56 4.56 4.56
30.58 30.58 30.58
5060.46 3715.76 405.92
85% 85% 85%
85% 85% 85%
17.34 17.34 17.34
520.2 520.2 520.2
77.83 77.83 77.83
1349.51 1349.51 1349.51
40485.39 40485.39 40485.39
4726062.57 3470222.19 379099.56
9.73 7.14 0.78
20 21 22
1 1 1
15.56 15.56 15.56
30 30 30
5 5 5
2.5 2.5 2.5
2.5 2.5 2.5
472.91 347.24 37.93
85% 85% 85%
85% 85% 85%
17.34 17.34 17.34
520.2 520.2 520.2
832.8 832.8 832.8
433222.56 433222.56 433222.56
24984.00 24984.00 24984.00
4726062.57 3470222.19 379099.56
0.91 0.67 0.07
DESBROCE
INVERSION $ 827,176.40

MINERAL DESMONTE
CARGUIO 0.361 0.203
ACARREO 0.502 0.482

TOTAL 0.863 0.685

Camiones Excavadoras

Vida de la mina Rodando Stand By Minado Stand By

1 14 2 3 2
2 11 2 2 2
3 10 2 2 2
4 9 2 2 2
5 9 2 2 2
6 9 2 2 2
7 9 2 2 2
8 9 2 2 2
9 9 2 2 2
10 9 2 2 2
11 10 2 2 2
12 10 2 2 2
13 9 2 2 2
14 9 2 2 2
15 9 2 2 2
16 9 2 2 2
17 10 2 2 2
18 12 2 2 2
19 13 2 2 2
20 13 2 2 2
21 11 2 2 2
22 2 2 2 2
Clculo de volquetes
18
16
14
12
10
8
6
4
2
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Clculo de excavadoras
6

0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
OPCION 2

Excavadora Caterpillar 339 DL 2.7m3


Camiones de 15 m3

Consideraciones generales
Capacidad de camion 15 m3
Capacidad de camion 12 BCM
Capacidad de camion real (promedio) 29.754 tn
Costo horario 36.31 $/Hr
Costo de posesion 8.17 $/Hr
Costo de operacin 28.14 $/Hr
Distancia de transporte (promedio) 2453.445447 Kms
Ciclo de transporte (promedio) 4906.890894 Kms
Cantidad de llantas 10 #

1ra Etapa 2da Etapa


Capacidad de camion m3 15 15
Capacidad de camion BCM 12 12
Capacidad de camion real (promedio) tn 29.754 29.754
Costo horario $/Hr 36.31 36.31
Costo de posesion $/Hr 8.17 8.17
Costo de operacin $/Hr 28.14 28.14
Distancia de transporte (promedio) Kms 3287.5629775 2724.2864133
Ciclo de transporte (promedio) Kms 6575.125955 5448.5728266
Cantidad de llantas # 10 10

Periodo -1 0
Numero de camiones # 0 0
Consumo de combustible diesel gls/hr 4.26 4.26
Tiempo de ciclo tramo minutos 26.6666666667 26.666666667
Total de horas operativas Hrs/mes 0 0
Disponibilidad % 85% 85%
Utilizacion % 85% 85%
Horas operativas Hrs/dia 17.34 17.34
Horas por camion operativas Hrs/mes 520.2 520.2
Rendimiento tn/hr 66.9465 66.9465
Extraccion de equipos de acarreo Tn/dia 1160.85231 1160.85231
Extraccion de equipos de acarreo tn/mes 34825.5693 34825.5693
PRODUCCION MATERIAL Tn 0 0
Requerimiento de camiones Und 0 0

Camiones
Ao Stand By
rodando

-1 0 0
0 0 0
1 4 1
2 4 1
3 4 1
4 4 1
5 4 1
6 4 1
7 3 1
8 3 1
9 3 1
10 3 1
11 3 1
12 3 1
13 3 1
14 3 1
15 3 1
16 3 1
17 4 1
18 4 1
19 4 1
20 4 1
21 4 1
22 1 1

