Академический Документы
Профессиональный Документы
Культура Документы
2. MEC/BH/011/033
02/40/9106/02 Miscellaneous (Non-Technical) File
3. 02/40/9106/03 Leave Record of FSPD section. MEC/BH/011/033
4. MEC/BH/011/033
02/40/9106/04 Circular & Office order
5. MEC/BH/011/033
02/40/9188/01 ISO file
6. Management Reviews & Project Review MEC/BH/011/033
02/40/9188/02
meetings.
Additional Consultancy & Engineering MEC/BH/011/033
Services for Balance Work of Water Supply
7. Vol- 12
02/40/C38H/01 Packages 078,077-01 & 077-02-MECONs
7 closed
Offer for Fee, BSP Work order and Status
report.-Vol-2
2) Installation of 700 TPD ASU-4 in OP-II (Pkg-1)-(WI C37W)
1. 02/40/C37W/Pkg- Installation of 700 TPD ASU-4 in OP-II-(Pkg- MEC/BH/011/033
closed
1/01 1)-M/s ALEIs Letter-(Vol-2)
2. 02/40/C37W/Pkg- Installation of 700 TPD ASU-4 in OP-II-(Pkg- MEC/BH/011/033 closed
1/02 1)-M/s MECONs Letter.
3. 02/40/C37W/Pkg- Installation of 700 TPD ASU-4 in OP-II-(Pkg- MEC/BH/011/033 closed
1/03 1)-M/s BSPs Letter.
4. 02/40/C37W/Pkg- Installation of 700 TPD ASU-4 in OP-II-(Pkg- MEC/BH/011/033 closed
1/04 1)-ISO:9001:2008 & MRM
5. 02/40/C37W/Pkg- Invoice for release of payments for 700 TPD MEC/BH/011/033
1/05 ASU-4
6. Installation of 700 TPD ASU-4 at OP-II- MEC/BH/011/033
02/40/C37W/01 April-2016
General file, Vol-4
3)Air Separation Unit-4-(WI-C37W)-Pkg-3
1. 02/40/C37W/Pkg- Installation of Pump House & Cooling Tower
MEC/BH/011/033 closed
3/01 for 700 TPD ASU-4-BSPs Letter
2. 02/40/C37W/Pkg- Installation of Pump House & Cooling Tower Vol- 1& 2
MEC/BH/011/033
3/02 for 700 TPD ASU-4 closed
3. 02/40/C37W/Pkg- Installation of Pump House & Cooling Tower
MEC/BH/011/033 closed
3/03 for 700 TPD ASU-4-BSBKs Letter
4. 02/40/C37W/Pkg- Installation of Pump House & Cooling Tower
MEC/BH/011/033 closed
3/04 for 700 TPD ASU-4-Internal Letters
4)Air Separation Unit-4-(WI-C37W)-Pkg-2,5&6
02/40/C37W/Pkg- closed
1. Power Supply Facility for 700 TPD ASU-4 MEC/BH/011/033
2/01
02/40/C37W/Pkg- Extension of Main Building for 700 TPD closed
2. MEC/BH/011/033
5/01 ASU-4
02/40/C37W/Pkg- closed
3 Illumination & Area Lighting for 700 ASU-4 MEC/BH/011/033
6/01
5) BSP-OP-II-INSTALLATION OF 700 TPD ASU-4 (PKG-4)
1 02/40/C37W/04/01 ASU-4 PKG-4-(ACVS)M/s Voltas ltd MEC/BH/011/034 Closed
2 02/40/C37W/04/02 ASU-4 PKG-4-(ACVS)M/s SK Systems MEC/BH/011/034 Closed
3 02/40/C37W/04/03 ASU-4 PKG-4-(ACVS)M/s Mesina MEC/BH/011/034 Closed
ASU-4 PKG-4-(ACVS)M/s Saket / Blue
4 02/40/C37W/04/04 MEC/BH/011/034 Closed
Star Ltd
5 02/40/C37W/04/05 ASU-4 PKG-4-(ACVS)General Letters MEC/BH/011/034
6 02/40/C37W/04/06 ASU-4 PKG-4-(ACVS)Drawings Letter MEC/BH/011/034 Closed
7 02/40/C37W/04/07 ASU-4 PKG-4-(ACVS)Review Meetings MEC/BH/011/034 Closed
