Вы находитесь на странице: 1из 69

PLANNING

Define Project
Requirements

Determine the scope

Determine the
deliverables

Define Design
Specification

Hardware Design

Software Design

Define Code
Requirements

Platform

Supported Browsers

Testing Requirement
LA UNION VIRTUAL TOURIS

DATA GATHERING DESIGN

Gather Background Web User Interface


Information Design

Tourist Spots Create Mock Ups

Historical Background Conduct Design


of Tourist Spots Review

Location Deliver Working


Prototype

Accomodations
Database Design

Booking Information
Identify Entities an
Attributes
Photo/ Video
Documentation
Design Table Schem

Drone Location
Capturing
Build database tabl

Photo/Video Editing

Collation of Data

Review/Finalization
of data
LA UNION VIRTUAL TOURIST WEBSITE

DESIGN DEVELOPMENT/ TESTING IMPLEMENTATION

Web User Interface Set-up development Set-up Website on Live


Design Environment Environment

Create Mock Ups Install Operating System Verify System


functionality

Conduct Design Install development Tools


Review Obtain User
Acceptance
Deliver Working
Prototype Code Web Pages Log Issues

User Interface
Database Design
Monitor System
Back-End Code
Identify Entities and
Attributes Review Code Verify Performance

Design Table Schema


Perform Tests Verify Functionality

Build database table


Unit Testing

Functional Testing

Perform Manual Testing


SUMMARY
Category No. Work Category

0 Planning

1 Data Collection

2 Design

3 Development/ Testing

4 Implementation
4 Implementation

# of Personnel Name
2 Wern Ancheta, Ryan Losgano
1 Camille Cacayuran
1 Ara Rivina Malaya
1 Jhon Madonguit

Contractor
Additional 1 photographer/videographer
Work No.
0.1
0.1.1
0.1.2
0.2
0.2.1
0.2.2
0.3
0.3.1
0.3.2
0.3.3
1.1
1.1.1
1.1.1.1
1.1.1.2
1.2
1.2.1
1.3
1.3.1
1.3.2
1.4
1.4.1
2.1
2.1.1
2.1.2
2.1.3
2.2
2.2.1
2.2.2
2.2.3
3.1
3.1.1
3.1.2
3.2
3.2.1
3.2.2
3.2.3
3.3
3.3.1
3.3.2
3.3.3
4.1
4.1.1
4.1.2
4.1.3
4.2
4.2.1
4.2.2

Position
Web Designer/Developer
Project Manager
Data Gatherer/ Photographer
System Administrator/ Database admin
Work Contents PIC
Define Project Requirements Project Team
Determine the Scope
Determine deliverables
Define Design Specification Web Developer
Hardware design
Software design
Define Code Requirements Web Developer
Platform
Supported Browsers
Testing Requirements
Gather Background Information Data Gatherer
Tourist Spots Data Gatherer
Historical background of Tourist spots in La Union Data Gatherer
Location Data Gatherer
Accomodations ( Hotels, Resorts, Restaurants) Data Gatherer
Booking information Data Gatherer
Photo/Video Documentation Data Gatherer/Photographer
Drone location capturing
Photo/ Video Editing Videographer
Collation of Data
Review/ Finalization of data gathered
Web User Interface Design Web designer/developer
Create Mock Ups
Conduct Design Review
Deliver Working Prototype
Database Design Database Admin
Identify Entities and Attributes
Design Table Schema
Build database table
Set-up development Environment
Install Operating System System Admin
Install development Tools
Code Web Pages Web Developer
User Interface Web Developer
Back-End Code Web Developer
Review Code Web Developer
Perform Tests Web Developer
Unit Testing Web Developer
Functional Testing Web Developer
Perform Manual Testing Web Developer
Set-up Website on Live Environment Web Developer
Verify System functionality System Admin
Obtain User Acceptance System Admin
Log Issues System Admin
Monitor System System Admin
Verify Performance System Admin
Verify Functionality System Admin
Output
Project Requirement Specification