Consideraciones para el calculo de Excavadora Caterpillar 339 DL 2.7m3

1ra Etapa 2da Etapa


Capacidad balde m3 2.7 2.7
Capacidad balde BCM 2.16 2.16
Capacidad balde real tn 5.36 5.36
Costo horario $/Hr 113.2 113.2
Costo de posesion $/Hr 30.54 30.54
Costo de operacin $/Hr 82.65 82.65

Periodo -1 0
Numero de excavadoras # 0 0
Consumo de combustible diesel gls/hr 12.59 12.59
Tiempo por baldada seg 30 30
Numero de pases # 5 5
Tiempo de carguio min 2.5 2.5
Tiempo de ciclo/camion minutos 2.5 2.5
Total de horas operativas Hrs/mes 0 0
Disponibilidad % 85% 85%
Utilizacion % 85% 85%
Horas operativas Hrs/dia 17.34 17.34
Horas por excavadora operativas Hrs/mes 520.2 520.2
Rendimiento tn/hr 643.2 643.2
Extraccion tn/mes 334592.64 334592.64
Extraccion de equipos de carguio Tn/dia 19296 19296
PRODUCCION MATERIAL Tn 0 0
Requerimiento de excavadoras Und 0 0

Ao Minado Stand By

-1 0 0
0 0 0
1 1 1
2 1 1
3 1 1
4 1 1
5 1 1
6 1 1
7 1 1
8 1 1
9 1 1
10 1 1
11 1 1
12 1 1
13 1 1
14 1 1
15 1 1
16 1 1
17 1 1
18 1 1
19 1 1
20 1 1
21 1 1
22 1 1
3ra Etapa 4ta Etapa 5ta Etapa
15 15 15
12 12 12
29.754 29.754 29.754
36.31 36.31 36.31
8.17 8.17 8.17
28.14 28.14 28.14
2248.7632326 1655.9741249542 2350.64048714
4497.5264651 3311.9482499085 4701.28097427
10 10 10

Calculo del numero d


1 2 3 4 5 6 7
4 4 4 4 4 4 3
4.26 4.26 4.26 4.26 4.26 4.26 4.26
26.666666667 21.5785939108 21.5785939108 21.578593911 21.5785939 21.5785939 20
2016.778323 1813.1106397228 1813.10056704 1812.9404113 1813.24864 1812.83767 1680.47713
85% 85% 85% 85% 85% 85% 85%
85% 85% 85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2 520.2 520.2
66.9465 82.731989275 82.731989275 82.731989275 82.7319893 82.7319893 89.262
1160.85231 1434.5726940292 1434.57269403 1434.572694 1434.57269 1434.57269 1547.80308
34825.5693 43037.180820874 43037.1808209 43037.180821 43037.1808 43037.1808 46434.0924
1620195 1800027 1800017 1799858 1800164 1799756 1800033
3.8769287255 3.4854106877 3.4853913246 3.4850834512 3.48567596 3.48488595 3.23044432

Horas Costo $/hr


Total Costo total
Operativas Efectivas Operativo Satnd By
0 0.00 0.00 36.31 12.85 0 5
0 0.00 0.00 36.31 12.85 0
5 2601.00 2016.78 36.31 12.85 80736.4695
5 2601.00 1813.11 36.31 12.85 75958.4256
5 2601.00 1813.10 36.31 12.85 75958.1893 4
5 2601.00 1812.94041133 36.31 12.85 75954.432
5 2601.00 1813.24863552 36.31 12.85 75961.663
5 2601.00 1812.83766994 36.31 12.85 75952.0217
4 2080.80 1680.47713473 36.31 12.85 66162.2736
4 2080.80 1680.61530476 36.31 12.85 66165.515 3 4

