PRIMER NIVEL

(Abastecimiento independiente del resto del edificio)


DISTRIBUCION NORMA CARACTERISTICAS DOTACION
TIENDA 01 S.222.2.10 37.17 M2 500
TIENDA 02 S.222.2.10 16.54 M2 500
juntosss PARCIAL 1000

PRIMER NIVEL
DISTRIBUCION NORMA CARACTERISTICAS DOTACION
RECEPCION S.222.2.10 2.00 M2 500
ONE ROOM 101 S.222.2.02 01 DORMITORIO 500
ONE ROOM 102 S.222.2.02 01 DORMITORIO 500
ONE ROOM 103 S.222.2.02 01 DORMITORIO 500
ONE ROOM 104 S.222.2.02 01 DORMITORIO 500
PARCIAL 2500

SEGUNDO NIVEL
DISTRIBUCION NORMA CARACTERISTICAS DOTACION
01 DEPARTAMENTO D201 S.222.2.02 03 Dormitorios 1200
01 DEPARTAMENTO D202 S.222.2.02 03 Dormitorios 1200
ONE ROOM 201 S.222.2.02 01 Dormitorios 500
ONE ROOM 202 S.222.2.02 01 Dormitorios 500
PARCIAL 3400

TERCER NIVEL
DISTRIBUCION NORMA CARACTERISTICAS DOTACION
01 DEPARTAMENTO D301 S.222.2.02 03 Dormitorios 1200
01 DEPARTAMENTO D302 S.222.2.02 03 Dormitorios 1200
ONE ROOM 301 S.222.2.02 01 Dormitorios 500
ONE ROOM 302 S.222.2.02 01 Dormitorios 500
PARCIAL 3400

CUARTO NIVEL
DISTRIBUCION NORMA CARACTERISTICAS DOTACION
01 DEPARTAMENTO D401 S.222.2.02 03 Dormitorios 1200
01 DEPARTAMENTO D402 S.222.2.02 03 Dormitorios 1200
ONE ROOM 401 S.222.2.02 01 Dormitorios 500
ONE ROOM 402 S.222.2.02 01 Dormitorios 500
PARCIAL 3400

AZOTEA
DISTRIBUCION NORMA CARACTERISTICAS DOTACION
AREA DE COMIDA S.222.2.04 62.00 M2 3100
DEPOSITO A S.222.2.09 3.50 M2 1.75
DEPOSITO 201 S.222.2.09 3.60 M2 1.80
DEPOSITO 202 S.222.2.09 3.60 M2 1.80
DEPOSITO 301 S.222.2.09 4.70 M2 2.35
DEPOSITO 302 S.222.2.09 4.70 M2 2.35
DEPOSITO 401 S.222.2.09 4.70 M2 2.35
DEPOSITO 402 S.222.2.09 4.70 M2 2.35
DEPOSITO B S.222.2.09 15.70 M2 7.85
LAVANDERIA S.222.2.19 24.00 KG 1200
PARCIAL 4322.60

DOTACION TOTAL DIARIA (Litros/Dia) 17022.60


CAPACIDAD DE LA CISTERNA

DOTACION CAPACIDAD
(LPD) (M3)
17022.60 12.77
CAPACIDAD
13.00
ADOPTADA
CAPACIDAD DEL
TANQUE ELEVADO
DOTACION CAPACIDAD
(LPD) (M3)
17022.60 5.67
CAPACIDAD
6.00
ADOPTADA
CALCULO DE LA TUBERIA DE ALIMENTACION DE LA RED PUBLICA HASTA LA CISTERNA

DATOS VALOR UNIDAD


Presin en la red pblica 7 mt.
Presin mnima de agua
2 mt.
a la salida de la cisterna
Desnivel entre la red pblica y el
1 mt.
punto de entrega a la cisterna
Longitud de la linea de servicio 25 mt.
Tiempo de llenado de la cisterna 4 hr
Capacidad de la cisterna 13 m3

CALCULO DEL GASTO DE ENTRADA


Q = Capacidad de la cisterna = 13000 = 0.90 LPS
Tiempo de llenado de la cisterna 14400

CALCULO DE LA CARGA DISPONIBLE


H = PR - PS - HT H = Carga disponible
PR = Presin en la red
H = 4 mt. PS = Presin de salida
HT = Altura de red a cisterna

SELECCIN DEL MEDIDOR


Hf = 0,5 x carga disponible
Hf = 2 mt. Hf = Prdida de carga en medidor

DIAMETRO PERDIDA DE CARGA


1/2" 7,15 mt.
3/4" 2,66 mt.
1" 1,18 mt.

Por lo tanto seleccionamos el medidor de 1"


Hf ( 1" ) = 1.18 mt.

SELECCIN DEL DIAMETRO DE LA TUBERIA

Carga disponible para la tubera de alimentacin = H - Hf ( 1" )


= 2.82 mt.

Asumiendo un Dimetro de 1" para la tubera de alimentacin

Longitud equivalente por accesorios:


1 vlvula de paso 1" = 0.2
1 vlvula compuerta 1" = 0.2
2 codos 1" x 90 = 1.8
1 codo 1" x 45 = 0.5
LONGITUD EQUIVALENTE = 2.7 mt.

LONGITUD TOTAL = 27.70 mt.

Q = 0.90 LPS
D = 1 1/4 PULG
C = 110
S = 80.4127 m/Km

PERDIDA DE CARGA EN LA TUBERIA = 2.23 mt.

Como la prdida de carga en la tubera de alimentacin (2.23m) es menor que la carga disponible
(2,82m) entonces el dimetro supuesto es correcto.

