B-199 Barka 3 IPP projects BOQ Item Al Hassan

AL HASSAN ENGINEERING CO. SAOG

WAREHOUSE & OFFICE BUILDING AT NIZWA INDUSTRIAL ESTATE

Area DESCRIPTION Special Note UNIT Rate $ QTY Amount Remarks Pump Room

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH FROM M3 4.58 1,925.00 260.62
0002-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH MOR M3 13.36 43.44 43.44
0003-00 SELECTED EXCAVATED SOIL M3 7.05 195.69 195.69
0004-00 DISPOSAL M3 3.12 1,480.19 108.36
0005-00 CRUSH STONE M3 22.54 43.27 -
BUILDING WORK - 0101 REINFORCED CONCRETE WORK -
0001-00 PE FILM(THK 0.15, 2PLY) DAMP PROOF C M2 1.14 1,214.63 41.36
0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa M3 162.66 122.54 4.14
0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUB STRUCT M3 173.73 473.53 41.17
0004-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUPERSTRU M3 179.97 193.37 2.92
0005-00 HIGH YIELD DEFORMED BAR BS 4449 G460 Y TN 1003.4 116.11 7.06
0006-00 HIGH YIELD DEFORMED BAR / EPOXY COATED BS 4449 G460 Y TN 1135.4 0.15 0.15
" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT
0007-00 M2 19.42 1,799.55 186.76
PLINTH AND FLOOR OPENING) "

" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT


0008-00 PIPE SUPPORT M2 22.52 1,632.10 24.30
PLINTH AND FLOOR OPENING) "
0009-00 NORMAL FACED FORM (FOR HIDDEN SURFACE) PIPE SUPPORT M2 18.1 3.36 -
0010-00 WATERSTOP W=200 PVC TYPE(THK. MZ 6.42 72.00 23.20
0011-00 FIBRE REINFORCED BITUMEN COATING M2 174.24 -
0012-00 ANTITERMITE TREATMENT M2 562.84 -
0013-00 EPOXY MORTAR FINISH TO CONCRETE BENCHING AS PER SPECIFICATION M3 5.28 -
0014-00 POLYESTER PROTECTIVE RESIN NITOCOTE PE13 M2 14.77 912.10 86.62
0015-00 HYPOSEAL SUPER WATER PROOFER TO CO M2 260.00 114.00
BUILDING WORK - 0101 STEEL STRUCTURE WORK -
0001-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 200 TN 3.20 -
0002-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 200 TN 16.56 -
only erection
0003-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 200 TN 17.93 -
rate
0007-00 ANCHOR BOLT (M24, L=700) STEEL : ASTM A EA 56.00 -

1/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan
only erection
Area DESCRIPTION Special Note UNIT Rate $ QTY Amount rate
Remarks Pump Room

0008-00 ANCHOR BOLT (M30, L=900) STEEL : ASTM A EA 16.00 -


BUILDING WORK - 0101 MASONRY WORK -
0002-00 8" BLOCK WALL 8" BLOCK WALL M2 24.43 1,773.06 28.72
0003-00 4.5" BLOCK WALL TYPE A AS PER M2 16.48 56.37 -
BUILDING WORK - 0102 PLASTER WORK -
0001-00 EXTERIOR CEMENT PLASTER FOR WALL, THK. 24mm M2 6.16 1,402.62 46.32
0002-00 INTERIOR CEMENT PLASTER FOR WALL, THK. 18mm M2 6.6 2,137.51 29.28
BUILDING WORK - 0103 PAINTING WORK -
0001-00 1 COAT OF PRIMER + 2 COATS OF MEDIUM TEXTURE PAINT FOR EXT. WALL M2 13.52 1,377.82 54.00
0002-00 1 COAT OF PRIMER + 2 OF ACRYLIC EMULSION PAINT FOR INT. WALL & CEILING M2 9.44 2,130.80 38.28
0003-00 CONCRETE FLOORING(EMERY TOP FLOORING (5Kg/m2)) FOR RAMP. FLOOR M2 - -
BUILDING WORK - 0105 FLOORING & TILING WORK -
0001-00 SINGLE PIECE GRANITE RISER & THREAD M2 9.37 -
0002-00 20MM THK 200MM WIDE GRANITE STRIPS M2 7.20 -
0003-00 600 X 300 X 20MM GRANITE FLOOR TILES M2 7.20 -
0004-00 400 X 400MM CERAMIC TILES M2 402.25 -
0005-00 8mm THK RUBBER MAT ABOVE 400 X 400 X 28mm TERRAZZO TILES M2 58.42 25.76
0006-00 200 X 200mm NON SLIPPERY VITRIFIED CERAMIC TILES M2 53.67 -
0007-00 30mm THK SINGLE PIECE OMANI MARBLE RISER AND TREAD M2 45.36 -
0008-00 300 X 300mm WHITE CEMENT ROOF TILES M2 747.07 -
0009-00 200 x 300mm Fully glazed ceramic wall tiles 351.00
BUILDING WORK - 0106 INTERIOR WORK -
0001-00 GYPSUM BOARD FALSE CEILING SIZE : 600 x 600 M2 30.1 239.58 -
0002-00 CEILING W/ PVC STRIP W 100mm M2 31.12 - -
BUILDING WORK - 0107 PANEL & ROOF WORK -
0001-00 " 26 GA.GI COLOUR COATED PROFILE ROOF SHEET FOR ROOF" M2 617.74 -
0002-00 " 26 GA.GI COLOUR COATED PROFILE ROOF SHEET FOR WALL" M2 827.89 -
0003-00 TRANSUSCENT SKY LIGHT ROOF SHEET TYP. 1.50M X 1.0M MZ 18.00 -
0007-00 ROOF DRAIN 150 CAST IRON EA 1.00 1.00
0009-00 DOWN SPOUT 150 CAST IRON MZ 3.00 3.00
0011-00 CANOPY W:1000 MZ 12.00 -
BUILDING WORK - 0108 DOOR & WINDOW WORK -
0001-00 DOOR TYPE - SD HEAVY DUTY M.S EA 1.00 1.00

2/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate $ QTY Amount Remarks Pump Room

0002-00 DOOR TYPE - D 44MM.THK. COMM EA 4.00 -


0003-00 DOOR TYPE - D1 44MM.THK DECOREA 5.00 -
0004-00 DOOR TYPE - D2 44MM. THK.SEMI EA 2.00 -
0005-00 DOOR TYPE - D3 44MM. THK.SEMI EA 8.00 -
0006-00 DOOR TYPE - D4 44MM. THK.SEMI EA 3.00 -
0007-00 DOOR TYPE - D5 44MM.THK. COMM EA 3.00 -
0008-00 DOOR TYPE - D6 44MM. THK.SEMI EA 2.00 -
0009-00 DOOR TYPE - D7 44MM. THK.SEMI EA 1.00 -
0010-00 WINDOW TYPE - W1 POWER COATED AEA 10.00 -
0011-00 WINDOW TYPE - W2 POWER COATED AEA 21.00 -
0012-00 M.S. Flat Gate (1200 x 1800) EA 1.00 -
BUILDING WORK - 0102 MISC METAL WORK -
0001-00 MISC. STEEL WORK GALVANIZED(COATN 2577.7 1.54 -
0003-00 CHECKERED PLATE THK. 6mm GALVANIZED(COAM2 31.8 16.80 -
0004-00 STEEL CAGE LADDER GALVANIZED(COAMZ 17.68 3.10 only erection 3.10
0005-00 STEEL PIPE HANDRAIL GRIP : I.D.50mm MZ 10.45 7.78 rate -
0006-00 STAINLESS PIPE HANDRAIL GRIP : I.D.50mm MZ
(600x600)/ 29.41 1.80 -
0007-00 HEAVY DUTY DOUBLE SEAL C.I. COVER WITH FRAME (800x800) EA 168.4
Building WORK - 0110 ROAD AND PAVING WORKS -
0001-00 WEARING COURSE with tack coating M2 6.2 7,661.00 -
0002-00 ASPHALT BINDER COURSE with prime coatin M2 9.28 7,661.00 -
0003-00 BASE COURSE T=200mm Granula M3 16.9 1,532.20 -
0004-00 SUBBASE COURSE T=200 mm Grushe M3 19.5 1,532.20 -
0005-00 FORMATION LEVEL COMPACTION 95% Density ; do M2 2.6 10,200.31 -
0006-00 PC CURB STONE 180x210x300x10 MZ 13.83 224.30 -
0007-00 P.E FILM Minimun 0.15mm p M2 1.17 67.29 -
0008-00 PRECAST CONC BLOCK PAVING 100mm thick to c M2 22.49 2,539.31 -
0009-00 SAND FILLING M3 11.5 290.53 -
GRAND TOTAL in OMR

3/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Pipe Electric Office/gener


Road Guard Substation off/Electrical Holding tank
workshop room al

- 53.25 242.79 38.29 72.12 74.36 645.59 537.98


- - - - - - - -
- - - - - - - -
- 53.25 242.79 38.29 72.12 74.36 645.59 245.43
- 3.17 36.60 3.50 - - - -
- - - - - - - -
67.29 47.88 620.26 22.23 110.43 23.20 150.42 131.56
6.73 6.04 62.03 2.05 11.04 2.32 15.04 13.16
- 9.25 112.70 6.36 35.32 5.96 156.82 105.96
- 6.90 - - 60.35 8.66 114.52 -
- 2.58 27.96 0.50 15.31 2.34 43.41 16.95
- - - - - - - -

- 37.04 101.36 - 204.61 88.36 436.70 744.72

- 53.92 - 57.68 526.15 - 970.05 -

- - - 3.36 - - - -
- - - - - - - 48.80
- - - - - - - 174.24
- 21.16 541.68 - - - - -
- - - - - - - 5.28
- 71.04 101.36 - 532.44 60.32 - 60.32
- - - - - - - 146.00
- - - - - - - -
- - 3.20 - - - - -
- - 16.56 - - - - -
- - 17.93 - - - - -
- - 56.00 - - - - -

4/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Pipe Electric Office/gener


Road Guard Substation off/Electrical Holding tank
workshop room al
- - 16.00 - - - - -
- - - - - - - -
- 73.08 - 44.46 672.40 63.52 890.88 -
- 10.65 - - 23.00 - 22.72 -
- - - - - - - -
- 104.76 - 60.12 357.16 130.64 703.62 -
- 69.33 - 56.28 421.28 98.16 1,336.46 126.72
- - - - - - - -
- 104.76 - 60.12 357.16 98.16 703.62 -
- 90.49 - 60.12 477.29 128.16 1,336.46 -
- - - - - - - -
- - - - - - - -
- - - - 5.04 1.72 2.62 -
- - - - - - 7.20 -
- - - - - - 7.20 -
- 17.67 - - 149.66 - 234.92 -
- - - - - 18.00 14.66 -
- 5.85 - - 22.51 - 25.31 -
- - - - 23.61 - 21.75 -
- 21.16 - - 240.00 30.00 455.91 -
117.00 117.00 - 117.00 -
- - - - - - - -
- 25.00 - - 214.58 - - -
- - - - - - - -
- - - - - - - -
- - 617.74 - - - - -
- - 827.89 - - - - -
- - 18.00 - - - - -
- - - - - - - -
- - - - - - - -
- - 12.00 - - - - -
- - - - - - - -
- - - - - - - -

5/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Pipe Electric Office/gener


Road Guard Substation off/Electrical Holding tank
workshop room al
- - 2.00 - - - 2.00 -
- - - - 2.00 1.00 2.00 -
- - - - 2.00 - - -
- - - - 6.00 - 2.00 -
- - - - 1.00 - 2.00 -
- - - - 2.00 - 1.00 -
- - - - - - 2.00 -
- - - - 1.00 - - -
- - - - 9.00 - 1.00 -
- - - - 1.00 - 20.00 -
- - - - - - 1.00 -
- - - - - - - -
- - 0.54 1.00 - - - -
- - - - - 16.80 - -
- - - - - - - -
- - - - 7.78 - - -
- - - - 1.80 - - -
2.00
- - - - - - -
7,661.00 - - - - - - -
7,661.00 - - - - - - -
1,532.20 - - - - - - -
1,532.20 - - - - - - -
10,200.31 - - - - - - -
224.30 - - - - - - -
67.29 - - - - - - -
2,539.31 - - - - - - -
253.93 - 36.60 - - - - -

6/216
Project : WareHouse & Office Building at Nizwa Industrial Room

Title : Guard Room & Electrical Room

Sl.No DESCRIPTION Nos Length width

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATI

Total
0002-00 SOIL EXCAVATION BY MACHINE FOR FOUNDAT

Total
0003-00 SELECTED EXCAVATED SOIL

Total
0004-00 DISPOSAL

Total
0005-00 CRUSH STONE

Total
BUILDING WORK - 0101 REINFORCED CONCRETE WORK
0001-00 PE FILM(THK 0.15, 2PLY)

0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa

0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa

0004-00 " REINF. CONCRETE CUBE STRENGTH 35MPa

0005-00 HIGH YIELD DEFORMED BAR

0006-00 HIGH YIELD DEFORMED BAR / EPOXY COATED

" FAIR FACED FORM (FOR FAIR FACED


0007-00 SURFACE, EQUIPMENT PLINTH AND FLOOR
OPENING) "
" FAIR FACED FORM (FOR FAIR FACED
0008-00 SURFACE, EQUIPMENT PLINTH AND FLOOR
OPENING) "

0009-00 NORMAL FACED FORM (FOR HIDDEN SURFACE

0010-00 WATERSTOP W=200

0011-00 WATER PROOFING SHEET

0012-00 ANTITERMITE TREATMENT

0013-00 PROTECTION BOARD

0014-00 POLYESTER PROTECTIVE RESIN

0015-00 HYPOSEAL SUPER WATER

BUILDING WORK - 0101 STEEL STRUCTURE WORK


0001-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP

0002-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (

0003-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61

0004-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP

0005-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (

0006-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61

0007-00 ANCHOR BOLT (M24, L=700)


0008-00 ANCHOR BOLT (M30, L=900)

0009-00 NON-SHRINKAGE GROUT

0010-00 DECK PLATE - THK.1.6mm (Including stud bolt)

0011-00 Additional Items : STRUCTURAL STEEL (ROLL-S

0012-00 Additional Items : STRUCTURAL STEEL (ROLL-SH

0013-00 Additional Items: STRUCTURAL STEEL (BUILT-UP

0014-00 Additional Items : ANCHOR BOLT (M36, L=1080)

0015-00 Additional Items : STAIR TREAD

BUILDING WORK - 0101 MASONRY WORK


0001-00 INSULATED BLOCK WALL

0002-00 8" BLOCK WALL

0003-00 4.5" BLOCK WALL

BUILDING WORK - 0102 PLASTER WORK


0001-00 EXTERIOR CEMENT PLASTER FOR WALL, THK.

0002-00 INTERIOR CEMENT PLASTER FOR WALL, THK.

0003-00 INTERIOR CEMENT PLASTER FOR CEILING, TH


BUILDING WORK - 0103 PAINTING WORK
0001-00 1 COAT OF PRIMER + 2 COATS OF MEDIUM TEX

0002-00 1 COAT OF PRIMER + 2 OF ACRYLIC EMULSION P

0003-00 CONCRETE FLOORING(EMERY TOP FLOORING (5

BUILDING WORK - 0105 FLOORING & TILING WORK


0001-00 CERAMIC TILES

0002-00 NON SLIPPERY VITRIFIED CERAMIC TILES

0003-00 GRANITE FLOOR TILES

0004-00 SINGLE PIECE TERRAZZO RISER & THREAD

0005-00 SINGLE PIECE OMANI MARBKLE RISER AND TR

0006-00 TERRAZZO TILES

0007-00 WHITE CEMENT ROOF TILES

0008-00 300 X 300mm WHITE CEMENT ROOF TILES

BUILDING WORK - 0106 INTERIOR WORK


0001-00 CEILING W/ ACOUSTIC BOARD

0002-00 CEILING W/ PVC STRIP

BUILDING WORK - 0107 PANEL & ROOF WORK


0001-00 " THERMAL INSULATED TRAPEZOIDAL CLADDIN
0002-00 " THERMAL INSULATED TRAPEZOIDAL CLADDI

0003-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING F

0004-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FO

0005-00 GUTTER FLASHING

0006-00 ROOF DRAIN 100

0007-00 ROOF DRAIN 150

0008-00 DOWN SPOUT 100

0009-00 DOWN SPOUT 150

0010-00 SPLASH BLOCK

0011-00 CANOPY W:1000

BUILDING WORK - 0108 DOOR & WINDOW WORK


0001-00 a) FIRE RESIST. SINGLE STEEL DOOR 1.02.2(2

0002-00 b) FIRE RESIST. DOUBLE STEEL DOOR 2.02.2(

0003-00 a) NORMAL SINGLE STEEL DOOR 1.02.2

0004-00 b) NORMAL DOUBLE STEEL DOOR 2.02.2


0005-00 c) NORMAL DOUBLE STEEL DOOR 2.42.6

0006-00 d) NORMAL SINGLE STEEL DOOR 0.752.2

0007-00 b) TEMPERED GLASS DOOR W/STAINLESS STE

0008-00 a) ROLL-UP SHUTTER 3.03.0

0009-00 b) ROLL-UP SHUTTER 4.05.0

0010-00 c) ROLL-UP SHUTTER 3.04.0 (FIRE PROOF)

0011-00 d) ROLL-UP SHUTTER 4.05.0 (FIRE PROOF)

0012-00 e) ROLL-UP SHUTTER 6.07.0 (FIRE PROOF)

0013-00 MASKER-KEY SYSTEM

0014-00 ALUMINIUM WINDOW (1.2H Unit) / Double Sliding

0015-00 ALUMINIUM WINDOW (1.2H Unit) / Fixed Type

0016-00 ALUMINIUM LOUVER

BUILDING WORK - 0101 TEMPORARY WORK

0001-00 BATTER BOARD

0002-00 SITE & HOUSING CLEANING

BUILDING WORK - 0102 MISC METAL WORK


0001-00 MISC. STEEL WORK

0002-00 STEEL GRATING T532

0003-00 CHECKERED PLATE THK. 6mm

0004-00 STEEL CAGE LADDER

0005-00 STEEL PIPE HANDRAIL

0006-00 STAINLESS PIPE HANDRAIL

0007-00 CHAIN LINK FENCE H=2.5m

BUILDING WORK - 0103 MISCELLANEOUS WORK


0001-00 ISOLATION JOINT THK. 50mm

0002-00 ISOLATION JOINT THK. 12mm

0003-00 CONTRACTION JOINT THK. 1212 FOR FLOOR

0006-00 SIGN BOARD FOR BUILDING

0007-00 SIGN BOARD FOR ROOM

BUILDING WORK - 0104 SANITARY FIXTURES


0001-00 WATER CLOSET (WESTERN STYLE)

0002-00 URINAL

0003-00 WASH BASIN


0004-00 SOAP DISPENSER

0005-00 LAVATORY SINK

0006-00 PAPER HOLDER FOR WATER CLOSET

0007-00 b)MIRROR 1.7*1.5

0008-00 TOWEL HOLDER

0009-00 KITCHENETTE UNIT

0010-00 SHOWER CUBICLE

0011-00 ELETRICAL HAND DRYER

Building WORK - 0110 ROAD AND PAVING WORKS


0001-00 Wearing course

0002-00 Asphalt Binder course

0003-00 Base course

0004-00 Subbase course

0005-00 Formation Level Compaction

0006-00 PC Curb Stone


0007-00 P.E Film

0008-00 Precast concrete block paving

0009-00 Sand Fill M3

Prepared by Arunkumar.G (Emp.14326) Qunatity Surveyor


Depth Qty Remarks Unit

0.00 M3

0.00 M3

0.00 M3

0.00 M3

0.00 M3

0.00 M2

0.00 M3

0.00 M3

0.00 M3

0.00 TN

0.00 TN

0.00 M2
0.00 M2

0.00 M2

0.00 MZ

0.00 M2

0.00 M2

0.00 M2

0.00 M2

0.00 M2

0.00 TN

0.00 TN

0.00 TN

0.00 TN

0.00 TN

0.00 TN
0.00 EA

0.00 EA

0.00 M3

0.00 M2

0.00 TN

0.00 TN

0.00 TN

0.00 EA

0.00 M2

0.00 M2

0.00 M2

0.00 M2

0.00 M2

0.00 M2
0.00 M2

0.00 M2

0.00 M2

0.00 M2

0.00 M2

0.00 M2

0.00 M2

0.00 MZ

0.00 MZ

0.00 M2

0.00 MZ

0.00 M2

0.00 M2

0.00 M2
0.00 M2

0.00 M2

0.00 M2

0.00 M2

0.00 MZ

0.00 EA

0.00 EA

0.00 MZ

0.00 MZ

0.00 EA

0.00 MZ

0.00 EA

0.00 EA

0.00 EA

0.00 EA
0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 LO

0.00 M2

0.00 M2

0.00 M2

0.00 M2

0.00 M2
0.00 TN

0.00 M2

0.00 M2

0.00 MZ

0.00 MZ

0.00 MZ

0.00 MZ

0.00 M2

0.00 MZ

0.00 MZ

0.00 EA

0.00 EA

0.00 EA

0.00 EA
0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 M2

0.00 M2

0.00 M3

0.00 M3

0.00 M2

0.00 MZ
0.00 M2

0.00 M2

0.00 M3

ity Surveyor
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH FROM M3 260.62
0002-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH MOR M3 43.44
0003-00 SELECTED EXCAVATED SOIL M3 195.69
0004-00 DISPOSAL M3 108.36
0005-00 CRUSH STONE M3 -
BUILDING WORK - 0101 REINFORCED CONCRETE WORK
0001-00 PE FILM(THK 0.15, 2PLY) DAMP PROOF C M2 41.36
0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa M3 4.14
0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUB STRUCT M3 41.17
0004-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUPERSTRU M3 2.92
0005-00 HIGH YIELD DEFORMED BAR BS 4449 G460 Y TN 7.06
0006-00 HIGH YIELD DEFORMED BAR / EPOXY COATED BS 4449 G460 Y TN 0.15
" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT
0007-00 M2 186.76
PLINTH AND FLOOR OPENING) "

" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT


0008-00 PIPE SUPPORT M2 24.30
PLINTH AND FLOOR OPENING) "
0009-00 NORMAL FACED FORM (FOR HIDDEN SURFACE) PIPE SUPPORT M2 -
0010-00 WATERSTOP W=200 PVC TYPE(THK. MZ 23.20
0011-00 FIBRE REINFORCED BITUMEN COATING M2 -
0012-00 ANTITERMITE TREATMENT M2 -
0013-00 EPOXY MORTAR FINISH TO CONCRETE BENCHING AS PER SPECIFICATION M3 -
0014-00 POLYESTER PROTECTIVE RESIN NITOCOTE PE13 M2 86.62
0015-00 HYPOSEAL SUPER WATER PROOFER TO CO M2 114.00
BUILDING WORK - 0101 STEEL STRUCTURE WORK
0001-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 200 TN -
0002-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 200 TN -
0003-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 200 TN -
0004-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 320 TN -
0005-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 320 TN -
0006-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 320 TN -
0007-00 ANCHOR BOLT (M24, L=700) STEEL : ASTM A EA -
0008-00 ANCHOR BOLT (M30, L=900) STEEL : ASTM A EA -

25/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0009-00 NON-SHRINKAGE GROUT Fcu= 65N/mm2 A M3 -


0010-00 DECK PLATE - THK.1.6mm (Including stud bolt) GALVANIZED STE M2 -
0011-00 Additional Items : STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM ( DFT : Total 200 TN -
0012-00 Additional Items : STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61 DFT : Total 200 TN -
0013-00 Additional Items: STRUCTURAL STEEL (BUILT-UP) DFT : Total 200 TN -
0014-00 Additional Items : ANCHOR BOLT (M36, L=1080) STEEL : ASTM A EA -
0015-00 Additional Items : STAIR TREAD HOT DIP GALVAN M2 -
BUILDING WORK - 0101 MASONRY WORK
0001-00 INSULATED BLOCK WALL 4" BLOCK (INT) M2 -
0002-00 8" BLOCK WALL TYPE A AS PER M2 28.72
0003-00 4.5" BLOCK WALL TYPE A AS PER M2 -
BUILDING WORK - 0102 PLASTER WORK
0001-00 EXTERIOR CEMENT PLASTER FOR WALL, THK. 24mm M2 46.32
0002-00 INTERIOR CEMENT PLASTER FOR WALL, THK. 18mm M2 29.28
0003-00 INTERIOR CEMENT PLASTER FOR CEILING, THK. 18mm M2 -
BUILDING WORK - 0103 PAINTING WORK
0001-00 1 COAT OF PRIMER + 2 COATS OF MEDIUM TEXTURE PAINT FOR EXT. WALL M2 54.00
0002-00 1 COAT OF PRIMER + 2 OF ACRYLIC EMULSION PAINT FOR INT. WALL & CEILING M2 38.28
0003-00 CONCRETE FLOORING(EMERY TOP FLOORING (5Kg/m2)) FOR RAMP. FLOOR M2 -
BUILDING WORK - 0105 FLOORING & TILING WORK
0001-00 SINGLE PIECE GRANITE RISER & THREAD M2 -
0002-00 20MM THK 200MM WIDE GRANITE STRIPS M2 -
0003-00 600 X 300 X 20MM GRANITE FLOOR TILES M2 -
0004-00 400 X 400MM CERAMIC TILES M2 -
0005-00 8mm THK RUBBER MAT ABOVE 400 X 400 X 28mm TERRAZZO TILES M2 25.76
0006-00 200 X 200mm NON SLIPPERY VITRIFIED CERAMIC TILES M2 -
0007-00 300mm THK SINGLE PIECE OMANI MARBLE RISER AND TREAD M2 -
0008-00 300 X 300mm WHITE CEMENT ROOF TILES M2 -
BUILDING WORK - 0106 INTERIOR WORK
0001-00 GYPSUM BOARD FALSE CEILING SIZE : 600 x 600 M2 -
0002-00 CEILING W/ PVC STRIP W 100mm M2 -
BUILDING WORK - 0107 PANEL & ROOF WORK
0001-00 " THERMAL INSULATED TRAPEZOIDAL CLADDING FOR EXT. WALLTHK. 0.7mm(EXT M2 -

26/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0002-00 " THERMAL INSULATED TRAPEZOIDAL CLADDING FOR ROOF" THK. 0.7mm(EXT M2 -
0003-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FOR ROOF" M2 -
0004-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FOR WALL" M2 -
0005-00 GUTTER FLASHING THK. 1.6mm MZ -
0006-00 ROOF DRAIN 100 CAST IRON EA -
0007-00 ROOF DRAIN 150 CAST IRON EA 1.00
0008-00 DOWN SPOUT 100 GALVANISED ST MZ -
0009-00 DOWN SPOUT 150 CAST IRON MZ 3.00
0010-00 SPLASH BLOCK SIZE : 500x500x EA -
0011-00 CANOPY W:1000 MZ -
BUILDING WORK - 0108 DOOR & WINDOW WORK
0001-00 DOOR TYPE - SD HEAVY DUTY M.S EA 1.00
0002-00 DOOR TYPE - D 44MM.THK. COMM EA -
0003-00 DOOR TYPE - D1 44MM.THK DECOREA -
0004-00 DOOR TYPE - D2 44MM. THK.SEMI EA -
0005-00 DOOR TYPE - D3 44MM. THK.SEMI EA -
0006-00 DOOR TYPE - D4 44MM. THK.SEMI EA -
0007-00 DOOR TYPE - D5 44MM.THK. COMM EA -
0008-00 DOOR TYPE - D6 44MM. THK.SEMI EA -
0009-00 DOOR TYPE - D7 44MM. THK.SEMI EA -
0010-00 WINDOW TYPE - W1 POWER COATED AEA -
0011-00 WINDOW TYPE - W2 POWER COATED AEA -
0012-00 M.S. Flat Gate (1200 x 1800) EA -
BUILDING WORK - 0102 MISC METAL WORK
0001-00 MISC. STEEL WORK GALVANIZED(COATN -
0002-00 STEEL GRATING T532 HOT DIP GALVAN M2 -
0003-00 CHECKERED PLATE THK. 6mm GALVANIZED(COAM2 -
0004-00 STEEL CAGE LADDER GALVANIZED(COAMZ 3.10
0005-00 STEEL PIPE HANDRAIL GRIP : I.D.50mm MZ -
0006-00 STAINLESS PIPE HANDRAIL GRIP : I.D.50mm MZ -
Building WORK - 0110 ROAD AND PAVING WORKS
0001-00 WEARING COURSE with tack coating M2 -
0002-00 ASPHALT BINDER COURSE with prime coatin M2 -

27/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0003-00 BASE COURSE T=200mm Granula M3 -


0004-00 SUBBASE COURSE T=200 mm Grushe M3 -
0005-00 FORMATION LEVEL COMPACTION 95% Density ; do M2 -
0006-00 PC CURB STONE 180x210x300x10 MZ -
0007-00 P.E FILM Minimun 0.15mm p M2 -
0008-00 PRECAST CONC BLOCK PAVING 100mm thick to c M2 -
0009-00 SAND FILLING
GRAND TOTAL

28/216
Project : WareHouse & Office Building at Nizwa Industrial Room

Title : Pump Room

Sl.No DESCRIPTION Nos Length width

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATI
under ground water tank 1 12.15 7.15
Total
0002-00 SOIL EXCAVATION BY MACHINE FOR FOUNDAT
under ground water tank 1 12.15 7.15
Total
0003-00 SELECTED EXCAVATED SOIL FILLING
1 195.69
Total
0004-00 DISPOSAL
under ground water tank 1 8.60 3.60
Total
BUILDING WORK - 0101 REINFORCED CONCRETE WORK
0001-00 PE FILM(THK 0.15, 2PLY)
Pcc under 1 9.40 4.40
Total
0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa
1 9.40 4.40
Total
0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa
Raft 1 9.20 4.20
Wall 1 24.40 0.30
Slab 1 8.60 3.60
Beam 1 3.60 0.30
Deducation man hole -2 1.00 1.00
Total
0004-00 " REINF. CONCRETE CUBE STRENGTH 35MPa
Pump room Slab 1 3.40 3.40
Beam 1 12.8 0.2
Parapet 1 12.8 0.2
Total
0005-00 HIGH YIELD DEFORMED BAR
1 44.09 0.16

Total
0006-00 HIGH YIELD DEFORMED BAR / EPOXY COATED
Ring step 8 1.90
Total
0007-00 " FAIR FACED FORM (FOR FAIR FACED SURFAC
Tank raft 2 13.40
Wall outer 1 24.40
Wall inner 1 22.00
Beam side 2 3.00
Slab 1 8.00 3.00
Total
0008-00 " FAIR FACED FORM (FOR FAIR FACED SURFAC
Slab bottom 1 3.00 3.00
Side board 1 13.6
inner board 1 13.6
Parapet 2 12.8
Total
0010-00 WATERSTOP W=200
All around tank base 1 23.20
Total
0014-00 POLYESTER PROTECTIVE RESIN
outer sider 1 24.4
Total
0015-00 HYPOSEAL SUPER WATER
Inner side 2 8.00 3.00
1 22.00
Total
BUILDING WORK - 0101 MASONRY WORK
0002-00 8" BLOCK WALL
outer wall 1 12.8
Deducation door -1 2.20 1.20

BUILDING WORK - 0102 PLASTER WORK


0001-00 EXTERIOR CEMENT PLASTER FOR WALL, THK.
outer wall 1 13.60
Deducation door -1 2.20 1.20

0002-00 INTERIOR CEMENT PLASTER FOR WALL, THK.


