Вы находитесь на странице: 1из 6

FSPD SECTION

LIST OF CURRENT FILES AS ON 02.12.2017


S.N File Number Description Location Remark
1) Miscellaneous Files (Technical /Non technical)
1. 02/40/9106/01 List of files & documents FSPD
MEC/BH/011/033 SECTION

2. MEC/BH/011/033
02/40/9106/02 Miscellaneous (Non-Technical) File
3. 02/40/9106/03 Leave Record of FSPD section. MEC/BH/011/033

4. MEC/BH/011/033
02/40/9106/04 Circular & Office order
5. MEC/BH/011/033
02/40/9188/01 ISO file
6. Management Reviews & Project Review MEC/BH/011/033
02/40/9188/02
meetings.
Additional Consultancy & Engineering MEC/BH/011/033
Services for Balance Work of Water Supply
7. Vol- 12
02/40/C38H/01 Packages 078,077-01 & 077-02-MECONs
7 closed
Offer for Fee, BSP Work order and Status
report.-Vol-2
2) Installation of 700 TPD ASU-4 in OP-II (Pkg-1)-(WI C37W)
1. 02/40/C37W/Pkg- Installation of 700 TPD ASU-4 in OP-II-(Pkg- MEC/BH/011/033
closed
1/01 1)-M/s ALEIs Letter-(Vol-2)
2. 02/40/C37W/Pkg- Installation of 700 TPD ASU-4 in OP-II-(Pkg- MEC/BH/011/033 closed
1/02 1)-M/s MECONs Letter.
3. 02/40/C37W/Pkg- Installation of 700 TPD ASU-4 in OP-II-(Pkg- MEC/BH/011/033 closed
1/03 1)-M/s BSPs Letter.
4. 02/40/C37W/Pkg- Installation of 700 TPD ASU-4 in OP-II-(Pkg- MEC/BH/011/033 closed
1/04 1)-ISO:9001:2008 & MRM
5. 02/40/C37W/Pkg- Invoice for release of payments for 700 TPD MEC/BH/011/033
1/05 ASU-4
6. Installation of 700 TPD ASU-4 at OP-II- MEC/BH/011/033
02/40/C37W/01 April-2016
General file, Vol-4
3)Air Separation Unit-4-(WI-C37W)-Pkg-3
1. 02/40/C37W/Pkg- Installation of Pump House & Cooling Tower
MEC/BH/011/033 closed
3/01 for 700 TPD ASU-4-BSPs Letter
2. 02/40/C37W/Pkg- Installation of Pump House & Cooling Tower Vol- 1& 2
MEC/BH/011/033
3/02 for 700 TPD ASU-4 closed
3. 02/40/C37W/Pkg- Installation of Pump House & Cooling Tower
MEC/BH/011/033 closed
3/03 for 700 TPD ASU-4-BSBKs Letter
4. 02/40/C37W/Pkg- Installation of Pump House & Cooling Tower
MEC/BH/011/033 closed
3/04 for 700 TPD ASU-4-Internal Letters
4)Air Separation Unit-4-(WI-C37W)-Pkg-2,5&6
02/40/C37W/Pkg- closed
1. Power Supply Facility for 700 TPD ASU-4 MEC/BH/011/033
2/01
02/40/C37W/Pkg- Extension of Main Building for 700 TPD closed
2. MEC/BH/011/033
5/01 ASU-4
02/40/C37W/Pkg- closed
3 Illumination & Area Lighting for 700 ASU-4 MEC/BH/011/033
6/01
5) BSP-OP-II-INSTALLATION OF 700 TPD ASU-4 (PKG-4)
1 02/40/C37W/04/01 ASU-4 PKG-4-(ACVS)M/s Voltas ltd MEC/BH/011/034 Closed
2 02/40/C37W/04/02 ASU-4 PKG-4-(ACVS)M/s SK Systems MEC/BH/011/034 Closed
3 02/40/C37W/04/03 ASU-4 PKG-4-(ACVS)M/s Mesina MEC/BH/011/034 Closed
ASU-4 PKG-4-(ACVS)M/s Saket / Blue
4 02/40/C37W/04/04 MEC/BH/011/034 Closed
Star Ltd
5 02/40/C37W/04/05 ASU-4 PKG-4-(ACVS)General Letters MEC/BH/011/034
6 02/40/C37W/04/06 ASU-4 PKG-4-(ACVS)Drawings Letter MEC/BH/011/034 Closed
7 02/40/C37W/04/07 ASU-4 PKG-4-(ACVS)Review Meetings MEC/BH/011/034 Closed
6)Replacement / Revamping of ATC 1&2 in Oxygen Plant-(WI-C37S)
Vol-1
1. 02/40/C37S/01-Vol-2 Replacement / Revamping of ATC 1&2, Vol-2 MEC/BH/011/033
closed
Replacement / Revamping of ATC 1&2-
2. 02/40/C37S/02 MEC/BH/011/033 closed
Internal Correspondence
7) 7 MT Expansion projects (WI-9101)-External Water System for Mills & Fire Water Pump House-(Pkg-077-
02)
02/40/9101/077-
External Water System for Mills & Fire Water Vol 1to 9
1. 02/01 MEC/BH/011/033
Pump House-Pkg-077-02, Vol-9 closed
FSPD SECTION
LIST OF Documents
A. LIST OF CONTRACTS

