2- EQUIPMENT
i) Are rigging tools-tackles recently inspected and correctly color coded?
iii) Are the rigging tools-tackles checked in accordance with the lift plan?
iv) SWL of the crane and its mode of operation suitable to complete the lift?
vii) Is the copy of approved lifting plan available at site with the crane operator and site engineer?
3- ENVIRONMENT
i) Is the ground well compacted and levelled in accordance to the permissible crane working range?
4- COMMUNICATIONS
i) Has the lifting supervisor and appropriate lift team been nominated?
ii) Has a pre-lift meeting between the crane operator, signal person, supervisor, and other affected person
been conducted and been understood?
iii) Have the primary and secondary means of communication been established & tested?
iv) Radios are available during lifting operation commenced at night time?
5- LIFTING OPERATION
i) Is the load free from any fastening and any other vertical restraints?
ii) Is the area for lifting the load & route is clear of the obstruction and barricaded?
iii) Is the area for landing the load clear, strong enough, properly prepared & is there any risk of the
load becoming unstable after landing?
iv) Is there any lifting equipment clash or potential load clash?
Page 1 of 1
Rev-0 23/11/2017