Inner wall 1 12.00
Deducation door -1 2.20 1.20

BUILDING WORK - 0103 PAINTING WORK


0001-00 1 COAT OF PRIMER + 2 COATS OF MEDIUM TEX
outer wall 1 13.60
Parapet 1 25.60
Deducation door -1 2.20 1.20

0002-00 1 COAT OF PRIMER + 2 OF ACRYLIC EMULSION P


Inner wall 1 12.00
Ceiling 1 3.00 3.00
Deducation door -1 2.20 1.20

BUILDING WORK - 0105 FLOORING & TILING WORK


0005-00 8mm THK RUBBER MAT ABOVE 400 X 400 X 28m
1 5.60 4.60

0008-00 300 X 300mm WHITE CEMENT ROOF TILES


1 3.00 3.00

BUILDING WORK - 0106 INTERIOR WORK


BUILDING WORK - 0107 PANEL & ROOF WORK
0007-00 ROOF DRAIN 150
1 1.00

0009-00 DOWN SPOUT 150


1 3.00

BUILDING WORK - 0108 DOOR & WINDOW WORK


0001-00 b) Aluminium shutter Door Double Leaf 2.2 x 1.2
1 1

BUILDING WORK - 0102 MISC METAL WORK


0004-00 STEEL CAGE LADDER
1 3.10

Prepared by Arunkumar.G (Emp.14326) Qunatity Surveyor


Depth Qty Remarks Unit

10.4 5.4
3.00 260.62 13.9 8.9
260.62 M3

0.50 43.44 3.5 3.5


43.44 M3

195.69
195.69 M3

3.50 108.36
108.36 M3

41.36
41.36 M2

0.10 4.14
4.14 M3

0.30 11.59
3.00 21.96
0.25 7.74
0.35 0.38
0.25 -0.50
41.17 M3

0.14 1.62
0.21 0.54
0.3 0.77
2.92 M3

7.06

7.06 TN

0.15
0.15 TN

0.30 8.04
3.55 86.62
3.00 66.00
0.35 2.10
24.00
186.76 M2

9.00
0.35 4.76
0.21 2.86
0.3 7.68
24.30 M2

23.2
23.20 MZ

3.55 86.62
86.62 M2

48.00
3.00 66.00
114.00 M2

2.45 31.36
-2.64
28.72 M2

3.60 48.96
-2.64
46.32 M2

2.66 31.92
-2.64
29.28 M2

3.60 48.96
0.30 7.68
-2.64

54.00 M2
2.66 31.92
9.00
-2.64

38.28 M2

25.76
25.76 M2

9.00
9.00 M2

1.00
1.00 EA

3.00
3.00 MZ

1.00
1.00 EA

3.10
3.10 MZ

atity Surveyor
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH FROM M3 -
0002-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH MOR M3 -
0003-00 SELECTED EXCAVATED SOIL M3 -
0004-00 DISPOSAL M3 -
0005-00 CRUSH STONE M3 -
BUILDING WORK - 0101 REINFORCED CONCRETE WORK
0001-00 PE FILM(THK 0.15, 2PLY) DAMP PROOF C M2 67.29
0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa M3 6.73
0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUB STRUCT M3 -
0004-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUPERSTRU M3 -
0005-00 HIGH YIELD DEFORMED BAR BS 4449 G460 Y TN -
0006-00 HIGH YIELD DEFORMED BAR / EPOXY COATED BS 4449 G460 Y TN -
" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT
0007-00 M2 -
PLINTH AND FLOOR OPENING) "

" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT


0008-00 PIPE SUPPORT M2 -
PLINTH AND FLOOR OPENING) "
0009-00 NORMAL FACED FORM (FOR HIDDEN SURFACE) PIPE SUPPORT M2 -
0010-00 WATERSTOP W=200 PVC TYPE(THK. MZ -
0011-00 FIBRE REINFORCED BITUMEN COATING M2 -
0012-00 ANTITERMITE TREATMENT M2 -
0013-00 EPOXY MORTAR FINISH TO CONCRETE BENCHING AS PER SPECIFICATION M3 -
0014-00 POLYESTER PROTECTIVE RESIN NITOCOTE PE13 M2 -
0015-00 HYPOSEAL SUPER WATER PROOFER TO CO M2 -
BUILDING WORK - 0101 STEEL STRUCTURE WORK
0001-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 200 TN -
0002-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 200 TN -
0003-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 200 TN -
0004-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 320 TN -
0005-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 320 TN -
0006-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 320 TN -
0007-00 ANCHOR BOLT (M24, L=700) STEEL : ASTM A EA -
0008-00 ANCHOR BOLT (M30, L=900) STEEL : ASTM A EA -

35/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0009-00 NON-SHRINKAGE GROUT Fcu= 65N/mm2 A M3 -


0010-00 DECK PLATE - THK.1.6mm (Including stud bolt) GALVANIZED STE M2 -
0011-00 Additional Items : STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM ( DFT : Total 200 TN -
0012-00 Additional Items : STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61 DFT : Total 200 TN -
0013-00 Additional Items: STRUCTURAL STEEL (BUILT-UP) DFT : Total 200 TN -
0014-00 Additional Items : ANCHOR BOLT (M36, L=1080) STEEL : ASTM A EA -
0015-00 Additional Items : STAIR TREAD HOT DIP GALVAN M2 -
BUILDING WORK - 0101 MASONRY WORK
0001-00 INSULATED BLOCK WALL 4" BLOCK (INT) M2 -
0002-00 8" BLOCK WALL TYPE A AS PER M2 -
0003-00 4.5" BLOCK WALL TYPE A AS PER M2
BUILDING WORK - 0102 PLASTER WORK
0001-00 EXTERIOR CEMENT PLASTER FOR WALL, THK. 24mm M2 -
0002-00 INTERIOR CEMENT PLASTER FOR WALL, THK. 18mm M2 -
0003-00 INTERIOR CEMENT PLASTER FOR CEILING, THK. 18mm M2 -
BUILDING WORK - 0103 PAINTING WORK
0001-00 1 COAT OF PRIMER + 2 COATS OF MEDIUM TEXTURE PAINT FOR EXT. WALL M2 -
0002-00 1 COAT OF PRIMER + 2 OF ACRYLIC EMULSION PAINT FOR INT. WALL & CEILING M2 -
0003-00 CONCRETE FLOORING(EMERY TOP FLOORING (5Kg/m2)) FOR RAMP. FLOOR M2 -
BUILDING WORK - 0104 CONCRETE ROOFING AND WATERPROOFING WORK
0001-00 ROOF WATERPROOFING M2 -
0002-00 MORTAR WATERPROOFING DFT : 80 M2 -
BUILDING WORK - 0105 FLOORING & TILING WORK
0001-00 CERAMIC TILES SIZE :400 x 400m M2 -
0002-00 NON SLIPPERY VITRIFIED CERAMIC TILES SIZE :200 x 200 M2 -
0003-00 GRANITE FLOOR TILES SIZE :600 x 300 M2 -
0004-00 SINGLE PIECE TERRAZZO RISER & THREAD M2 -
0005-00 SINGLE PIECE OMANI MARBKLE RISER AND TREAD 30mm THK. M2 -
0006-00 TERRAZZO TILES 8mm THK. RUBBERM2 -
0007-00 WHITE CEMENT ROOF TILES 300 X 300 mm, M2 -
BUILDING WORK - 0106 INTERIOR WORK
0001-00 GYPSUM BOARD FALSE CEILING SIZE : 600 x 600 M2 -
0002-00 CEILING W/ PVC STRIP W 100mm M2 -

36/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

BUILDING WORK - 0107 PANEL & ROOF WORK


0001-00 " THERMAL INSULATED TRAPEZOIDAL CLADDING FOR EXT. WALLTHK. 0.7mm(EXT M2 -
0002-00 " THERMAL INSULATED TRAPEZOIDAL CLADDING FOR ROOF" THK. 0.7mm(EXT M2 -
0003-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FOR ROOF" M2 -
0004-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FOR WALL" M2 -
0005-00 GUTTER FLASHING THK. 1.6mm MZ -
0006-00 ROOF DRAIN 100 CAST IRON EA -
0007-00 ROOF DRAIN 150 CAST IRON EA -
0008-00 DOWN SPOUT 100 GALVANISED ST MZ -
0009-00 DOWN SPOUT 150 CAST IRON MZ -
0010-00 SPLASH BLOCK SIZE : 500x500x EA -
0011-00 CANOPY W:1000 MZ -
BUILDING WORK - 0108 DOOR & WINDOW WORK
0001-00 DOOR TYPE - SD HEAVY DUTY M.S EA -
0002-00 DOOR TYPE - D 44MM.THK. COMM EA -
0003-00 DOOR TYPE - D1 44MM.THK DECOREA -
0004-00 DOOR TYPE - D2 44MM. THK.SEMI EA -
0005-00 DOOR TYPE - D3 44MM. THK.SEMI EA -
0006-00 DOOR TYPE - D4 44MM. THK.SEMI EA -
0007-00 DOOR TYPE - D5 44MM.THK. COMM EA -
0008-00 DOOR TYPE - D6 44MM. THK.SEMI EA -
0009-00 DOOR TYPE - D7 44MM. THK.SEMI EA -
0010-00 WINDOW TYPE - W1 POWER COATED AEA -
0011-00 WINDOW TYPE - W2 POWER COATED AEA -
0012-00 M.S. Flat Gate (1200 x 1800) EA -
BUILDING WORK - 0102 MISC METAL WORK
0001-00 MISC. STEEL WORK GALVANIZED(COATN -
0002-00 STEEL GRATING T532 HOT DIP GALVAN M2 -
0003-00 CHECKERED PLATE THK. 6mm GALVANIZED(COAM2 -
0004-00 STEEL CAGE LADDER GALVANIZED(COAMZ -
0005-00 STEEL PIPE HANDRAIL GRIP : I.D.50mm MZ -
0006-00 STAINLESS PIPE HANDRAIL GRIP : I.D.50mm MZ -
Building WORK - 0110 ROAD AND PAVING WORKS

37/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0001-00 Wearing course with tack coating M2 7,661.00


0002-00 Asphalt Binder course with prime coatin M2 7,661.00
0003-00 Base course T=200,max 40 M3 1,532.20
0004-00 Subbase course T=200,max.80mm M3 1,532.20
0005-00 Formation Level Compaction 95% Density ; do M2 10,200.31
0006-00 PC Curb Stone 180x210x300x10 MZ 224.30
0007-00 P.E Film Minimun 0.15mm p M2 67.29
0008-00 Precast concrete block paving 100mm thick to c M2 2,539.31
0009-00 Sand Fill M3 253.93
GRAND TOTAL

38/216
Project : WareHouse & Office Building at Nizwa Industrial Room

Title : Road work

Sl.No DESCRIPTION Nos Length width

BUILDING WORK - 0101 REINFORCED CONCRETE WORK


0001-00 PE FILM(THK 0.15, 2PLY)
Curb stone 1 224.30 0.30

0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa


Curb stone 1 224.30 0.30

Building WORK - 0110 ROAD AND PAVING WORKS


0001-00 Wearing course
10 m wide road 1 4461.00
20 m wide road 1 3200.00

0002-00 Asphalt Binder course


10 m wide road 1 4461.00
20 m wide road 1 3200.00

0003-00 Base course


10 m wide road 1 4461.00
20 m wide road 1 3200.00

0005-00 Subbase course


10 m wide road 1 4461.00
20 m wide road 1 3200.00

0007-00 Formation Level Compaction


10 m wide road 1 4461.00
20 m wide road 1 3200.00
Electrical store around 1 184.45
Office & General store 1 2354.86

0008-00 PC Curb Stone


1 224.30

0014-00 P.E Film


Curb stone 1 224.30

0018-00 Precast concrete block paving


Electrical store around 1 184.45
Office & General store 1 2354.86

0019-00 Sand Fill


Electrical store around 1 184.45
Office & General store 1 2354.86

Prepared by Arunkumar.G (Emp.14326) Qunatity Surveyor


Depth Qty Remarks Unit

67.29
67.29 M2

0.10 6.73
6.73 M3

4461.00
3200.00
7661.00 M2

4461.00
3200.00
7661.00 M2

0.2 892.20
0.2 640.00
1532.20 M3

0.20 892.20
0.20 640.00

1532.20 M3

4461.00
3200.00
184.45
2354.86

10200.31 M2

224.30
224.30 MZ

0.30 67.29
67.29 M2

184.45
2354.86

2539.31 M2

0.10 18.445
0.10 235.486

253.93 M3

ity Surveyor
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH FROM M3 53.25
0002-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH MOR M3 -
0003-00 SELECTED EXCAVATED SOIL M3 -
0004-00 DISPOSAL M3 53.25
0005-00 CRUSH STONE M3 3.17
BUILDING WORK - 0101 REINFORCED CONCRETE WORK
0001-00 PE FILM(THK 0.15, 2PLY) DAMP PROOF C M2 47.88
0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa M3 6.04
0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUB STRUCT M3 9.25
0004-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUPERSTRU M3 6.90
0005-00 HIGH YIELD DEFORMED BAR BS 4449 G460 Y TN 2.58
0006-00 HIGH YIELD DEFORMED BAR / EPOXY COATED BS 4449 G460 Y TN -
" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT
0007-00 M2 37.04
PLINTH AND FLOOR OPENING) "

" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT


0008-00 PIPE SUPPORT M2 53.92
PLINTH AND FLOOR OPENING) "
0009-00 NORMAL FACED FORM (FOR HIDDEN SURFACE) PIPE SUPPORT M2 -
0010-00 WATERSTOP W=200 PVC TYPE(THK. MZ -
0011-00 FIBRE REINFORCED BITUMEN COATING M2 -
0012-00 ANTITERMITE TREATMENT M2 21.16
0013-00 EPOXY MORTAR FINISH TO CONCRETE BENCHING AS PER SPECIFICATION M3 -
0014-00 POLYESTER PROTECTIVE RESIN NITOCOTE PE13 M2 71.04
0015-00 HYPOSEAL SUPER WATER PROOFER TO CO M2 -
BUILDING WORK - 0101 STEEL STRUCTURE WORK
0001-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 200 TN -
0002-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 200 TN -
0003-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 200 TN -
0004-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 320 TN -
0005-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 320 TN -
0006-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 320 TN -
0007-00 ANCHOR BOLT (M24, L=700) STEEL : ASTM A EA -
0008-00 ANCHOR BOLT (M30, L=900) STEEL : ASTM A EA -

43/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0009-00 NON-SHRINKAGE GROUT Fcu= 65N/mm2 A M3 -


0010-00 DECK PLATE - THK.1.6mm (Including stud bolt) GALVANIZED STE M2 -
0011-00 Additional Items : STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM ( DFT : Total 200 TN -
0012-00 Additional Items : STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61 DFT : Total 200 TN -
0013-00 Additional Items: STRUCTURAL STEEL (BUILT-UP) DFT : Total 200 TN -
0014-00 Additional Items : ANCHOR BOLT (M36, L=1080) STEEL : ASTM A EA -
0015-00 Additional Items : STAIR TREAD HOT DIP GALVAN M2 -
BUILDING WORK - 0101 MASONRY WORK
0001-00 INSULATED BLOCK WALL 4" BLOCK (INT) M2 -
0002-00 8" BLOCK WALL TYPE A AS PER M2 73.08
0003-00 4.5" BLOCK WALL TYPE A AS PER M2 10.65
BUILDING WORK - 0102 PLASTER WORK
0001-00 EXTERIOR CEMENT PLASTER FOR WALL, THK. 24mm M2 104.76
0002-00 INTERIOR CEMENT PLASTER FOR WALL, THK. 18mm M2 69.33
0003-00 INTERIOR CEMENT PLASTER FOR CEILING, THK. 18mm M2 -
BUILDING WORK - 0103 PAINTING WORK
0001-00 1 COAT OF PRIMER + 2 COATS OF MEDIUM TEXTURE PAINT FOR EXT. WALL M2 104.76
0002-00 1 COAT OF PRIMER + 2 OF ACRYLIC EMULSION PAINT FOR INT. WALL & CEILING M2 90.49
0003-00 CONCRETE FLOORING(EMERY TOP FLOORING (5Kg/m2)) FOR RAMP. FLOOR M2 -
BUILDING WORK - 0104 CONCRETE ROOFING AND WATERPROOFING WORK
0001-00 ROOF WATERPROOFING M2 -
0002-00 MORTAR WATERPROOFING DFT : 80 M2 -
BUILDING WORK - 0105 FLOORING & TILING WORK
0001-00 SINGLE PIECE GRANITE RISER & THREAD M2 -
0002-00 20MM THK 200MM WIDE GRANITE STRIPS M2 -
0003-00 600 X 300 X 20MM GRANITE FLOOR TILES M2 -
0004-00 400 X 400MM CERAMIC TILES M2 17.67
0005-00 8mm THK RUBBER MAT ABOVE 400 X 400 X 28mm TERRAZZO TILES M2 -
0006-00 200 X 200mm NON SLIPPERY VITRIFIED CERAMIC TILES M2 5.85
0007-00 300mm THK SINGLE PIECE OMANI MARBLE RISER AND TREAD M2 -
0008-00 300 X 300mm WHITE CEMENT ROOF TILES M2 21.16
0009-00 200 x 300mm Fully glazed ceramic wall tiles M2 117.00
BUILDING WORK - 0106 INTERIOR WORK

44/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0001-00 GYPSUM BOARD FALSE CEILING SIZE : 600 x 600 M2 25.00


0002-00 CEILING W/ PVC STRIP W 100mm M2 -
BUILDING WORK - 0107 PANEL & ROOF WORK
0001-00 " THERMAL INSULATED TRAPEZOIDAL CLADDING FOR EXT. WALLTHK. 0.7mm(EXT M2 -
0002-00 " THERMAL INSULATED TRAPEZOIDAL CLADDING FOR ROOF" THK. 0.7mm(EXT M2 -
0003-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FOR ROOF" M2 -
0004-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FOR WALL" M2 -
0005-00 GUTTER FLASHING THK. 1.6mm MZ -
0006-00 ROOF DRAIN 100 CAST IRON EA -
0007-00 ROOF DRAIN 150 CAST IRON EA -
0008-00 DOWN SPOUT 100 GALVANISED ST MZ -
0009-00 DOWN SPOUT 150 CAST IRON MZ -
0010-00 SPLASH BLOCK SIZE : 500x500x EA -
0011-00 CANOPY W:1000 MZ -
BUILDING WORK - 0108 DOOR & WINDOW WORK
0001-00 DOOR TYPE - SD HEAVY DUTY M.S EA -
0002-00 DOOR TYPE - D 44MM.THK. COMM EA -
0003-00 DOOR TYPE - D1 44MM.THK DECOREA -
0004-00 DOOR TYPE - D2 44MM. THK.SEMI EA -
0005-00 DOOR TYPE - D3 44MM. THK.SEMI EA -
0006-00 DOOR TYPE - D4 44MM. THK.SEMI EA -
0007-00 DOOR TYPE - D5 44MM.THK. COMM EA -
0008-00 DOOR TYPE - D6 44MM. THK.SEMI EA -
0009-00 DOOR TYPE - D7 44MM. THK.SEMI EA -
0010-00 WINDOW TYPE - W1 POWER COATED AEA -
0011-00 WINDOW TYPE - W2 POWER COATED AEA -
0012-00 M.S. Flat Gate (1200 x 1800) ELECTRICALLY EA
BUILDING WORK - 0102 MISC METAL WORK
0001-00 MISC. STEEL WORK GALVANIZED(COATN -
0002-00 STEEL GRATING T532 HOT DIP GALVAN M2 -
0003-00 CHECKERED PLATE THK. 6mm GALVANIZED(COAM2 -
0004-00 STEEL CAGE LADDER GALVANIZED(COAMZ -
0005-00 STEEL PIPE HANDRAIL GRIP : I.D.50mm MZ -

45/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0006-00 STAINLESS PIPE HANDRAIL GRIP : I.D.50mm MZ -


0007-00
Building WORK - 0110 ROAD AND PAVING WORKS
0001-00 Wearing course with tack coating M2 -
0002-00 Asphalt Binder course with prime coatin M2 -
0003-00 Base course T=150,max 40 M3 -
0004-00 Subbase course T=200,max.80mm M3 -
0005-00 Formation Level Compaction 95% Density ; do M2 -
0006-00 PC Curb Stone 180x210x300x10 MZ -
0007-00 P.E Film Minimun 0.15mm p M2 -
0008-00 Precast concrete block paving 100mm thick to c M2 -
0009-00 Sand Fill M3 -
GRAND TOTAL

46/216
Project : WareHouse & Office Building at Nizwa Industrial Room

Title : Guard wall

Sl.No DESCRIPTION Nos Length width

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATI
1 6.40 6.40
Total
0004-00 DISPOSAL
1 6.40 6.40
Total
0005-00 CRUSH STONE
1 4.60 4.60
Total
BUILDING WORK - 0101 REINFORCED CONCRETE WORK
0001-00 PE FILM(THK 0.15, 2PLY)
Main wall 1 19.20 1.00
Cross wall 1 9.20 0.40
Grade slab 1 5.00 5.00

0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa


Main wall 1 19.20 1.00
Cross wall 1 9.20 0.40
Grade slab 1 5.00 5.00

0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa


Footing 1 19.20 0.80
Beam 1 20.00 0.20
Column 1 0.20 0.20
Plinth 1 20.00 0.20
Grade slab 1 5.00 5.00

0004-00 " REINF. CONCRETE CUBE STRENGTH 35MPa


Column 1 0.20 0.20
Slab 1 5.00 5.00
Beam 1 20.00 0.20
Parapet 1 20.00 0.20
koping 3 20.00 0.10

0005-00 HIGH YIELD DEFORMED BAR


1 16.15 0.16

0006-00 HIGH YIELD DEFORMED BAR / EPOXY COATED


0007-00 " FAIR FACED FORM (FOR FAIR FACED SURFAC
Footing 1 38.40
Beam 1 38.40
Grade Beam 1 38.40
Column 1 0.80

0008-00 " FAIR FACED FORM (FOR FAIR FACED SURFAC


Column 1 0.80
Slab 1 4.60 4.60
Beam (outer side) 1 20.00
Beam (Inner side) 1 18.40
Parapet (outer side) 1 20.00
Parapet (Inner side) 1 18.40

0012-00 ANTITERMITE TREATMENT


Grd floor 1 4.60 4.60

0014-00 POLYESTER PROTECTIVE RESIN


Outer side 1 20.00
Inner side 1 18.40

BUILDING WORK - 0101 MASONRY WORK


0002-00 8" BLOCK WALL
Fdt outer side 1 19.20
Fdt inner side 1 9.60
SS outer side 1 19.20
Deducation door1 -1 2.20
Deducation door2 -1 2.20
Deducation window 1 -2 1.20
Deducation GRC -1 1.20

0003-00 4.5" BLOCK WALL


Partition wall 1 5.20
Deducation Arch -1 2.41
Deducation door2 -1 2.20

BUILDING WORK - 0102 PLASTER WORK


0001-00 EXTERIOR CEMENT PLASTER FOR WALL, THK.
Fdt outer side 1 19.20
SS outer side 1 19.20
Deducation door1 -1 2.20
Deducation door2 -1 2.20
Deducation window 1 -2 1.20
Deducation GRC -1 1.20
0002-00 INTERIOR CEMENT PLASTER FOR WALL, THK.
Fdt inner side 1 9.60
SS outer side 1 19.20
Deducation door1 -1 2.20
Deducation door2 -1 2.20
Deducation window 1 -2 1.20
Deducation GRC -1 1.20
Partition wall 1 5.20
Deducation Arch -1 2.41
Deducation door2 -1 2.20

BUILDING WORK - 0103 PAINTING WORK


0001-00 1 COAT OF PRIMER + 2 COATS OF MEDIUM TEX
Fdt outer side 1 19.20
SS outer side 1 19.20
Deducation door1 -1 2.20
Deducation door2 -1 2.20
Deducation window 1 -2 1.20
Deducation GRC -1 1.20