4 2080.80 1680.24840731 36.31 12.85 66156.9076


4 2080.80 1680.55742272 36.31 12.85 66164.1571
4 2080.80 1680.46686533 36.31 12.85 66162.0327
4 2080.80 1369.63376614 36.31 12.85 58869.8882 2
4 2080.80 1369.88564266 36.31 12.85 58875.7972
4 2080.80 1369.57669442 36.31 12.85 58868.5493
4 2080.80 1369.77073827 36.31 12.85 58873.1015
4 2080.80 1369.70529603 36.31 12.85 58871.5662
5 2601.00 1820.51689595 36.31 12.85 76132.1764 1
5 2601.00 1820.47340663 36.31 12.85 76131.1561
5 2601.00 1820.36721175 36.31 12.85 76128.6648 1
5 2601.00 1820.6392729 36.31 12.85 76135.0473
5 2601.00 1820.36721175 36.31 12.85 76128.6648 0 0
-1
0
0 1
2 1040.40 289.959737751 36.31 12.85 20171.5954

3ra Etapa 4ta Etapa 5ta Etapa


2.7 2.7 2.7
2.16 2.16 2.16
5.36 5.36 5.36
113.2 113.2 113.2
30.54 30.54 30.54
82.65 82.65 82.65

Calculo del numero de unid


1 2 3 4 5 6 7
1 1 1 1 1 1 1
12.59 12.59 12.59 12.59 12.59 12.59 12.59
30 30 30 30 30 30 30
5 5 5 5 5 5 5
2.5 2.5 2.5 2.5 2.5 2.5 2.5
2.5 2.5 2.5 2.5 2.5 2.5 2.5
209.913324 233.2124533582 233.211157753 233.19055763 233.230203 233.177342 233.213231
85% 85% 85% 85% 85% 85% 85%
85% 85% 85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2 520.2 520.2
643.2 643.2 643.2 643.2 643.2 643.2 643.2
334592.64 334592.64 334592.64 334592.64 334592.64 334592.64 334592.64
19296 19296 19296 19296 19296 19296 19296
1,620,195 1,800,027 1,800,017 1,799,858 1,800,164 1,799,756 1,800,033
0.4035242676 0.4483130591 0.4483105685 0.4482709681 0.44834718 0.44824556 0.44831455

Horas Costo $/hr


Total Costo total
Operativas Efectivas Operativo Satnd By
2.5
0 0 0 113.2 35.46 0
0 0 0 113.2 35.46 0
2 1040.4 209.913324005 113.2 35.46 53211.2458
2 1040.4 233.212453358 113.2 35.46 55022.5201
2 1040.4 233.211157753 113.2 35.46 55022.4194 2
2 1040.4 233.190557629 113.2 35.46 55020.818
2 1040.4 233.230203151 113.2 35.46 55023.9
2 1040.4 233.177342454 113.2 35.46 55019.7906
2 1040.4 233.213230721 113.2 35.46 55022.5806
1.5 1
2 1040.4 233.23240568 113.2 35.46 55024.0712
2 1040.4 233.181488391 113.2 35.46 55020.1129
2 1040.4 233.224372927 113.2 35.46 55023.4468

1
1.5 1

2 1040.4 233.211805556 113.2 35.46 55022.4698


2 1040.4 233.194055763 113.2 35.46 55021.0899 1
2 1040.4 233.236940299 113.2 35.46 55024.4237
2 1040.4 233.184338723 113.2 35.46 55020.3345
2 1040.4 233.217376658 113.2 35.46 55022.9029
2 1040.4 233.206234453 113.2 35.46 55022.0367
0.5 1
2 1040.4 233.213230721 113.2 35.46 55022.5806
2 1040.4 233.207659619 113.2 35.46 55022.1475
2 1040.4 233.194055763 113.2 35.46 55021.0899
2 1040.4 233.228907546 113.2 35.46 55023.7993
2 1040.4 233.194055763 113.2 35.46 55021.0899 0 0 0
-1 0 1
2 1040.4 37.1446413765 113.2 35.46 39780.2084
Calculo del numero de unidades de la flota de camiones de 20 m3
8 9 10 11 12 13 14
3 3 3 3 3 3 3
4.26 4.26 4.26 4.26 4.26 4.26 4.26
20 20 20 20 16.3018747398 16.3018747398 16.30187474
1680.6153048 1680.24841 1680.55742 1680.46686533 1369.63376614 1369.885642663 1369.5766944
85% 85% 85% 85% 85% 85% 85%
85% 85% 85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2 520.2 520.2
89.262 89.262 89.262 89.262 109.511330967 109.5113309665 109.51133097
1547.80308 1547.80308 1547.80308 1547.80308 1898.92647896 1898.92647896 1898.926479
46434.0924 46434.0924 46434.0924 46434.0924 56967.7943688 56967.7943688 56967.794369
1800181 1799788 1800119 1800022 1799885 1800216 1799810
3.2307099284 3.23000463 3.23059866 3.2304245777 2.6328984355 2.6333826272 2.6327887244

