2 SEAT
2.1 BASE MACHINING TIME CALCULATED
2.2 HARD-FACING CALCULATED
4 STUFFING BOX
4.1 BASE MACHINING TIME CALCULATED
4.2 MATERIAL PRICE CALCULATED
5 COLUMN
5.1 BASE MACHINING TIME CALCULATED
5.2 MATERIAL PRICE CALCULATED
6 ACTUATOR
NS DIRECT PRICE
NF DIRECT PRICE
KU - INDIA DIRECT PRICE
KU - GERMANY DIRECT PRICE
ELECTRIC - ROTORK DIRECT PRICE
PKE CALCULATED (OR) DIRECT PRICE
PKD CALCULATED (OR) DIRECT PRICE
7 ANTI-ROTATIONAL DEVICE
7.1 BASE MACHINING TIME CALCULATED
7.2 MATERIAL PRICE CALCULATED
8 GUIDE BUSH
8.1 BASE MACHINING TIME CALCULATED
9 ANTI-EXTRUSION RING
9.1 BASE MACHINING TIME CALCULATED
10 FASTENERS
10.1 SOCKET HEAD CAP SCREW CALCULATED
10.2 HEX SCREW CALCULATED
10.3 STUD CALCULATED
10.4 NUT CALCULATED
10.5 WASHER CALCULATED
14 Pad flange
14.1 BASE MACHINING TIME CALCULATED
15 Accessories
Limit Switch DIRECT PRICE
Positioner DIRECT PRICE
PRICE ESTIMATE-PART WISE
Refer COMMENTS
MACHININGTIME- TABLE
MACHININGTIME- TABLE
MACHININGTIME- TABLE
MATERIAL COST TABLE BASED ON TOTAL VOLUME
MACHININGTIME- TABLE
MATERIAL COST TABLE BASED ON TOTAL VOLUME
4.40 5.48
5.37
9.57 11.35
1.5
1.6
1.7
1.8 2.1
2.0
2.0
2.0
2.1 2.3
2.7 2.8
3.0
5.0 5.5
RF RTJ BW SW
(Set-up)+(Run-time*Qty)*Hr. Rate) 1 1.2 0.6 0.6
(Set-up)+(Run-time*Qty)* Hr.Rate) 1 1.2 0.6 0.6
= ((Vessel Side)*2.16)*Hr.Rate 1 1.2 0.6 0.6
((Set-up)+(Run-time*Qty))*Hr.Rate 2 2.4 1 1
Set-up)+(Run-time*2*Qty))*Hr.Rate
(Run time*Qty)*Hr.Rate
(Run time*Qty)*Hr.Rate
((Set-up)+(Run-time*Qty))*Hr.Rate
((Set-up)+(Run-time*Qty))*Hr.Rate
Code 1
Code 1
Code 1
Code 3
Code 4
Code 1
Code 2
Code1
Code1
Code2
Code2
PACKING RING
Unit Cost (In
NPS PACKING RING SIZE MATERIAL INR)
2" PTFE
2" GRAPHITE
Spiral Wound gasket
105 x 86 x 70
O-RING
Unit Cost
NPS MATERIAL Dimension (In mm) (In INR)
DIAMETER WIRE DIA
2" PTFE
2" 1.451/SILVER
MATERIAL -COST TABLE
MATERIAL DENSITY Per Kg Cost
CF8M
1.4401/1.4404
A4-70
A4
B7
2H
17-4PH
1.4122
304
304/304L
Hard Facing
1.ALL BODY MATERIAL,TRIM MATERIAL ADDITION SHALL HAVE THE COST COLUMN ADDED IN THE MASTER TABLE & LINKED T
2.FASTENER MATERIALS& OTHER COMPONENT MATERIALS SPECIFIED IN REGISTER TABLE SHALL BE ADDED HERE
N THE MASTER TABLE & LINKED TO THIS TABLE
ALL BE ADDED HERE