0002-00 1 COAT OF PRIMER + 2 OF ACRYLIC EMULSION P


Fdt inner side 1 9.60
SS outer side 1 19.20
Deducation door1 -1 2.20
Deducation door2 -1 2.20
Deducation window 1 -2 1.20
Deducation GRC -1 1.20
Partition wall 1 5.20
Deducation Arch -1 2.41
Deducation door2 -1 2.20
Ceiling 1 4.60 4.60

BUILDING WORK - 0105 FLOORING & TILING WORK


0001-00 SINGLE PIECE GRANITE RISER & THREAD

0002-00 20MM THK 200MM WIDE GRANITE STRIPS

0003-00 600 X 300 X 20MM GRANITE FLOOR TILES

0004-00 400 X 400MM CERAMIC TILES


Room 1 3.70 3.20
Stirp 1 13.80
Balcony 1 3.20 0.80
Stirp 1 8.00

0005-00 8mm THK RUBBER MAT ABOVE 400 X 400 X 28m

0006-00 200 X 200mm NON SLIPPERY VITRIFIED CERAMI


Pantry 1 2.50 1.30
Bath 1 2.00 1.30

0007-00 300mm THK SINGLE PIECE OMANI MARBLE RIS

0008-00 300 X 300mm WHITE CEMENT ROOF TILES


1 4.60 4.60

0009-00 200 x 300mm Fully glazed ceramic wall tiles


Pantry 1 7.60
Bath 1 6.60

BUILDING WORK - 0106 INTERIOR WORK


0001-00 GYPSUM BOARD FALSE CEILING
1 5.00 5.00

0002-00 CEILING W/ PVC STRIP

BUILDING WORK - 0107 PANEL & ROOF WORK


0001-00 " THERMAL INSULATED TRAPEZOIDAL CLADDIN

0002-00 " THERMAL INSULATED TRAPEZOIDAL CLADDI

0003-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING F

0004-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FO

0005-00 GUTTER FLASHING


0006-00 ROOF DRAIN 100

0007-00 ROOF DRAIN 150

0008-00 DOWN SPOUT 100

0009-00 DOWN SPOUT 150

0010-00 SPLASH BLOCK

0011-00 CANOPY W:1000

BUILDING WORK - 0108 DOOR & WINDOW WORK


0001-00 DOOR TYPE - SD

0002-00 DOOR TYPE - D

0003-00 DOOR TYPE - D1

0004-00 DOOR TYPE - D2

0005-00 DOOR TYPE - D3

0006-00 DOOR TYPE - D4

0007-00 DOOR TYPE - D5

0008-00 DOOR TYPE - D6

0009-00 DOOR TYPE - D7


0010-00 WINDOW TYPE - W1

0011-00 WINDOW TYPE - W2

BUILDING WORK - 0102 MISC METAL WORK


0001-00 MISC. STEEL WORK

0002-00 STEEL GRATING T532

0003-00 CHECKERED PLATE THK. 6mm

0004-00 STEEL CAGE LADDER

0005-00 STEEL PIPE HANDRAIL

0006-00 STAINLESS PIPE HANDRAIL

BUILDING WORK - 0104 SANITARY FIXTURES


0001-00 WATER CLOSET (WESTERN STYLE)

0002-00 URINAL

0003-00 WASH BASIN

0004-00 SOAP DISPENSER

0005-00 LAVATORY SINK

0006-00 PAPER HOLDER FOR WATER CLOSET


0007-00 b)MIRROR 1.7*1.5

0008-00 TOWEL HOLDER

0009-00 KITCHENETTE UNIT

0010-00 SHOWER CUBICLE

0011-00 ELETRICAL HAND DRYER

Building WORK - 0110 ROAD AND PAVING WORKS


0001-00 Wearing course

0002-00 Asphalt Binder course

0003-00 Base course

0004-00 Base course

0005-00 Subbase course

0006-00 Subbase course

0007-00 Formation Level Compaction

0008-00 PC Curb Stone

0009-00 Line Marking

0010-00 Traffic Signs


0011-00 Galvanized welded wire fabric

0012-00 Construction Joint

0013-00 Expansion Joint

0014-00 P.E Film

0015-00 Hard Landscaping

0016-00 Guard rail fence

0017-00 Concrete for concrete paving

0018-00 Precast concrete block paving

0019-00 Sand Fill M3

Prepared by Arunkumar.G (Emp.14326) Qunatity Surveyor


Depth Qty Remarks Unit

1.30 53.25
53.25 M3

1.30 53.25
53.25 M3

0.15 3.17
3.17 M3

19.20
3.68
25.00
47.88 M2

0.10 1.92
0.10 0.37
0.15 3.75
6.04 M3

0.20 3.07
0.30 1.20
0.70 0.03
0.30 1.20
0.15 3.75
9.25 M3

3.80 0.15
0.15 3.75
0.25 1.00
0.35 1.40
0.10 0.60
6.90 M3

2.58
2.58 TN
0.00 TN

0.20 7.68
0.30 11.52
0.45 17.28
0.70 0.56
37.04 M2

3.40 2.72
21.16
0.45 9.00
0.25 4.60
0.50 10.00
0.35 6.44
53.92 M2

21.16
21.16 M2

1.85 37.00
1.85 34.04
71.04 M2

0.70 13.44
0.90 8.64
3.05 58.56
1.00 -2.20
0.80 -1.76
1.00 -2.40
1.00 -1.20
73.08 M2

2.85 14.82
-2.41
0.80 -1.76
10.65 M2

0.70 13.44
5.15 98.88
1.00 -2.20
0.80 -1.76
1.00 -2.40
1.00 -1.20

104.76 M2
0.90 8.64
3.00 57.60
1.00 -2.20
0.80 -1.76
1.00 -2.40
1.00 -1.20
2.85 14.82
-2.41
0.80 -1.76

69.33 M2

0.70 13.44
5.15 98.88
1.00 -2.20
0.80 -1.76
1.00 -2.40
1.00 -1.20

104.76 M2

0.90 8.64
3.00 57.60
1.00 -2.20
0.80 -1.76
1.00 -2.40
1.00 -1.20
2.85 14.82
-2.41
0.80 -1.76 37000 5920
21.16
90.49 M2

0.00 M2

0.00 M2

0.00 M2
11.84
0.15 2.07
2.56
0.15 1.2
17.67 M2

0.00 M2

3.25
2.6
5.85 M2

0.00 M2

21.16
21.16 M2

3.00 22.8
3.00 19.8
42.60 M2

25.00
25.00 M2

0.00 M2

0.00 M2

0.00 M2

0.00 M2

0.00 M2

0.00 MZ
0.00 EA

0.00 EA

0.00 MZ

0.00 MZ

0.00 EA

0.00 MZ

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA
0.00 EA

0.00 EA

0.00 EA

0.00 TN

0.00 M2

0.00 M2

0.00 MZ

0.00 MZ

0.00 MZ

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA
0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 M2

0.00 M2

0.00 M3

0.00 M3

0.00 M3

0.00 M3

0.00 M2

0.00 MZ

0.00 M2
0.00 EA

0.00 M2

0.00 MZ

0.00 M2

0.00 M2

0.00 M2

0.00 MZ

0.00 M3

0.00 M2

0.00 M3

ity Surveyor
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH FROM M3 242.79
0002-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH MOR M3 -
0003-00 SELECTED EXCAVATED SOIL M3 -
0004-00 DISPOSAL M3 242.79
0005-00 CRUSH STONE M3 36.60
BUILDING WORK - 0101 REINFORCED CONCRETE WORK
0001-00 PE FILM(THK 0.15, 2PLY) DAMP PROOF C M2 620.26
0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa M3 62.03
0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUB STRUCT M3 112.70
0004-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUPERSTRU M3 -
0005-00 HIGH YIELD DEFORMED BAR BS 4449 G460 Y TN 27.96
0006-00 HIGH YIELD DEFORMED BAR / EPOXY COATED BS 4449 G460 Y TN -
" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT
0007-00 M2 101.36
PLINTH AND FLOOR OPENING) "

" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT


0008-00 PIPE SUPPORT M2 -
PLINTH AND FLOOR OPENING) "
0009-00 NORMAL FACED FORM (FOR HIDDEN SURFACE) PIPE SUPPORT M2 -
0010-00 WATERSTOP W=200 PVC TYPE(THK. MZ -
0011-00 FIBRE REINFORCED BITUMEN COATING M2 -
0012-00 ANTITERMITE TREATMENT M2 541.68
0013-00 EPOXY MORTAR FINISH TO CONCRETE BENCHING AS PER SPECIFICATION M3 -
APPROVED PROTECTIVE COATING
0014-00 NITOCOTE PE13 M2 101.36
0015-00 HYPOSEAL SUPER WATER PROOFER TO CO M2 -
BUILDING WORK - 0101 STEEL STRUCTURE WORK
0001-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 200 TN 3.20
0002-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 200 TN 16.56
0003-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 200 TN 17.93
0004-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 320 TN -
0005-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 320 TN -
0006-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 320 TN -
0007-00 ANCHOR BOLT (26 ) STEEL : ASTM A EA 56.00
0008-00 ANCHOR BOLT (M20 ) STEEL : ASTM A EA 16.00

63/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0009-00 NON-SHRINKAGE GROUT Fcu= 65N/mm2 A M3 -


0010-00 DECK PLATE - THK.1.6mm (Including stud bolt) GALVANIZED STE M2 -
0011-00 Additional Items : STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM ( DFT : Total 200 TN -
0012-00 Additional Items : STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61 DFT : Total 200 TN -
0013-00 Additional Items: STRUCTURAL STEEL (BUILT-UP) DFT : Total 200 TN -
0014-00 Additional Items : ANCHOR BOLT (M36, L=1080) STEEL : ASTM A EA -
0015-00 Additional Items : STAIR TREAD HOT DIP GALVAN M2 -
BUILDING WORK - 0101 MASONRY WORK
0001-00 INSULATED BLOCK WALL 4" BLOCK (INT) M2 -
0002-00 8" BLOCK WALL TYPE A AS PER M2 -
0003-00 4.5" BLOCK WALL TYPE A AS PER M2 -
BUILDING WORK - 0102 PLASTER WORK
0001-00 EXTERIOR CEMENT PLASTER FOR WALL, THK. 24mm M2 -
0002-00 INTERIOR CEMENT PLASTER FOR WALL, THK. 18mm M2 -
0003-00 INTERIOR CEMENT PLASTER FOR CEILING, THK. 18mm M2 -
BUILDING WORK - 0103 PAINTING WORK
0001-00 1 COAT OF PRIMER + 2 COATS OF MEDIUM TEXTURE PAINT FOR EXT. WALL M2 -
0002-00 1 COAT OF PRIMER + 2 OF ACRYLIC EMULSION PAINT FOR INT. WALL & CEILING M2 -
0003-00 CONCRETE FLOORING(EMERY TOP FLOORING (5Kg/m2)) FOR RAMP. FLOOR M2 -
BUILDING WORK - 0104 CONCRETE ROOFING AND WATERPROOFING WORK
0001-00 ROOF WATERPROOFING M2 -
0002-00 MORTAR WATERPROOFING DFT : 80 M2 -
BUILDING WORK - 0105 FLOORING & TILING WORK
0001-00 SINGLE PIECE GRANITE RISER & THREAD M2 -
0002-00 20MM THK 200MM WIDE GRANITE STRIPS M2 -
0003-00 600 X 300 X 20MM GRANITE FLOOR TILES M2 -
0004-00 400 X 400MM CERAMIC TILES M2 -
0005-00 8mm THK RUBBER MAT ABOVE 400 X 400 X 28mm TERRAZZO TILES M2 -
0006-00 200 X 200mm NON SLIPPERY VITRIFIED CERAMIC TILES M2 -
0007-00 30mm THK SINGLE PIECE OMANI MARBLE RISER AND TREAD M2 -
0008-00 300 X 300mm WHITE CEMENT ROOF TILES M2
BUILDING WORK - 0106 INTERIOR WORK
0001-00 GYPSUM BOARD FALSE CEILING SIZE : 600 x 600 M2 -

64/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0002-00 CEILING W/ PVC STRIP W 100mm M2 -


BUILDING WORK - 0107 PANEL & ROOF WORK
0001-00 " THERMAL INSULATED TRAPEZOIDAL CLADDING FOR EXT. WALLTHK. 0.7mm(EXT M2 -
0002-00 " THERMAL INSULATED TRAPEZOIDAL CLADDING FOR ROOF" THK. 0.7mm(EXT M2 -
0003-00 " 26 GA.GI COLOUR COATED PROFILE ROOF SHEET FOR ROOF" M2 617.74
0004-00 " 26 GA.GI COLOUR COATED PROFILE ROOF SHEET FOR WALL" M2 827.89
0005-00 TRANSUSCENT SKY LIGHT ROOF SHEET TYP. 1.50M X 1.0M M2 18.00
0006-00 ROOF DRAIN 100 CAST IRON EA -
0007-00 ROOF DRAIN 150 CAST IRON EA -
0008-00 DOWN SPOUT 100 GALVANISED ST MZ -
0009-00 DOWN SPOUT 150 CAST IRON MZ -
0010-00 SPLASH BLOCK SIZE : 500x500x EA -
0011-00 CANOPY W:1000 MZ 12.00
BUILDING WORK - 0108 DOOR & WINDOW WORK
0001-00 DOOR TYPE - SD HEAVY DUTY M.S EA -
0002-00 DOOR TYPE - D 44MM.THK. COMM EA 2.00
0003-00 DOOR TYPE - D1 44MM.THK DECOREA -
0004-00 DOOR TYPE - D2 44MM. THK.SEMI EA -
0005-00 DOOR TYPE - D3 44MM. THK.SEMI EA -
0006-00 DOOR TYPE - D4 44MM. THK.SEMI EA -
0007-00 DOOR TYPE - D5 44MM.THK. COMM EA -
0008-00 DOOR TYPE - D6 44MM. THK.SEMI EA -
0009-00 DOOR TYPE - D7 44MM. THK.SEMI EA -
0010-00 WINDOW TYPE - W1 POWER COATED AEA -
0011-00 WINDOW TYPE - W2 POWER COATED AEA -
0012-00 M.S. Flat Gate (1200 x 1800) EA -
BUILDING WORK - 0102 MISC METAL WORK
0001-00 MISC. STEEL WORK GALVANIZED(COATN 0.54
0002-00 STEEL GRATING T532 HOT DIP GALVAN M2 -
0003-00 CHECKERED PLATE THK. 6mm GALVANIZED(COAM2 -
0004-00 STEEL CAGE LADDER GALVANIZED(COAMZ -
0005-00 STEEL PIPE HANDRAIL GRIP : I.D.50mm MZ -
0006-00 STAINLESS PIPE HANDRAIL GRIP : I.D.50mm MZ -

65/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

Building WORK - 0110 ROAD AND PAVING WORKS


0001-00 WEARING COURSE with tack coating M2 -
0002-00 ASPHALT BINDER COURSE with prime coatin M2 -
0003-00 BASE COURSE T=150,max 40 M3 -
0004-00 SUBBASE COURSE T=200,max.80mm M3 -
0005-00 FORMATION LEVEL COMPACTION 95% Density ; do M2 -
0006-00 PC CURB STONE 180x210x300x10 MZ -
0007-00 P.E FILM Minimun 0.15mm p M2 -
0008-00 PRECAST CONC BLOCK PAVING 100mm thick to c M2 -
0009-00 SAND FILLING M3 36.60

GRAND TOTAL

66/216
Project : WareHouse & Office Building at Nizwa Industrial Room

Title : Piping Workshop

Sl.No DESCRIPTION Nos Length width

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATI
Footing F3-A1 1 3.00 3.00
Footing F3-B1 1 3.00 3.00
Footing F3-C1 1 3.00 3.00
Footing F3-D1 1 3.00 3.00
Footing F3-E1 1 3.00 3.00
Footing F3-F1 1 3.00 3.00
Footing F3-G1 1 3.00 3.00
Footing F2-A1 1 2.60 2.60
Footing F1-D1 1 2.10 2.10
Footing F2-G1 1 2.60 2.60
Footing F2-A3 1 2.60 2.60
Footing F1-D3 1 2.10 2.10
Footing F2-G3 1 2.60 2.60
Footing F3-A4 1 3.00 3.00
Footing F3-B4 1 3.00 3.00
Footing F3-C4 1 3.00 3.00
Footing F3-D4 1 3.00 3.00
Footing F3-E4 1 3.00 3.00
Footing F3-F4 1 3.00 3.00
Footing F3-G4 1 3.00 3.00
Total
0002-00 SOIL EXCAVATION BY MACHINE FOR FOUNDAT

Total
0003-00 SELECTED EXCAVATED SOIL

Total
0004-00 DISPOSAL
1 242.79
Total
0005-00 CRUSH STONE
Dry Rubble packing 1 36.60 14.80
Total
BUILDING WORK - 0101 REINFORCED CONCRETE WORK
0001-00 PE FILM(THK 0.15, 2PLY)
Footing F3-A1 1 2.00 2.00
Footing F3-B1 1 2.00 2.00
Footing F3-C1 1 2.00 2.00
Footing F3-D1 1 2.00 2.00
Footing F3-E1 1 2.00 2.00
Footing F3-F1 1 2.00 2.00
Footing F3-G1 1 2.00 2.00
Footing F2-A1 1 1.60 1.60
Footing F1-D1 1 1.10 1.10
Footing F2-G1 1 1.60 1.60
Footing F2-A3 1 1.60 1.60
Footing F1-D3 1 1.10 1.10
Footing F2-G3 1 1.60 1.60
Footing F3-A4 1 2.00 2.00
Footing F3-B4 1 2.00 2.00
Footing F3-C4 1 2.00 2.00
Footing F3-D4 1 2.00 2.00
Footing F3-E4 1 2.00 2.00
Footing F3-F4 1 2.00 2.00
Footing F3-G4 1 2.00 2.00
Floor area 1 36.60 14.80
Ramp 2 3.10 1.60

0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa


Footing F3-A1 1 2.00 2.00
Footing F3-B1 1 2.00 2.00
Footing F3-C1 1 2.00 2.00
Footing F3-D1 1 2.00 2.00
Footing F3-E1 1 2.00 2.00
Footing F3-F1 1 2.00 2.00
Footing F3-G1 1 2.00 2.00
Footing F2-A1 1 1.60 1.60
Footing F1-D1 1 1.10 1.10
Footing F2-G1 1 1.60 1.60
Footing F2-A3 1 1.60 1.60
Footing F1-D3 1 1.10 1.10
Footing F2-G3 1 1.60 1.60
Footing F3-A4 1 2.00 2.00
Footing F3-B4 1 2.00 2.00
Footing F3-C4 1 2.00 2.00
Footing F3-D4 1 2.00 2.00
Footing F3-E4 1 2.00 2.00
Footing F3-F4 1 2.00 2.00
Footing F3-G4 1 2.00 2.00
Floor area 1 36.60 14.80
Ramp 2 3.10 1.60

0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa


Footing F3-A1 1 1.80 1.80
Footing F3-B1 1 1.80 1.80
Footing F3-C1 1 1.80 1.80
Footing F3-D1 1 1.80 1.80
Footing F3-E1 1 1.80 1.80
Footing F3-F1 1 1.80 1.80
Footing F3-G1 1 1.80 1.80
Footing F2-A1 1 1.40 1.40
Footing F1-D1 1 0.90 0.90
Footing F2-G1 1 1.40 1.40
Footing F2-A3 1 1.40 1.40
Footing F1-D3 1 0.90 0.90
Footing F2-G3 1 1.40 1.40
Footing F3-A4 1 1.80 1.80
Footing F3-B4 1 1.80 1.80
Footing F3-C4 1 1.80 1.80
Footing F3-D4 1 1.80 1.80
Footing F3-E4 1 1.80 1.80
Footing F3-F4 1 1.80 1.80
Footing F3-G4 1 1.80 1.80
Pedestal
C1 2 0.20 0.20
C2 4 0.45 0.45
C3 14 0.50 0.50
Floor area 1 36.60 14.80
Ramp 2 3.10 1.60

0004-00 " REINF. CONCRETE CUBE STRENGTH 35MPa

0005-00 HIGH YIELD DEFORMED BAR


1 174.73 0.16

0006-00 HIGH YIELD DEFORMED BAR / EPOXY COATED

" FAIR FACED FORM (FOR FAIR FACED


0007-00 SURFACE, EQUIPMENT PLINTH AND FLOOR
OPENING) "
Footing F3-A1 1 7.20
Footing F3-B1 1 7.20
Footing F3-C1 1 7.20
Footing F3-D1 1 7.20
Footing F3-E1 1 7.20
Footing F3-F1 1 7.20
Footing F3-G1 1 7.20
Footing F2-A1 1 5.60
Footing F1-D1 1 3.60
Footing F2-G1 1 5.60
Footing F2-A3 1 5.60
Footing F1-D3 1 3.60
Footing F2-G3 1 5.60
Footing F3-A4 1 7.20
Footing F3-B4 1 7.20
Footing F3-C4 1 7.20
Footing F3-D4 1 7.20
Footing F3-E4 1 7.20
Footing F3-F4 1 7.20
Footing F3-G4 1 7.20
Pedestal
C1 2 0.80
C2 4 1.80
C3 14 2.00

" FAIR FACED FORM (FOR FAIR FACED


0008-00 SURFACE, EQUIPMENT PLINTH AND FLOOR
OPENING) "

0009-00 NORMAL FACED FORM (FOR HIDDEN SURFACE

0010-00 WATERSTOP W=200

0011-00 WATER PROOFING SHEET

0012-00 ANTITERMITE TREATMENT


Floor area 1 36.60 14.80

0013-00 PROTECTION BOARD

APPROVED PROTECTIVE COATING


0014-00
Footing F3-A1 1 7.20
Footing F3-B1 1 7.20
Footing F3-C1 1 7.20
Footing F3-D1 1 7.20
Footing F3-E1 1 7.20
Footing F3-F1 1 7.20
Footing F3-G1 1 7.20
Footing F2-A1 1 5.60
Footing F1-D1 1 3.60
Footing F2-G1 1 5.60
Footing F2-A3 1 5.60
Footing F1-D3 1 3.60
Footing F2-G3 1 5.60
Footing F3-A4 1 7.20
Footing F3-B4 1 7.20
Footing F3-C4 1 7.20
Footing F3-D4 1 7.20
Footing F3-E4 1 7.20
Footing F3-F4 1 7.20
Footing F3-G4 1 7.20
Pedestal
C1 2 0.80
C2 4 1.80
C3 14 2.00

0015-00 HYPOSEAL SUPER WATER

BUILDING WORK - 0101 STEEL STRUCTURE WORK


0001-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP
Angle 100 x 100 x 37 16 8.60 137.60
Angle 100 x 100 x 37 16 7.80 124.80

0002-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (


UB- 203 x 133 x 30 4 8.00 32.00
UB- 356 x 171 x 51 14 8.70 121.80
UC - 152 x 152 x 37 14 3.00 42.00
UC - 152 x 152 x 37 12 6.00 72.00
UC - 152 x 152 x 37 8 8.00 64.00
Plate 190 x 120 x 6mm 70 0.02 1.60
Plate 262x120x6 48 0.03 1.51
Plate 180x120x6mm 98 0.02 2.12
Plate 190 x 120 x 6mm 98 0.02 2.23
CH 250x90x34.6 6 12.00 72.00

0003-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61


UB 406 X 178 X76 14 7 98
UB 406 X 178 X76 14 1.5 21
Plate 450x450x20mm 14 0.202 2.828
Plate 150x200x12mm 64 0.03 1.92
Plate 200x65x12mm 8 0.013 0.104
Plate 180x576x12mm 14 0.103 1.442
Plate 200x80x12mm 56 0.16 8.96
Plate 240 x240x12 32 0.576 18.432
Plate 240 x 225x12 32 0.054 1.728
Plate 240 x 150 x 12mm 8 0.036 0.288
Plate 380 x 380x 16mm 4 0.144 0.576
UB 406 x 178x74 6 12 72
Plate 170x 300x12mm 44 0.04 1.76
Plate 100x200x12mm 8 0.02 0.16

0007-00 ANCHOR BOLT (26 )


Details of A 14 4.00

0008-00 ANCHOR BOLT (M20 )


Details of B 4 4.00

BUILDING WORK - 0107 PANEL & ROOF WORK


0003-00 " 26 GA.GI COLOUR COATED PROFILE ROOF
Top 2 36.60 8.69
Deducation Lighting roof sheet -12 1.50 1.00

0004-00 " 26 GA.GI COLOUR COATED PROFILE ROOF S


Wall 2 36.60
2 14.50
1 14.50
Deducation Door -2 4.15 3.00

0005-00 TRANSUSCENT SKY LIGHT ROOF SHEET TYP.