FLOTA DE CAMIONES
5

3 4 4 4 4 4 4 4

3 3 3 3 3 3 3 3 3 3

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

0 0
-1
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Calculo del numero de unidades de la flota dela excavadora PC 600 de 3.5 m3
8 9 10 11 12 13 14
1 1 1 1 1 1 1
12.59 12.59 12.59 12.59 12.59 12.59 12.59
30 30 30 30 30 30 30
5 5 5 5 5 5 5
2.5 2.5 2.5 2.5 2.5 2.5 2.5
2.5 2.5 2.5 2.5 2.5 2.5 2.5
233.23240568 233.181488 233.224373 233.211805556 233.194055763 233.2369402985 233.18433872
85% 85% 85% 85% 85% 85% 85%
85% 85% 85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2 520.2 520.2
643.2 643.2 643.2 643.2 643.2 643.2 643.2
334592.64 334592.64 334592.64 334592.64 334592.64 334592.64 334592.64
19296 19296 19296 19296 19296 19296 19296
1,800,181 1,799,788 1,800,119 1,800,022 1,799,885 1,800,216 1,799,810
0.4483514142 0.44825353 0.44833597 0.4483118138 0.4482776927 0.4483601313 0.4482590133

Excavadoras
2.5

1.5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1
1.5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

0.5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

0 0 0
-1 0 1 2 3 4 5 6 7 8 9 10 11 12 13
15 16 17 18 19 20 21 22
3 3 4 4 4 4 4 1
4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26
16.3018747 16.3018747 21.6666667 21.6666667 21.6666667 21.6666667 21.6666667 21.6666667
1369.77074 1369.7053 1820.5169 1820.47341 1820.36721 1820.63927 1820.36721 289.959738
85% 85% 85% 85% 85% 85% 85% 85%
85% 85% 85% 85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2 520.2 520.2 520.2
109.511331 109.511331 82.3956923 82.3956923 82.3956923 82.3956923 82.3956923 82.3956923
1898.92648 1898.92648 1428.7413 1428.7413 1428.7413 1428.7413 1428.7413 1428.7413
56967.7944 56967.7944 42862.2391 42862.2391 42862.2391 42862.2391 42862.2391 42862.2391
1800065 1799979 1800033 1799990 1799885 1800154 1799885 286,697
2.63316174 2.63303594 3.49964801 3.49956441 3.49936027 3.49988326 3.49936027 0.5574005

4 4 4 4 4

3 3 3 3

1 1 1 1 1 1 1 1 1 1

13 14 15 16 17 18 19 20 21 22
15 16 17 18 19 20 21 22
1 1 1 1 1 1 1 1
12.59 12.59 12.59 12.59 12.59 12.59 12.59 12.59
30 30 30 30 30 30 30 30
5 5 5 5 5 5 5 5
2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5
2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5
233.217377 233.206234 233.213231 233.20766 233.194056 233.228908 233.194056 37.1446414
85% 85% 85% 85% 85% 85% 85% 85%
85% 85% 85% 85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2 520.2 520.2 520.2
643.2 643.2 643.2 643.2 643.2 643.2 643.2 643.2
334592.64 334592.64 334592.64 334592.64 334592.64 334592.64 334592.64 334592.64
19296 19296 19296 19296 19296 19296 19296 19296
1,800,065 1,799,979 1,800,033 1,799,990 1,799,885 1,800,154 1,799,885 286,697
0.44832252 0.4483011 0.44831455 0.44830384 0.44827769 0.44834469 0.44827769 0.07140454