Design Specification

Code Requirements Specification

information about tourist spots, restaurant, and others


identify all Tourist Spots in La Union
history of the Tourist Spots
locaton and routes idenfied

image and video files

final editing of photo /video


summary of all the data
Review final data
Web User Interface

Installation of needed Operating system for the Project

Verified Working Code


Website running on a live environment
Verified Working System
Production System is accepted
Issues on website are solved
System Logs
Website Performs Well
Website functions well
SKILL TABLE

Member Skill

Kristoffer Cacayuran

Wern Ancheta

Ryan Losgano

John Madonguit

Ara rivina Malaya

Contractor:

Photographer/Videographer
Leadership skills Statistics


Research/Analysis Designs Websites


Java, .Net, AJAX, PHP,
HTML, CSS, JavaScript XHTML, PythonJQuery
and Bootstrap

a
Photoshop, Illustrator, SQL Scripting
Flash & Flex


Creates test cases, test Photography/Videography
scenarios, test scripts


DevOPs Cloud Database


Database Security Technical/Troubleshooting(Hard
ware)


Task Responsible Matrix

Work No. Work Contents Person-In-charge

Planning
0

0.1 Define Project Requirements Kristopher Cacayuran

0.1.1 Determine the Scope Kristopher Cacayuran

0.1.2 Determine deliverables Kristopher Cacayuran

0.2 Define Design Specification Kristopher Cacayuran

0.2.1 Hardware design Jhon Madongit


0.2.2 Software design Wern Ancheta

0.3 Define Code Requirements Wern Ancheta


0.3.1 Platform Wern Ancheta
0.3.2 Supported Browsers Wern Ancheta

0.3.3 Testing Requirements Wern Ancheta

Data Collection
1
1.1 Gather Background Information Ara Rivina Malaya

1.1.1 Tourist Spots Ara Rivina Malaya


Historical background of Tourist spots in La
1.1.2 Ara Rivina Malaya
Union
1.1.3 Location Ara Rivina Malaya
1.2 Accomodations ( Hotels, Resorts, Restaurants) Ara Rivina Malaya

1.2.1 Booking information Ara Rivina Malaya


1.3 Photo/Video Documentation Contractor

Contractor
1.3.1 Drone location capturing
Contractor
1.3.2 Photo/Video Editing
1.4 Collation of Data Ara Rivina Malaya
1.4.1 Review/ Finalization of data gathered Kristopher Cacayuran
2 Design
2.1 Web User Interface Design Ryan Losgano

2.1.1 Create Mock Ups Ryan Losgano


2.1.2 Conduct Design Review Ryan Losgano
2.1.3 Deliver Working Prototype Ryan Losgano
2.2 Database Design Jhon Madongit
2.2.1 Identify Entities and Attributes Jhon Madongit
2.2.2 Design Table Schema Jhon Madongit
2.2.3 Build database table Jhon Madongit
3 Development/ Testing
3.1 Set-up development Environment Jhon Madongit

3.1.1 Install Operating System Jhon Madongit


3.1.2 Install development Tools Jhon Madongit
3.2 Code Web Pages Wern Ancheta
3.2.1 User Interface Wern Ancheta
3.2.2 Back-End Code Wern Ancheta
3.2.3 Review Code Wern Ancheta
3.3 Perform Tests Ryan Losgano
3.3.1 Unit Testing Ryan Losgano
3.3.2 Functional Testing Ryan Losgano
3.3.3 Perform Manual Testing Ryan Losgano
4 Implementation
Set-up Website on Live Environment Wern Ancheta
4.1
4.1.1 Verify System functionality Wern Ancheta
4.1.2 Obtain User Acceptance Wern Ancheta
4.1.3 Log Issues Ryan Losgano
4.2 Monitor System Jhon Madongit
4.2.1 Verify Performance Kristopher Cacayuran
4.2.2 Verify Functionality Kristopher Cacayuran
Legend: P (Prime) - Person In Charge