12 1.50 1.00

0011-00 CANOPY W:1000


2 6.00

BUILDING WORK - 0108 DOOR & WINDOW WORK


0001-00 DOOR TYPE - SD

0002-00 DOOR TYPE - D


1 2.00

0003-00 DOOR TYPE - D1


0004-00 DOOR TYPE - D2

0005-00 DOOR TYPE - D3

0006-00 DOOR TYPE - D4

0007-00 DOOR TYPE - D5

0008-00 DOOR TYPE - D6

0009-00 DOOR TYPE - D7

0010-00 WINDOW TYPE - W1

0011-00 WINDOW TYPE - W2

BUILDING WORK - 0102 MISC METAL WORK


0001-00 MISC. STEEL WORK
Base Plate - A 20mm thk 14 0.20 0.02
Base Plate - B 20mm thk 4 0.14 0.02

0009-00 Sand Fill M3


Dry Rubble packing 1 36.60 14.80

Prepared by Arunkumar.G (Emp.14326) Qunatity Surveyor


Depth Qty Remarks Unit

1.50 13.50 1
1.50 13.50 1
1.50 13.50 1
1.50 13.50 1
1.50 13.50 1
1.50 13.50 1
1.50 13.50 1
1.50 10.14 1
1.50 6.62 1
1.50 10.14 1
1.50 10.14 1
1.50 6.62 1
1.50 10.14 1
1.50 13.50 1
1.50 13.50 1
1.50 13.50 1
1.50 13.50 1
1.50 13.50 1
1.50 13.50 1
1.50 13.50 1
242.79 M3

0.00 M3

0.00 M3

242.79
242.79 M3

0.15 36.6
36.60 M3

4.00 1
4.00 1
4.00 1
4.00 1
4.00 1
4.00 1
4.00 1
2.56 1
1.21 1
2.56 1
2.56 1
1.21 1
2.56 1
4.00 1
4.00 1
4.00 1
4.00 1
4.00 1
4.00 1
4.00 1
541.68
9.92
620.26 M2

0.10 0.40 1
0.10 0.40 1
0.10 0.40 1
0.10 0.40 1
0.10 0.40 1
0.10 0.40 1
0.10 0.40 1
0.10 0.26 1
0.10 0.12 1
0.10 0.26 1
0.10 0.26 1
0.10 0.12 1
0.10 0.26 1
0.10 0.40 1
0.10 0.40 1
0.10 0.40 1
0.10 0.40 1
0.10 0.40 1
0.10 0.40 1
0.10 0.40 1
0.10 54.17
0.10 0.99
62.03 M3
0.45 1.46 1
0.45 1.46 1
0.45 1.46 1
0.45 1.46 1
0.45 1.46 1
0.45 1.46 1
0.45 1.46 1
0.40 0.78 1
0.40 0.32 1
0.40 0.78 1
0.40 0.78 1
0.40 0.32 1
0.40 0.78 1
0.45 1.46 1
0.45 1.46 1
0.45 1.46 1
0.45 1.46 1
0.45 1.46 1
0.45 1.46 1
0.45 1.46 1

1.20 0.10
1.20 0.97
1.20 4.20
0.15 81.25
0.20 1.98

112.70 M3

0.00 M3

27.96
27.96 TN

0.00 TN

0.45 3.24 1
0.45 3.24 1
0.45 3.24 1
0.45 3.24 1
0.45 3.24 1
0.45 3.24 1
0.45 3.24 1
0.40 2.24 1
0.40 1.44 1
0.40 2.24 1
0.40 2.24 1
0.40 1.44 1
0.40 2.24 1
0.45 3.24 1
0.45 3.24 1
0.45 3.24 1
0.45 3.24 1
0.45 3.24 1
0.45 3.24 1
0.45 3.24 1

1.20 1.92
1.20 8.64
1.20 33.60

101.36 M2

0.00 M2

0.00 M2

0.00 MZ

0.00 M2

541.68
541.68 M2

0.00 M2

0.45 3.24 1
0.45 3.24 1
0.45 3.24 1
0.45 3.24 1
0.45 3.24 1
0.45 3.24 1
0.45 3.24 1
0.40 2.24 1
0.40 1.44 1
0.40 2.24 1
0.40 2.24 1
0.40 1.44 1
0.40 2.24 1
0.45 3.24 1
0.45 3.24 1
0.45 3.24 1
0.45 3.24 1
0.45 3.24 1
0.45 3.24 1
0.45 3.24 1

1.20 1.92
1.20 8.64
1.20 33.60

101.36 M2

0.00 M2

12.20 1678.72
12.20 1522.56

3.20 TN

30.00 960.00
51.00 6211.80
37.00 1554.00
37.00 2664.00
37.00 2368.00
47.10 75.17
47.10 71.06
47.10 99.70
47.10 105.24
34.00 2448.00

16.56 TN

74 7252
74 1554
157 443.996
94.2 180.864
94.2 9.7968
94.2 135.8364
94.2 844.032
94.2 1736.2944
94.2 162.7776
94.2 27.1296
125.6 72.3456
74 5328
94.2 165.792
94.2 15.072
17.93 TN

56.00
56.00 EA

16.00
16.00 EA

635.74 36.60
-18.00
617.74 M2

8.55 625.86
7.10 205.90
1.45 21.03
-24.9
827.89 M2

18.00
18.00 M2

12
12.00 MZ

0.00 EA

2.00
2.00 EA

0.00 EA
0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

7.85 0.45
7.85 0.09
0.54 TN

0.05 36.6
36.60 M3

ity Surveyor
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.4 1.4 0.4
0.9 0.9 0.4
1.4 1.4 0.4
1.4 1.4 0.4
0.9 0.9 0.4
1.4 1.4 0.4
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45

1.8 1.8 0.45


1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.4 1.4 0.4
0.9 0.9 0.4
1.4 1.4 0.4
1.4 1.4 0.4
0.9 0.9 0.4
1.4 1.4 0.4
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45

1.8 1.8 0.45


1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.4 1.4 0.4
0.9 0.9 0.4
1.4 1.4 0.4
1.4 1.4 0.4
0.9 0.9 0.4
1.4 1.4 0.4
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.4 1.4 0.4
0.9 0.9 0.4
1.4 1.4 0.4
1.4 1.4 0.4
0.9 0.9 0.4
1.4 1.4 0.4
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45

1.8 1.8 0.45


1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.4 1.4 0.4
0.9 0.9 0.4
1.4 1.4 0.4
1.4 1.4 0.4
0.9 0.9 0.4
1.4 1.4 0.4
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45

0.20 0.20 1.20


0.45 0.45 1.20
0.50 0.50 1.20

1.8 1.8 0.45


1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.4 1.4 0.4
0.9 0.9 0.4
1.4 1.4 0.4
1.4 1.4 0.4
0.9 0.9 0.4
1.4 1.4 0.4
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45
1.8 1.8 0.45

0.20 0.20 1.20


0.45 0.45 1.20
0.50 0.50 1.20
8.60
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH FROM M3 38.29
0002-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH MOR M3 -
0003-00 SELECTED EXCAVATED SOIL M3 -
0004-00 DISPOSAL M3 38.29
0005-00 CRUSH STONE M3 3.50
BUILDING WORK - 0101 REINFORCED CONCRETE WORK
0001-00 PE FILM(THK 0.15, 2PLY) DAMP PROOF C M2 22.23
0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa M3 2.05
0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUB STRUCT M3 6.36
0004-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUPERSTRU M3 -
0005-00 HIGH YIELD DEFORMED BAR BS 4449 G460 Y TN 0.50
0006-00 HIGH YIELD DEFORMED BAR / EPOXY COATED BS 4449 G460 Y TN -
" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT
0007-00 M2 -
PLINTH AND FLOOR OPENING) "

" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT


0008-00 PIPE SUPPORT M2 57.68
PLINTH AND FLOOR OPENING) "
0009-00 NORMAL FACED FORM (FOR HIDDEN SURFACE) PIPE SUPPORT M2 3.36
0010-00 WATERSTOP W=200 PVC TYPE(THK. MZ -
0011-00 FIBRE REINFORCED BITUMEN COATING M2 -
0012-00 ANTITERMITE TREATMENT M2 -
0013-00 EPOXY MORTAR FINISH TO CONCRETE BENCHING AS PER SPECIFICATION M3 -
0014-00 POLYESTER PROTECTIVE RESIN NITOCOTE PE13 M2 -
0015-00 HYPOSEAL SUPER WATER PROOFER TO CO M2 -
BUILDING WORK - 0101 STEEL STRUCTURE WORK
0001-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 200 TN -
0002-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 200 TN -
0003-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 200 TN -
0004-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 320 TN -
0005-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 320 TN -
0006-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 320 TN -
0007-00 ANCHOR BOLT (M24, L=700) STEEL : ASTM A EA -
0008-00 ANCHOR BOLT (M30, L=900) STEEL : ASTM A EA -

87/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0009-00 NON-SHRINKAGE GROUT Fcu= 65N/mm2 A M3 -


0010-00 DECK PLATE - THK.1.6mm (Including stud bolt) GALVANIZED STE M2 -
0011-00 Additional Items : STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM ( DFT : Total 200 TN -
0012-00 Additional Items : STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61 DFT : Total 200 TN -
0013-00 Additional Items: STRUCTURAL STEEL (BUILT-UP) DFT : Total 200 TN -
0014-00 Additional Items : ANCHOR BOLT (M36, L=1080) STEEL : ASTM A EA -
0015-00 Additional Items : STAIR TREAD HOT DIP GALVAN M2 -
BUILDING WORK - 0101 MASONRY WORK
0001-00 INSULATED BLOCK WALL 4" BLOCK (INT) M2 -
0002-00 8" BLOCK WALL TYPE A AS PER M2 44.46
0003-00 4.5" BLOCK WALL TYPE A AS PER M2 -
BUILDING WORK - 0102 PLASTER WORK
0001-00 EXTERIOR CEMENT PLASTER FOR WALL, THK. 24mm M2 60.12
0002-00 INTERIOR CEMENT PLASTER FOR WALL, THK. 18mm M2 56.28
0003-00 INTERIOR CEMENT PLASTER FOR CEILING, THK. 18mm M2 -
BUILDING WORK - 0103 PAINTING WORK
0001-00 1 COAT OF PRIMER + 2 COATS OF MEDIUM TEXTURE PAINT FOR EXT. WALL M2 60.12
0002-00 1 COAT OF PRIMER + 2 OF ACRYLIC EMULSION PAINT FOR INT. WALL & CEILING M2 60.12
0003-00 CONCRETE FLOORING(EMERY TOP FLOORING (5Kg/m2)) FOR RAMP. FLOOR M2 -
BUILDING WORK - 0104 CONCRETE ROOFING AND WATERPROOFING WORK
0001-00 ROOF WATERPROOFING M2 -
0002-00 MORTAR WATERPROOFING DFT : 80 M2 -
BUILDING WORK - 0105 FLOORING & TILING WORK
0001-00 CERAMIC TILES SIZE :400 x 400m M2 -
0002-00 NON SLIPPERY VITRIFIED CERAMIC TILES SIZE :200 x 200 M2 -
0003-00 GRANITE FLOOR TILES SIZE :600 x 300 M2 -
0004-00 SINGLE PIECE TERRAZZO RISER & THREAD M2 -
0005-00 SINGLE PIECE OMANI MARBKLE RISER AND TREAD 30mm THK. M2 -
0006-00 TERRAZZO TILES 8mm THK. RUBBERM2 -
0007-00 WHITE CEMENT ROOF TILES 300 X 300 mm, M2 -
BUILDING WORK - 0106 INTERIOR WORK
0001-00 GYPSUM BOARD FALSE CEILING SIZE : 600 x 600 M2 -
0002-00 CEILING W/ PVC STRIP W 100mm M2 -

88/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

BUILDING WORK - 0107 PANEL & ROOF WORK


0001-00 " THERMAL INSULATED TRAPEZOIDAL CLADDING FOR EXT. WALLTHK. 0.7mm(EXT M2 -
0002-00 " THERMAL INSULATED TRAPEZOIDAL CLADDING FOR ROOF" THK. 0.7mm(EXT M2 -
0003-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FOR ROOF" M2 -
0004-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FOR WALL" M2 -
0005-00 GUTTER FLASHING THK. 1.6mm MZ -
0006-00 ROOF DRAIN 100 CAST IRON EA -
0007-00 ROOF DRAIN 150 CAST IRON EA -
0008-00 DOWN SPOUT 100 GALVANISED ST MZ -
0009-00 DOWN SPOUT 150 CAST IRON MZ -
0010-00 SPLASH BLOCK SIZE : 500x500x EA -
0011-00 CANOPY W:1000 MZ -
BUILDING WORK - 0108 DOOR & WINDOW WORK
0001-00 DOOR TYPE - SD HEAVY DUTY M.S EA -
0002-00 DOOR TYPE - D 44MM.THK. COMM EA -
0003-00 DOOR TYPE - D1 44MM.THK DECOREA -
0004-00 DOOR TYPE - D2 44MM. THK.SEMI EA -
0005-00 DOOR TYPE - D3 44MM. THK.SEMI EA -
0006-00 DOOR TYPE - D4 44MM. THK.SEMI EA -
0007-00 DOOR TYPE - D5 44MM.THK. COMM EA -
0008-00 DOOR TYPE - D6 44MM. THK.SEMI EA -
0009-00 DOOR TYPE - D7 44MM. THK.SEMI EA -
0010-00 WINDOW TYPE - W1 POWER COATED AEA -
0011-00 WINDOW TYPE - W2 POWER COATED AEA -
0017-00 M.S. Flat Gate (1200 x 1800) EA 1.00
BUILDING WORK - 0102 MISC METAL WORK
0001-00 MISC. STEEL WORK GALVANIZED(COATN -
0002-00 STEEL GRATING T532 HOT DIP GALVAN M2 -
0003-00 CHECKERED PLATE THK. 6mm GALVANIZED(COAM2 -
0004-00 STEEL CAGE LADDER GALVANIZED(COAMZ -
0005-00 STEEL PIPE HANDRAIL GRIP : I.D.50mm MZ -
0006-00 STAINLESS PIPE HANDRAIL GRIP : I.D.50mm MZ -
Building WORK - 0110 ROAD AND PAVING WORKS

89/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0001-00 WEARING COURSE with tack coating M2 -


0002-00 ASPHALT BINDER COURSE with prime coatin M2 -
0003-00 BASE COURSE T=150,max 40 M3 -
0004-00 SUBBASE COURSE T=200,max.80mm M3 -
0005-00 FORMATION LEVEL COMPACTION 95% Density ; do M2 -
0006-00 PC CURB STONE 180x210x300x10 MZ -
0007-00 P.E FILM Minimun 0.15mm p M2 -
0008-00 PRECAST CONC BLOCK PAVING 100mm thick to c M2 -
0009-00 SAND FILLING M3 -

GRAND TOTAL

90/216
Project : WareHouse & Office Building at Nizwa Industrial Room

Title : Substation

Sl.No DESCRIPTION Nos Length width

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATI
Footing BB, CC 7 2.20 2.20
Plinth Beam 1 26.00 1.00

Total
0004-00 DISPOSAL
Footing BB, CC 7 2.20 2.20
Plinth Beam 1 26.00 1.00

Total
0005-00 CRUSH STONE
Ground floor area 1 7.60 4.60
Total
BUILDING WORK - 0101 REINFORCED CONCRETE WORK
0001-00 PE FILM(THK 0.15, 2PLY)
Footing 7 1.30 1.30
Plinth Beam 1 26.00 0.40

0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa


Footing 7 1.20 1.20
Plinth Beam 1 26.00 0.40

0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa


Footing 7 1.00 1.00
Pedestal 7 0.20 0.20
Plinth Beam 1 26.00 0.20
Column 7 0.20 0.20
Top Beam 1 24.60 0.20

0005-00 HIGH YIELD DEFORMED BAR


Footing Bottom T14 7 1.30 12.00
Footing Top T10 7 1.30 12.00
Column T14 7 3.50 4.00
Column Ring T8 7 0.45 12.00
Top Beam T14 1 26.00 4.00
Top Beam Ring T8 1 0.80 130.00
Project : WareHouse & Office Building at Nizwa Industrial Room

Title : Substation

Sl.No DESCRIPTION Nos Length width


" FAIR FACED FORM (FOR FAIR FACED
0008-00 SURFACE, EQUIPMENT PLINTH AND FLOOR
OPENING) "
Footing 7 4.00
Pedestal 7 0.80
Plinth Beam 2 26.00
Column 7 0.80
Top Beam 2 24.60

0009-00 NORMAL FACED FORM (FOR HIDDEN SURFACE


Footing 7 4.80

BUILDING WORK - 0101 MASONRY WORK


0002-00 8" BLOCK WALL
1 24.60
Deducation door -1 1.20

BUILDING WORK - 0102 PLASTER WORK


0001-00 EXTERIOR CEMENT PLASTER FOR WALL, THK.
1 26.00
Deducation door -1 1.20

0002-00 INTERIOR CEMENT PLASTER FOR WALL, THK.


1 24.40
Deducation door -1 1.20

BUILDING WORK - 0103 PAINTING WORK


0001-00 1 COAT OF PRIMER + 2 COATS OF MEDIUM TEX
1 26.00
Deducation door -1 1.20

0002-00 1 COAT OF PRIMER + 2 OF ACRYLIC EMULSION P


1 26.00
Deducation door -1 1.20

BUILDING WORK - 0108 DOOR & WINDOW WORK


0017-00 M.S. Flat Gate (1200 x 1800) 1 1

Prepared by Arunkumar.G (Emp.14326) Qunatity Surveyor


Depth Qty Remarks Unit

0.90 30.49
0.30 7.80

38.29 M3

0.90 30.49
0.30 7.80

38.29 M3

0.10 3.50
3.50 M3

11.83
10.40
22.23 M2

0.10 1.01
0.10 1.04

2.05 M3

0.30 2.10
0.30 0.08
0.50 2.60
2.10 0.59
0.20 0.98
6.36 M3

1.21 132.12
0.62 67.41
1.21 118.58
0.395 14.93
1.21 125.83
0.395 41.08

0.50 TN
Depth Qty Remarks Unit

0.30 8.40
0.30 1.68
0.50 26.00
2.10 11.76
0.20 9.84
57.68 M2

0.10 3.36
3.36 M2

1.90 46.74
1.90 -2.28
44.46 M2

2.40 62.4
1.90 -2.28
60.12 M2

2.40 58.56
1.90 -2.28
56.28 M2

2.40 62.4
1.90 -2.28

60.12 M2

2.40 62.4
1.90 -2.28

60.12 M2

1.00

1.00 EA

ity Surveyor
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH FROM M3 72.12
0002-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH MOR M3 -
0003-00 SELECTED EXCAVATED SOIL M3 -
0004-00 DISPOSAL M3 72.12
0005-00 CRUSH STONE M3 -
BUILDING WORK - 0101 REINFORCED CONCRETE WORK
0001-00 PE FILM(THK 0.15, 2PLY) DAMP PROOF C M2 110.43
0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa M3 11.04
0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUB STRUCT M3 35.32
0004-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUPERSTRU M3 60.35
0005-00 HIGH YIELD DEFORMED BAR BS 4449 G460 Y TN 15.31
0006-00 HIGH YIELD DEFORMED BAR / EPOXY COATED BS 4449 G460 Y TN -
" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT
0007-00 M2 204.61
PLINTH AND FLOOR OPENING) "

" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT


0008-00 PIPE SUPPORT M2 526.15
PLINTH AND FLOOR OPENING) "
0009-00 NORMAL FACED FORM (FOR HIDDEN SURFACE) PIPE SUPPORT M2 -
0010-00 WATERSTOP W=200 PVC TYPE(THK. MZ -
0011-00 FIBRE REINFORCED BITUMEN COATING M2 -
0012-00 ANTITERMITE TREATMENT M2 -
0013-00 EPOXY MORTAR FINISH TO CONCRETE BENCHING AS PER SPECIFICATION M3 -
0014-00 POLYESTER PROTECTIVE RESIN NITOCOTE PE13 M2 532.44
0015-00 HYPOSEAL SUPER WATER PROOFER TO CO M2 -
BUILDING WORK - 0101 STEEL STRUCTURE WORK
0001-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 200 TN -
0002-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 200 TN -
0003-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 200 TN -
0004-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 320 TN -
0005-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 320 TN -
0006-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 320 TN -
0007-00 ANCHOR BOLT (M24, L=700) STEEL : ASTM A EA -
0008-00 ANCHOR BOLT (M30, L=900) STEEL : ASTM A EA -

95/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0009-00 NON-SHRINKAGE GROUT Fcu= 65N/mm2 A M3 -


0010-00 DECK PLATE - THK.1.6mm (Including stud bolt) GALVANIZED STE M2 -
0011-00 Additional Items : STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM ( DFT : Total 200 TN -
0012-00 Additional Items : STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61 DFT : Total 200 TN -
0013-00 Additional Items: STRUCTURAL STEEL (BUILT-UP) DFT : Total 200 TN -
0014-00 Additional Items : ANCHOR BOLT (M36, L=1080) STEEL : ASTM A EA -
0015-00 Additional Items : STAIR TREAD HOT DIP GALVAN M2 -
BUILDING WORK - 0101 MASONRY WORK
0001-00 INSULATED BLOCK WALL 4" BLOCK (INT) M2 -
0002-00 8" BLOCK WALL TYPE A AS PER M2 672.40
0003-00 4.5" BLOCK WALL TYPE A AS PER M2 23.00
BUILDING WORK - 0102 PLASTER WORK
0001-00 EXTERIOR CEMENT PLASTER FOR WALL, THK. 24mm M2 357.16
0002-00 INTERIOR CEMENT PLASTER FOR WALL, THK. 18mm M2 421.28
0003-00 INTERIOR CEMENT PLASTER FOR CEILING, THK. 18mm M2 -
BUILDING WORK - 0103 PAINTING WORK
0001-00 1 COAT OF PRIMER + 2 COATS OF MEDIUM TEXTURE PAINT FOR EXT. WALL M2 357.16
0002-00 1 COAT OF PRIMER + 2 OF ACRYLIC EMULSION PAINT FOR INT. WALL & CEILING M2 477.29
0003-00 CONCRETE FLOORING(EMERY TOP FLOORING (5Kg/m2)) FOR RAMP. FLOOR M2 -
BUILDING WORK - 0104 CONCRETE ROOFING AND WATERPROOFING WORK
0001-00 ROOF WATERPROOFING M2 -
0002-00 MORTAR WATERPROOFING DFT : 80 M2 -
BUILDING WORK - 0105 FLOORING & TILING WORK
0001-00 SINGLE PIECE GRANITE RISER & THREAD M2 5.04
0002-00 20MM THK 200MM WIDE GRANITE STRIPS M2 -
0003-00 600 X 300 X 20MM GRANITE FLOOR TILES M2 -
0004-00 400 X 400MM CERAMIC TILES M2 149.66
0005-00 8mm THK RUBBER MAT ABOVE 400 X 400 X 28mm TERRAZZO TILES M2 -
0006-00 200 X 200mm NON SLIPPERY VITRIFIED CERAMIC TILES M2 22.51
0007-00 30mm THK SINGLE PIECE OMANI MARBLE RISER AND TREAD M2 23.61
0008-00 300 X 300mm WHITE CEMENT ROOF TILES M2 240.00
0009-00 200 x 300mm Fully glazed ceramic wall tiles M2 117.00
BUILDING WORK - 0106 INTERIOR WORK

96/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0001-00 GYPSUM BOARD FALSE CEILING SIZE : 600 x 600 M2 214.58


0002-00 CEILING W/ PVC STRIP W 100mm M2 -
BUILDING WORK - 0107 PANEL & ROOF WORK
0001-00 " THERMAL INSULATED TRAPEZOIDAL CLADDING FOR EXT. WALLTHK. 0.7mm(EXT M2 -
0002-00 " THERMAL INSULATED TRAPEZOIDAL CLADDING FOR ROOF" THK. 0.7mm(EXT M2 -
0003-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FOR ROOF" M2 -
0004-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FOR WALL" M2 -
0005-00 GUTTER FLASHING THK. 1.6mm MZ -
0006-00 ROOF DRAIN 100 CAST IRON EA -
0007-00 ROOF DRAIN 150 CAST IRON EA -
0008-00 DOWN SPOUT 100 GALVANISED ST MZ -
0009-00 DOWN SPOUT 150 CAST IRON MZ -
0010-00 SPLASH BLOCK SIZE : 500x500x EA -
0011-00 CANOPY W:1000 MZ -
BUILDING WORK - 0108 DOOR & WINDOW WORK
0001-00 DOOR TYPE - SD HEAVY DUTY M.S EA -
0002-00 DOOR TYPE - D 44MM.THK. COMM EA -
0003-00 DOOR TYPE - D1 44MM.THK DECOREA 2.00
0004-00 DOOR TYPE - D2 44MM. THK.SEMI EA 2.00
0005-00 DOOR TYPE - D3 44MM. THK.SEMI EA 6.00
0006-00 DOOR TYPE - D4 44MM. THK.SEMI EA 1.00
0007-00 DOOR TYPE - D5 44MM.THK. COMM EA 2.00
0008-00 DOOR TYPE - D6 44MM. THK.SEMI EA -
0009-00 DOOR TYPE - D7 44MM. THK.SEMI EA 1.00
0010-00 WINDOW TYPE - W1 POWER COATED AEA 9.00
0011-00 WINDOW TYPE - W2 POWER COATED AEA 1.00
0012-00 M.S. Flat Gate (1200 x 1800) EA -
BUILDING WORK - 0102 MISC METAL WORK
0001-00 MISC. STEEL WORK GALVANIZED(COATN -
0002-00 STEEL GRATING T532 HOT DIP GALVAN M2 -
0003-00 CHECKERED PLATE THK. 6mm GALVANIZED(COAM2 -
0004-00 STEEL CAGE LADDER GALVANIZED(COAMZ -
0005-00 STEEL PIPE HANDRAIL GRIP : I.D.50mm MZ 7.78

97/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0006-00 STAINLESS PIPE HANDRAIL GRIP : I.D.50mm MZ 1.80


Building WORK - 0110 ROAD AND PAVING WORKS
0001-00 WEARING COURSE with tack coating M2 -
0002-00 ASPHALT BINDER COURSE with prime coatin M2 -
0003-00 BASE COURSE T=150,max 40 M3 -
0004-00 SUBBASE COURSE T=200,max.80mm M3 -
0005-00 FORMATION LEVEL COMPACTION 95% Density ; do M2 -
0006-00 PC CURB STONE 180x210x300x10 MZ -
0007-00 P.E FILM Minimun 0.15mm p M2 -
0008-00 PRECAST CONC BLOCK PAVING 100mm thick to c M2 -
0009-00 SAND FILLING M3 -

GRAND TOTAL

98/216
Project : WareHouse & Office Building at Nizwa Industrial Room

Title : Office & Electronic store

Sl.No DESCRIPTION Nos Length width

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATI
Footing F5-C3 1 3.15 2.95
Footing F5-C5 1 3.15 2.95
Footing F4-C7 1 3.05 2.85
Footing F3-C8 1 2.90 2.70
Footing F3-D1 1 2.90 2.70
Footing F5-D2 1 3.15 2.95
Footing F4-D3 1 3.05 2.85
Footing F5-D4 1 3.15 2.95
Footing F6-D7 1 3.50 3.20
Footing F3-D8 1 2.90 2.70
Footing F1-E1 1 2.65 1.33
Footing F5-E2 1 3.15 2.95
Footing F4-E3 1 3.05 2.85
Footing F5-E4 1 3.15 2.95
Footing F5-E7 1 3.15 2.95
Footing F2-E8 1 2.80 2.60

Total
0002-00 SOIL EXCAVATION BY MACHINE FOR FOUNDAT

Total
0003-00 SELECTED EXCAVATED SOIL

Total
0004-00 DISPOSAL
Footing F5-C3 1 3.15 2.95
Footing F5-C5 1 3.15 2.95
Footing F4-C7 1 3.05 2.85
Footing F3-C8 1 2.90 2.70
Footing F3-D1 1 2.90 2.70
Footing F5-D2 1 3.15 2.95
Footing F4-D3 1 3.05 2.85
Footing F5-D4 1 3.15 2.95
Footing F6-D7 1 3.50 3.20
Footing F3-D8 1 2.90 2.70
Footing F1-E1 1 2.65 1.33
Footing F5-E2 1 3.15 2.95
Footing F4-E3 1 3.05 2.85
Footing F5-E4 1 3.15 2.95
Footing F5-E7 1 3.15 2.95
Footing F2-E8 1 2.80 2.60
Total
0005-00 CRUSH STONE

Total
BUILDING WORK - 0101 REINFORCED CONCRETE WORK
0001-00 PE FILM(THK 0.15, 2PLY)
Footing F5-C3 1 2.15 1.95
Footing F5-C5 1 2.15 1.95
Footing F4-C7 1 2.05 1.85
Footing F3-C8 1 1.90 1.70
Footing F3-D1 1 1.90 1.70
Footing F5-D2 1 2.15 1.95
Footing F4-D3 1 2.05 1.85
Footing F5-D4 1 2.15 1.95
Footing F6-D7 1 2.50 2.20
Footing F3-D8 1 1.90 1.70
Footing F1-E1 1 1.65 0.33
Footing F5-E2 1 2.15 1.95
Footing F4-E3 1 2.05 1.85
Footing F5-E4 1 2.15 1.95
Footing F5-E7 1 2.15 1.95
Footing F2-E8 1 1.80 1.60
Plinth beam
P1 1 107.10 0.40
P2 1 10.40 0.40
P3 1 5.55 0.40
P4 1 4.70 0.40

0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa


Footing F5-C3 1 2.15 1.95
Footing F5-C5 1 2.15 1.95
Footing F4-C7 1 2.05 1.85
Footing F3-C8 1 1.90 1.70
Footing F3-D1 1 1.90 1.70
Footing F5-D2 1 2.15 1.95
Footing F4-D3 1 2.05 1.85
Footing F5-D4 1 2.15 1.95
Footing F6-D7 1 2.50 2.20
Footing F3-D8 1 1.90 1.70
Footing F1-E1 1 1.65 0.33
Footing F5-E2 1 2.15 1.95
Footing F4-E3 1 2.05 1.85
Footing F5-E4 1 2.15 1.95
Footing F5-E7 1 2.15 1.95
Footing F2-E8 1 1.80 1.60
Plinth beam
P1 1 107.10 0.40
P2 1 10.40 0.40
P3 1 5.55 0.40
P4 1 4.70 0.40