MEDIDOR = 1"
DIAMETRO DE TUBERIA = 1 1/4"
SELECCIN DEL EQUIPO DE BOMBEO

CAUDAL DE BOMBEO

UH CAUDAL
Q(mds)= 318 3.36

VOLUMEN CAUDAL
Q(llenado)= 6000 0.83 necesario para llenar el tanque en dos horas

Caudal de Bombeo= 4.19 LPS

ALTURA DINAMICA TOTAL

Presin de Salida= 2 mt
Altura Geomtrica= 20.20 mt
Prdidas de Carga= 16.80 mt

Tubera de Succin 2" Tubera de Impulsin 1 1/4"


01 Valvula de Pie = 13.841 01 Vlvula Check = 3.213
01 Codos = 2.841 01 Vlvula Compuerta = 0.328
Longitud de Tubera = 2.60 06 Codos = 12.954
Longitud de Tubera = 25
Prdida de Carga = 1.73 Prdida de Carga = 15.07
PERDIDA TOTAL(mt) 16.80

ALTURA DINAMICA TOTAL = 39.00 mt

CARACTERISTICAS TECNICAS DEL EQUIPO


DE BOMBEO HIDROSTAL

MODELO = 32-160
POTENCIA = 4,5 HP
VELOCIDAD = 3450 RPM
SUCCION = 2"
IMPULSION = 1"
FRECUENCIA = 60 CPS
VOLTAJE = 220 V
Q bombeo = 4.19 LPS
HDT = 40.00 mt
CALCULO DEL ALIMENTADOR N01
Alimentador que abastece a:
One Room: 102= 12
One Room: 202= 12
One Room: 302= 12
One Room: 402= 12
Cada One Room tiene una demanda de 12 UH, lo cual
incluye agua fria y produccion de agua caliente

UH
NIVEL Q(lps) V(m/s) D(Pulg)
DEMANDA OFERTA
4 12 48 1.09 1.38 1 1/4
3 12 36 0.85 1.07 1 1/4
2 12 24 0.61 0.77 1 1/4
1 12 12 0.38 0.48 1 1/4
TOTAL DE UH EN LA MONTANTE N01= 48.00

CALCULO DEL ALIMENTADOR N02


Alimentador que abastece a:
One Room: 101= 12
One Room: 201= 12
One Room: 301= 12
One Room: 401= 12
Cada One Room tiene una demanda de 12 UH, lo cual
incluye agua fria y produccion de agua caliente

UH
NIVEL Q(lps) V(m/s) D(Pulg)
DEMANDA OFERTA
4 12 48 1.09 1.38 1 1/4
3 12 36 0.85 1.07 1 1/4
2 12 24 0.61 0.77 1 1/4
1 12 12 0.38 0.48 1 1/4
TOTAL DE UH EN LA MONTANTE N02= 48.00
CALCULO DEL ALIMENTADOR N03
Alimentador que abastece a:
Departamento 401= 26
Departamento 402= 26
Departamento 301= 26
Departamento 302= 26
Departamento 201= 26
Departamento 202= 26
Cada Departamento tiene una demanda de 26 UH, lo cual
incluye agua fria y produccion de agua caliente

UH
NIVEL Q(lps) V(m/s) D(Pulg)
DEMANDA OFERTA
4 52 156 2.11 1.85 1 1/2
3 52 104 1.70 1.49 1 1/2
2 52 52 1.15 1.01 1 1/2
TOTAL DE UH EN LA MONTANTE N03= 156.00

CALCULO DEL ALIMENTADOR N04


Alimentador que abastece a:
One Room: 103= 12
One Room: 104= 12
Cada One Room tiene una demanda de 12 UH, lo cual
incluye agua fria y produccion de agua caliente

UH
NIVEL Q(lps) V(m/s) D(Pulg)
DEMANDA OFERTA
1 12 24 0.61 1.20 1
1 12 24 0.61 1.20 1
TOTAL DE UH EN LA MONTANTE N04= 24.00
CALCULO DEL ALIMENTADOR N05
Alimentador que abastece a:
1/2 BAO= 5
LAVADERO 3
En total tiene una demanda de 12 UH, lo cual
incluye solo agua fria

UH
NIVEL Q(lps) V(m/s) D(Pulg)
DEMANDA OFERTA
4 8 8 0.29 1.02 3/4
3 8 8 0.29 1.02 3/4

ALIMENTADOR PRINCIPAL
Alimentador que abastece a:
ALIMENTADOR 01 = 48
ALIMENTADOR 02 = 48
ALIMENTADOR 03 = 156
ALIMENTADOR 04 = 24

En total tiene una demanda de 276 UH, lo cual


incluye solo agua fria

UH
NIVEL Q(lps) V(m/s) D(Pulg)
DEMANDA OFERTA
Azotea 276 276 3.04 1.50 2

TOTAL DE UH EN LA MONTANTE N05= 8.00

DEMANDA EN LA AZOTEA

DEMANDA
EQUIPO
UH
LAVADORA= 3
LAVA ROPA= 3
THERMA= 5
MEDIO BAO= 5
MEDIO BAO= 5
INODORO= 3
URINARIO= 3
LAVA CARA= 1
LAVA PLATO= 3
THERMA= 3
TOTAL DEMANDA= 34
DEMANDA DE AGUA EN TODO EL EDIFICIO

DEMNADA
MONTANTE
UH
N 01 48.00
N 02 48.00
N 03 156.00
N 04 24.00
N 05 8.00
AZOTEA 34.00

TOTAL= 318.00 UH
CAUDAL= 3.36 LPS
CALCULO HIDRULICO DE AGUA FRA

AZOTEA

DETERMINACION DEL NIVEL DE FONDO DEL TANQUE ELEVADO


Desde la ducha de los servicios higinicos ubicado entre los tendales y sol y sombra hasta el Tanque Elevado

DATOS PARA EL CALCULO:


NIVEL DE PISO EN TERRAZA: 11.10
PRESION DE SALIDA (EN DUCHA) 2.00
PERDIDA DE CARGA LOCAL 0.96
NIVEL DE FONDO DE TANQUE ELEVADO 14.06

NIVEL DE FONDO DEL TANQUE ELEVADO

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)
A6c - A6b 2 0.08 1/2 0.63 140 0.324 0.324 1.45 50.192 0.09
A6b - A6a 5 0.23 3/4 0.81 140 0.518 0.518 0.90 49.243 0.07
A6a - A6 5 0.23 3/4 0.81 140 1.296 0.216 1.512 1.80 49.243 0.16
A6 - A5 15 0.44 1 0.87 140 0.518 0.518 0.40 40.331 0.04
A5 - A4 18 0.5 1 0.99 140 0.518 0.518 0.45 51.092 0.05
A4 - A3 26 0.67 1 1/4 0.85 140 0.518 0.518 6.75 29.647 0.22
A3 - A2 42 0.95 1 1/4 1.20 140 0.518 0.518 0.70 56.562 0.07
A2 - A1 42 0.95 1 1/4 1.20 140 1.944 0.216 1.2 3.360 1.40 56.562 0.27
CALCULO HIDRAULICO EN LA AZOTEA
DISTRIBUCION DE SERVICIOS COMUNES