Kristopher Cacayuran (Project Wern Ancheta (Web


Manager) Designer/Web Developer)

P S

P S

S
P

S P
S P

S P
P

S
S S
S

S
S
S

S
S

P
P
P

S
S
S

S P
S P
S S

P S
P S
son In Charge
S (support)

Ryan Losgano (Web Jhon Madongit Ara Malaya (Data


Designer/Web Developer) (SysAdmin/DEvOps) Gathere)

S S S

S S S

S P
S S

S
S

P
P

P
P
P

S P
S P
S P

S P
S P

S S
S S
S S

P S
P S
P S

S S
S S
P S

S S
S S
Contractor (photographer
and videographer)

S
S

S
Task Responsible Matrix

Work No. Work Contents Person-In-charge

Planning
0

0.1 Define Project Requirements Kristopher Cacayuran

0.1.1 Determine the Scope Kristopher Cacayuran

0.1.2 Determine deliverables Kristopher Cacayuran

0.2 Define Design Specification Kristopher Cacayuran

0.2.1 Hardware design Jhon Madongit


0.2.2 Software design Wern Ancheta

0.3 Define Code Requirements Wern Ancheta


0.3.1 Platform Wern Ancheta
0.3.2 Supported Browsers Wern Ancheta

0.3.3 Testing Requirements Wern Ancheta

Data Collection
1
1.1 Gather Background Information Ara Rivina Malaya

1.1.1 Tourist Spots Ara Rivina Malaya


Historical background of Tourist spots in La
1.1.2 Ara Rivina Malaya
Union
1.1.3 Location Ara Rivina Malaya
1.2 Accomodations ( Hotels, Resorts, Restaurants) Ara Rivina Malaya

1.2.1 Booking information Ara Rivina Malaya


1.3 Photo/Video Documentation Contractor

Contractor
1.3.1 Drone location capturing
Contractor
1.3.2 Photo/Video Editing
1.4 Collation of Data Ara Rivina Malaya
1.4.1 Review/ Finalization of data gathered Kristopher Cacayuran
2 Design
2.1 Web User Interface Design Ryan Losgano

2.1.1 Create Mock Ups Ryan Losgano


2.1.2 Conduct Design Review Ryan Losgano
2.1.3 Deliver Working Prototype Ryan Losgano
2.2 Database Design Jhon Madongit
2.2.1 Identify Entities and Attributes Jhon Madongit
2.2.2 Design Table Schema Jhon Madongit
2.2.3 Build database table Jhon Madongit
3 Development/ Testing
3.1 Set-up development Environment Jhon Madongit

3.1.1 Install Operating System Jhon Madongit


3.1.2 Install development Tools Jhon Madongit
3.2 Code Web Pages Wern Ancheta
3.2.1 User Interface Wern Ancheta
3.2.2 Back-End Code Wern Ancheta
3.2.3 Review Code Wern Ancheta
3.3 Perform Tests Ryan Losgano
3.3.1 Unit Testing Ryan Losgano
3.3.2 Functional Testing Ryan Losgano
3.3.3 Perform Manual Testing Ryan Losgano
4 Implementation
Set-up Website on Live Environment Wern Ancheta
4.1
4.1.1 Verify System functionality Wern Ancheta
4.1.2 Obtain User Acceptance Wern Ancheta
4.1.3 Log Issues Ryan Losgano
4.2 Monitor System Jhon Madongit
4.2.1 Verify Performance Kristopher Cacayuran
4.2.2 Verify Functionality Kristopher Cacayuran
Legend: P (Prime) - Person In Charge

Kristopher Cacayuran (Project Wern Ancheta (Web


Manager) Designer/Web Developer)

P S

P S

S
P

S P
S P

S P
P

S
S S
S

S
S
S

S
S

P
P
P

S
S
S

S P
S P
S S
P S
P S
son In Charge
S (support)