0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa


Footing F5-C3 1 1.95 1.75
Footing F5-C5 1 1.95 1.75
Footing F4-C7 1 1.85 1.65
Footing F3-C8 1 1.70 1.50
Footing F3-D1 1 1.70 1.50
Footing F5-D2 1 1.95 1.75
Footing F4-D3 1 1.85 1.65
Footing F5-D4 1 1.95 1.75
Footing F6-D7 1 2.30 2.00
Footing F3-D8 1 1.70 1.50
Footing F1-E1 1 1.45 0.13
Footing F5-E2 1 1.95 1.75
Footing F4-E3 1 1.85 1.65
Footing F5-E4 1 1.95 1.75
Footing F5-E7 1 1.95 1.75
Footing F2-E8 1 1.60 1.40
Column C1-A1 1 0.20 0.40
Column C1-A2 1 0.20 0.40
Column C1-A3 1 0.20 0.40
Column C1-A5 1 0.20 0.40
Column C1-A6 1 0.20 0.40
Column C1-A8 1 0.20 0.40
Column C1-C1 1 0.20 0.40
Column C1-C2 1 0.20 0.40
Column C1-C3 1 0.20 0.40
Column C1-C5 1 0.20 0.40
Column C1-C7 1 0.20 0.40
Column C1-C8 1 0.20 0.40
Column C1-D1 1 0.20 0.40
Column C1-D2 1 0.20 0.40
Column C1-D3 1 0.20 0.40
Column C1-D4 1 0.20 0.40
Column C2-D7 1 0.20 0.50
Column C1-D8 1 0.20 0.40
Column C1-E1 1 0.20 0.40
Column C1-E2 1 0.20 0.40
Column C1-E3 1 0.20 0.40
Column C1-E4 1 0.20 0.40
Column C1-E7 1 0.20 0.40
Column C1-E8 1 0.20 0.40
Plinth beam
P1 1 107.10 0.20
P2 1 10.40 0.20
P3 1 5.55 0.20
P4 1 4.70 0.20

0004-00 " REINF. CONCRETE CUBE STRENGTH 35MPa


Column C1-A1 1 0.20 0.40
Column C1-A2 1 0.20 0.40
Column C1-A3 1 0.20 0.40
Column C1-A5 1 0.20 0.40
Column C1-A6 1 0.20 0.40
Column C1-A8 1 0.20 0.40
Column C1-C1 1 0.20 0.40
Column C1-C2 1 0.20 0.40
Column C1-C3 1 0.20 0.40
Column C1-C5 1 0.20 0.40
Column C1-C7 1 0.20 0.40
Column C1-C8 1 0.20 0.40
Column C1-D1 1 0.20 0.40
Column C1-D2 1 0.20 0.40
Column C1-D3 1 0.20 0.40
Column C1-D4 1 0.20 0.40
Column C2-D7 1 0.20 0.50
Column C1-D8 1 0.20 0.40
Column C1-E1 1 0.20 0.40
Column C1-E2 1 0.20 0.40
Column C1-E3 1 0.20 0.40
Column C1-E4 1 0.20 0.40
Column C1-E7 1 0.20 0.40
Column C1-E8 1 0.20 0.40
Ground floor Roof Beam
B1 1 0.20
B2 1 40.30 0.20
B3 1 3.80 0.20
B4 1 40.60 0.20
B5 1 3.60 0.20
B6 1 8.05 0.20
B7 1 0.20
B8 1 0.20
B9 1 18.80 0.20
B10 1 4.70 0.20
Slab S5 1 12.00 4.70
Slab S3 1 4.70 4.70
Slab S1 1 19.60 1.80
Slab S2 1 14.50 4.70
Slab S4 1 4.30 3.70
Slab S5 1 6.70 2.50
Stair case 2 3.63 1.20
Step 11 1.20 0.20
Way slab 2 1.70 2.50

0005-00 HIGH YIELD DEFORMED BAR


1 95.67 0.16

0006-00 HIGH YIELD DEFORMED BAR / EPOXY COATED

" FAIR FACED FORM (FOR FAIR FACED


0007-00 SURFACE, EQUIPMENT PLINTH AND FLOOR
OPENING) "
Footing F5-C3 1 7.40
Footing F5-C5 1 7.40
Footing F4-C7 1 7.00
Footing F3-C8 1 6.40
Footing F3-D1 1 6.40
Footing F5-D2 1 7.40
Footing F4-D3 1 7.00
Footing F5-D4 1 7.40
Footing F6-D7 1 8.60
Footing F3-D8 1 6.40
Footing F1-E1 1 3.15
Footing F5-E2 1 7.40
Footing F4-E3 1 7.00
Footing F5-E4 1 7.40
Footing F5-E7 1 7.40
Footing F2-E8 1 6.00
Column C1-A1 1 1.20
Column C1-A2 1 1.20
Column C1-A3 1 1.20
Column C1-A5 1 1.20
Column C1-A6 1 1.20
Column C1-A8 1 1.20
Column C1-C1 1 1.20
Column C1-C2 1 1.20
Column C1-C3 1 1.20
Column C1-C5 1 1.20
Column C1-C7 1 1.20
Column C1-C8 1 1.20
Column C1-D1 1 1.20
Column C1-D2 1 1.20
Column C1-D3 1 1.20
Column C1-D4 1 1.20
Column C2-D7 1 1.40
Column C1-D8 1 1.20
Column C1-E1 1 1.20
Column C1-E2 1 1.20
Column C1-E3 1 1.20
Column C1-E4 1 1.20
Column C1-E7 1 1.20
Column C1-E8 1 1.20
Plinth beam
P1 2 107.10
P2 2 10.40
P3 2 5.55
P4 2 4.70

" FAIR FACED FORM (FOR FAIR FACED


0008-00 SURFACE, EQUIPMENT PLINTH AND FLOOR
OPENING) "
Column C1-A1 1 1.20
Column C1-A2 1 1.20
Column C1-A3 1 1.20
Column C1-A5 1 1.20
Column C1-A6 1 1.20
Column C1-A8 1 1.20
Column C1-C1 1 1.20
Column C1-C2 1 1.20
Column C1-C3 1 1.20
Column C1-C5 1 1.20
Column C1-C7 1 1.20
Column C1-C8 1 1.20
Column C1-D1 1 1.20
Column C1-D2 1 1.20
Column C1-D3 1 1.20
Column C1-D4 1 1.20
Column C2-D7 1 1.40
Column C1-D8 1 1.20
Column C1-E1 1 1.20
Column C1-E2 1 1.20
Column C1-E3 1 1.20
Column C1-E4 1 1.20
Column C1-E7 1 1.20
Column C1-E8 1 1.20
Stair case 2 3.63 1.20
Step 22 1.20
Way slab 2 1.70 2.50
Ground floor Roof Beam
B1 1 0.20
B2 2 40.30
B3 2 3.80
B4 2 40.60
B5 2 3.60
B6 2 8.05
B7 1
B8 1
B9 2 18.80
B10 2 4.70
Slab S5 1 12.00 4.70
Slab S3 1 4.70 4.70
Slab S1 1 19.60 1.80
Slab S2 1 14.50 4.70
Slab S4 1 4.30 3.70
Slab S5 1 6.70 2.50

0014-00 APPROVED PROTECTIVE COATING


Footing F5-C3 1 7.40 3.41
Footing F5-C5 1 7.40 3.41
Footing F4-C7 1 7.00 3.05
Footing F3-C8 1 6.40 2.55
Footing F3-D1 1 6.40 2.55
Footing F5-D2 1 7.40 3.41
Footing F4-D3 1 7.00 3.05
Footing F5-D4 1 7.40 3.41
Footing F6-D7 1 8.60 4.60
Footing F3-D8 1 6.40 2.55
Footing F1-E1 1 3.15 0.18
Footing F5-E2 1 7.40 3.41
Footing F4-E3 1 7.00 3.05
Footing F5-E4 1 7.40 3.41
Footing F5-E7 1 7.40 3.41
Footing F2-E8 1 6.00 2.24
Column C1-A1 1 1.20
Column C1-A2 1 1.20
Column C1-A3 1 1.20
Column C1-A5 1 1.20
Column C1-A6 1 1.20
Column C1-A8 1 1.20
Column C1-C1 1 1.20
Column C1-C2 1 1.20
Column C1-C3 1 1.20
Column C1-C5 1 1.20
Column C1-C7 1 1.20
Column C1-C8 1 1.20
Column C1-D1 1 1.20
Column C1-D2 1 1.20
Column C1-D3 1 1.20
Column C1-D4 1 1.20
Column C2-D7 1 1.40
Column C1-D8 1 1.20
Column C1-E1 1 1.20
Column C1-E2 1 1.20
Column C1-E3 1 1.20
Column C1-E4 1 1.20
Column C1-E7 1 1.20
Column C1-E8 1 1.20
Plinth beam
P1 2 107.10
P2 2 10.40
P3 2 5.55
P4 2 4.70

0015-00 HYPOSEAL SUPER WATER

BUILDING WORK - 0101 MASONRY WORK


0001-00 INSULATED BLOCK WALL

0002-00 8" BLOCK WALL


Plinth beam
P1 1 107.10
P2 1 10.40
P3 1 5.55
P4 1 4.70
Floor wall for external
A&E1-8 2 20.00
1&8 A-E 2 12.00
Staircase 1 18.40
W1 -9 1.50
W2 -1 1.20
D7 -1 2.35
D1 -2 2.40
Floor wall for Internal
1 69.00
D2 -2 1.50
D3 -5 1.00
D4 -1 0.80

0003-00 4.5" BLOCK WALL


1 8.6
D5 -2 0.70

BUILDING WORK - 0102 PLASTER WORK


0001-00 EXTERIOR CEMENT PLASTER FOR WALL, THK.
Floor wall for external
A&E1-8 2 20.00
1&8 A-E 2 12.00
Staircase 1 18.40
W1 -9 1.50
W2 -1 1.20
D7 -1 2.35
D1 -2 2.40

0002-00 INTERIOR CEMENT PLASTER FOR WALL, THK.


Floor wall for Internal
2 69.00
D2 -4 1.50
D3 -10 1.00
D4 -2 0.80
2 8.60
D5 -4 0.70

0003-00 INTERIOR CEMENT PLASTER FOR CEILING, TH

BUILDING WORK - 0103 PAINTING WORK


0001-00 1 COAT OF PRIMER + 2 COATS OF MEDIUM TEX
Floor wall for external
A&E1-8 2 20.00
1&8 A-E 2 12.00
Staircase 1 18.40
W1 -9 1.50
W2 -1 1.20
D7 -1 2.35
D1 -2 2.40

0002-00 1 COAT OF PRIMER + 2 OF ACRYLIC EMULSION P


Floor wall for Internal
2 69.00
D2 -4 1.50
D3 -10 1.00
D4 -2 0.80
2 8.60
D5 -4 0.70
1 4.90 2.70
Staircase 1 18.40

0003-00 CONCRETE FLOORING(EMERY TOP FLOORING (5

BUILDING WORK - 0105 FLOORING & TILING WORK


0001-00 SINGLE PIECE GRANITE RISER & THREAD
2 2.50 0.80
1 6.90 0.15

0002-00 20MM THK 200MM WIDE GRANITE STRIPS

0003-00 600 X 300 X 20MM GRANITE FLOOR TILES

0004-00 400 X 400MM CERAMIC TILES


Office 1 12.90 4.70
Skirting 1 53.20
Electronic room 1 12.00 4.70
Skirting 1 33.40
Meeting room 1 4.70 4.70
Skirting 1 18.80

0005-00 8mm THK RUBBER MAT ABOVE 400 X 400 X 28m


0006-00 200 X 200mm NON SLIPPERY VITRIFIED CERAMI
Pantry 1 2.00 3.30
Toilet 1 4.30 3.70

0007-00 30mm THK SINGLE PIECE OMANI MARBLE RISE


1 6.70 2.70
22 1.20 0.15
Strikting 1 15.60 0.10

0008-00 300 X 300mm WHITE CEMENT ROOF TILES


1 20.00 12.00

0009-00 200 x 300mm Fully glazed ceramic wall tiles


Pantry 1 10.60
Toilet 1 16.00
2 6.20

BUILDING WORK - 0106 INTERIOR WORK


0001-00 CEILING W/ ACOUSTIC BOARD
Slab S5 1 12.00 4.70
Slab S3 1 4.70 4.70
Slab S1 1 19.60 1.80
Slab S2 1 14.50 4.70
Slab S4 1 4.30 3.70
Slab S5 1 6.70 2.50

0002-00 CEILING W/ PVC STRIP

BUILDING WORK - 0107 PANEL & ROOF WORK


0001-00 " THERMAL INSULATED TRAPEZOIDAL CLADDIN

0002-00 " THERMAL INSULATED TRAPEZOIDAL CLADDI

0003-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING F

0004-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FO

0005-00 GUTTER FLASHING


0006-00 ROOF DRAIN 100

0007-00 ROOF DRAIN 150

0008-00 DOWN SPOUT 100

0009-00 DOWN SPOUT 150

0010-00 SPLASH BLOCK

0011-00 CANOPY W:1000

BUILDING WORK - 0108 DOOR & WINDOW WORK


0001-00 DOOR TYPE - SD

0002-00 DOOR TYPE - D

0003-00 DOOR TYPE - D1


1 2

0004-00 DOOR TYPE - D2


1 2

0005-00 DOOR TYPE - D3


1 6

0006-00 DOOR TYPE - D4


1 1

0007-00 DOOR TYPE - D5


1 2

0008-00 DOOR TYPE - D6

0009-00 DOOR TYPE - D7


1 1

0010-00 WINDOW TYPE - W1


1 9

0011-00 WINDOW TYPE - W2


1 1

BUILDING WORK - 0102 MISC METAL WORK


0001-00 MISC. STEEL WORK

0002-00 STEEL GRATING T532

0003-00 CHECKERED PLATE THK. 6mm

0004-00 STEEL CAGE LADDER

50 mm. G. I. PIPE HANDRAIL FINISHED WITH


0005-00 2 COATS OF EPOXY PAINT
1 7.78

0006-00 20 x 20mm SQUARE BAR BALUSTER WELDED ON 5


9 0.2

BUILDING WORK - 0104 SANITARY FIXTURES


0001-00 WATER CLOSET (WESTERN STYLE)

0002-00 URINAL

0003-00 WASH BASIN

0004-00 SOAP DISPENSER

0005-00 LAVATORY SINK

0006-00 PAPER HOLDER FOR WATER CLOSET


0007-00 b)MIRROR 1.7*1.5

0008-00 TOWEL HOLDER

0009-00 KITCHENETTE UNIT

0010-00 SHOWER CUBICLE

0011-00 ELETRICAL HAND DRYER

Building WORK - 0110 ROAD AND PAVING WORKS


0001-00 Wearing course

0002-00 Asphalt Binder course

0003-00 Base course

0004-00 Subbase course

0005-00 Formation Level Compaction

0006-00 PC Curb Stone

0007-00 P.E Film

0008-00 Precast concrete block paving

0009-00 Sand Fill M3


Prepared by Arunkumar.G (Emp.14326) Qunatity Surveyor
Depth Qty Remarks Unit

0.55 5.11
0.55 5.11
0.50 4.35
0.50 3.92
0.50 3.92
0.55 5.11
0.50 4.35
0.55 5.11
0.55 6.16
0.50 3.92
0.50 1.76
0.55 5.11
0.50 4.35
0.55 5.11
0.55 5.11
0.50 3.64

72.12 M3

0.00 M3

0.00 M3

0.55 5.11
0.55 5.11
0.50 4.35
0.50 3.92
0.50 3.92
0.55 5.11
0.50 4.35
0.55 5.11
0.55 6.16
0.50 3.92
0.50 1.76
0.55 5.11
0.50 4.35
0.55 5.11
0.55 5.11
0.50 3.64
72.12 M3

0.00 M3

4.19
4.19
3.79
3.23
3.23
4.19
3.79
4.19
5.50
3.23
0.54
4.19
3.79
4.19
4.19
2.88

42.84
4.16
2.22
1.88

110.43 M2

0.10 0.42
0.10 0.42
0.10 0.38
0.10 0.32
0.10 0.32
0.10 0.42
0.10 0.38
0.10 0.42
0.10 0.55
0.10 0.32
0.10 0.05
0.10 0.42
0.10 0.38
0.10 0.42
0.10 0.42
0.10 0.29

0.10 4.28
0.10 0.42
0.10 0.22
0.10 0.19

11.04 M3

0.45 1.54
0.45 1.54
0.40 1.22
0.40 1.02
0.40 1.02
0.45 1.54
0.40 1.22
0.45 1.54
0.45 2.07
0.40 1.02
0.40 0.07
0.45 1.54
0.40 1.22
0.45 1.54
0.45 1.54
0.40 0.90
1.00 0.08
1.00 0.08
1.00 0.08
1.00 0.08
1.00 0.08
1.00 0.08
1.00 0.08
1.00 0.08
1.00 0.08
1.00 0.08
1.00 0.08
1.00 0.08
1.00 0.08
1.00 0.08
1.00 0.08
1.00 0.08
1.00 0.10
1.00 0.08
1.00 0.08
1.00 0.08
1.00 0.08
1.00 0.08
1.00 0.08
1.00 0.08

0.50 10.71
0.50 1.04
0.50 0.56
0.60 0.56
35.32 M3

5.00 0.40
5.00 0.40
5.00 0.40
5.00 0.40
5.00 0.40
5.00 0.40
5.00 0.40
5.00 0.40
5.00 0.40
5.00 0.40
7.60 0.61
7.60 0.61
5.00 0.40
5.00 0.40
5.00 0.40
5.00 0.40
7.60 0.76
7.60 0.61
5.00 0.40
5.00 0.40
5.00 0.40
5.00 0.40
7.60 0.61
7.60 0.61

0.50
0.50 4.03
0.50 0.38
0.50 4.06
0.50 0.36
0.60 0.97
0.60
0.60
0.60 2.26
0.60 0.56
0.18 10.15
0.14 3.09
0.12 4.23
0.14 9.54
0.18 2.86
0.18 3.02
0.20 1.74
0.15 0.40
0.20 1.70
60.35 M3

15.31
15.31 TN

0.00 TN

0.45 3.33
0.45 3.33
0.40 2.80
0.40 2.56
0.40 2.56
0.45 3.33
0.40 2.80
0.45 3.33
0.45 3.87
0.40 2.56
0.40 1.26
0.45 3.33
0.40 2.80
0.45 3.33
0.45 3.33
0.40 2.40
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.40
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20

0.50 107.10
0.50 10.40
0.50 5.55
0.60 5.64

204.61 M2

5.00 6.00
5.00 6.00
5.00 6.00
5.00 6.00
5.00 6.00
5.00 6.00
5.00 6.00
5.00 6.00
5.00 6.00
5.00 6.00
7.60 9.12
7.60 9.12
5.00 6.00
5.00 6.00
5.00 6.00
5.00 6.00
7.60 10.64
7.60 9.12
5.00 6.00
5.00 6.00
5.00 6.00
5.00 6.00
7.60 9.12
7.60 9.12
8.71
0.15 3.96
8.50

0.50
0.50 40.30
0.50 3.80
0.50 40.60
0.50 3.60
0.60 9.66
0.60
0.60
0.60 22.56
0.60 5.64
56.40
22.09
35.28
68.15
15.91
16.75

526.15 M2

0.45 6.74
0.45 6.74
0.40 5.85
0.40 5.11
0.40 5.11
0.45 6.74
0.40 5.85
0.45 6.74
0.45 8.47
0.40 5.11
0.40 1.44
0.45 6.74
0.40 5.85
0.45 6.74
0.45 6.74
0.40 4.64
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.40
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20
1.00 1.20

1.60 342.72
1.60 33.28
1.60 17.76
1.60 15.04
532.44 M2

0.00 M2

0.00 M2

1.60 171.36
1.60 16.64
1.60 8.88
1.60 7.52

4.20 168.00
4.20 100.80
2.33 42.78
1.40 -18.90
3.25 -3.90
0.60 -1.41
1.46 -7.01

3.00 207.00
2.20 -6.60
2.20 -11.00
2.20 -1.76
672.40 M2

3 25.80
2.00 -2.80
23.00 M2

5.40 216.00
5.40 129.60
2.33 42.78
1.40 -18.90
3.25 -3.90
0.60 -1.41
1.46 -7.01

357.16 M2

3.00 414.00
2.20 -13.20
2.20 -22.00
2.20 -3.52
3.00 51.60
2.00 -5.60

421.28 M2

0.00 M2

5.40 216.00
5.40 129.60
2.33 42.78
1.40 -18.90
3.25 -3.90
0.60 -1.41
1.46 -7.01

357.16 M2

3.00 414.00
2.20 -13.20
2.20 -22.00
2.20 -3.52
3.00 51.60
2.00 -5.60
13.23
2.33 42.78
477.29 M2

0.00 M2

4.00
1.04
5.04 M2

0.00 M2

0.00 M2

60.63
0.10 5.32
56.40
0.10 3.34
22.09
0.10 1.88
149.66 MZ

0.00 MZ
6.60
15.91
22.51 M2

18.09
3.96
1.56
23.61 MZ

240.00
240.00 MZ

3.00 31.80
3.00 48.00
3.00 37.20
117.00 MZ

56.40
22.09
35.28
68.15
15.91
16.75

214.58 M2

0.00 M2

0.00 M2

0.00 M2

0.00 M2

0.00 M2
0.00 MZ

0.00 EA

0.00 EA

0.00 MZ

0.00 MZ

0.00 EA

0.00 MZ

0.00 EA

0.00 EA

2.00
2.00 EA

2.00
2.00 EA

6.00
6.00 EA

1.00
1.00 EA

2.00
2.00 EA

0.00 EA
1.00
1.00 EA

9.00
9.00 EA

1.00
1.00 EA

0.00 TN

0.00 M2

0.00 M2

0.00 MZ

7.78
7.78 MZ

1.8
1.80 MZ

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA
0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 M2

0.00 M2

0.00 M3

0.00 M3

0.00 M2

0.00 MZ

0.00 M2

0.00 M2

0.00 M3
ity Surveyor
1.95 1.75 0.45
1.95 1.75 0.45
1.85 1.65 0.4
1.7 1.5 0.4
1.7 1.5 0.4
1.95 1.75 0.45
1.85 1.65 0.4
1.95 1.75 0.45
2.3 2 0.45
1.7 1.5 0.4
1.45 0.125 0.4
1.95 1.75 0.45
1.85 1.65 0.4
1.95 1.75 0.45
1.95 1.75 0.45
1.6 1.4 0.4

1.95 1.75 0.45


1.95 1.75 0.45
1.85 1.65 0.4
1.7 1.5 0.4
1.7 1.5 0.4
1.95 1.75 0.45
1.85 1.65 0.4
1.95 1.75 0.45
2.3 2 0.45
1.7 1.5 0.4
1.45 0.125 0.4
1.95 1.75 0.45
1.85 1.65 0.4
1.95 1.75 0.45
1.95 1.75 0.45
1.6 1.4 0.4

1.95 1.75 0.45


1.95 1.75 0.45
1.85 1.65 0.4
1.7 1.5 0.4
1.7 1.5 0.4
1.95 1.75 0.45
1.85 1.65 0.4
1.95 1.75 0.45
2.3 2 0.45
1.7 1.5 0.4
1.45 0.125 0.4
1.95 1.75 0.45
1.85 1.65 0.4
1.95 1.75 0.45
1.95 1.75 0.45
1.6 1.4 0.4

1.95 1.75 0.45


1.95 1.75 0.45
1.85 1.65 0.4
1.7 1.5 0.4
1.7 1.5 0.4
1.95 1.75 0.45
1.85 1.65 0.4
1.95 1.75 0.45
2.3 2 0.45
1.7 1.5 0.4
1.45 0.125 0.4
1.95 1.75 0.45
1.85 1.65 0.4
1.95 1.75 0.45
1.95 1.75 0.45
1.6 1.4 0.4

1.95 1.75 0.45


1.95 1.75 0.45
1.85 1.65 0.4
1.7 1.5 0.4
1.7 1.5 0.4
1.95 1.75 0.45
1.85 1.65 0.4
1.95 1.75 0.45
2.3 2 0.45
1.7 1.5 0.4
1.45 0.125 0.4
1.95 1.75 0.45
1.85 1.65 0.4
1.95 1.75 0.45
1.95 1.75 0.45
1.6 1.4 0.4
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 8.60
1 0.200 0.400 1.000 8.60
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.500 1.000 8.60
1 0.200 0.400 1.000 8.60
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 8.60
1 0.200 0.400 1.000 8.60

1 0.200 0.400 1.000 6.00


1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 8.60
1 0.200 0.400 1.000 8.60
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.500 1.000 8.60
1 0.200 0.400 1.000 8.60
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 8.60
1 0.200 0.400 1.000 8.60
1.95 1.75 0.45
1.95 1.75 0.45
1.85 1.65 0.4
1.7 1.5 0.4
1.7 1.5 0.4
1.95 1.75 0.45
1.85 1.65 0.4
1.95 1.75 0.45
2.3 2 0.45
1.7 1.5 0.4
1.45 0.125 0.4
1.95 1.75 0.45
1.85 1.65 0.4
1.95 1.75 0.45
1.95 1.75 0.45
1.6 1.4 0.4
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.500 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000
0.2 0.400 1.000

107.1 0.200 0.500


10.4 0.200 0.500
5.55 0.200 0.500
4.7 0.2 0.6

0.20 0.40 5.00


0.20 0.40 5.00
0.20 0.40 5.00
0.20 0.40 5.00
0.20 0.40 5.00
0.20 0.40 5.00
0.20 0.40 5.00
0.20 0.40 5.00
0.20 0.40 5.00
0.20 0.40 5.00
0.20 0.40 7.60
0.20 0.40 7.60
0.20 0.40 5.00
0.20 0.40 5.00
0.20 0.40 5.00
0.20 0.40 5.00
0.20 0.50 7.60
0.20 0.40 7.60
0.20 0.40 5.00
0.20 0.40 5.00
0.20 0.40 5.00
0.20 0.40 5.00
0.20 0.40 7.60
0.20 0.40 7.60

0.20 0.50
40.30 0.20 0.50
3.80 0.20 0.50
40.60 0.20 0.50
3.60 0.20 0.50
8.05 0.20 0.60
0.20 0.60
0.20 0.60
18.80 0.20 0.60
4.70 0.20 0.60
12.00 4.70 0.18
4.70 4.70 0.14
19.60 1.80 0.12
14.50 4.70 0.14
4.30 3.70 0.18
6.70 2.50 0.18

1.95 1.75 0.45


1.95 1.75 0.45
1.85 1.65 0.4
1.7 1.5 0.4
1.7 1.5 0.4
1.95 1.75 0.45
1.85 1.65 0.4
1.95 1.75 0.45
2.3 2 0.45
1.7 1.5 0.4
1.45 0.125 0.4
1.95 1.75 0.45
1.85 1.65 0.4
1.95 1.75 0.45
1.95 1.75 0.45
1.6 1.4 0.4
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 8.60
1 0.200 0.400 1.000 8.60
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.500 1.000 8.60
1 0.200 0.400 1.000 8.60
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 6.00
1 0.200 0.400 1.000 8.60
1 0.200 0.400 1.000 8.60
12.00 4.70 0.18
4.70 4.70 0.14
19.60 1.80 0.12
14.50 4.70 0.14
4.30 3.70 0.18
6.70 2.50 0.18
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH FROM M3 74.36
0002-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH MOR M3 -
0003-00 SELECTED EXCAVATED SOIL M3 -
0004-00 DISPOSAL M3 74.36
0005-00 CRUSH STONE M3 -
BUILDING WORK - 0101 REINFORCED CONCRETE WORK
0001-00 PE FILM(THK 0.15, 2PLY) DAMP PROOF C M2 23.20
0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa M3 2.32
0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUB STRUCT M3 5.96
0004-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUPERSTRU M3 8.66
0005-00 HIGH YIELD DEFORMED BAR BS 4449 G460 Y TN 2.34
0006-00 HIGH YIELD DEFORMED BAR / EPOXY COATED BS 4449 G460 Y TN -
" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT
0007-00 M2 88.36
PLINTH AND FLOOR OPENING) "

" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT


0008-00 PIPE SUPPORT M2 -
PLINTH AND FLOOR OPENING) "
0009-00 NORMAL FACED FORM (FOR HIDDEN SURFACE) PIPE SUPPORT M2 -
0010-00 WATERSTOP W=200 PVC TYPE(THK. MZ -
0011-00 FIBRE REINFORCED BITUMEN COATING M2 -
0012-00 ANTITERMITE TREATMENT M2 -
0013-00 EPOXY MORTAR FINISH TO CONCRETE BENCHING AS PER SPECIFICATION M3 -
0014-00 POLYESTER PROTECTIVE RESIN NITOCOTE PE13 M2 60.32
0015-00 HYPOSEAL SUPER WATER PROOFER TO CO M2 -
BUILDING WORK - 0101 STEEL STRUCTURE WORK
0001-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 200 TN -
0002-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 200 TN -
0003-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 200 TN -
0004-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 320 TN -
0005-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 320 TN -
0006-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 320 TN -
0007-00 ANCHOR BOLT (M24, L=700) STEEL : ASTM A EA -
0008-00 ANCHOR BOLT (M30, L=900) STEEL : ASTM A EA -

138/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0009-00 NON-SHRINKAGE GROUT Fcu= 65N/mm2 A M3 -


0010-00 DECK PLATE - THK.1.6mm (Including stud bolt) GALVANIZED STE M2 -
0011-00 Additional Items : STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM ( DFT : Total 200 TN -
0012-00 Additional Items : STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61 DFT : Total 200 TN -
0013-00 Additional Items: STRUCTURAL STEEL (BUILT-UP) DFT : Total 200 TN -
0014-00 Additional Items : ANCHOR BOLT (M36, L=1080) STEEL : ASTM A EA -
0015-00 Additional Items : STAIR TREAD HOT DIP GALVAN M2 -
BUILDING WORK - 0101 MASONRY WORK
0001-00 INSULATED BLOCK WALL 4" BLOCK (INT) M2 -
0002-00 8" BLOCK WALL TYPE A AS PER M2 63.52
0003-00 4.5" BLOCK WALL TYPE A AS PER M2 -
BUILDING WORK - 0102 PLASTER WORK
0001-00 EXTERIOR CEMENT PLASTER FOR WALL, THK. 24mm M2 130.64
0002-00 INTERIOR CEMENT PLASTER FOR WALL, THK. 18mm M2 98.16
0003-00 INTERIOR CEMENT PLASTER FOR CEILING, THK. 18mm M2 -
BUILDING WORK - 0103 PAINTING WORK
0001-00 1 COAT OF PRIMER + 2 COATS OF MEDIUM TEXTURE PAINT FOR EXT. WALL M2 98.16
0002-00 1 COAT OF PRIMER + 2 OF ACRYLIC EMULSION PAINT FOR INT. WALL & CEILING M2 128.16
0003-00 CONCRETE FLOORING(EMERY TOP FLOORING (5Kg/m2)) FOR RAMP. FLOOR M2 -
BUILDING WORK - 0104 CONCRETE ROOFING AND WATERPROOFING WORK
0001-00 ROOF WATERPROOFING M2 -
0002-00 MORTAR WATERPROOFING DFT : 80 M2 -
BUILDING WORK - 0105 FLOORING & TILING WORK
0001-00 SINGLE PIECE GRANITE RISER & THREAD M2 1.72
0002-00 20MM THK 200MM WIDE GRANITE STRIPS M2 -
0003-00 600 X 300 X 20MM GRANITE FLOOR TILES M2 -
0004-00 400 X 400MM CERAMIC TILES M2 -
0005-00 8mm THK RUBBER MAT ABOVE 400 X 400 X 28mm TERRAZZO TILES M2 18.00
0006-00 200 X 200mm NON SLIPPERY VITRIFIED CERAMIC TILES M2 -
0007-00 30mm THK SINGLE PIECE OMANI MARBLE RISER AND TREAD M2 -
0008-00 300 X 300mm WHITE CEMENT ROOF TILES M2 30.00
0009-00 200 x 300mm Fully glazed ceramic wall tiles M2 -
BUILDING WORK - 0106 INTERIOR WORK

139/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0001-00 GYPSUM BOARD FALSE CEILING SIZE : 600 x 600 M2 -


0002-00 CEILING W/ PVC STRIP W 100mm M2 -
BUILDING WORK - 0107 PANEL & ROOF WORK
0001-00 " THERMAL INSULATED TRAPEZOIDAL CLADDING FOR EXT. WALLTHK. 0.7mm(EXT M2 -
0002-00 " THERMAL INSULATED TRAPEZOIDAL CLADDING FOR ROOF" THK. 0.7mm(EXT M2 -
0003-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FOR ROOF" M2 -
0004-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FOR WALL" M2 -
0005-00 GUTTER FLASHING THK. 1.6mm MZ -
0006-00 ROOF DRAIN 100 CAST IRON EA -
0007-00 ROOF DRAIN 150 CAST IRON EA -
0008-00 DOWN SPOUT 100 GALVANISED ST MZ -
0009-00 DOWN SPOUT 150 CAST IRON MZ -
0010-00 SPLASH BLOCK SIZE : 500x500x EA -
0011-00 CANOPY W:1000 MZ -
BUILDING WORK - 0108 DOOR & WINDOW WORK
0001-00 DOOR TYPE - SD HEAVY DUTY M.S EA -
0002-00 DOOR TYPE - D 44MM.THK. COMM EA -
0003-00 DOOR TYPE - D1 44MM.THK DECOREA 1.00
0004-00 DOOR TYPE - D2 44MM. THK.SEMI EA -
0005-00 DOOR TYPE - D3 44MM. THK.SEMI EA -
0006-00 DOOR TYPE - D4 44MM. THK.SEMI EA -
0007-00 DOOR TYPE - D5 44MM.THK. COMM EA -
0008-00 DOOR TYPE - D6 44MM. THK.SEMI EA -
0009-00 DOOR TYPE - D7 44MM. THK.SEMI EA -
0010-00 WINDOW TYPE - W1 POWER COATED AEA -
0011-00 WINDOW TYPE - W2 POWER COATED AEA -
0012-00 M.S. Flat Gate (1200 x 1800) EA -
BUILDING WORK - 0102 MISC METAL WORK
0001-00 MISC. STEEL WORK GALVANIZED(COATN -
0002-00 STEEL GRATING T532 HOT DIP GALVAN M2 -
0003-00 CHECKERED PLATE THK. 6mm GALVANIZED(COAM2 16.80
0004-00 STEEL CAGE LADDER GALVANIZED(COAMZ -
0005-00 STEEL PIPE HANDRAIL GRIP : I.D.50mm MZ -

140/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0006-00 STAINLESS PIPE HANDRAIL GRIP : I.D.50mm MZ -


Building WORK - 0110 ROAD AND PAVING WORKS
0001-00 WEARING COURSE with tack coating M2 -
0002-00 ASPHALT BINDER COURSE with prime coatin M2 -
0003-00 BASE COURSE T=150,max 40 M3 -
0004-00 SUBBASE COURSE T=200,max.80mm M3 -
0005-00 FORMATION LEVEL COMPACTION 95% Density ; do M2 -
0006-00 PC CURB STONE 180x210x300x10 MZ -
0007-00 P.E FILM Minimun 0.15mm p M2 -
0008-00 PRECAST CONC BLOCK PAVING 100mm thick to c M2 -
0009-00 SAND FILLING M3 -

GRAND TOTAL

141/216
Project : WareHouse & Office Building at Nizwa Industrial Room

Title : Electrical Room

Sl.No DESCRIPTION Nos Length width

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATI
1 26.00 2.20

Total
0002-00 SOIL EXCAVATION BY MACHINE FOR FOUNDAT

Total
0003-00 SELECTED EXCAVATED SOIL

Total
0004-00 DISPOSAL
1 26.00 2.20

Total
0005-00 CRUSH STONE

Total
BUILDING WORK - 0101 REINFORCED CONCRETE WORK
0001-00 PE FILM(THK 0.15, 2PLY)
1 23.20 1.00

0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa


1 23.20 1.00

0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa


Foundation 1 23.20 0.80
1 21.20 0.30
Column 4 0.60 0.20
Plinth 1 21.20 0.20

0004-00 " REINF. CONCRETE CUBE STRENGTH 35MPa


Column 4 0.60 0.20
Slab 1 6.00 5.00
Parapet 1 22.00 0.20
0005-00 HIGH YIELD DEFORMED BAR
1 14.62 0.16

0006-00 HIGH YIELD DEFORMED BAR / EPOXY COATED

" FAIR FACED FORM (FOR FAIR FACED


0007-00 SURFACE, EQUIPMENT PLINTH AND FLOOR
OPENING) "
Foundation 2 23.20
2 21.20
Column 4 1.20
Plinth 2 21.20
Column 4 1.20
Slab 1 6.00 5.00
Parapet 2 22.00

" FAIR FACED FORM (FOR FAIR FACED


0008-00 SURFACE, EQUIPMENT PLINTH AND FLOOR
OPENING) "

0014-00 APPROVED PROTECTIVE COATING


2 23.20

0015-00 HYPOSEAL SUPER WATER

BUILDING WORK - 0101 MASONRY WORK


0001-00 INSULATED BLOCK WALL

0002-00 8" BLOCK WALL


Foundation 1 23.20
wall 1 21.20
Door D1 -1 1.50

0003-00 4.5" BLOCK WALL

BUILDING WORK - 0102 PLASTER WORK


0001-00 EXTERIOR CEMENT PLASTER FOR WALL, THK.
Foundation 2 23.20
wall 2 21.20
Door D1 -1 1.50

0002-00 INTERIOR CEMENT PLASTER FOR WALL, THK.


wall 2 21.20
Door D1 -1 1.50

0003-00 INTERIOR CEMENT PLASTER FOR CEILING, TH

BUILDING WORK - 0103 PAINTING WORK


0001-00 1 COAT OF PRIMER + 2 COATS OF MEDIUM TEX
wall 2 21.20
Door D1 -1 1.50

0002-00 1 COAT OF PRIMER + 2 OF ACRYLIC EMULSION P


wall 2 21.20
Door D1 -1 1.50
1 6.00 5.00

0003-00 CONCRETE FLOORING(EMERY TOP FLOORING (5

BUILDING WORK - 0105 FLOORING & TILING WORK


0001-00 SINGLE PIECE GRANITE RISER & THREAD
1 1.40
1 3.00

0002-00 20MM THK 200MM WIDE GRANITE STRIPS

0003-00 600 X 300 X 20MM GRANITE FLOOR TILES

0004-00 400 X 400MM CERAMIC TILES


0005-00 8mm THK RUBBER MAT ABOVE 400 X 400 X 28m
1 12.00 1.40
1 12.00

0006-00 200 X 200mm NON SLIPPERY VITRIFIED CERAMI

0007-00 30mm THK SINGLE PIECE OMANI MARBLE RISE

0008-00 300 X 300mm WHITE CEMENT ROOF TILES


1 6.00 5.00

0009-00 200 x 300mm Fully glazed ceramic wall tiles

BUILDING WORK - 0106 INTERIOR WORK


0001-00 CEILING W/ ACOUSTIC BOARD

0002-00 CEILING W/ PVC STRIP

BUILDING WORK - 0107 PANEL & ROOF WORK


0001-00 " THERMAL INSULATED TRAPEZOIDAL CLADDIN

0002-00 " THERMAL INSULATED TRAPEZOIDAL CLADDI

0003-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING F

0004-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FO

0005-00 GUTTER FLASHING


0006-00 ROOF DRAIN 100

0007-00 ROOF DRAIN 150

0008-00 DOWN SPOUT 100

0009-00 DOWN SPOUT 150

0010-00 SPLASH BLOCK

0011-00 CANOPY W:1000

BUILDING WORK - 0108 DOOR & WINDOW WORK


0001-00 DOOR TYPE - SD

0002-00 DOOR TYPE - D

0003-00 DOOR TYPE - D1


1 1

0004-00 DOOR TYPE - D2

0005-00 DOOR TYPE - D3

0006-00 DOOR TYPE - D4

0007-00 DOOR TYPE - D5

0008-00 DOOR TYPE - D6

0009-00 DOOR TYPE - D7


0010-00 WINDOW TYPE - W1

0011-00 WINDOW TYPE - W2

BUILDING WORK - 0102 MISC METAL WORK


0001-00 MISC. STEEL WORK

0002-00 STEEL GRATING T532

0003-00 CHECKERED PLATE THK. 6mm


1 12.00 1.40

0004-00 STEEL CAGE LADDER


1 3.2
50 mm. G. I. PIPE HANDRAIL FINISHED WITH
0005-00 2 COATS OF EPOXY PAINT

0006-00 20 x 20mm SQUARE BAR BALUSTER WELDED ON 5

BUILDING WORK - 0104 SANITARY FIXTURES


0001-00 WATER CLOSET (WESTERN STYLE)

0002-00 URINAL

0003-00 WASH BASIN

0004-00 SOAP DISPENSER

0005-00 LAVATORY SINK

0006-00 PAPER HOLDER FOR WATER CLOSET


0007-00 b)MIRROR 1.7*1.5

0008-00 TOWEL HOLDER

0009-00 KITCHENETTE UNIT

0010-00 SHOWER CUBICLE

0011-00 ELETRICAL HAND DRYER

Building WORK - 0110 ROAD AND PAVING WORKS


0001-00 Wearing course

0002-00 Asphalt Binder course

0003-00 Base course

0004-00 Subbase course

0005-00 Formation Level Compaction

0006-00 PC Curb Stone

0007-00 P.E Film

0008-00 Precast concrete block paving

0009-00 Sand Fill M3


Prepared by Arunkumar.G (Emp.14326) Qunatity Surveyor
Depth Qty Remarks Unit

1.30 74.36
0.00

74.36 M3

0.00 M3

0.00 M3

1.30 74.36
0.00
74.36 M3

0.00 M3

23.20

23.20 M2

0.10 2.32

2.32 M3

0.20 3.71
0.20 1.27
0.70 0.34
0.15 0.64

5.96 M3

2.80 1.34
0.20 6.00
0.30 1.32
8.66 M3
2.34
2.34 TN

0.00 TN

0.20 9.28
0.30 12.72
0.70 3.36
0.15 6.36
2.80 13.44
30.00
0.30 13.20

88.36 M2

0.00
0.00

0.00 M2

1.30 60.32
0.00
60.32 M2

0.00 M2

0.00 M2

0.70 16.24
2.40 50.88
2.40 -3.60
63.52 M2

0.00
0.00
0.00 M2
0.70 32.48
2.40 101.76
2.40 -3.60
0.00

130.64 M2

2.40 101.76
2.40 -3.60
0.00

98.16 M2

0.00 M2

2.40 101.76
2.40 -3.60

98.16 M2

2.40 101.76
2.40 -3.60
30.00
128.16 M2

0.00 M2

0.80 1.12
0.20 0.60
1.72 M2

0.00 M2

0.00 M2

0.00
0.00 MZ

16.8
0.1 1.2
18.00 MZ

0.00
0.00
0.00 M2

0
0
0
0.00 MZ

30.00
30.00 MZ

0.00 MZ

0.00 M2

0.00 M2

0.00 M2

0.00 M2

0.00 M2

0.00 M2

0.00 MZ
0.00 EA

0.00 EA

0.00 MZ

0.00 MZ

0.00 EA

0.00 MZ

0.00 EA

0.00 EA

1
1.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA
0.00 EA

0.00 EA

0.00 EA

0.00 TN

0.00 M2

16.8
16.80 M2

0.00 MZ

0
0.00 MZ

0
0.00 MZ

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA
0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 M2

0.00 M2

0.00 M3

0.00 M3

0.00 M2

0.00 MZ

0.00 M2

0.00 M2

0.00 M3
ity Surveyor
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH FROM M3 645.59
0002-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH MOR M3 -
0003-00 SELECTED EXCAVATED SOIL M3 -
0004-00 DISPOSAL M3 645.59
0005-00 CRUSH STONE M3 -
BUILDING WORK - 0101 REINFORCED CONCRETE WORK
0001-00 PE FILM(THK 0.15, 2PLY) DAMP PROOF C M2 150.42
0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa M3 15.04
0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUB STRUCT M3 156.82
0004-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUPERSTRU M3 114.52
0005-00 HIGH YIELD DEFORMED BAR BS 4449 G460 Y TN 43.41
0006-00 HIGH YIELD DEFORMED BAR / EPOXY COATED BS 4449 G460 Y TN -
" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT
0007-00 M2 436.70
PLINTH AND FLOOR OPENING) "

" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT


0008-00 PIPE SUPPORT M2 970.05
PLINTH AND FLOOR OPENING) "
0009-00 NORMAL FACED FORM (FOR HIDDEN SURFACE) PIPE SUPPORT M2 -
0010-00 WATERSTOP W=200 PVC TYPE(THK. MZ -
0011-00 FIBRE REINFORCED BITUMEN COATING M2 -
0012-00 ANTITERMITE TREATMENT M2 -
0013-00 EPOXY MORTAR FINISH TO CONCRETE BENCHING AS PER SPECIFICATION M3 -
0014-00 POLYESTER PROTECTIVE RESIN NITOCOTE PE13 M2 -
0015-00 HYPOSEAL SUPER WATER PROOFER TO CO M2 -
BUILDING WORK - 0101 STEEL STRUCTURE WORK
0001-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 200 TN -
0002-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 200 TN -
0003-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 200 TN -
0004-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 320 TN -
0005-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 320 TN -
0006-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 320 TN -
0007-00 ANCHOR BOLT (M24, L=700) STEEL : ASTM A EA -
0008-00 ANCHOR BOLT (M30, L=900) STEEL : ASTM A EA -

158/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0009-00 NON-SHRINKAGE GROUT Fcu= 65N/mm2 A M3 -


0010-00 DECK PLATE - THK.1.6mm (Including stud bolt) GALVANIZED STE M2 -
0011-00 Additional Items : STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM ( DFT : Total 200 TN -
0012-00 Additional Items : STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61 DFT : Total 200 TN -
0013-00 Additional Items: STRUCTURAL STEEL (BUILT-UP) DFT : Total 200 TN -
0014-00 Additional Items : ANCHOR BOLT (M36, L=1080) STEEL : ASTM A EA -
0015-00 Additional Items : STAIR TREAD HOT DIP GALVAN M2 -
BUILDING WORK - 0101 MASONRY WORK
0001-00 INSULATED BLOCK WALL 4" BLOCK (INT) M2 -
0002-00 8" BLOCK WALL TYPE A AS PER M2 890.88
0003-00 4.5" BLOCK WALL TYPE A AS PER M2 22.72
BUILDING WORK - 0102 PLASTER WORK
0001-00 EXTERIOR CEMENT PLASTER FOR WALL, THK. 24mm M2 703.62
0002-00 INTERIOR CEMENT PLASTER FOR WALL, THK. 18mm M2 1,336.46
0003-00 INTERIOR CEMENT PLASTER FOR CEILING, THK. 18mm M2 -
BUILDING WORK - 0103 PAINTING WORK
0001-00 1 COAT OF PRIMER + 2 COATS OF MEDIUM TEXTURE PAINT FOR EXT. WALL M2 703.62
0002-00 1 COAT OF PRIMER + 2 OF ACRYLIC EMULSION PAINT FOR INT. WALL & CEILING M2 1,336.46
0003-00 CONCRETE FLOORING(EMERY TOP FLOORING (5Kg/m2)) FOR RAMP. FLOOR M2 -
BUILDING WORK - 0104 CONCRETE ROOFING AND WATERPROOFING WORK
0001-00 ROOF WATERPROOFING M2 -
0002-00 MORTAR WATERPROOFING DFT : 80 M2 -
BUILDING WORK - 0105 FLOORING & TILING WORK
0001-00 SINGLE PIECE GRANITE RISER & THREAD M2 2.62
0002-00 20MM THK 200MM WIDE GRANITE STRIPS M2 7.20
0003-00 600 X 300 X 20MM GRANITE FLOOR TILES M2 7.20
0004-00 400 X 400MM CERAMIC TILES M2 234.92
0005-00 8mm THK RUBBER MAT ABOVE 400 X 400 X 28mm TERRAZZO TILES M2 14.66
0006-00 200 X 200mm NON SLIPPERY VITRIFIED CERAMIC TILES M2 25.31
0007-00 30mm THK SINGLE PIECE OMANI MARBLE RISER AND TREAD M2 21.75
0008-00 300 X 300mm WHITE CEMENT ROOF TILES M2 455.91
0009-00 200 x 300mm Fully glazed ceramic wall tiles M2 117.00
BUILDING WORK - 0106 INTERIOR WORK

159/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0001-00 GYPSUM BOARD FALSE CEILING SIZE : 600 x 600 M2 -


0002-00 CEILING W/ PVC STRIP W 100mm M2 -
BUILDING WORK - 0107 PANEL & ROOF WORK
0001-00 " THERMAL INSULATED TRAPEZOIDAL CLADDING FOR EXT. WALLTHK. 0.7mm(EXT M2 -
0002-00 " THERMAL INSULATED TRAPEZOIDAL CLADDING FOR ROOF" THK. 0.7mm(EXT M2 -
0003-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FOR ROOF" M2 -
0004-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FOR WALL" M2 -
0005-00 GUTTER FLASHING THK. 1.6mm MZ -
0006-00 ROOF DRAIN 100 CAST IRON EA -
0007-00 ROOF DRAIN 150 CAST IRON EA -
0008-00 DOWN SPOUT 100 GALVANISED ST MZ -
0009-00 DOWN SPOUT 150 CAST IRON MZ -
0010-00 SPLASH BLOCK SIZE : 500x500x EA -
0011-00 CANOPY W:1000 MZ -
BUILDING WORK - 0108 DOOR & WINDOW WORK
0001-00 DOOR TYPE - SD HEAVY DUTY M.S EA -
0002-00 DOOR TYPE - D 44MM.THK. COMM EA 2.00
0003-00 DOOR TYPE - D1 44MM.THK DECOREA 2.00
0004-00 DOOR TYPE - D2 44MM. THK.SEMI EA -
0005-00 DOOR TYPE - D3 44MM. THK.SEMI EA 2.00
0006-00 DOOR TYPE - D3A 44MM. THK.SEMI EA 2.00
0007-00 DOOR TYPE - D4 44MM. THK.SEMI EA 1.00
0008-00 DOOR TYPE - D5 44MM.THK. COMM EA 2.00
0009-00 DOOR TYPE - D6 44MM. THK.SEMI EA -
0010-00 DOOR TYPE - D7 44MM. THK.SEMI EA 1.00
0011-00 WINDOW TYPE - W1 POWER COATED AEA 20.00
0012-00 WINDOW TYPE - W2 POWER COATED AEA 1.00
0013-00 M.S. Flat Gate (1200 x 1800) EA -
BUILDING WORK - 0102 MISC METAL WORK
0001-00 MISC. STEEL WORK GALVANIZED(COATN -
0002-00 STEEL GRATING T532 HOT DIP GALVAN M2 -
0003-00 CHECKERED PLATE THK. 6mm GALVANIZED(COAM2 -
0004-00 STEEL CAGE LADDER GALVANIZED(COAMZ -

160/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0005-00 STEEL PIPE HANDRAIL GRIP : I.D.50mm MZ -


0006-00 STAINLESS PIPE HANDRAIL GRIP : I.D.50mm MZ -
Building WORK - 0110 ROAD AND PAVING WORKS
0001-00 WEARING COURSE with tack coating M2 -
0002-00 ASPHALT BINDER COURSE with prime coatin M2 -
0003-00 BASE COURSE T=150,max 40 M3 -
0004-00 SUBBASE COURSE T=200,max.80mm M3 -
0005-00 FORMATION LEVEL COMPACTION 95% Density ; do M2 -
0006-00 PC CURB STONE 180x210x300x10 MZ -
0007-00 P.E FILM Minimun 0.15mm p M2 -
0008-00 PRECAST CONC BLOCK PAVING 100mm thick to c M2 -
0009-00 SAND FILLING M3 -

GRAND TOTAL

161/216
Project : WareHouse & Office Building at Nizwa Industrial Room

Title : Electrical Room

Sl.No DESCRIPTION Nos Length width

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATI
Footing F1-A1 1 2.65 2.45
Footing F6-A2 1 3.25 3.05
Footing F5-A3 1 3.15 2.95
Footing F6-A5 1 3.25 3.05
Footing F6-A10 1 3.25 3.05
Footing F1-A11 1 2.65 2.45
Footing F3-B1 1 2.90 2.70
Footing F7-B2 1 3.40 3.10
Footing F7-B3 1 3.40 3.10
Footing F8-B5 1 3.50 3.20
Footing F8-B10 1 3.50 3.20
Footing F3-B11 1 2.90 2.70
Footing F3-C1 1 2.90 2.70
Footing F7-C2 1 3.40 3.10
Footing F7-C3 1 3.40 3.10
Footing F8-C6 1 3.50 3.20
Footing F8-C9 1 3.50 3.20
Footing F3-C11 1 2.90 2.70
Footing F1-E1 1 2.65 2.45
Footing F6-E2 1 3.25 3.05
Footing F4-E3 1 3.05 2.85
Footing F4-E4 1 3.05 2.85
Footing F6-E7 1 3.25 3.05
Footing F7-E9 1 3.40 3.10
Footing F4-E11 1 3.05 2.85
Footing F4-F7 1 3.05 2.85
Footing F4-F11 1 3.05 2.85
Footing F4-G7 1 3.05 2.85
Footing F4-G11 1 3.05 2.85
Footing F5-H7 1 3.15 2.95
Footing F5-H11 1 3.15 2.95
Footing F4-J7 1 3.05 2.85
Footing F4-J11 1 3.05 2.85
Footing F4-K7 1 3.05 2.85
Footing F4-K11 1 3.05 2.85
Footing F2-L7 1 2.80 2.60
Footing F2-L11 1 2.80 2.60
Total
0002-00 SOIL EXCAVATION BY MACHINE FOR FOUNDAT

Total
0003-00 SELECTED EXCAVATED SOIL

Total
0004-00 DISPOSAL
Footing F1-A1 1 2.65 2.45
Footing F6-A2 1 3.25 3.05
Footing F5-A3 1 3.15 2.95
Footing F6-A5 1 3.25 3.05
Footing F6-A10 1 3.25 3.05
Footing F1-A11 1 2.65 2.45
Footing F3-B1 1 2.90 2.70
Footing F7-B2 1 3.40 3.10
Footing F7-B3 1 3.40 3.10
Footing F8-B5 1 3.50 3.20
Footing F8-B10 1 3.50 3.20
Footing F3-B11 1 2.90 2.70
Footing F3-C1 1 2.90 2.70
Footing F7-C2 1 3.40 3.10
Footing F7-C3 1 3.40 3.10
Footing F8-C6 1 3.50 3.20
Footing F8-C9 1 3.50 3.20
Footing F3-C11 1 2.90 2.70
Footing F1-E1 1 2.65 2.45
Footing F6-E2 1 3.25 3.05
Footing F4-E3 1 3.05 2.85
Footing F4-E4 1 3.05 2.85
Footing F6-E7 1 3.25 3.05
Footing F7-E9 1 3.40 3.10
Footing F4-E11 1 3.05 2.85
Footing F4-F7 1 3.05 2.85
Footing F4-F11 1 3.05 2.85
Footing F4-G7 1 3.05 2.85
Footing F4-G11 1 3.05 2.85
Footing F5-H7 1 3.15 2.95
Footing F5-H11 1 3.15 2.95
Footing F4-J7 1 3.05 2.85
Footing F4-J11 1 3.05 2.85
Footing F4-K7 1 3.05 2.85
Footing F4-K11 1 3.05 2.85
Footing F2-L7 1 2.80 2.60
Footing F2-L11 1 2.80 2.60
Total
0005-00 CRUSH STONE