S.N. Document Number Description location Remark


Contract for Balance work for Augmentation
1. DGM/PCC/TK/2017/432 of Make-Up & Drinking water System MEC/BH/011/33 26.06.2017
(pkg-078A)
Contract for Installation of Buffer Vessel &
2. DGM/PCC/TK/2012/361 PRMS for Oxygen , Nitrogen & Argon-Pkg- MEC/BH/102/030 07.07.2012
075B
Contract for Balance Work for External
3. DGM/PCC/TK/2016/427 MEC/BH/011/33 15.12.2016
Water System for SMS-III (Pkg-077-01A)
Contract for Inter Plant fuel & industrial
4. DGM/PCC/TK/2011/333 MEC/BH/102/030 22.01.2011
gases Pipe Lines (Pkg 075)
Contract for Propane storage handling
5. DGM/PCC/TK/2011/343 MEC/BH/071/002 19.04.2011
system (Pkg-032)
DGM/PCC/TK/2012/352 Contract for Gas Mixing & Boosting Station
6. MEC/BH/071/002 06.01.2012
dated 06.01.12 (Pkg- 076)
Contract for ESP based De-dusting System at
7. DGM/PCC/TK/2010/311 MEC/BH/071/002 19.06.2010
SP-II (Pkg 21D)

8. SBD-May2009 STANDARED BIDDING DOCUMENTS MEC/BH/071/002 May 2009


Contract Agreement for Balance work for
9. DGM/PCC/TK/2017/434 External Water System for Mills & Fire MEC/BH/071/002 14.09.2017
Fighting Pump House(Pkg-077-02)
Installation of Air Conditioning System and
10. DGM/PCC/TK/2012/366 ventilation system for BOF & CCP Complex MEC/BH/071/002 31.08.2012
(Pkg-125-01)
Installation of Ventilation & Ac System for
11. DGM/PCC/TK/2007/250 MEC/BH/071/002 09.10.2007
700 TPD ASU-IV in OP-2
Installation of Air Conditioning System and
12. DGM/PCC/TK/2013/387 ventilation system for BRM,URM & RWL MEC/BH/071/002 25.06.2013
(Pkg-125-02)
Balance Work for External Water System for
13. DGM/PCC/TK/2016/426 MEC/BH/071/002 15.12.2016
SMS-III ( Pkg-077-01A)
FSPD SECTION

B. LIST OF FR & TS

S.N. Document Number Description location Remark


MEC/S/9101/11/40/10/2 Technical Specification of Make Up &
1. MEC/BH/011/33 19.05.2010
4/078 R-6 Drinking water System(Pkg-078)
MEC/S/9101/11/40/10/2 TS for Inter Plant fuel & industrial gases Pipe
2. MEC/BH/102/030 31.01.2010
4/075/R0 Lines (Pkg 075)
MEC/S/9101/02/40/10/2 TS for Buffer Vessel & PRMS for O2, N2 &
3. MEC/BH/102/030 12.01.2011
4/075-B/R0 Ar (Pkg 075-B)
MEC/S/9101/40/10/00/0 TS for Propane Storage Handling System
4. MEC/BH/071/002 09.03.2010
32 R2 dated 09.03.10 (Pkg- 032)
MEC/S/9101/11/40/0/00 TS for ACVS system of BOF & CCP (Pkg-
5. MEC/BH/071/002 July 2011
/01/125-01 125-01)
MEC/S/9101/02/0/00/00 TS for ESP based De-dusting System at SP-II
6. MEC/BH/071/002 Sep 2008
/021D/R0 (Pkg 21D)
MEC/C342/02/06/U/000 TS for Up-Gradation of Nitrogen Phase II-
7. MEC/BH/071/002 Dec2006
S1001 R-01 WI -C342
MEC/S/9101/11/40/10/2 TS of External Water System for Mills (Pkg- MEC/BH/071/002
8. 22.06.2011
4/077-02 R-3 077-02)
MEC/S/9101/11/40/10/2 TS of External Water System for SMS-III MEC/BH/071/002
9. 18.05.2011
4/077-01 R-1 (Pkg-077-01)
MEC/11/TS/9101/11/40/ TS of ACVS of BRM, URM & RWL (Pkg- MEC/BH/011/036
10. 04.08.2012
125-02 125-02)
MEC/S/9101/11/40/10/2 Balance work for make-up water system & MEC/BH/011/33
11. drinking water system for 7.0 MTPD 09.07.2016
4/078A (RPN) expansion(Package no. 078A)
MEC/S/9101/11/40/10/2 Technical specification For Balance work for MEC/BH/011/33
12. external water system for SMS_III 18.06.2016
4/077-01A (RPN) (Pkg. No. 077-01A)
Balance works of external water System For MEC/BH/011/33
MEC/S/9101/11/40/10/2
13. mills & Fire-fighting pump houses 04.07.2016
4/077-02A, Rev. 02
(package no. 077-02a)