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

A1 - A2 42 0.95 1 1/4 1.20 140 1.944 0.216 1.2 3.360 1.40 56.562 0.27 2.69 A2
A2 - A3 42 0.95 1 1/4 1.20 140 0.518 0.518 0.70 56.562 0.07 2.62 A3
A3 - A4 26 0.67 1 1.32 140 0.518 0.518 6.75 87.800 0.64 1.99 A4
A4 - A4a 8 0.29 3/4 1.02 140 0.324 0.518 0.842 6.00 75.610 0.52 1.47 A4a
A4 - A5 18 0.50 3/4 1.75 140 0.518 0.518 0.45 207.1282 0.20 1.79 A5
A5 - A6 15 0.44 3/4 1.54 140 0.518 0.518 0.40 163.505 0.15 1.64 A6
A6 - A6a 5 0.23 3/4 0.81 140 1.296 0.216 1.512 1.80 49.243 0.16 1.47 A6a
A6a - A6b 5 0.23 3/4 0.81 140 0.518 0.518 0.90 49.243 0.07 1.40 A6b
A6b - A6c 2 0.08 1/2 0.63 140 0.324 0.324 1.45 50.192 0.09 1.31 A6c
A6c - Ducha 2 0.08 1/2 0.63 140 0.324 0.324 1.45 50.192 1.80 -0.49 Ducha
A6 - A7 10 0.34 3/4 1.19 140 0.518 0.518 1.20 101.480 0.17 1.46 A7
A7 - A7a 2 0.08 1/2 0.63 140 0.518 0.518 1.75 50.192 0.11 1.35 A7a
A7a - Lava. 2 0.08 1/2 0.63 140 0.324 0.518 0.216 1.058 1.00 50.192 0.10 0.24 Lava.
A7 - A8 8 0.29 3/4 1.02 140 0.518 0.518 0.25 75.610 0.06 1.40 A8
A8 - A8a 6 0.25 3/4 0.88 140 1.944 0.216 2.16 1.75 57.456 0.22 1.18 A8a
A8a -A8b 6 0.25 3/4 0.88 140 0.518 0.518 0.30 57.456 0.05 1.13 A8b
A8b -A8c 3 0.12 1/2 0.95 140 0.518 0.518 0.85 106.268 0.15 0.99 A8c
A8 - A9 2 0.08 1/2 0.63 140 0.518 0.518 3.75 50.192 0.21 1.19 A9
A9 - Lava. 2 0.08 1/2 0.63 140 0.216 0.216 1.00 50.192 0.06 -0.82 Lava.
A3 - A11 16 0.46 1 0.91 140 0.518 0.518 5.60 43.788 0.27 2.36 A11
A11 - A11a 5 0.23 3/4 0.81 140 1.944 0.518 0.216 2.678 2.35 49.243 0.25 2.11 A11a
A11a - A11b 3 0.12 1/2 0.95 140 0.324 0.518 0.842 0.60 106.268 0.15 1.96 A11b
A11a - A11c 2 0.08 1/2 0.63 140 0.324 0.518 0.842 1.15 50.192 0.10 2.01 A11c
A11 - A12 11 0.36 3/4 1.26 140 0.324 0.518 0.842 4.80 112.799 0.64 1.72 A12
A12 - A13 6 0.25 3/4 0.88 140 0.517 0.517 0.60 57.456 0.06 1.66 A13
A13 - A14 3 0.12 1/2 0.95 140 0.324 0.324 0.50 106.268 0.09 1.57 A14
CALCULO HIDRAULICO EN LA AZOTEA
RAMALES QUE ABASTECEN A LOS ALIMETADORES DE AGUA

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

B1 - B2 276 3.04 2 1.50 140 0.412 0.412 0.35 49.421 0.04 2.92 B2
B2 - AL02 48 1.09 1 1/4 1.38 140 0.412 0.628 1.040 4.00 72.942 0.37 2.56 AL02
B2 - B3 228 2.64 2 1.30 140 0.628 0.628 0.70 38.068 0.05 2.87 B3
B3 - AL01 48 1.09 1 1/4 1.38 140 0.412 0.518 0.930 1.90 72.942 0.21 2.67 AL01
B3 - B4 180 2.29 2 1.13 140 0.628 0.628 10.6 29.26103 0.33 2.55 B4
B4 - AL04 24 0.61 1 1.20 140 0.628 0.628 3.95 73.810 0.34 2.21 AL04
B4 - AL03 156 2.11 1 1/2 1.85 140 0.412 1.256 1.668 4.95 101.954 0.67 1.87 AL03
CUARTO PISO

CALCULO HIDRAULICO EN EL CUARTO PISO


ALIMENATDOR 01, ONE ROOM 402

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

T4A - 4B 12 0.38 3/4 1.33 140 1.944 1.256 1.2 4.400 1.95 124.665 0.79 4.28 4B
4B - 4C 12 0.38 3/4 1.33 140 0.324 0.324 2.20 124.665 0.31 3.96 4C
4C - 4D 6 0.25 3/4 0.88 140 0.518 0.518 0.15 57.456 0.04 3.92 4D
4D - 4E 3 0.12 1/2 0.95 140 0.518 0.518 0.35 106.268 0.09 3.83 4E
4E - LAV 3 0.12 1/2 0.95 140 0.648 1.256 1.904 1.55 106.2679 0.37 2.46 LAV.
4D - THE. 3 0.12 1/2 0.95 140 0.648 1.256 1.904 2.35 106.268 0.45 1.58 THE
4C - 4F 6 0.25 3/4 0.88 140 1.944 0.718 1.256 3.918 2.30 57.456 0.36 3.60 4F
4F - 4W 5 0.23 3/4 0.81 140 0.518 0.518 0.40 49.243 0.05 3.56 4W
4W - DUCHA 2 0.08 1/2 0.63 140 0.324 0.324 2.30 50.192 0.13 1.63 DUCHA