Total
BUILDING WORK - 0101 REINFORCED CONCRETE WORK
0001-00 PE FILM(THK 0.15, 2PLY)
Footing F1-A1 1 1.65 1.45
Footing F6-A2 1 2.25 2.05
Footing F5-A3 1 2.15 1.95
Footing F6-A5 1 2.25 2.05
Footing F6-A10 1 2.25 2.05
Footing F1-A11 1 1.65 1.45
Footing F3-B1 1 1.90 1.70
Footing F7-B2 1 2.40 2.10
Footing F7-B3 1 2.40 2.10
Footing F8-B5 1 2.50 2.20
Footing F8-B10 1 2.50 2.20
Footing F3-B11 1 1.90 1.70
Footing F3-C1 1 1.90 1.70
Footing F7-C2 1 2.40 2.10
Footing F7-C3 1 2.40 2.10
Footing F8-C6 1 2.50 2.20
Footing F8-C9 1 2.50 2.20
Footing F3-C11 1 1.90 1.70
Footing F1-E1 1 1.65 1.45
Footing F6-E2 1 2.25 2.05
Footing F4-E3 1 2.05 1.85
Footing F4-E4 1 2.05 1.85
Footing F6-E7 1 2.25 2.05
Footing F7-E9 1 2.40 2.10
Footing F4-E11 1 2.05 1.85
Footing F4-F7 1 2.05 1.85
Footing F4-F11 1 2.05 1.85
Footing F4-G7 1 2.05 1.85
Footing F4-G11 1 2.05 1.85
Footing F5-H7 1 2.15 1.95
Footing F5-H11 1 2.15 1.95
Footing F4-J7 1 2.05 1.85
Footing F4-J11 1 2.05 1.85
Footing F4-K7 1 2.05 1.85
Footing F4-K11 1 2.05 1.85
Footing F2-L7 1 1.80 1.60
Footing F2-L11 1 1.80 1.60
0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa
Footing F1-A1 1 1.65 1.45
Footing F6-A2 1 2.25 2.05
Footing F5-A3 1 2.15 1.95
Footing F6-A5 1 2.25 2.05
Footing F6-A10 1 2.25 2.05
Footing F1-A11 1 1.65 1.45
Footing F3-B1 1 1.90 1.70
Footing F7-B2 1 2.40 2.10
Footing F7-B3 1 2.40 2.10
Footing F8-B5 1 2.50 2.20
Footing F8-B10 1 2.50 2.20
Footing F3-B11 1 1.90 1.70
Footing F3-C1 1 1.90 1.70
Footing F7-C2 1 2.40 2.10
Footing F7-C3 1 2.40 2.10
Footing F8-C6 1 2.50 2.20
Footing F8-C9 1 2.50 2.20
Footing F3-C11 1 1.90 1.70
Footing F1-E1 1 1.65 1.45
Footing F6-E2 1 2.25 2.05
Footing F4-E3 1 2.05 1.85
Footing F4-E4 1 2.05 1.85
Footing F6-E7 1 2.25 2.05
Footing F7-E9 1 2.40 2.10
Footing F4-E11 1 2.05 1.85
Footing F4-F7 1 2.05 1.85
Footing F4-F11 1 2.05 1.85
Footing F4-G7 1 2.05 1.85
Footing F4-G11 1 2.05 1.85
Footing F5-H7 1 2.15 1.95
Footing F5-H11 1 2.15 1.95
Footing F4-J7 1 2.05 1.85
Footing F4-J11 1 2.05 1.85
Footing F4-K7 1 2.05 1.85
Footing F4-K11 1 2.05 1.85
Footing F2-L7 1 1.80 1.60
Footing F2-L11 1 1.80 1.60

0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa


Footing F1-A1 1 1.45 1.25
Footing F6-A2 1 2.05 1.85
Footing F5-A3 1 1.95 1.75
Footing F6-A5 1 2.05 1.85
Footing F6-A10 1 2.05 1.85
Footing F1-A11 1 1.45 1.25
Footing F3-B1 1 1.70 1.50
Footing F7-B2 1 2.20 1.90
Footing F7-B3 1 2.20 1.90
Footing F8-B5 1 2.30 2.00
Footing F8-B10 1 2.30 2.00
Footing F3-B11 1 1.70 1.50
Footing F3-C1 1 1.70 1.50
Footing F7-C2 1 2.20 1.90
Footing F7-C3 1 2.20 1.90
Footing F8-C6 1 2.30 2.00
Footing F8-C9 1 2.30 2.00
Footing F3-C11 1 1.70 1.50
Footing F1-E1 1 1.45 1.25
Footing F6-E2 1 2.05 1.85
Footing F4-E3 1 1.85 1.65
Footing F4-E4 1 1.85 1.65
Footing F6-E7 1 2.05 1.85
Footing F7-E9 1 2.20 1.90
Footing F4-E11 1 1.85 1.65
Footing F4-F7 1 1.85 1.65
Footing F4-F11 1 1.85 1.65
Footing F4-G7 1 1.85 1.65
Footing F4-G11 1 1.85 1.65
Footing F5-H7 1 1.95 1.75
Footing F5-H11 1 1.95 1.75
Footing F4-J7 1 1.85 1.65
Footing F4-J11 1 1.85 1.65
Footing F4-K7 1 1.85 1.65
Footing F4-K11 1 1.85 1.65
Footing F2-L7 1 1.60 1.40
Footing F2-L11 1 1.60 1.40
Column
Column C1-A1 1 0.20 0.40
Column C1-A2 1 0.20 0.40
Column C1-A3 1 0.20 0.40
Column C1-A5 1 0.20 0.40
Column C1-A10 1 0.20 0.40
Column C1-A11 1 0.20 0.40
Column C1-B1 1 0.20 0.40
Column C2-B2 1 0.20 0.50
Column C2-B3 1 0.20 0.50
Column C2-B5 1 0.20 0.50
Column C2-B10 1 0.20 0.50
Column C1-B11 1 0.20 0.40
Column C1-C1 1 0.20 0.40
Column C2-C2 1 0.20 0.50
Column C2-C3 1 0.20 0.50
Column C2-C6 1 0.20 0.50
Column C2-C9 1 0.20 0.50
Column C1-C11 1 0.20 0.40
Column C1-E1 1 0.20 0.40
Column C1-E2 1 0.20 0.40
Column C1-E3 1 0.20 0.40
Column C1-E4 1 0.20 0.40
Column C1-E7 1 0.20 0.40
Column C2-E9 1 0.20 0.50
Column C1-E11 1 0.20 0.40
Column C1-F7 1 0.20 0.40
Column C1-F11 1 0.20 0.40
Column C1-G7 1 0.20 0.40
Column C1-G11 1 0.20 0.40
Column C1-H7 1 0.20 0.40
Column C1-H11 1 0.20 0.40
Column C1-J7 1 0.20 0.40
Column C1-J11 1 0.20 0.40
Column C1-K7 1 0.20 0.40
Column C1-K11 1 0.20 0.40
Column C1-L7 1 0.20 0.40
Column C1-L11 1 0.20 0.40
P1- 200 x 500 1 149.55 0.20
P2 - 200 x 500 1 8.70 0.20
P3 - 200 x 500 1 20.05 0.20
P4 - 200 x 600 1 22.85 0.20
P5 - 200 x 700 1 31.20 0.20
P6 - 200 x 700 1 6.65 0.20
Grade slab 1 12.00 25.00
Grade slab 1 24.80 8.20

0004-00 " REINF. CONCRETE CUBE STRENGTH 35MPa


Column C1-A1 1 0.20 0.40
Column C1-A2 1 0.20 0.40
Column C1-A3 1 0.20 0.40
Column C1-A5 1 0.20 0.40
Column C1-A10 1 0.20 0.40
Column C1-A11 1 0.20 0.40
Column C1-B1 1 0.20 0.40
Column C2-B2 1 0.20 0.50
Column C2-B3 1 0.20 0.50
Column C2-B5 1 0.20 0.50
Column C2-B10 1 0.20 0.50
Column C1-B11 1 0.20 0.40
Column C1-C1 1 0.20 0.40
Column C2-C2 1 0.20 0.50
Column C2-C3 1 0.20 0.50
Column C2-C6 1 0.20 0.50
Column C2-C9 1 0.20 0.50
Column C1-C11 1 0.20 0.40
Column C1-E1 1 0.20 0.40
Column C1-E2 1 0.20 0.40
Column C1-E3 1 0.20 0.40
Column C1-E4 1 0.20 0.40
Column C1-E7 1 0.20 0.40
Column C2-E9 1 0.20 0.50
Column C1-E11 1 0.20 0.40
Column C1-F7 1 0.20 0.40
Column C1-F11 1 0.20 0.40
Column C1-G7 1 0.20 0.40
Column C1-G11 1 0.20 0.40
Column C1-H7 1 0.20 0.40
Column C1-H11 1 0.20 0.40
Column C1-J7 1 0.20 0.40
Column C1-J11 1 0.20 0.40
Column C1-K7 1 0.20 0.40
Column C1-K11 1 0.20 0.40
Column C1-L7 1 0.20 0.40
Column C1-L11 1 0.20 0.40
B1 1 5.00 0.20
B2 1 55.75 0.20
B3 1 2.00 0.20
B4 1 34.35 0.20
B5 1 4.40 0.20
B6 1 4.30 0.20
B7 1 0.20
B8 1 44.85 0.20
B9 1 6.45 0.20
B10 1 31.45 0.20
B11 1 9.30 0.20
B12 1 4.30 0.20
B13 1 18.80 0.20
B14 1 4.70 0.20
B15 1 31.20 0.40
B16 1 7.40 0.20
B17 1 7.40 0.20
CB1 1 1.80 0.20
Slab S1 1 24.80 1.80
Slab S2 1 9.50 4.70
Slab S3 1 24.00 4.70
Slab S4 1 22.80 7.80
Slab S5 1 6.90 4.70
Slab S6 1 6.70 2.50

0005-00 HIGH YIELD DEFORMED BAR


1 271.34 0.16

0006-00 HIGH YIELD DEFORMED BAR / EPOXY COATED

" FAIR FACED FORM (FOR FAIR FACED


0007-00 SURFACE, EQUIPMENT PLINTH AND FLOOR
OPENING) "
Footing F1-A1 1 5.40
Footing F6-A2 1 7.80
Footing F5-A3 1 7.40
Footing F6-A5 1 7.80
Footing F6-A10 1 7.80
Footing F1-A11 1 5.40
Footing F3-B1 1 6.40
Footing F7-B2 1 8.20
Footing F7-B3 1 8.20
Footing F8-B5 1 8.60
Footing F8-B10 1 8.60
Footing F3-B11 1 6.40
Footing F3-C1 1 6.40
Footing F7-C2 1 8.20
Footing F7-C3 1 8.20
Footing F8-C6 1 8.60
Footing F8-C9 1 8.60
Footing F3-C11 1 6.40
Footing F1-E1 1 5.40
Footing F6-E2 1 7.80
Footing F4-E3 1 7.00
Footing F4-E4 1 7.00
Footing F6-E7 1 7.80
Footing F7-E9 1 8.20
Footing F4-E11 1 7.00
Footing F4-F7 1 7.00
Footing F4-F11 1 7.00
Footing F4-G7 1 7.00
Footing F4-G11 1 7.00
Footing F5-H7 1 7.40
Footing F5-H11 1 7.40
Footing F4-J7 1 7.00
Footing F4-J11 1 7.00
Footing F4-K7 1 7.00
Footing F4-K11 1 7.00
Footing F2-L7 1 6.00
Footing F2-L11 1 6.00
Column 0.00
Column C1-A1 1 1.20
Column C1-A2 1 1.20
Column C1-A3 1 1.20
Column C1-A5 1 1.20
Column C1-A10 1 1.20
Column C1-A11 1 1.20
Column C1-B1 1 1.20
Column C2-B2 1 1.40
Column C2-B3 1 1.40
Column C2-B5 1 1.40
Column C2-B10 1 1.40
Column C1-B11 1 1.20
Column C1-C1 1 1.20
Column C2-C2 1 1.40
Column C2-C3 1 1.40
Column C2-C6 1 1.40
Column C2-C9 1 1.40
Column C1-C11 1 1.20
Column C1-E1 1 1.20
Column C1-E2 1 1.20
Column C1-E3 1 1.20
Column C1-E4 1 1.20
Column C1-E7 1 1.20
Column C2-E9 1 1.40
Column C1-E11 1 1.20
Column C1-F7 1 1.20
Column C1-F11 1 1.20
Column C1-G7 1 1.20
Column C1-G11 1 1.20
Column C1-H7 1 1.20
Column C1-H11 1 1.20
Column C1-J7 1 1.20
Column C1-J11 1 1.20
Column C1-K7 1 1.20
Column C1-K11 1 1.20
Column C1-L7 1 1.20
Column C1-L11 1 1.20
P1- 200 x 500 2 149.55
P2 - 200 x 500 2 8.70
P3 - 200 x 500 2 20.05
P4 - 200 x 600 2 22.85
P5 - 200 x 700 2 31.20
P6 - 200 x 700 2 6.65
Grade slab 1 54.00
Grade slab 1 66.00

" FAIR FACED FORM (FOR FAIR FACED


0008-00 SURFACE, EQUIPMENT PLINTH AND FLOOR
OPENING) "

Column C1-A1 1 1.20


Column C1-A2 1 1.20
Column C1-A3 1 1.20
Column C1-A5 1 1.20
Column C1-A10 1 1.20
Column C1-A11 1 1.20
Column C1-B1 1 1.20
Column C2-B2 1 1.40
Column C2-B3 1 1.40
Column C2-B5 1 1.40
Column C2-B10 1 1.40
Column C1-B11 1 1.20
Column C1-C1 1 1.20
Column C2-C2 1 1.40
Column C2-C3 1 1.40
Column C2-C6 1 1.40
Column C2-C9 1 1.40
Column C1-C11 1 1.20
Column C1-E1 1 1.20
Column C1-E2 1 1.20
Column C1-E3 1 1.20
Column C1-E4 1 1.20
Column C1-E7 1 1.20
Column C2-E9 1 1.40
Column C1-E11 1 1.20
Column C1-F7 1 1.20
Column C1-F11 1 1.20
Column C1-G7 1 1.20
Column C1-G11 1 1.20
Column C1-H7 1 1.20
Column C1-H11 1 1.20
Column C1-J7 1 1.20
Column C1-J11 1 1.20
Column C1-K7 1 1.20
Column C1-K11 1 1.20
Column C1-L7 1 1.20
Column C1-L11 1 1.20
B1 2 5.00
B2 2 55.75
B3 2 2.00
B4 2 34.35
B5 2 4.40
B6 2 4.30
B7 1
B8 2 44.85
B9 2 6.45
B10 2 31.45
B11 2 9.30
B12 2 4.30
B13 2 18.80
B14 2 4.70
B15 2 31.20
B16 2 7.40
B17 2 7.40
CB1 2 1.80
Slab S1 1 24.80 1.80
Slab S2 1 9.50 4.70
Slab S3 1 24.00 4.70
Slab S4 1 22.80 7.80
Slab S5 1 6.90 4.70
Slab S6 1 6.70 2.50

0014-00 APPROVED PROTECTIVE COATING

0015-00 HYPOSEAL SUPER WATER

BUILDING WORK - 0101 MASONRY WORK


0001-00 INSULATED BLOCK WALL

0002-00 8" BLOCK WALL


1 226.00
Staircase 1 19.20
D2 -2 2.00
D1 -2 1.50
D3 -8 1.00
D3A -2 1.00
D4 -1 0.80
D7 -1 0.60
W1 -20 1.50
W2 -1 1.20

0003-00 4.5" BLOCK WALL


1 8.6
D5 -2 0.70

BUILDING WORK - 0102 PLASTER WORK


0001-00 EXTERIOR CEMENT PLASTER FOR WALL, THK.
1 123.60
D2 -2 2.00
D1 -2 1.50
W1 -20 1.50
W2 -1 1.20

0002-00 INTERIOR CEMENT PLASTER FOR WALL, THK.


2 226.00
-1 123.60
Staircase 2 19.20
D2 -2 2.00
D1 -2 1.50
D3 -16 1.00
D3A -4 1.00
D4 -2 0.80
D7 -2 0.60
W1 -20 1.50
W2 -1 1.20

0003-00 INTERIOR CEMENT PLASTER FOR CEILING, TH

BUILDING WORK - 0103 PAINTING WORK


0001-00 1 COAT OF PRIMER + 2 COATS OF MEDIUM TEX
1 123.60
D2 -2 2.00
D1 -2 1.50
W1 -20 1.50
W2 -1 1.20

0002-00 1 COAT OF PRIMER + 2 OF ACRYLIC EMULSION P


2 226.00
-1 123.60
Staircase 2 19.20
D2 -2 2.00
D1 -2 1.50
D3 -16 1.00
D3A -4 1.00
D4 -2 0.80
D7 -2 0.60
W1 -20 1.50
W2 -1 1.20

0003-00 CONCRETE FLOORING(EMERY TOP FLOORING (5

BUILDING WORK - 0104 CONCRETE ROOFING AND WATERPROOFING WORK


0001-00 ROOF WATERPROOFING

BUILDING WORK - 0105 FLOORING & TILING WORK


0001-00 SINGLE PIECE GRANITE RISER & THREAD
1 2.50 0.80
1 4.10 0.15

0002-00 20MM THK 200MM WIDE GRANITE STRIPS


2 3.00 1.20

0003-00 600 X 300 X 20MM GRANITE FLOOR TILES


1 6.00 1.20

0004-00 400 X 400MM CERAMIC TILES


1 21.90 4.70
1 9.80 4.70
1 24.60 1.80
1 4.70 4.70
1 80.20
1 49.20
1 66.20
1

0005-00 8mm THK RUBBER MAT ABOVE 400 X 400 X 28m


1 4.70 2.80
1 15.00

0006-00 200 X 200mm NON SLIPPERY VITRIFIED CERAMI


Pantry 1 4.70 2.00
Toilet 1 4.30 3.70

0007-00 30mm THK SINGLE PIECE OMANI MARBLE RISE


1 6.70 2.50
1 2.00 2.50

0008-00 300 X 300mm WHITE CEMENT ROOF TILES


1 21.90 11.60
1 3.70 2.70
1 24.60 7.80

0009-00 200 x 300mm Fully glazed ceramic wall tiles


Pantry 1 10.60
Toilet 1 28.40

BUILDING WORK - 0106 INTERIOR WORK


0001-00 CEILING W/ ACOUSTIC BOARD

0002-00 CEILING W/ PVC STRIP

BUILDING WORK - 0107 PANEL & ROOF WORK


0001-00 " THERMAL INSULATED TRAPEZOIDAL CLADDIN

0002-00 " THERMAL INSULATED TRAPEZOIDAL CLADDI


0003-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING F

0004-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FO

0005-00 GUTTER FLASHING

0006-00 ROOF DRAIN 100

0007-00 ROOF DRAIN 150

0008-00 DOWN SPOUT 100

0009-00 DOWN SPOUT 150

0010-00 SPLASH BLOCK

0011-00 CANOPY W:1000

BUILDING WORK - 0108 DOOR & WINDOW WORK


0001-00 DOOR TYPE - SD

0002-00 DOOR TYPE - D


1 2

0003-00 DOOR TYPE - D1


1 2

0004-00 DOOR TYPE - D2

0005-00 DOOR TYPE - D3


1 2

0006-00 DOOR TYPE - D3A


1 2

0007-00 DOOR TYPE - D4


1 1

0008-00 DOOR TYPE - D5


1 2

0009-00 DOOR TYPE - D6

0010-00 DOOR TYPE - D7


1 1

0011-00 WINDOW TYPE - W1


1 20

0012-00 WINDOW TYPE - W2


1 1

BUILDING WORK - 0102 MISC METAL WORK


0001-00 MISC. STEEL WORK

0002-00 STEEL GRATING T532

0003-00 CHECKERED PLATE THK. 6mm

0004-00 STEEL CAGE LADDER

50 mm. G. I. PIPE HANDRAIL FINISHED WITH


0005-00 2 COATS OF EPOXY PAINT

0006-00 20 x 20mm SQUARE BAR BALUSTER WELDED ON 5

BUILDING WORK - 0104 SANITARY FIXTURES


0001-00 WATER CLOSET (WESTERN STYLE)

0002-00 URINAL
0003-00 WASH BASIN

0004-00 SOAP DISPENSER

0005-00 LAVATORY SINK

0006-00 PAPER HOLDER FOR WATER CLOSET

0007-00 b)MIRROR 1.7*1.5

0008-00 TOWEL HOLDER

0009-00 KITCHENETTE UNIT

0010-00 SHOWER CUBICLE

0011-00 ELETRICAL HAND DRYER

Building WORK - 0110 ROAD AND PAVING WORKS


0001-00 Wearing course

0002-00 Asphalt Binder course

0003-00 Base course

0004-00 Subbase course

0005-00 Formation Level Compaction

0006-00 PC Curb Stone


0007-00 P.E Film

0008-00 Precast concrete block paving

0009-00 Sand Fill M3

Prepared by Arunkumar.G (Emp.14326) Qunatity Surveyor


Depth Qty Remarks Unit

1.90 12.34 Footing F1-A


1.95 19.33 Footing F6-A
1.90 17.66 Footing F5-A
1.95 19.33 Footing F6-A
1.95 19.33 Footing F6-A
1.90 12.34 Footing F1-A
1.90 14.88 Footing F3-B
1.95 20.55 Footing F7-B
1.95 20.55 Footing F7-B
1.95 21.84 Footing F8-B
1.95 21.84 Footing F8-B
1.90 14.88 Footing F3-B
1.90 14.88 Footing F3-C
1.95 20.55 Footing F7-C
1.95 20.55 Footing F7-C
1.95 21.84 Footing F8-C
1.95 21.84 Footing F8-C
1.90 14.88 Footing F3-C
1.90 12.34 Footing F1-E
1.95 19.33 Footing F6-E
1.90 16.52 Footing F4-E
1.90 16.52 Footing F4-E
1.95 19.33 Footing F6-E
1.95 20.55 Footing F7-E
1.90 16.52 Footing F4-E
1.90 16.52 Footing F4-F
1.90 16.52 Footing F4-F
1.90 16.52 Footing F4-G
1.90 16.52 Footing F4-G
1.90 17.66 Footing F5-H
1.90 17.66 Footing F5-H
1.90 16.52 Footing F4-J
1.90 16.52 Footing F4-J
1.90 16.52 Footing F4-K
1.90 16.52 Footing F4-K
1.90 13.83 Footing F2-L
1.90 13.83 Footing F2-L
645.59 M3

0.00 M3

0.00 M3

1.90 12.34 Footing F1-A


1.95 19.33 Footing F6-A
1.90 17.66 Footing F5-A
1.95 19.33 Footing F6-A
1.95 19.33 Footing F6-A
1.90 12.34 Footing F1-A
1.90 14.88 Footing F3-B
1.95 20.55 Footing F7-B
1.95 20.55 Footing F7-B
1.95 21.84 Footing F8-B
1.95 21.84 Footing F8-B
1.90 14.88 Footing F3-B
1.90 14.88 Footing F3-C
1.95 20.55 Footing F7-C
1.95 20.55 Footing F7-C
1.95 21.84 Footing F8-C
1.95 21.84 Footing F8-C
1.90 14.88 Footing F3-C
1.90 12.34 Footing F1-E
1.95 19.33 Footing F6-E
1.90 16.52 Footing F4-E
1.90 16.52 Footing F4-E
1.95 19.33 Footing F6-E
1.95 20.55 Footing F7-E
1.90 16.52 Footing F4-E
1.90 16.52 Footing F4-F
1.90 16.52 Footing F4-F
1.90 16.52 Footing F4-G
1.90 16.52 Footing F4-G
1.90 17.66 Footing F5-H
1.90 17.66 Footing F5-H
1.90 16.52 Footing F4-J
1.90 16.52 Footing F4-J
1.90 16.52 Footing F4-K
1.90 16.52 Footing F4-K
1.90 13.83 Footing F2-L
1.90 13.83 Footing F2-L
645.59 M3

0.00 M3

2.39 Footing F1-A


4.61 Footing F6-A
4.19 Footing F5-A
4.61 Footing F6-A
4.61 Footing F6-A
2.39 Footing F1-A
3.23 Footing F3-B
5.04 Footing F7-B
5.04 Footing F7-B
5.50 Footing F8-B
5.50 Footing F8-B
3.23 Footing F3-B
3.23 Footing F3-C
5.04 Footing F7-C
5.04 Footing F7-C
5.50 Footing F8-C
5.50 Footing F8-C
3.23 Footing F3-C
2.39 Footing F1-E
4.61 Footing F6-E
3.79 Footing F4-E
3.79 Footing F4-E
4.61 Footing F6-E
5.04 Footing F7-E
3.79 Footing F4-E
3.79 Footing F4-F
3.79 Footing F4-F
3.79 Footing F4-G
3.79 Footing F4-G
4.19 Footing F5-H
4.19 Footing F5-H
3.79 Footing F4-J
3.79 Footing F4-J
3.79 Footing F4-K
3.79 Footing F4-K
2.88 Footing F2-L
2.88 Footing F2-L

150.42 M2
0.10 0.24 Footing F1-A
0.10 0.46 Footing F6-A
0.10 0.42 Footing F5-A
0.10 0.46 Footing F6-A
0.10 0.46 Footing F6-A
0.10 0.24 Footing F1-A
0.10 0.32 Footing F3-B
0.10 0.50 Footing F7-B
0.10 0.50 Footing F7-B
0.10 0.55 Footing F8-B
0.10 0.55 Footing F8-B
0.10 0.32 Footing F3-B
0.10 0.32 Footing F3-C
0.10 0.50 Footing F7-C
0.10 0.50 Footing F7-C
0.10 0.55 Footing F8-C
0.10 0.55 Footing F8-C
0.10 0.32 Footing F3-C
0.10 0.24 Footing F1-E
0.10 0.46 Footing F6-E
0.10 0.38 Footing F4-E
0.10 0.38 Footing F4-E
0.10 0.46 Footing F6-E
0.10 0.50 Footing F7-E
0.10 0.38 Footing F4-E
0.10 0.38 Footing F4-F
0.10 0.38 Footing F4-F
0.10 0.38 Footing F4-G
0.10 0.38 Footing F4-G
0.10 0.42 Footing F5-H
0.10 0.42 Footing F5-H
0.10 0.38 Footing F4-J
0.10 0.38 Footing F4-J
0.10 0.38 Footing F4-K
0.10 0.38 Footing F4-K
0.10 0.29 Footing F2-L
0.10 0.29 Footing F2-L
15.04 M3

0.40 0.73 Footing F1-A


0.45 1.71 Footing F6-A
0.45 1.54 Footing F5-A
0.45 1.71 Footing F6-A
0.45 1.71 Footing F6-A
0.40 0.73 Footing F1-A
0.40 1.02 Footing F3-B
0.45 1.88 Footing F7-B
0.45 1.88 Footing F7-B
0.45 2.07 Footing F8-B
0.45 2.07 Footing F8-B
0.40 1.02 Footing F3-B
0.40 1.02 Footing F3-C
0.45 1.88 Footing F7-C
0.45 1.88 Footing F7-C
0.45 2.07 Footing F8-C
0.45 2.07 Footing F8-C
0.40 1.02 Footing F3-C
0.40 0.73 Footing F1-E
0.45 1.71 Footing F6-E
0.40 1.22 Footing F4-E
0.40 1.22 Footing F4-E
0.45 1.71 Footing F6-E
0.45 1.88 Footing F7-E
0.40 1.22 Footing F4-E
0.40 1.22 Footing F4-F
0.40 1.22 Footing F4-F
0.40 1.22 Footing F4-G
0.40 1.22 Footing F4-G
0.45 1.54 Footing F5-H
0.45 1.54 Footing F5-H
0.40 1.22 Footing F4-J
0.40 1.22 Footing F4-J
0.40 1.22 Footing F4-K
0.40 1.22 Footing F4-K
0.40 0.90 Footing F2-L
0.40 0.90 Footing F2-L