1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1
Consideraciones generales
Capacidad de camion 15 m3
Capacidad de camion 12 BCM
Capacidad de camion real (promedio) 29.754 tn
Costo horario 36.31 $/Hr
Costo de posesion 8.17 $/Hr
Costo de operacin 28.14 $/Hr
Distancia de transporte (promedio) 2735.37255 Kms
Ciclo de transporte (promedio) 5470.7451 Kms
Cantidad de llantas 10 #

1ra Etapa
Capacidad de camion m3 15
Capacidad de camion BCM 12
Capacidad de camion real (promedio) tn 29.754
Costo horario $/Hr 36.31
Costo de posesion $/Hr 8.17
Costo de operacin $/Hr 28.14
Distancia de transporte (promedio) Kms 2490.56085309
Ciclo de transporte (promedio) Kms 4981.12170617
Cantidad de llantas # 10

Periodo -1
Numero de camiones # 13
Consumo de combustible diesel gls/hr 4.26
Tiempo de ciclo tramo minutos 20.563814431
Total de horas operativas Hrs/mes 6735.48798645
Disponibilidad % 85%
Utilizacion % 85%
Horas operativas Hrs/dia 17.34
Horas por camion operativas Hrs/mes 520.2
Rendimiento tn/hr 86.8146328586
Extraccion de equipos de acarreo Tn/dia 1505.36573377
Extraccion de equipos de acarreo tn/mes 45160.972013
PRODUCCION MATERIAL Tn 7,016,867.00
Requerimiento de camiones Und 12.947881558
Camiones
Ao rodando
-1 13
0 17
1 15
2 11
3 9
4 8
5 8
6 7
7 8
8 8
9 8
10 7
11 10
12 11
13 9
14 9
15 9
16 9
17 9
18 12
19 13
20 13
21 10
22 1

Consideraciones para el calculo de excavadora Komatsu PC 600 de 3.5 m3

1ra Etapa
Capacidad balde m3 2.7
Capacidad balde BCM 2.16
Capacidad balde real tn 5.36
Costo horario $/Hr 113.2
Costo de posesion $/Hr 30.54
Costo de operacin $/Hr 82.65
Periodo -1
Numero de excavadoras # 2
Consumo de combustible diesel gls/hr 12.59
Tiempo por baldada seg 30
Numero de pases # 5
Tiempo de carguio min 2.5
Tiempo de ciclo/camion minutos 2.5
Total de horas operativas Hrs/mes 909.109012231
Disponibilidad % 85%
Utilizacion % 85%
Horas operativas Hrs/dia 17.34
Horas por excavadora operativas Hrs/mes 520.2
Rendimiento tn/hr 643.2
Extraccion tn/mes 334592.64
Extraccion de equipos de carguio Tn/dia 19296
PRODUCCION MATERIAL Tn 7,016,867.00
Requerimiento de excavadoras Und 1.7476144026

Ao Minado

-1 2
0 2
1 2
2 2
3 2
4 1
5 1
6 1
7 1
8 1
9 1
10 1
11 1
12 1
13 1
14 1
15 1
16 1
17 1
18 1
19 1
20 1
21 1
22 1
2da Etapa 3ra Etapa 4ta Etapa 5ta Etapa
15 15 15 15
12 12 12 12
29.754 29.754 29.754 29.754
36.31 36.31 36.31 36.31
8.17 8.17 8.17 8.17
28.14 28.14 28.14 28.14
2054.02375801 2337.50040231 2853.39438509 3941.38335804
4108.04751603 4675.00080463 5706.78877019 7882.76671608
10 10 10 10