Ryan Losgano (Web Jhon Madongit Ara Malaya (Data


Designer/Web Developer) (SysAdmin/DEvOps) Gathere)

S S S

S S S

S P
S S

S
S

P
P

P
P
P

S P
S P
S P

S P
S P

S S
S S
S S

P S
P S
P S

S S
S S
P S
S S
S S
Contractor (photographer Work Volume Time Required (days)
and videographer)

48 11

30 5

S 18 3

S 12 2

9 3

3 1
6 2

9 3
3 1
3 1

3 1

94 47

40 20

S 10 5

S 20 10

S 10 5
8 4

S 8 4
40 20

P 15
30
P 5
10
6 3
S 6 3
52 20
22 10
6 3
6 2
10 5
30 10
6 2
9 3
15 5
399 132

9 2

3 1
6 1
225 75
60 20
150 50
15 5
165 55
90 30
45 15
30 10
52 13
32 8
12 3
12 3
8 2
20 5
12 3
8 2 645
223
LOAD ADJUSTMENT

Member's Load

Time Required
Work No. Work Volume Member- In - Charge
(days)

Kristopher Cacayuran(P)
Wern Ancheta (S)
Ryan Losgano (S)
0.1.1 18 3
Jhon Madonguit (S)
Ara Malaya (S)
Contractor (S)
Kristopher Cacayuran(P)
Wern Ancheta (S)
Ryan Losgano (S)
0.1.2 12 2
Jhon Madonguit (S)
Ara Malaya (S)
Contractor (S)
Jhon Madonguit (P)
0.2.1 3 1 Wern Ancheta (S)
Ryan Losgano (S)
Wern Ancheta (P)
0.2.2 6 2 Ryan Losgano (S)
Jhon Madonguit (S)
Wern Ancheta (P)
0.3.1 3 1 Ryan Losgano (S)
Kristopher Cacayuran(S)
Wern Ancheta (P)
0.3.2 3 1 Ryan Losgano (S)
Kristopher Cacayuran(S)
Wern Ancheta (P)
0.3.3 3 1 Ryan Losgano (S)
Kristopher Cacayuran(S)
Ara Malaya (P)
1.1.1 10 5
Contractor (S)
Ara Malaya (P)
1.1.2 20 10
Contractor (S)
Ara Malaya (P)
1.1.3 10 5

Contractor (S)
Ara Malaya (P)
1.2.1 8 4
Contractor (S)
Ara Malaya (P)
1.3.1 30 15
Contractor (S)
Ara Malaya (P)
1.3.2 10 5
Contractor (S)
Kristopher Cacayuran(P)
1.4.1 9 3 Ara Malaya (S)
Contractor (S)
Ryan Losgano (P)
2.1.1 6 3
Wern Ancheta (S)
Ryan Losgano (P)
2.1.2 6 2 Wern Ancheta (S)
Kristopher Cacayuran(S)
Ryan Losgano (P)
2.1.3 10 5
Wern Ancheta (S)
Jhon Madonguit(P)
2.2.1 6 2 Wern Ancheta (S)
Ryan Losgano (S)
Jhon Madonguit(P)
2.2.2 9 3 Wern Ancheta (S)
Ryan Losgano (S)
Jhon Madonguit(P)
2.2.3 15 5 Wern Ancheta (S)
Ryan Losgano (S)
Jhon Madonguit(P)
3.1.1 3 1 Wern Ancheta (S)
Ryan Losgano (S)
Jhon Madonguit(P)
3.1.2 3 1 Wern Ancheta (S)
Ryan Losgano (S)
Wern Ancheta (P)
3.2.1 60 20 Ryan Losgano (S)
Jhon Madonguit(S)
Wern Ancheta (P)
3.2.2 150 50 Ryan Losgano (S)
Jhon Madonguit(S)
Wern Ancheta (P)
3.2.3 15 5 Ryan Losgano (S)
3.2.3 15 5
Jhon Madonguit(S)
Ryan Losgano (P)
3.3.1 90 30 Wern Ancheta (S)
Jhon Madonguit(S)
Ryan Losgano (P)
3.3.2 45 15 Wern Ancheta (S)
Jhon Madonguit(S)
Ryan Losgano (P)
3.3.3 30 10 Wern Ancheta (S)
Jhon Madonguit(S)
Wern Ancheta (P)
Ryan Losgano (S)
4.1.1 12 3
Jhon Madonguit(S)
Kristopher Cacayuran(S)
Wern Ancheta (P)
Ryan Losgano (S)
4.1.2 12 3
Jhon Madonguit(S)
Kristopher Cacayuran(S)
Ryan Losgano (P)
Wern Ancheta (S)
4.1.3 8 2
Jhon Madonguit(S)
Kristopher Cacayuran(S)
Kristopher Cacayuran(P)
Wern Ancheta (S)
4.2.1 12 3
Ryan Losgano (S)
Jhon Madonguit(S)
Kristopher Cacayuran(P)
Wern Ancheta (S)
4.2.2 8 2
Ryan Losgano (S)
Jhon Madonguit(S)