6)Replacement / Revamping of ATC 1&2 in Oxygen Plant-(WI-C37S)
Vol-1
1. 02/40/C37S/01-Vol-2 Replacement / Revamping of ATC 1&2, Vol-2 MEC/BH/011/033
closed
Replacement / Revamping of ATC 1&2-
2. 02/40/C37S/02 MEC/BH/011/033 closed
Internal Correspondence
7) 7 MT Expansion projects (WI-9101)-External Water System for Mills & Fire Water Pump House-(Pkg-077-
02)
02/40/9101/077-
External Water System for Mills & Fire Water Vol 1to 9
1. 02/01 MEC/BH/011/033
Pump House-Pkg-077-02, Vol-9 closed
FSPD SECTION
LIST OF Documents
A. LIST OF CONTRACTS
B. LIST OF FR & TS
2) IPPL (Pkg-075):
TPL(ER)/BSP-Pkg-075/09-10/026
6 M/s TATA Projects Ltd MEC/BH/102/30 28.01.2010
dated 27.04.10
CAL/EPC/T117/R0/BSP-IPPL/Rev-0 M/s Shapoorji Pallonji & Co
7 MEC/BH/102/30 28.01.2010
dated 27.04.10 Ltd
D. LIST OF Standards
Sl.
Offer Number Description Location Remarks
No.
1) INDIAN BOILER
11TH EDITION 2010 MEC/BH/071/002 Hard Print
REGULATION
RULES FOR
2)
ASME SEC-VIII DIV-2 , 2007 CONSTRUCTION OF PC Soft print.
PRESSURE VESSELS
3) CODE OF PRACTICE FOR
IPSS 1-06-034-098 MEC/BH/071/002 Hard Print
OXYGEN GAS PIPELINE
4) BOLTED BONET STEEL
API 600, 2001 PC Soft print
GATE VALVE
5) Soft &
ASME B31.1,2004 POWER PIPING MEC/BH/071/002
Hard print
6) FRAY IRON PIPE FLANGE
ASME B16.1,2009 PC Soft print
AND FLANGED FITTING
7) OXYGEN PIPELINE & Soft &
IGC Doc 13/12/E MEC/BH/071/002
PIPING SYSTEMS Hard print
E. Location of Drawings :
S.No Package Description and Folder Name Location
Number
1. Installation of Buffer Vessels Mechanical Drgs-1 & 2 Cabinet- MEC/BH/101/109
and PRMS- Package-075B Civil & Structural Drgs-1
Electrical & Automation
Drawings-1
2. Balance work for Make-Up and Approved Drawings-078A MEC/BH/011/034
Drinking Water System (Pkg-
78A)
3. Balance work for External water Pdf copy of Approved Drawings E/7MT/WSPkg/077-01/077-
System for SMS-III (Pkg-77- 01A/Drg/MECON/Approved
01A) Drg.
4. Balance Work for External Approved Drawings-077-02A MEC/BH/011/034
Water System for Mills and Fire
Fighting Pump House-(Package-
077-02A)
5. Interplant Fuel & Industrial 1) A zone: Cabinet no-
FSPD SECTION
Gases Piping for all unit (Pkg- a) Technological- 1 MEC/BH/101/093
075) b) Structural-1
c) Civil-1
2) B Zone: MEC/BH/001/076
a) Technological- 1
b) Structural-1
c) Civil-1
3) C Zone: MEC/BH/001/076
10) a) Technological- 1
11) b) Structural-1
12) c) Civil-1
13) 4) D Zone: MEC/BH/001/076
14) a) Technological- 1
15) b) Structural-1 & 2
16) c) Civil-1
17) 5) E zone: Cabinet no-
18) a) Technological- 1 MEC/BH/101/072 for E
19) b) Structural-1 zone
20) c) Civil-1
21) 6) Fabrication drawings MEC/BH/001/059
22) 7) Typical drawings MEC/BH/001/076
23) 8) Supports drawings MEC/BH/001/076