0 1 2 3 4 5
17 15 11 9 8 8
4.26 4.26 4.26 4.26 4.26 4.26
20.563814431 20.563814431 16.987400804 16.987400804 16.987400804 16.987400804
8692.08888353 7477.50083567 5802.52084418 4829.73368135 3961.92028799 4010.90322155
85% 85% 85% 85% 85% 85%
85% 85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2 520.2
86.8146328586 86.8146328586 105.092004398 105.092004398 105.092004398 105.092004398
1505.36573377 1505.36573377 1822.29535626 1822.29535626 1822.29535626 1822.29535626
45160.972013 45160.972013 54668.8606878 54668.8606878 54668.8606878 54668.8606878
9055206.06237 7789877.87698 7317582.55291 6090796.71937 4996393.73196 5058166.30799
16.7091289572 14.3742807299 11.1544037758 9.2843784724 7.6161481891 7.7103099223
Horas Costo $/hr
Stand By Total
Operativas Efectivas Operativo Satnd By
1 14 7282.8 6735.48798645 36.31 12.85
1 18 9363.6 8692.08888353 36.31 12.85
1 16 8323.2 7477.50083567 36.31 12.85
1 12 6242.4 5802.52084418 36.31 12.85
1 10 5202 4829.73368135 36.31 12.85
1 9 4681.8 3961.92028799 36.31 12.85
1 9 4681.8 4010.90322155 36.31 12.85
1 8 4161.6 3550.60954421 36.31 12.85
1 9 4681.8 3968.55562395 36.31 12.85
1 9 4681.8 4053.42162849 36.31 12.85
1 9 4681.8 4266.29307485 36.31 12.85
1 8 4161.6 3620.42189896 36.31 12.85
1 11 5722.2 4964.26261311 36.31 12.85
1 12 6242.4 5585.53142077 36.31 12.85
1 10 5202 4575.47792744 36.31 12.85
1 10 5202 4714.57572302 36.31 12.85
1 10 5202 4333.37759477 36.31 12.85
1 10 5202 4866.30909191 36.31 12.85
1 10 5202 4614.59995384 36.31 12.85
1 13 6762.6 6139.27952437 36.31 12.85
1 14 7282.8 6853.75623693 36.31 12.85
1 14 7282.8 6746.94362091 36.31 12.85
1 11 5722.2 4954.10145128 36.31 12.85
1 2 1040.4 541.203872823 36.31 12.85

u PC 600 de 3.5 m3

2da Etapa 3ra Etapa 4ta Etapa 5ta Etapa


2.7 2.7 2.7 2.7
2.16 2.16 2.16 2.16
5.36 5.36 5.36 5.36
113.2 113.2 113.2 113.2
30.54 30.54 30.54 30.54
82.65 82.65 82.65 82.65
0 1 2 3 4 5
2 2 2 2 1 1
12.59 12.59 12.59 12.59 12.59 12.59
30 30 30 30 30 30
5 5 5 5 5 5
2.5 2.5 2.5 2.5 2.5 2.5
2.5 2.5 2.5 2.5 2.5 2.5
1173.19730286 1009.26071167 948.069878849 789.126855226 647.335423398 655.33871113
85% 85% 85% 85% 85% 85%
85% 85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2 520.2
643.2 643.2 643.2 643.2 643.2 643.2
334592.64 334592.64 334592.64 334592.64 334592.64 334592.64
19296 19296 19296 19296 19296 19296
9,055,206.06 7,789,877.88 7,317,582.55 6,090,796.72 4,996,393.73 5,058,166.31
2.2552812435 1.9401397764 1.82251034 1.5169681954 1.2443971999 1.2597822206