Total 645 223


Individual Member's Load
Kristopher Cacayuran
(Project
Manager)

Member Work Work Load Work No.


Volume

4 1.33 0.1.1
3 1 0.1.2
3 1 0.3.1
3 1 0.3.2
3 1 0.3.3
2 0.67 1.4.1
0.65 0.33 2.1.2
0.35 0.18 4.1.1
0.25 0.13 4.1.2
0.25 0.13 4.1.3
0.25 0.13 4.2.1
0.25 0.13 4.2.2
0.5 0.5 Total
0.25 0.25
0.25 0.25
1 0.5
0.5 0.25
0.5 0.25
0.5 0.5
0.35 0.35
0.15 0.15
0.5 0.5
0.35 0.35
0.15 0.15
0.5 0.5
0.25 0.25
0.25 0.25
3 0.6
2 0.4
6 0.6
4 0.4
Jhon Madonguit
(Sys Admin)
3 0.6

Work No.
2 0.4
3 0.75 0.1.1
1 0.25 0.1.2
8 0.53 0.2.1
7 0.47 0.2.2
3 0.6 2.2.1
2 0.4 2.2.2
1 0.33 2.2.3
1 0.33 3.1.1
1 0.33 3.1.2
2 0.67 3.2.1
1 0.33 3.2.2
1 0.50 3.2.3
0.5 0.25 3.3.1
0.5 0.25 3.3.2
3 0.60 3.3.3
2 0.40 4.1.1
1 0.50 4.1.2
0.5 0.25 4.1.3
0.5 0.25 4.2.1
1 0.33 4.2.2
1 0.33 Total
1 0.33
2 0.40
1.5 0.30
1.5 0.30
0.5 0.50
0.25 0.25
0.25 0.25
0.5 0.50
0.25 0.25
0.25 0.25
8 0.40
6 0.30
6 0.30
25 0.50
15 0.30
10 0.20
2 0.40
2 0.40
1 0.20
15 0.50
10 0.33
5 0.17
7 0.47
4 0.27
4 0.27
4 0.40
3 0.30
3 0.30
0.75 0.25
0.75 0.25
0.75 0.25
0.75 0.25
1 0.33
0.7 0.23
0.6 0.20
0.7 0.23
0.8 0.40
0.7 0.35
0.25 0.13
0.25 0.13
1 0.33
1 0.33
0.5 0.17
0.5 0.17
0.5 0.25
0.5 0.25
0.5 0.25
0.5 0.25

238 38
er's Load
Wern Ancheta
(Web
Designer/Web
Developer)

