NJEGAS-MUTITU-KIAGA-MUKINDURI SECTION

KARIMA A2-KIANJEGE-KARATINA SECTION


KIBURU-KIBONGE ROAD ROAD SETION
RELATIVE COMPACTION TEST RESULTS
KM:2+685 LAYER TESTED: Bed (service duct) REQUEST NO :281
Field Max.Dry Optimum Relative Relative
Layer Field dry moisture
Serial DATE Chainage:
Location; thickness density moisture Comp. moisture
content Density content REMARKS SPEC
No km (mm) kg/m3 kg/m3 content (%)
% (%)
1 9-Apr-017 2+685 RHS 150 1308 32.8 1293 36.3 101 90

2 9-Apr-017 2+685 CL 140 1332 31.7 1293 36.3 103 87

3 9-Apr-017 2+685 LHS 150 1291 32.2 1293 36.3 100 89


(MIN100%)
AASHTO
T99R.M.C 70-
105% O.M.C

... ...
J.M WAMBUGU Eng N Gichangi
Project Materials Officer Resident Engineer
CC:1) CONTRACTOR-. Stecol Corporation
2) LAB ...
KIAGA-MUKINDURI SECTION
KARIMA A2-KIANJEGE-KARATINA SECTION
KIBURU-KABONGE ROAD SETION
RELATIVE COMPACTION TEST RESULTS
KM:3+040-3+140 Layer tested: SUBGRADE 1 Req no.728
Field Max.Dry Optimum Relative Relative
Serial Layer Field dry moisture
DATE Chainage:
Location; thickness density moisture Comp. moisture
content Density content REMARKS SPEC
No km (mm) kg/m3 kg/m3 content (%)
% (%)
1 15-Jul-017 3+060 RHS 150 1375 24.9 1350 32.2 102 77

2 15-Jul-017 3+120 LHS 150 1361 24.1 1350 32.2 101 75

(MIN95%)
AASHTO
T99R.M.C 70-
105% O.M.C

.. ..
J.M WAMBUGU Eng J.K Murage
Project Materials Officer Resident Engineer
CC:1) CONTRACTOR-. Stecol Corporation
2) LAB ...
NJEGAS-MUTITU-KIAGA-MUKINDURI SECTION
KARIMA A2-KIANJEGE-KARATINA SECTION
KIBURU-KIBONGE ROAD ROAD SETION
RELATIVE COMPACTION TEST RESULTS
KM:2+685 LAYER TESTED: Bed (service duct) REQUEST NO :281
Field Max.Dry Optimum Relative Relative
Layer Field dry moisture
Serial DATE Chainage:
Location; thickness density moisture Comp. moisture
content Density content REMARKS SPEC
No km (mm) kg/m3 kg/m3 content (%)
% (%)
1 9-Apr-017 2+685 RHS 150 1308 32.8 1293 36.3 101 90

2 9-Apr-017 2+685 CL 140 1332 31.7 1293 36.3 103 87

3 9-Apr-017 2+685 LHS 150 1291 32.2 1293 36.3 100 89


(MIN100%)
AASHTO
T99R.M.C 70-
105% O.M.C

... ...
J.M WAMBUGU Eng N Gichangi
Project Materials Officer Resident Engineer
CC:1) CONTRACTOR-. Stecol Corporation
2) LAB ...