CALCULO HIDRAULICO EN EL CUARTO PISO


ALIMENATDOR 02, ONE ROOM 401

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

T4A - 4B 12 0.38 3/4 1.33 140 1.944 1.256 1.2 4.400 3.00 124.665 0.92 4.03 4B
4B - 4C 12 0.38 3/4 1.33 140 0.324 0.324 5.35 124.665 0.71 3.33 4C
4C - 4D 6 0.25 3/4 0.88 140 0.518 0.518 2.80 57.456 0.19 3.14 4D
4D - THE 3 0.12 1/2 0.95 140 0.518 1.256 1.774 2.80 106.2679 0.49 1.65 THE
4D - 4E 3 0.12 1/2 0.95 140 0.648 0.648 2.90 106.268 0.38 2.76 4E
4C - 4F 6 0.25 3/4 0.88 140 1.944 1.256 3.200 0.60 57.456 0.22 2.54 4F
4F - 4W 5 0.23 3/4 0.81 140 0.518 0.518 1.00 49.243 0.07 2.47 4W
CALCULO HIDRAULICO EN EL CUARTO PISO
ALIMENATDOR 03, DEPARTAMENTO 401

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

T4A - T4 52 1.15 1 1/4 1.45 140 0.518 0.518 0.40 80.544 0.07 4.20 T4
T4 - 4B 26 0.67 1 1.32 140 1.944 0.518 1.256 3.718 1.70 87.800 0.48 3.72 4B
4B - 4C 26 0.67 1 1.32 140 0.324 0.324 5.35 87.800 0.50 3.22 4C
4C - 4D 17 0.48 1 0.95 140 0.518 0.518 0.25 47.375 0.04 3.19 4D
4D - THE 5 0.23 3/4 0.81 140 0.324 0.518 1.256 2.098 2.20 49.24264 0.21 1.97 THE
4D - 4E 12 0.38 3/4 1.33 140 0.324 0.518 0.842 2.05 124.665 0.36 2.83 4E
4E - 4F 6 0.25 3/4 0.88 140 1.944 0.518 1.256 3.718 3.60 57.456 0.42 2.41 4F
4F - 4Fa 5 0.23 3/4 0.81 140 0.518 0.518 0.35 49.243 0.04 2.36 4Fa
4Fa - 4Fb 2 0.08 1/2 0.63 140 0.324 0.324 0.85 50.192 0.06 2.30 4Fb
4E - 4G 6 0.25 3/4 0.88 140 1.944 0.518 1.256 3.718 1.95 57.456 0.33 2.50 4G
4G - 4Ga 3 0.12 1/2 0.95 140 0.518 0.518 0.75 106.268 0.13 2.37 4Ga
4Ga - 4Gb 2 0.08 1/2 0.63 140 0.324 0.324 0.65 50.192 0.05 2.32 4Gb
4C - 4H 9 0.32 3/4 1.12 140 0.324 0.518 0.842 2.25 90.714 0.28 2.94 4H
4H - LR 3 0.12 1/2 0.95 140 0.324 0.518 0.842 1.75 106.268 0.28 1.67 LR
4H - 4J 6 0.25 3/4 0.88 140 0.518 0.518 2.45 57.456 0.17 2.77 4J
CALCULO HIDRAULICO EN EL CUARTO PISO
ALIMENATDOR 03, DEPARTAMENTO 402

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

T4A - T4 52 1.15 1 1/4 1.45 140 0.518 0.518 0.40 80.544 0.07 4.20 T4
T4 - 4B 26 0.67 1 1.32 140 1.944 0.518 1.256 3.718 1.70 87.800 0.48 3.72 4B
4B - 4C 26 0.67 1 1.32 140 0.324 0.324 5.50 87.800 0.51 3.21 4C
4C - 4D 14 0.42 1 0.83 140 0.518 0.518 2.80 37.006 0.12 3.09 4D
4D - LAV 3 0.12 1/2 0.95 140 0.518 1.256 1.774 1.00 106.2679 0.29 1.79 LAV
4D - 4E 11 0.36 3/4 1.26 140 0.648 0.648 2.90 112.799 0.40 2.69 4E
4E - 4F 8 0.29 3/4 1.02 140 0.518 0.518 0.60 75.610 0.08 2.60 4F
4F - 4G 5 0.23 3/4 0.81 140 0.518 0.518 1.00 49.243 0.07 2.53 4G
4C - 4H 12 0.38 3/4 1.33 140 0.518 0.518 0.55 124.665 0.13 3.08 4H
4H - 4Ha 6 0.25 3/4 0.88 140 1.944 0.518 1.256 3.718 1.40 57.456 0.29 2.78 4Ha
4Ha - 4Hb 5 0.23 3/4 0.81 140 0.518 0.518 0.50 49.243 0.05 2.73 4Hb
4Hb - 4Hc 2 0.08 1/2 0.63 140 0.324 0.324 0.95 50.192 0.06 2.67 4Hc
4Hc - DUCHA 2 0.08 1/2 0.63 140 0.648 0.648 2.10 50.192 0.14 0.73 DUCHA
4H - 4J 6 0.25 3/4 0.88 140 0.518 0.518 1.65 57.456 0.12 2.95 4J
4J - 4Ja 6 0.25 3/4 0.88 140 1.944 0.518 1.256 3.718 1.20 57.456 0.28 2.67 4Ja
4Ja - 4Jb 5 0.23 3/4 0.81 140 0.518 0.518 0.50 49.243 0.05 2.62 4Jb
4Jb - 4Jc 2 0.08 1/2 0.63 140 0.518 0.518 0.95 50.192 0.07 2.55 4Jc
4Jc - DUCHA 2 0.08 1/2 0.63 140 0.648 0.648 2.55 50.192 0.16 0.58 DUCHA
TERCER PISO