Work Volume Time Required (days) Work Load Work No. Work Volume

4 3 1.33 0.1.1 3
0.65 2 0.33 0.1.2 0.35
0.15 1 0.15 0.2.1 0.25
0.15 1 0.15 0.2.2 1
0.25 1 0.25 0.3.1 0.5
1 3 0.33 0.3.2 0.5
0.5 2 0.25 0.3.3 0.5
0.75 3 0.25 2.1.1 1
0.7 3 0.23 2.1.2 0.5
0.25 2 0.125 2.1.3 2
1 3 0.33 2.2.1 0.5
0.5 2 0.25 2.2.2 1
9.9 26 3.98 2.2.3 1.5
3.1.1 0.25
3.1.2 0.25
3.2.1 8
3.2.2 25
3.2.3 2
3.3.1 10
3.3.2 4
3.3.3 3
4.1.1 0.75
4.1.2 1
4.1.3 0.7
4.2.1 1
4.2.2 0.5
Total 69.05
Ara Malaya
(Data
Gatherer)

Work Volume Time Required (days) Work Load Work No. Work Volume

3 3 1.00 0.1.1 3
0.25 2 0.13 0.1.2 0.25
0.5 1 0.50 1.1.1 3
0.5 2 0.25 1.1.2 6
1 2 0.50 1.1.3 3
1 3 0.33 1.2.1 3
2 5 0.4 1.3.1 8
0.5 1 0.5 1.3.2 3
0.5 1 0.50 1.4.1 1
6 20 0.30 Total 30.25
10 50 0.20
1 5 0.2
5 30 0.17
4 15 0.27
3 10 0.3
0.75 3 0.25
0.6 3 0.20
0.25 2 0.13
0.5 3 0.17
0.5 2 0.25
40.85 163 6.53
Ryan Losgano
(Web Designer/Web
Developer)

Time Required Work Volume Time(days)


Required
Work Load Work No.
(days)

3 1.00 0.1.1 3 3
2 0.18 0.1.2 0.25 2
1 0.25 0.2.1 0.25 1
2 0.50 0.2.2 0.5 2
1 0.50 0.3.1 0.35 1
1 0.50 0.3.2 0.35 1
1 0.5 0.3.3 0.25 1
3 0.33 2.1.1 2 3
2 0.25 2.1.2 1 2
5 0.4 2.1.3 3 5
2 0.25 2.2.1 0.5 2
3 0.33 2.2.2 1 3
5 0.3 2.2.3 1.5 5
1 0.25 3.1.1 0.25 1
1 0.25 3.1.2 0.25 1
20 0.4 3.2.1 6 20
50 0.5 3.2.2 15 50
5 0.4 3.2.3 2 5
30 0.33 3.3.1 15 30
15 0.27 3.3.2 7 15
10 0.3 3.3.3 4 10
3 0.25 4.1.1 0.75 3
3 0.33 4.1.2 0.7 3
2 0.35 4.1.3 0.8 2
3 0.33 4.2.1 0.5 3
2 0.25 4.2.2 0.5 2
176 9.51 Total 66.7 176
Contractor
(Photographer/Videogrpher)

Time Required Work Volume Time(days)


Required
Work Load Work No.
(days)

3 1.00 0.1.1 2 3
2 0.13 0.1.2 0.25 2
5 0.60 1.1.1 2 5
10 0.60 1.1.2 4 10
5 0.60 1.1.3 2 5
4 0.75 1.2.1 1 4
15 0.53 1.3.1 7 15
5 0.6 1.3.2 2 5
3 0.33 1.4.1 1 3
52 5.14 Total 21.25 52
Work Load

1.00
0.13
0.25
0.25
0.35
0.35
0.25
0.67
0.50
0.6
0.25
0.33
0.3
0.25
0.25
0.3
0.3
0.4
0.5
0.47
0.4
0.25
0.23
0.4
0.17
0.25
9.39
Work Load

0.67
0.13
0.40
0.40
0.40
0.25
0.47
0.4
0.33
3.44
Histogram of Member's Load ( Load Chart)
Kristopher Cacayuran
(Project Manager)

Work Time Required Work Load


Work No. Completion Rate
Volume (days)