1.00 0.08 Column C1-A


1.00 0.08 Column C1-A
1.00 0.08 Column C1-A
1.00 0.08 Column C1-A
1.00 0.08 Column C1-A
1.00 0.08 Column C1-A
1.00 0.08 Column C1-B
1.00 0.10 Column C2-B
1.00 0.10 Column C2-B
1.00 0.10 Column C2-B
1.00 0.10 Column C2-B
1.00 0.08 Column C1-B
1.00 0.08 Column C1-
1.00 0.10 Column C2-
1.00 0.10 Column C2-
1.00 0.10 Column C2-
1.00 0.10 Column C2-
1.00 0.08 Column C1-C
1.00 0.08 Column C1-E
1.00 0.08 Column C1-E
1.00 0.08 Column C1-E
1.00 0.08 Column C1-E
1.00 0.08 Column C1-E
1.00 0.10 Column C2-E
1.00 0.08 Column C1-E
1.00 0.08 Column C1-F
1.00 0.08 Column C1-F
1.00 0.08 Column C1-
1.00 0.08 Column C1-
1.00 0.08 Column C1-
1.00 0.08 Column C1-H
1.00 0.08 Column C1-J
1.00 0.08 Column C1-J
1.00 0.08 Column C1-K
1.00 0.08 Column C1-K
1.00 0.08 Column C1-L
1.00 0.08 Column C1-L
0.50 14.96
0.50 0.87
0.50 2.01
0.60 2.74
0.70 4.37
0.70 0.93
0.15 45.00
0.15 30.50
156.82 M3

4.70 0.38 Column C1-A


4.70 0.38 Column C1-A
4.70 0.38 Column C1-A
4.70 0.38 Column C1-A
7.30 0.58 Column C1-A
7.30 0.58 Column C1-A
4.70 0.38 Column C1-B
4.70 0.47 Column C2-B
4.70 0.47 Column C2-B
4.70 0.47 Column C2-B
7.30 0.73 Column C2-B
7.30 0.58 Column C1-B
4.70 0.38 Column C1-
4.70 0.47 Column C2-
4.70 0.47 Column C2-
4.70 0.47 Column C2-
4.70 0.47 Column C2-
4.70 0.38 Column C1-C
4.70 0.38 Column C1-E
4.70 0.38 Column C1-E
4.70 0.38 Column C1-E
4.70 0.38 Column C1-E
4.70 0.38 Column C1-E
4.70 0.47 Column C2-E
4.70 0.38 Column C1-E
4.70 0.38 Column C1-F
4.70 0.38 Column C1-F
4.70 0.38 Column C1-
4.70 0.38 Column C1-
4.70 0.38 Column C1-
4.70 0.38 Column C1-H
4.70 0.38 Column C1-J
4.70 0.38 Column C1-J
4.70 0.38 Column C1-K
4.70 0.38 Column C1-K
4.70 0.38 Column C1-L
4.70 0.38 Column C1-L
0.50 0.50
0.50 5.58
0.50 0.20
0.50 3.44
0.50 0.44
0.60 0.52
0.60 0.00
0.60 5.38
0.60 0.77
0.60 3.77
0.60 1.12
0.60 0.52
0.60 2.26
0.60 0.56
0.60 7.49
0.70 1.04
0.70 1.04
0.60 0.22
0.12 5.36
0.14 6.25
0.14 15.79
0.16 28.45
0.16 5.19
0.18 3.02
0.00
114.52 M3

43.41
43.41 TN

0.00 TN

0.40 2.16 Footing F1-A


0.45 3.51 Footing F6-A
0.45 3.33 Footing F5-A
0.45 3.51 Footing F6-A
0.45 3.51 Footing F6-A
0.40 2.16 Footing F1-A
0.40 2.56 Footing F3-B
0.45 3.69 Footing F7-B
0.45 3.69 Footing F7-B
0.45 3.87 Footing F8-B
0.45 3.87 Footing F8-B
0.40 2.56 Footing F3-B
0.40 2.56 Footing F3-C
0.45 3.69 Footing F7-C
0.45 3.69 Footing F7-C
0.45 3.87 Footing F8-C
0.45 3.87 Footing F8-C
0.40 2.56 Footing F3-C
0.40 2.16 Footing F1-E
0.45 3.51 Footing F6-E
0.40 2.80 Footing F4-E
0.40 2.80 Footing F4-E
0.45 3.51 Footing F6-E
0.45 3.69 Footing F7-E
0.40 2.80 Footing F4-E
0.40 2.80 Footing F4-F
0.40 2.80 Footing F4-F
0.40 2.80 Footing F4-G
0.40 2.80 Footing F4-G
0.45 3.33 Footing F5-H
0.45 3.33 Footing F5-H
0.40 2.80 Footing F4-J
0.40 2.80 Footing F4-J
0.40 2.80 Footing F4-K
0.40 2.80 Footing F4-K
0.40 2.40 Footing F2-L
0.40 2.40 Footing F2-L
0.00
1.00 1.20 Column C1-A
1.00 1.20 Column C1-A
1.00 1.20 Column C1-A
1.00 1.20 Column C1-A
1.00 1.20 Column C1-A
1.00 1.20 Column C1-A
1.00 1.20 Column C1-B
1.00 1.40 Column C2-B
1.00 1.40 Column C2-B
1.00 1.40 Column C2-B
1.00 1.40 Column C2-B
1.00 1.20 Column C1-B
1.00 1.20 Column C1-
1.00 1.40 Column C2-
1.00 1.40 Column C2-
1.00 1.40 Column C2-
1.00 1.40 Column C2-
1.00 1.20 Column C1-C
1.00 1.20 Column C1-E
1.00 1.20 Column C1-E
1.00 1.20 Column C1-E
1.00 1.20 Column C1-E
1.00 1.20 Column C1-E
1.00 1.40 Column C2-E
1.00 1.20 Column C1-E
1.00 1.20 Column C1-F
1.00 1.20 Column C1-F
1.00 1.20 Column C1-
1.00 1.20 Column C1-
1.00 1.20 Column C1-
1.00 1.20 Column C1-H
1.00 1.20 Column C1-J
1.00 1.20 Column C1-J
1.00 1.20 Column C1-K
1.00 1.20 Column C1-K
1.00 1.20 Column C1-L
1.00 1.20 Column C1-L
0.50 149.55
0.50 8.70
0.50 20.05
0.60 27.42
0.70 43.68
0.70 9.31
0.15 8.10
0.15 9.90
436.70 M2

0.00
4.70 5.64 Column C1-A
4.70 5.64 Column C1-A
4.70 5.64 Column C1-A
4.70 5.64 Column C1-A
7.30 8.76 Column C1-A
7.30 8.76 Column C1-A
4.70 5.64 Column C1-B
4.70 6.58 Column C2-B
4.70 6.58 Column C2-B
4.70 6.58 Column C2-B
7.30 10.22 Column C2-B
7.30 8.76 Column C1-B
4.70 5.64 Column C1-
4.70 6.58 Column C2-
4.70 6.58 Column C2-
4.70 6.58 Column C2-
4.70 6.58 Column C2-
4.70 5.64 Column C1-C
4.70 5.64 Column C1-E
4.70 5.64 Column C1-E
4.70 5.64 Column C1-E
4.70 5.64 Column C1-E
4.70 5.64 Column C1-E
4.70 6.58 Column C2-E
4.70 5.64 Column C1-E
4.70 5.64 Column C1-F
4.70 5.64 Column C1-F
4.70 5.64 Column C1-
4.70 5.64 Column C1-
4.70 5.64 Column C1-
4.70 5.64 Column C1-H
4.70 5.64 Column C1-J
4.70 5.64 Column C1-J
4.70 5.64 Column C1-K
4.70 5.64 Column C1-K
4.70 5.64 Column C1-L
4.70 5.64 Column C1-L
0.50 5.00
0.50 55.75
0.50 2.00
0.50 34.35
0.50 4.40
0.60 5.16
0.60 0.00
0.60 53.82
0.60 7.74
0.60 37.74
0.60 11.16
0.60 5.16
0.60 22.56
0.60 5.64
0.60 37.44
0.70 10.36
0.70 10.36
0.60 2.16
44.64
44.65
112.80
177.84
32.43
16.75

970.05 M2

0.00
0.00
0.00 M2

0.00 M2

0.00 M2

4.11 928.86
2.60 49.92
2.40 -9.60
2.40 -7.20
2.20 -17.60
2.20 -4.40
2.20 -1.76
2.40 -1.44
1.40 -42.00
3.25 -3.90
890.88 M2

3 25.80
2.20 -3.08
22.72 M2

6.20 766.32
2.40 -9.60
2.40 -7.20
1.40 -42.00
3.25 -3.90
703.62 M2

4.11 1857.72
4.11 -508.00
2.60 99.84
2.40 -9.60
2.40 -7.20
2.20 -35.20
2.20 -8.80
2.20 -3.52
2.40 -2.88
1.40 -42.00
3.25 -3.90

1336.46 M2

0.00 M2

6.20 766.32
2.40 -9.60
2.40 -7.20
1.40 -42.00
3.25 -3.90
703.62 M2

4.11 1857.72
4.11 -508.00
2.60 99.84
2.40 -9.60
2.40 -7.20
2.20 -35.20
2.20 -8.80
2.20 -3.52
2.40 -2.88
1.40 -42.00
3.25 -3.90
1336.46 M2

0.00 M2

2.00
0.62
2.62 M2

7.20

7.20 M2

7.20
7.20 M2

102.93
46.06
44.28
22.09
0.10 8.02
0.10 4.92
0.10 6.62

234.92 M2

13.16
0.10 1.50
14.66 M2

9.40
15.91
25.31 M2

16.75
5.00
0
21.75 M2

254.04
9.99
191.88
455.91 M2

3.00 31.80
3.00 85.20

117.00 M2

0.00 M2

0.00 M2

0.00 M2
0.00 M2

0.00 M2

0.00 M2

0.00 MZ

0.00 EA

0.00 EA

0.00 MZ

0.00 MZ

0.00 EA

0.00 MZ

0.00 EA

2
2.00 EA

2
2.00 EA

0.00 EA

2
2.00 EA
2
2.00 EA

1
1.00 EA

2
2.00 EA

0.00 EA

1
1.00 EA

20
20.00 EA

1
1.00 EA

0.00 TN

0.00 M2

0
0.00 M2

0.00 MZ

0
0.00 MZ

0
0.00 MZ

0.00 EA
0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 EA

0.00 M2

0.00 M2

0.00 M3

0.00 M3

0.00 M2
0.00 MZ

0.00 M2

0.00 M2

0.00 M3

ity Surveyor
1 1.450 1.250 0.400
1 2.050 1.850 0.450
1 1.950 1.750 0.450
1 2.050 1.850 0.450
1 2.050 1.850 0.450
1 1.450 1.250 0.400
1 1.700 1.500 0.400
1 2.200 1.900 0.450
1 2.200 1.900 0.450
1 2.300 2.000 0.450
1 2.300 2.000 0.450
1 1.700 1.500 0.400
1 1.700 1.500 0.400
1 2.200 1.900 0.450
1 2.200 1.900 0.450
1 2.300 2.000 0.450
1 2.300 2.000 0.450
1 1.700 1.500 0.400
1 1.450 1.250 0.400
1 2.050 1.850 0.450
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 2.050 1.850 0.450
1 2.200 1.900 0.450
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.950 1.750 0.450
1 1.950 1.750 0.450
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.600 1.400 0.400
1 1.600 1.400 0.400
1 1.450 1.250 0.400
1 2.050 1.850 0.450
1 1.950 1.750 0.450
1 2.050 1.850 0.450
1 2.050 1.850 0.450
1 1.450 1.250 0.400
1 1.700 1.500 0.400
1 2.200 1.900 0.450
1 2.200 1.900 0.450
1 2.300 2.000 0.450
1 2.300 2.000 0.450
1 1.700 1.500 0.400
1 1.700 1.500 0.400
1 2.200 1.900 0.450
1 2.200 1.900 0.450
1 2.300 2.000 0.450
1 2.300 2.000 0.450
1 1.700 1.500 0.400
1 1.450 1.250 0.400
1 2.050 1.850 0.450
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 2.050 1.850 0.450
1 2.200 1.900 0.450
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.950 1.750 0.450
1 1.950 1.750 0.450
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.600 1.400 0.400
1 1.600 1.400 0.400
1 1.450 1.250 0.400
1 2.050 1.850 0.450
1 1.950 1.750 0.450
1 2.050 1.850 0.450
1 2.050 1.850 0.450
1 1.450 1.250 0.400
1 1.700 1.500 0.400
1 2.200 1.900 0.450
1 2.200 1.900 0.450
1 2.300 2.000 0.450
1 2.300 2.000 0.450
1 1.700 1.500 0.400
1 1.700 1.500 0.400
1 2.200 1.900 0.450
1 2.200 1.900 0.450
1 2.300 2.000 0.450
1 2.300 2.000 0.450
1 1.700 1.500 0.400
1 1.450 1.250 0.400
1 2.050 1.850 0.450
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 2.050 1.850 0.450
1 2.200 1.900 0.450
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.950 1.750 0.450
1 1.950 1.750 0.450
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.600 1.400 0.400
1 1.600 1.400 0.400
1 1.450 1.250 0.400
1 2.050 1.850 0.450
1 1.950 1.750 0.450
1 2.050 1.850 0.450
1 2.050 1.850 0.450
1 1.450 1.250 0.400
1 1.700 1.500 0.400
1 2.200 1.900 0.450
1 2.200 1.900 0.450
1 2.300 2.000 0.450
1 2.300 2.000 0.450
1 1.700 1.500 0.400
1 1.700 1.500 0.400
1 2.200 1.900 0.450
1 2.200 1.900 0.450
1 2.300 2.000 0.450
1 2.300 2.000 0.450
1 1.700 1.500 0.400
1 1.450 1.250 0.400
1 2.050 1.850 0.450
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 2.050 1.850 0.450
1 2.200 1.900 0.450
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.950 1.750 0.450
1 1.950 1.750 0.450
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.600 1.400 0.400
1 1.600 1.400 0.400

1 1.450 1.250 0.400


1 2.050 1.850 0.450
1 1.950 1.750 0.450
1 2.050 1.850 0.450
1 2.050 1.850 0.450
1 1.450 1.250 0.400
1 1.700 1.500 0.400
1 2.200 1.900 0.450
1 2.200 1.900 0.450
1 2.300 2.000 0.450
1 2.300 2.000 0.450
1 1.700 1.500 0.400
1 1.700 1.500 0.400
1 2.200 1.900 0.450
1 2.200 1.900 0.450
1 2.300 2.000 0.450
1 2.300 2.000 0.450
1 1.700 1.500 0.400
1 1.450 1.250 0.400
1 2.050 1.850 0.450
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 2.050 1.850 0.450
1 2.200 1.900 0.450
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.950 1.750 0.450
1 1.950 1.750 0.450
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.600 1.400 0.400
1 1.600 1.400 0.400

1 0.200 0.400 1.000


1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.500 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000

1 0.200 0.400 1.000


1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.500 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 1.450 1.250 0.400
1 2.050 1.850 0.450
1 1.950 1.750 0.450
1 2.050 1.850 0.450
1 2.050 1.850 0.450
1 1.450 1.250 0.400
1 1.700 1.500 0.400
1 2.200 1.900 0.450
1 2.200 1.900 0.450
1 2.300 2.000 0.450
1 2.300 2.000 0.450
1 1.700 1.500 0.400
1 1.700 1.500 0.400
1 2.200 1.900 0.450
1 2.200 1.900 0.450
1 2.300 2.000 0.450
1 2.300 2.000 0.450
1 1.700 1.500 0.400
1 1.450 1.250 0.400
1 2.050 1.850 0.450
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 2.050 1.850 0.450
1 2.200 1.900 0.450
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.950 1.750 0.450
1 1.950 1.750 0.450
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.850 1.650 0.400
1 1.600 1.400 0.400
1 1.600 1.400 0.400

1 0.200 0.400 1.000


1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.500 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000

12.00 15.00
24.80 8.20

1 0.200 0.400 1.000


1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.500 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.500 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
1 0.200 0.400 1.000
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH FROM M3 537.98
0002-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATION (DEPTH MOR M3 -
0003-00 SELECTED EXCAVATED SOIL M3 -
0004-00 DISPOSAL M3 245.43
0005-00 CRUSH STONE M3 -
BUILDING WORK - 0101 REINFORCED CONCRETE WORK
0001-00 PE FILM(THK 0.15, 2PLY) DAMP PROOF C M2 131.56
0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa M3 13.16
0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUB STRUCT M3 105.96
0004-00 " REINF. CONCRETE CUBE STRENGTH 35MPa FOR SUPERSTRU M3 -
0005-00 HIGH YIELD DEFORMED BAR BS 4449 G460 Y TN 16.95
0006-00 HIGH YIELD DEFORMED BAR / EPOXY COATED BS 4449 G460 Y TN -
" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT
0007-00 M2 744.72
PLINTH AND FLOOR OPENING) "

" FAIR FACED FORM (FOR FAIR FACED SURFACE, EQUIPMENT


0008-00 PIPE SUPPORT M2 -
PLINTH AND FLOOR OPENING) "
0009-00 NORMAL FACED FORM (FOR HIDDEN SURFACE) PIPE SUPPORT M2 -
0010-00 WATERSTOP W=200 PVC TYPE(THK. MZ 48.80
0011-00 FIBRE REINFORCED BITUMEN COATING M2 174.24
0012-00 ANTITERMITE TREATMENT M2 -
0013-00 EPOXY MORTAR FINISH TO CONCRETE BENCHING AS PER SPECIFICATION M3 5.28
0014-00 POLYESTER PROTECTIVE RESIN NITOCOTE PE13 M2 60.32
0015-00 HYPOSEAL SUPER WATER PROOFER TO CO M2 146.00
BUILDING WORK - 0101 STEEL STRUCTURE WORK
0001-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 200 TN -
0002-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 200 TN -
0003-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 200 TN -
0004-00 STRUCTURAL STEEL (ROLL-SHAPE) / LIGHT (UP TO 30kg/m) DFT : Total 320 TN -
0005-00 STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM (31~60kg/m) DFT : Total 320 TN -
0006-00 STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61~180kg/m) DFT : Total 320 TN -
0007-00 ANCHOR BOLT (M24, L=700) STEEL : ASTM A EA -
0008-00 ANCHOR BOLT (M30, L=900) STEEL : ASTM A EA -

209/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0009-00 NON-SHRINKAGE GROUT Fcu= 65N/mm2 A M3 -


0010-00 DECK PLATE - THK.1.6mm (Including stud bolt) GALVANIZED STE M2 -
0011-00 Additional Items : STRUCTURAL STEEL (ROLL-SHAPE) / MEDIUM ( DFT : Total 200 TN -
0012-00 Additional Items : STRUCTURAL STEEL (ROLL-SHAPE) / HEAVY (61 DFT : Total 200 TN -
0013-00 Additional Items: STRUCTURAL STEEL (BUILT-UP) DFT : Total 200 TN -
0014-00 Additional Items : ANCHOR BOLT (M36, L=1080) STEEL : ASTM A EA -
0015-00 Additional Items : STAIR TREAD HOT DIP GALVAN M2 -
BUILDING WORK - 0101 MASONRY WORK
0001-00 INSULATED BLOCK WALL 4" BLOCK (INT) M2 -
0002-00 8" BLOCK WALL TYPE A AS PER M2 -
0003-00 4.5" BLOCK WALL TYPE A AS PER M2 -
BUILDING WORK - 0102 PLASTER WORK
0001-00 EXTERIOR CEMENT PLASTER FOR WALL, THK. 24mm M2 -
0002-00 INTERIOR CEMENT PLASTER FOR WALL, THK. 18mm M2 126.72
0003-00 INTERIOR CEMENT PLASTER FOR CEILING, THK. 18mm M2 -
BUILDING WORK - 0103 PAINTING WORK
0001-00 1 COAT OF PRIMER + 2 COATS OF MEDIUM TEXTURE PAINT FOR EXT. WALL M2 -
0002-00 1 COAT OF PRIMER + 2 OF ACRYLIC EMULSION PAINT FOR INT. WALL & CEILING M2 -
0003-00 CONCRETE FLOORING(EMERY TOP FLOORING (5Kg/m2)) FOR RAMP. FLOOR M2 -
BUILDING WORK - 0105 FLOORING & TILING WORK
0001-00 SINGLE PIECE GRANITE RISER & THREAD M2 -
0002-00 20MM THK 200MM WIDE GRANITE STRIPS M2 -
0003-00 600 X 300 X 20MM GRANITE FLOOR TILES M2 -
0004-00 400 X 400MM CERAMIC TILES M2 -
0005-00 8mm THK RUBBER MAT ABOVE 400 X 400 X 28mm TERRAZZO TILES M2 -
0006-00 200 X 200mm NON SLIPPERY VITRIFIED CERAMIC TILES M2 -
0007-00 30mm THK SINGLE PIECE OMANI MARBLE RISER AND TREAD M2 -
0008-00 300 X 300mm WHITE CEMENT ROOF TILES M2 -
0009-00 200 x 300mm Fully glazed ceramic wall tiles M2 -
BUILDING WORK - 0106 INTERIOR WORK
0001-00 GYPSUM BOARD FALSE CEILING SIZE : 600 x 600 M2 -
0002-00 CEILING W/ PVC STRIP W 100mm M2 -
BUILDING WORK - 0107 PANEL & ROOF WORK

210/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0001-00 " THERMAL INSULATED TRAPEZOIDAL CLADDING FOR EXT. WALLTHK. 0.7mm(EXT M2 -
0002-00 " THERMAL INSULATED TRAPEZOIDAL CLADDING FOR ROOF" THK. 0.7mm(EXT M2 -
0003-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FOR ROOF" M2 -
0004-00 " THK. 0.7 SINGLE TRAPEZOIDAL CLADDING FOR WALL" M2 -
0005-00 GUTTER FLASHING THK. 1.6mm MZ -
0006-00 ROOF DRAIN 100 CAST IRON EA -
0007-00 ROOF DRAIN 150 CAST IRON EA -
0008-00 DOWN SPOUT 100 GALVANISED ST MZ -
0009-00 DOWN SPOUT 150 CAST IRON MZ -
0010-00 SPLASH BLOCK SIZE : 500x500x EA -
0011-00 CANOPY W:1000 MZ -
BUILDING WORK - 0108 DOOR & WINDOW WORK
0001-00 DOOR TYPE - SD HEAVY DUTY M.S EA -
0002-00 DOOR TYPE - D 44MM.THK. COMM EA -
0003-00 DOOR TYPE - D1 44MM.THK DECOREA -
0004-00 DOOR TYPE - D2 44MM. THK.SEMI EA -
0005-00 DOOR TYPE - D3 44MM. THK.SEMI EA -
0006-00 DOOR TYPE - D4 44MM. THK.SEMI EA -
0007-00 DOOR TYPE - D5 44MM.THK. COMM EA -
0008-00 DOOR TYPE - D6 44MM. THK.SEMI EA -
0009-00 DOOR TYPE - D7 44MM. THK.SEMI EA -
0010-00 WINDOW TYPE - W1 POWER COATED AEA -
0011-00 WINDOW TYPE - W2 POWER COATED AEA -
0012-00 M.S. Flat Gate (1200 x 1800) EA -
BUILDING WORK - 0102 MISC METAL WORK
0001-00 MISC. STEEL WORK GALVANIZED(COATN -
0002-00 STEEL GRATING T532 HOT DIP GALVAN M2 -
0003-00 CHECKERED PLATE THK. 6mm GALVANIZED(COAM2 -
0004-00 STEEL CAGE LADDER GALVANIZED(COAMZ -
0005-00 STEEL PIPE HANDRAIL GRIP : I.D.50mm MZ -
0006-00 STAINLESS PIPE HANDRAIL GRIP : I.D.50mm MZ
(600x600)/ -
0007-00 HEAVY DUTY DOUBLE SEAL C.I. COVER WITH FRAME (800x800) EA 2.00
Building WORK - 0110 ROAD AND PAVING WORKS

211/216
B-199 Barka 3 IPP projects BOQ Item Al Hassan

Area DESCRIPTION Special Note UNIT Rate QTY

0001-00 WEARING COURSE with tack coating M2 -


0002-00 ASPHALT BINDER COURSE with prime coatin M2 -
0003-00 BASE COURSE T=150,max 40 M3 -
0004-00 SUBBASE COURSE T=200,max.80mm M3 -
0005-00 FORMATION LEVEL COMPACTION 95% Density ; do M2 -
0006-00 PC CURB STONE 180x210x300x10 MZ -
0007-00 P.E FILM Minimun 0.15mm p M2 -
0008-00 PRECAST CONC BLOCK PAVING 100mm thick to c M2 -
0009-00 SAND FILLING M3 -

GRAND TOTAL

212/216
Project : WareHouse & Office Building at Nizwa Industrial Room

Title : Electrical Room

Sl.No DESCRIPTION Nos Length width

BUILDING WORK - 0101 EARTH WORK


0001-00 SOIL EXCAVATION BY MACHINE FOR FOUNDATI
Holding tank 2 9.80 4.80
MH 33 2.40 2.40

Total
0004-00 DISPOSAL
Holding tank 1 26.00 2.20
MH 33 2.40 2.40
Total
BUILDING WORK - 0101 REINFORCED CONCRETE WORK
0001-00 PE FILM(THK 0.15, 2PLY)
Holding tank 2 8.80 3.80
MH 33 1.40 1.40

0002-00 LEAN CONCRETE CUBE STRENGTH 20MPa


2 8.80 3.80
33 1.40 1.40

0003-00 " REINF. CONCRETE CUBE STRENGTH 35MPa


Holding tank Raft 2 8.60 3.60
Holding tank wall 2 24.40 0.30
Holding tank Top 2 8.60 3.60
Raft 33 1.20 1.20
33 4.80 0.10

0005-00 HIGH YIELD DEFORMED BAR


1 105.96 0.16

" FAIR FACED FORM (FOR FAIR FACED


0007-00 SURFACE, EQUIPMENT PLINTH AND FLOOR
OPENING) "
Holding tank Raft 2 24.40
Holding tank wall 4 24.40
Holding tank Top 2 24.40
2 8.60 3.60
Raft 33 4.80
66 4.80

0010-00 WATERSTOP W=200


2 24.40
0011-00 FIBRE REINFORCED BITUMEN COATING
33 4.80

0013-00 EPOXY MORTAR FINISH TO CONCRETE BENCHIN


33 0.8 0.8

0014-00 APPROVED PROTECTIVE COATING


2 23.20

0015-00 HYPOSEAL SUPER WATER


4 3.00 4.00
2 14.00

BUILDING WORK - 0102 PLASTER WORK


0002-00 INTERIOR CEMENT PLASTER FOR WALL, THK.
wall 33 3.20

0007-00 HEAVY DUTY DOUBLE SEAL C.I. COVER WITH F


800 x 800 2 1

Prepared by Arunkumar.G (Emp.14326) Qunatity Surveyor


Depth Qty Remarks Unit

3.90 366.91
0.90 171.07

537.98 M3

1.30 74.36
0.90 171.07
245.43 M3

66.88
64.68
131.56 M2

0.10 6.69
0.10 6.47
13.16 M3

0.30 18.58
3.50 51.24
0.20 12.38
0.20 9.50
0.90 14.26
105.96 M3

16.95
16.95 TN

0.30 14.64
3.50 341.60
0.20 9.76
61.92
0.20 31.68
0.90 285.12
744.72 M2

48.80
48.80 MZ

1.10 174.24
174.24 M2

0.25 5.28
5.28 M3

1.30 60.32
0.00
60.32 M2

48
3.50 98
146.00 M2

1.20 126.72

126.72 M2

2
2.00 EA