CALCULO HIDRAULICO EN EL TERCER PISO


ALIMENATDOR 01, ONE ROOM 302

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

T3A - 3B 12 0.38 3/4 1.33 140 1.944 1.256 1.2 4.400 1.95 124.665 0.79 6.68 3B
3B - 3C 12 0.38 3/4 1.33 140 0.324 0.324 2.20 124.665 0.31 6.36 3C
3C - 3D 6 0.25 3/4 0.88 140 0.518 0.518 0.15 57.456 0.04 6.32 3D
3D - 3E 3 0.12 1/2 0.95 140 0.518 0.518 0.35 106.268 0.09 6.23 3E
3E - LAV 3 0.12 1/2 0.95 140 0.648 1.256 1.904 1.55 106.2679 0.37 4.86 LAV.
3D - THE. 3 0.12 1/2 0.95 140 0.648 1.256 1.904 2.35 106.268 0.45 3.98 THE
3C - 3F 6 0.25 3/4 0.88 140 1.944 0.718 1.256 3.918 2.30 57.456 0.36 6.00 3F
3F - 3W 5 0.23 3/4 0.81 140 0.518 0.518 0.40 49.243 0.05 5.96 3W
3W - DUCHA 2 0.08 1/2 0.63 140 0.324 0.324 2.30 50.192 0.13 4.03 DUCHA

CALCULO HIDRAULICO EN EL TERVER PISO


ALIMENATDOR 02, ONE ROOM 301

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

T3A - T3 52 1.15 1 1/4 1.45 140 0.518 0.518 0.40 80.544 0.07 7.28 T3
T3 - 3B 26 0.67 1 1.32 140 1.944 0.518 1.256 3.718 1.70 87.800 0.48 6.81 3B
3B - 3C 26 0.67 1 1.32 140 0.324 0.324 5.35 87.800 0.50 6.31 3C
3C - 3D 14 0.42 1 0.83 140 0.518 0.518 2.80 37.006 0.12 6.19 3D
3D - LAV 3 0.12 1/2 0.95 140 0.518 1.256 1.774 1.00 106.2679 0.29 4.89 LAV.
3D - 3E 11 0.36 3/4 1.26 140 0.648 0.648 2.90 112.799 0.40 5.79 3E
3E - 3F 8 0.29 3/4 1.02 140 0.518 0.518 0.60 75.610 0.08 5.70 3F
3F - 3G 5 0.23 3/4 0.81 140 0.518 0.518 1.00 49.243 0.07 5.63 3G
CALCULO HIDRAULICO EN EL TERCER PISO
ALIMENATDOR 03, DEPARTAMENTO 301

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

T3A - T3 52 1.15 1 1/4 1.45 140 0.518 0.518 0.40 80.544 0.07 6.60 T3
T3 - 3B 26 0.67 1 1.32 140 1.944 0.518 1.256 3.718 1.70 87.800 0.48 6.12 3B
3B - 3C 26 0.67 1 1.32 140 0.324 0.324 5.35 87.800 0.50 5.62 3C
3C - 3D 17 0.48 1 0.95 140 0.518 0.518 0.25 47.375 0.04 5.59 3D
3D - THE 5 0.23 3/4 0.81 140 0.324 0.518 1.256 2.098 2.20 49.24264 0.21 4.37 THE
3D - 3E 12 0.38 3/4 1.33 140 0.324 0.518 0.842 2.05 124.665 0.36 5.23 3E
3E - 3F 6 0.25 3/4 0.88 140 1.944 0.518 1.256 3.718 3.60 57.456 0.42 4.81 3F
3F - 3Fa 5 0.23 3/4 0.81 140 0.518 0.518 0.35 49.243 0.04 4.76 3Fa
3Fa - 3Fb 2 0.08 1/2 0.63 140 0.324 0.324 0.85 50.192 0.06 4.70 3Fb
3E - 3G 6 0.25 3/4 0.88 140 1.944 0.518 1.256 3.718 1.95 57.456 0.33 4.90 3G
3G - 3Ga 3 0.12 1/2 0.95 140 0.518 0.518 0.75 106.268 0.13 4.77 3Ga
3Ga - 3Gb 2 0.08 1/2 0.63 140 0.324 0.324 0.65 50.192 0.05 4.72 3Gb
CALCULO HIDRAULICO EN EL TERCER PISO
ALIMENATDOR 03, DEPARTAMENTO 302

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

T3A - T3 52 1.15 1 1/4 1.45 140 0.518 0.518 0.40 80.544 0.07 6.60 T3
T3 - 3B 26 0.67 1 1.32 140 1.944 0.518 1.256 3.718 1.70 87.800 0.48 6.12 3B
3B - 3C 26 0.67 1 1.32 140 0.324 0.324 5.50 87.800 0.51 5.61 3C
3C - 3D 14 0.42 1 0.83 140 0.518 0.518 2.80 37.006 0.12 5.49 3D
3D - LAV 3 0.12 1/2 0.95 140 0.518 1.256 1.774 1.00 106.2679 0.29 4.19 LAV
3D - 3E 11 0.36 3/4 1.26 140 0.648 0.648 2.90 112.799 0.40 5.09 3E
3E - 3F 8 0.29 3/4 1.02 140 0.518 0.518 0.60 75.610 0.08 5.00 3F
3F - 3G 5 0.23 3/4 0.81 140 0.518 0.518 1.00 49.243 0.07 4.93 3G
3C - 3H 12 0.38 3/4 1.33 140 0.518 0.518 0.55 124.665 0.13 5.48 3H
3H - 3Ha 6 0.25 3/4 0.88 140 1.944 0.518 1.256 3.718 1.40 57.456 0.29 5.18 3Ha
3Ha - 3Hb 5 0.23 3/4 0.81 140 0.518 0.518 0.50 49.243 0.05 5.13 3Hb
3Hb - 3Hc 2 0.08 1/2 0.63 140 0.324 0.324 0.95 50.192 0.06 5.07 3Hc
3Hc - DUCHA 2 0.08 1/2 0.63 140 0.648 0.648 2.10 50.192 0.14 3.13 DUCHA
3H - 3J 6 0.25 3/4 0.88 140 0.518 0.518 1.65 57.456 0.12 5.35 3J
3J - 3Ja 6 0.25 3/4 0.88 140 1.944 0.518 1.256 3.718 1.20 57.456 0.28 5.07 3Ja
3Ja - 3Jb 5 0.23 3/4 0.81 140 0.518 0.518 0.50 49.243 0.05 5.02 3Jb
3Jb - 3Jc 2 0.08 1/2 0.63 140 0.518 0.518 0.95 50.192 0.07 4.95 3Jc
3Jc - DUCHA 2 0.08 1/2 0.63 140 0.648 0.648 2.55 50.192 0.16 2.98 DUCHA
SEGUNDO PISO