0.1.1 4 3 1.33 20%


0.1.2 0.65 2 0.33 40%
0.3.1 0.15 1 0.15 50%
0.3.2 0.15 1 0.15 60%
0.3.3 0.25 1 0.25 80%
1.4.1 1 3 0.33 100%
2.1.2 0.5 2 0.25 120%
4.1.1 0.75 3 0.25 140%
4.1.2 0.7 3 0.23 150%
4.1.3 0.25 2 0.125 160%
4.2.1 1 3 0.33 180%
4.2.2 0.5 2 0.25 200%
Total 9.9 26 3.98

Wern Ancheta
(Web Designer/Web
Developer)

Work Time Required Work Load


Work No. Completion Rate
Volume (days)

0.1.1 3 3 1.00 10%


0.1.2 0.35 2 0.18 20%
0.2.1 0.25 1 0.25 30%
0.2.2 1 2 0.50 40%
0.3.1 0.5 1 0.50 50%
0.3.2 0.5 1 0.50 60%
0.3.3 0.5 1 0.5
2.1.1 1 3 0.33
2.1.2 0.5 2 0.25
2.1.3 2 5 0.4
2.2.1 0.5 2 0.25
2.2.2 1 3 0.33
2.2.3 1.5 5 0.3
3.1.1 0.25 1 0.25
3.1.2 0.25 1 0.25
3.2.1 8 20 0.4
3.2.2 25 50 0.5
3.2.3 2 5 0.4
3.3.1 10 30 0.33
3.3.2 4 15 0.27
3.3.3 3 10 0.3
4.1.1 0.75 3 0.25
4.1.2 1 3 0.33
4.1.3 0.7 2 0.35
4.2.1 1 3 0.33
4.2.2 0.5 2 0.25
Total 69.05 176 9.51

Ryan Losgano
(Web Designer/Web
Developer)

Work Time Required Work Load


Work No. Completion Rate
Volume (days)

0.1.1 3 3 1.00 10%


0.1.2 0.25 2 0.13 20%
0.2.1 0.25 1 0.25 30%
0.2.2 0.5 2 0.25 40%
0.3.1 0.35 1 0.35 50%
0.3.2 0.35 1 0.35 60%
0.3.3 0.25 1 0.25
2.1.1 2 3 0.67
2.1.2 1 2 0.50
2.1.3 3 5 0.6
2.2.1 0.5 2 0.25
2.2.2 1 3 0.33
2.2.3 1.5 5 0.3
3.1.1 0.25 1 0.25
3.1.2 0.25 1 0.25
3.2.1 6 20 0.3
3.2.2 15 50 0.3
3.2.3 2 5 0.4
3.3.1 15 30 0.5
3.3.2 7 15 0.47
3.3.3 4 10 0.4
4.1.1 0.75 3 0.25
4.1.2 0.7 3 0.23
4.1.3 0.8 2 0.4
4.2.1 0.5 3 0.17
4.2.2 0.5 2 0.25
Total 66.7 176 9.39
1 2 3 4 5 6 7 8
200%
180%
160%
150%
140%
120% 0.25
Completion Rate 100% 0.15
80% 0.15
60%
0.33
50% 1.33
40%
20%
10%
1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

Completion Rate
Completion Rate

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

Completion Rate
1
10%
1 2 3 4 5 6 7 8
TIME

9 10 11 12 13 14 15 16 17 18 19

0.23
0.25

0.25
0.33

9 10 11 12 13 14 15 16 17 18 19

TIME

9 10 11 12 13 14 15 16 17 18 19
9 10 11 12 13 14 15 16 17 18 19

9 10 11 12 13 14 15 16 17 18 19
9 10 11 12 13 14 15 16 17 18 19
20 21 22 23 24 25 26
0.125 0.25
0.33

20 21 22 23 24 25 26

20 21 22 23 24 25 176
20 21 22 23 24 25 26

20 21 22 23 24 25 176
20 21 22 23 24 25 26

Вам также может понравиться