C. LIST OF EVALUATED OFFERS


Sl.
Offer Number Description Location Remarks
No.
1) Buffer Vessel & PRMS (Pkg-75B):
IIL;MKTG;11101041200530A
1 M/s INOX India Ltd MEC/BH/102/30 01.08.11
dated 01.08.11
OMPL/QTN/11-12/166 dated M/s OMPL & Air liquid engg
2 MEC/BH/102/30 08/08/11
08/08/11 India Ltd.
3 CC/1908/01 dated 01/08/11 M/s BOC India Ltd MEC/BH/102/30 01/08/11

2) IPPL (Pkg-075):

1 MEL/MKTG/0036/05 dated 13/08/10 M/s Mukund Industries MEC/BH/102/30 28.01.2010


FSPD SECTION
OTH/SS/SAIL-BHILAI/10-11/006/Q
2 M/s Bluestar Ltd MEC/BH/102/30 28.01.2010
dated 22.04.10
HSCL/122-Mktg/2010-8641 dated
3 M/s HSCL Ltd MEC/BH/102/30 28.01.2010
22.04.10
ARC/APS/EPT775D1.4/723/10 dated
4 M/s NICCO Ltd MEC/BH/102/30 28.01.2010
26.04.10
5 IQ-1011003/EPC/021 dated 23.04.10 M/s UB Engg Ltd MEC/BH/102/30 28.01.2010

TPL(ER)/BSP-Pkg-075/09-10/026
6 M/s TATA Projects Ltd MEC/BH/102/30 28.01.2010
dated 27.04.10
CAL/EPC/T117/R0/BSP-IPPL/Rev-0 M/s Shapoorji Pallonji & Co
7 MEC/BH/102/30 28.01.2010
dated 27.04.10 Ltd

D. LIST OF Standards
Sl.
Offer Number Description Location Remarks
No.
1) INDIAN BOILER
11TH EDITION 2010 MEC/BH/071/002 Hard Print
REGULATION
RULES FOR
2)
ASME SEC-VIII DIV-2 , 2007 CONSTRUCTION OF PC Soft print.
PRESSURE VESSELS
3) CODE OF PRACTICE FOR
IPSS 1-06-034-098 MEC/BH/071/002 Hard Print
OXYGEN GAS PIPELINE
4) BOLTED BONET STEEL
API 600, 2001 PC Soft print
GATE VALVE
5) Soft &
ASME B31.1,2004 POWER PIPING MEC/BH/071/002
Hard print
6) FRAY IRON PIPE FLANGE
ASME B16.1,2009 PC Soft print
AND FLANGED FITTING
7) OXYGEN PIPELINE & Soft &
IGC Doc 13/12/E MEC/BH/071/002
PIPING SYSTEMS Hard print

E. Location of Drawings :
S.No Package Description and Folder Name Location
Number
1. Installation of Buffer Vessels Mechanical Drgs-1 & 2 Cabinet- MEC/BH/101/109
and PRMS- Package-075B Civil & Structural Drgs-1
Electrical & Automation
Drawings-1
2. Balance work for Make-Up and Approved Drawings-078A MEC/BH/011/034
Drinking Water System (Pkg-
78A)
3. Balance work for External water Pdf copy of Approved Drawings E/7MT/WSPkg/077-01/077-
System for SMS-III (Pkg-77- 01A/Drg/MECON/Approved
01A) Drg.
4. Balance Work for External Approved Drawings-077-02A MEC/BH/011/034
Water System for Mills and Fire
Fighting Pump House-(Package-
077-02A)
5. Interplant Fuel & Industrial 1) A zone: Cabinet no-
FSPD SECTION
Gases Piping for all unit (Pkg- a) Technological- 1 MEC/BH/101/093
075) b) Structural-1
c) Civil-1
2) B Zone: MEC/BH/001/076
a) Technological- 1
b) Structural-1
c) Civil-1
3) C Zone: MEC/BH/001/076
10) a) Technological- 1
11) b) Structural-1
12) c) Civil-1
13) 4) D Zone: MEC/BH/001/076
14) a) Technological- 1
15) b) Structural-1 & 2
16) c) Civil-1
17) 5) E zone: Cabinet no-
18) a) Technological- 1 MEC/BH/101/072 for E
19) b) Structural-1 zone
20) c) Civil-1
21) 6) Fabrication drawings MEC/BH/001/059
22) 7) Typical drawings MEC/BH/001/076
23) 8) Supports drawings MEC/BH/001/076

6. Gas Mixing & Boosting station24) a) Technological- 1 Cabinet- MEC/BH/101/071


(Pkg-076) 25) b) Civil & Structural-1
26) c) Elect & Instrument-1
7. ACVS for BOF & CCP 27) Approved drawings Cabinet- MEC/BH/011/036
(Pkg 125-01)
8. ACVS for URM, BRM & RWL 28) Approved drawings Cabinet- MEC/BH/011/036
(Pkg 125-02)
9. Propane Storage & Handling 29) Approved drawings Cabinet- MEC/BH/011/036
System (Pkg-032)

Вам также может понравиться