CALCULO HIDRAULICO EN EL SEGUNDO PISO


ALIMENATDOR 01, ONE ROOM 202

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

T2A - 2B 12 0.38 3/4 1.33 140 1.944 1.256 1.2 4.400 1.95 124.665 0.79 9.08 2B
2B - 2C 12 0.38 3/4 1.33 140 0.324 0.324 2.20 124.665 0.31 8.76 2C
2C - 2D 6 0.25 3/4 0.88 140 0.518 0.518 0.15 57.456 0.04 8.72 2D
2D - 2E 3 0.12 1/2 0.95 140 0.518 0.518 0.35 106.268 0.09 8.63 2E
2E - LAV 3 0.12 1/2 0.95 140 0.648 1.256 1.904 1.55 106.2679 0.37 7.26 LAV.
2D - THE. 3 0.12 1/2 0.95 140 0.648 1.256 1.904 2.35 106.268 0.45 6.38 THE
2C - 2F 6 0.25 3/4 0.88 140 1.944 0.718 1.256 3.918 2.30 57.456 0.36 8.40 2F
2F - 2W 5 0.23 3/4 0.81 140 0.518 0.518 0.40 49.243 0.05 8.36 2W
2W - DUCHA 2 0.08 1/2 0.63 140 0.324 0.324 2.30 50.192 0.13 6.43 DUCHA

CALCULO HIDRAULICO EN EL SEGUNDO PISO


ALIMENATDOR 02, ONE ROOM 201

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

T2A - T2 52 1.15 1 1/4 1.45 140 0.518 0.518 0.40 80.544 0.07 9.68 T2
T2 - 2B 26 0.67 1 1.32 140 1.944 0.518 1.256 3.718 1.70 87.800 0.48 9.21 2B
2B - 2C 26 0.67 1 1.32 140 0.324 0.324 5.35 87.800 0.50 8.71 2C
2C - 2D 14 0.42 1 0.83 140 0.518 0.518 2.80 37.006 0.12 8.59 2D
2D - LAV 3 0.12 1/2 0.95 140 0.518 1.256 1.774 1.00 106.2679 0.29 7.29 LAV.
2D - 2E 11 0.36 3/4 1.26 140 0.648 0.648 2.90 112.799 0.40 8.19 2E
2E - 2F 8 0.29 3/4 1.02 140 0.518 0.518 0.60 75.610 0.08 8.10 2F
2F - 2G 5 0.23 3/4 0.81 140 0.518 0.518 1.00 49.243 0.07 8.03 2G
CALCULO HIDRAULICO EN EL SEGUNDO PISO
ALIMENATDOR 03, DEPARTAMENTO 201

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

T2A - T2 52 1.15 1 1/4 1.45 140 0.518 0.518 0.40 80.544 0.07 9.00 T2
T2 - 2B 26 0.67 1 1.32 140 1.944 0.518 1.256 3.718 1.70 87.800 0.48 8.52 2B
2B - 2C 26 0.67 1 1.32 140 0.324 0.324 5.35 87.800 0.50 8.02 2C
2C - 2D 17 0.48 1 0.95 140 0.518 0.518 0.25 47.375 0.04 7.99 2D
2D - THE 5 0.23 3/4 0.81 140 0.324 0.518 1.256 2.098 2.20 49.24264 0.21 6.77 THE
2D - 2E 12 0.38 3/4 1.33 140 0.324 0.518 0.842 2.05 124.665 0.36 7.63 2E
2E - 2F 6 0.25 3/4 0.88 140 1.944 0.518 1.256 3.718 3.60 57.456 0.42 7.21 2F
2F - 2Fa 5 0.23 3/4 0.81 140 0.518 0.518 0.35 49.243 0.04 7.16 2Fa
2Fa - 2Fb 2 0.08 1/2 0.63 140 0.324 0.324 0.85 50.192 0.06 7.10 2Fb
2E - 2G 6 0.25 3/4 0.88 140 1.944 0.518 1.256 3.718 1.95 57.456 0.33 7.30 2G
2G - 2Ga 3 0.12 1/2 0.95 140 0.518 0.518 0.75 106.268 0.13 7.17 2Ga
2Ga - 2Gb 2 0.08 1/2 0.63 140 0.324 0.324 0.65 50.192 0.05 7.12 2Gb
CALCULO HIDRAULICO EN EL SEGUNDO PISO
ALIMENATDOR 03, DEPARTAMENTO 202

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

T2A - T2 52 1.15 1 1/4 1.45 140 0.518 0.518 0.40 80.544 0.07 9.00 T2
T2 - 2B 26 0.67 1 1.32 140 1.944 0.518 1.256 3.718 1.70 87.800 0.48 8.52 2B
2B - 2C 26 0.67 1 1.32 140 0.324 0.324 5.50 87.800 0.51 8.01 2C
2C - 2D 14 0.42 1 0.83 140 0.518 0.518 2.80 37.006 0.12 7.89 2D
2D - LAV 3 0.12 1/2 0.95 140 0.518 1.256 1.774 1.00 106.2679 0.29 6.59 LAV
2D - 2E 11 0.36 3/4 1.26 140 0.648 0.648 2.90 112.799 0.40 7.49 2E
2E - 2F 8 0.29 3/4 1.02 140 0.518 0.518 0.60 75.610 0.08 7.40 2F
2F - 2G 5 0.23 3/4 0.81 140 0.518 0.518 1.00 49.243 0.07 7.33 2G
2C - 2H 12 0.38 3/4 1.33 140 0.518 0.518 0.55 124.665 0.13 7.88 2H
2H - 2Ha 6 0.25 3/4 0.88 140 1.944 0.518 1.256 3.718 1.40 57.456 0.29 7.58 2Ha
2Ha - 2Hb 5 0.23 3/4 0.81 140 0.518 0.518 0.50 49.243 0.05 7.53 2Hb
2Hb - 2Hc 2 0.08 1/2 0.63 140 0.324 0.324 0.95 50.192 0.06 7.47 2Hc
2Hc - DUCHA 2 0.08 1/2 0.63 140 0.648 0.648 2.10 50.192 0.14 5.53 DUCHA
2H - 2J 6 0.25 3/4 0.88 140 0.518 0.518 1.65 57.456 0.12 7.75 2J
2J - 2Ja 6 0.25 3/4 0.88 140 1.944 0.518 1.256 3.718 1.20 57.456 0.28 7.47 2Ja
2Ja - 2Jb 5 0.23 3/4 0.81 140 0.518 0.518 0.50 49.243 0.05 7.42 2Jb
2Jb - 2Jc 2 0.08 1/2 0.63 140 0.518 0.518 0.95 50.192 0.07 7.35 2Jc
2Jc - DUCHA 2 0.08 1/2 0.63 140 0.648 0.648 2.55 50.192 0.16 5.38 DUCHA
PRIMER PISO