Horas Costo $/hr


Stand By Total
Operativas Efectivas Operativo Satnd By
1 3 1560.6 909.109012231 113.2 35.46
1 3 1560.6 1173.19730286 113.2 35.46
1 3 1560.6 1009.26071167 113.2 35.46
1 3 1560.6 948.069878849 113.2 35.46
1 3 1560.6 789.126855226 113.2 35.46
1 2 1040.4 647.335423398 113.2 35.46
1 2 1040.4 655.33871113 113.2 35.46
1 2 1040.4 580.131644645 113.2 35.46
1 2 1040.4 550.748153149 113.2 35.46
1 2 1040.4 562.525686259 113.2 35.46
1 2 1040.4 592.067556666 113.2 35.46
1 2 1040.4 502.434856258 113.2 35.46
1 2 1040.4 688.930362829 113.2 35.46
1 2 1040.4 661.449045443 113.2 35.46
1 2 1040.4 541.836627451 113.2 35.46
1 2 1040.4 558.30884776 113.2 35.46
1 2 1040.4 513.166654643 113.2 35.46
1 2 1040.4 576.277396221 113.2 35.46
1 2 1040.4 418.792756791 113.2 35.46
1 2 1040.4 557.163312625 113.2 35.46
1 2 1040.4 622.004831957 113.2 35.46
1 2 1040.4 612.311174788 113.2 35.46
1 2 1040.4 449.603828058 113.2 35.46
1 2 1040.4 49.1163403442 113.2 35.46
Calculo del numero de unidades de la flota de camiones de 20 m3
6 7 8 9 10 11
7 8 8 8 7 10
4.26 4.26 4.26 4.26 4.26 4.26
16.987400804 20 20 20 20 20
3550.60954421 3968.55562395 4053.42162849 4266.29307485 3620.42189896 4964.26261311
85% 85% 85% 85% 85% 85%
85% 85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2 520.2
105.092004398 89.262 89.262 89.262 89.262 89.262
1822.29535626 1547.80308 1547.80308 1547.80308 1547.80308 1547.80308
54668.8606878 46434.0924 46434.0924 46434.0924 46434.0924 46434.0924
4477688.08603 4250894.54526 4341798.25682 4569814.22937 3877993.19454 5317440.11246
6.8254700965 7.6289035447 7.792044653 8.2012554303 6.9596730084 9.5429884912
Costo total
FLOTA DE CAMIONES
251598.528162
324238.665208 20

282375.289605
216341.979005 18
180151.252165
153107.779956 16
154256.919578
136773.859907 14
153263.444938
155254.401404 12
160248.365536
138411.65775
10
189991.870904 17
211251.407131 15
8
174186.412178 13
177449.646462 11 11
6 10
168506.738373 9
181009.311296 8 8 8 8 8
7 7
175104.214917 4

230926.907642
254373.101318 2
251867.277347
1 1 1 1 1 1 1 1 1 1 1 1 1 1
189753.490047 0
-1 0 1 2 3 4 5 6 7 8 9 10 11 12
26065.7828564
Calculo del numero de unidades de la flota dela excavadora PC 600 de 3.5 m3
6 7 8 9 10 11
1 1 1 1 1 1
12.59 12.59 12.59 12.59 12.59 12.59
30 30 30 30 30 30
5 5 5 5 5 5
2.5 2.5 2.5 2.5 2.5 2.5
2.5 2.5 2.5 2.5 2.5 2.5
580.131644645 550.748153149 562.525686259 592.067556666 502.434856258 688.930362829
85% 85% 85% 85% 85% 85%
85% 85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2 520.2
643.2 643.2 643.2 643.2 643.2 643.2
334592.64 334592.64 334592.64 334592.64 334592.64 334592.64
19296 19296 19296 19296 19296 19296
4,477,688.09 4,250,894.55 4,341,798.26 4,569,814.23 3,877,993.19 5,317,440.11
1.1152088517 1.0587238623 1.0813642566 1.1381537037 0.9658493969 1.3243567144

Costo total

126013.010611
Excavadoras
146543.234324 3.5
133798.803725
129041.828382
116685.597725 3
87216.439815
87838.6154033
81992.0180547 2.5
79707.7454258
80623.3308498
82919.9158552 2 2 2 2 2 2
75951.8697255
90450.0304063
88313.6327927 1.5 1 1 1 1 1 1 1 1
79014.963418
80295.5138249
76786.159732 1
81692.3887822
69449.5329129
80206.4599234 0.5 1 1 1 1 1 1 1 1 1 1 1 1 1
85247.2396363
84493.654728
0
-1 0 1 2 3 4 5 6 7 8 9 10 11
0.5 1 1 1 1 1 1 1 1 1 1 1 1 1

71844.7855932
0
40710.8882984 -1 0 1 2 3 4 5 6 7 8 9 10 11
e camiones de 20 m3
12 13 14 15 16 17
11 9 9 9 9 9
4.26 4.26 4.26 4.26 4.26 4.26
23.4378990033 23.4378990033 23.4378990033 23.4378990033 23.4378990033 30.58337916
5585.53142077 4575.47792744 4714.57572302 4333.37759477 4866.30909191 4614.59995384
85% 85% 85% 85% 85% 85%
85% 85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2 520.2
76.1689432892 76.1689432892 76.1689432892 76.1689432892 76.1689432892 58.3728825602
1320.76947663 1320.76947663 1320.76947663 1320.76947663 1320.76947663 1012.18578359
39623.084299 39623.084299 39623.084299 39623.084299 39623.084299 30365.5735078
5105328.31234 4182111.82531 4309251.01055 3960825.5072 4447939.45499 3232410.01402
10.7372768565 8.7956130862 9.0630060035 8.3302145228 9.354688758 8.8708188271
FLOTA DE CAMIONES