CALCULO HIDRAULICO EN EL PRIMER PISO


ALIMENATDOR 01, ONE ROOM 102

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

T1A - 1B 12 0.38 3/4 1.33 140 1.944 1.256 1.2 4.400 1.95 124.665 0.79 11.98 1B
1B - 1C 12 0.38 3/4 1.33 140 0.324 0.324 2.20 124.665 0.31 11.66 1C
1C - 1D 6 0.25 3/4 0.88 140 0.518 0.518 0.15 57.456 0.04 11.62 1D
1D - 1E 3 0.12 1/2 0.95 140 0.518 0.518 0.35 106.268 0.09 11.53 1E
1E - LAV 3 0.12 1/2 0.95 140 0.648 1.256 1.904 1.55 106.2679 0.37 10.16 LAV.
1D - THE. 3 0.12 1/2 0.95 140 0.648 1.256 1.904 2.35 106.268 0.45 9.28 THE
1C - 1F 6 0.25 3/4 0.88 140 1.944 0.718 1.256 3.918 2.30 57.456 0.36 11.30 1F
1F - 1W 5 0.23 3/4 0.81 140 0.518 0.518 0.40 49.243 0.05 11.26 1W
1W - DUCHA 2 0.08 1/2 0.63 140 0.324 0.324 2.30 50.192 0.13 9.33 DUCHA

CALCULO HIDRAULICO EN EL PRIMER PISO


ALIMENATDOR 02, ONE ROOM 101

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

T1A - T1 52 1.15 1 1/4 1.45 140 0.518 0.518 0.40 80.544 0.07 12.58 T1
T1 - 1B 26 0.67 1 1.32 140 1.944 0.518 1.256 3.718 1.70 87.800 0.48 12.11 1B
1B - 1C 26 0.67 1 1.32 140 0.324 0.324 5.35 87.800 0.50 11.61 1C
1C - 1D 14 0.42 1 0.83 140 0.518 0.518 2.80 37.006 0.12 11.49 1D
1D - LAV 3 0.12 1/2 0.95 140 0.518 1.256 1.774 1.00 106.2679 0.29 10.19 LAV.
1D - 1E 11 0.36 3/4 1.26 140 0.648 0.648 2.90 112.799 0.40 11.09 1E
1E - 1F 8 0.29 3/4 1.02 140 0.518 0.518 0.60 75.610 0.08 11.00 1F
1F - 1G 5 0.23 3/4 0.81 140 0.518 0.518 1.00 49.243 0.07 10.93 1G
CALCULO HIDRAULICO EN EL PRIMER PISO
ALIMENATDOR 02, ONE ROOM 103

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

T1A - T2A 24 0.61 1 1.20 140 0.324 0.324 3.70 73.810 0.30 12.01 T2A
T2A - 1B 12 0.38 3/4 1.33 140 1.944 0.518 1.256 3.718 6.50 124.665 1.27 10.74 1B
1B - 1C 6 0.25 3/4 0.88 140 0.324 0.518 0.842 2.85 57.456 0.21 10.52 1C
1C - 1D 3 0.12 1/2 0.95 140 0.518 0.518 1.25 106.268 0.19 10.34 1D
1D - THE 3 0.12 1/2 0.95 140 0.324 0.324 1.80 106.2679 0.23 9.11 THE
1B - 1E 6 0.25 3/4 0.88 140 1.944 0.518 2.462 3.45 57.456 0.34 10.40 1E
1E - 1F 5 0.23 3/4 0.81 140 0.518 0.518 0.80 49.243 0.06 10.33 1F
1F - 1G 2 0.08 1/2 0.63 140 0.324 0.324 0.35 50.192 0.03 10.30 1G

CALCULO HIDRAULICO EN EL PRIMER PISO


ALIMENATDOR 02, ONE ROOM 104

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

T1A - T2A 24 0.61 1 1.20 140 0.324 0.324 3.70 73.810 0.30 12.36 T2A
T2A - 1B 12 0.38 3/4 1.33 140 1.944 0.518 1.256 3.718 5.90 124.665 1.20 11.16 1B
1B - 1C 6 0.25 3/4 0.88 140 0.518 0.518 2.65 57.456 0.18 10.98 1C
1C - 1D 3 0.12 1/2 0.95 140 0.518 0.518 1.80 106.268 0.25 10.73 1D
1D - LAV 3 0.12 1/2 0.95 140 0.324 0.324 1.00 106.2679 0.14 9.59 LAV
1B - 1E 6 0.25 3/4 0.88 140 1.944 0.518 1.256 3.718 2.50 57.456 0.36 10.80 1E
1E - 1F 5 0.23 3/4 0.81 140 0.518 0.518 0.50 49.243 0.05 10.75 1F
CALCULO DE MONTANTES DE DESAGUE

MONTANTE N 1
TOTAL POR TOTAL EN LA DIAMETRO
NIVEL
PISO MONTANTE (Pulg)
5 3
4 12 3 4
3 12 15 4
2 12 27 4
1 3 39 4
42 4

MONTANTE N 2
TOTAL POR TOTAL EN LA DIAMETRO
NIVEL
PISO MONTANTE (Pulg)
5 6
4 7 6 4
3 7 13 4
2 7 20 4
1 0 27 4
27 4

MONTANTE N 3
TOTAL POR TOTAL EN LA DIAMETRO
NIVEL
PISO MONTANTE (Pulg)
5 12
4 12 12 4
3 12 24 4
2 12 36 4
1 0 48 4
48 4

MONTANTE N 4
TOTAL POR TOTAL EN LA DIAMETRO
NIVEL
PISO MONTANTE (Pulg)
5 7
4 7 7 4
3 7 14 4
2 7 21 4
1 3 28 4
31 4
Usar
C= 150 Hf= (Long. Tub + Long. Equiv.) x pendiente / 1000

Q 1.85
S=
0.000426 x C x D^2.63

presion= 5
V= 1,974 x Q
D
CUADRO DE CALCULOS HIDRAULICOS

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (m)

A-B 9 0.32 3/4 1.12 150 0.777 0.777 2.35 79.844 0.25 4.75 B
B-C 3 0.12 1/2 0.95 150 0.532 1.554 2.086 1.45 93.534 0.33 4.42 C
C - Lav. Plato 3 0.12 1/2 0.95 150 0.532 5.909 6.441 0.50 93.534 0.65 3.77 Lav. Plat
B-E 6 0.25 3/4 0.88 150 3.108 1.554 8.638 0.328 13.628 3.20 50.571 0.85 2.92 E
E-D 1 0.04 1/2 0.32 150 1.554 1.554 0.4 12.255 0.02 2.90 D
D- Lav. Cara 1 0.04 1/2 0.32 150 1.064 1.064 0.50 12.255 0.02 2.88 Lav. Cara
E-F 5 0.23 3/4 0.81 150 1.554 1.554 0.15 43.342 0.07 2.80 F
F - Inodoro 3 0.12 1/2 0.95 150 0.532 1.554 2.086 0.30 93.534 0.22 2.58 Inodoro
F-G 2 0.08 1/2 0.63 150 1.554 1.554 0.95 44.178 0.11 2.47 G
G - Ducha 2 0.08 1/2 0.63 150 1.064 5.909 6.973 1.80 44.178 0.39 2.08 Ducha

Nota: en el plano Isometrico colocar los caudales de diseo, y en el plano de planta colocar los diametros comerciales que se instalaran de
acuerdo a sus resulatado

es importante colocar en el cuadro de calculos las presiones en los puntos


CALCULO HIDRAULICO PARA EL BAO DEL 4 NIVEL

Q 1.85
S=
0.000426 x C x D^2.63

V= 1,974 x Q
D

PRESION EN EL PISO= NIVEL DE TANQUE ELEVADO - NIVEL DEL PISO


PRESION EN EL PISO= 12.8

CUADRO DE CALCULOS HIDRAULICOS

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (mca)

A-B 46 1.03 1 1/4 1.30 150 3.109 3.109 2.50 57.817 0.32 12.48 B
B-C 22 0.58 1 1/4 0.73 150 1.295 3.109 0.328 0.656 5.388 5.40 19.982 0.22 12.26 C
C-D 20 0.54 1 1/4 0.68 150 3.109 3.109 1.40 17.508 0.08 12.18 D
D-E 18 0.50 1 1/4 0.63 150 3.109 3.109 1.40 15.185 0.07 12.11 E
E-F 16 0.46 1 1/4 0.58 150 3.109 3.109 1.80 13.014 0.06 12.05 F
F- G 8 0.29 1 1/4 0.37 150 3.109 3.109 1.45 5.543 0.03 12.02 G
CALCULO HIDRAULICO PARA EL BAO DEL 3 NIVEL

Q 1.85
S=
0.000426 x C x D^2.63

V= 1,974 x Q
D

PRESION EN EL PISO= NIVEL DE TANQUE ELEVADO - NIVEL DEL PISO


PRESION EN EL PISO= 16.3

CUADRO DE CALCULOS HIDRAULICOS

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (mca)

A-B 46 1.03 1 1/4 1.30 150 3.109 3.109 2.50 57.817 0.32 15.98 B
B-C 22 0.58 1 1/4 0.73 150 1.295 3.109 0.328 0.656 5.388 5.40 19.982 0.22 15.76 C
C-D 20 0.54 1 1/4 0.68 150 3.109 3.109 1.40 17.508 0.08 15.68 D
D-E 18 0.50 1 1/4 0.63 150 3.109 3.109 1.40 15.185 0.07 15.61 E
E-F 16 0.46 1 1/4 0.58 150 3.109 3.109 1.80 13.014 0.06 15.55 F
F- G 8 0.29 1 1/4 0.37 150 3.109 3.109 1.45 5.543 0.03 15.52 G
CALCULO HIDRAULICO PARA EL BAO DEL 2 NIVEL

Q 1.85
S=
0.000426 x C x D^2.63

V= 1,974 x Q
D

PRESION EN EL PISO= NIVEL DE TANQUE ELEVADO - NIVEL DEL PISO


PRESION EN EL PISO= 19.8

CUADRO DE CALCULOS HIDRAULICOS

Q DIAMETRO V LONGITUD EQUIVALENTE ACCESORIOS LONGITUD LONGITUD PENDIENTE Hf PRESION


TRAMO UH C PUNTO
(LPS) (pulg) (m/s) CODOS TEES VLVULA OTROS EQUIVAL. TUBERIA (m/km) (m) (mca)

A-B 46 1.03 1 1/4 1.30 150 3.109 3.109 2.50 57.817 0.32 19.48 B
B-C 22 0.58 1 1/4 0.73 150 1.295 3.109 0.328 0.656 5.388 5.40 19.982 0.22 19.26 C
C-D 20 0.54 1 1/4 0.68 150 3.109 3.109 1.40 17.508 0.08 19.18 D
D-E 18 0.50 1 1/4 0.63 150 3.109 3.109 1.40 15.185 0.07 19.11 E
E-F 16 0.46 1 1/4 0.58 150 3.109 3.109 1.80 13.014 0.06 19.05 F
F- G 8 0.29 1 1/4 0.37 150 3.109 3.109 1.45 5.543 0.03 19.02 G