13 13
12
11
10 10
9 9 9 9 9
8 8 8
7

1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
avadora PC 600 de 3.5 m3
12 13 14 15 16 17
1 1 1 1 1 1
12.59 12.59 12.59 12.59 12.59 12.59
30 30 30 30 30 30
5 5 5 5 5 5
2.5 2.5 2.5 2.5 2.5 2.5
2.5 2.5 2.5 2.5 2.5 2.5
661.449045443 541.836627451 558.30884776 513.166654643 576.277396221 418.792756791
85% 85% 85% 85% 85% 85%
85% 85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2 520.2
643.2 643.2 643.2 643.2 643.2 643.2
334592.64 334592.64 334592.64 334592.64 334592.64 334592.64
19296 19296 19296 19296 19296 19296
5,105,328.31 4,182,111.83 4,309,251.01 3,960,825.51 4,447,939.45 3,232,410.01
1.2715283457 1.0415929017 1.0732580695 0.986479536 1.1077996852 0.8050610473

Excavadoras

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
18 19 20 21 22
12 13 13 10 1
4.26 4.26 4.26 4.26 4.26
30.58337916 30.58337916 30.58337916 30.58337916 30.58337916
6139.27952437 6853.75623693 6746.94362091 4954.10145128 541.2038728
85% 85% 85% 85% 85%
85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2
58.3728825602 58.3728825602 58.3728825602 58.3728825602 58.37288256
1012.18578359 1012.18578359 1012.18578359 1012.18578359 1012.185784
30365.5735078 30365.5735078 30365.5735078 30365.5735078 30365.57351
4300409.31216 4800882.09497 4726062.57149 3470222.18648 379099.5613
11.8017676362 13.1752330583 12.9699031544 9.5234553081 1.040376534
18 19 20 21 22
1 1 1 1 1
12.59 12.59 12.59 12.59 12.59
30 30 30 30 30
5 5 5 5 5
2.5 2.5 2.5 2.5 2.5
2.5 2.5 2.5 2.5 2.5
557.163312625 622.004831957 612.311174788 449.603828058 49.11634034
85% 85% 85% 85% 85%
85% 85% 85% 85% 85%
17.34 17.34 17.34 17.34 17.34
520.2 520.2 520.2 520.2 520.2
643.2 643.2 643.2 643.2 643.2
334592.64 334592.64 334592.64 334592.64 334592.64
19296 19296 19296 19296 19296
4,300,409.31 4,800,882.09 4,726,062.57 3,470,222.19 379,099.56
1.0710559643 1.1957032525 1.1770687712 0.8642903269 0.094418186

1 1

1 1

1 22
1 1

1 22
DESBROCE
INVERSION $ 848,393.44

MINERAL DESMONTE
CARGUIO 0.378 0.224
ACARREO 0.471 0.471

TOTAL 0.848 0.694

Camiones Excavadoras

Vida de la mina Rodando Stand By Minado Stand By

1 19 2 3 2
2 15 2 3 2
3 13 2 3 2
4 12 2 2 2
5 12 2 2 2
6 11 2 2 2
7 11 2 2 2
8 11 2 2 2
9 11 2 2 2
10 10 2 2 2
11 13 2 2 2
12 14 2 2 2
13 12 2 2 2
14 12 2 2 2
15 12 2 2 2
16 12 2 2 2
17 13 2 2 2
18 16 2 2 2
19 17 2 2 2
20 17 2 2 2
21 14 2 2 2
22 2 2 2 2
Chart Title
25

20

15

Axis Title
10

0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Chart Title
6

Axis Title 3

0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Вам также может понравиться